shbj kubar 2014 - 2015 final 2014 - pu
DESCRIPTION
daftar harga satuan kutai baratTRANSCRIPT
-
STANDARISASI HARGA SATUANBARANG/JASATAHUN 2015
PEMERINTAH KABUPATEN KUTAI BARAT
-
PEMERINTAH KABUPATEN KUTAI BARATSTANDARISASI HARGA SATUAN BARANG DAN JASA
TAHUN 2015
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
PEMELIHARAAN DAN PERBAIKAN (Rupiah)
NO NAMA BARANG MERK/UKURAN SATUAN HARGA SATUAN 2015
1 2 3 4 5
A. PEMERIHARAAN AC
1 Pemeliharaan 1 PK AC Split unit 156,600
2 Pemeliharaan 2 PK AC Split unit 208,800
3 Pemeliharaan 1 PK AC Window unit 114,800
4 Pemeliharaan 2 PK AC Window unit 146,200
5 Pemeliharaan 2 PK AC Split Multi unit 261,000
B. PERBAIKAN
1 Ganti Komputer AC Window 2 PK pcs 4,802,400
2 Ganti Komputer AC Window 1,5 PK pcs 1,461,600
3 Ganti Komputer AC Window 1 PK pcs 1,670,400
4 Ganti Komputer AC Split 2 PK pcs 3,654,000
5 Ganti Komputer AC Split 1,5 PK pcs 2,610,000
6 Ganti Komputer AC Split 3 PK pcs 5,220,000
C. PENAMBAHAN FREON AC
1 AC Split 0,5 - 1 PK R 22 DUFFON kg 261,000
2 AC Split 1,5 - 2 PK R 22 kg 417,600
3 AC Split 2,5 - 3 PK R 22 kg 522,000
4 AC Split 5 PK R 22 kg 835,200
5 AC Split 10 PK R 22 kg 1,566,000
D. PEMELIHARAAN MESIN TULIS
1 Service Dana Perbaikan Mesin Tulis KK Manual 1X1 Tahun pcs 407,200
2 Service Dana Perbaikan Mesin Calkulator KK Manual 1X1 Tahun pcs 114,800
E. PEMELIHARAAN MESIN SETENSIL/
FOTO COPY
1 Service Dana Perbaikan Diluar Spare Part Setensi 1x1 Tahun pcs 501,100
2 Service Dana Perbaikan Mesin Diluar Rekam 1x1 Tahun pcs 114,800
Spare Part
F. KONTRASERVICE PEMELIHARAAN
MESIN FOTO COPY PER SHEET
1 Service Foto Copy Xerox, 400 DC shet 208,800
32_PemeliharaanPerbaikan_479
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
PEMELIHARAAN DAN PERBAIKAN (Rupiah)
NO NAMA BARANG MERK/UKURAN SATUAN HARGA SATUAN 2015
1 2 3 4 5
2 Service Foto Copy Xerox, 551 DC shet 229,700
3 Service Foto Copy Xerox, 231 PL shet 355,000
4 Service Foto Copy Xerox, 3400 N toner 1,169,300
5 Service Foto Copy Xerox, WC Pro 320 toner 553,300
6 Service Foto Copy Xerox, WC Pro 315 toner 553,300
7 Service Foto Copy Xerox, Phaser 5400 toner 292,300
8 Service Foto Copy Xerox, Ducoprint C 1618 toner 2,171,500
G. PEMELIHARAAN TELEPON,
PENGHANCUR KERTAS, AXHAUST
FAN, KOMPUTER, MEJA KERSI, KAMERA
1 Service TeleponTanpa Ganti Serperpart,
Ongkos Kerjaunit 62,600
2 Service Penghancur KertasTanpa Ganti Serperpart,
Ongkos Kerjaunit 208,800
3 Service Exhaust FanTanpa Ganti Serperpart,
Ongkos Kerjaunit 62,600
4 Service Camputer PC + CpuTanpa Ganti Serperpart,
Ongkos Kerjaunit 114,800
5 Service Key BoardTanpa Ganti Serperpart,
Ongkos Kerjaunit 31,300
6 Service Monitor ComputerTanpa Ganti Serperpart,
Ongkos Kerjaunit 146,200
7 Service Hard DiskTanpa Ganti Serperpart,
Ongkos Kerjaunit 177,500
8 Service Check AllTanpa Ganti Serperpart,
Ongkos Kerjaunit 292,300
9 Service PrinterTanpa Ganti Serperpart,
Ongkos Kerjaunit 177,500
10 Service 1 Unit FC LengkapTanpa Ganti Serperpart,
Ongkos Kerjaunit 407,200
11 Perbaikan Kunci Filling CabinetTanpa Ganti Serperpart,
Ongkos Kerjaset 31,300
12 Ganti Kunci Filling CabinetTanpa Ganti Serperpart,
Ongkos Kerjaunit 62,600
13 Pengecetan Almari 2 Pintu Cat DucoTanpa Ganti Serperpart,
Ongkos Kerjabuah 438,500
14 Pemlitur Almari SorokTanpa Ganti Serperpart,
Ongkos Kerjabuah 114,800
15 Plitur Almari KayuTanpa Ganti Serperpart,
Ongkos Kerjabuah 114,800
32_PemeliharaanPerbaikan_480
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
PEMELIHARAAN DAN PERBAIKAN (Rupiah)
NO NAMA BARANG MERK/UKURAN SATUAN HARGA SATUAN 2015
1 2 3 4 5
16 Perbaikan Rak Buku KacaTanpa Ganti Serperpart,
Ongkos Kerjabuah 146,200
17 Perbaikan Kurci LipatTanpa Ganti Serperpart,
Ongkos Kerjabuah 94,000
18 Ganti Anak Kunci MejaTanpa Ganti Serperpart,
Ongkos Kerjaunit 31,300
19 Perbaikan Pompa Air Kedalaman 200 MTanpa Ganti Serperpart,
Ongkos Kerjaunit 323,600
20 Perbaikan Kursi Staf Ganti Kulit, Busa Cat Brow Plitur buah 229,700
21 Perbaikan Kaki Kursi RodaTanpa Ganti Serperpart,
Ongkos Kerjaset 219,200
22 Perbaikan Meja Kerja Eselon IV Cat Duco, Plitur buah 292,300
23 Perbaikan Meja Kerja Eselon III Cat Duco, Plitur buah 292,300
24 Pemeliharaan Kamera Pembersihan dan Perawatan 1 kamera 2 x
pertahun1,753,900
H. PEMERIHARAAN KEBERSIHAAN
1 Pemeriharaan Gedung Kantor M2 114,800
Celeaning Service
2 Pemeriharaan Kebersihaan Halaman Teras M2 1,409,400
3 Pemeriharaan Taman / Tanaman Hias Sistem Kotak Perbulan 6,712,900
4 Pemeriharaan Rumput Hias Sistem Kotak Perbulan 5,418,400
I. HARGA SATUAN PEKERJAAN
1 Lantai Karpet m2 6,300
2 Lantai Keramik m2 6,300
3 Lantai Granite m2 6,300
4 Plafon AC & Kap Lampu m2 4,200
5 Kaca Dinding Dalam m2 4,200
6 Kaca Partisi m2 4,200
7 Dinding Partisi m2 4,200
8 Dinding Walpaper m2 3,100
9 Toilet m2 8,400
10 Mushalla m2 5,200
11 Tangga m2 4,200
12 Dinding Kayu ( wood vinyl) m2 4,200
13 Lantai Kayu ( fancy wood ) m2 4,200
32_PemeliharaanPerbaikan_481
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
PEMELIHARAAN DAN PERBAIKAN (Rupiah)
NO NAMA BARANG MERK/UKURAN SATUAN HARGA SATUAN 2015
1 2 3 4 5
J. Pemeliharaan Peralatan & Perlengkapan Kantor
1 Sofa Meja/AdmistrasiOngkos Kerja Pembersihan dan
Perawatan unit 7,300
2 Kursi KerjaOngkos Kerja Pembersihan dan
Perawatan unit 4,200
3 Lemari Filling KabinetOngkos Kerja Pembersihan dan
Perawatan luar Dalamunit 10,400
4 Komputer PCOngkos Kerja Pembersihan dan
Perawatan luar Dalamunit 23,000
32_PemeliharaanPerbaikan_482
-
PEMERINTAH KABUPATEN KUTAI BARATSTANDARISASI HARGA SATUAN BARANG DAN JASA
TAHUN 2015
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN ANGGARAN 2015
II.2. BELANJA BARANG DAN JASAII.2.1. Belanja Barang Habis PakaiII.2.1.4 Belanja Bahan Bakar Minyak
(Rupiah)
NAMA BARANG SPESIFIKASI / UKURAN SATUAN HARGA SATUAN 2015
2 3 4 5
Pertamax Non Subsidi liter 12,800
Solar Non Subsidi liter 12,800
1
2
NO
1
33_BahanBakarMinyak_483
-
PEMERINTAH KABUPATEN KUTAI BARATSTANDAR HARGA SATUAN BARANG DAN JASA
TAHUN 2015
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
II.2. BELANJA BARANG DAN JASAII.2.2. Belanja Bahan / MaterialII.2.2.1 Sewa Alat Berat
1 2 3 4 5
01. Aplicator Jam 51,942 59,733
02. Asphal Finisher Jam 375,540 431,871
03. Asphalt Mixing Plant Jam 8,499,370 9,774,276
04. Asphalt Sprayer Jam 137,445 158,062
05. Bull Dozer Jam 580,470 667,541
06. Compressor Jam 97,570 112,206
07. Concrete Mixer Jam 81,026 93,180
08. Concrete Vibrator Jam 40,150 46,173
09. Dump Truck 3 - 4 M Jam 306,823 352,846
10. Dump Truck 5 M Jam 385,374 443,180
11. Excavator Jam 637,670 733,321
12. Flat Bed Truck Jam 462,891 532,325
13. Generator Set Jam 358,699 412,504
14. Jack Hammer Jam 58,905 67,741
15. Mobil Pick Up Jam 135,300 155,595
16. Motor Grader Jam 586,520 674,498
17. Pedestrian Roller Jam 95,249 109,536
18. Pneumatic Tire Roller Jam 351,120 403,788
19. Stamper Jam 41,822 48,095
20. Tandem Roller Jam 286,531 329,511
21. Thedolite Bulan 8,250,000 9,487,500
22. Vibrator Roller Jam 420,970 484,116
23. Water Pass Bulan 4,730,000 5,439,500
24. Water Tank Truck Jam 400,290 460,334
25. Wheel Loader Jam 779,174 896,050
26. Beaching Plant Jam 778,470 895,241
26. Truck Mixer Jam 499,774 574,740
NO SATUANNAMA BARANG HARGA SATUAN 2015 Zone 2
HARGA SATUAN 2015 Zone 1
34_SewaAlatBerat_484
-
PEMERINTAH KABUPATEN KUTAI BARATSTANDARISASI HARGA SATUAN BARANG DAN JASA
TAHUN 2015
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
II.2. BELANJA BARANG DAN JASAII.2.2. Belanja Bahan / MaterialII.2.2.1 Upah Jasa Konstruksi
1 2 3 4 5
1 Pekerja Jam 15,400 17,700
2 Tukang Batu - Jalan Jam 18,700 21,500
3 Tukang Batu Jam 19,250 22,100
4 Tukang Kayu Jam 19,250 22,100
5 Tukang Besi Jam 19,250 22,100
6 Kepala Tukang - Jalan Jam 19,250 22,100
7 Kepala Tukang Jam 20,350 23,400
8 Mandor - Jalan Jam 20,350 23,400
9 Mandor Jam 21,428 24,600
10 Pekerja Terampil Jam 19,250 22,100
11 Pekerja Terlatih Jam 19,250 22,100
12 Operator Jam 33,000 38,000
13 Pembantu Operator Jam 19,800 22,800
14 Sopir / Driver Jam 30,800 35,400
15 Pembantu Sopir Jam 16,500 19,000
16 Mekanik Jam 27,500 31,600
17 Pembantu Mekanik Jam 18,150 20,900
NO SATUANNAMA BARANG HARGA SATUAN 2015 Zone 2
HARGA SATUAN 2015 Zone 1
35_UpahJasaKontruksi_485
-
PEMERINTAH KABUPATEN KUTAI BARATSTANDARISASI HARGA SATUAN BARANG DAN JASA
TAHUN 2015
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
II.2. BELANJA BARANG DAN JASAII.2.2. Belanja Bahan / MaterialII.2.2.1 Bahan Bangunan
1 2 3 4 5
1 Barang galian
1. Pasir
a. Pasir Urug m3 417,600 501,700
b. Pasir Pasang m3 424,900 536,800
c. Pasir Beton m3 459,400 561,100
2. Batu Pondasi
a. Batu kali m3 480,200 656,700
b. Batu Gunung m3 438,500 526,500
c. Batu Belah m3 490,700 619,900
3. Batu Kerikil m3 448,900 548,300
4. Batu Kerikil Pecah "Split" m3 631,600 758,800
5. Sirtu m3 143,600 167,000
6. Sirtu Base m3 261,000 302,800
7. Tanah
a. Tanah Timbunan Biasa m3 33,000 39,700
b. Tanah Timbunan Pilihan m3 60,500 73,100
2 Paku
1. Paku kayu
a. Panjang 2 cm Kg 23,000 29,200
b. Panjang 3 cm Kg 23,000 29,200
c. Panjang 4 cm Kg 23,000 20,900
d. Panjang 5 cm kg 23,000 20,900
e. Panjang 7cm kg 23,000 18,800
f. Panjang 10 cm kg 23,000 18,800
2. Paku Ulin
a. Paku Ulin 1" kg 28,700 31,300
b. Paku Ulin 2" kg 28,700 31,300
c. Paku Ulin 3" kg 28,700 31,300
d. Paku Ulin 4" kg 28,700 31,300
e. Paku Ulin 5" kg 28,700 31,300
3. Paku seng
a. Panjang 5cm kg 26,100 29,200
HARGA SATUAN 2015 ZONE 2
HARGA SATUAN 2015 ZONE 1 NO SATUANNAMA BARANG
36_BahanBangunan_486
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
II.2. BELANJA BARANG DAN JASAII.2.2. Belanja Bahan / MaterialII.2.2.1 Bahan Bangunan
1 2 3 4 5
HARGA SATUAN 2015 ZONE 2
HARGA SATUAN 2015 ZONE 1 NO SATUANNAMA BARANG
a. Panjang 7cm kg 26,100 36,500
b. Panjang 10 cm kg 26,100 36,500
4. Paku Plywood kg 32,400 37,600
5. Paku beton
a. Panjang 5 cm kg 47,000 57,400
b. Panjang 7cm kg 36,500 41,800
6. Baut bh 10,000 11,500
7. Dinabolt Buah 8,400 9,400
3 Kayu
1.Ulin
Balok m3 5,167,800 3,654,000
Papan m3 5,585,400 4,176,000
2.Bengkirai
Balok m3 3,132,000 4,176,000
Papan m3 3,758,400 4,019,400
3.a. Meranti
Balok m3 2,610,000 2,014,900
Papan m3 2,792,700 2,150,600
4. Kayu / Patok m3 2,420,000 1,941,800
5. Kayu Perancah m3 1,650,000 1,325,900
4 Pipa PVC
a. AW paralon 1/2"-4m btg 17,700 20,900
b. AW paralon 3/4"-4m btg 23,000 26,100
c. AW paralon 1,5"-4"m btg 58,500 69,900
d. AW paralon 2"-4"m btg 67,900 76,200
e. AW paralon 3''-4m btg 120,100 140,900
f. AW paralon 4"-4m btg 219,200 239,100
h. D paralon 2"-4"m btg 67,900 77,300
i. D paralon 3''-4m btg 167,600 189,000
j. D paralon 4"-4m btg 178,500 201,500
a. Ball Valve, PVC , 3/4" pcs 21,900 26,100
b. Ball Valve, PVC, 1/2" pcs 15,700 18,800
36_BahanBangunan_487
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
II.2. BELANJA BARANG DAN JASAII.2.2. Belanja Bahan / MaterialII.2.2.1 Bahan Bangunan
1 2 3 4 5
HARGA SATUAN 2015 ZONE 2
HARGA SATUAN 2015 ZONE 1 NO SATUANNAMA BARANG
c. Ball Valve, PVC, 1" pcs 29,200 33,400
a. Increaser / Reducer, 3/4" x 1/2" pcs 4,200 5,200
b. Increaser / Reducer, 1" x 1/2" pcs 4,200 5,200
a. Knee / Elbow 90', 3/4" pcs 3,100 4,200
b. Knee / Elbow 90', 1/2" pcs 2,600 2,100
c. Knee / Elbow 90', 1" pcs 5,200 5,200
a. Sok, 3/4" pcs 7,300 9,400
b. Sok , 1/2" pcs 5,200 6,300
c. Sok, 1" pcs 5,200 6,300
a. Tee, 3/4" pcs 5,200 6,300
b. Tee, 1/2" pcs 4,200 5,200
c. Tee, 1" pcs 7,300 9,400
a. Water mur, 3/4" pcs 21,900 26,100
b. Water mur, 1" pcs 27,100 31,300
-. Plastik fiberglas polos lembar 1 meter m 47,000 57,400
5 Bahan sinitair
a. Kloset Jongkok pcs 219,200 313,200
b. Kloset duduk putih pcs 1,670,400 1,409,400
c. Bak cuci piring 1 lubang pcs 261,000 287,100
d. Bak cuci piring 2 lubang (steenliss Still) pcs 657,700 678,600
e. Tandon air 1000 L pcs 1,044,000 1,566,000
f. Tandon air 1200L pcs 1,461,600 1,461,600
g. Wastafel lengkap Set 469,800 1,044,000
6 Agregat
a. Aggregat Halus (Kelas A + B) m3 643,500 773,600
b. Aggregat Kasar (Kelas A + B) m3 610,500 733,900
36_BahanBangunan_488
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
II.2. BELANJA BARANG DAN JASAII.2.2. Belanja Bahan / MaterialII.2.2.1 Bahan Bangunan
1 2 3 4 5
HARGA SATUAN 2015 ZONE 2
HARGA SATUAN 2015 ZONE 1 NO SATUANNAMA BARANG
c. Aggregat Halus (Hotmix) m3 810,400 974,100
d. Aggregat Halus (Hotmix) m3 763,100 916,600
d. Filler (Agregat Pengisi) Kg 1,865 2,100
7 Cat
1. Cat tembok Paragon
a. Cat dinding 5 kg kaleng 125,300 104,400
b. Cat dinding 25 kg kaleng 522,000 468,800
c. Merk Metrolite 261,000 234,900
c. Aries 5 Kg Kaleng 62,600 67,900
d. Aries 20 Kg kaleng 177,500 167,000
f. V-tex 5 kg 47,000 49,100
e. Plamir 5 Kg kaleng 57,400 47,000
f. Cat Dasar ( Primer 7) 1.5 Ltr kaleng 134,400 145,100
g. Cat Dasar ( Primer 7) 20 Ltr kaleng 1,022,100 1,100,400
2. Cat kayu/besi isi 1 kg
a. Avian kaleng 59,500 57,400
b. Lainnya 47,000 47,000
3. Cat Marka Jalan kg 40,150 48,000
4. Renolith ltr 106,700 128,400
5. Thinner ltr 23,650 31,300
6. Balss Bit kg 38,500 45,900
8 Asphalt kg 13,600 14,600
9 Barang dari Karet
Karpet Naga Mas 90 x 50 cm t 0.8 roll 626,400 630,600
Karpet Naga Mas 70 x 50 cm t 0.6 roll 501,100 505,300
Karpet Naga Mas 60 x 50 cm t 0.6 roll 438,500 441,600
Terpal 2 lapis 8 X 10 pcs 522,000 526,200
Terpal 2 lapis 6 X 8 pcs 240,100 234,900
Terpal 2 lapis 4 X 6 pcs 135,700 140,900
Terpal 2 lapis 3 X 4 pcs 73,100 74,100
Terpal 2 lapis 3 X 2 pcs 41,800 41,800
36_BahanBangunan_489
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
II.2. BELANJA BARANG DAN JASAII.2.2. Belanja Bahan / MaterialII.2.2.1 Bahan Bangunan
1 2 3 4 5
HARGA SATUAN 2015 ZONE 2
HARGA SATUAN 2015 ZONE 1 NO SATUANNAMA BARANG
10 kaca
1. Kaca polos bening Tebal 5 mm m2 130,500 150,300
2. Kaca reyben 5 mm m2 140,900 161,800
3. Kaca cermin m2 187,900 216,100
11 Barang Cetakan
a. Batako Semen bh 5,200 5,800
b. Bata Merah bh 1,000 1,300
c. Loster -
Ukuran 20 x 20 cm bh 47,000 50,100
Ukuran 30 x 30 cm bh 34,500 39,700
Ukuran 25 x 50 cm bh 47,000 54,300
Ukuran 30 x 60 cm - Motif Biasa bh 41,800 48,000
Ukuran 25 x 20 cm - Motif Bunga bh 58,500 66,800
Ukuran 30 x 80 cm bh 69,900 80,400
d. Paping Block
Ukuran 18 Polos bh 2,300 3,100
Ukuran 18 Warna bh 3,100
e. Gorong - Gorong
Ukuran 60 cm bh 381,100 430,100
Ukuran 80 cm bh 498,000 562,700
Ukuran 100 cm bh 644,100 727,700
Ukuran 120 cm bh 783,000 932,300
12 Semen abu-abu
Semen
a. Tiga roda zak = 50 kg zak 90,800 104,400
zak = 40 kg zak 83,500 89,800
b. Gresik zak = 50 kg zak 88,700 83,500
zak = 40 kg zak 81,400 90,800
c. Tonasa zak = 50 kg zak 92,900 88,700
d. Semen putih zak 167,600 179,600
36_BahanBangunan_490
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
II.2. BELANJA BARANG DAN JASAII.2.2. Belanja Bahan / MaterialII.2.2.1 Bahan Bangunan
1 2 3 4 5
HARGA SATUAN 2015 ZONE 2
HARGA SATUAN 2015 ZONE 1 NO SATUANNAMA BARANG
13 Penutup Atap
1. Jabesmen
a. Jabesmen gelombang 150 x 105 mm lbr 51,700 56,400
b. Jabesmen gelombang 180 x 105 mm lbr 57,400 63,700
-
3. Genteng Multiroof -
a. Genteng 2 x 5 Multiroof lbr 140,900 166,000
b. Genteng 2 x 5 Multicolor lbr 125,300 146,200
c. Genteng 1 x 5 Multiroof lbr 72,000 84,600
d. Genteng 1 x 5 Multicolor lbr 64,700 76,200
e. Nok Model U Multiroof pcs 44,900 53,200
f. Nok Model U Multicolor pcs 40,700 48,000
g. Nok Model C Multiroof pcs 30,300 36,500
h. Nok Model C Multicolor pcs 26,100 31,300
i. Nok Samping Multiroof pcs 44,900 53,200
j. Nok Samping Multicolor lbr 41,800 50,100
k. Wall Flashing Multiroof lbr 45,400 54,300
l. Wall Flashing Multicolor lbr 42,800 51,200
m. Tutup Nok Multiroof lbr 32,400 38,600
n. Tutup Nok Multicolor lbr 29,200 34,500
14 Atap Baja Ringan
a. Taso galvalum Profil C tinggi 7,5 cm tebal 0,75cm lebar 3 cm
m' 187,900 223,400
b. Apluss galvanis Profil C tinggi 7,5 cm tebal 0,80cm lebar 3 cm
m' 189,000 224,500
c. Apluss Zincalume Profil C tinggi 7,5 cm tebal0,80 cm lebar 3 cm
m' 196,800 233,900
d. Karya Mandiri Galvanis Profil C tinggi 7,5 cmtebal 0,75 cm lebar 3 cm
m' 189,000 224,500
e. Karya Mandiri Galvalume Profil C tinggi 7,5 cmtebal 0,75 cm lebar 3 cm
m' 200,400 238,000
f. Blue Steel Galvanis dan Galvalum Profil C tinggi7,5 cm tebal 0,75 cm lebar 3 cm,
m' 204,600 243,300
36_BahanBangunan_491
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
II.2. BELANJA BARANG DAN JASAII.2.2. Belanja Bahan / MaterialII.2.2.1 Bahan Bangunan
1 2 3 4 5
HARGA SATUAN 2015 ZONE 2
HARGA SATUAN 2015 ZONE 1 NO SATUANNAMA BARANG
15 Bahan Lantai dan dingding
1. Ubin lantai dari proslen/keramik -
a. Merk KIA m2 94,000 108,600
b. Merk Mulia m2 83,500 101,300
c. Merk Asiatile m2 92,900 106,500
d IKAD m2 83,000 95,000
16 Barang-barang dari besi baja
1. Besi Beton Kg 19,250 24,000
2. Baja Tulangan Kg 19,250 23,000
3. Kawat Beton/bindrad kg 44,000 57,400
17 Barang-barang dari logam dasar bukan besi
1. Seng plat
Ukuran ( 0,03 x 90 x 180 ) cm m 79,300 96,000
2. Seng Gelombang, ukuran ( 0,02 x 90 x180 ) lbr 41,800 48,000
18 Bahan bangunan dari logam
Pagar besi BRC
a. BRC-HD 60 (ukuran 60 x 240 cm) 225,500 225,500
b. BRC-HD 90 (ukuran 90 x 240 cm) 253,700 253,700
c. BRC-HD 120 (ukuran 120 x 240 cm) 298,600 298,600
d. BRC-HD 150 (ukuran 150 x 240 cm) 475,000 475,000
e. BRC-HD 175 (ukuran 175 x 240 cm) 518,900 517,800
f. BRC-HD 190 (ukuran 190 x 240 cm) 546,000 545,000
19 Barang-barang dari logam lainya
1. Pipa besi
a. Diameter 3/4 (inchi) panjang 6 m btg 376,400 440,600
b. Diameter 1 1/2 inchi panjang 6 m btg 430,100 503,200
20 Mesin Air
1. Pompa air listrik biasa, tanpa tutup tabung
daya 125 watt
36_BahanBangunan_492
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
II.2. BELANJA BARANG DAN JASAII.2.2. Belanja Bahan / MaterialII.2.2.1 Bahan Bangunan
1 2 3 4 5
HARGA SATUAN 2015 ZONE 2
HARGA SATUAN 2015 ZONE 1 NO SATUANNAMA BARANG
a. Merk Panasonic unit 730,800 574,200
b. Merk Sanyo unit 730,800 522,000
21 Mesin listrik dan perlengkapan
1. Travo portal/cantol 100 KVA (standar PLN) unit 31,320,000 37,270,800
2. Cut out travo portal/control (standar PLN) set 3,549,600 4,155,100
3. Mesin las listrik WIM TIG Welder ITG 222P set 8,111,900 8,926,200
4. Mesin Genset Honda HL 3500 LX unit 2,871,000 3,163,300
5. Stop kontak
a. Merk Broco bh 24,000 26,100
b. Eltra bh 10,400 11,500
22 Perlengkapan listrik lainnya
1. Bola lampu
a. Philips 8 watt bh 35,500 39,700
b. Philips 11watt bh 37,600 44,900
c. Philips 14 watt bh 39,700 49,100
d. Philips 18 watt bh 44,900 53,200
e. Philips 23 watt bh 50,100 59,500
f. Hori 9 watt bh 30,300 45,900
g. Hori 18 watt bh 36,500 45,900
h. Visi Com 5 Watt bh 32,400 38,600
i. Visi Com 8 Watt bh 37,600 44,900
j. Visi Com 14vWatt bh 42,800 51,200
k. Lampu Emergency LED Pro Eclat bh 391,500 438,500
1. Kabel listrik
a. Kabel listrik Eterna NYY 32.5 (100Meter),- m 66,800 77,300
b. Kabel listrik Eterna NYMHY/NYYHY 20.75(100Meter)
m 5,200 6,300
3. Tiang beton
a. 9 - 200 daN bh 2,088,000 2,359,400
b. 11 - 200 daN bh 3,132,000 3,539,200
4. Tiang besi
a. 9 - 200 daN bh 1,461,600 1,649,500
b. 11 - 200 daN bh 1,879,200 2,161,100
36_BahanBangunan_493
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
II.2. BELANJA BARANG DAN JASAII.2.2. Belanja Bahan / MaterialII.2.2.1 Bahan Bangunan
1 2 3 4 5
HARGA SATUAN 2015 ZONE 2
HARGA SATUAN 2015 ZONE 1 NO SATUANNAMA BARANG
23 Alat-alat pertukangan manual
1. Cangkul bh 67,900 73,100
2. Gergaji Kayu bh 88,700 73,100
4. Kikir, uk. 4 inchi bh 62,600 47,000
6. Palu bh 52,200 47,000
8. Pahat 3/4'' bh 62,600 62,600
9. Ember bh 20,900 10,400
10. Linggis bh 78,300 94,000
11. Batu Asahan bh 26,100 47,000
12. Kuas 4" bh 18,800 20,900
13. Kuas 5" bh 20,900 15,700
14. Kuas 2,5" bh 11,500 15,700
15. Kuas Roll bh 36,500 26,100
16. Amplas LBR 10,400 31,300
17. Sendok Semen bh 26,100 20,900
18. Meteran 100 m bh 177,500 114,800
19. Meteran 50 m bh 104,400 94,000
20. Meteran 3 m (Hioshi) bh 15,700 16,700
24 Alat Bantu
a. Gunting Pemotong bh 38,600 44,900
b. Gerobak /Arco bh 438,500 469,800
c. Mesin Gergaji Circular 6-1/2" Bosch bh 1,743,500 1,722,600
d. Mesin Bor Modern M2100b bh 522,000 365,400
e. Mesin Ketam M-2950 bh 417,600 417,600
f. Mesin Ketam M-2400 bh 417,600 448,900
36_BahanBangunan_494
-
PEMERINTAH KABUPATEN KUTAI BARATSTANDARISASI HARGA SATUAN BARANG DAN JASA
TAHUN 2015
-
STANDARISASI HARGA SATUAN KEGIATAN PEKERJAANPEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
HARGA SATUAN KEGIATAN PEKERJAAN
NO Jenis Pekerjaan SATUAN (Kg/Phn)
STANDAR TAHUN 2015
ZONA I
STANDAR TAHUN 2015
ZONA II
1 2 3 4 5
I Umum
1.1 Pematokan dan Pengukuran Km 2,697,000 2,831,850
II Drainase
2.1 Galian untuk Selokan Drainase dan Saluran Air M3 58,235 61,146
2.2 Galian Utk Drainase, Saluran dan Saluran Air (manual & diangkut) M3 169,629 178,111
2.3 Galian Utk Drainase, Saluran dan Saluran Air (manual) M3 75,324 79,090
2.4 Pasangan Batu dengan Mortar M3 928,031 974,433
2.5 Pasangan Batu Dengan Mortar untuk Saluran M3 1,059,150 1,112,108
2.6 Gorong-Gorong Pipa Beton Bertulang, Dalam 50 cm M1 808,548 848,976
2.7 Gorong-Gorong Pipa Beton Bertulang, Dalam 50 cm sampai 70 cm M1 994,530 1,044,256
2.8 Gorong-Gorong Pipa Beton Bertulang, Dalam 70 cm sampai 100 cm M1 1,690,637 1,775,169
2.9 Koker (Box Culvert) Beton Bertulang, Ukuran dalam 70 cm sampai 100 cm M1 4,265,888 4,479,183
2.10 Gorong-Gorong Pipa Beton Bertulang, Dalam 100 cm sampai 130 cm M1 2,776,488 2,915,312
2.11 Gorong-Gorong Pipa Baja Bergelombang Ton 17,828,277 18,719,691
2.12 Gorong-Gorong Pipa Beton Tanpa Tulangan dalam 20 cm sampai 30 cm M1 255,240 268,001
2.13 Timbunan Porous atau Bahan Penyaring (Filter) M3 555,785 583,575
2.14 Anyaman Filter Plastik M2 35,478 37,252
2.15Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan M
1 83,768 87,956
III Pekerjaan Tanah
3.1 Land Clearing M2 5,139.50 5,396
3.2 Galian Biasa M3 62,439.07 65,561
3.3 Galian Biasa (manual & diangkut) M3 185,728.69 195,015
3.4 Galian Biasa (manual) M3 117,123.60 122,980
3.5 Galian Batu M3 239,981.78 251,981
3.6 Galian Struktur dengan kedalaman 0 - 2 meter M3 105,676.45 110,960
3.7 Galian Struktur dengan Kedalaman 0 - 2 M (modif) M3 95,851.37 100,644
3.8 Galian Struktur dengan kedalaman 2 - 4 meter M3 714,604.73 750,335
3.9 Galian Struktur dengan kedalaman 4 - 6 meter M3 778,445.46 817,368
3.10 Galian Perkerasan Beraspal dengan Cold Milling Machine M3 227,846.98 239,239
3.11 Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 1,078,124.31 1,132,031
3.12 Biaya Tambahan untuk Pengangkutan Hasil Galian dengan Jarak melebihi 5 km M3/Km 22,124.50 23,231
3.13 Galian Perkerasan Beraspal dengan excavator M3 143,054.09 150,207
3.14 Timbunan Biasa dari selain Galian Sumber Bahan M3 195,486.77 205,261
3.15 Timbunan Biasa M3 71,650.01 75,233
3.16 Timbunan Pilihan M3 179,803.99 188,794
3.17 Timbunan Pilihan (Peladis) M3 108,559.87 113,988
3.18 Timbunan Pasir untuk Badan Jalan M3 153,850.87 161,543
3.19 Timbunan Pilihan diatas Tanah Rawa (diukur diatas bak truk) M3 281,875.35 295,969
3.20 Timbunan Batu dengan Manual M3 204,099.77 214,305
3.21 Timbunan Batu dengan Derek M3 417,033.04 437,885
3.22 Timbunan Batu dengan Derek Ton 159,942.15 167,939
3.23 Penyiapan Badan Jalan M2 7,937.63 8,335
IV Pelebaran Perkerasan Dan Bahu Jalan
4.1 Lapis Pondasi Agregat Kelas A M3 904,825 950,066
4.2 Lapis Pondasi Agregat Kelas B M3 710,610 746,141
4.3 Semen untuk Lapis Pondasi Semen Tanah Ton 2,296,229 2,411,041
4.4 Lapis Pondasi Semen Tanah M3 268,813 282,253
4.5 Agregat Penutup BURTU M2 9,111 9,566
37_HSPK495
-
STANDARISASI HARGA SATUAN KEGIATAN PEKERJAANPEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
HARGA SATUAN KEGIATAN PEKERJAAN
NO Jenis Pekerjaan SATUAN (Kg/Phn)
STANDAR TAHUN 2015
ZONA I
STANDAR TAHUN 2015
ZONA II
1 2 3 4 5
4.6 Bahan Aspal untuk Pekerjaan Pelaburan Liter 16,810 17,651
4.7 Lapis Resap Pengikat Liter 17,072 17,926
4.8 Timbunan Bahu Jalan M3 77,856 81,749
4.9 Timbunan Bahu Jalan Pilihan M3 105,110 110,365
4.10 Timbunan Bahu Jalan dengan Tanah Setempat M3 22,522 23,648
V Perkerasan Berbutir
5.1 Lapis Pondasi Agregat Kelas A M3 929,376 975,845
5.2 Lapis Pondasi Agregat Kelas B M3 726,098 762,403
5.3 Lapis Pondasi Agregat Kelas C M3 641,516 673,591
5.4 Lapis Pondasi Sirtu M3 244,178 256,387
5.5 Semen untuk Lapis Pondasi Semen Tanah Ton 2,496,366 2,621,184
5.6 Lapis Pondasi Tanah Semen M3 237,097 248,952
5.7 Lapis Fondasi Telford M3 804,302 844,517
5.8 Lapisan Batu Kosong M3 451,770 474,359
5.9 Lapisan Batu Shape Pinang M3 571,890 600,485
VI Perkerasan Aspal
6.1 Lapis Resap Pengikat (Prime Coat) Liter 17,045 17,898
6.2 Lapis Perekat (Tack Coat) Liter 15,844.58 16,637
6.3 Agregat Penutup BURTU M2 6,522 6,848
6.4 Agregat Penutup BURDA M2 10,456 10,978
6.5 Bahan Aspal untuk Pekerjaan Pelaburan Liter 15,749 16,536
6.6 Latasir Kelas A (SS-A) M2 69,866 73,360
6.7 Latasir Kelas B (SS-B) M2 85,779 90,068
6.8 Latasir Kelas B (SS-B) AMP M2 87,306 91,671
6.9 Latasir Kelas B (SS-B) manual M2 83,691 87,875
6.10 Lataston Lapis Aus (HRS-WC) M2 122,685 128,819
6.11 Lataston Lapis Aus (HRS-WC) Leveling Ton 1,826,467 1,917,790
6.12 Lataston Lapis Pondasi (HRS-Base) M3 3,639,101 3,821,056
6.13 Lataston Lapis Pondasi (HRS-Base) Leveling Ton 1,640,603 1,722,633
6.14 Laston Lapis Aus (AC-WC) M2 159,792 167,782
6.15 Laston Lapis Aus (AC-WC) Modifikasi M2 144,988 152,237
6.16 Laston Lapis Aus (AC-WC) Leveling Ton 1,621,483 1,702,557
6.17 Laston Lapis Aus (AC-WC) Modifikasi Leveling Ton 1,557,253 1,635,116
6.18 Laston Lapis Antara (AC-BC) M3 3,642,463 3,824,586
6.19 Laston Lapis Antara (AC-BC) Modifikasi M3 3,506,755 3,682,093
6.20 Laston Lapis Antara (AC-BC) Leveling Ton 1,575,011 1,653,762
6.21 Laston Lapis Antara (AC-BC) Modifikasi Leveling Ton 1,514,736 1,590,472
6.22 Laston Lapis Pondasi (AC-Base) M3 3,459,826 3,632,818
6.23 Laston Lapis Pondasi (AC-Base) Modifikasi M3 3,297,500 3,462,375
6.24 Laston Lapis Pondasi (AC-Base) Leveling Ton 1,471,684 1,545,268
6.25 Laston Lapis Pondasi (AC-Base) Modifikasi Leveling Ton 1,426,477 1,497,801
6.26 Lasbutag M2 20,712 21,748
6.27 Latasbusir Kelas A M2 7,496 7,870
6.28 Latasbusir Kelas B M2 11,841 12,433
6.29 Bitumen Asbuton Ton 1,740,578 1,827,607
6.30 Bitumen Bahan Peremaja Ton 13,574,204 14,252,914
6.31 Bahan Anti Pengelupasan (anti stripping agent) Liter 56,050 58,853
6.32 Campuran Aspal Dingin untuk Pelapisan M3 2,192,104 2,301,709
6.33 Lapis Permukaan Penetrasi Macadam M3 2,937,742 3,084,629
6.34 Lapis Permukaan Penetrasi Macadam ( t = 7 cm ) M3 2,932,040 3,078,642
37_HSPK496
-
STANDARISASI HARGA SATUAN KEGIATAN PEKERJAANPEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
HARGA SATUAN KEGIATAN PEKERJAAN
NO Jenis Pekerjaan SATUAN (Kg/Phn)
STANDAR TAHUN 2015
ZONA I
STANDAR TAHUN 2015
ZONA II
1 2 3 4 5
6.35 Lapis Permukaan Penetrasi Macadam ( t = 5 cm ) M3 3,292,829 3,457,471
6.36 Lapis Fondasi atau Perata Penetrasi Macadam M3 3,154,736 3,312,473
6.37 Lapis Fondasi atau Perata Penetrasi Macadam ( t = 7,5 cm ) M3 3,138,217 3,295,127
6.38 Lapis Fondasi atau Perata Penetrasi Macadam ( t = 5,5 cm ) M3 3,135,674 3,292,458
VII Struktur
7.1 Beton K500 M3 3,352,214 3,519,825
7.2 Beton K400 M3 3,109,389 3,264,859
7.3 Beton K350 (readymix) M3 2,782,737 2,921,874
7.4 Beton K300 (readymix) M3 2,354,247 2,471,960
7.5 Beton K250 (readymix) M3 2,266,186 2,379,496
7.6 Beton K225 (readymix) M3 2,218,603 2,329,534
7.7 Beton K175 (readymix) M3 2,123,730 2,229,917
7.8 Beton K175 M3 1,910,772 2,006,311
7.9 Beton Siklop K175 M3 1,667,674 1,751,057
7.10 Beton K125 M3 1,778,566 1,867,494
7.11 Unit Pracetak Gelagar Tipe I bentang 16 m Buah 31,464,582 33,037,811
7.12 Unit Pracetak Gelagar Tipe I bentang 20 m Buah 35,617,860 37,398,753
7.13 Unit Pracetak Gelagar Tipe I bentang 22 m Buah 36,617,702 38,448,587
7.14 Unit Pracetak Gelagar Tipe I bentang 25 m Buah 37,558,202 39,436,112
7.15 Unit Pracetak Gelagar Tipe I bentang 28 m Buah 38,498,702 40,423,637
7.16 Unit Pracetak Gelagar Tipe I bentang 30 m Buah 39,125,702 41,081,987
7.17 Unit Pracetak Gelagar Tipe I bentang 31 m Buah 42,519,862 44,645,855
7.18 Unit Pracetak Gelagar Tipe I bentang 35 m Buah 40,693,202 42,727,862
7.19 Baja Prategang Kg 378,022 396,924
7.20 Pelat Berongga (Hollow Slab) pracetak bentang 21 m Buah 63,083,321 66,237,487
7.21 M3 1,721,386 1,807,455
7.22 Baja Tulangan U24 Polos Kg 21,378 22,447
7.23 Baja Tulangan U32 Polos Kg 20,869 21,912
7.24 Baja Tulangan U32 Ulir Kg 13,972 14,670
7.25 Baja Tulangan U39 Ulir Kg 23,377 24,545
7.26 Baja Tulangan U48 Ulir Kg 27,766 29,154
7.27 Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 66,849 70,191
7.28 Baja Struktur Titik leleh 2500 kg/cm2 penyediaan dan pemasangan Kg 12,548 13,175
7.29 Baja Struktur Titik leleh 2800 kg/cm2 penyediaan dan pemasangan Kg 12,548 13,175
7.30 Baja Struktur Titik leleh 3500 kg/cm2 penyediaan dan pemasangan Kg 12,548 13,175
7.31 Pemasangan Jembatan Rangka Baja Kg 1,113 1,169
7.32 Pengangkutan Bahan Jembatan Kg 913 959
7.33 Pondasi Cerucuk, Penyediaan dan Pemancangan M1 8,965 9,413
7.34 Dinding Turap Kayu Dengan Pengawetan M2 60,429 63,451
7.35 Dinding Turap Baja M2 20,092 21,096
7.36 Penyediaan Tiang Pancang Kayu Tanpa Pengawetan M3 9,396 9,866
7.37 Penyediaan Tiang Pancang Kayu Dengan Pengawetan M3 84,558 88,786
7.38 Penyediaan Tiang Pancang Baja Kg 208,621 219,052
7.39 Penyediaan Tiang Pancang Beton Bertulang Pracetak M3 6,338,375 6,655,294
7.40 Penyediaan Tiang Pancang Beton Pratekan Pracetak M3 1,444,665 1,516,898
7.41 Pemancangan Tiang Pancang Kayu M1 236,440 248,262
7.42 Pemancangan Tiang Pancang Pipa Baja : 400 mm M1 78,813 82,754
7.43 Pemancangan Tiang Pancang Pipa Baja : 500 mm M1 78,813 82,754
7.44 Pemancangan Tiang Pancang Pipa Baja : 600 mm M1 78,813 82,754
7.45 Pemancangan Tiang Pancang Beton Pracetak :30 cm x 30 cm atau 300 mm M1 83,265 87,428
Beton Diafragma K350 termasuk pekerjaan penegangan setelah pengecoran (post tension)
37_HSPK497
-
STANDARISASI HARGA SATUAN KEGIATAN PEKERJAANPEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
HARGA SATUAN KEGIATAN PEKERJAAN
NO Jenis Pekerjaan SATUAN (Kg/Phn)
STANDAR TAHUN 2015
ZONA I
STANDAR TAHUN 2015
ZONA II
1 2 3 4 5
7.46 Pemancangan Tiang Pancang Beton Pracetak :40 cm x 40 cm atau 400 mm M1 83,265 87,428
7.47 Pemancangan Tiang Pancang Beton Pracetak :50 cm x 50 cm atau 500 mm M1 83,265 87,428
7.48 Tiang Bor Beton, dia. 600 mm M1 1,411,045 1,481,597
7.49 Tiang Bor Beton, dia. 800 mm M1 2,496,491 2,621,316
7.50 Tiang Bor Beton, dia. 1000 mm M1 3,889,814 4,084,304
7.51 Tiang Bor Beton, dia. 1200 mm M1 5,591,013 5,870,564
7.52 Tiang Bor Beton, dia. 1500 mm M1 8,720,080 9,156,084
7.53 Penyediaan Dinding Sumuran Silinder, 250 cm M1 8,625,685 9,056,969
7.54 Penyediaan Dinding Sumuran Silinder, 300 cm M1 10,418,334 10,939,251
7.55 Penyediaan Dinding Sumuran Silinder, 350 cm M1 11,801,676 12,391,760
7.56 Penyediaan Dinding Sumuran Silinder, 400 cm M1 14,875,644 15,619,426
7.57 Penurunan Dinding Sumuran Silinder, 250 cm M1 457,956 480,854
7.58 Penurunan Dinding Sumuran Silinder, 300 cm M1 589,866 619,360
7.59 Penurunan Dinding Sumuran Silinder, 350 cm M1 707,482 742,856
7.60 Penurunan Dinding Sumuran Silinder, 400 cm M1 1,119,215 1,175,176
7.61 Pasangan Batu Belah M3 1,214,848 1,275,590
7.62 Pasangan Batu Kosong yang diisi Adukan M3 1,219,585 1,280,564
7.63 Pasangan Batu Kosong M3 586,382 615,701
7.64 Bronjong M3 901,025 946,076
7.65 Expansion Joint Tipe Asphaltic Plug M1 110,683 116,217
7.66 Sandaran (Railing) M1 140,777 147,816
7.67 Papan Nama Jembatan Buah 346,940 364,287
7.68 Pembongkaran Beton M3 813,421 854,092
7.69 Pembongkaran Rangka Baja M2 447,948 470,345
7.70 Pembongkaran Balok Baja (Steel Stringers) M1 340,490 357,515
7.71 Perkerasan Jalan Beton M3 2,374,813 2,493,554
VIII Pengembalian Kondisi & Pekerjaan Minor
8.1 Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3 1,091,348 1,145,915
8.2 Lapis Pondasi Agregat Kelas B utk Pekerjaan Minor M3 1,038,237 1,090,148
8.3 Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3 (vol. gembur) 543,641 570,823
8.4 Waterbound Macadam untuk Pekerjaan Minor M3 896,498 941,322
8.5 Campuran Aspal Panas untuk Pekerjaan Minor M3 4,377,678 4,596,561
8.6 Penetrasi Macadam untuk Pekerjaan Minor M3 2,910,339 3,055,856
8.7 Campuran Aspal Dingin untuk Pekerjaan Minor M3 2,023,108 2,124,263
8.8 Residu Bitumen untuk Pekerjaan Minor Liter 17,000 17,850
8.9 Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya M3 193,191 202,851
8.10 Pembersihan dan Pembongkaran Tanaman (diamater < 30 cm) M2 100,091 105,095
8.11 Pemotongan Pohon 30 - 50 cm Buah 349,034 366,485
8.12 Pemotongan Pohon 50 - 75 cm Buah 542,570 569,699
8.13 Pemotongan Pohon > 75 cm Buah 1,133,959 1,190,657
8.14 Stabilisasi dengan Tanaman M2 12,132 12,739
8.15 Semak / Perdu M2 11,631 12,212
8.16 Pohon Buah 11,265 11,828
8.17 Marka Jalan Termoplastik M2 264,350 277,568
8.18 Marka Jalan Bukan Termoplastik M2 223,595 234,775
8.19 Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah 590,995 620,544
8.20 Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade Buah 777,046 815,898
8.21 Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah 633,317 664,983
8.22 Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah 859,560 902,538
8.23 Patok Pengarah Buah 162,129 170,236
8.24 Patok Kilometer Buah 516,808 542,649
37_HSPK498
-
STANDARISASI HARGA SATUAN KEGIATAN PEKERJAANPEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
HARGA SATUAN KEGIATAN PEKERJAAN
NO Jenis Pekerjaan SATUAN (Kg/Phn)
STANDAR TAHUN 2015
ZONA I
STANDAR TAHUN 2015
ZONA II
1 2 3 4 5
8.25 Patok Hektometer Buah 244,588 256,817
8.26 Rel Pengaman M1 796,632 836,463
8.27 Paku Jalan Buah 190,132 199,639
8.28 Mata Kucing Buah 244,472 256,696
8.29 Pengecatan Kerb, Trotoar dan Median M2 44,663 46,896
8.30 Kerb Pracetak M1 249,196 261,655
8.31 Perkerasan Blok Beton pada Trotoar dan Median M2 13,387 14,056
8.32 Pengembalian Kondisi Lantai Jembatan Beton M2 142,495 149,620
8.33 Kerb Pracetak Pemisah Jalan (Concrete Barrier) M1 970,104 1,018,609
8.34 Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Sodium 250 Watt Buah 22,867,201 24,010,561
8.35 Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Sodium 250 Watt Buah 2,506,794 2,632,133
8.36 Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt Buah 2,474,962 2,598,711
8.37 Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt Buah 2,506,794 2,632,133
8.38 Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt Buah 2,474,962 2,598,711
8.39 Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt Buah 2,506,794 2,632,133
8.40 Pagar Pemisah Pedestrian Carbon Steel M1 795,700 835,485
8.41 Pagar Pemisah Pedestrian Galvanized M1 1,520,178 1,596,187
IX Pekerjaan Harian
9.1 Mandor Jam 19,143 19,964
9.2 Pekerja Biasa Jam 14,000 14,000
9.3 Tukang Kayu, Tukang Batu dll Jam 17,571 18,125
9.4 Dump Truck 3 - 4 m3 Jam 276,141 303,755
9.5 Truck dengan Bak Terbuka Kap. 3 - 4 ton Jam 140,580 154,638
9.6 Tangki Air 3000 - 4500 Liter Jam 352,178 387,396
9.7 Bulldozer 100 - 150 HP Jam 522,423 574,665
9.8 Motor Grader min. 100 HP Jam 527,868 580,655
9.9 Wheel Loader 1,0 - 1,6 m3 Jam 701,257 771,382
9.10 Truck Loader 75 - 100 HP Jam 453,284 498,613
9.11 Excavator 80 - 140 HP Jam 573,903 631,293
9.12 Crane 10 -15 ton Jam 1,034,550 1,138,005
9.13 Mesin Gilas Roda Besi 6 - 9 ton Jam 483,120 531,432
9.14 Mesin Gilas Bervibrasi 5 - 8 ton Jam 484,110 532,521
9.15 Pemadatan dengan Bervibrasi 1,5 - 3 ton Jam 126,720 139,392
9.16 Mesin Gilas Roda Karet 8 - 10 ton Jam 473,220 520,542
9.17 Kompresor 4000 - 6500 liter / menit Jam 166,320 182,952
9.18 Mesin Pengaduk Beton 1,3 - 0,6 m3 Jam 142,560 156,816
9.19 Pompa Air 70 - 100 mm Jam 46,530 51,183
X Pekerjaan Pemeliharaan Rutin
10.1 Pemeliharaan Rutin Perkerasan Ls
10.2 Pemeliharaan Rutin Bahu Jalan Ls
10.3 Pemeliharaan Rutin selokan, saluran air, galian dan timbunan Ls
10.4 Pemeliharaan Rutin Perlengkapan Jalan Ls
10.5 Pemeliharaan Rutin Jembatan Ls
XI Pekerjaan Pondasi
11.1 Pasangan Batu Kosong m3 586,382 615,701
11.2 Pasangan Batu Gunung m3 990,000 1,089,000
11.3 Pasangan Batu Alam Tipe I m2 466,814 490,154
11.4 Pasangan Batu Alam Tipe II & III m2 569,164 597,622
11.5 Pasangan Batu Belah 1 : 3 m3 1,127,501 1,240,251
disesuaikan dengan kondisi
lapangan
disesuaikan dengan kondisi
lapangan
37_HSPK499
-
STANDARISASI HARGA SATUAN KEGIATAN PEKERJAANPEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
HARGA SATUAN KEGIATAN PEKERJAAN
NO Jenis Pekerjaan SATUAN (Kg/Phn)
STANDAR TAHUN 2015
ZONA I
STANDAR TAHUN 2015
ZONA II
1 2 3 4 5
11.6 Pasangan Batu Belah 1 : 5 m3 1,032,714 1,135,986
XII Pekerjaan Beton
12.1 Lantai Rabat Beton m2 102,638 107,769
12.2 Pemasangan Bakesting dengan Papan m2 156,209 164,019
12.3 Bekisting Multipleks dgn Perancah m2 210,558 231,614
12.4 Bekesting Multipleks tanpa perancah 2 kali Pakai m2 161,977 174,125
12.5 Cor Beton FC 175, Site Mix m3 1,276,977 1,404,674
12.6 Cor Beton FC 200, Site Mix m3 1,315,054 1,446,559
12.7 Cor Beton FC 250, Site Mix m3 1,361,876 1,498,064
12.8 Besi Beton Terpasang kg 23,517 25,868
12.9 Beton Kolom Praktis m1 96,376 101,195
12.10 Beton Footing m3 3,864,000 4,250,400
12.11 Beton Sloof 15 x 20 cm m3 6,711,981 7,215,379
12.12 Beton Sloof 15 x 30 cm m3 6,812,660 7,323,610
12.13 Beton Sloof 20 x 40 cm m3 6,891,190 7,408,030
12.14 Beton Sloof 30 x 30 cm m3 6,913,340 7,431,841
12.15 Beton Sloof 30 x 40 cm m3 7,069,729 7,599,959
12.16 Beton Kolom 20 x 20 cm m3 9,554,740 10,271,346
12.17 Beton Kolom 15 x 30 cm m3 9,662,709 10,387,412
12.18 Beton Kolom 30 x 30 cm m3 9,769,722 10,502,451
12.19 Beton Kolom 50 x 30 cm m3 9,913,043 10,656,521
12.20 Beton Kolom 40 x 40 cm m3 9,936,930 10,682,200
12.21 Beton Ringbalk 15 x 30 cm m3 6,812,660 7,323,610
12.22 Beton Ringbalk 15 x 20 cm m3 6,711,981 7,215,379
12.23 Beton Balok Lantai 15 x 15 cm m3 6,040,783 6,493,841
12.24 Beton Balok Lantai 30 x 50 cm m3 9,665,252 10,390,146
12.25 Beton Balok 30 x 30 cm m3 9,061,174 9,740,762
12.26 Beton Balok 20 x 40 cm m3 8,155,056 8,766,686
12.27 Beton Plat Dak m3 5,808,027 6,243,629
12.28 Beton List Plank m3 5,162,691 5,549,892
12.29 Beton Pelat Lantai m3 6,453,363 6,937,365
12.30 Beton Kuda-Kuda 15 x 15 cm m3 6,644,861 7,143,225
12.31 Beton Tandon Bawah m3 5,436,717 5,844,471
12.32 Beton Plat Dasar terbal 25 cm m3 9,154,917 9,841,535
12.33 Beton Plat Dinding tebal 20 cm m3 7,323,933 7,873,228
12.34 Beton Plat Atap tebal 15 cm m3 6,098,428 6,555,810
12.35 Beton Pondasi Genset m3 7,323,933 7,873,228
12.36 Beton Pondasi Cerobong m3 7,323,933 7,873,228
12.37 Beton Pondasi Sling m3 7,323,933 7,873,228
12.38 Pekerjaan dengan Konstruksi Besi Siku kg 30,446 32,729
12.39 Pekerjaan konstruksi dgn Baja WF kg 30,429 32,711
XIII Pekerjaan Pasangan Batu dan Plesteran
13.1 Pasangan Batako 1 : 3 m2 147,766 155,155
13.2 Pasangan Batako 1 : 5 m2 144,321 151,537
13.3 Plesteran Dinding 1 : 2 m2 106,543 111,870
13.4 Plesteran Dinding 1 : 3 m2 87,337 91,704
13.5 Acian Semen m2 40,920 42,966
XIV Pekerjaan Plafond
14.1 Pasangan Plafon Asbes m2 108,302 119,132
37_HSPK500
-
STANDARISASI HARGA SATUAN KEGIATAN PEKERJAANPEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
HARGA SATUAN KEGIATAN PEKERJAAN
NO Jenis Pekerjaan SATUAN (Kg/Phn)
STANDAR TAHUN 2015
ZONA I
STANDAR TAHUN 2015
ZONA II
1 2 3 4 5
14.2 Pasangan Plafon Lambriziring m2 235,402 258,942
14.3 Pekerjaan List Plank Bengkirai 2,5/20 cm m1 80,302 88,333
14.4 Pasangan Plafon Multipleks 6 mm m2 120,629 132,692
XV Pekerjaan Rangka Kap / Atap
15.1 Kuda-kuda kayu Bengkirai (Expose) m3 7,710,177 8,095,686
15.2 Kuda - kuda Kayu Bengkirai m3 5,977,874 6,276,768
15.3 Kuda-kuda Diserut Halus m3 3,151,680 3,309,264
15.4 Listplank Meranti 2,5/20 m1 69,027 72,479
15.5 Usuk/ Reng Kayu m2 72,269 75,882
15.6 Atap Genteng m2 22,459 24,144
15.7 Genteng Bubungan m2 8,777 9,435
15.8 Atap Seng m2 11,308 12,156
15.9 Bubungan Genteng Metal m1 28,757 30,914
15.10 Surya Roof m2 307,506 330,568
15.11 Sakura Roof m2 178,680 192,081
15.12 Multi Roof m2 179,648 193,121
XVI Pekerjaan Lantai / Dinding
16.1 Keramik Lantai 30 x 30 m2 160,766 172,823
16.2 Keramik Lantai 40 x 40 m2 214,355 230,431
16.3 Keramik Lantai Granito m2 87,771 94,353
16.4 Keramik Lantai & dinding 20 x 20 KM/WC m2 282,239 303,407
16.5 Keramik Lantai 20 x 25 m2 133,972 144,019
16.6 Dinding Papan + Rangka Meranti m2 287,174 301,532
16.7 Bongkaran Kansten M1 22,109 22,109
16.8 Pasang Kanstin M1 239,049 256,977
16.9 Bongkar Paving Block M2 50,775 50,775
16.10 Pasang Paving block M2 574,215 617,281
16.11 Bongkar Beton M3 1,006,940 1,006,940
XVII Pekerjaan Pengecetan
17.1 Pengecetan Dinding Interior m2 77,118 82,901
17.2 Pengecetan Dinding Exterior (weathershield) m2 107,666 115,741
17.3 Pengecetan Plafon m2 82,820 89,032
17.4 Pelitur Kayu m2 150,049 161,303
XVIII Pekerjaan Pemancangan
18.1 Meruncingkan Tiang Pancang Ulin 10/10 Batang 32,920 32,920
18.2 Memancang Kayu Ulin 10/10- 4 m Batang 179,631 193,104
18.3 Memancang Kayu Ulin 10/10 - 2 m Batang 114,152 122,714
XIX Pekerjaan Pasangan
19.1 Pasangan Batu Kali 1 : 5 m3 1,028,874 1,106,040
19.2 Plesteran dinding 1 : 2 m3 106,543 114,534
19.3 Cor Rabat Beton m2 137,799 148,134
XX Pemasangan Pipa Distribusi
20.1 Pemasangan Pipa PVC dia. 150 mm m1 33,460 35,133
20.2 Pemasangan Pipa PVC dia. 100 mm m1 22,306 23,422
20.3 Pemasangan Pipa PVC dia. 75 mm m1 16,730 17,566
20.4 Pemasangan Pipa PVC dia. 50 mm m1 11,153 11,711
37_HSPK501
-
STANDARISASI HARGA SATUAN KEGIATAN PEKERJAANPEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
HARGA SATUAN KEGIATAN PEKERJAAN
NO Jenis Pekerjaan SATUAN (Kg/Phn)
STANDAR TAHUN 2015
ZONA I
STANDAR TAHUN 2015
ZONA II
1 2 3 4 5
20.5 Pemasangan Pipa Baja PVC dia. 150 mm m1 39,638 41,620
20.6 Pemasangan Pipa Baja PVC dia. 100 mm m1 26,425 27,746
20.7 Pengetesan Pipa PVC dia. 150 mm m1 5,570 5,570
20.8 Pengetesan Pipa PVC dia. 100 mm m1 4,665 4,665
20.9 Pengetesan pipa PVC dia. 75 mm m1 4,075 4,075
20.10 Pengetesan Pipa PVC dia. 50 mm m1 3,441 3,441
20.11 Pemasangan Gate Valve dia. 100 mm unit 725,714 740,228
20.12 Pemasangan Gate Valve dia. 50 mm unit 682,298 695,944
20.13 Pemasangan Tee dia. 100 mm unit 161,066 164,287
20.14 Pemasangan Tee dia. 50 mm unit 113,249 115,514
20.15 Pemasangan Bend 900 dia. 75 mm unit 130,278 132,884
20.16 Pemasangan Bend 900 dia. 50 mm unit 75,575 77,087
20.17 Pemasangan Sambungan Pipa PVC dia. 150 mm buah 7,291 7,437
20.18 Pemasangan Sambungan Pipa PVC dia. 100 mm buah 6,249 6,374
20.19 Pemasangan Sambungan Pipa PVC dia. 75 mm buah 5,524 5,635
20.20 Pemasangan Sambungan Pipa PVC dia. 50 mm buah 4,574 4,665
20.21 Pemasangan Flange Spigot dia. 50 mm unit 311,400 317,628
20.22 Pemasangan Flange Spigot dia. 100 mm unit 302,706 308,760
20.23 Pemasangan Reducer Socket Pipa PVC dia. 150 x 50 mm buah 306,147 312,270
20.24 Pemasangan Reducer Socket Pipa PVC dia. 100 x 75 mm buah 269,786 275,181
20.25 Pemasangan Reducer Socket Pipa PVC dia. 100 x 50 mm buah 161,654 164,887
20.26 Pemasangan Reducer Socket Pipa PVC dia. 75 x 50 mm buah 267,568 272,919
20.27 Pemasangan Flange Baja dia. 150 mm unit 1,335,978 1,362,698
20.28 Pemasangan Flange Baja dia. 100 mm unit 1,096,893 1,118,831
XXI Perencanaan / SID / Pengawasan / dan
Pengendalian O&P Pengairan
21.1 Identifikasi / recognaisance ha 1,610,000 1,658,300
21.2 Survey / Pengukuran Situasi ha 3,220,000 3,316,600
21.3 Desain / Petak-Petak ha 676,200 696,486
21.4 Desain / Jaringan Utama ha 1,487,640 1,532,269
21.5 Pengukuran Trase Saluran ha 4,226,250 4,353,038
21.6 Detail Engeenering Design Bangunan pada main sistem ha 2,028,600 2,089,458
21.7 Desain Geometrik Jalan Km 3,360,761 3,461,584
21.8 Master Plant ha 4,226,250 4,353,038
XXII Sektor Pengembangan dan Konservasi
Sumber Daya Air
1. Pekerjaan PLB dan Pencetakan Sawah
a. Tebas / Tebang
- Semak-semak ha 2,324,438 2,498,770
- Hutan Ringan ha 2,656,500 2,789,325
- Hutan Sedang ha 3,145,106 3,302,362
- Hutan Lebat ha 3,494,563 3,669,291
XXIII Sub Sektor Irigasi
1. Pekerjaan PLB dan Pencetakan Sawah
a. Tebas / Tebang
- Semak-semak ha 2,324,438 2,498,770
- Hutan Ringan Diameter Kayu < 10 cm ha 2,656,500 2,855,738
- Hutan Sedang Diameter Kayu 10 - 35 cm ha 3,145,106 3,380,989
37_HSPK502
-
STANDARISASI HARGA SATUAN KEGIATAN PEKERJAANPEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
HARGA SATUAN KEGIATAN PEKERJAAN
NO Jenis Pekerjaan SATUAN (Kg/Phn)
STANDAR TAHUN 2015
ZONA I
STANDAR TAHUN 2015
ZONA II
1 2 3 4 5
- Hutan Lebat Diameter Kayu > 35 cm ha 3,494,563 3,756,655
b. Cincang
- Hutan Ringan Diameter Kayu < 10 cm ha 1,600,000 1,720,000
- Hutan Sedang Diameter Kayu 10 - 35 cm ha 2,200,000 2,365,000
- Hutan Lebat Diameter Kayu > 35 cm ha 2,800,000 3,010,000
c. Kumpul Bakar
- Hutan Ringan Diameter Kayu < 10 cm ha 1,200,000 1,290,000
- Hutan Sedang Diameter Kayu 10 - 35 cm ha 1,800,000 1,935,000
- Hutan Lebat Diameter Kayu > 35 cm ha 2,200,000 2,365,000
d. Pemotongan Tanggul
- Hutan Ringan Diameter Kayu < 10 cm ha 1,100,000 1,182,500
- Hutan Sedang Diameter Kayu 10 - 35 cm ha 1,450,000 1,558,750
- Hutan Lebat Diameter Kayu > 35 cm ha 2,000,000 2,150,000
e. Pembersihan / Pembakaran ha 1,250,000 1,343,750
f. Pembuatan Galangan ha 1,250,000 1,343,750
g. Pembuatan Jalan Usaha Tani (tanah Lebar 3 m') m' 290,555 290,555
h. Pembuatan Jalan Usaha Tani (Kayu Ulin) m2 1,509,375 1,539,563
2 Pembuatan Saluran Irigasi Dengan Alat Berat
a. Saluran Primer / Induk (galian dan cor beton K-250) m3 3,629,070 2,235,445
b. Saluaran Sekunder (galian dan pas. Batu Mortar) m3 1,090,949 1,354,815
c. Saluran Tersier (Galian & Pas. Batu Kosong) m3 644,617 508,056
3 Pembuatan Saluran Dengan Tenaga Manusia :
a. Saluaran Sekunder (Galian dan pas. Batu Mortar) m3 1,095,153 1,071,763
b. Saluran Tersier (Galian & Pas. Batu Kosong) m3 648,821 296,366
4. Perapihan m1 8,302 8,468
5. Pembuatan Bangunan Air di :
a. Saluaran Primer (Batu) m3 1,127,501 1,212,064
b. Saluran sekunder (Batu) m3 1,095,153 1,177,290
c. Saluran Tersier (Batu) m3 644,617 692,963
d. Saluran Primer (Kayu Ulin) m3 6,718,140 7,054,047
e. Saluran sekunder (kayu Ulin) m3 6,201,360 6,511,428
F. Saluran Tersier (Kayu Ulin) m3 5,684,580 5,968,809
6. Pembuatan Pintu Air Irigasi
a. Pekerjaan Pembuatan Pintu Air (0.8 m X 1 m ) unit 5,950,800 6,397,110
a. Pekerjaan Pembuatan Pintu Air (0.5 m X 0.8 m ) unit 2,818,800 3,030,210
7. Galian Tanah untuk Saluran Irigasi (Mekanis) m3 58,235 98,166
8. Galian Tanah untuk Saluran Irigasi (Manual) m3 62,439 89,252
9. Urugan Kembali Tanah Bekas Galian m3 18,732 98,109
10. Urugan Pasir m3 74,714 80,318
XXIV Sub Sektor Rawa
1. Pembuatan saluran Pembuang
a. Saluran Induk / Primer m3 3,629,070 3,762,268
37_HSPK503
-
STANDARISASI HARGA SATUAN KEGIATAN PEKERJAANPEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
HARGA SATUAN KEGIATAN PEKERJAAN
NO Jenis Pekerjaan SATUAN (Kg/Phn)
STANDAR TAHUN 2015
ZONA I
STANDAR TAHUN 2015
ZONA II
1 2 3 4 5
b. Saluran Sekunder m3 1,090,949 2,992,713
c. Saluran Tersier m3 644,617 1,111,579
2. Pembuatan PLB dan Pencetakan Sawah
-Semak-semak Kemiringan Lahan '< 5 % ha 14,000,000 15,050,000
-Hutan Ringan Diameter Kayu < 10 cm Kemiringan Lahan '< 5% ha 16,000,000 17,200,000
-Hutan Sedang Diameter Kayu 10'-35 cm Kemiringan Lahan '< 5% ha 17,500,000 18,812,500
-Hutan Lebat Diameter Kayu > 35 cm Kemiringan Lahan '
-
PEMERINTAH KABUPATEN KUTAI BARATSTANDARISASI HARGA SATUAN BARANG DAN JASA
TAHUN 2015
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
RETRIBUSI SEWA PAKAI PERALATAN LABORATORIUM
1 2 3 4
I. LABORATORIUM TANAH
(GEOTEK / BAHAN JALAN )
1. Kadar Air Tanah 1 x Uji 100,000
2. Berat Jenis Tanah 1 x Uji 200,000
3. Atterberg Limit 1 x Uji 150,000
4. Analisa Saringan 1 x Uji 200,000
5. Pemadatan laboratorium Standar 1 x Uji 300,000
6. Pemadatan Laboratorium Modified 1 x Uji 300,000
7. CBR Laboratorium Standar 1 x Uji 300,000
8. CBR Laboratorium Modified 1 x Uji 350,000
9. Hidrometer 1 x Uji 300,000
10. Batas Susut / Shrinkage Limit 1 x Uji 300,000
11. Kuat Tekanan Bebas / Unconfined.Comp Strength 1 x Uji 250,000
12. Pemampatan / Konsolidasi 1 x Uji 300,000
13. Kuat Geser Langsung / Direct Shear 1 x Uji 300,000
14. Permiabiliitas ( Constant Head ) 1 x Uji 300,000
15. Permiabilitas ( Falling Head ) 1 x Uji 300,000
16. Berat Isi Tanah 1 x Uji 200,000
17. Triaxial ( UU ) 1 x Uji 400,000
18. Triaxial ( CU ) 1 x Uji 700,000
II. PEKERJAAN LAPANGAN ( GEOTEK / AGREGAT )
1. Pemboran Tangan Meter 75,000
2. Pengambilan Contoh Tanah Asli Tabung 100,000
3. Sounding / Sondir / Ducth Cone Penetrometer 5 Ton ( Minimal 5 titik, diluar operasional )
Titik 450,000
4. Benkelamet Beam ( Minimal 4 titik, diluar operasional ) Titik 200,000
5. Dynamic Cone Penetrometer ( DCP)( Mnimal 4 titik diluar operasional )
Titik 150,000
6. CBR Lapangaan ( Loading Test )( minimal 4 titik, diluar operasional )
Titik 150,000
7. Kepadatan Lapangan ( Loading test, diluar operasional ) Titik 150,000
8. kepadatan Lapangan ( Core Drill , diluar operasional) Titik 337,500
NO. JENIS PENGUJIAN SATUAN RETRIBUSI 2015
(Rp.)
38_Laboratorium Pekerjaan Umum_505
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
RETRIBUSI SEWA PAKAI PERALATAN LABORATORIUM
1 2 3 4
NO. JENIS PENGUJIAN SATUAN RETRIBUSI 2015
(Rp.)
9. Pengukuran ( Polygon ) Hektare 300,000
10. Pengukuran ( Memanjang ) Km 250,000
11. Pengujian Slump 1 x Uji 75,000
12. Pembuatan Benda Uji Kubus / Silinder Beton BUah 75,000
13. Pengambilan contoh dengan SPT Percontoh 100,000
14. Pemboran mesin tanah basah Permeter 150,000
15. Kuat tekan dengan alat Hammer test Titik 100,000
16. Kadar air dengan alat Speedy Titik 150,000
17. Analisa fisik pengujian air 1 x Uji 200,000
18. Pengambilan sampel air
- Sungai besar lebar > 20 m 2,000,000
- Sungai sedang lebar 10 - 20 m 1,500,000
- Sungai kecil < 10 m 750,000
III. ASPAL ( KERAS, CAIR, CAMPURAN ASPAL )
1. Penetrasi 1 x Uji 150,000
2. Titik Lembek 1 x Uji 150,000
3. Daktilitas 1 x Uji 150,000
4. Kehilangan Berat 1 x Uji 150,000
5. Titik Nyala 1 x Uji 150,000
6. Berat Jenis 1 x Uji 100,000
7. Viscositas 1 x Uji 150,000
8. Penyulingan 1 x Uji 200,000
9. KadarAir 1 x Uji 100,000
10.Pelekatan 1 x Uji 150,000
11. Prime Coat / Take Coat 1 x Uji 250,000
12.Ekstraksi 1 x Uji 300,000
13. Kelarutan CHCL3 1 x Uji 150,000
14.Marshall Test 1 x Uji 75,000
15. Penetrasi setelah kehilangan berat 1 x Uji 150,000
16. Pengendapan/ Kestabilan 1 x Uji 150,000
17. Kelekatan terhadap batuan kering 1 x Uji 200,000
18. Kelekatan terhadap batuan basah 1 x Uji 200,000
38_Laboratorium Pekerjaan Umum_506
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
RETRIBUSI SEWA PAKAI PERALATAN LABORATORIUM
1 2 3 4
NO. JENIS PENGUJIAN SATUAN RETRIBUSI 2015
(Rp.)
IV. SEMEN / BETON / CAMPURAN BETON
1. Konsistensi Semen 1 x uji 100,000
2. Pengikatan Awal Semen 1 x uji 200,000
3. Berat Jenis 1 x uji 150,000
4. Kehalusan Semen 1 x uji 200,000
5. Kadar Air Semen 1 x uji 100,000
6. Bobot Isi 1 x uji 75,000
7. Kuat tekan mortar 1 x uji 50,000
8. Kuat tekan kubus 1 x uji 50,000
9. Kuat tekan dengan hammer test Titik 100,000
10. ketepatan bentuk 1 x uji 100,000
V. AGREGAT
1. Abrasi 1 x Uji 300,000
2. Gradasi / Analisis Saringan 1 x Uji 200,000
3. Berat Jenis dan Penyerapan Agregat Kasar 1 x Uji 200,000
4. Berat Jenis dan Penyerapan Agregat Halus 1 x Uji 200,000
5. Berat Isi 1 x Uji 200,000
6. Kadar Lumpur 1 x Uji 250,000
7. Soudness 1 x Uji 300,000
8. Organik 1 x Uji 250,000
9. Kadar Air 1 x Uji 100,000
10. Kelayakan terhadap aspal 1 x Uji 250,000
11. Impact tes 1 x Uji 250,000
12. Sand Equivalent 1 x Uji 250,000
13. Kelekatan terhadap aspal 1 x Uji 200,000
14. Kepipihan agregat 1 x Uji 200,000
VI. BENDA UJI ( KUBUS,CYLINDER BETON DLL )
1. Kuat Tekan 1 x Uji 50,000
2. Kuat Tarik 1 x Uji 50,000
3. Lentur 1 x Uji 50,000
38_Laboratorium Pekerjaan Umum_507
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
RETRIBUSI SEWA PAKAI PERALATAN LABORATORIUM
1 2 3 4
NO. JENIS PENGUJIAN SATUAN RETRIBUSI 2015
(Rp.)
4. Kuat Tekan Dengan Hammer Test 1 x Uji 100,000
5. Kuat tekan mortar 1 x Uji 50,000
6. Kuat tekan stabilitas marshall 1 x Uji 75,000
6. Kuat tekan kubus paving block 1 x Uji 50,000
6. Kuat tekan Silinder,mutu tinggi > Kavling-400 1 x Uji 75,000
7. Rudolf Coloum 1 x Uji 200,000
VII. JOB MIX
1. Job Mix Desigen Beton 1 x Uji 900,000
2. Job Mix Formula Aspal 1 x Uji 1,000,000
3. Job Mix Desigen Mortar 1 x Uji 750,000
4. Job Mix Semen ( Pemeriksaan Fisika Semen ) 1 x Uji 750,000
5. Sampel Tabung Bor 1 x Uji 850,000
6. Job Mix Desigen Agregat Kelas A 1 x Uji 850,000
7. Job Mix Desigen Agregat Kelas B 1 x Uji 850,000
8. Job Mix Desigen Agregat Kelas C 1 x Uji 850,000
9. Job Mix Desigen Tanah 1 x Uji 850,000
10. Job Mix Desigen Renolith (Persentase Mix ) 1 x Uji 900,000
11. Job Mix Desigen Soil Semen 1 x Uji 900,000
VII. BIAYA PERSONIL
1. Pemboran tangan ( 5 orang ) 1 x Uji 1,000,000
2. Pengambilan contoh tanah asli ( 5 orang ) 1 x Uji 750,000
3. Sounding/ Soundir/ Dutch Cone Penetrometer 5 ton ( 8 orang 1 x Uji 1,500,000
4. Benkelmant Beam 1 x Uji 500,000
5. Dinamic Cone Penetrometer / DPC ( 2 orang ) 1 x Uji 500,000
6. CBR Lapangan / Loading test ( 3 orang ) 1 x Uji 500,000
7. Kepadatan Lapangan / Loading test ( 2 Orang ) 1 x Uji 500,000
8. Kepadatan Lapangan / Core Drill ( 5 Orang ) 1 x Uji 750,000
9. Pengukuran / Polygon ( 4 Orang ) 1 x Uji 800,000
10. Pengukuran / Memanjang ( 4 orang ) 1 x Uji 800,000
11. Pengujian Slump ( 1 Orang ) 1 x Uji 200,000
12. Pembuatan benda uji kubus / Slinder beton ( 1 Orang ) 1 x Uji 200,000
13. Kuat tekan dengan Hammer test ( 1 Orang ) 1 x Uji 300,000
38_Laboratorium Pekerjaan Umum_508
-
STANDARISASI HARGA SATUAN BARANG/JASA PEMERINTAH KABUPATEN KUTAI BARAT
TAHUN 2015
RETRIBUSI SEWA PAKAI PERALATAN LABORATORIUM
1 2 3 4
NO. JENIS PENGUJIAN SATUAN RETRIBUSI 2015
(Rp.)
VII. BIAYA MOBILISASI ALAT DAN PERSONIL
1. Mobilisasi Alat ( 1 hari ) 1 Paket/ Hari 800,000
2. Personil ( 1 orang/ hari ) 1 Paket/ Hari 800,000
38_Laboratorium Pekerjaan Umum_509