the lhc startup

36
The The LHC Startup LHC Startup Federico Antinori Federico Antinori INFN, Padova, Italy INFN, Padova, Italy and and CERN, Geneva, Switzerland CERN, Geneva, Switzerland

Upload: allene

Post on 29-Jan-2016

63 views

Category:

Documents


0 download

DESCRIPTION

The LHC Startup. Federico Antinori INFN, Padova , Italy and CERN, Geneva, Switzerland. Since you asked…. So: what happened on 19 Sept ?. 19 September, ~ 11:30: large helium leak in sector 34 helium escaped in the tunnel insulation vacuum broken beam vacuum broken (up to sector valves) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The LHC  Startup

TheThe LHC StartupLHC Startup

Federico AntinoriFederico Antinori

INFN, Padova, ItalyINFN, Padova, Italy

andand

CERN, Geneva, SwitzerlandCERN, Geneva, Switzerland

Page 2: The LHC  Startup

Since you asked…Since you asked…

Page 3: The LHC  Startup

So: what happenedSo: what happened on 19 Sept?on 19 Sept?

19 September, ~ 11:30: large helium leak in sector 3419 September, ~ 11:30: large helium leak in sector 34 helium escaped in the tunnelhelium escaped in the tunnel insulation vacuum brokeninsulation vacuum broken beam vacuum broken (up to sector valves)beam vacuum broken (up to sector valves)

probably due to electrical fault probably due to electrical fault resistive splice in interconnect?resistive splice in interconnect?

to be sure, have to wait for interconnect to be opened (at room to be sure, have to wait for interconnect to be opened (at room T)T)

magnets in sector 34 were being commissioned to 5 TeVmagnets in sector 34 were being commissioned to 5 TeV all other (7) sectors had been commissioned to 5 TeV (and above) all other (7) sectors had been commissioned to 5 TeV (and above)

without problemswithout problems

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

33

Page 4: The LHC  Startup

When will beam resume?When will beam resume?

clear that recovery of sector 34 will take until into the winter clear that recovery of sector 34 will take until into the winter shutdownshutdown

LHC operations are planned to restart in springLHC operations are planned to restart in spring precise planning being worked outprecise planning being worked out

experiments now going into shutdown modeexperiments now going into shutdown mode repairsrepairs improvementsimprovements additional installationsadditional installations ……

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

44

Page 5: The LHC  Startup

55

ALICE

ATLAS

CMS

LHCb

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

Page 6: The LHC  Startup

66

Large Hadron Collider (LHC)Large Hadron Collider (LHC)

about 100 m undergroundabout 100 m underground 27 km circumference27 km circumference

11245 orbits per second 11245 orbits per second pp collisions up to √s = 14 TeVpp collisions up to √s = 14 TeV Pb-Pb collisions up to Pb-Pb collisions up to √s√sNNNN = = 5.5 TeV5.5 TeV

Page 7: The LHC  Startup

ALICEALICE

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

77

Page 8: The LHC  Startup

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

88

Page 9: The LHC  Startup

ATLASATLAS

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

99

Page 10: The LHC  Startup

CMSCMS

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

1010

Page 11: The LHC  Startup

Cosmics (ATLAS)Cosmics (ATLAS)

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

1111

Page 12: The LHC  Startup

Alignment of the ALICE ITSAlignment of the ALICE ITS

2200 volumes 2200 volumes 13k degrees of freedom 13k degrees of freedom Millepede, “hierarchical” alignmentMillepede, “hierarchical” alignment

~ 50 k cosmic events (SPD trigger ~ 0.1 Hz)~ 50 k cosmic events (SPD trigger ~ 0.1 Hz)

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

1212

Hit distribution in the 6 layers of the ITS

Page 13: The LHC  Startup

Distance between Distance between upper and lower upper and lower track segmentstrack segments

= 56 µm= 56 µm (40 µm in simulation (40 µm in simulation

with no misalignment) with no misalignment)

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

1313

after alignment

before alignment

after alignment

before alignment

Distance between hit Distance between hit and track in the and track in the overlap regionoverlap region

= 22µm= 22µm (15 µm µm in simulation (15 µm µm in simulation

with no with no misalignment)misalignment)

Page 14: The LHC  Startup

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

1414

Page 15: The LHC  Startup

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

1515

Page 16: The LHC  Startup

16

Particle shower in the endcapParticle shower in the endcap

ShowerShower

Cosmics showers/interactions in the TRT with solenoid on

Fully commissioned and inside ATLAS partition since long

(Xe is in since few days results shown are with Ar/CO2/O2; 70/27/3%)

SQM 2008 中国 · 北京 · 清华大学 2008 年 10 月 安飞德

意大利国家核物理学院(帕多瓦)

Page 17: The LHC  Startup

ALICE TPCALICE TPC

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

1717

Cosmics Laser Krypton

ExB

vdrift

Page 18: The LHC  Startup

Particles in the LHCParticles in the LHC

first signs of life…first signs of life… 14-15 June14-15 June extraction in TI2 and dumpextraction in TI2 and dump

injection tests injection tests 1)1) 8-11 August8-11 August

first injection in LHC (beam 1)first injection in LHC (beam 1)

2)2) 22-24 August22-24 August first injection of beam 2first injection of beam 2

3)3) 5-7 September5-7 September

circulating beamscirculating beams 10 September10 September

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

1818

Page 19: The LHC  Startup

Extraction tests: 14-15 JuneExtraction tests: 14-15 June

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

1919

14 June 15 June

ALICE Pixels

beam extracted from beam extracted from the SPS and dumped in the SPS and dumped in the transfer linethe transfer line

muons make it all the muons make it all the way to ALICEway to ALICE

Page 20: The LHC  Startup

08.08.0808.08.08 :: First Injection in LHCFirst Injection in LHC ! !

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

2020

Page 21: The LHC  Startup

Optics: measured vs theoreticalOptics: measured vs theoretical

kick response (histo = measured, points = model)kick response (histo = measured, points = model)

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

2121

Page 22: The LHC  Startup

First injection in the LHC!First injection in the LHC!

8 August 20088 August 2008 ALICE SPD (pixel) and V0 ALICE SPD (pixel) and V0

(scintillator) switched on (scintillator) switched on during first phase (upstream during first phase (upstream dump)dump) pilot bunches: ~ 5 10pilot bunches: ~ 5 1099 protons protons

Trigger: ≥ 10 hits on layer 2Trigger: ≥ 10 hits on layer 2 32 events triggered 32 events triggered

Run 51403 (16:53 to 18:05)Run 51403 (16:53 to 18:05)

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

2222

multiplicity

SPDSPD

V0 vs SPDV0 vs SPD

ADC vs multiplicity

Δt

Page 23: The LHC  Startup

Background studiesBackground studies bunches of 2 10bunches of 2 1099 protons injected through ALICE from TI2 protons injected through ALICE from TI2

all beam screens in all beam screens in ~ 100 particles per cm ~ 100 particles per cm22 in ALICE (inner region) in ALICE (inner region) LHC ring screens out, injection line screens in LHC ring screens out, injection line screens in 1-2 part. per cm 1-2 part. per cm22

all screens out all screens out no detectable background (SPD triggers: only cosmics) no detectable background (SPD triggers: only cosmics)

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

2323

Page 24: The LHC  Startup

10 September: circulating beams!10 September: circulating beams!

beam 1: 1beam 1: 1stst complete orbit ~ 10:30 complete orbit ~ 10:30

beam 2: 1beam 2: 1st st complete orbit ~ 15:00complete orbit ~ 15:00

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

2424

first signals from ALICEfirst signals from ALICE

Page 25: The LHC  Startup

11 September: RF capture11 September: RF capture(Physics data!)(Physics data!)

11 September, ~ 22:35 first capture11 September, ~ 22:35 first capture beam 2 kept in orbit for over 10 minutes! beam 2 kept in orbit for over 10 minutes!

series of injections with tens of mins RF capture during series of injections with tens of mins RF capture during nightnight in ALICE: 673 events in totalin ALICE: 673 events in total

first data for Physics (beam 2 background)first data for Physics (beam 2 background)

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

2525

run 58338run 58338event 27event 27

Page 26: The LHC  Startup

Beam-halo event in ATLASBeam-halo event in ATLAS

2626SQM 2008 SQM 2008 中国中国 ··北京 北京 · · 清华大学 清华大学 20082008 年年 1010 月 安飞德 意大利国家核物理学院(帕多月 安飞德 意大利国家核物理学院(帕多瓦)瓦)

Page 27: The LHC  Startup

Trigger TimingTrigger Timing

Measurements of relative arrival times of trigger signals Measurements of relative arrival times of trigger signals

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

2727

ALICEALICEATLASATLAS

Page 28: The LHC  Startup

Beam-halo in CMS CalorimetersBeam-halo in CMS Calorimeters

Correlation between hadronic Correlation between hadronic and electromagnetic energyand electromagnetic energy

Crystals were time-aligned to ~ Crystals were time-aligned to ~ nsns

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

2828

Page 29: The LHC  Startup

Next: first collisions (2009)Next: first collisions (2009)

e.g.: 2 on 2 bunches with one delayed bunch per beame.g.: 2 on 2 bunches with one delayed bunch per beam

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

2929

delayed by 75ns

with this scheme, for each with this scheme, for each orbit, each experiment sees:orbit, each experiment sees: 1 beam-beam encounter1 beam-beam encounter 1 beam-gas encounter1 beam-gas encounter 1 gas-beam encounter1 gas-beam encounter

First collisions @ 900 GeVFirst collisions @ 900 GeV 1 beam-beam bc per orbit1 beam-beam bc per orbit * = 10 m* = 10 m beam size = 280 µm (beam size = 280 µm ()) L ~ several 10L ~ several 102727 cm cm-2-2 s s-1-1

rate per bc ~ a few %rate per bc ~ a few % MB rate ~ a few 100 HzMB rate ~ a few 100 Hz

Page 30: The LHC  Startup

First PhysicsFirst Physics

average multiplicityaverage multiplicity multiplicity distributionmultiplicity distribution

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

3030

10 TeV|| < 0.9

Page 31: The LHC  Startup

ppTT distribution distribution

ppTT distr. vs mult’y distr. vs mult’y

ppTT distr. for identified distr. for identified particlesparticles

strangeness productionstrangeness production baryon transportbaryon transport ……

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

3131

CDF, Phys. Rev. D65 (2002) 072005

charged multiplicity

<p

T>

(G

eV/c

)

Page 32: The LHC  Startup

Before long: hard physicsBefore long: hard physics

e.g.: e.g.: DD00 K K--++

forfor LL > 10> 102828 cm cm-2-2ss-1-1

(1 bc per orbit @ 10 (1 bc per orbit @ 10 TeV)TeV)

~ 3 10~ 3 1077 events/day events/day

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

3232

Page 33: The LHC  Startup

High multiplicity pp!High multiplicity pp!

As soon as As soon as LL ~ 10 ~ 103030 cm-2s-1 cm-2s-1

high multiplicity trigger!high multiplicity trigger! e.g.: 10 x mean e.g.: 10 x mean dNch/dy ~ 50 dNch/dy ~ 50 ~ semi-central Cu-Cu @ RHIC ! ~ semi-central Cu-Cu @ RHIC !

““heavy-ion physics” in pp ? heavy-ion physics” in pp ? strangeness enhancement ?strangeness enhancement ? transverse flow ?transverse flow ? HBT ?HBT ? v2 ??v2 ?? ““Rcp” ???Rcp” ??? ……

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

3333

Phobos Cu-Cu

Page 34: The LHC  Startup

ConclusionsConclusions

2008 was a crucial year for LHC2008 was a crucial year for LHC completion of installationscompletion of installations checkout/commissioning of machinecheckout/commissioning of machine commissioning of experimentscommissioning of experiments

individual subdetectorsindividual subdetectors system-level operationsystem-level operation organization of human operationsorganization of human operations

first beams !first beams ! background studiesbackground studies timingtiming calibrationscalibrations machine opticsmachine optics

looking forward to continuing the adventure after the looking forward to continuing the adventure after the winter shutdown !winter shutdown !

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

3434

谢谢 !

Page 35: The LHC  Startup

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

3535

Page 36: The LHC  Startup

SQM 2008 中国·北京 · 清华大学 2008 年 10 月 安飞德 意大利国家核物理学院(帕多瓦)

3636