JASPERS Support – Romanian Standardised Tender Documents for Solid Waste Projects CONSORTIUM: ENVIROPLAN S.A. – LOUIS BERGER France – KOCKS Consult GmbH – ICP mbH – C&E GmbH Task 3.1 Standard tender documents for the construction of landfills Final Version: November 2011 Assignment: “JASPERS Support – Romanian Standardised Tender Documents for Solid Waste Projects” Project Reference: 2010 174 RO SWE SLW

Upload: sorinfair

Post on 23-Nov-2015

17 views

Category:

Documents


0 download

TRANSCRIPT

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    Task 3.1 Standard tender documents for the construction

    of landfills

    Final Version: November 2011

    AAssssiiggnnmmeenntt::

    JJAASSPPEERRSS SSuuppppoorrtt RRoommaanniiaann SSttaannddaarrddiisseedd TTeennddeerr DDooccuummeennttss ffoorr SSoolliidd WWaassttee PPrroojjeeccttss

    PPrroojjeecctt RReeffeerreennccee:: 22001100 117744 RROO SSWWEE SSLLWW

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    AssignmentName: JASPERS Support Romanian

    StandardisedTenderDocuments forSolidWasteProjects

    ReferenceNo: 2010174ROSWESLW Documenttitle: Standard tender documents for the construction of

    landfills

    Status: FINALVERSION

    Date: November2011

    Client: EUROPEANINVESTMENTBANKJASPERSUnit

    Draftedby: GerdUweBURKHARDTTeamLeader

    ChristosTSOMPANIDISFIDICExpert

    CarmenCALINTDPreparation/ProcurementExpert:

    BernhardGIPPSWLandfillsconstructionexpert1

    AliChakirKASDARLISWLandfillsConstructionExpert2

    MariusBOACSAConstructionSupervisionExpert

    CheckedApprovedby: GerdBURKHARDT TeamLeader ProjectManager

    Date/Initialscheck:

    November2011

    CheckedApprovedby: Mrs.KonstantiaPASCHALIMANOU ProjectCoordinator

    Date/Initialscheck:

    November2011

    Approvedby: TheofanisLOLOS ProjectDirector

    Date/Initialsapproval:

    November2011

  • CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    TenderDocumentfor

    ProcurementofWorks

    Constructionofasanitarylandfillin[insertregion]Romania

    RedFIDICBook

    Issuedon:....

    TenderNo:..

    [ContractingAuthority]Romania

  • CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    LISTOFVOLUMES

    Volume0 TenderData

    Volume1 ContractData

    Volume2 TechnicalSpecifications

    Volume3 Drawings

    Volume4 BillofQuantities

    Volume5 InformationincludedintheContract

    Volume6 InformationnotincludedintheContract

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1: Standard tender documents for the construction of landfills Volume 0 Tender Data Page I

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    VOLUME0

    TENDERDATA

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1: Standard tender documents for the construction of landfills Volume 0 Tender Data Page II

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    LISTOFVOLUMES

    Volume0 TenderData

    Section1DataFiche

    Section2Instructiontotenderers

    Section3InformationSubmission

    Section4TenderAssessmentGrids

    Volume1 ContractData

    Volume2 TechnicalSpecifications

    Volume3 Drawings

    Volume4 BillofQuantities

    Volume5 InformationincludedintheContract

    Volume6 InformationnotincludedintheContract

    WordsorphraseswrittenwithinitialcapitallettersaredefinedintheConditionsofContractorGlossary. If there is a choice between the Conditions of Contract terms and glossary, theConditionsofContracttakeprecedence.

    The tenderer is expected to examine all instructions, forms, terms, and specifications in theTenderDocument.Failuretofurnishall informationordocumentationrequiredbytheTenderDocumentmayresultintherejectionoftheTender.

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 1 FIDIC Red Book Page I

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    Section1DataFiche

    TABLEOFCONTENTS

    I.AContractingAuthority

    I.BMainActivityorActivitiesoftheContractingAuthority

    I.CTenderingCalendar

    I.DComplaints

    I.ESourceofFunding

    IIObjectoftheContract

    II.1Description

    II.2QuantityorScopeoftheContract

    IIIProcedure

    III.1TypeofProcedure

    III.2Finalphaseofelectronictender

    IVQualificationand/orSelection

    IV.1Personalsituationofeconomicoperators

    IV.2Capacitytoundertakeaprofessionalactivity(registration)

    IV.3EconomicandFinancialcapacity

    IV.4TechnicalCapacity

    IV.5JointVenture

    VSubmissionofTender

    V.1Languageoftender

    V.2Validityperiodoftender

    V.3Guarantees

    V.4ContentofTender

    V.5QualificationInformationdocuments

    V.6TechnicalProposal(ifapplicable)

    V.7FinancialProposal

    V.8Conditionsforsubmissionsoftender

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 1 FIDIC Red Book Page II

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    v.9Dateofdispatchofinvitationstotender

    V.10Conditionsofopeningtenders

    VAwardCriteria

    VIIComplementaryInformation

    VII.1Thisisarecurrentprocurement

    VII.2FileReferenceNumberAttributablebytheContractingAuthority

    VII.3PreviousPublicationsConcerningtheSameContract

    VII.4ConditionsforobtainingTenderDocumentsandadditionalinformation

    VII.5Dateofdispatchofthisnotice

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 1 FIDIC Red Book Page 1

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    DATAFICHE

    I.AContractingAuthority

    Name:[..]

    Address:[..]

    Locality:[..]

    PostCode:[..] Country:[..]

    Contactperson:[..]

    Telephone:[..] Fax[..]

    Email:[..] Website:[..]

    Address/otherinternet(ifapplicable)

    I.BMainActivityorActivitiesoftheContractingAuthority

    Publicadministration

    TheContractingAuthoritypurchasingonbehalfofothercontractingauthorities:Yes

    Nox

    I.C.Tenderingcalendar:

    Dateofpublicationoftheprocurementnotice Date

    Deadline for request for obtaining TenderDocumentsandadditionalInformation.

    Date

    Recommended Deadline for requests forclarifications

    Date

    Deadlineforanswerstoclarificationrequests Date

    Deadlineforsubmissionoftenders Date/time/place

    Openingsession Date/time/place

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 1 FIDIC Red Book Page 2

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    Estimated date for completion of tenderingprocedure

    Date

    Estimateddateforsigningofcontract Date

    Otherinformationand/orclarificationscanbeobtained: attheaddressaforementioned

    others:(address/fax/workinghours)

    Note:Incompliancewiththelawontherulesofcommunicationanddatatransmission,thecontractingauthority shall specify the method of communication used during the procedure (clarificationdocuments/tender):mail,fax,mailandbiddersshouldindicateaddressesofcorrespondence)Note:Allclarificationsprovidedbythecontractingauthoritytothebiddersonthetenderdocumentationwillbean integralpartof this,andclarifications from thebiddersduring thetenderevaluationwillbeattached.

    I.D.Complaints:

    ComplaintsaresubmittedtotheNationalCouncilforSolvingComplaintsName:NationalCouncilforSolvingComplaintsAddress:6StavropoleosStreet,6.3rdDistrict Location:Bucharest Postcode:030084Country:RomaniaEmail:[email protected] Phone:0213104641Website:www.cnsc.ro Fax:0213104642

    I.E.SourceofFunding:

    EUfunds [insertpercentage]%

    Statebudget [insertpercentage]%

    Localbudget [insertpercentage]%

    Othersources* [insertpercentage]%

    TOTAL 100%

    *[insertdetailsofothersources]

    IIObjectoftheContract

    II.1Description

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 1 FIDIC Red Book Page 3

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    II.1.1:Contractname:

    [InserttheexactnameintheContractnotice]

    II.1.2:ObjectofContract:

    Typeofcontract Executionof constructionofworksBaseduponFIDIC Conditions of Contract for Construction(1999editionRedBook)

    Shortdescriptionofthecontract [Short_Description_1]

    [Short_Description_2]

    [Short_Description_3]

    [Short_Description_4]

    [Short_Description_5]

    II.1.3EstimatedvalueofContract:

    TheestimatedContractvalueis[insertamount]lei,excludingVAT.

    II.1.4Locationoftheworks

    Themainlocationofperformance:

    [Location_Town]

    [Location_County]

    [Site_Visit_1]

    [Site_Visit_2]

    [Site_Visit_3]

    Note:Thecontractingauthoritymayarrangesitevisits,dependingonthecomplexityoftheworks;thepresenceofpotentialbiddersisoptional.

    Inthiscase,thecontractingauthorityshallstatethedate,time,andvenueanditwillassurethepresenceoftheexperiencedpersonnelwithinthefieldoftheobjectofthecontract.

    II.1.6.CPVCode:

    MainObject:452221103WastedisposalsiteconstructionworkAdditionalObjects:[tobefilledaccordinglybytheContractingAuthority,ifnecessary]

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 1 FIDIC Red Book Page 4

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    II.1.7Thecontractinvolves

    Publicprocurementcontract:x

    CompletionofFrameworkagreement:

    II.1.8Duration:

    Duration of theWorks Contract is [insert duration] (including Defects Notification Period of [insertduration])fromthecommencementnotice,asstatedintheAppendixtoTender.

    II.1.9Informationonframeworkagreement(ifapplicable)

    Frameworkagreementwithseveraloperatorsno..........Maximumno...ofparticipantsconcerningtheframeworkagreement

    Frameworkagreementwithoneoperator

    Durationoftheframeworkagreement:Durationinyears___ormonths___PossibilitytostartovercompetitionwiththesignatoriesoftheframeworkagreementYesNoIfYes____________________________________(areadditionalclarificationsrelatedtotheconductofrecompetitionamongthesigningpartiesofframeworkagreement)

    II.1.10Divisionintolots

    notapplicable

    II.1.11Alternativetenders

    Alternativetendersnotallowed.

    II.2QuantityorScopeoftheContract

    II.2.1Totalquantityorscope

    TheContractincludesundertakingthefollowingactivitiesforthe[insertnameoflandill]accordingtotheContractingAuthoritysRequirementsasdetailedintheSpecifications&DrawingsinthisTenderdocumentation.

    a)Constructionworks

    b)Testingandcommissioning

    c)Trainingofoperatingstaff.

    d)RepairofthepossibledamagesduringDefectNotificationPeriodof[insertduration]months

    e)OthersubjectsasdefinedintherelevantTenderDocuments

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 1 FIDIC Red Book Page 5

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    A full description of works and related quantities, is presented in the Specifications of the Tenderdocumentation.

    II.2.2Options

    Notapplicable.

    IIIProcedure

    III.1TypeofProcedure

    Opentender.

    III.2Finalphaseofelectronictender

    YesxNo

    IfYes,additionalinformationaboutelectronicauction

    ____________________________________________________________________

    __________________________________________________________________

    IV.Qualificationand/orSelection

    IV.1.Personalsituationofeconomicoperators

    Declarationregardingthecompliancewith34/2006Article180

    Declarationregardingthecompliancewith34/2006Article691andArticle181

    A Tax Registration Certificate delivered by the competent tax body, in legalized copy or certified inaccordance with the original, attesting the fulfillment towards the state budget of the obligationsregisteredforthepreviousmonthconsideringthedateofsubmissionoftheofferor,inthecaseofnonRomaniancompany,theequivalent,validandwithoutregistereddebts.

    ACertificateattestingthepaymentoflocaltaxesandcharges,inlegalizedcopyorcertifiedinaccordancewiththeoriginal,attestingthefulfillmenttowardsthestatebudgetoftheobligationsregisteredfortheprevious month considering the date of submission of the offer or, in the case of nonRomaniancompany,theequivalent,validandwithoutregistereddebts.

    ACertificateattesting thepaymentof social contributions in legalized copyorcertified inaccordancewith theoriginal regarding theobligations registered for thepreviousmonthconsidering thedateofsubmissionoftheoffer(forthecountriesinwhichsuchcontributionsarecollectedseparately),validand

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 1 FIDIC Red Book Page 6

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    withoutregistereddebts

    Declarationregardingtenderersparticipationwithindividualoffer

    IV.2Capacitytoundertakeaprofessionalactivity(registration)

    a) Romanian individuals/legal entities shall submit a certificate issued by the National CompanyRegister,specifying the fieldofactivity,validon thedateofsubmitting theTenders (inoriginalorlegalizedcopy,orcopycertifiedinaccordancewiththeoriginal).

    b) NonRomanianindividuals/legalentitiesshallsubmitincopycertifiedinaccordancewiththeoriginalof the certified translation intoRomanianof appropriate relevantdocuments attesting a formofregistration/certificationorprofessionalmembership,deliveredbythecompetentauthoritiesinthecountrywherethenonRomanianindividuals/legalentitysheadofficeislocated.

    c) NonRomanian individuals/legalentitiesshallsubmitafiscalresidencecertificate(inordertoavoidthedoubletaxation)ordeclarationvalidforthecurrentyear

    IV.3Economicandfinancialcapacity

    a) Registeredbalancesheetsforatleast3years.

    b) AverageAnnualturnoverofatleast[Amount]leioverthelast3years.

    c) Availableresourcesforthescopeofthecontractin[Amount]foraperiodof[insertduration]months.

    IV.4Technicaland/orProfessionalcapacity

    Previousexperience:

    At leasttwoprojects forConstructionofLandfill finalizedandsuccessfullycompletedwithinthe last5years,includingatleastthefollowingworksbutnotbeinglimitedto:

    Compliantlandfillbottomliningsystemwithasurfaceareaof[specifyrequiredarea]m2 LeachateCollectionSystem LeachateTreatmentPlant Landfillgastreatmentsystem EnvironmentalMonitoringsystem

    IncasethecontractwasexecutedbyaJointVenture,theTenderershalldemonstratethat itsshare intheJointVenturewasatleast50%.Incasethattheexperiencereferstoalandfillwhichitsbottomliningsystemcoversanareagreaterthantheminimumoneassetabove,thenalowersharepercentageintheJointVenturecanbeacceptedunderthefollowingcondition:

    [sharepercentageofreference]x[areaofreference]50%x[minimumrequiredarea]

    Thelowestacceptablepercentageforthatcalculationis30%.

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 1 FIDIC Red Book Page 7

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    IV.5JointVenture

    Subject to a JointVenture agreement acceptable to the ContractingAuthority, and joint and severalliabilityofallmembers,JointVenturesarepermittedbytheContractingAuthority.

    VSubmissionoftheTender

    V.1Languageoftender

    Romanian

    V.2Validityperiodoftender

    90daysfromtendersubmissiondate.

    V.3Guarantees

    TenderGuaranteetosum[enter_amount]leirequired.

    PerformanceGuaranteeshallbe[insert%]ofthecontractamount.

    V.4ContentofTender

    Offermustcontainthefollowings,whichisdescribedanalyticallyinSection2:

    a) EnvelopewithQualificationInformationdocuments

    b) EnvelopewithTechnicalProposal(ifapplicable)

    c) EnvelopewithFinancialProposal

    ThetendermustcontaintheformsfilledasprovidedinSection3ofVolume0ofTenderDocuments

    V.5QualificationInformationdocuments

    Thefirstenvelopementionedabovecontainstheformsandeverydocumentsrelatedtoqualificationandselectionprocedure.

    V.6TechnicalProposal(ifapplicable)

    Only in cases that some specific parts of the Landfill Sitewill be offered as a lump sum price (e.g.leachatetreatmentplant),atechnicalproposalshouldbesubmittedonlyforthispartsandwillinclude:

    a) TechnicalDescriptionoftheofferedsubjects;

    b) TechnicalSpecificationoftheofferedsubjects;

    c) TechnicalBrochuresoftheofferedsubjects;

    d) Listofsparepartsandconsumables,includinglaboratoryreagentsfor2years(indicatively);

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 1 FIDIC Red Book Page 8

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    e) Drawingsoftheofferedsubjects.

    V.7FinancialProposal

    a) FormofTender

    b) AppendixtoTender

    c) CompletedBillofQuantities

    TheFormofTendershallpresentthepriceoftheTender,excludingVAT,statedinlei.

    [insertsubjecttoadjustmentduringtheperformanceoftheContractinaccordancewithnationallaw

    orfixedduringtheperformanceoftheContract]

    V.8Conditionsforsubmissionsoftender

    Tenderareprovided[date,time,place]

    V.9Dateofdispatchofinvitationstotender

    Notapplicable

    V.10Conditionsofopeningtenders

    TenderDocumentsshallbeopenedat[date,time,place]

    VI.AwardCriteria

    Lowestprice.

    VII.ComplementaryInformation

    VII.1Thisisarecurrentprocurement

    No

    VII.2FileReferenceNumberAttributablebytheContractingAuthority

    [File_Ref]

    VII.3PreviousPublicationsConcerningtheSameContract

    Notapplicable

    VII.4ConditionsforobtainingTenderDocumentsandadditionalinformation

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 1 FIDIC Red Book Page 9

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    Thedeadlineforrequestsoftenderdocumentsis[Deadline_for_documents]

    Tenderdocumentsareobtainablefromwww.elicitatie.ro(SEAP).

    VII.5Dateofdispatchofthisnotice

    [Date]

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 1

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    LISTOFVOLUMES

    Volume0 Tenderdata

    Section1DataFiche

    Section2InstructiontoTenderers

    Section3InformationSubmission

    Section4TenderAssessmentGrids

    Volume1 ContractData

    Volume2 TechnicalSpecifications

    Volume3 Drawings

    Volume4 BillofQuantities

    Volume5 InformationincludedintheContract

    Volume6 InformationnotincludedintheContract

    Wordsorphraseswrittenwith initialcapital lettersaredefined intheConditions ofContractorGlossary. Ifthere isachoicebetween theConditions ofContract termsandglossary, theConditionsofContracttakeprecedence.

    Thetenderer isexpectedtoexamineall instructions,forms,terms,andspecificationsintheTenderDocument.FailuretofurnishallinformationordocumentationrequiredbytheTenderDocumentmayresultintherejectionoftheTender.

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 2

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    Section2InstructiontoTenderers

    TABLEOFCONTENTS

    1. GeneralInformation ................................................................................................. 31.1. Introduction ................................................................................................................... 31.2. Contracting Authority .................................................................................................... 31.3. The main activity or activities of the Contracting Authority ........................................... 41.4. Tendering calendar ....................................................................................................... 41.5. Tender Clarifications and Modifications ........................................................................ 41.6. Site Visit ........................................................................................................................ 51.7. Means of Appeal ........................................................................................................... 51.8. Financing source .......................................................................................................... 5

    2. ObjectofContract .................................................................................................... 72.1 Description .................................................................................................................... 72.2 Scope of the Contract ................................................................................................... 7

    3. SpecificConditions ................................................................................................... 83.1 Restriction of Tenderers ............................................................................................... 83.2 Ethics ............................................................................................................................ 83.3 Others ........................................................................................................................... 9

    4. Procedure ................................................................................................................ 94.1 Selected Procedure ...................................................................................................... 94.2 Final phase of electronic bidding .................................................................................. 94.3 Applicable Legislation ................................................................................................... 9

    5. Qualificationand/orSelectionCriteria .................................................................... 105.1 Personal situation of the Tenderer ............................................................................. 115.2 Capacity to undertake a professional activity (registration) ........................................ 125.3 Economic and financial situation ................................................................................ 125.4 Technical and/or Professional Capacity ..................................................................... 125.5 Joint Ventures ............................................................................................................. 13

    6. SubmissionoftheTender ....................................................................................... 146.1 Language of the Tender ............................................................................................. 146.2 Validity period of the Tender ....................................................................................... 146.3 Tender Guarantee ...................................................................................................... 146.4 Content of the Tender ................................................................................................. 156.5 Technical proposal (if applicable) ............................................................................... 156.6 Financial proposal ....................................................................................................... 166.7 Tender Submission ..................................................................................................... 166.8 Withdrawal, Substitution, and Modification of Tenders .............................................. 176.9 Opening of the Tenders .............................................................................................. 186.10 Analysis and assessment of the Tenders ................................................................... 186.11 Right of the Contracting Authority to Accept or Reject Any Tender ........................... 196.12 Rules to avoid conflict of interest ................................................................................ 19

    7. AwardCriteria ........................................................................................................ 208. AwardoftheContract ............................................................................................ 20

    8.1 Adjustment of the Contract price ................................................................................ 208.2 Notification of Award ................................................................................................... 20

    9. ContractSigningandPerformanceSecurity/Guarantee ............................................ 209.1 Signing of Contract ..................................................................................................... 209.2 Performance Guarantee ............................................................................................. 21

    10. CommencementofWorks ................................................................................... 21

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 3

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    INSTRUCTIONSTOTENDERERS

    (Structureandframeworkcontent)

    MODELAPPLICABLE TOCONTRACTS FORTHECONSTRUCTION OFLANDFILLS(RedFIDIC)

    1. GeneralInformation

    1.1. Introduction

    TheTenderDocuments,asissuedtoeachtenderercomprise:

    (a)Volume0containingtheseDataFiche,InstructionstoTenderers,InformationSubmission,TenderAssessmentGrids;

    (b)VolumeIcontainingtheConditionsofContractandForms,

    (c)Volume IIcontaining theGeneralandParticularTechnicalSpecifications,HealthandSafetyPlanandQualityAssurancePlan

    (d)VolumeIIIcontainingtheDrawings,

    (e)VolumeIVcontainingtheBillofQuantities

    (f)VolumeVcontainingInformationincludedintheContract;

    (g)VolumeVIcontainingInformationnotincludedintheContract;

    [Thefollowingdocumentshavealsobeenissuedtoeachtendererforinformation:[]

    These[documentsandthe]InstructionstoTenderersshallnotformpartofthetenderer'soffer,norpartofthedefinedwords "Tender" or "Contract". These Instructions prescribe the procedures to be followed until theContracting Authority either enters into a Contract with the tenderer or advises him that the ContractingAuthoritydoesnotintendtodoso.

    The tenderershallbearallcosts incurred in thepreparationandsubmissionof theTender, includingvisitsandotheractionsmentionedorimpliedintheseInstructions.

    TheContractingAuthoritywillnotberesponsibleorliableforsuchcosts,regardlessoftheconductoroutcomeofthetenderingprocess.TheContractingAuthorityreservestherighttoacceptorrejectanyTender,ortoannulthetenderingprocessandrejectallTenders,withoutincurringliabilitytoanytendererandwithoutbeingobligedtoinformanytendererofthereasonsfortheContractingAuthority'saction.

    1.2. ContractingAuthority

    Name:[..]

    Address:[..]

    Locality:[..]

    PostCode:[] Country:[]

    ContactPerson:[..]

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 4

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    Telephone:[] Fax:[]

    Email:[] Website:[]

    1.3. ThemainactivityoractivitiesoftheContractingAuthority

    Publicadministration

    TheContracting Authority isnotpurchasingonbehalfofanotherauthority.

    1.4. Tenderingcalendar

    Dateofpublicationoftheprocurementnotice Date

    Deadline for request for obtaining Tender DocumentsandadditionalInformation

    Date

    RecommendedDeadlineforrequestsforclarifications Date

    Deadlineforanswerstoclarificationrequests Date

    Deadlineforsubmissionoftenders Date/time/place

    Openingsession Date/time/place

    Estimateddateforcompletionoftenderingprocedure Date

    Estimateddateforsigningofcontract Date

    1.5. TenderClarificationsandModifications

    Tenderersmaysubmitrequestsforother informationand/orclarifications inwriting[byfax,email,registeredpost to be specified by the Contracting Authority] to the Contracting Authority using the contact detailsprovidedabove.

    Thedeadlineforreceivingclarificationrequestsis9dayspriortotheTendersubmissiondate.RequestsmustbesenttotheContactPersonattheaddressprovidedinSection1.1.

    Thedeadlineforsendingthereplytoclarificationsis6dayspriortotheTendersubmissiondate.Replieswillbepublishedonwww.elicitatie.ro(SEAP).

    Atany timeprior to thedeadline for submissionofTenders, theContractingAuthoritymay clarify theTenderDocumentbyissuingclarificationnotes.

    AnyclarificationnoteissuedshallbeshallbepublishedonSEAP.

    TogiveprospectivetenderersreasonabletimeinwhichtotakeaclarificationnoteintoaccountinpreparingtheirTenders, the ContractingAuthoritymay, at its discretion, extend the deadline for the submission of Tenders,pursuanttoITT.Insuchcases,allrightsandobligationsoftheContractingAuthorityandtheTendererregardingtheoriginaldatespecifiedintheprocurementnoticewillbesubjecttothenewdate.

    [Ifapplicable]:Thetenderersdesignatedrepresentative is invitedtoattendapreTendermeetingand/orsitevisiton[date/time/location].Thepurposeofthemeetingwillbetoclarifyissuesandtoanswerquestionsonanymatterthatmayberaisedatthatstage.

    MinutesofthepreTendermeetingand/orsitevisit,includingthetextofthequestionsraisedwithoutidentifyingthesource,andtheresponsesgiven,togetherwithanyresponsespreparedafterthemeeting,willpublishedon

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 5

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    SEAP.AnyclarificationoftheTenderDocumentthatmaybecomenecessaryasaresultofthepreTendermeetingshallbemadebytheContractingAuthorityexclusivelythroughthe issueofaClarificationnoteandnotthroughtheminutesofthepreTendermeeting.

    NonattendanceatthepreTendermeetingwillnotbeacausefordisqualificationofatenderer.

    All clarification notes issued by the Contracting Authority will become part of the tender documents. Theclarificationssentbythetenderersduringtheevaluationprocesswillbecomepartoftheiroffer.

    1.6. SiteVisit

    The tenderer isadvised to visitandexamine theproject site, its surroundingsandpossiblyotherpartsof thecountry,andmustobtainfor itselfon itsownresponsibilityall informationthatmaybenecessaryforpreparingtheTenderandenteringintoacontractfortheexecutionoftheworks.Thecostsofvisitingthesiteshallbeatthetenderers own expense. The Tenderermust notify the Contracting Authority inwriting at least 72 hours inadvanceregardingtheirintentiontothevisitthelocation.Thelocationcanbevisitedasof[insertdate]between[inserttime]and[inserttime]Contactperson[insertname]

    TheContractingAuthorityshallnotbeboundbyanyoralrepresentationswhichmaybemadeduringasitevisit,whether by the Contracting Authoritys personnel or by others; and whether during a formal meeting orotherwise. Inorder tominimize thepossibilityofmisunderstanding, tenderersshouldpresentany requests forclarification inwriting. In accordancewithClause1.5of these Instructions,any recordof the formalmeeting,requests,clarificationsand/orAddendumtoTenderDocumentswillbepublishedonwww.elicitatie.ro.

    Where the tenderer and any of its personnel or agents have been granted permission by the ContractingAuthority toenterupon itspremises and lands for thepurposeof such visit, the tenderer, itspersonnel, andagentswill releaseand indemnify theContractingAuthorityand itspersonnelandagents fromandagainstallliabilityinrespectthereof,andwillberesponsiblefordeathorpersonalinjury,lossofordamagetoproperty,andanyotherloss,damage,costs,andexpensesincurredasaresultofthevisit.

    1.7. MeansofAppeal

    ComplaintsmaybesubmittedtotheNationalAuthorityforSolvingComplaints.

    Name: NationalAuthorityforSolvingComplaints

    Address: str.Stavropoleosnr.6sector3

    Locality: Bucharest

    PostCode: 030084 Country: Romania

    Telephone: 0213104641 Fax: 0213104642

    Email: [email protected] Website: www.cnsc.ro

    1.8. Financingsource

    Thesourceoffunding fortheproject is:

    EUfunds [insertpercentage]%

    Statebudget [insertpercentage]%

    Localbudget [insertpercentage]%

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 6

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    Othersources* [insertpercentage]%

    TOTAL 100%

    *[insertdetailsofothersources]

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 7

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    2. ObjectofContract

    2.1 Description

    2.1.1 Contractname:

    [InserttheexactnameintheContractnotice]

    2.1.2 TheestimatedvalueofContract:

    TheestimatedContract value is[insertamount]lei,excludingVAT.

    2.1.3 Mainlocationofperformance:

    Themain locationofperformance: [insertlocation]

    2.1.4 Typeofcontract:

    ExecutionofconstructionofworksBaseduponFIDICConditionsofContractforConstruction(1999editionRedBook)

    2.1.5 ObjectofContract:

    ConstructionofaSanitaryLandfillSiteof[insertarea]in[insertlocation]includingsupply,installation,testingandcommissioningforalltherequiredmachineryandtechnologicalequipment.

    Morespecifically,theworkstobeexecutedareaimingtotheconstructionofIntegratedSanitaryLandfillSiteof[insertvolumecapacity]m3,surfaceoccupiedbylandfillbasin[insertarea]ha,includingatleastthefollowing: constructionofthefirstcellofthelandfill[insertarea]ha(earthworks,sealingsystem,etc.) collection,transportandtreatmentofleachate collection,transportandcombustionofbiogas necessaryBuildings(administrativebuilding,garage,etc) relevantinfrastructure(weighbridge,wheelwashsystem,fuelstation,etc) EnvironmentalMonitoringSystem Restrequiredworks(roads,rainwatermanagementsystem,etc).

    2.1.6 Duration:

    Duration of theWorks Contract is [insert duration] (includingDefectsNotification Period of [insert duration])fromthecommencementnotice,asstatedintheAppendixtoTender.

    2.1.7 CPVCode:

    MainObject:

    452221103Wastedisposalsiteconstructionwork

    AdditionalObjects:

    [tobefilledaccordinglybytheContractingAuthority,ifnecessary]

    2.1.8 AlternativeTenders:

    Alternativetendersnotallowed.

    2.2 ScopeoftheContract

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 8

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    The Contract includes undertaking the following activities for the [insert name of landfill] according to theContractingAuthoritysRequirementsasdetailedintheSpecifications&DrawingsinthisTenderdocumentation.

    a)Constructionworks

    b)Testingandcommissioning

    c)Trainingofoperatingstaff

    d)RepairofthepossibledamagesduringDefectNotificationPeriodof[insertduration]months

    e)OthersubjectsasdefinedintherelevantTenderDocuments

    3. SpecificConditions

    3.1 RestrictionofTenderers

    An entitymay not tender for the contract both individually and as a partner in a joint venture/consortium.Submission or participation by a Tenderer in more than one Tender for the contract will result in thedisqualification ofallthoseTendersforthecontract inwhichtheparty is involved.Atthesametime,anentitymaynot tender fora contractboth individuallyorpartner ina joint venture/consortiumand subcontractor inanothertenderorbothindividuallyorpartnerinajointventure/consortiumandsupportingthirdpartyinanothertender,underthesanctionofexclusionoftherespectivetenders.

    3.2 Ethics

    AnyattemptbyaTenderertoobtainconfidentialinformation,enterintounlawfulagreementswithcompetitorsorinfluence thecommitteeor theContractingAuthorityduring theprocessofexamining,clarifying,evaluatingandcomparingTenderswillleadtotherejectionofitsTender.

    The Contracting Authority requires tenderers, suppliers, contractors, subcontractors, concessionaires andconsultantsunderthesefinancedcontractstoobservethehigheststandardofethicsduringtheprocurementandexecutionofsuchcontracts.Inpursuanceofthispolicy,TheContractingAuthority:

    (a) defines,forthepurposesofthisprovision,thetermssetforthbelowasProhibitedPractices:

    i) corrupt practice means the offering, giving, receiving, or soliciting, directly or indirectly, ofanythingofvaluetoinfluenceimproperlytheactionsofanotherparty;

    ii) fraudulentpracticemeansanyactoromission, includingamisrepresentation, thatknowinglyorrecklesslymisleads,orattemptstomislead,apartytoobtainafinancialorotherbenefitortoavoidanobligation;

    iii) coercive practicemeans impairing or harming, or threatening to impair or harm, directly orindirectly,anypartyorthepropertyofthepartytoinfluenceimproperlytheactionsofaparty;and

    iv) collusivepracticemeansanarrangementbetween twoormorepartiesdesigned toachieveanimproperpurpose,includinginfluencingimproperlytheactionsofanotherparty;

    (b) willrejectaproposalforawardifitdeterminesthatthesupplier,contractor,concessionaireorconsultantrecommendedforawardhasengagedinprohibitedpracticesincompetingforthecontractinquestion;

    (c) reservestheright,whereafirmhasbeenfoundbyajudicialprocessorbytheenforcementmechanismof another international organization to have engaged in prohibited practices to exclude such a firm from theprocedure,eitherindefinitelyorforastatedperiodoftime,tobeawardedacontract;and

    (e) willhavetherighttorequirethat, incontractsaprovisionbe includedrequiringsuppliers,contractors,concessionairesandconsultantstopermittheContractingAuthoritytoinspecttheiraccountsandrecordsrelatingtotheperformanceofthecontractandtohavethemauditedbyauditorsappointedbytheContractingAuthority.

    Furthermore,tenderersshallbeawareoftheprovisionsstatedinthecontractconditions.

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 9

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    TheTenderswillbe rejectedorcontract terminated if itemerges that theawardorexecutionofacontracthasgivenrisetounusualcommercialexpenses.Suchunusualcommercialexpensesarecommissionsnotmentionedinthemaincontractornotstemmingfromaproperlyconcludedcontractreferringtothemaincontract,commissionsnotpaidinreturnforanyactualandlegitimateservice,commissionsremittedtoataxhaven,commissionspaidtoarecipientwhoisnotclearlyidentifiedorcommissionspaidtoacompanywhichhaseveryappearanceofbeingafrontcompany.

    3.3 Others

    [Ifyes,pleasedescribe]

    4. Procedure

    4.1 SelectedProcedure

    Theopentenderprocedure.

    4.2 Finalphaseofelectronictender

    YesxNo

    IfYes,additionalinformationaboutelectronictender

    ____________________________________________________________________

    __________________________________________________________________

    4.3 ApplicableLegislationTheTenderprocedureandanysubsequentcontractwillbeinaccordancewithRomanianLaw.

    BysubmittingitsTender,theTendererisdeemedtoknowallrelevantlaws,actsandregulationsof

    Romania that inanywayaffectorgovern theoperationsandactivities coveredby theTenderandany resultingcontract.

    Themainactsthatshallgoverntheprocurementandexecutionoftheworksincludebutarenotlimitedto:

    GovernmentEmergencyOrdinanceno.34/2006regardingtheawardofpublicprocurementcontracts,publicworksconcession contracts and services concession contracts, approved by Law 337/2006, as further amended andsupplemented

    Government Decision no. 925/2006 for approving of the application norms of the Government's EmergencyOrdinance no. 34/2006 regarding the award of public procurement contracts works concession contracts andservicesconcessioncontracts,asfurtheramendedandsupplemented

    Orders no. 314/2010, 313/2011 and 509/2011 of the President of the National Authority for Regulating andMonitoringofPublicProcurementclarifyingproceduralaspectsrelatedtotheprocurementprocedures

    Government Emergency Ordinance no. 30/2006 regarding the verification function of the procedural aspectsconcerningthepublicprocurementcontracts,asfurtheramendedandsupplemented

    GovernmentDecisionno942/2006forapprovingtheapplicationnormsofG.E.O.no.30/2006,withtheamendmentandsupplementsofLaw1083/2007,asfurtheramendedandsupplemented

    GovernmentDecisionno.782/2006forapprovingtheRegulationoftheorganizationandfunctioningoftheN.C.S.C.

    GovernmentEmergencyOrdinanceno.74/2005 regarding the setupof theNationalAuthority forRegulatingandMonitoringofPublicProcurement

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 10

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    Lawno.554/2004regardingadministrativeproceedings

    Lawno.215/2001ofthelocalpublicadministration

    Lawno.500/2002regardingpublicfinances,asfurtheramendedandsupplemented

    Lawno.273/2006regardingthelocalpublicfinances

    Lawno.10/1995regardingthequalityinconstructions,asfurtheramendedandsupplemented

    GovernmentDecisionno. 766/1997 regarding theobligation touse approvedmaterials for the execution of thework,asfurtheramendedandsupplemented

    GovernmentDecisionno. 925/1995 for approvalof the regulation for verification and technical expertiseof thequalityofthedesignandworksexecutionasfurtheramendedandsupplemented

    GovernmentDecisionno.51/1996regardingtheapprovaloftheRegulationfortakingoverofinstallationworksofequipment,machinery,technologicalinstallationsandproductionfacilitiesasfurtheramendedandsupplemented

    Government Decision no. 28/2008 regarding the approval of the structure of the general estimate and of themethodologyregardingtheelaborationofthegeneralestimateforinvestmentworks

    Government Decision no. 1072/2003 regarding the approval by the State Inspectorate in Constructions of thetechnicaleconomicaldocumentationforinvestmentfinancedfrompublicfunds

    Lawno.161/2003regardingcertainmeasuresforassuranceoftransparencyintheexerciseofpublicfunctionsandinthebusinessenvironment,forpreventionandsanctionofcorruption,asfurtheramendedandsupplemented

    La no. 265/2006 regarding the approval of Emergency Ordinance no. 195/2005 regarding the environmentprotectionLawno.15/1991regardingtheapprovaloftheconstructionworksandsomemeasuresforhousing, ,asfurtheramendedandsupplemented

    Order no. 863/2008 of theMinister of Development, PublicWorks and Housing regarding the approval of theInstructionsfortheapplicationofsomeprovisionsofGovernementDecisionno.28/2008regardingtheapprovalofthestructureofthegeneralestimateandofthemethodologyregardingtheelaborationofthegeneralestimateforinvestmentworks

    Order no. 597/2008 of theMinister of Interior and Administrative Reform regarding the establishment of theframework, elaboration and approval of technicaleconomical documentation regarding new investments and/orrehabilitationofexistingconstructions

    GovernmentDecisionnp.273/1994regardingtheapprovaloftheRegulationfortheworksTakingover

    Nationalstandardsandothertechnicalregulationsandactsintheareaofthecontract.

    5. Qualificationand/orSelectionCriteriaTheTenderershallpresenttheinformationformsgiveninVolume0section3andalsoprovidethedocumentationandcompleted formsdescribed insections5.1 to5.4below. In thecaseofa jointventureof twoormore legalentities,theinformationshallbesubmittedinrespectofeachoftheseentitiesandinrespectofthejointventuretenderer.

    The qualification criteria are mandatory and failure to comply with these requirements shall lead to thedisqualificationofthetender.

    Tenderersshallprovidesufficientandappropriatedocumentaryevidenceinordertodemonstratethefulfillmentofthequalificationrequirements.

    Alldocumentsshallbeinoriginalorlegalizedcopyorcertifiedcopybearingthename,signatureandstampoftheTenderer.Any originaldocumentssubmitted in a languageother than Romanianshall be submittedwithacertified translation.

    In order to demonstrate the fulfillment of the qualification criteria, the Tenderer has the right to present adeclarationsignedbythe legalrepresentativeconfirmingthecompliancewiththecriteriaspecified inthetenderdocuments. The declaration shall be accompanied by an annex outlining themeans for the fulfillment of the

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 11

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    criteria.IncasetheTendereroptsforthisfacility,itshallhavetheobligationtopresentalldocumentswhichprove/ confirm the fulfillment of the selection criteria at the time the ContractingAuthority requests so,within theprovidedtimelimit,butnotlaterthantheendoftheevaluationperiod.

    Alldocumentsshallbearthenameofthesignatoryperson.Incasethesignatoryisnotthelegalrepresentativeofthecompany,awrittenPowerofAttorneyforthesignatorypersonshallbeannexedtothedocumentation,Form0.3.5.1POWEROFATTORNEY.

    IfaTendererwishestoclaimtheexperienceandcapabilityofathirdparty,regardlessofthelegalrelationsexistingbetween the company and the person in question, for the purposes of meeting the minimum mandatoryrequirements (economicand financial situationand technicaland /orprofessionalcapacity), theTenderer shallsubmitwith its tender an irrevocable guarantee, inoriginal (Forms 0.3.5.2 FINANCIALCOMMITMENT FROMASUPPORTING ENTITY, and Form 0.3.5.3 TECHNICAL COMMITMENT FROM A SUPPORTING ENTITY). Theguaranteeshallspecify,asminimum:

    thenamesofthepartiestotheguaranteeincludingthenameoftheContractingAuthority,theTendereranditsguarantor;

    thenameoftheContractrelatingtowhichtheguaranteeisprovided; thevalidityof theguarantee,which shallbe consistentwith the time for completionordelivery required

    undertheContract;

    thelawgoverningtheguarantee,whichshallbethesameasthelawgoverningtheContract;and thecumulativelimitofliabilityoftheGuarantorundertheguaranteewhichshallnotbelessthanthelimitof

    liabilityoftheTendererundertheContract.

    Failuretofurnishsuitableguaranteewillresultintherejectionofthetender.

    5.1 PersonalsituationoftheTenderer

    TheTenderershallfulfilltheminimummandatoryrequirements:

    a) The Tenderer is required to declare that it does not fail the provisions of art. 180 ofGEO no. 34/2006 bysubmittinginoriginalacompletedForm0.3.5.5

    b)The Tenderer will be required todeclare that itdoes not fail theprovisions of art.181 ofGEOno.34/2006bysubmitting:

    Acompletedselfdeclaration(inoriginal)onForm0.3.5.4. A TaxRegistrationCertificatedeliveredby the competent taxbody, in legalized copyor certified in

    accordancewith the original, attesting the fulfillment towards the state budget of the obligationsregisteredforthepreviousmonthconsideringthedateofsubmissionoftheoffer or, inthecaseofnonRomaniancompany,theequivalent,validandwithoutregistereddebts.

    A Certificate attesting the payment of local taxes and charges, in legalized copy or certified inaccordancewith the original, attesting the fulfillment towards the state budget of the obligationsregisteredforthepreviousmonthconsideringthedateofsubmissionoftheoffer or, inthecaseofnonRomaniancompany,theequivalent,validandwithoutregistereddebts.

    ACertificateattestingthepaymentofsocialcontributions in legalizedcopyorcertified inaccordancewiththeoriginalregardingtheobligationsregisteredforthepreviousmonthconsideringthedateofsubmissionoftheoffer(forthecountriesinwhichsuchcontributionsarecollectedseparately),validandwithoutregistereddebts

    c)TheTenderer shallalsosubmit:

    DeclarationregardingtenderersparticipationwithindividualofferonForm0.3.5.6 Declarationthatitdoesnotfallundertheprovisionsofart.691(0.3.5.41)

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 12

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    All documentationrequiredunderthissubclauseshallbesubmittedfortheTenderer,foreachmemberofajointventure,asapplicable.Supporting thirdpartieswillberequested tosubmit thedeclarationmentionedatpointa)aboveonlyandtheDeclaration that itdoesnot fallunder theprovisionsofart.691.ThirdpartiesshallalsoberequestedtosubmittheForm0.3.5.4forpointsa,c1anddonly.

    5.2 Capacitytoundertakeaprofessionalactivity(registration)

    TheTenderershallsubmitcertificates/documents issuedbycompetentbodiestoconfirmtheregistrationandthefieldofactivity.

    a) Romanian individuals/legal entities shall submit a certificate issued by the National Company Register,specifying the field of activity, valid on the date of submittingtheTenders(inoriginal,legalizedcopyorcopycertifiedinaccordancewiththeoriginal).

    b)NonRomanian individuals/legal entities shall submit incopycertifiedinaccordancewiththeoriginalthecertified translation into Romanian of appropriate relevant documents attesting a form ofregistration/certification or professional membership, delivered by the competent authorities in thecountrywherethenonRomanianindividuals/legal entitysheadoffice islocated.

    c)NonRomanian individuals/legalentitiesshallsubmitafiscalresidencecertificate(inordertoavoidthedoubletaxation)ordeclarationvalidforthecurrentyear

    Alldocumentation required under thissubclause shallbesubmitted fortheTendererand foreachmemberofajointventure,asapplicable.

    5.3 EconomicandFinancialSituation

    The following documents and minimum mandatory requirements shall be submitted to demonstrate theTenderers economicandfinancial situation:

    a) Thebalancesheetsforthelastthreeyearsregisteredwiththerelevantfiscalauthorities.(Form0.3.5.7)

    b) The Average Annual Turnover in the last 3 years shall be at least [insert amount] lei (for Romanianlegalentities) orthe equivalentamountin Euro at the lei /Euroaverageexchangerate notifiedby theEuropeanCentral Bank for the relevant year.(Form0.3.5.8)

    c) The Tenderer shalldemonstrate that ithas access to,orhas available, liquid assets,unencumbered realassets, lines of credit, and other financialmeans sufficient tomeet the construction cash flow for thecontractforaperiodof[insertduration]months,estimatedasnotlessthanlei[insertamount],takingintoaccounttheapplicant'scommitmentsforothercontracts.(Form0.3.5.9)

    Comment:

    TheEconomicandfinancialcapacityoftheTenderermaybesupportedbyathirdparty,regardlessoflegalrelationsexisitingbetweenthecompanyandthepersoninquestion.

    The Tenderer whose economic and financial situation receives supportmust prove this fact bysubmittingadequatedocumentationconfirmingafirmcommittment.

    Ifagroupofeconomicentitiessubmita jointbid,theeconomicandfinancialsituationconsideringthecumulativeresourcesofallgroupmembers.

    The Contracting Authority reserves the right to carry out such any further inquiry on the Tenderers financialstanding,astheEvaluationCommitteemaydeemappropriate.

    5.4 Technicaland/orProfessionalCapacity

    Ifa jointventuresubmitsaTender,thetechnicaland/orprofessionalcapacitymaybeprovedbyconsideringtheresourcesofallthemembersinthejointventure.

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 13

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    TheTenderershallfulfillthefollowingminimummandatoryrequirements:

    5.4.1 Previousexperience

    TheTenderermusthavefinalizedandsuccessfullycompletedwithinthelastfiveyearscalculatedfromthedeadlineforsubmissionof tenders theconstructionofat least two (2)projectsofLandfill, includingat least the folowingworksbutnotbeinglimitedto:

    Compliantlandfillbottomliningsystemwithasurfaceareaof[specifyrequiredarea]m2 LeachateCollectionSystem LeachateTreatmentPlant Biogastreatmentsystem EnvironmentalMonitoringSystem

    IncasethecontractwasexecutedbyaJointVenture,theTenderershalldemonstratethatitsshareintheJointVenturewasatleast50%.Incasethattheexperiencereferstoalandfillwhichitsbottomliningsystemcoversanareagreaterthantheminimumoneassetabove,thenalowersharepercentageintheJointVenturecanbeacceptedunderthefollowingcondition:

    [sharepercentageofreference]x[areaofreference]50%x[minimumrequiredarea]

    Thelowestacceptablepercentageforthatcalculationis30%.

    The Tenderers shallprovide the Listofproject references in similarworksexecuted anddocumentaryproof tosustaintheinformationcontainedtherein.Theevidenceshallincludeasappropriate:

    a) performancecertificates

    b) takingovercertificates

    c) partialtakingover/performancecertificate

    d) anyotherdocumentconsideredrelevantbytheTendererincasea,b,ccannotbeprovided.

    The documents shall be copies certified in accordance with the original and shall indicate the beneficiaries,regardlesswhethertheyarecontractingauthoritiesorprivateclients,thevalue,thetimeperiodandtheplaceofworksexecution.

    5.4.2 SubcontractorsIncasethetendererintendstosubcontractpartoftheworks,forallsubcontractorsperformingmorethan20%ofthevalueoftheTenderPrice,itshallprovidewithinthetenderthelistofsubcontractorsinForm0.3.5.10 DATA ABOUT SUB CONTRACTING ENVISAGED andtheiridentificationdataaswellasthepercentageandtypeofworkassignedtothem.

    5.5 JointVentures

    Joint Ventures/Consortia must satisfy cumulatively all the specific criteria of Economic and Financialrequirementsin5.3andTechnicaland/orProfessionalrequirementsin5.4.

    Tenders submitted by economic entities being partners of two ormore firms forming a JointVentureshalladditionallyfulfillthefollowingrequirements:

    a) The Tender shall comprise all information required for each partner of the Joint Venture as wellasthesummarydataforexecutionofWorksbytheTenderer.

    b) TheTender shallbesigned inawaythat legallybindsallpartners.

    c) One partner shall be appointed as the Leading Partner responsible for the Contract and such

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 14

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    appointmentshall be confirmedby submissionof Powers of Attorney signed by legally authorizedsignatories representing alltheindividualpartners.

    d) The Tender shall include an agreementstating that all partners shall be legally responsible,jointlyandseverally, for the executionof theContract, that theLeading Partner shall be authorized toobligate and receive instructions for and onbehalf ofeach and allpartners, and that the executionofthe Contract, including payments,shall be responsibilityof the Leading Partner.

    e) All partners in the Joint Venture/Consortium shall be bound to remain in the JointVenture/Consortiumforthewholeperiodoftheimplementation ofContract.

    6. SubmissionoftheTender

    6.1 LanguageoftheTender

    ThelanguageoftheTenderisRomanian.

    The technical documentation and documents issued by official institutions/ bodies in the countrywhere theforeign Tenderer is resident may be in another language, provided they are accompanied by a certifiedtranslation.

    ForthepurposesofinterpretationoftheTenderandanyresultingContract,theRomanianlanguagewillprevail.

    6.2 ValidityperiodoftheTender

    ThevalidityoftheTendershallbe90daysfromthedateofsubmissionoftheTender.Tendersvalidforashorterperiodshallberejected.

    In exceptional circumstances the Contracting Authority may request that Tenderers extend the validity ofTendersforaspecificperiod,whichwillbedefinedintheextensionrequest.Suchrequestsandtheresponsestothemmustbemadeinwriting.

    ATenderermayrefusetocomplywithsucharequestwithoutforfeitinghisTenderguarantee. IftheTendererdecidestoaccedetosucharequest,hemaynotmodifyhisTender.Heis,however,boundtoextendthevalidityofhisTenderguaranteefortherevisedperiodofvalidityoftheTender.

    6.3 TenderGuarantee

    TheTenderershallprovideaTenderguaranteeintheamountof[insertamount]lei.TheguaranteemusthaveatleastthesamevalidityasthevalidityoftheTenderandbeaddressedtotheContractingAuthority.

    Thetenderguaranteeshallbeinanyofthefollowingformsatthetenderersoption:

    a) A bank transfer to account No [insert number] opened at [bank name, address and IBAN code] quotingreference:[insertContractingAuthoritysrequiredreferencee.g.ContractNumber/TendererName]

    TobeconsideredavalidTenderguarantee thebank, theproofshallbepresented the lateston thedateandtimeoftheopeningsession.

    .

    OR

    b) A guarantee instrument issued under the law of a bank or an insurance company for the procurementprocedurecoveringthe[nametypeofworksconstructedunderintendedcontract].

    ThedocumentshallbeasForm0.3.6.2.TENDERGUARANTEEandsubmittedinoriginalwithinthetenderorattheopeningsessionthelatest.

    AnyTendernotaccompaniedbyasubstantiallyresponsivetenderguaranteeshallberejectedbytheContractingAuthorityasnonresponsive.

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 15

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    Thetenderguaranteewillbeextendedforthesameperiodforwhichthetenderwasextended.

    Thetenderguaranteeofthesuccessfultenderershallbereturnedwithin3daysfromthemomentthesuccessfultendererfurnishedtherequiredperformanceguarantee.

    Thetendersecurityofunsuccessfultenderersshallbereturnedaspromptlyaspossible inaccordancewiththeprocurementlegislation.

    Thetenderguaranteemaybeforfeited:

    (a) ifatendererwithdrawsitsTenderduringtheperiodofTendervalidityspecifiedbythetendererintheLetterofTenderor

    (b) ifthesuccessfultendererfailsto:

    (i) sign theContract during theperiodofvalidityof the tender,once its tenderhasbeendeclaredsuccessful,or

    (ii) furnishaperformancesecurityduringtheperiodofvalidityofthetender,onceitstenderhasbeendeclaredsuccessful,and inanycase,no later than15dayssince thecontracthasbeensigned.

    (c) IncaseacomplaintwassubmittedtotheNCSCanditwasrejected,theContractingAuthorityhastherighttoanamountof[insertamount]

    TheguaranteeshallspecifytheContractingAuthoritysrighttoforfeittheguaranteeforthereasonsmentionedabove.

    6.4 ContentoftheTender

    The tenderer must submit all documents required by the provisions of the tender dossier, namely thosespecified in Volume 1 and 4 described in Clause 1.1 of these instructions and also including the technicalproposal[ifapplicable]andthefinancialproposal.Allsuchdocuments,withoutexception,mustcomplystrictlywiththeseconditionsandprovisionsandcontainnoalterationsmadebythetenderer.

    Tenders which do not comply with the minimum requirements of the tender dossier shall result in thedisqualificationofthetender.

    6.5 Technicalproposal(ifapplicable)

    GeneralComment:

    Normally, anoffer for the constructionof a Landfill Site should include a analyticalBillofQuantities andnoTechnicalProposalshouldbesubmitted.OnlyincasesthatsomespecificpartsoftheLandfillSitewillbeofferedasalumpsumprice(e.g.leachatetreatmentplant),thenatechnicalproposalshouldbesubmitted,inorderthecompliancewiththedefinedspecificationtobeproved.

    Inothercases,thisparagraphmustbeeliminated

    The tenders shall complywith theminimum requirements specified in the Technical Specifications. For thatpurpose,tenderersshallincludeinthetechnicalofferdetailsonthefollowinginformation:

    a) TechnicalDescriptionoftheofferedsubjectsunderevaluation;

    b) TechnicalSpecificationoftheofferedsubjectsunderevaluation;

    c) TechnicalBrochuresoftheofferedsubjectsunderevaluation;

    d) Listofsparepartsandconsumables,includinglaboratoryreagentsfor2years(indicatively);

    e) Drawingsoftheofferedsubjectsunderevaluation.

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 16

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    6.6 Financialproposal

    TheFinancialProposal shallcontainthefollowingdocuments:

    a)FormofTender(Form0.3.6.3)

    b)AppendixtoTender(Form0.3.6.4)

    c)CompletedBillofQuantities

    The tenderer shall submit the Form of Tender using the form 0.3.6.3 FORMOF TENDER furnished inSection 3. This formmust be completed without any alterations to its format and no substitutes shall beaccepted.Allblankspacesshallbefilledinwiththeinformationrequested.

    TheLetterofTendershallpresentthetotalpriceoftheTender,excludingVAT,statedinlei.AllsumsintheBillofQuantitiesandotherdocumentsmustalsobeexpressed in thiscurrency,with theexceptionoforiginalsofbankandannualfinancialstatements.Discountsarenotallowed.

    Allduties,taxes,andotherleviespayablebytheContractorundertheContract,orforanyothercauseshallbeincludedintheratesandpricesandthetotalTenderPricesubmittedbythetenderer.

    ThepricesquotedbytheTenderershallbe:

    [insertsubjecttoadjustmentduringtheperformanceoftheContractinaccordancewithnationallaw.

    orfixedduringtheperformanceoftheContract]

    Thepriceofthetendershallcoverallcostsrelatedtotheexecutionofworks,includingsupply,installationandtestingforthemachineryandequipmentaspertheTechnicalSpecificationsprovisions.ATenderwhichexcludespartoftheWorkswillberejectedasunresponsive.

    TheTenderershallpresenttheBillofQuantitiesfilledinwithpricesquotedinlei.

    Any itemwithout aprice shallnotbepaid forandshallbedeemed tobe included inotherprices intheBillofQuantities.

    Provided that theTender issubstantiallyresponsive, theContractingAuthorityand/or theEvaluationCommitteeshall correct arithmetical errors as indicated in the procurement legislation. If a tenderer does not accept thecorrectionoferrors,itsTendershallbedeclarednonresponsive.

    Offerswhicharepresentinganapparentlyabnormally lowpricewillbesubjecttofurtherclarificationasdetailedbelow.

    If in the opinion of the ContractingAuthority a Tender is seriously unbalanced or front loaded or substantiallybelow the Contracting Authoritys estimates, the Contracting Authority may require the tenderer to producedetailedpriceanalysesforanyorallitemsoftheBillofQuantities,todemonstratetheinternalconsistencyofthosepriceswiththemethodsandscheduleproposed.

    Pursuanttoarticle202ofGEO34/2006,asfurthermodifiedandamended,atenderhasanabnormallylowpriceinrelationtowhatistobesupplied,executedorperformed

    (a) whentheofferedprice,excludingVAT,islessthan85%oftheestimatedcontractvalue,or

    (b) if within the awarding procedure there are at least five tenders which have been consideredacceptable,whentheofferedprice is lessthan85%ofthearithmeticmeanofthetenderscalculatedwithouttakingintoaccountthelowestandthehighestfinancialproposals.

    Anofferwhichisdeemedashavinganabnormallylowprice,accordingtotheabovementionedpointsaswellasitwillbeconsideredasinsufficientlyjustifiedafterajustificationrequest,willbedisqualified.

    6.7 TenderSubmission

    TheaddresstowhichTenderistobesubmittedisindicatedintheprocurementnotice.TheTendersaretobesentby

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 17

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    registeredmailwithacknowledgementofreceipt,ordeliveredbyhandagainstareceiptsignedbytheContractingAuthorityoritsdulyauthorisedrepresentativetotheaddressindicatedabovebeforethedateandtimeindicatedintheprocurementnotice.AnyTender receivedafter thedeadline for submissionofTenderswillbe rejected. TheTenderer'ssubmissionwillbereturned to theTendererunopened. In thecaseof latesubmissions theassociatedTenderguaranteewillbereturnedtotheTenderersonrequest.

    TheContractingAuthoritymay,atitsdiscretion,extendthedeadlineforthesubmissionofTendersbyamendingtheTenderdocuments, inwhich caseall rightsandobligationsof theContractingAuthorityand tendererspreviouslysubjecttothedeadlineshallthereafterbesubjecttothedeadlineasextended.

    The qualification documents, the technical proposal [if applicable] and the financial proposal, shall be placed inseparateenvelopesandshallhavealistofdocumentsandeachpageshallbenumberedforeachfile,separatelyandsigned by the authorized representative of the Tenderer, empowered to act on behalf of the Tenderer. Thequalification documents shall be included in the file in the order in which they are required in the in theseinstructions.

    The separated envelopes containing the qualification documents, the technical proposal [if applicable] and thefinancialproposalshallbeappropriatelysealedandmarkedasfollows:

    Envelope1:Qualificationandinformationdocuments(1original+1hardcopy+1CDcopyinelectronicnoneditableformat)

    Envelope2:TechnicalProposal[ifapplicable](1original+1hardcopy+1CDcopyinelectronicnoneditableformat)

    Envelope3:FinancialProposal(1original+1hardcopy+1CDcopyinelectronicnoneditableformat)

    TheTenderermustsealthethreeabovementionedenvelopesofitsTenderinasingleenvelopeorpackagebearingonlythefollowing:

    a) theaboveaddress;

    b) thereferenceoftheinvitationtoTenderconcerned[insertSEAPnumber]

    c) thewordsNottobeopenbeforetheopeningsession.

    d) theTenderersname.

    TheoriginalofeachenvelopebemarkedasORIGINAL.ThecopyoftheoriginalmustbemarkedasCOPY.

    Iftheouterenvelopeisnotsealedandmarkedandreceiptedasrequired,theContractingAuthoritywillassumenoresponsibilityforthemisplacementorprematureopeningoftheTender.

    Inthecaseofanydiscrepancybetweenthe"Original",the"Copy"and/ortheElectronicCopy,the"Original"willprevail.

    TheoriginaloftheTendermustbetypewritten,printedorwritteninindelibleinkandsignedbyapersonorpersonsempowered by the Power of Attorney. Any pages onwhich entries, ormodifications to the Tenderers originalentries,havebeenmademustbe initialedthepersonorpersonssigningtheTender.Allpagesmustbenumberedconsecutivelybyhand,machineorinanyotherwayacceptabletotheContractingAuthority.

    The Tender must contain no changes or modifications to the tender documents, other than those made inaccordancewith instructions issuedby theContractingAuthority. Any correctionof anerroron thepartof theTenderermustbeinitialedbythepersonsigningtheTender.

    The Tendermay be rejected if it contains anymodification, addition or deletion to the Tender documents notspecifiedinamodificationissuedbytheContractingAuthority,oriftheTenderdocumentsarenotfilledinproperly.

    The Tendererwill bear all costs associatedwith the preparation and submission of the Tender. The ContractingAuthoritywillinnocaseberesponsibleorliableforsuchcosts,whatevertheconductoroutcomeoftheprocedure.

    6.8 Withdrawal,Substitution,andModificationofTenders

    Atenderermaywithdraw,substitute,ormodifyitsTenderafterithasbeensubmitted,butbeforethedeadlineforsubmissionofTenders,bysendingawrittennotice,dulysignedbyanauthorizedrepresentative,andshallincludeacopy of the authorization in accordance with Section 2, (withdrawal notices do not require copies). The

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 18

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    correspondingsubstitutionormodificationoftheTendermustaccompanytherespectivewrittennotice.Allnoticesmustbe:

    (a) preparedandsubmittedinaccordancewithSection2,andinaddition,therespectiveenvelopesshallbeclearlymarkedWithdrawal,Substitution,Modification;and

    (b) receivedbytheContractingAuthoritypriortothedeadlineprescribedforsubmissionofTenders.

    Tendersrequestedtobewithdrawnshallbereturnedunopenedtothetenderers.

    No Tendermaybewithdrawn, substituted,ormodified in the intervalbetween thedeadline for submissionofTendersandtheexpirationoftheperiodofTendervalidityspecifiedbythetendererontheLetterofTenderoranyextensionthereof.

    6.9 OpeningoftheTenders

    Tenderswillbeopenedon[date]at[time]at[officeandaddress]bythecommitteeappointedforthepurpose.Thecommitteewilldrawupminutesofthemeeting,whichshallbedistributedtoallTenderers.

    Theopeningmaybe attendedby the Tenderers. For thoseparticipating in themeeting for theopeningof theTendersonbehalfoftheTenderer,apowerofattorney isrequiredfromthepersonauthorizedtorepresenttheTendererintheprocedure.

    At the tender opening, the Tenderers names, the Tender prices, written notifications of modifications andwithdrawals,thepresenceoftherequisiteTenderguaranteeandanyotherinformationtheContractingAuthoritymayconsiderappropriatewillbeannounced.

    First, envelopesmarked Withdrawal shallbe opened and readout and the envelopewith the correspondingTender shallnotbeopened,but returned to the tenderer.NoTenderwithdrawal shallbepermittedunless thecorrespondingwithdrawalnoticecontainsavalidauthorizationtorequestthewithdrawalandisreadoutatTenderopening.

    Next, envelopesmarked Substitution shall be opened and read out and exchangedwith the correspondingTenderbeingsubstituted,andthesubstitutedTendershallnotbeopened,butreturnedtothetenderer.NoTendersubstitution shall be permitted unless the corresponding substitution notice contains a valid authorization torequestthesubstitutionandisreadoutatTenderopening.

    Envelopes marked Modification shall be opened and read out with the corresponding Tender. No Tendermodification shall be permitted unless the correspondingmodification notice contains a valid authorization torequestthemodificationandisreadoutatTenderopening.

    OnlyTendersthatareopenedandreadoutatTenderopeningshallbeconsideredfurther.

    The EvaluationCommitteeshallopenallotherenvelopesoneata time.NoTendershallbe rejectedatTenderopening except for late Tenders or Tenders not accompanies by a Tender guarantee in the amount and therequestedformorforalowervalidityperiodthanrequested.

    6.10 AnalysisandassessmentoftheTenders

    Information relating to the evaluationof Tenders shallnotbedisclosed to tenderersor anyotherpersonsnotofficiallyconcernedwithsuchprocessuntilinformationonContractawardiscommunicatedtoalltenderers.

    Anyattemptbyatendererto influence improperlytheContractingAuthority intheevaluationoftheTendersorContractawarddecisionsmayresult in therejectionof itsTender.Notwithstanding theabove, from the timeofTenderopeningtothetimeofContractaward,ifanytendererwishestocontacttheContractingAuthorityonanymatter related to the tendering process, it should do so inwriting in accordance with the provisions of theprocurementlegislation.

    FailuretosubmitaTendercontainingtherequired informationanddocumentationwithinthedeadlinespecifiedwillleadtotherejectionoftheTender.Tenderswhichareincomplete,conditional,illegible,andobscureorcontain

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 19

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    unrequestedadditionsorotherirregularitiesmayberejected.

    BeforebeginningadetailedanalysisoftheTenders,theEvaluationCommitteewillcheckthateachTender:

    (a) hasbeenproperlysigned,and

    (b) includestherequiredTenderguarantee,and

    (c) substantiallycomplieswiththerequirementsoftheseTenderdocuments.

    AnadmissibleTender isonewhichdoesnotfallundertheconditions listed inart.36fromGovernmentDecision925/2006andwhichconformstotherequirementsandspecificationsdescribedintheTenderdocumentswithnosubstantialdeviationsorreservations.Substantialdeviationsandreservationsarethosewhich:

    (a) inanywayinfluencethescope,qualityorexecutionofworks,or

    (b) restricttherightsoftheContractingAuthorityortheobligationsoftheTendererundertheContractinamannerinconsistentwiththeTenderdocuments,or

    (c) rectificationofwhichwouldunfairlyaffectthecompetitivepositionofotherTendererspresentingadmissibleTenders.

    Thewinningtendershallbeselectedfromtheadmisibletendersonlyandbasedontheawardcriterionmentionedintheprocurementnoticeandtenderdocuments.

    Toassist in theexamination,evaluation,and comparisonof theTendersandqualificationof the tenderers, theEvaluationCommitteemay,atitsdiscretion,askanytendererforaclarificationofitsTender,allowingareasonabletimeforresponse.AnyclarificationsubmittedbyatendererthatisnotinresponsetoarequestbytheContractingAuthorityshallnotbeconsidered.TheEvaluationCommitteesrequestforclarificationandtheresponseshallbeinwriting.

    Nochangeinthepricesorsubstance(technicalproposalorotherelementsoftheTender)shallbesought,offered,orpermitted,excepttoconfirmthecorrectionofarithmeticerrorsdiscoveredbytheEvaluationCommitteeand/orContractingAuthorityintheevaluationoftheTenders.IfatendererdoesnotprovideclarificationsofitsTenderbythe date and time set in the Contracting Authoritys request for clarification or the Tenderers response isinconclusive,itsTenderwillberejected.

    6.11 RightoftheContractingAuthoritytoAcceptorRejectAnyTender

    TheContractingAuthorityreservestherighttoacceptorrejectanytender,andtoannultheTenderingprocessatany timeprior to contractaward,without thereby incurringany liability to tenderers. In caseofannulment,allTenderssubmittedandspecifically,Tendersecurities,shallbepromptlyreturnedtothetenderers.

    6.12 Rulestoavoidconflictofinterest

    A tenderer shall not have a conflict of interest. All tenderers found to have a conflict of interest shall bedisqualifiedpursuanttoarticles6669fromGEO34/2006,asfurthermodifiedandamended.

    The natural or legal person that has participated to the elaboration of the tender documentation, as aneconomicentity,hastheright,tobetenderer,associatedtendererorsubcontractor,onlyinthecasewhenitsinvolvementintheelaborationofthetenderdocumentationdoesnotdistortthecompetition.

    The natural or legal persons who are directly taking part in the process of verification/evaluation of thecandidatures/tendershavenorighttobecandidates,tenderers,associatedtenderersorsubcontractors,underthesanctionoftheexclusionfromtheawardingprocedure.

    The tenderer/candidate/associated tenderer/subcontractor that has as members of its board ofadministration/managing or supervisory body and/or that has stakeholders or associates, personswho are aspouse, a relativeor inlawup to and including the fourthdegree,or thatareundercommercial relations,asdefined byArticle 69 point a) fromGEO 34/2006with persons holding decisionmaking positionswithin thecontractingauthority,shallbeexcludedfromtheawardingprocedure.

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 20

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    7. AwardCriteriaTheContractwillbeawardedonthebasisofthelowestprice.

    In case two ormore offers have the same lowest price, the respective tenderers shall submit a new financialproposalunderthesameformalandtechnicalconditionsasfortheintialoffer.

    TheTendersubmissionthat

    (a) complieswithalltheadministrativeandeligibilityrequirements,and

    (b) complieswithallthecapabilityrequirements,and

    (c) meets theRequirementsof theTechnicalSpecifications (in case that technicalproposal shouldbesubmitted)and

    (d) whosetenderoffersthelowestprice

    willbeawarded.

    8. AwardoftheContract

    8.1 AdjustmentoftheContractprice

    Theoptionthatisselectedfollowingiscorrelatedtotheoptionselectedinarticle6.6

    [ThepricewillbefixedfortheentireperiodoftheContract]or[Thepricewillbeadjusted inaccordancewith thenationallaw]

    8.2 NotificationofAward

    Prior to expiration of the period of Tender validity prescribed by the Contracting Authority, the ContractingAuthoritywillnotify the successfulTendererof its intention toaward theContractbyaLetterofAward.ThislettershallstatethattheonlythesigningoftheContractAgreementwillformacontactbetweentheContractingAuthorityandthesuccessfultenderer.Itshallalsostatethatanyactivitiesundertakenbythesuccessfultendererpriortothecontractcoming intoforcewillbeattheTenderersownrisk.AtthesametimethattheContractingAuthorityissuestheLetterofAwardtothesuccessfulTenderer,theContractingAuthoritywillnotifythenameofthewinningTenderertoeachunsuccessfulTenderer.

    TheContractingAuthorityhastheobligationtoinformtheunsuccesfultenderersaboutthegroundsonwhichtheirTenderwasnotselectedinaccordancewiththeprocurementlegislation.

    9. ContractSigningandPerformanceSecurity/Guarantee

    9.1 SigningofContract

    TheContractingAuthoritymaysignthecontractonlyaftertheperiodspecifiedbyarticle205fromGEO34/2006,asfurthermodifiedandamended,haselapsed.

    Within[insertduration]daysofreceivingthecontractsignedbytheContractingAuthority,thesuccessfultenderershallsign,date,andreturnthecontracttotheContractingAuthoritytogetherwith:

    (a) signedcontractswithsubcontractors

    (b) legalisedJVCorassociationagreement(ifthecase)

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 2 FIDIC Red Book Page 21

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    (c) performanceguarantee

    Onthesigningthecontractagreement,thesuccessfulTendererwillbecometheContractorandthecontractwillcomeintoforce.

    9.2 PerformanceGuarantee

    Theperformanceguarantee shallbe [insert%]of theaccepted contractvaluewithoutVAT.Theperformanceguaranteewillcovertheentiredurationofthecontract(includingthedefectsnotificationperiod).

    The successful tenderer shall furnish the performance security and together with the signed contract inaccordancewith the conditionsof contract,using for thatpurpose thePerformance Security Form 0.3.9.1oranotherformacceptabletotheContractingAuthority.

    Theperformanceguaranteeshall

    (a) take the formofaguarantee instrument issuedbyabankor insurancecompanywhichwillbecomeannextothecontractor

    (b) shall be constituted through successive installments retained from the partial payments under theconditionsofart.90(3)fromGovernmentDecisionno.925/2006.

    Thesuccessfultenderershallcommunicateitsdecisionontheformoftheperformancesecuritybeforesignatureofthecontract.

    The contracting authority has the right to formulate claims regarding theperformance guarantee,during theexecutionof thecontract,with respect to thedamageoccurred,when thecontractordoesnot fulfil itscontractobligations. Prior to the claim regarding the good performance guarantee, the Contracting Authority has theobligationtonotifytheclaimtothecontractor,statingtheobligationsthatwerenotfulfilled.

    Failureof the successful tenderer to submit theabovementionedPerformanceGuaranteeor sign theContractshallconstitutesufficientgroundsfortheannulmentoftheawardandforfeitureofthetenderguarantee.

    Intheeventthewinningtendererisinaforcemajeuresituationorunabletoperformthecontract,theContractingAuthority has the right to declare as winner the tenderer classified on the second place, if it exists and isadmissible.Otherwise,theawardprocedureiscancelled.

    The performance guaranteewill be released in accordancewith the provisions of article 92 fromGovernmentDecision925/2006,asfurtheramendedandmodified.

    10. CommencementofWorksFollowingthesignatureoftheContractbybothparties,awrittennoticeofcommencementoftheworkswillbeissuedinaccordancewithclause8.1oftheGeneralConditionsofContract.

    TheContractormustinformthesenderbyreturnthathehasreceivedthenotice.

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 3 FIDIC Red Book Page 1

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    LISTOFVOLUMES

    Volume0 Tenderdata

    Section1DataFiche

    Section2InstructiontoTenderers

    Section3InformationSubmission

    Section4TenderAssessmentGrids

    Volume1 ContractData

    Volume2 TechnicalSpecifications

    Volume3 Drawings

    Volume4 BillofQuantities

    Volume5 InformationincludedintheContract

    Volume6 InformationnotincludedintheContract

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 3 FIDIC Red Book Page 2

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    Section3InformationSubmission

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 3 FIDIC Red Book Page 3

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    FORM0.3.1.1TENDERERSINFORMATIONSHEET

    TenderersInformation

    Tendererslegalname

    IncaseofJVCA,legalnameofeachpartner

    Tendererscountryofconstitution

    Tenderersyearofconstitution

    Tendererslegaladdressincountryofconstitution

    Tenderersauthorizedrepresentative

    (name,address,telephonenumbers,faxnumbers,emailaddress)

    Attachedarecopiesofthefollowingoriginaldocuments.

    1. Incaseofsingleentity,articlesofincorporationorconstitutionofthelegalentitynamedabove,inaccordancewithITT.

    2. AuthorizationtorepresentthefirmorJVCAnamedinabove,inaccordancewithITT. 3. IncaseofJVCA,letterofintenttoformJVCAorJVCAagreement,inaccordancewith

    ITT.

    Tenderersname Singanture of the authorized person orpersons authorized to sign on behalf oftheTenderer

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 3 FIDIC Red Book Page 4

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    Date

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 3 FIDIC Red Book Page 5

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    FORM0.3.1.2JVCAINFORMATIONSHEET

    EachmemberofaJVCA/nominatedsubcontractormustfillinthisform

    JVCA/SpecialistSubcontractorInformation

    Tendererslegalname

    JVCAPartnersorSubcontractorslegalname

    JVCAPartnersorSubcontractorscountryofconstitution

    JVCAPartnersorSubcontractorsyearofconstitution

    JVCAPartnersorSubcontractorslegaladdressincountryofconstitution

    JVCAPartnersorSubcontractorsauthorizedrepresentativeinformation

    (name,address,telephonenumbers,faxnumbers,emailaddress)

    Attachedarecopiesofthefollowingoriginaldocuments.

    1. Articlesofincorporationorconstitutionofthelegalentitynamedabove,inaccordancewithITT.

    2. Authorizationtorepresentthefirmnamedabove,inaccordancewithITT.

    Tenderersname Singanture of the authorized person orpersons authorized to sign on behalf oftheTenderer

    Date

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 3 FIDIC Red Book Page 6

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 3 FIDIC Red Book Page 7

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    FORM0.3.5.1POWEROFATTORNEY

    PleaseattachherethePowerofAttorneyauthorisingthesignatoryoftheTenderandallrelateddocumentation.

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Project Reference 2010 174 RO SEW SLW Task 3.1/ Volume 0 Section 3 FIDIC Red Book Page 8

    CONSORTIUM: ENVIROPLAN S.A. LOUIS BERGER France KOCKS Consult GmbH ICP mbH C&E GmbH

    FORM0.3.5.2FINANCIALCOMMITMENTFROMASUPPORTINGENTITY

    (NameofProject)

    (nameofthecompany/address)

    Wehavebeen informed that...(hereinaftercalled theContractor) issubmitting an offer for such Contract in response to your invitation, and that theconditions of your invitation mean that his offer needs to be supported by asupportingentity.In accordancewith the provisions ofClause (1) ofArticle 186 ofGEO 34/2006,weconfirmthatwearesupportingtheContractorseconomicandfinancialsituation.Inconsiderationofyou, theEmployer,awarding theContract to theContractor,we(name of supporting entity)...irrevocably and unconditionally committoputattheContractorsdisposalanyinvokedfinancialresourcesinaccordancewiththeprovisionsofClause(2)ofArticle186ofGEO34/2006.Thiscommitmentwillcome into full forceandeffectwhen theContractcomes intofull forceandeffect.Thiscommitmentshallcontinue in full forceandeffectuntilalltheContractorsobligationsand liabilitiesunder theContracthavebeendischarged,when this commitment shall expire and our liability hereunder shall be dischargedabsolutely.This commitment shall apply and be supplemental to the Contract as amended orvariedby theEmployerand theContractor from time to time.Weherebyauthorisethemtoagreeanysuchamendmentorvariation,thedueperformanceofwhichandthecompliancewithwhichbytheContractorarelikewisecommittedhereunder.Ourobligations and liabilities under this commitment shall not be discharged by anyallowanceoftimeorotherindulgencewhatsoeverbytheEmployertotheContractor,orbyanyvariationorsuspensionoftheworkstobeexecutedundertheContract,orbyanyamendments to theContractor to theconstitutionof theContractoror theEmployer, or by any other matters, whether with or without our knowledge orconsent.ThiscommitmentshallbegovernedbythelawofRomaniaandanydisputeundertheinvoked benefits shall be finally settled under the Rules of Arbitration of theInternational Chamber of Commerce by one or more arbitrators appointed inaccordancewithsuchRules.Weconfirmthatthebenefitofthiscommitmentmaybeassignedsubjectonlytotheprovisionsforassignmentofthecontract.

    Date: Signature:

  • JASPERS Support Romanian Standardised Tender Documents for Solid Waste Projects Projec