Status Report MAX-lab. New kappa not yet in operation. Status Report MAX-lab. Status Report MAX-lab. I911-1 Diffraction station Under reconstruction. Status Report MAX-lab. I911-1 Diffraction station Under reconstruction. I911-2 MX station Single-axis goniostat. Status Report MAX-lab. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

• New kappa not yet in operation

Page 2: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

Page 3: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

I911-1Diffraction stationUnder reconstruction

Page 4: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

I911-1Diffraction stationUnder reconstruction

I911-2MX stationSingle-axis goniostat

Page 5: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

I911-1Diffraction stationUnder reconstruction

I911-2MX stationSingle-axis goniostat

I911-4SAXS stationUnder commissioning

Page 6: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

I911-1Diffraction stationUnder reconstruction

I911-2MX stationSingle-axis goniostat

I911-4SAXS stationUnder commissioning

I911-5MX stationSingle-axis goniostatNew monochromator

Page 7: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

I911-1Diffraction stationUnder reconstruction

I911-2MX stationSingle-axis goniostat

I911-4SAXS stationUnder commissioning

I911-5MX stationSingle-axis goniostatNew monochromator

I911-3Tunable MX stationMini-kappa MK3

Page 8: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

I911-3:Experiment station completely rebuilt March-May 2010(new hutch, new experiment tables, new goniostat,...)

Users during June 2010

Sample changer installation October 2010

Page 9: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

Page 10: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

Page 11: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

Page 12: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

I911-3:

Control software: spec and mxCuBE

mini-kappa MK3: not yet used

Page 13: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

MAX IV

New facility replacing the present MAX I, MAX II & MAX III storage rings (and the present FEL test facility)

Consisting of:- 1.5 GeV ring (96 m circumference, 6 nm rad)- 3 GeV ring (530 m circumference, 0.3 nm rad, 19 straight sections available)- a short pulse facility that could be extended with a FEL

Page 14: Status Report MAX-lab

Kappa meeting, EMBL, Grenoble, 20th September 2010 Thomas Ursby

Status Report MAX-labStatus Report MAX-lab

MAX IV

Funding available for buildings and accelerator

... but not for the beamlines

We hope to have funding for 7 beamlines this autumn including a microfocus MX beamline and possibly ahigh-throughput MX beamline.