special span and tmp slides
TRANSCRIPT
PERMOHONAN PENUTUPAN JALAN ANTARA PERSIMPANGAN LEBUHRAYA KG JAWA DAN PERSIMPANGAN HILIR SG KLUANG BAGI
PEMBINAAN ‘SPECIAL SPAN’
08 JULAI 2015
MENAIKTARAF LEBUHRAYA BAYAN LEPAS (BLE)
DARI BATU MAUNG KE SG. NIBONG (QUEENSBAY)
PULAU PINANG
TAKLIMAT KEPADA EXCO KERAJAAN NEGERI PULAU PINANG
SG TIRAM
QUEENSBAY
BLE PROJECT
1
STANDARD SPAN PROGRESS
PHOTO
2
3
ELEVATED
BRIDGE FOR
STANDARD SPAN
SPECIAL SPAN PROGRESS
PHOTO
4
5
6
7
SECTION ELEVATION
PIER 19 PIER 20
Balance_Cantilever_Method.mp4
8
Special Span
Elevated Bridge Crossing Sg Kluang
Method of Construction
Cast In-Situ Balanced Cantilever Segmental Box Girder
(SBG)
Scope of works
Installation of Form Traveller (4 nos). (Status of work -
Completed)
Construction of Segmental Box Girder (96 segments +
3 stitching segments). ( Status of work - in progress)
9
Special Span
Elevated Bridge Crossing Sg Kluang
Main Activities – must be carried out during
road closure
1) Concreting of SBG.
2) Self Launching of Form Traveller.
3) Stressing cable
Other activities
Rebar works, installation of PT duct & anchorage, FT
PVC pipe, hyrib, cable strand and etc.
10
Info of Special Span
Total Length : 390 m.
Total Span : 3 span.
Total Segment : 96 nos + 3 nos (stitching)
Total Load : 14,000 tonne
Mid Span : 170 m.
Span Width : 18.2 m
Mid Span Load: 6,400 tonne.
11
12
Penang 2nd Bridge Ramp Collapse
TRAFFIC MANAGEMENT
PLAN (TMP)
13
SG TIRAM
QUEENSBAY
BLE PROJECT
14
SG KLUANG
15
SKIM PENYURAIAN TRAFIK DARI BATU MAUNG KE GEORGETOWN
1
2
3
4
A
B
C
D
E
F
16
SKIM PENYURAIAN TRAFIK DARI QUEENSBAY KE BATU MAUNG
1
2
3 4
5
6
A B
1
17
UTILIZATION PLAN AND TMP FOR SPECIAL SPAN
18
Info of Lane Closure
LOCATION
Lebuhraya Tun Dr Lim Chong Eu from junction
Lebuhraya Kg Jawa to Hilir Sg Kluang 1.
DURATION
7 months from the gazetted date by the Minister
(Ministry of Works)
19
OPTION 1
TOTAL ROAD CLOSURE (24 hours)
Advantage
Eliminate risk to road users
Disadvantage
Cause massive jam to road user during
peak hour
20
OPTION 2
ROAD CLOSURES BY A SCHEDULED BASIS
Approved by Exco on 12 June 2015
Open to Traffic
Monday to Thursday
Morning: 5.30 am to 10.00 am,
Evening: 4.00 pm to 9.00 pm
Friday
From 5.30 am to 9.00 pm
21
OPTION 2
Closed to Traffic
Monday to Thursday
From 10.00 am to 4.00 pm &
9.00 pm to 5.30 am
Friday to Sunday
From 9.00 pm (Friday) to 5.30 am (Monday)
22
OPTION 2
Advantage
Reduces traffic jam during peak hour
Disadvantage
Exposed risk to road users
23
24