    REKAYASA PONDASI

    M.SAM SUL HI DAYAT (022113145)

    SETTLEMENT TOTAL

    1.

    Mencari qu (terzaghi) table

    Sudut geser Nc Nq N c' Df h L B SF

    Pondasi - - - - - 1 - 5 53.0sand loose ( 30) 37.16 22.46 19.73 16.5 0 - 5 - -

    medium dense sand ( 40) 95.66 81.27 100.39 17.8 0 - 8 - -

    clay ( 20) 17.69 7.44 4.97 18.2 20 - 10 - -

    qu = 1.3cNc+ qNq+ 0.4BN = 1.3 (0x37.16) + (1x16.5)(22.46) + 0.4 (16.5x5x19.73) = 410.05 KN/m2

    q ijin = qu / SF = 410.05 / 3 = 136.683 KN/m2

    Q = q ijin (BxL) = 136.683 (5x5) = 3417.08 KN

    2.

    z ( distribusi tegangan), z = 5

    q = x Df = 16.5 x 1 =16.5 KN/m3

    m = 5/5 = 1 n = 5/5 = 1 I = 0.1752 (table 5.2)

    z= q x I = 136.683 x 0.1752 = 23.94 KN/m2

    B

    5 m

    8 m

    10 m

    sand loose

    = 16.5 KN/m3

    M. dense sand

    = 17.8 KN/m3

    clay

    = 18.2 KN/m3

    e = 0.9

    Cc = 0.35

    qu

    1m

  • 8/9/2019 Settlement Pondasi Sederhana

    2/9

    REKAYASA PONDASI

    M.SAM SUL HI DAYAT (022113145)

    3.

    Settlement Elastic (Se)

    Sudut geser Q B Es m n I3 I4

    v Se

    corner

    (m)

    I5 Se

    center(m)

    Pondasi - 5 - 1 1 0.838 0.167 - - 1.122 -

    loose sand (35) 16.5 - 20000 - - - - 0.25 0.00140 - 0.00434

    medium sand (40) 16.5 - 25000 - - - - 0.25 0.00112 - 0.00347

    clay (20) 16.5 - 750 - - - - 0.5 - - 6.00674

    m = L/B = 5/5 = 1

    n = B/z = 5/5 = 1

    I3= 0.838 (table 5.6)

    I4= 0.167 (table 5.7)

    I5= 1.122 (table 5.8)

    Sand loose

    Se(edge) =

    (1-0,252) [0,838 -( -

    ). 0,167]

    Se = 0.00140 m = 1.4 mm

    Se(center) =

    (1-0,25

    2) . 1,122

    se = 0.00434 m = 4.34 mm

    Medium Dense Sand

    Se(edge) =

    (1-0,252) [0,838 -( -

    ). 0,167]

    Se = 0.00112 m = 1.12 mm

  • 8/9/2019 Settlement Pondasi Sederhana

    3/9

    REKAYASA PONDASI

    M.SAM SUL HI DAYAT (022113145)

    Se(center) =

    (1-0,252) . 1,122

    se = 0.00347 m = 3.47 mm

    Clay

    rumus janbu

    Df/B 1 h/B L/B 2 Se

    2 0.9 2 1 0.36 6.00674

    1 = 0.9 (table 5.15)

    2 = 0.36 (table 5.16)

    Se = 6.00674 m

    4. Settlement Pondasi (Sc)

    Sudut geser E Cc Hc h1 h2 Iav(h1) Iav(h2) 0 av Sc

    Pondasi - - - - 65.274 -

    loose sand (30) - - -12

    0.37 0.2

    99

    - 0.11288medium sand(40) - - -

    22

    63,92- 0.11288

    clay (20) 0.9 0.35 10267,813

    - -

    h1= h medium dense sandDf + h sand loose = 81 + 5 = 12 m

    h2= h sand loosedf + h medium dense sand + h clay = 51 + 8 + 10 = 22 m

    0 = (Df/h)*I3=1/5 *0.838 = 99

    0 = h*(9.81) = 8(17.8-9.81) = 63.92

    0 = 3/2*(9.81) = 3/2(18.2-9.81) = 267.813

    0 (total) = 430.733

    Iav(h1) = 0.37 ( table 5.31)

    Iav(h2) = 0.2(table 5.31)

  • 8/9/2019 Settlement Pondasi Sederhana

    4/9

    REKAYASA PONDASI

    M.SAM SUL HI DAYAT (022113145)

    av = 65.274

    Untuk loose sand dan medium sand

    Sc = 0.11288 m

    Stotal = Se + Sc = (0.00434+0.00347+6.00674) + 0.11288 = 6.12744m

  • 8/9/2019 Settlement Pondasi Sederhana

    5/9

    REKAYASA PONDASI

    M.SAM SUL HI DAYAT (022113145)

    LAMPIRAN

  • 8/9/2019 Settlement Pondasi Sederhana

    6/9

  • 8/9/2019 Settlement Pondasi Sederhana

    7/9

    REKAYASA PONDASI

    M.SAM SUL HI DAYAT (022113145)

  • 8/9/2019 Settlement Pondasi Sederhana

    8/9

    REKAYASA PONDASI

    M.SAM SUL HI DAYAT (022113145)

  • 8/9/2019 Settlement Pondasi Sederhana

    9/9

    REKAYASA PONDASI

    M.SAM SUL HI DAYAT (022113145)