single european sky atm research (sesar) friday 6 th june 2008
Post on 20-Dec-2015
219 views
TRANSCRIPT
Single European Sky ATM Research
(SESAR)
Friday 6th June 2008
Agenda
1. 11:00 Introductions
2. 11:10 Presentations from guest speakers
3. 12:00(ish) Open question forum
4. 13:30(ish) Lunch
Running Order
• DGCA – Peter Griffiths• DAP – John Arscott• Me• EXCOM – Olaf Dlugi• Eurocontrol – Dr Erik Merckx• SJU – Patrick Ky• NATS – David Hilton
SESAR
Why?
Society· Noise & Climate
change
· Safety
· Security
· Sustainable growth
· Mobility
· Carbon
Emissions
Airspace Users· Cost pressure (+fuel)
· 9/11 and economic downturn
· Low cost airlines
· VLJs, UAVs
· Military operations
· GA
Airports· Capacity limitation
ANSPs· Corporatisation /
privatisation
· Under pressure of users
Supply Industry· Concentration
· Global
Aviation - an evolving Environment
2005: 10.5 millions
Traffic expected to double by 2020
2010: 12.5 millions 2020: 17.2 millions
2005 2010 2020
Closing the capacity gap
Traffic
Capacity with current system
2005 2013 2020
An ATM System reaching its limits
PotentialCapacity with
current system
Ongoing Short/Medium
Term Programmes
}Gap: need for
future system
New Solutionsfrom R&D
A new system is required
Background - SESAR
• SESAR is a project to “develop the new generation European ATM System”.
• Its aim is to deliver a new operational platform for ATM for Europe.• Joint funding was agreed for the project’s first phase by the
European Community and Eurocontrol at a total cost of 60m Euros.• ATA and stakeholders formed the SESAR Consortium to take the
project definition phase forward.• Deliverable of the Project Definition Phase is the ATM Master Plan.
The three phases of SESAR
2005 2010 2015 2020
2005 2010 2015 2020
SESAR PhasesDefinition
Development
Deployment
SESAR Impact on Operational ATM system
Olaf Dlugi
D5 – SESAR Master Plan
Olaf Dlugi
The SESAR Definition Phase is co-financed by the European Community and EUROCONTROL
SESAR Consortium including EUROCONTROL
SESAR overview : The Definition Phase
24 months
Deployment sequence analysis
Build the ATM
Master Plan
Define organisation & work- programme 2008-2013
The Market Its Requirements
PerformanceRequirements
The Top Product How to
Build it ActionPlan Go!
D2D2D3D3
D4D4 D5D5D6D6
Analyse air
transport value and
role of ATM
D1D1
ATM Target
Concept selection
Everything you always wanted to know about the
Master Plan
• One overall plan for all:– Plus individual roadmaps & – Supporting Changes
2006 07 08 09 10 11 12 13 14 15 16 17 18 19 20
Implementation
R&D
21 22
Available for Operations
List of concerned operationalor technical changes
• Contains • Planning information for Deployment and R&D
• Not a one-off Master Planning process
• Passed to SJU for execution and maintenance
Th
e S
ES
AR
Ma
ste
r P
l an
Pro
du
cts
of
the
SE
SA
R D
efin
itio
n P
has
eD5 is only the tip of the iceberg
TaskDeliverables
Electronic Master Planwww.atmmasterplan.eu
Renewed ECIP/LCIP
D5
Agreed strategicguideline
Working andPlanning area
Derived agreed &committed actions
R&DDeploymentOperations
Trajectory based operations preparation
Net-centric trajectory management
Advanced automation in a shared trajectory environment
Full 4D-trajectory management & self separation
Best practices
Advancedseparation modes
Commitment to deployment now
Commitment to R&D Investment
Agreed way Forward
Performance Benefits by 2020
• The 2020 European ATM system will accommodate 15.8M flights/year;
• Average improvement of delays by 40 % per flight;
• Fuel savings (ATM related) of 14 MTons CO2
• ATM costs per flight reaches an average of €630/flight;
Benefits
• Societal Benefits (in 2020)– Direct, indirect and induced aviation contributions €470Bn /year to
European GDP
• Quantified Operational Benefits (cumulated between 2008 - 2020)– €8Bn Cost-effectiveness – €9Bn Capacity Gain & Delay Reduction– €8Bn Fuel cost savings– €2Bn Quality of Service - Low visibility
• Further Benefits– Flexibility, Interoperability, …
CONCLUSION
• Shared Master Plan
• Systematic approach to Master Planning
Erik Merckx
The ATM Master Planand
EUROCONTROL’s role
UK Stakeholders ForumLondon, 6 June 2008
Dr. Erik MerckxEUROCONTROLDeputy Director ATM Programmes
Overview
• Traffic and Capacity Profiles 2009 - 2013• ATM Master Plan Framework • EUROCONTROL’s roles• Stakeholder consultation and monitoring mechanisms
Traffic and Capacity Profiles 2009-2013
35% Additional capacity between
2007-2013
From 28000 to 37500
flights / day
Stakeholder Engagement in the Business FrameworkStakeholder Engagement in the Business Framework
Institutional FrameworkInstitutional Framework
Single European Sky
Target Concept &
Architecture
Target Concept &
Architecture
Common Specifications& Prototypes
Common Specifications& Prototypes
Development Framework
TargetsTargets
PerformanceFramework
ATM Master Plan Management
DeploymentFramework
SESAR ATM
System
SESAR ATM
System
Support to Regulation & Standardisation
Framework
DraftIR and
CS
DraftIR and
CS
IndustryStandardsIndustry
Standards
ATM Master Plan Framework
EUROCONTROL’s Roles in the ATM Master Plan
• Implementation of Short Term Implementation Programmes
• Responsibilities as Founding Member of the SESAR JU
• Leading and Contributing to a number of Work Packages as a Member of the SESAR JU
• Support to Single Sky Legislation
Outside SJU
Inside SJU
Inside and
outside SJU
EUROCONTROL as SJU Founding Member
• Manage the cooperative development of the European ATM Network• Co-ordinate the overall network validation activities• Identify SESAR components for progressive implementation including support to
regulatory measures, as required• Organise and co-ordinate long term ATM research activities• Maintain and up-date the ATM Master Plan, ensuring consistency with other
relevant convergence plans• Manage horizontal safety activities related to SESAR, including appropriate safety
management and safety regulation, the latter in co-operation with EASA• Ensure the involvement of all civil/military stakeholders, through adaptation of the
relevant EUROCONTROL consultation mechanisms• Organise and co-ordinate ATM training in support of SESAR development as
appropriate
EUROCONTROL Role in IP 1
• All implementation programmes that need completion by 2013 …
• That are ongoing …• And mature ….• Together with stakeholders…• That are needed to meet the
performance requirements of the ATM at 2013 ….
• That are the baseline for further R&D work …
• In IP2 and IP3
EUROCONTROL Role in IP 1
• Examples:– CCAMS– ESP– DMEAN– DLINK– FASTI– CASCADE– 8.33 kHz– Airport CDM– ARN V5/V6– ……
• Already indicated in D2 to have good CBAs and further qualified in D5
EUROCONTROL Role in IP 1
• The Agency to complete the IP1 programmes that are in line with the ATM Master Plan
• Stakeholders to implement the IP1 programmes
• Update the ECIP to measure performance against IP1
• Use the renewed ECIP/LCIP mechanism as a formal, EC approved instrument for States to report against IP1 (SES) achievements
EUROCONTROL Role in IP 2
3 - Validation Infrastructure
13 - NIMS
10 - ATC
11 - AOC
12 - Airport 14 - SWIM
9 - Aircraft4 - En Route Operations
7 - Network Operations
5 - TMA Operations
6 - Airport Operations
8 - Information Management
15- Gnd CNS
2 - R&D Overall Consistency
A/1 - WP Management
D - ATM NetworkR&D Programme
16 - Transversal Areas
B - Target concept & Architecture
C - Master PlanMaintenance
E - LT & InnovativeResearch
SJUSJU
Possible Agency WP leadership
Agency WP leadership
DFS
DSNA AENA
NATS LFV
ENAV
Airbus
Indra-Thales Thales-SelexIndra-Selex
Thales-Selex
Stakeholder consultation and monitoring
The performance of European ATM
Agency performance
EUROCONTROL
SCG
Stakeholder consultation and monitoring
EUROCONTROL
SCG
The Performance of European ATM
Patrick Ky
SESAR Development
London, June 6th 2008
The SESAR Joint Undertaking
• Created by EC Council Reg. N°219/2007• Responsible for the execution of the ATM Master Plan, and in
particular the management of the SESAR Development phase
• Two founding members: the EC and EUROCONTROL• Public-private partnership
SESAR Work Flows
ATM Master Plan (endorsed by EU Ministers, adopted by SJU Admin Board)
MPUpdates
R&DValidation
Regulation Implementation
ATM Master Plan (endorsed by EU Ministers, adopted by SJU Admin Board)
MPUpdates
R&DValidation
ATM Master Plan (endorsed by EU Ministers, adopted by SJU Admin Board)
MPUpdates
R&DValidation
SJUSJU
SESSES EurocontrolEurocontrol
Standardisation
SJU organisationExec Director
P Ky
Director AdminFinance
C. BORGHINI
Deputy Exec DirectorProgramme Director
Legal
Comm & stakeholders relations: E Platteau
HR
Finance
Legal
HR
FinanceM DEDIC
LegalC POUZA
HRP COURTOIS
Chief Ops/ Validation
M. STANDAR
Chief Regulatory Affairs
Chief Architect:P. HOTHAM
Chief EconomistA. SIEBERT
WOrk Programme Manager
F. GUILLERMET
The SESAR Partnership
• EU funding (700 M€, TEN-T and FP7) and regulatory actions• EUROCONTROL funding and in kind contribution (700 M€): alignment of
relevant EUROCONTROL activities• Industry (700 M€+): alignment of business strategy and product
development– 15 candidate members as part of an initial core group (CFI 07/07)– Membership agreements to be signed end 2008– Second round of partnership in 2009-2010
Candidate Members (initial core group)
• ANSPs:– AENA, DFS, DSNA, ENAV, NATS, [LFV, Austrocontrol, AVINOR,
ISAVIA, IAA, NAVIAIR, FINAVIA, EANS]• Manufacturing Industry:
– AIRBUS, [ALENIA, Galileo Avionica, Telespazio], INDRA, [SELEX SI, SELEX COM], [THALES Air Systems, THALES Avionics], [SINTEF, SAAB, Kongsberg, Park Air Systems, Thrane&Thrane, Airtel ATN], HONEYWELL
• Airports:– SEAC: ADP, BAA, FRAPORT, MUNICH, SCHIPHOL, UNIQUE– (AENA, LFV, AVINOR)
Indicative Work Programme
Validation Infrastructure
NIMS
ATC
AOC
Airport SWIM
AircraftEn Route Operations
Network Operations
TMA Operations
Airport Operations
Information Management
Grd CNS
TH/SEL
R&D Overall Consistency
WP ManagementATM Network
R&D Programme
Transversal Areas
Target concept &Architecture
Master PlanMaintenance
LT & InnovativeResearch
SJUSJU
Validation Infrastructure
ENAV
NIMS
EUROCONTROL
ATC
TH/IN
AOC
Airport
IN/SEL SWIM
SEL/TH
Aircraft
AIRBUS
En Route Operations
DSNA
Network
EUROCONTROL
TMA Operations
NATSAirport
Operations
AENA
Information Management
LFV
R&D Overall Consistency
WP ManagementATM Network
R&D Programme
Transversal AreasEUROCONTROL
Target concept &Architecture
DFS
Master PlanMaintenance
EUROCONTROL
LT & InnovativeResearch
EUROCONTROL
SJUSJU
SESAR JU management principles
• A small entity, complementary to existing organisations and processes (SES and EUROCONTROL)
• A delivery-oriented work programme:– Concrete deliveries every 1-2 years– Pilot projects enable validation of quick wins in different operational
environments• Need to coordinate with other initiatives:
– NEXTGEN, ICAO• Geared towards implementation:
– The business case– Link with standardisation bodies
Other parties involvement
• Ad Hoc working arrangements to be put in place before end 2008:– Airspace users– Staff representatives– Military Authorities, National Supervisory Authorities, EASA– Independent experts
• External calls for tenders:– On specific fields where an external input is necessary:
• Because of need for independence (e.g. COM study)• Because of need for specific technical input (e.g. AOC)
– On pre-defined topics (e.g. long term research)
Conclusion
• The SESAR definition phase has agreed on a common way forward
• The Joint Undertaking is a tool pooling resources together into a single programme
• It is a partnership, and builds its work upon consolidated and aligned activities
• Working arrangements are being organised to ensure participation of all relevant stakeholders
www.sesarju.eu
SESAR Joint Undertaking
Rue du Luxembourg 3
Brussels
Tel: +32 2 5078000
David Hilton
NATS
SESAR Stakeholders Seminar 6th June
NATS (& Europe) Need SESAR!
• Implementation of SESAR is vital to ensuring the continued growth of civil aviation in UK and European airspace:
– NATS has some of the busiest airspace in Europe– NATS are approaching the airspace projects benefit limit– NATS advanced controller tools programme only bridges the
capacity gap until circa 2015• The European ATM Network can gain shorter term benefits from knowledge
sharing and the sharing of best practices with our European partners in the SESAR JU
– Future capacity will only be realised through such open collaboration in a performance partnership
• Advanced 4D Trajectory Management tools are however essential to increase capacity in the longer term
• Convergence to common methods of operations and architecture roadmaps will increase ANSP efficiency and lower our operating costs
• Interoperability and standard interfaces will reduce our capital investment programmes
NATS Expectations of SESAR
– SESAR will create a viable, safe, efficient and environmentally acceptable future for European Aviation
– SESAR will facilitate and act as the catalyst for a true Single European Sky
– SESAR will enable the early delivery of benefits to our customers
– SESAR Advanced Concepts will deliver the performance targets we all aspire to
Plan refinement:•Arrival capacity•Departure planning•Impacting events•Weather
•Forecasts, •Airline Plans,•Schedule Dev,•Military Exercises,•Major Events•Airspace Design
Negotiation on: •Schedules•Airspace,•Routes, •Resources.
FLIGHT OBJECT
YEARS 6 MONTHS
Medium / Short-term Planning
Long-term Planning
Execution
HOURS MINUTES
Business Development
Trajectory
SBT
Shared Business Trajectory
SBT SBT SBT SBT RBTBDT
Reference Business Trajectory
DAYS
•Local capacity mgt. •Traffic balancing •Real time synchronisation•Tactical De-Confliction
European ATM in 2020
The evolutionary implementation of the SESAR concepts will transform ATMThe evolutionary implementation of the SESAR concepts will transform ATM
Reducing Uncertainty
European ATM in 2020 – Key Expectations
Stable and predictable operation– Business Trajectories published well in advance of the day of
operation– Airspace structures support the preferred trajectories– Decisions affecting the network are made collaboratively– Resources are managed for the best overall outcome– The system has built in resilience for business continuity– Deviation from Business trajectory minimised
Safety– All aircraft intentions and trajectories “known” and “published”
in real time via data-link– Separation assured using Performance Based Navigation (PBN)
with containment along published trajectories– Controller tactical intervention minimised – traffic flows
managed rather than controlled
Environment – No planned airborne holding– Ground based delays with engines on < 3mins over actual taxi
time from gate to runway– Tailored glideslope to reduce local noise & emissions– Continuous descent from cruise altitude (min power/min
emissions)
The Products • Must be developed along a service and performance driven performance driven
roadmap, and of course be feasible and affordable roadmap, and of course be feasible and affordable • Must be interoperable at both a regional and global levelMust be interoperable at both a regional and global level
• Interoperability on its own is not enough – alignment of stakeholder roadmaps will be the key to success
• Must have balanced costs against benefitsMust have balanced costs against benefits• Must deliver benefits early where feasible – but without diverting Must deliver benefits early where feasible – but without diverting
from the ultimate SESAR goal from the ultimate SESAR goal The Customers
• Must have a SESAR menu to choose from• Must be assured of a clear governance and leadership structure clear governance and leadership structure
for product development and deployment with their engagementfor product development and deployment with their engagement• StrengthenedStrengthened
The Stakeholders• Must commit and ensure that Phase 1 - ECIP/LCIP is deliveredMust commit and ensure that Phase 1 - ECIP/LCIP is delivered• Must establish a single European legislative frameworkMust establish a single European legislative framework• Must drive for efficiency and better regulatory principlesMust drive for efficiency and better regulatory principles• Must endorse and commit to the Master PlanMust endorse and commit to the Master Plan
SESAR - Some Key Must Haves
The Master Plan
• Visit the e-ATM Master Plan Portal at www.atmmasterplan.eu for a detailed and interactive view of the information contained in the ATM Master Plan.
• This portal will let you:• Navigate easily through the complex architecture of the master plan
through clickable diagrams and roadmaps • Browse the master plan according to predefined categories targeting
your specific needs (by chapter, by type of stakeholder, by key performance area, etc.)
• Access the documentation of the SESAR definition phase through our ATM Master Plan Library
• Stay informed of latest news and updates through our e-newsletter and RSS services.
• Provide feedback and suggestions for modification on the content or display of the information available on the portal.
Lunch
Spares (SCG)
Item 2.6Item 2.6SES Reporting Working GroupSES Reporting Working Group
Reference: Information Paper SCG/8/IP03Reference: Information Paper SCG/8/IP03
Danny DEBALSDanny DEBALS
LCIP ManagerLCIP Manager
SCG/8 – 14/15th May 2008
BACKGROUND
• SCG/2 – Agreed to convene an E/LCIP TF to address adaptation to SES and SESAR
• SCG/4 – TF report presented + Action Plan to implement its recommendations is subsequently developed + approved at SCG/5
• SCG/6 – Reaffirmed the need for avoidance of double reporting (+ later also by SSC), and Agency+EC invited to streamline reporting requirements and find synergies in order to avoid the double reporting
• SCG/7 – SES Reporting WG arrangements presented and approved. SCG requested that SCG members be involved in the WG.
Progress since SCG/7• EC (DG-TREN) and Agency experts worked together and drafted
proposals on:
– The approach to “translate” the (SES) reporting requirements into LCIP-type questions, and already translated a sub-set of these requirements
– The approach to “translate” ECIP objectives into SES-related implementation objectives
– Specific chapter(s) of the LCIP, with specific signature arrangements, will be devoted to the SES reports
– The reporting period of the SES Reports will be set per calendar year to synchronise it with the LCIP cycle (also recommended by SSC)
– Prefilling (where possible) + separate full-guidance
• This work was presented to the SCG representatives on 30 April, and received full support
Next Steps
• Continue with the work of the Drafting group in the development of the adapted LCIP Template
• Develop guidance material as appropriate
• Present progress of the work end of May
• EC to assess and accept the outcome of the work – June 2008
• Initial approach for an enhanced “ECIP/LCIP” mechanism, including updated templates and guidance material, to be presented to stakeholders at SES Reporting Workshop planned for Sep 2008
• SES-related implementation objectives to progressively replace existing ECIP objectives where relevant - Two ‘translated’ SES-related objectives to be introduced into ECIP 2009-2013.