SIMPTWW FORMTask Name Pressure vessel external inspection Category: Tech Safety - PV-External
Equip. Name: Glycerine Product Cooler Process: ESTER SYSTEM
Equip Tag # : E-309 P&ID / Drawing #: A1-314 Owner (s): HSE
Functional Loc.: 300 Work Order #:
Scheduling Info: Major Turnaround _______________ System Owner (s): Julaini
Updated (Rev#): SAP Maintenance Plan: Frequency Months
Line Items / Subtasks Date Work (hrs / hrs) Resource(s) NOTES ICC Aproval (# ) hrs JSA / Risk
Prediction (Date Comp. 20.12.2010 ) hrs
Job Walkthrough (Date Comp. ) hrs
Scaffolding - External / Internal N/A UBF (in-house)
Insulation (Remove / Install) / N/A Atmajaya
Steam Tracer (Remove / Install) / N/A , Mech
LO/TO (Install / Remove) / / hrs Operation
CSE (use Notes to specify additional. CSE dates) hrs CSE Crew - FPG Cont.
Open / Close Vessel / / hrs Mech
Crane / Vacuum Truck / Forklift / Skylift hrs
Blower / Lighting / Drums / Gen. Set hrs
Empty Vessel hrs Operation
Wash Method : hrs Operation
hrs
hrs
hrs
hrs
hrs
FORM-PM-SIMPTWW Develop: 15/10/2010 Rev. # 01
SIMPTWW FORMTask Name Pressure vessel external inspection Category: Tech Safety - PV-External
Equip. Name: Glycerine Product Cooler Process: ESTER SYSTEM
Equip Tag # : E-309 P&ID / Drawing #: A1-314 Owner (s): HSE
Functional Loc.: 300 Work Order #:
Scheduling Info: Major Turnaround _______________ System Owner (s): Julaini
Updated (Rev#): SAP Maintenance Plan: Frequency Months
Additional Information Required - Pls. add drawings, sketches, photo etc. to show the location and scope of work.Comments : Shutdown Procedure (by System Owner) : Use Sd Procedure Template and MUST be attached to this documentWork Procedure / Sequence (by Job Owner) : 1. Open bonnet2. UT - shell3. Fiberscope - tube4. visual inspection5. box upControlled Doc./ SOP # (if any):
FORM-PM-SIMPTWW Develop: 15/10/2010 Rev. # 01
E-309
E-307
SIMPTWW FORMTask Name Pressure vessel external inspection Category: Tech Safety - PV-External
Equip. Name: Glycerine Product Cooler Process: ESTER SYSTEM
Equip Tag # : E-309 P&ID / Drawing #: A1-314 Owner (s): HSE
Functional Loc.: 300 Work Order #:
Scheduling Info: Major Turnaround _______________ System Owner (s): Julaini
Updated (Rev#): SAP Maintenance Plan: Frequency Months
If additional tasks are required, add them on the back of this form. Identify where the additional tasks belong in the sequence and provide details to the Maintenance Planner to update the Schedule.
Material Master # (Parts) Bin # Part # Qty Tools (specify size, spec etc.) Qty
FORM-PM-SIMPTWW Develop: 15/10/2010 Rev. # 01
SIMPTWW FORMTask Name Pressure vessel external inspection Category: Tech Safety - PV-External
Equip. Name: Glycerine Product Cooler Process: ESTER SYSTEM
Equip Tag # : E-309 P&ID / Drawing #: A1-314 Owner (s): HSE
Functional Loc.: 300 Work Order #:
Scheduling Info: Major Turnaround _______________ System Owner (s): Julaini
Updated (Rev#): SAP Maintenance Plan: Frequency Months
Notes:
FORM-PM-SIMPTWW Develop: 15/10/2010 Rev. # 01