status on recent accelerator projects at korea ( 最近 韓國內 加速器 科題現況 )

31
1 Status on recent acceler ator projects at Korea ( 最最 最最最 最最最 最最最最 ) 1 最 22 最 2008 最 最最 最最最 最 最

Upload: chaz

Post on 21-Jan-2016

44 views

Category:

Documents


0 download

DESCRIPTION

Status on recent accelerator projects at Korea ( 最近 韓國內 加速器 科題現況 ). 1 月 22 日 2008 年 慶北 大學校 金 銀 山. 內 容.  Light source project ( 浦 港 ) - PLS-II ( 確定 , 1000 億圓 , Jan 2009 - Dec. 2011) : 現 PLS upgrade  Proton linac project ( 慶 州 ) - PowerPoint PPT Presentation

TRANSCRIPT

  • Status on recent accelerator projects at Korea ( )

    1 22 2008

  • Light source project ( ) - PLS-II ( , 1000, Jan 2009 - Dec. 2011) : PLS upgrade Proton linac project ( ) - 100 MeV (, ~1250 (2500) , 2002-2012)

    Heavy-Ion accelerator project - Cancer therapy ( , ~1400(1900), + , 2010-2015, @) - heavy-ion accelerator (75, 2008-2011, KBSI )

    business ( Jan. 2009, : ) : 3 5487 (, ) - Rare Isotope Accelerator : (2010-2011), (2012-2015), 4600

    - ABSI ( , 2012 ) : 50 groups

    - 10 GeV SASE-FEL ( / in 2009, PAL) - 10 MeV superconducting electron linac (@ KAERI )

  • 1. PLS II projectExtension of linac energyModification of ring lattice

  • 1. PLS II project ( )

  • 1. PLS II project( linac) Beam energy 2.5 GeV Length 160 m RF frequency 2.856 GHz No. of columns 44 Beam pulse length 1 nsEnergy spread 5x 10-3Repetition rate 10 HzBunch length 6 mm

  • 1. PLS II project(linac upgrade)Add Modulator / Klystron

    - Add 4 MK units @ linac - Energy increase : from 2.5 GeV to 3 GeV

    Improvement of stability for Top-up injection

    - improvements on diagnostics, gun, timing, modulator, optics, control, utilities.

  • 1. PLS II project ( ring) Lattice type Triple Bend ArcBeam energy 2.5 GeV Circumference 280 m RF frequency 500.08 MHz Harmonic number 468 Beam emittance 18.9 nmEnergy spread 8.6 x 10-4Damping time 8 ms / 4 ms

  • 1. PLS II project (ring lattice modification) TBA @2.5 GeVChromatic DBA @3 GeVCombined BendIDIDID

  • 1. PLS II project (ring parameters )Energy : 3.0 GeV (2.5 GeV)Emittance : 5 nm (18.9nm)Beam current : 400 mA (190mA)Circumference : 281.82 m (280.56m)Number of bunch : 470 (468)Bunch length : 6 mm (7.6mm)Energy spread : 0.1% (0.086%)RF voltage : 3.6 MV (1.6 MV)RF frequency : 500 MHz (500 MHz)

  • 12 x 6.8 m long straight sections 10 are for IDs and 1 for injection 1 (or 2) for 500 MHz RF [Normal Cavity or Super-Cavity : ]

    12 x 3.1 m short straight sections 10 are for IDs ( 20 bending magnet beam lines ) 1. PLS II project (ring straight sections)

  • 2. Proton Linac Project

  • 2. Proton Linac

  • 2. Proton Linac (RCS,)

  • 2. Proton Linac

  • 2. Proton Linac 20 MeV

  • 2. Proton Linac

  • 3. Heavy ion therapy accelerator(@ Pusan)

    KIRAMS ( , Seoul)

  • 3. Heavy ion therapy

  • 3. Heavy ion therapy120 MeV

  • 3. Heavy ion therapy

  • @ Pusan 400MeV C123. Heavy ion therapy not still fixed layoutbasic concept

  • (Li2~3+ production >1pmA)Acceleration ~2.5MeV/uNeutron production(2.5MeV 3x1012/sec)H(7Li, n)7Be Inverse kinematics4. Heavy-Ion and Fast Neutron Beam Facility KBSI (Pusan)(2008-2011) Li 3+ 5mA / Ar 8+ 2mA Kr 13+ 0.6 mA / Xe 20+ 0.3 mAECR

  • business - President visited KEK, CERN and GSI during electron period in 2007.

    - He promised a new science city that includes an institute and an accelerator facility.

    - Last week, government officially decided a new science city project that includes establishment of ABSI and construction of a heavy-ion accelerator [actually, Rare-Isotope Accelerator].

  • 5. Rare Isotope Accelerator (@ business ) 2010-2011 : 2012-2015 : Not still detailed layout

    Rough SPECSuperconducting LINACU : 200 MeV/n, L~ 120mSynchrotron (?)C : 400 MeV/n, C ~150mBeam current H : 4 mA (CW)U : 2 A (CW)ParticleH ~ U InsertionECRIS, RFQBudget 4,600

  • 5. Rare Isotope Accelerator (@ business ) ion

  • 6. Superconducting e- linac at KAERI - 10 MeV beam - 10 MeV ERL (not still funded)

  • 7. 10 GeV SASE-FEL plan

  • M1 L1 XBC1 M2 L2 BC2M3 L3 M4 BTL Injector Undu. M : Matching section X : X-band Linac ( 31.6 MV/m) L : S-band Linac (27 MV/m)q=1 nCsz=2.9 psex=0.93 mmey=0.93 mmsd=0.2 %E=0.135 GeVq=1 nCsz=0.94 psex=1.05 mmey=1.11 mmsd=0.93 %E=0.42 GeVq=1 nCsz=0.078 psex=1.10 mmey=1.14 mmsd=0.53 %E=2.84 GeVq=1 nCsz=0.078 psex=1.10 mmey=1.06 mmsd=0.037 %E=10.0 GeV frf =21o frf =20o frf=22.2o 7. 10 GeV SASE-FEL layout

  • 7. Bunch compressor IICompression factor: 12Bending angle : 0.0396 rad R56 : -49.5 mm

  • 7. Beam performance

  • Several accelerator projects are on-going: mainly in stages of design and initial construction, but man-power is not enough.

    -CERN MOU (done) : LHC : 30 (2009) -KEK MOU (how about?) : [ILC(ATF..), Super-B...] /

    Extension of linacCombined Bend ECR