VÝROČNÁ SPRÁVA ANNUAL REPORT 2001 Bratislava Slovenská republika Slovak Republic

Upload: others

Post on 07-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

VÝROČNÁ SPRÁVAANNUAL REPORT

2001

BratislavaSlovenská republika

Slovak Republic

Transpetrol 16.7.2002 8:27 Stránka 1

Page 2: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Príhovor predsedu predstavenstva a generálneho riaditeľa

Členovia predstavenstva

Členovia dozornej rady

Organizačná štruktúra

Dcérske spoločnosti

Hlavné hospodárske aktivity

Ochrana životného prostredia

Technický a investičný rozvoj

Ľudské zdroje a sociálna politika

Ekonomické výsledky

Súvaha

Výsledovka

Správa nezávislého auditora

Kontaktné adresy

Address of the Chairman of the Board of Directors and General Director

Members of the Board of Directors

Members of the Supervisory Board

Organisational Structure

Subsidiaries

Main Business activities

Protection of the Environment

Technical and Investment Development

Human Resources and Social Policy

Profit/Loss for the Period

Balance Sheet

Income Statement

Independent Auditor’s Report

Contact Addresses

2

Obsah Contents

3

5

5

5

6

7

13

25

31

33

34

35

36

38

Transpetrol 16.7.2002 8:28 Stránka 2

Page 3: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Strategicky dôležitou súčasťou slo-venskej ekonomiky, osobitne jej energe-tického sektora, je preprava a skladova-nie ropy, čo tvorí core business akciovejspoločnosti Transpetrol.

Preprava ropy zohráva kľúčovú pozí-ciu v hospodárení Transpetrolu, nakoľkopríjem z tejto činnosti tvorí rozhodujúcučasť jeho výnosov. Počínajúc rokom1996 spoločnosť zaznamenala klesajú-ci trend v objeme prepravovanej ropy.Čiastočný obrat nastal až v roku 2001,keď množstvo prepravenej ropy v porov-naní s predchádzajúcim rokom vzrástloo 2,9 %, t. j. o 277 929 ton. Celoročnýobjem prepravenej ropy v uplynulom roku predstavoval9 551 465 ton.

Druhou rozhodujúcou súčasťou podnikateľskej čin-nosti Transpetrolu je skladovanie ropy. Okrem skladova-nia ropy pre hlavných odberateľov, ktorými sú na Slo-vensku Slovnaft a v Českej republike Paramo a Českárafinérska, Transpetrol zabezpečuje skladovanie ropy ajpre Štátne hmotné rezervy.

Sústredenú pozornosť vedenie spoločnosti venovaloochrane a tvorbe životného prostredia. V súčasnosti jecelá trasa slovenského ropovodu kontrolovaná telemet-rickým systémom. Do prevádzky sme uviedli pilotný pro-jekt ropovodného informačného systému, ktorý umožníriadiacim pracovníkom pružne rozhodovať najmä v kritic-kých a havarijných situáciách.

Pre upevnenie konkurenčnej schopnosti Transpetro-lu je mimoriadne dôležitá úroveň riadenia spoločnosti.V riadiacej činnosti vrcholového manažmentu prevládastrategický prístup k rozvoju spoločnosti. V roku 2001 nazáklade certifikačného auditu bol Transpetrolu udelenýcertifikát podľa ISO 14001, a to bez výhrad, pre celýropovodný systém SR. Transpetrol sa tak stal prvou spo-ločnosťou v strednej Európe, ktorá má registrovanú pre-pravnú líniu ropy podľa tejto medzinárodne uznávanejnormy. Certifikát na zhodu s ISO 14001 bol udelený, akoprvým v rámci Slovenska, aj všetkým čerpacím staniciampohonných hmôt, ktorých vlastníkom bol Transpetrol.

Transpetrol má za sebou rok bohatý na viacerovýznamných udalostí. Oslávili sme 10. výročie vznikuakciovej spoločnosti, ktorá bola založená 1. júla 1991.Za desať rokov svojej existencie si Transpetrol vybudovalpovesť seriózneho obchodného partnera.

Pre budúce smerovanie Transpetrolu malo zásadnývýznam rozhodnutie vlády SR o spôsobe privatizácie 49-percentného podielu Transpetrolu a vyhlásenie

A strategically important componentof the Slovak economy, in particular ofits energy sector, is the transport andstorage of crude oil, which forms thecore business of Transpetrol joint-stockcompany.

The transport of crude oil plays a keyrole in the economy of Transpetrol itself,since the income from this activity formsthe decisive part of its revenues. Startingfrom 1996, the company has registereda decreasing trend in the volume oftransported oil. A partial turnabout onlyoccurred in 2001, when the amount oftransported oil increased by 2.9 per cent

in comparison with the previous year, i. e. by 277 929metric tons. The volume of oil transported last yearrepresented 9 551 465 metric tons.

The second decisive part of Transpetrol business isstorage of oil. Apart from storing oil for the maincustomers, which are Slovnaft in Slovakia, Paramo andČeská rafinérska in the Czech Republic, Transpetrolprovides oil storage for the State Reserve Stocks. The company's management pays constant attention tocreating and protecting the environment. At present thewhole length of the Slovak oil pipeline is controlled bya telemetric system. A pilot project of oil pipelineinformation system was put into operation, enabling themanagerial staff to make flexible decisions, in particularshould any critical or emergency situations occur.

In order to improve the competitiveness ofTranspetrol, the level of management of the company isof special importance. In the managing activity of the topmanagement it is the strategic approach to thedevelopment of the company that prevails. In 2001, onthe basis of a certification audit, Transpetrol received theISO 14001 certificate, without any reservations, for thewhole pipeline system in the Slovak Republic. ThusTranspetrol became the first company in Central Europeto have registered its transport line for oil under thisinternationally recognised standard. The ISO 14001certificate was also granted to all the petrol stationsowned by Transpetrol, as the first ones in Slovakia.

For Transpetrol the year was rich in important events.We celebrated the tenth anniversary of theestablishment of the joint-stock company, which wasestablished on 1 July 1991. In the ten years of itsexistence Transpetrol has gained a reputation ofa reliable business partner.

However, what was of utmost importance for the

3

Príhovorpredsedu predstavenstva

a generálneho riaditeľaof the Board of Directors and General Director

Address of the Chairman

Transpetrol 16.7.2002 8:28 Stránka 3

Page 4: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

medzinárodného tendra na jeho predaj. V stanovenomtermíne predbežné ponuky predložilo šesť spoločností,ktorým v nadväznosti na to Medzirezortná komisia preprivatizáciu umožnila vykonať hĺbkový audit (due dili-gence). Záväzné ponuky na kúpu 49 % akcií Transpetro-lu nakoniec predložili iba dve spoločnosti – slovenskárafinéria Slovnaft a druhý najväčší ropný koncernv Rusku – Yukos.

Vláda SR na základe vyhodnotenia oboch ponúk19. 12. 2001 schválila odpredaj akcií štátu v a.s. Trans-petrol ruskej spoločnosti Yukos.

Podmienkami privatizácie štátneho podielu bol ajodpredaj siete 13 čerpacích staníc pohonných hmôta 21, 24-percentného podielu Transpetrolu vo VSŽ.

Víťazom tendra na predaj 100 percent akcií dcérskejspoločnosti Transpetrol Trading, do ktorej boli čerpaciestanice prevedené, sa stala spoločnosť OMV Slovensko.

Koncom minulého roka sa na základe rozhodnutia100-percentného akcionára – Ministerstva hospodár-stva SR – uskutočnil predaj nášho podielu vo VSŽ pro-stredníctvom verejného trhu s cennými papiermi.

V roku 2001 zmenila na základe rozhodnutia vládySR vlastnícku štruktúru aj ďalšia dcérska spoločnosť –Transtel. Táto spravovala optickú sieť Transpetrolua stala sa základom novovytvorenej telekomunikačnejspoločnosti Energotel.

Vstupom strategického investora – ruského naftové-ho gigantu Yukos – do spoločnosti Transpetrol sa vytvo-rili nebývalé možnosti na jej ďalší rozvoj. Očakáva sapredovšetkým posilnenie medzinárodného postaveniaTranspetrolu a zvýšenie jeho konkurencieschopnostiv oblasti tranzitu ropy. Zvýšením objemu prepravovanejropy budú rásť ekonomické výsledky Transpetrolu, upev-ní sa jeho finančná stabilita a objektívne tým vzrastie ajhodnota majetkového podielu štátu v Transpetrole.

Rok 2001 bol pre Transpetrol úspešný nielen z hľa-diska dosiahnutých hospodárskych výsledkov, ale prinie-sol aj významné zmeny vo vlastníckych pomeroch spoloč-nosti a predznamenal jej nové strategické smerovanie.

Ing. Štefan Czuczpredseda predstavenstva

a generálny riaditeľ a.s. Transpetrol

future orientation of Transpetrol was the decision of theSlovak government about the method of privatisation of49 per cent stake in Transpetrol and the invitation forinternational tender for its sale. Six companies submittedpreliminary offers within the set time limit, andsubsequently the Interdepartmental PrivatisationCommission enabled them to carry out due diligence. Inthe end only two companies submitted binding offers tobuy 49 per cent of the Transpetrol shares - the Slovakrefinery Slovnaft and the second largest oil concern inRussia - Yukos.

After assessing both bids, on 19 December 2001 theSlovak government approved the sale of the stake of theState in Transpetrol to the Russian company Yukos.

The conditions for the privatisation of the stake of theState included the sales of a network of 13 petrolstations and of the 21.24 per cent stake of Transpetrol inVSŽ ironworks.

The winner of the tender for selling 100 per cent ofthe shares of the subsidiary Transpetrol Trading, to whichthe petrol stations had been transferred, was thecompany OMV Slovensko.

At the end of last year, by a decision of a 100 per centshareholder, the Ministry of the Economy, our share inVSŽ was sold on the public securities market.

In 2001, a decision of the Slovak government changedthe ownership structure of another subsidiary - Transtel.This subsidiary used to manage Transpetrol's opticalnetwork and it became the basis of a newly establishedtelecommunications company Energotel.

The entry of strategic investor – the Russian oil giantYukos – into Transpetrol has created unprecedentedpossibilities for its further development. Above all theinternational position of Transpetrol is expected to bestrengthened and its competitiveness in the transit of oilto be improved. By increasing the volume of transportedoil, the profit of Transpetrol will increase, its financialstability will be strengthened and thus objectively thevalue of the stake of the State in Transpetrol will grow too.

The year 2001 was successful for Transpetrol notonly in terms of the profit achieved, but it has alsobrought significant changes in the company's ownershipand has heralded its new strategic orientation.

Ing. Štefan CzuczChairman of the Board of Directors

and General Director Transpetrol joint-stock company

4

Address of the Chairmanof the Board of Directors and General Director

Transpetrol 16.7.2002 8:28 Stránka 4

Page 5: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Členovia predstavenstvaMembers of the Board of Directors

Ing. Štefan Czuczpredseda predstavenstva a generálny riaditeľ

Chairman of the Board of Directors and General Director

Ing. Jaroslav Linkešpodpredseda predstavenstva a prevádzkový riaditeľ

Vice Chairman of the Board of Directors and Operations Director

Ing. Michal Durankočlen predstavenstva a ekonomický riaditeľ

Member of the Board of Directors and Economic Director

Ing. Milan Gálčlen predstavenstva a technicko-investičný riaditeľ

Member of the Board of Directors and Technical and Investment Director

Ing. Miloslav Čurillačlen predstavenstva a riaditeľ úseku výstavby

a prevádzky servisných zariadeníMember of the Board of Directors and Director of the Division

for Construction and Operation of Service Facilities

Miroslav Marekčlen predstavenstva a personálny riaditeľ

Member of the Board of Directors and Human Resources Director

Členovia dozornej radyMembers of the Supervisory Board

Ing. Jozef Kaiserpredseda dozornej radyChairman of the Supervisory Board

Ing. Jolana Petrášovápodpredsedníčka dozornej radyVice Chairman of the Supervisory Board

JUDr. Ján Sabolod/from 11. 6. 2001 PhDr. Ján Oravecčlen dozornej radyMember of the Supervisory Board

Mgr. Pavel Kravecod/from 27. 9. 2001 Ing. Peter Klimentčlen dozornej radyMember of the Supervisory Board

Ing. Peter Moravčíkčlen dozornej radyMember of the Supervisory Board

Ing. Ján Žitniakčlen dozornej radyMember of the Supervisory Board

5

Organizačná štruktúra Organisational Structure

Organizačná štruktúraOrganisational Structure

ÚSEK VÝSTAVBY SERVISNÝCHZARIADENÍ

DIVISION FOR THE CONSTRUCTIONOF SERVICE FACILITIES

VALNÉ ZHROMAŽDENIEGENERAL ASSEMBLY

PREDSTAVENSTVOBOARD OF DIRECTORS

KANCELÁRIAGENERÁLNEHO RIADITEĽA

OFFICEOF THE GENERAL DIRECTOR

GENERÁLNY RIADITEĽGENERAL DIRECTOR

TECHNICKO-INVESTIČNÝ ÚSEKTECHNICAL AND INVESTMENT

DIVISION

DOZORNÁ RADASUPERVISORY BOARD

EKONOMICKÝ ÚSEKFINANCIAL DIVISION

PERSONÁLNO-ORGANIZAČNÝ ÚSEKHUMAN RESOURCES AND

ORGANISATIONAL DIVISION

PREVÁDZKOVÝ ÚSEKOPERATIONS DIVISION

Transpetrol 16.7.2002 8:28 Stránka 5

Page 6: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

• export a import tovaru a služieb• kompenzačné a barterové obchody

• preprava ropných produktov• podpora vybraných obchodno-výrobných projektov

• zastupovanie partnerských slovenských firiem vovybraných teritóriách a projektoch v zahraničí

• údržba a opravy strojno-technologickýcha pomocných zariadení

• odstraňovanie následkov prípadných haváriía prevádzkových porúch potrubných systémov

• výrobná činnosť v strojárskom odbore• stavebná činnosť, demontáž a likvidácia

nepotrebných zariadení a objektov

• zabezpečovanie obchodnej činnosti v sietičerpacích staníc pohonných hmôt

• poskytovanie komplexných služieb v oblastifinančného a operatívneho lízingu osobných motorovýchvozidiel, budov, technológií a technologických zariadení

• poskytovanie verejných telekomunikačných služiebokrem hlasovej telekomunikačnej služby

• výstavba verejnej telekomunikačnejinfraštruktúry

export and import of goods and services •off-set and barter trade •transport of oil products •support for selected trade and production projects •representing Slovak partner companies in selected •territories and projects abroad

maintenance and repair of machinery and auxiliary •equipmentremoving consequences of accidents, should any •happen, and operational faults of the pipeline systemsmechanical engineering production •construction, dismantling and removal •of unnecessary facilities and structures

ensure business activities in the network of petrol •stations

provide comprehensive services in financial and •operative leasing of passenger vehicles, buildings,technologies and technological equipment

provision of public telecommunication services, •with the exception of voice mailconstruction of public telecommunication •infrastructure

6

Dcérske spoločnosti Subsidiaries

TRANSPETROL TRANZIT, a.s.

TRANSPETROL SERVIS, a.s.

TRANSPETROL TRADING, a.s.

TPF LEASING, s.r.o.

TRANSTEL, a.s.od /since 17. 12. 2001ENERGOTEL, a.s.

Transpetrol 16.7.2002 8:28 Stránka 6

Page 7: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Hlavným poslaním akciovej spoločnosti Transpet-rol, ako jediného prevádzkovateľa ropovodnéhosystému v Slovenskej republike, je tranzitná a vnútro-štátna preprava ropy a jej skladovanie pre svojichodberateľov a pre Štátne hmotné rezervy, v čom mámonopolné postavenie. K jej hospodárskym aktivitámpatrilo aj prevádzkovanie čerpacích staníc pohonnýchhmôt a obchodná činnosť spojená s poskytovanímverejných telekomunikačných služieb a s výstavbouverejnej telekomunikačnej infraštruktúry. Jej ekono-mické výsledky sú v rozhodujúcej miere závislé oddopytu po rope a následne od realizovaného objemuprepravenej ropy.

Jediným odberateľom ropy na Slovensku je rafiné-ria Slovnaft. Objem jej ročného odberu ropy je už nie-koľko rokov na približne rovnakej úrovni. Podľa našichprognóz sa v dôsledku využívania nových progresív-nych technológií a vyššieho zhodnotenia ropy pri jejfinálnom spracovaní nedá očakávať, že by v Slovnaftedošlo v dohľadnom čase k zvýšeniu odberu ropy.V minulom roku sme Slovnaftu dodali 5 340 905 tonropy, čo z hľadiska využiteľnosti prepravnej kapacityslovenského úseku ropovodu Družba je o niečo viacako jedna štvrtina jeho celkovej kapacity.

Významnú úlohu z hľadiska realizovaných tržieba využívania prepravnej kapacity nášho ropovoduzohrávajú rafinérie v Českej republike – Česká rafinér-ska a Paramo, hoci počínajúc rokom 1996 objemprepravovanej ropy do ČR má klesajúcu tendenciu. Jeto predovšetkým v dôsledku diverzifikácie importuropy v ČR, a to využívaním prepravných kapacítnemeckého ropovodu IKL, ktorý nadväzuje na ropo-vod TAL vedúci z talianskeho prístavu Terst,a v dôsledku modernizácie českých rafinérií, nakoľkoefektivita nových výrobných procesov, ktoré zaviedli,umožňuje vyrobiť väčšie množstvo ropných produktovpri vstupe rovnakého množstva ropy. V roku 2001sme do Českej republiky dodali 3 784 620 ton ropy,čo oproti minulému roku je viac o 146 566 ton. Aniu českých odberateľov sa nedá prognózovať v krátkejbudúcnosti zvýšený odber ropy.

Mierne zvýšenie odberu ropy sme zaznamenali aju ostatných odberateľov. V roku 2001 sme im doda-li 425 940 ton ropy, čo je o 113 475 ton viac akov roku 2000.

Akciová spoločnosť Transpetrol v roku 2001 pre-pravila pre svojich odberateľov celkom 9 551 465ton ropy.

The main mission of joint-stock companyTranspetrol, as the only operator of oil pipeline systemin the Slovak Republic, is transit and inland transport ofcrude oil and its storage for the customers and for theState Reserve Stocks, in which it holds a monopoly. Itsbusiness activities also used to include operating petrolstations and commercial activity related to the provisionof public telecommunications services and building ofpublic telecommunications infrastructure. Its profit toa decisive extent depends on the demand for oil and thesubsequent volume of transported oil.

The only customer for oil in Slovakia is the Slovnaftoil refinery. The annual volume of oil it buys has beenstable for several years, remaining at approximately thesame level. According to our forecasts, due to the use ofnew progressive technologies and better finalprocessing of the oil, it cannot be expected that in thenear future the amount of oil bought will increase. Lastyear we supplied 5 340 905 metric tons of crude oil toSlovnaft, which in terms of using the transport capacityof the Slovak stretch of the Družba pipeline is slightlymore than one fourth of its overall capacity.

An important role in terms of sales achieved and theuse of the transport capacity of our pipeline is played byoil refineries in the Czech Republic - Česká rafinérskaand Paramo, although starting from 1996 the volume ofoil transported to the Czech Republic has showna downward trend. This is above all due to diversificationof oil imports in the Czech Republic by using thetransport capacities of the German IKL pipeline which islinked to the TAL pipeline leading from the Italian port ofTrieste, and also due to modernisation at the Czechrefineries, since the efficiency of the new productionprocesses which they have introduced makes it possibleto produce a larger amount of oil products from thesame amount of crude oil as an input. In 2001 wesupplied 3 784 620 metric tons of oil to the CzechRepublic, which is more by 146 566 metric tons than inthe previous year. With the Czech customers we cannotforecast an increased buying of oil in the near futureeither.

We have recorded a slight increase in the purchaseof oil by the other customers too. In 2001 we deliveredto them 425 940 metric tons of oil, which is more by113 475 metric tons than in 2000.

In total in 2001 joint-stock company Transpetroltransported for its customers 9 551 465 metric tonsof oil.

7

Hlavné hospodárske aktivity Main Business Activities

Transpetrol 16.7.2002 8:28 Stránka 7

Page 8: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Preprava ropy sa v roku 2001 zvýšila v porovnanís predchádzajúcim rokom o 2,9 %. Dodávky ropy prejednotlivé rafinérie sa realizovali na základe zmluvnedohodnutých ročných objemov a v požadovaných ter-mínoch.

Slovenský ropovodný systém pozostáva z dvochropovodov. Ropovod Družba na území Slovenskejrepubliky bol vybudovaný v rokoch 1960 – 61 a prváropa ním pretiekla od ukrajinských hraníc do Slovnaf-tu v Bratislave 3. februára 1962. Jeho trasa sa začínav Ruskej federácii a pokračuje cez Bielorusko, Ukrajinua Slovensko do Českej republiky.

Celková dĺžka ropovodu Družba mimo územiaSR je 2 280 km a na Slovensku meria vyše 506,6km, pričom takmer po celej slovenskej trase jevybudované zdvojené potrubie. Prepravná kapacitaslovenského úseku ropovodu Družba je 21 mil.ton/rok, ale v súčasnosti sa využíva ani nie z polo-vice. Druhým ropovodom je Adria. Bol vybudovanýkvôli prípadnej diverzifikácii zdrojov ropy a do pre-vádzky bol uvedený v roku 1980. Začína sa v chor-vátskom prístave Omišalj, pokračuje cez Chorvát-sko a Maďarsko a po prekonaní 606 km prechádzana územie Slovenska, kde jeho dĺžka predstavuje8,5 km. V Šahách-Tupej sa napája na ropovod Druž-

The transport of oil in 2001 increased incomparison with the previous year by 2.9 per cent. Thedeliveries of oil for the individual refineries were carriedout on the basis of annual volumes agreed by contractsand at the time required.

The Slovak oil pipeline system consists of two oilpipelines. The Družba pipeline in the territory of Slovakiawas built in the years 1960 - 61 and the first oil flowedthrough it from the Ukrainian border to Slovnaft inBratislava on 3 February 1962. Its route starts in theRussian Federation and continues through Belorussia,Ukraine and Slovakia to the Czech Republic.

The total length of the Družba pipeline outside theterritory of Slovakia is 2 280 km and within Slovakia itmeasures over 506.6 km, where almost the wholeSlovak segment is made up of a double line. Thetransport capacity of the Slovak stretch of the Družbapipeline is 21 million metric tons per year, however, atpresent it is only used by less than a half. The secondpipeline is Adria, which was built to achievediversification of sources of oil and put in operation in1980. It starts in the Croatian port of Omišalj, continuesthrough Croatia and Hungary and after covering 606 kmit enters the territory of Slovakia, where it is 8.5 km long.In Šahy-Tupá it is linked to the Družba pipeline. Its

8

Hlavné hospodárske aktivity Main Business Activities

Množstvo prepravenej ropy v roku 2001 podľa odberateľov v porovnaní s rokom 2000The amount of transported crude oil in 2001, for individual customers, compared to 2000

Odberateľ Množstvo prepravenej ropy Rozdiel v porovnaní v roku 2001 v tonách s rokom 2000 v tonách

Customer Amount of oil transported Difference compared to 2000,in 2001 in metric tons in metric tons

SLOVNAFT 5 340 904 + 17 887ČESKÁ RAFINÉRSKA 3 187 320 + 194 506PARAMO 597 300 - 47 940INÍ ODBERATELIA/OTHER CUSTOMERS 425 941 + 113 476SPOLU/TOTAL 9 551 465 + 277 929

Množstvo prepravenej ropy podľa odberateľov v tis. tonVolume of transported crude oil for individual customers in thous. tons

1993 1994 1995 1996 1997 1998 1999 2000 2001

SLOVNAFT 4 449 4 849 5 223 5 338 5 273 5 347 5 298 5 323 5 341

RAFINÉRIE V ČR/REFINERIES IN CZ 6 053 6 651 7 021 6 141 5 756 5 456 4 809 3 638 3 785

INÍ ODBERATELIA/OTHER CUSTOMERS 314 813 46 70 422 298 312 425

SPOLU/TOTAL 10 816 12 313 12 244 11 525 11 099 11 225 10 405 9 273 9 551

Transpetrol 16.7.2002 8:28 Stránka 8

Page 9: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

ba. Jeho ročná kapacita je 4,5 mil. ton/rok, ale natrase od Chorvátska do SR sa už dlhšiu dobu nevy-užíva. Slúži iba na transport ruskej ropy do Maďar-ska a Chorvátska.

Slovenský ropovodný systém má výhodnú pozíciuv sieti európskych ropovodov. Jeho výborná geografic-ká poloha a relatívne veľká prepravná kapacita, umož-ňujúca tranzit ropy oboma smermi, perspektívnevytvára reálne predpoklady na jeho napojenie sa nanovovytvorené tranzitné cesty najmä po uvedení do

prevádzky ropovodu Odesa – Brody. Využitím týchtovýhod sa v budúcnosti dá reálne predpokladať až dvoj-násobný nárast objemu prepravovanej ropy, čím savýrazne upevní konkurenčná schopnosť Transpetroluna európskych ropných trhoch a zásadne sa zvýši ajvýznam Slovenska, ako tranzitnej krajiny ropy nielenpre Českú republiku, ale aj pre štáty západnej Európy.

Popri preprave ropy v obchodnej činnosti Trans-petrolu významnú úlohu zohráva aj skladovanie ropy.Za posledných päť rokov investoval Transpetrol dobudovania skladovacích kapacít okolo 2,5 mld. Sk.Súčasná kapacita zásobníkov ropy dosahuje objem

annual capacity is 4.5 million metric tons per year, but ithas been out of operation for a long time now on theCroatia to Slovakia route. It only serves to transportRussian oil to Hungary and Croatia.

The Slovak pipeline system has an advantageousposition within the network of European pipelines. Itsexcellent geographical position and a relatively hightransport capacity, making possible the transport of oilin both directions, creates future realistic conditions forlinking it up to newly created transit routes, especially

after the Odesa – Brody pipeline is put into operation. Byusing these advantages a real future growth of thevolume of transported oil can be anticipated up to twice the present volume, which will boost thecompetitiveness of Transpetrol in the European oilmarkets, thus also increasing the importance ofSlovakia as a transit country for oil not only for the CzechRepublic, but also for Western European countries.

Apart from the transit of oil, important role within thebusiness activity of Transpetrol is played by the storageof oil. In the last five years Transpetrol investedapproximately 2.5 billion Slovak crowns in building

9

Hlavné hospodárske aktivity Main Business Activities

14 000

12 000

10 000

8 000

6 000

4 000

2 000

01993 1994 1995 1996 1997 1998 1999 2000 2001

4 44

9

4 84

9

5 22

3

5 33

8

5 27

3

5 34

7

5 29

8

5 32

3

5 34

1

6 05

3

6 65

1

7 02

1

6 14

1

5 75

6

5 45

6

4 80

9

3 63

8

3785

Rafinérie v âR / Refineries in CZSlovnaft

v tis. ton / in thous. tons

Hlavní odberatelia ropyMain customers for crude oil

Transpetrol 16.7.2002 8:28 Stránka 9

Page 10: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

520-tisíc kubických metrov a prevažná časť zodpove-dá prísnym vnútroštátnym legislatívnym požiadavkám,ale aj európskym štandardom, hlavne v oblasti tvorbya ochrany životného prostredia. Okrem operatívnehopreskladnenia ropy pre obchodných partnerov zásob-níky slúžia aj na skladovanie ropy pre Štátne hmotnérezervy. V roku 2001 podľa operatívnych požiadaviekodberateľov sa uskutočnilo preskladnenie ropy v obje-me 24 897 203 tonodní, čo sa pozitívne odzrkadlilo ajv ekonomickom prínose pre spoločnosť.

Podľa našich právnych predpisov a požiadaviekEurópskej únie sa počíta s postupným zvyšovanímobjemov skladovanej ropy pre Štátne hmotné rezervy.Do roku 2008 majú zodpovedať úrovni 90-dňovej spo-treby ropy a ropných produktov. Ďalšími investíciamido budovania zásobníkov sa plánuje dosiahnuť poža-dovanú úroveň v priebehu 5 – 6 rokov.

V posledných rokoch boli výnosy zo skladovaniaropy relatívne nízke, približne na rovnakej úrovni.V roku 2001 dosiahli čiastku 55 160 tis. Sk. Vzhľadomna očakávané zvyšovanie objemu skladovanej ropypre Štátne hmotné rezervy sa počíta v budúcnostis nárastom príjmov aj z tejto činnosti.

Transpetrol, a.s., venoval sústavnu pozornosť ajzvyšovaniu bezpečnosti a spoľahlivosti prevádzkyropovodov. V úzkej súčinnosti s externými odbornýmiorganizáciami pokračoval v realizácii rozvojového pro-gramu spoločnosti, v modernizácii technickýcha technologických zariadení, najmä realizovanímopatrení na upevnenie stability ropovodných potrubív miestach podchodov vodných tokov, zosuvnéhoúzemia a nadzemných úsekov ponad strže a rokliny.Uskutočnila sa vnútorná inšpekcia ropovodnéhopotrubia a na základe jej výsledkov bol vypracovanýplán opráv potrubí. Pokračovala rekonštrukcia a opra-vy katódovej ochrany ropovodov s cieľom dosiahnuťpožadované parametre ochrany potrubí v meniacichsa podmienkach ich uloženia.

V rámci diverzifikačných akcií bola v priebehu roka2001 ukončená výstavba čerpacej stanice pohonnýchhmôt Michalovce, ktorá rozšírila počet čerpacích stanícvo vlastníctve a.s. Transpetrol na trinásť. RozhodnutímPredstavenstva spoločnosti z apríla 2001 bol ukončenýprogram rozvoja čerpacích staníc v podmienkacha.s. Transpetrol. V druhej polovici roku 2001 bol vypí-saný tender na predaj stopercentného podielu akciídcérskej spoločnosti Transpetrol Trading. Víťazomtendra sa stala spoločnosť OMV Slovensko, s.r.o.

storage facilities. The present capacity of the oil storagetanks amounts to 520 thousand cubic metres anda majority of them correspond to the strict domesticlegislative requirements, as well as to Europeanstandards, in particular their environmental aspects.Apart from operative storage of oil for commercialpartners, the storage tanks serve to store oil for theState Reserve Stocks. In 2001, in accordance withoperative requirements of the customers, 24 897 203ton-days of oil were stored, which was positivelyreflected in the company's economy.

Our legal regulations and the European Unionrequirements anticipate a gradual increase of thevolume of oil stored for the State Reserve Stocks. By2008 they should equal 90-day consumption of oil andoil products. The required level is planned to beachieved by further investment in the building of storagetanks in the course of five to six years.

In the last years the revenue from storage of oil hasbeen relatively low, remaining at approximately thesame level. In 2001 it amounted to SKK 55 160thousands. With regard to the expected increase in thestorage of oil for State Reserve Stocks an increase ofrevenue from this activity is anticipated for the future.

Transpetrol has been paying constant attention toimproving the safety and reliability of the pipelines'operation. In close co-ordination with externalprofessional organisations the company has continuedin implementing its development programme,modernising the technical and technologicalequipment, above all by implementing measures forstrengthening the stability of the pipeline in placeswhere it goes under streams, through territory prone tolandslides and segments above abysses and crevasses.An internal inspection of the pipeline has been carriedout, on the basis of which a plan of pipe repair has beenprepared. Reconstruction and repair of the cathodicprotection of the pipelines has continued, aimed atachieving the required parameters for the protection ofpipes in changing conditions of their placing.

As a part of diversification activities in the course of2001, the construction of Michalovce petrol station wasfinished, thus extending the number of petrol stationsowned by Transpetrol to thirteen. The Decision of thecompany's Board of Directors in April 2001 ended theprogramme of developing petrol stations within theTranspetrol joint-stock company. In the second half of2001 a tender was invited for the sale of a 100 per cent

10

Hlavné hospodárske aktivity Main Business Activities

Transpetrol 16.7.2002 8:28 Stránka 10

Page 11: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

V priebehu roka 2001 sa predalo na čerpacíchstaniciach a.s. Transpetrol 22 826 tisíc litrov pohon-ných hmôt.

V roku 2001 pokračoval proces budovania vlast-ných telekomunikačných zariadení využívajúcich pre-nos po optickom vlákne. Vyznačoval sa ďalším rozvo-jom optickej infraštruktúry, ktorá bola v súbehu s ropo-vodom úspešne dobudovaná až po hranicu s Ukraji-nou a realizáciou ďalšej časti transportného systémuSDH o prenosovej kapacite 2,5 Gbit/s.

V priebehu roka 2001 došlo k ďalšiemu rozvojumiestnej optickej siete v Bratislave a k prepojeniuoptickej infraštruktúry s optickými trasami zahranič-ných telekomunikačných operátorov v Rakúskua Maďarsku, čím sa získali dôležité predpoklady naposkytovanie kvalitných prenosových kapacít pre ďal-šie komerčné zhodnotenie na medzinárodnej úrovniprostredníctvom dcérskej spoločnosti Transtel, a.s.

Spoločnosť Transtel, ktorá od roku 2000 pôsobilana poli telekomunikačných služieb ako samostatnýprávny subjekt so zameraním na obchodné zabezpe-čenie prenájmu dátových prenosov koncovému zákaz-níkovi, bola v roku 2001 pretransformovaná na spo-

stake of shares of the Transpetrol Trading subsidiary.The winner of the tender was OMV Slovensko, s. r. o.

In the course of 2001 the Transpetrol petrol stationssold 22 826 thousand litres of fuel.

In 2001 the process of building the company's owntelecommunications facilities using transmission overoptical fibre continued. The optical infrastructure wasfurther developing, successfully reaching the Ukrainianborder in parallel with the pipeline, and implementinganother part of SDH transport system with a transmissioncapacity of 2.5 Gbit/s.

In the course of 2001 the local optical network inBratislava underwent further development and the opticalinfrastructure was linked to optical routes of foreigntelecommunications operators in Austria and Hungary,thus creating conditions for providing high-qualitytransmission capacities for further commercial use at theinternational level through the Transtel, a.s. subsidiary.

The company Transtel, which since 2000 was anindependent legal entity in telecommunicationsservices focusing on the commercial provision of hireof data transmission to the end users, wastransformed in 2001 to a joint venture set up by

11

Hlavné hospodárske aktivity Main Business Activities

Transpetrol 16.7.2002 8:28 Stránka 11

Page 12: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

ločný podnik, ktorý vytvorili akciové spoločnosti Trans-petrol, SPP, Slovenské elektrárne a Energetické závo-dy. Pod novým názvom Energotel, a.s., začal svoju čin-nosť v telekomunikačných sieťach s ambíciou stať sasilným alternatívnym operátorom v poskytovaní tele-komunikačných služieb.

V súčasnosti a.s. Transpetrol stojí pred úlohouprispôsobiť prevádzku a ďalší rozvoj telekomunikačné-ho systému tak, aby zabezpečil nároky na prenos dátu vlastných informačných a riadiacich systémova zároveň dosiahol potrebnú mieru súladu so strate-gickými zámermi a pokryl kapacitné potreby a.s. Ener-gotel. Uvedené predpokladá vykonať nevyhnutnéúpravy v centrálnom riadení siete, organizačné pri-spôsobenie a korekciu v plánoch ďalšieho rozvojatelekomunikačnej infraštruktúry.

Výrazným podielom pozitívne ovplyvnila hospo-dársky výsledok spoločnosti za rok 2001 výplata divi-dend a predaj 21,24 % podielu akcií Transpetrolu voVSŽ, ktorý sa uskutočnil na Burze cenných papierov zapredajnú cenu 160,- Sk za jednu akciu. Pre Transpet-rol spolu s vyplatenými dividendami v roku 2001 toprinieslo zisk vo výške 333 mil. Sk a takmer dvojná-sobné zvýšenie plánovaného hospodárskeho výsled-ku, pred zdanením.

Základné imanie a.s. Transpetrol je 1,9 mld. Sk a cel-kove jeho aktíva v roku 2001 predstavujú 8,611 mld. Sk.

Najvýznamnejšou udalosťou uplynulého roka preTranspetrol bol vstup strategického partnera do spo-ločnosti. Stala sa ním ruská naftová spoločnosťYukos, ktorá za 74 mil. USD odkúpila 49 % akcií štátuv a.s. Transpetrol. Tým sa pre Transpetrol otvorili novémožnosti ďalšieho technického a ekonomickéhonapredovania.

Transpetrol joint-stock company, SPP gas utility,Slovenské elektrárne electricity producer andelectricity distribution companies. It started its activityunder the new name Energotel a. s., with an ambitionto become a major alternative operator providingtelecommunications services.

At present Transpetrol is facing the task of adjustingthe operation and further development of thetelecommunications system in such a way as to meet therequirements for data transmission in thecompany's own information and management systemsand at the same time achieve the necessary compliancewith the strategic intentions and cover the capacityneeds of Energotel a. s. This entails the necessaryadjustment in the central management of the network,organisational change and correction in the plans offurther development of the telecommunicationsinfrastructure.

The company's profit for 2001 was toa considerable extent positively influenced by thedividend payment and the sales of 21.24 per cent of theshares of Transpetrol in VSŽ, which was conducted onthe Stock Exchange at a selling price of SKK 160 pershare. Together with the dividends paid in 2001 thisbrought in profit of SKK 333 million and an almostdouble increase of the planned profit before tax.

The registered capital of Transpetrol, a. s. is SKK 1.9billion and the total assets in 2001 represent SKK8.611 billion.

The most important event of last year for Transpetrolwas the entry of a strategic partner into the company.This was the Russian oil company Yukos, which bought49 per cent of State's shares in Transpetrol for USD 74million. This has opened new opportunities forTranspetrol's further technical and economic progress.

12

Main Business Activities

Transpetrol 16.7.2002 8:28 Stránka 12

Page 13: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

V oblasti ochrany a tvorby životného prostredia sav roku 2001 uskutočnili plánované ekologické opatre-nia na líniovej časti ropovodu. V súčasnosti je celátrasa ropovodu kontrolovaná telemetrickým systémoma patrí k najmodernejším v Európe. Do prevádzky boluvedený i pilotný projekt Ropovodného informačnéhosystému, ktorý zvýši bezpečnosť a spoľahlivosť pre-vádzkovania ropovodov. Jeho hlavným prínosom jeumožniť rýchle a profesionálne rozhodovanie riadiacichpracovníkov v kritických a havarijných situáciách.

Do skúšobnej prevádzky bol uvedený tiež Mana-žérsky informačný systém, ktorý poskytuje manažmen-tu na všetkých stupňoch riadenia komplexné informá-cie o prevádzkovej, personálnej i ekonomickej situáciiv spoločnosti.

V roku 2001 sa pokračovalo v likvidácii a odstraňo-vaní starých ekologických záťaží na trase ropovoduv oblasti Čaňa-Gyňov a na prečerpávacích staniciachBudkovce a Moldava nad Bodvou. Podľa uzatvorenýchzmlúv ich likvidácia sa ukončí v roku 2003.

V máji 2001 švajčiarska spoločnosť SQS vykona-la v spoločnosti certifikačný audit podľa ISO 14001a Transpetrolu udelila certifikát EMS. V závere rokasa uskutočnilo prvé preskúmanie spoločnosti podľanormy ISO 9001:2000 QMS a Transpetrol sa pripra-vuje na audit podľa uvedenej normy, ktorý by sa malvykonať v polovici roku 2002.

Budovanie a rozvíjanie EMS/QMS v spoločnosti Transpetrol

Preskúmanie MS a.s. Transpetrol sa vykonávav súlade s normami STN EN ISO 14001, kapitola 4.6.a STN EN ISO 9001, kapitola 5.6. Vypracovalo sapodľa MP RKGR 1/2002 s cieľom prezentácie a prvé-ho preskúmania v rámci certifikačného auditu QMS.

Systém environmentálneho manažérstva smev a.s. Transpetrol zaviedli a rozvíjame ho na základeschválenej koncepcie budovania EMS a v súlade s roz-hodnutím vedenia spoločnosti z novembra 1999.Keďže v ISO normách radu 14001 rovnako ako v ISOnormách radu 9000 sa nachádza množstvo identic-kých kritérií manažérskych postupov – obe normybudujú na rovnakých princípoch systémov manažmen-tu – porada GR v decembri 2000 uznesením rozhodlapripravovanú certifikáciu a.s. Transpetrol podľa STNEN ISO 14001 rozšíriť o certifikáciu systému riadenia

Within the protection of the environment in 2001,the planned ecological measures on the line part of thepipeline were carried out. At present the whole length ofthe pipeline is controlled by a telemetric system and isamong the most modern in Europe. The pilot projectPipeline Information System, which will increase thesafety and reliability of the pipelines' operation, wasalso put in operation. Its main contribution is fast andprofessional decision-making of the managerial staff incritical and emergency situations.

The Management Information System was also putin trial operation, providing the management at alllevels with comprehensive information about thecompany's operational, personnel and economicsituation.

In 2001 the disposal and removal of old ecologicalburdens on the route of the pipeline near Čaňa-Gyňovand the Budkovce and Moldava nad Bodvou pumpingstations continued. In accordance with the signedcontracts their disposal will be finished in 2003.

In May 2001 Swiss company SQS carried outISO 14 001 certification audit and grantedTranspetrol the EMS certificate. At the end of theyear the first ISO 9001:2000 review was carried outand Transpetrol is getting ready for an audit inaccordance with this standard, which should becarried out in mid-2002.

Building and developing EMS/QMS in Transpetrol

The MS review of Transpetrol is carried out inaccordance with STN EN ISO 14001, Chapter 4.6 andSTN EN ISO 9001, Chapter 5.6. It was prepared inaccordance with MP RKGR 1/2002, with an aim ofpresentation and first review within the QMScertification audit.

The Environmental Management System wasintroduced in Transpetrol and has been developed onthe basis of approved policy of building EMS and in linewith the decision of the company's management ofNovember 1999. Since the ISO standards of the14001 series as well as ISO standards of the 9000series contain a number of identical criteria ofmanagement procedures - both standards are basedon the same principles of management systems - themeeting of the Managing Director in December 2000

13

Ochrana životného prostredia Protection of the Environment

Transpetrol 16.7.2002 8:28 Stránka 13

Page 14: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

kvality a.s. Transpetrol podľa ISO 9001:2000. Príkaz-mi GR 1/2001 a 7/2001 Manažérske systémy a.s.Transpetrol boli rozšírené a upravené povinnosti zmoc-nenca vrcholového manažmentu pre EMS, tajomníkaEMS, špecialistu EMS a členov Riadiaceho výboruEMS o otázky týkajúce sa QMS.

V súlade s harmonogramom prípravy spoločnostina certifikáciu švajčiarska audítorská spoločnosť SQSv máji 2001 uskutočnila certifikačný audit a.s. Trans-petrol. Správa z auditu konštatovala, že systém envi-ronmentálneho manažérstva je v a.s. Transpetrol zave-dený dôkladne a na vysokej úrovni. Certifikačný auditv a.s. Transpetrol nezistil žiadne slabé miesta v zave-denom systéme environmentálneho riadenia v oblastidopravy a skladovania ropy a audítor navrhol udeliťa.s. Transpetrol certifikát na zhodu s ISO 14001 preropovodný prepravný a skladovací systém bez akých-koľvek výhrad.

Environmentálna politika a.s. Transpetrol, vyhlá-sená v máji 2000, bola vo februári 2001 prehodnote-ná v zmysle pripomienok externého audítora a uprave-ná v súlade s rozhodnutím vedenia spoločnostio zapojení 12 čerpacích staníc pohonných hmôt a.s.Transpetrol do procesu certifikácie EMS. Na základevyhodnotenia adekvátnosti environmentálnej politikykonštatujeme, že environmentálna politika a.s. Trans-petrol je v súlade s charakterom činností a služiebTranspetrolu, ich rozsahom a prípadným dopadom naživotné prostredie.

Politika kvality a.s. Transpetrol bola vyhlásenáv auguste 2001. V novembri 2001, v rámci predcertifi-kačného auditu QMS, sa konštatoval jej súlad s požia-davkami normy ISO 9001:2000. Politika kvality a.s.Transpetrol zdôrazňuje prioritu neustále zlepšovaťslužby poskytované zákazníkom, ako aj uspokojovaťpotreby vlastných zamestnancov, zlepšovať celkovúvýkonnosť spoločnosti zavádzaním moderných tech-nológií a inováciami technologických zariadení i spolu-práce s verejnými a štátnymi inštitúciami. Na základevyhodnotenia adekvátnosti politiky kvality konštatuje-me, že politika kvality a.s. Transpetrol je primeranácharakteru činností a služieb, ktoré spoločnosť posky-tuje, vyjadruje pochopenie potrieb všetkých zaintere-sovaných strán a celej organizácii poskytuje smerk viditeľne očakávaným výsledkom.

Environmentálna politika a aj politika kvality jezverejnená v areáloch a.s. Transpetrol a v aktuálnejpodobe je sprístupnená na Internete.

decided in a Resolution to extend the planned STN ENISO 14001 certification of Transpetrol by QualityManagement System certification in accordance withISO 9001:2000. Orders of the Managing Director Nos.1/2001 and 7/2001 - Management Systems -extended and modified the obligations of theauthorised representative of top management for EMS,the EMS secretary, the EMS specialist and members ofthe EMS Steering Committee by issues related to QMS.

In May 2001, in line with the timetable of preparingTranspetrol for certification, the Swiss auditingcompany SQS carried out the certification audit. Theaudit report stated that the EnvironmentalManagement System in Transpetrol was thoroughlyintroduced and is on a high level. The certification auditdid not detect any weak points in the introducedEnvironmental Management System in oil transportand storage and the auditor proposed grantingTranspetrol ISO 14001 certificate for the pipelinetransport and storage system without any reservations.

Transpetrol's Environmental Policy, declared in May2000, was reviewed in February 2001 in accordancewith the comments of the external auditor and modifiedin line with the decision of the management on including12 petrol stations in the EMS certification process. Afterassessing the adequacy of the Environmental Policy wecan say that it is in line with the character of its activitiesand services, their scope and their potential impact onthe environment.

Transpetrol's Quality Policy was declared in August2001. In November 2001, within the pre-certificationaudit of QMS, it was declared to be in line with the ISO9001:2000 requirements. Transpetrol's Quality Policyemphasises the priority to keep improving the servicesprovided to customers as well as to satisfy the needs ofthe company's own staff, improve the overall efficiencyby introducing modern technologies and innovatingtechnological equipment and by co-operation withpublic and state institutions. After assessing theadequacy of the quality policy we can say thatTranspetrol's Quality Policy is adequate to thecharacter of activities and services which the companyprovides, it expresses an understanding for the needsof all the stakeholders and provides the organisationwith a focus on the clearly expected results.

The Environmental Policy as well as the QualityPolicy are displayed in all the premises of Transpetroland are available on Internet in an updated form.

14

Ochrana životného prostredia Protection of the Environment

Transpetrol 16.7.2002 8:28 Stránka 14

Page 15: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Ochrana vôd

Akciová spoločnosť Transpetrol nakladala s voda-mi v súlade so zákonom č. 138/1973 Zb. o vodách.Predpísané ročné limitné hodnoty ukazovateľov znečis-tenia vypúšťaných odpadových vôd, stanovené roz-hodnutiami príslušných vodohospodárskych orgánovv roku 2001, neboli prekročené ani v jednom prípade.Celkove je trend znečistenia odpadových vôd už dlho-dobo vyrovnaný až klesajúci - zvýšené množstvá vy-púšťaných odpadových vôd z jednotlivých PS v posled-nom období boli spôsobené napojením drenážnychvôd na kanalizáciu (PS 3), resp. potrebou odčerpáva-nia povrchových vôd pri stavebných prácach (PS 4).Koncentrácia sledovaného ukazovateľa v indikačnýchsondách ani v jednom prípade neprekročila normoustanovenú hodnotu pre pitné vody.

Pre prípad havarijného zhoršenia akosti vôd súspracované plány opatrení schválené príslušnýmivodohospodárskymi orgánmi a pre jednotlivé prípadysú vypracované programové opatrenia.

V rámci zrealizovaných ekologických opatrení • na trase hranica Ukrajiny – PS 1 – PS 2 boli uzatvá-

racie armatúry vybavené havarijnými nádržami, ichovládanie bolo napojené na centrálny riadiacisystém, takže informácie na riadenie sú prenášanételemetrickým diaľkovým káblom do centrálneho

Protection of waters

Transpetrol has been handling water in line with Act No.138/1973 on waters. The prescribed annual limits ofpollution indicators of the discharged waste waters,established by the decisions of the relevant watermanagement authorities in 2001, were not exceeded evenin one single case. The overall trend of pollution of wastewaters has for a long time been either balanced ordecreasing - the recent increased amounts of dischargedwaste waters from the individual PSs have been caused bythe linkage of the draining waters to the sewage system (PS 3) or the need for pumping surface waters duringconstruction work (PS 4). The concentration of themonitored indicator in the indication probes did not in onesingle case exceed the value set by the standard for drinkingwater.

Plans of measures have been prepared for the case ofemergency worsening of the quality of water, approved bythe relevant water management authorities and programmemeasures have been prepared for individual cases.

Within the implemented ecological measures • On the Ukrainian border – PS 1 – PS 2 route the closing

armatures have been equipped with emergency tanks,their controls have been linked to the centralmanagement system, so that management informationis transmitted by telemetric distance cable to the central

15

Ochrana životného prostredia Protection of the Environment

35 000

30 000

25 000

20 000

15 000

10 000

5 000

01996 1997 1998 1999 2000 2001

PS 1 PS 2 PS 3 PS 4 PS 5

trend PS 1 trend PS 2 trend PS 3 trend PS 4 trend PS 5

mno

Ïstv

o v

m3

amou

nt in

m3

Množstvo vypúšťaných odpadových vôd z PS 1 – 5The amount of vaste waters discharged from PS 1 – 5

Transpetrol 16.7.2002 8:28 Stránka 15

Page 16: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

dispečingu, kde sa vyhodnocujú, čo umožňuje včas-nú indikáciu prípadných mimoriadnych situácií.

• Vybudovanie šachty s havarijným kanalizačným uzá-verom na PS 2 zvýšilo ochranu povrchových vôdrecipientu pre prípad mimoriadnych situácií.

• Rekonštrukciou katódovej ochrany armatúrnychšácht na úseku PS 4 – PS 5 – OSR 1 a snímačov prí-tomnosti uhľovodíkov v šachtách bola zabezpečenátrasa.

• V záujme bezpečného vzorkovania vypúšťanýchodpadových vôd bol na kanalizácii PS 4 vybudovanýnový merný objekt.

control room, where it is evaluated, thus making possibleearly indication of any extraordinary situation.

• Building a shaft with an emergency sewage stopper atPS 2 increased the protection of surface waters of therecipient in case of extraordinary situations.

• The reconstruction of cathodic protection of armatureshafts in PS 4 – PS 5 – OSR 1 the segment and of thesensors of the presence of hydrocarbons in the shafts hassecured the pipeline.

• A new measurement facility was built on the PS 4 sewagesystem in order to ensure safe sampling of thedischarged waste waters.

16

Ochrana životného prostredia Protection of the Environment

7 000

6 000

5 000

4 000

3 000

2 000

1 000

01996 1997 1998 1999 2000 2001

TP a.s.trend

mno

Ïstv

o v

m3

amou

nt in

m3

Množstvo vypúšťaných odpadových vôd za TP, a.s.The amount of vaste waters discharged from Transpetrol

2,0

1,5

1,0

0,5

01996 1997 1998 1999 2000 2001

BSK 5 / BOC 5 CHSK / COC NL

trend BSK 5 / BOC 5 trend CHSK / COC trend NL

t/rok

met

ric to

ns/y

ear

Vypúšťané znečistenie z a.s. TranspetrolPollution discharged from Transpetrol

Transpetrol 16.7.2002 8:28 Stránka 16

Page 17: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Ročné hodnoty vypúšťaného znečistenia na jed-notlivých PS boli hlboko pod limitnými hodnotami,ktoré stanovili vodohospodárske orgány.

Ochrana ovzdušia

Činnosť a.s. Transpetrol v oblasti ochrany ovzdušiaje v súlade so zákonmi na ochranu ovzdušia SR, naria-dením vlády SR č. 92/1996 Z. z. v znení NV SR č. 473/2000 Z. z., zohľadňuje aj očakávané zmenyprávnej úpravy pri ochrane ovzdušia (Smernica Rady94/63/ES o riadení VOC) na prechodné obdobie do31. 12. 2010.

Spoplatnené sú prchavé organické zlúčeniny(VOC) unikajúce pri preprave a skladovaní ropy, tuhéznečisťujúce látky, SO2, NOX, CO a organický uhlík vy-púšťané z plynových kotolní v súlade so zákonom NRSR č. 401/1998 Z. z. Zdroje znečisťovania sú v kate-górii veľké, stredné a malé zdroje znečistenia. Nazáklade merania emisií oprávnenou organizáciou bolopreukázané, že emisné limity neboli prekročené.V roku 2001 preto neboli uložené a.s. Transpetrol žiad-ne pokuty za znečisťovanie ovzdušia.

Emisie VOC na PS 1 neboli pred rokom 1999bilancované, keďže technologický celok - prečerpáva-cia stanica ropy v Budkovciach sa považuje za veľkýzdroj znečisťovania ovzdušia až od 1. 1. 1999. Miernynárast v roku 2001 oproti roku 2000 súvisí so zvýše-ným objemom prepravovanej ropy.

The annual values of the discharged pollution at theindividual PSs were far below the limit values, establishedby decisions of water management authorities.

Air Protection

Transpetrol's activity in the protection of air is in linewith the Slovak laws for the protection of air, GovernmentRegulation No. 92/1996 Coll., as amended byGovernment Regulation No. 473/2000 Coll.; it takes intoaccount the expected changes of air protectionlegislation (Council Directive 94/63/EC on VOCmanagement) for the transitional period until 31December 2010.

In line with Act No. 401/1998 Coll., there are fees forvolatile organic compounds (VOCs) which leak during thetransport and storage of oil, solid pollutants, SO2, NOX,CO and organic carbon released from gas boiler houses.Sources of pollution fall within the major, medium andminor categories. The measurement of emissionsconducted by the authorised organisation has shown thatthe emission limits have not been exceeded. That is why in2001 Transpetrol was not levied any fines for air pollution.

Before 1999, VOC emissions at PS1 were notcalculated, since the technological whole - oil pumpingstation in Budkovce - is only considered a major source ofair pollution after 1 January 1999. The slight increase in2001 compared to 2000 is related to the higher volumeof transported oil.

17

Ochrana životného prostredia Protection of the Environment

0,007

0,006

0,005

0,004

0,003

0,002

0,001

01996 1997 1998 1999 2000 2001

NELtrend

t/rok

met

ric to

ns/y

ear

Vypúšťané znečistenie z a.s. TranspetrolPollution discharged from Transpetrol

Transpetrol 16.7.2002 8:28 Stránka 17

Page 18: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Emisie VOC na PS 4 zostali v r. 2001 približne naúrovni predchádzajúcich 2 rokov, keď boli doplnenéna skladovacích nádržiach PS 4 predpísané tesneniaplávajúcich striech. Veľmi mierny nárast VOC súvisí sozvýšeným objemom prepravovanej ropy.

Odpadové hospodárstvo

Odpadové hospodárstvo a.s. Transpetrol sa v r. 2001riadilo novým zákonom o odpadoch a príslušnými vyko-návacími predpismi. Náklady na odpadové hospodárstvopredstavovali v roku 2001 sumu 848 800,- Sk, z tohopoplatky za uloženie odpadov na sklad v sadzbe A pred-stavovali sumu 2 218,30 Sk. Pokuty uložené neboli.

V celej akciovej spoločnosti sa priebežne plniliprogramové ciele na materiálové využívanie odpadov,zneškodňovanie odpadov z odstránenia environmen-

The VOC emissions at PS 4 remained in 2001approximately at the level of the previous two years, whenthe prescribed sealings were added on the floating roofs ofstorage tanks PS 4. The very slight VOC increase is relatedto a higher volume of transported oil.

Waste management

Transpetrol's waste management was in 2001following the new act on waste and the relatedimplementing regulations. In 2001 the cost of wastemanagement represented SKK 848 800, out of which SKK2 218.30 were tariff A fees for storage. No fines were levied.

The whole joint-stock company was fulfilling theprogramme objectives for waste recovery, waste disposal inorder to remove environmental load and the reduction ofthe volume of waste produced. At PS 2 an emergency

18

Ochrana životného prostredia Protection of the Environment

1 400,0

1 200,0

1 000,0

800,0

600,0

400,0

200,0

01996 1997 1998 1999 2000 2001

Emisie VOC / VOC Emissions

Do r. 1999 hodnoty neboli bilancované

Until 1999 the values were not summedMno

Ïstv

o v

toná

ch /

rok

Am

ount

in m

etric

tons

/ ye

ar

1 000,0

800,0

600,0

400,0

200,0

01996 1997 1998 1999 2000 2001

Emisie VOC / VOC Emissions

Mno

Ïstv

o v

toná

ch /

rok

Am

ount

in m

etric

tons

/ ye

ar

Transpetrol 16.7.2002 8:28 Stránka 18

Page 19: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

tálnych záťaží a znižovanie množstva produkovanýchodpadov. Na PS 2 bola vybudovaná šachta havarijné-ho uzáveru a na PS 1 a PS 4 sa využíval betónovýodpad z likvidácie technických zariadení.

Celkove bolo v roku 2001 v a.s. Transpetrol vypro-dukovaných 4 095,7 t odpadov, z čoho najviac – 3 515 t – bolo betónového odpadu z demontáženepotrebných nadzemných zariadení a oplotenia (nadruhotné využitie), železného šrotu z rekonštrukcienádrží (na druhotné využitie) a zeminy znečistenejropnými látkami vyťaženej pri rekonštrukčných prá-cach na potrubných rozvodoch (zneškodnenie poúprave a biodegradácii). Programovým opatrením nazníženie množstva produkovaných ropných kalov sadarilo naďalej znižovať produkciu ropných kalov.

stopper shaft was built and at PS 1 and PS 4 use was madeof waste concrete from the dismantling of technicalequipment.

In 2001 Transpetrol produced 4 095.7 metric tons ofwaste in total, out of which the largest proportion - 3 315metric tons - was waste concrete from the dismantling ofunnecessary above-ground equipment and fencing (forsecondary use), scrap iron from the reconstruction oftanks (for secondary use), and soil polluted by oilsubstances extracted during reconstruction work at thedistribution pipes (disposal after treatment andbiodegradation). The programme measure to reduce theamount of produced oil sludge achieved further reductionof the oil sludge production.

19

Ochrana životného prostredia Protection of the Environment

600

500

400

300

200

100

01997 1998 1999 2000 2001

MnoÏstvo v tonách / Amount in metric tonsLineárne mnoÏstvo v tonách / Linear amount in metric tons

Vznik nebezpečného odpadu – ropné kalyGeneration of hazardous waste – oil sludges

Transpetrol 16.7.2002 8:28 Stránka 19

Page 20: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Spotreba elektrickej energie

V celej a.s. Transpetrol zaznamenala spotrebaelektrickej energie v posledných 6 rokoch pokleso 25,46 % v dôsledku zníženia prepravy ropy a čias-točne modernizáciou technologických zariadení. Mier-ny nárast v r. 2001 súvisí s vyšším objemom preprave-nej ropy a s plnením požiadaviek zákazníka na rovno-mernosť dodávok a množstvo prepravenej ropy.

Množstvo elektrickej energie potrebnej na pre-pravu tony ropy bolo v uplynulom roku v porovnanís rokom 1996 o 9,86 % nižšie. Toto zvýšenie efekti-vity nastalo po rekonštrukcii rozvodní a elektromoto-rov a čiastočne využívaním hospodárnejších režimovčerpania.

Electricity consumption

In the last six years the electricity consumption acrossthe whole joint-stock company has decreased by 25.46per cent, due to reduction in oil transport and partly due tomodernisation of the technological equipment. The slightincrease in 2001 is related to higher volume of transportedoil and to meeting the requirements of the customers foreven supplies and amounts of transported oil.

Last year the amount of electricity needed for thetransport of one metric ton of oil was lower by 9.86 percent compared to 1996. This increase of efficiencyoccurred after the reconstruction of distribution plantsand electrical engines and partly by using moreeconomical pumping regimes.

20

Ochrana životného prostredia Protection of the Environment

7 000,0

6 000,0

5 000,0

4 000,0

3 000,0

2 000,0

1 000,0

0,01997 1998 1999 2000 2001

O Z N

linear (O) linear (Z) linear (N)

mno

Ïstv

o v

toná

cham

ount

in m

etric

tons

Vznik odpadov za a.s. TranspetrolGeneration of waste in Transpetrol

Transpetrol 16.7.2002 8:28 Stránka 20

Page 21: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Spotreba zemného plynu

Spotreba zemného plynu v a.s. Transpetrol má odroku 1996 klesajúci trend. Klesajúca tendencia jedôsledkom realizovaných technických opatrení

Natural gas consumption

Transpetrol's natural gas consumption has beendecreasing since 1996. The decreasing trend is due toimplemented technical measures (thermal insulation of

21

Ochrana životného prostredia Protection of the Environment

6,100

6,000

5,900

5,800

5,700

5,600

5,500

5,400

5,300

5,200

5,1001996 1997 1998 1999 2000 2001

mnoÏstvo v kWh / tona • amount in kWh / tons

5,75

0

5,61

9

5,59

6

5,51

4

5,42

8

6,02

2

Spotreba elektrickej energie v a.s. Transpetrol na tonu prepravenej ropyElectricity consumption in Transpetrol per metric ton of transported oil

Transpetrol 16.7.2002 8:28 Stránka 21

Page 22: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

(zateplenie budov, výmena netesných okien a dverí,opravy tepelnej izolácie na rozvodoch). Kotolne boli porekonštrukcii vybavené ekvitermickou reguláciou, čímsa dosiahol optimálny pomer medzi tepelným komfor-tom pracoviska a spotrebou plynu ako surovinovéhoprírodného zdroja.

Zvýšená spotreba zemného plynu v roku 1999bola spôsobená chladnou zimou.

buildings, exchanging any windows and doors that did notfit properly, repair of thermal insulation on the distributionlines). After reconstruction the boiler houses wereequipped with equithermic regulation, thus achieving anoptimum ratio of thermal comfort of the workplace andthe consumption of gas as a natural raw material source.

The increased gas consumption in 1999 was causedby a cold winter.

22

Ochrana životného prostredia Protection of the Environment

870 000

860 000

850 000

840 000

830 000

820 000

810 000

800 000

790 000

780 000

770 0001996 1997 1998 1999 2000 2001

mnoÏstvo v m3 • amount in m3

840

221

827

313

864

278

810

817

802

976

858

077

Spotreba zemného plynu v a.s. TranspetrolTranspetrol’s natural gas consumption

Transpetrol 16.7.2002 8:28 Stránka 22

Page 23: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Odber pitnej vody

Odber pitnej vody v akciovej spoločnosti Trans-petrol má trvalo klesajúci trend. Pitná voda sa využí-vala na sociálne a hygienické účely, ako aj na požiar-nu ochranu.

Po rekonštrukcii vodovodu na PS 3 výrazne kleslaspotreba pitnej vody v tejto prevádzke. Mierne zvýšenýodber pitnej vody na PS 4 v roku 2001 bol zapríčinenýporuchou na vodovodnom potrubí, ktorá bola odstrá-nená. PS 1 bola napojená na verejnú vodovodnú sieťaž od tretieho štvrťroku 2000, preto je znázornenýodber len od roku 2000.

Consumption of drinking water

Transpetrol's consumption of drinking water hasbeen showing a constantly decreasing trend. Drinkingwater was used for social and hygienic purposes andfor fire protection.

After a reconstruction of the water mains at PS 3, thedrinking water consumption at this operation decreasedsignificantly. The slightly higher consumption of drinkingwater at P S4 in 2001 was caused by a damage to the wa-ter mains, which was later repaired. PS 1 was only linkedto the public water mains from the 3rd quarter of 2000,that is why only its consumption since 2000 is shown.

23

Ochrana životného prostredia Protection of the Environment

25 000

20 000

15 000

10 000

5 000

01996 1997 1998 1999 2000 2001

TP a.s.trend

mno

Ïstv

o v

m3

amou

nt in

m3

Odber pitnej vody v a.s. TranspetrolTranspetrol’s drinking water consumption

20 000

15 000

10 000

5 000

0

-5 0001996 1997 1998 1999 2000 2001

PS 1 PS 2 PS 3 PS 4

trend PS 1 trend PS 2 trend PS 3 trend PS 4

PS 4

trend PS 4

mno

Ïstv

o v

m3

amou

nt in

m3

Odber pitnej vody na PS 1 – 5Drinking water consumption at PS 1 – 5

Transpetrol 16.7.2002 8:28 Stránka 23

Page 24: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Bezpečnosť pri práci

Akciová spoločnosť Transpetrol venuje veľkúpozornosť bezpečnosti pri práci vlastných zamest-nancov a pracovníkov zmluvných firiem pohybujú-cich sa po areáli spoločnosti.

Spoločnosť má dobre prepracovaný systém ško-lení o bezpečnosti pri práci, vychádzajúci z povedo-mia osobitosti práce a pohybu osôb vo výbušnomprostredí, vo výškach a pod. Špecifiká našej činnos-ti sa premietajú do vybavenia a výcviku vlastnýchpožiarnych jednotiek, ktoré sa pravidelne dobreumiestňujú na okresných požiarnych cvičeniacha v prípade potreby poskytujú operatívnu pomoc ajblízkym obciam. Pravidelné požiarne, havarijnéa radiačné cvičenia sú v a.s. Transpetrol samozrej-mosťou, rovnako ako pravidelné lekárske prehliadkyvybraných profesií.

Vďaka cieľavedomej a systematickej starostli-vosti o bezpečnosť pri práci od roku 1996 nebolv a.s. Transpetrol zaznamenaný smrteľný pracovnýúraz ani ochorenie z povolania.

Safety at work

Transpetrol has been devoting much attention tosafety at work of its own employees and ofemployees of contractors who move round thecompany's premises.

The company has a well thought-out system oftraining courses on safety at work, based on theawareness of special nature of working and movingwithin explosive environment, in heights, etc. Thespecific features of our activity are reflected in theequipment and training of our own firefighting units,which regularly rank well at district firefightingexercises and in case of need provide operativeassistance also to nearby villages. Regularfirefighting, emergency and radiation exercises aretaken for granted in Transpetrol, just as regularmedical check-ups of workers in selected jobs.

Thanks to focused and systematic care for safetyat work, no single fatal accident at work oroccupational disease have been recorded inTranspetrol since 1996.

24

Ochrana životného prostredia Protection of the Environment

1996 1997 1998 1999 2000 2001

1 0 0 0 0 0

3

2

1

01996 1997 1998 1999 2000 2001

poãe

t úra

zov

num

ber

of a

ccid

ents

1

Ťažké pracovné úrazy v a.s. TranspetrolSerious accidents at work in Transpetrol

Transpetrol 16.7.2002 8:28 Stránka 24

Page 25: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Príprava a realizácia investičných akcií v roku2001 boli v súlade s dlhodobým plánom technickéhoa investičného rozvoja spoločnosti. Jednotlivé projektysa uskutočnili v súlade s požiadavkami environmetál-neho systému riadenia podľa normy ISO 14001a garantujú bezpečnosť ropovodného systému, porov-nateľnú so štandardom technickej úrovne ropovodovv krajinách Európskej únie. Rešpektovaním technic-kých noriem platných v EU pri ich realizácii sa stalikompatibilnými s európskym ropovodným systémom.V roku 2001 boli orientované na dokončenie rekon-štrukcie a modernizácie líniovej časti ropovodu, rekon-štrukciu a výstavbu veľkokapacitných zásobníkov ropy,dobudovanie zariadení vodného hospodárstva,modernizáciu požiarneho zabezpečenia a zdokonale-nie riadiaceho a informačného systému ropovodnéhosystému.

Na investičný rozvoj vrátane nákladov na zabezpe-čenie komerčného využitia optických vlákien a.s.Transpetrol vynaložila finančné prostriedky vo výške 1 022,9 mil. Sk, z toho na rekonštrukciu a modernizá-ciu ropovodného systému vrátane investičných náku-pov 938,9 tis. Sk. Vzhľadom na dôležitosť zabezpeče-nia trvalej prevádzky ropovodného systému, s cieľomzabezpečiť plynulosť dodávky ropy do rafinérií aj v sťa-žených a rizikových podmienkach, boli prednostnerealizované stavby v areáli stanice PS 1 Budkovce a naropovodnom potrubí.

V súlade s realizačným plánom na rok 2001 bolidokončené tieto stavby:

• Ekologické opatrenia na existujúcich ropovodochv úseku PS 2 Moldava n/Bodvou – PS 1 Budkovcea PS 1 Budkovce – hranica s Ukrajinou

• Ekologické opatrenia na trase preklenutia riekyMoravy

• Ekologické zabezpečenie trasy OSR 1 – PS 5 – PS 4• Zabezpečenie zimnej prevádzky požiarnej vody PS 4

Tupá• KAO areálu PS 4 Tupá• Zálohovanie vybraných elektrických zariadení PS 3

Rimavská Sobota• Rekonštrukcia nádrže č. 481 PS 1 Budkovce• Rekonštrukcia pohonov armatúr OSR 1 Slovnaft• Výmena zbernej nádrže 100 m3 PS 5 Bučany• Výmena regulačného ventilu ČS 222 PS 1 Budkovce• Vodné hospodárstvo PS 5 Bučany

The preparation and implementation of investmentsin 2001 went in line with the company's long-term planof technical and investment development. Individualprojects were implemented in accordance with therequirements of the ISO 14001 EnvironmentalManagement System and they guarantee the safety ofthe pipeline system, comparable to the technicalstandard of pipelines in the EU Member States. Byrespecting the technical standards valid in the EU, theyare now compatible with the European pipeline system.In 2001 the focus was on finishing the reconstructionand modernisation of the line part of the pipeline,reconstruction and building of high-capacity oil storagetanks, building of water management facilities,modernisation of firefighting facilities and improvementof management and information system of the pipelinesystem.

For the investment development, including the costfor ensuring the commercial use of the optical fibre,Transpetrol spent SKK 1 022.9 million, out of which SKK938.9 thousand for reconstruction and modernisation ofthe pipeline system, including investment purchases.With regard to the importance of ensuring permanentoperation of the pipeline system, with the aim to ensuresmooth deliveries of oil to refineries even in more difficultand risky conditions, preference was given to constructionwork at Budkovce PS 1 and on the pipelines.

In keeping with the 2001 implementation plan, thefollowing construction work was completed:

• Ecological measures on the existing pipelines in theMoldava nad Bodvou PS 2 - Budkovce PS 1 segmentand the Budkovce PS 1 - Ukrainian border segment

• Ecological measures on the route spanning theMorava river

• Ecological provision of the OSR 1 – PS 5 – PS 4 route • Ensuring winter operation of fire water at Tupá PS 4• KAO of the premises at Tupá PS 4 • Back-up of selected electrical equipment at Rimavská

Sobota PS 3• Reconstruction of tank No. 481 at Budkovce PS 1• Reconstruction of the drives of OSR armatures at OSR

1 Slovnaft • Exchange of 100 m3 collector tank at Bučany PS 5 • Exchange of regulator valve of oil station 222 at

Budkovce PS 1 • Water management system at Bučany PS 5

25

Technický Technicala investičný rozvoj and Investment Development

Transpetrol 16.7.2002 8:28 Stránka 25

Page 26: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

• Inovácia riadiaceho systému SCADA• Administratívna budova na Ulici odbojárov, Bratislava

Podľa požiadaviek prevádzkového úseku s cieľomdokončiť modernizáciu ropovodného systému sazačali, resp. pokračujú stavby:

• Výstavba informačného systému• Výmena elektromotorov hlavných čerpadiel ropy • Výstavba nádrží 2 x 75 tis. m3 PS 5 Bučany• Výstavba nádrže č. 233 50 tis. m3 PS 1 Budkovce • Výstavba nádrže č. 238 50 tis. m3 PS 1 Budkovce• Čerpacia stanica ropy č. 224 PS 1 Budkovce• Vstupno-výstupná stanica PS 1 Budkovce• Rekonštrukcia kanalizácie a ČOV PS 3 R. Sobota• Ostraha objektov – ČS a nádrže• Administratívna budova TP Miletičova č. 28• Riadiaci systém – napojenie stanice PS 1 Budkovce.

V projektovej a inžinierskej príprave sú stavby:

• Elektrifikácia mostového žeriavu v ČS 222 PS 2 Mol-dava n/B

• Meracia stanica PS 1 Budkovce• Meracia stanica ADRIA PS 4 Tupá• Rekonštrukcia rozvodne 110 kV PS 2 Moldava n/B• Rekonštrukcia rozvodne SHZ 6 kV PS 4 Tupá• Rekonštrukcia rozvodne obj. 292 6 kV PS 4 Tupá• Rekonštrukcia ČS a ČOV – požiarne zabezpečenie

PS 4 Tupá• Rekonštrukcia rozvodne SHZ 6 kV PS 1 Budkovce.

Dokončenie modernizácie ropovodného systé-mu v súlade s cieľom zabezpečiť efektívnosť a envi-ronmentálnu bezpečnosť prevádzky aj v prípade

• Innovation of the SCADA management system • Administrative building in Odbojárov Street in

Bratislava

In accordance with requirements of operationssection, with the aim to finalise modernisation of thepipeline system, the following construction work wasstarted or has been continuing:

• Building the information system • Exchange of electrical motors at the main oil pumps• Construction of 2 x 75 thousand m3 tanks at Bučany

PS 5• Construction of 50 thousand m3 tank No. 233 at

Budkovce PS 1 • Construction of 50 thousand m3 tank No. 238 at

Budkovce PS 1 • Oil pumping station No. 224 at Budkovce PS 1 • Incoming and outgoing station at Budkovce PS 1 • Reconstruction of the sewage system and waste

water treatment plant at Rimavská Sobota PS 3 • Security of facilities - oil stations and storage tanks • Administrative building of Transpetrol in Miletičova

Street No. 28, Bratislava • Management system - linking up the Budkovce PS 1

station

The following construction is in the stage of projectand engineering preparation:

• Electrification of the bridge crane in oil station 222 atMoldava nad Bodvou PS 2

• Measuring station Budkovce PS 1• Measuring station ADRIA Tupá PS 4 • Reconstruction of 110 kV distributor at Moldava nad

Bodvou PS 2• Reconstruction of 6 kV distributor in SHZ at Tupá

PS 4• Reconstruction of 6 kV distributor, facility No. 292 at

Tupá PS 4• Reconstruction of oil station and waste water

treatment plant - fire safety measures at Tupá PS 4 • Reconstruction of 6 kV distributor in SHZ at Budkovce

PS 1

In order to finalise the modernisation of thepipeline system to achieve efficiency andenvironmental safety of operation even in cases of

26

Technicaland Investment Development

Transpetrol 16.7.2002 8:28 Stránka 26

Page 27: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

potreby čerpania zvýšených objemov ropy predpo-kladá v ďalších rokoch preinvestovať približne 4,0mld. Sk.

Preskúmanie MS za rok 2001

V rámci investičného procesu boli do stavieb eko-logického charakteru v roku 2001 vložené investičnéprostriedky v objeme 634,3 mil. Sk. Boli preinvestova-né na stavbách uvádzaných v rámci dokumentov EMS,na akciách vyplývajúcich z požiadaviek jednotlivýchprevádzkovateľov a na rozpracovaných stavbách.

V súlade s dokumentmi EMS investičná výstavbav roku 2001 bola realizovaná na týchto stavbách(Program EMS je súhlasný s Registrom dlhodobýcha krátkodobých cieľov):

A 1 – Zmena užívania nádrže č. 236 PS 1 BudkovceStavba nezačala s ohľadom na komplexnú rekonštruk-ciu skladovacieho parku a potreby prevádzky. V prípa-de kompletného odovzdania nádrže č. 233 (vrátanenadväzujúcich) je možné stavbu začať v roku 2002v súlade s Plánom TIR na rok 2002.

A 2 – Výstavba nádrže č. 233 PS 1 BudkovceStavba je v realizácii s predpokladom uvedenia doprevádzky v roku 2002.

A 6 – Výstavba nádrží 2 x 75 000 m3 PS 5 BučanyStavba je v realizácii s tým, že v rámci 1. etapy bolivybudované časti vodného hospodárstva v oblastizabezpečenia požiarnej bezpečnosti stanice. V roku2002 predpokladáme výstavbu čistiacej staniceodpadových vôd.

A 7 – Ekologické opatrenia na trase PS 2 – PS 1Stavba bola dokončená a zaradená do majetku spo-ločnosti.

A 8 – Ekologické opatrenia na trase hranica s Ukraji-nou – PS 1Stavba bola dokončená a zaradená do majetku spo-ločnosti.

A 9 – Rekonštrukcia vstupno-výstupných potrubí PS 1BudkovceStavba bola zrealizovaná v rozsahu projektu do miery

pumping increased volumes of oil, approximately SKK4.0 billion are anticipated to be invested in the years tocome.

MS review for 2001

Within the investment process a volume of SKK634.3 million was invested in construction of ecologicalcharacter. It was invested in construction recorded withinthe EMS documents, in activities following from therequirements of the individual operators and in theconstruction which was already under way. In line with the EMS documents, investment in 2001 wasimplemented in the following construction (the EMSprogramme tallies with the Register of long-term andshort-term objectives):

A 1 - Changing the use of tank No. 236 at Budkovce PS 1 The construction has not started, due to comprehensivereconstruction of the storage facilities and the need tokeep operating them. In case tank No. 233 (includingthe related tanks) is handed over as a whole, theimplementation can start in 2002, in line with the 2002TID Plan.

A 2 - Building of tank No. 233 at Budkovce PS 1 The construction is under way and it is anticipated to beput in operation in 2002.

27

Technický Technicala investičný rozvoj and Investment Development

Transpetrol 16.7.2002 8:28 Stránka 27

Page 28: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

nadväznosti na ďalšie etapy s predpokladom dokon-čenia komplexného projektu v roku 2002.

B 3 – Odvodnenie areálu PS 4 TupáPredpoklad dokončenia v roku 2002 vzhľadom na potre-bu dokončenia rigolu “B“ v súlade s vykonávacím projek-tom v prijateľných poveternostných podmienkach.

B 6 – Rekonštrukcia vodovodu PS 3 Rimavská SobotaJe to len jedna časť stavby „Vodné hospodárstvo PS 3Rimavská Sobota.“ V rámci tejto stavby bola dokonče-ná časť „Rekonštrukcia vodovodu“.

B 7 – Nádrž požiarnej vody č. 236 PS 1 BudkovceStavba nezačala s ohľadom na komplexnú rekonštruk-ciu skladovacieho parku a potreby prevádzky. V prípa-de kompletného odovzdania nádrže č. 233 (vrátanenadväzujúcich) je možné stavbu začať v roku 2002v súlade s Plánom TIR na rok 2002.

B 10 – Ekologické opatrenia na trase PS 2 Moldava n/B – PS 1 BudkovceStavba bola dokončená a zaradená do majetku spo-ločnosti.

B 11 – Ekologické opatrenia na trase hranica s Ukrajinou – PS 1 BudkovceStavba bola dokončená a zaradená do majetku spo-ločnosti.

B 12 – Rekonštrukcia vstupno-výstupných potrubí –PS 1 BudkovceStavba bola zrealizovaná v rozsahu projektu do mierynadväznosti na ďalšie etapy s predpokladom dokon-čenia komplexného projektu v roku 2002.

A 6 - Building of 2 x 75 000 m3 tanks at Bučany PS 5 The construction is under way; within the first stagethe parts of the water management system forensuring the fire safety of the station were built. In2002 we anticipate the building of a waste watertreatment plant.

A 7 - Ecological measures on the PS 2 – PS 1 route The construction was finished and included in the assetsof the company.

A 8 - Ecological measures on the Ukrainian border -PS 1 route The construction was finished and included in the assetsof the company.

A 9 - Reconstruction of incoming and outgoing pipes atBudkovce PS 1 The construction was implemented in the scope of theproject to the extent where it links up with the followingstages, the comprehensive project is anticipated to befinished in 2002.

B 3 - Draining the Tupá PS 4 premisesIt is anticipated to be finished in 2002, since it isnecessary to finish the B ditch, in line with the implementation project, in acceptable weather conditions.

B 6 - Reconstruction of water mains at Rimavská SobotaPS 3 This is only one part of the construction WaterManagement at Rimavská Sobota PS 3. Within theoverall construction, the part Reconstruction of the watermains was finished.

B 7 - Fire water tank No. 236 at Budkovce PS 1 The construction has not started, due to comprehensivereconstruction of the storage facilities and the need tokeep operating them. In case tank No. 233 (includingthe related tanks) is handed over as a whole, theimplementation can start in 2002, in line with the 2002TID Plan.

B 10 - Ecological measures on the Moldava nad BodvouPS 2 – Budkovce PS 1 The construction was finished and included in the assetsof the company.

28

Technicaland Investment Development

Transpetrol 16.7.2002 8:28 Stránka 28

Page 29: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

B 13 – Ekologické zabezpečenie trasy OSR 1 – PS 5 – PS 4Stavba bola dokončená a zaradená do majetku spo-ločnosti.

B 14 – KAO jestvujúcej časti areálu – PS 1 BudkovceStavba bola dokončená a zaradená do majetku spo-ločnosti.

B 15 – Rekonštrukcia čuchačiek na chráničkách línio-vej časti ropovoduRekonštrukcia čuchačiek na chráničkách na líniovejčasti ropovodu PS 4 až PS 5 pokračuje realizáciouďalších čuchačiek na úseku PS 2 až PS 3 na 33 loka-litách.

B 16 – Vybudovanie šachty havarijného uzáveru – PS 2Moldava n/BStavba bola dokončená a zaradená do majetku spo-ločnosti.

B 17 – Vybudovanie plochy na čistenie zaropnenýchzariadení – PS 2 Moldava n/BJe vybavené stavebné povolenie s predpokladanourealizáciou v roku 2002.

Nadväzne na horeuvedené uvádzame nasledovnýodpočet podľa Registra environmentálnych aspektov.

PS 1 BudkovcePol. 12 Bola začatá stavba novej čerpacej stanice ropyč. 224Pol. 13 Prebieha výstavba nádrží č. 233 a č. 238 Pol. 14 Bola dokončená zberná nádrž č. 481Pol. 15 a 16 Prebieha výstavba nadzemných potrub-ných rozvodov v celom areáli stanice vrátane vstup-ných a výstupných šácht.

B 11 - Ecological measures on the Ukrainian border -Budkovce PS 1 The construction was finished and included in the assetsof the company.

B 12 Reconstruction of incoming and outgoing pipes atBudkovce PS 1 The construction was implemented in the scope of theproject to the extent where it links up with the followingstages, the comprehensive project is anticipated to befinished in 2002.

B 13 - Ecological provision of the OSR 1 – PS 5 – PS 4route The construction was finished and included in the assetsof the company.

B 14 - KAO of the existing part of the Budkovce PS 1premises The construction was finished and included in the assetsof the company.

B 15 - Reconstruction of odorimeters at the protectionfacilities of the line part of the pipeline The reconstruction of odorimeters at the line part of thepipeline PS 4 to PS 5 continues by implementing furtherodorimeters in the PS 2 to PS 3 segment in 33 locations.

B 16 - Building of the emergency stopper shaft -Moldava nad Bodvou PS 2 The construction was finished and included in the assetsof the company.

B 17 - Building of an area for cleaning equipment soiledby oil - Moldava nad Bodvou PS 2 Building permit has been obtained and theimplementation is expected in 2002.

29

Technický Technicala investičný rozvoj and Investment Development

Transpetrol 16.7.2002 8:28 Stránka 29

Page 30: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

PS 2 Moldava nad BodvouBola vybudovaná šachta havarijného uzáveru a plochana čistenie zaropnených zariadení.

PS 3 Rimavská SobotaPol. 35 V investičnej príprave je výstavba zhromaždiskaodpadov.Pol. 37 Bola dokončená rekonštrukcia vodovodnej siete.

PS 4 TupáPrebieha výstavba odvodnenia areálu.

PS 5 BučanyBola dokončená nová požiarna nádrž vrátane častivodného hospodárstva, výmena zbernej nádrže a roz-šírenie parkovacej plochy.

Línia ropovoduV rámci ekologických opatrení na trase boli dokončenéúseky PS 2 – PS 1 a PS 1 – hranica s Ukrajinou (okre-sy Michalovce, Trebišov, Košice-okolie, Rožňava).Pokračuje rekonštrukcia čuchačiek na chráničkách natrase PS 2 – PS 3 (okresy Košice-okolie, Rožňava,Revúca, Rimavská Sobota).Realizáciou ekologického zabezpečenia trasy v úsekuOSR 1 – PS 5 – PS 4 bola zvýšená bezpečnosť tejtočasti ropovodu.

In relation to the above-mentioned, we list thefollowing account according to the EnvironmentalAspects Register:

Budkovce PS 1Item 12 The construction of a new oil pumping stationNo. 234 was started Item 13 Construction of tanks No. 233 and No. 238 isunder way Item 14 Collection tank No. 481 was finished Items 15 and 16 Construction of above-grounddistribution pipes on the whole premises of thestation, including the incoming and outgoing shafts,is under way.

Moldava nad Bodvou PS 2 The emergency stopper shaft and the area forcleaning equipment soiled by oil was built.

Rimavská Sobota PS 3 Item 35 The construction of a waste collection point isin the stage of investment preparation. Item 37 The reconstruction of the water mains wasfinished.

Tupá PS 4 Work is being done on the drainage of the premises.

Bučany PS 5 New firefighting tank including part of watermanagement system has been finished, thecollection tank has been exchanged, the parking areahas been extended.

The line of the pipeline Within ecological measures on the route, thefollowing segments have been finished: PS 2 – PS 1and PS 1 –Ukrainian border (the districts ofMichalovce, Trebišov, Košice - surroundings,Rožňava). The reconstruction of odorimeters at the protectionfacilities on the PS 2 – PS 3 route continues (thedistricts of Košice - surroundings, Rožňava, Revúca,Rimavská Sobota). The ecological provision of the route in the OSR 1 – PS 5 – PS 4 segment has increased the safety of thispart of the pipeline.

30

Technicaland Investment Development

Transpetrol 16.7.2002 8:28 Stránka 30

Page 31: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

Akciová spoločnosť Transpetrol za jeden z rozho-dujúcich faktorov svojho dynamického rozvoja a ekono-mickej prosperity považuje kvalitu ľudského potenciá-lu. Zvlášť vysoké nároky kladie na kvalitu riadiacichpracovníkov. Súvisí to s celkovou orientáciou spoloč-nosti na permanentnú inováciu prevádzkových postu-pov, ako aj so vstupom zahraničného strategickéhoinvestora, od ktorého sa očakáva zavedenie novýchpostupov a vnútorných systémov organizácie spoloč-nosti a novej firemnej kultúry. Takýto prístup k perso-nálnej politike sa stáva nevyhnutným aj s prihliadnutímna úsilie, ktoré naša krajina vynakladá na dosiahnutiečlenstva v Európskej únii a tým aj na začlenenie našejekonomiky do vyspelého európskeho trhu.

V roku 2001 zamestnával Transpetrol v priemere 492zamestnancov, z toho 91 žien.

Štruktúra zamestnancov podľa pracovných kategóriíbola nasledovná:

• 206 technicko-hospodárskych zamestnancov• 216 robotníkov• 70 zamestnancov pomocného a obslužného personálu

Ku dňu 31. 12. 2001 bol stav zamestnancov 492,z toho 91 žien, čo predstavuje 18,5 % celkového počtuzamestnancov.

Vzdelanostná štruktúra ku dňu 31. 12. 2001 bolanasledovná:

• 101 vysokoškolské vzdelanie (20,53 %)• 248 stredoškolské vzdelanie s maturitou (50,40 %)• 135 stredoškolské vzdelanie (27,44 %)• 8 základné vzdelanie (1,63 %)

Vedenie spoločnosti venovalo osobitnú pozornosťzabezpečovaniu systému vzdelávacích aktivít s cieľomprehĺbiť a skvalitniť odbornú úroveň vybraného okruhuzamestnancov. Vzdelávacie aktivity boli preto zameranénajmä na dokonalé zvládnutie využívania výpočtovejtechniky a na prehlbovanie a rozširovanie odbornej a jazy-kovej úrovne zamestnancov. Celkove spoločnosť investo-vala v roku 2001 do vzdelávania svojich zamestnancovfinančnú čiastku 6 667 tis. Sk.

V r. 2001 bola ukončená realizácia projektu do-chádzkového, stravovacieho a prístupového systému

Transpetrol sees the quality of human potential as oneof the decisive factors of its dynamic development andeconomic prosperity. It puts particularly high requirementson the quality of the managers, which is related to theoverall orientation of the company at permanentinnovation of the operational procedures and to the arrivalof the foreign strategic partner, from which it is expectedthat new procedures and internal systems of thecompany's organisation and new corporate culture will beintroduced. Such approach to the human resources policybecomes necessary also with regard to the efforts whichthis country has been putting in to achieve membership inthe European Union and thus inclusion of our economy inthe developed European market.

In 2001 Transpetrol had an average of 492 employees,out of which 91 women.

The structure of the employees according to the workcategories was as follows:

• 206 clerical,• 216 manual,• 70 auxiliary and service staff.

As of 31 December 2001 the number of employees was492, of which 91 women, which represents 18.5 per centof the total number of employees.

The educational structure as of 31 December 2001 wasas follows:

• 101 university education 20.53 %• 248 secondary education, with secondary school-

leaving examination 50.40 %• 135 secondary education 27.44 %• 8 primary education 1.63 %

The company's management paid special attention toproviding a system of educational and training activitiesand to improving the professional level of a selected groupof employees. That is why the training activities focused oncoping with the use of information technology anddeepening as well as extending the professional andlinguistic skills of the employees. In 2001 the companyinvested a total of SKK 6 667 thousand in training thestaff.

In 2001 the implementation of the project of

31

Ľudské zdroje a sociálna politika Human Resources and Social Policy

Transpetrol 16.7.2002 8:28 Stránka 31

Page 32: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

na všetkých pracoviskách spoločnosti, čím sa zvýšilovyužívanie informačných technológií v oblasti riadeniaľudských zdrojov vrátane automatizovaného spraco-vania miezd.

Na účely sociálnej starostlivosti o zamestnancov spo-ločnosti boli v roku 2001 vynaložené finančné prostriedkyvo výške 4 987 185,- Sk zo sociálneho fondu. Uvedenéprostriedky boli použité vo forme príspevkov zamestnan-com, a to najmä na stravovanie, dopravu do zamestna-nia, rekreačné a liečebné pobyty a na sociálnu výpomoc.

V rámci realizácie podnikovej sociálnej politikypokračovalo poisťovanie zamestnancov formou dopln-kového dôchodkového pripoistenia. Podiel zamestnan-cov poistených touto formou predstavoval 70,12 % z cel-kového počtu zamestnancov spoločnosti evidovaných k 31. 12. 2001.

Spoločnosť zabezpečovala formou ekonomickéhoprenájmu aj celoročnú prevádzku vlastných rekreačnýchzariadení: TP hotel DRUŽBA v Senci, TP hotel ADRIAv Trenčianskych Tepliciach a TP hotel MIER v Račkovejdoline. Tieto zaradenia okrem komerčného využitia slúži-li aj pre potreby vzdelávania a na rekreačné, športovéa spoločenské účely pre zamestnancov a.s. Transpetrol.

attendance, catering and access system was finished at allthe workplaces, thus increasing the use of informationtechnologies in human resource management, includingautomated processing of salaries.

In 2001 SKK 4 987 185 from the Social Fund wasspent on social care for the employees. The above amountwas used in the form of a contribution to the employees,above all towards catering, transport to work, recreationand spa treatment and social assistance.

Within the framework of the company’s social policythe insuring of employees in the form of supplementarypension insurance continued. The share of employeesinsured in this way represented 70.12 per cent of theoverall number of the company’s employees registered asof 31 December 2001.

Through economic lease, the company ensured theoperation of its own recreational facilities during the wholeof 2001: the TP DRUŽBA hotel in Senec, the TP ADRIA hotelin Trenčianske Teplice and the TP MIER hotel in Račkovadolina. Apart from their commercial use they served fortraining as well as for recreational and sports purposes forTranspetrol's staff.

32

Ľudské zdroje a sociálna politika Human Resources and Social Policy

Základné vzdelaniePrimary education

1,63 %

Vysoko‰kolskéUniversity degree

20,53 %

Stredo‰kolskéSecondary education

27,44 %

Stredo‰kolské s maturitouSecondary education with

school-leaving examination50,40 %

Vzdelanostná štruktúra zamestnancovEducational structure of employees

Transpetrol 16.7.2002 8:28 Stránka 32

Page 33: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

33

Ekonomické výsledky Profit / Loss for the PeriodEK

ONOM

ICKÉ

VÝS

LEDK

Y* /

PRO

FIT/

LOSS

FOR

THE

PER

IOD*

* v t

isíco

ch S

k /

in S

KK th

ousa

nds

Rok

/ Ye

ar19

9519

9619

9719

9819

9920

0020

011.

Tržb

y za

pred

aj vl

ast.

výr.a

služ

ieb

/ Sa

les

of o

wn p

rodu

cts

and

serv

ices

214

421

11

656

431

160

048

11

667

899

164

215

41

439

263

153

731

52.

Tržb

y za

pred

aj to

varu

/ S

ales

of g

oods

729

134

602

452

348

163

482

912

634

318

552

047

3. Tr

žby z

pre

daja

HIM

a m

at. /

Inco

me

from

sal

e of

non

-cur

rent

ass

ets

and

inve

ntor

y5

620

507

85

243

896

07

545

631

213

236

4. Z

účto

vani

e re

zerv

a O

P do

výno

sov /

Rel

ease

of r

eser

ves

300

010

000

1200

069

250

2900

02

878

368

25.

Ost

atné

pre

vádz

kové

výno

sy /

Oth

er o

pera

ting

inco

me

524

216

487

2883

629

330

1513

422

960

6704

5PR

EVÁD

ZKOV

É VÝ

NOSY

SPO

LU /

TOTA

L OP

ERAT

ING

INCO

ME

215

880

21

822

598

164

701

22

123

602

217

674

52

105

731

217

332

56.

Výn

osy z

fina

nčný

ch in

vest

ícií

/ In

com

e fro

m fi

nanc

ial i

nves

tmen

ts1

051

1193

217

813

1823

012

323

955

18

737

7. V

ýnos

y z kr

átko

dob.

fin.

maj

etku

/ In

com

e fro

m s

hort-

term

fina

ncia

l inv

estm

ents

390

00

832

44

842

504

885

8. Z

účto

vani

e re

zerv

a O

P do

fin.

výno

sov /

Rel

ease

of r

eser

ves

174

440

018

259

707

395

352

9. V

ýnos

y z p

reda

ja C

P /

Inco

me

from

sal

e of

sec

uriti

es0

00

2888

30

055

000

10. V

ýnos

ové

úrok

y / In

tere

st in

com

e24

595

2094

015

581

597

68

581

1052

38

820

11. O

stat

né fi

nanč

né vý

nosy

/ O

ther

fina

ncia

l inc

ome

3108

629

490

4944

635

198

1866

126

231

1472

8FI

NANČ

NÉ V

ÝNOS

Y SP

OLU

/ TO

TAL

FINA

NCIA

L IN

COM

E56

945

6240

682

840

8828

766

148

5822

068

752

212

. Mim

oria

dne

výno

sy /

Ext

raor

dina

ry in

com

e2

527

382

42

200

416

149

15

041

184

4VÝ

NOSY

CEL

KOM

/ TO

TAL

INCO

ME

221

827

41

888

828

173

205

22

212

305

224

438

42

168

992

286

269

1NÁ

KLAD

Y* /

EXP

ENSE

S*1.

Spo

treba

mat

eriá

lu a

ene

rgie

/ P

urch

ased

con

sum

able

s16

221

112

798

620

780

315

514

215

267

414

636

716

350

22.

Nak

upov

ané

služb

y / P

urch

ased

ser

vices

193

620

167

526

200

967

309

422

293

949

337

389

351

378

3. O

sobn

é ná

klad

y / P

erso

nnel

cos

t83

143

9624

811

025

512

281

213

885

515

097

615

865

84.

Odp

isy H

aNIM

/ D

epre

ciat

ion

and

amor

tisat

ion

of in

tang

ible

and

tang

ible

ass

ets

240

993

299

675

310

267

370

973

432

707

470

434

514

805

5. N

ákla

dy n

a pr

edan

ý tov

ar /

Cos

t of g

oods

sol

d57

713

207

244

831

936

244

973

959

416

651

598

36.

Tvor

ba re

zerv

/ C

reat

ion

of re

serv

es30

050

2505

021

050

6765

086

80

07.

Tvor

ba o

prav

ných

pol

ožie

k /

Crea

tion

of p

rovis

ions

06

826

3527

194

592

646

48

260

1932

68.

Ost

atné

pre

vádz

kové

nák

lady

/ O

ther

ope

ratin

g ex

pens

es15

875

1994

019

361

1801

620

320

4308

084

796

PREV

ÁDZK

OVÉ

NÁKL

ADY

SPOL

U /

TOTA

L OP

ERAT

ING

EXPE

NSES

726

469

875

323

905

422

145

796

91

495

576

175

067

21

808

448

9. N

ákla

dové

úro

ky /

Inte

rest

exp

ense

s25

186

1209

524

447

4557

843

799

5711

566

107

10. P

reda

né C

P /

Cost

of s

ecur

ities

sol

d20

00

027

343

00

5500

011

. Ost

atné

fina

nčné

nák

lady

/ O

ther

fina

ncia

l exp

ense

s23

934

1992

230

238

6144

983

137

153

065

320

766

FINA

NČNÉ

NÁK

LADY

SPO

LU /

TOTA

L FI

NANC

IAL

EXPE

NSES

4932

032

017

5468

513

437

012

693

621

018

044

187

312

. Mim

oria

dne

nákl

ady /

Extra

ordi

nary

exp

ense

s1

412

102

71

475

6358

33

260

170

2NÁ

KLAD

Y /

EXPE

NSES

777

201

908

367

961

582

159

240

21

623

095

196

411

22

252

023

HOSP

ODÁR

SKY

VÝSL

EDOK

* /

PROF

IT/L

OSS

FOR

THE

PERI

OD*

VÝNO

SY C

ELKO

M /

TOTA

L RE

VENU

E2

218

274

188

882

81

732

052

221

230

52

244

384

216

899

22

862

691

NÁKL

ADY C

ELKO

M /

TOTA

L EX

PENS

ES77

720

190

836

796

158

21

592

402

162

309

51

964

112

225

202

3Úč

tovn

ý zis

k pr

ed zd

anen

ím /

Acc

ount

ing

prof

it be

fore

tax

144

107

398

046

177

047

061

990

362

128

920

488

061

066

8

Transpetrol 16.7.2002 8:28 Stránka 33

Page 34: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

34

Súvaha Balance SheetŠT

ATUT

ÁRNA

NEK

ONSO

LIDO

VANÁ

SÚV

AHA

V SK

RÁTE

NOM

ROZ

SAHU

* /

SHOR

TENE

D ST

ATUT

ORY

BALA

NCE

SHEE

T*

Rok

/ Y

ear

1995

1996

1997

1998

1999

2000

2001

Netto

/ N

etNe

tto /

Net

Netto

/ N

etNe

tto /

Net

Netto

/ N

etNe

tto /

Net

Netto

/ N

et

AKTÍ

VA C

ELKO

M /

TOT

AL A

SSET

S 5

079

997

575

778

46

285

789

665

679

46

999

918

836

708

58

610

998

Stál

e ak

tíva

/ No

n-cu

rrent

ass

ets

412

941

84

753

461

548

123

66

079

053

638

310

96

888

427

752

155

6

Nehm

otný

inve

stič

ný m

ajet

ok /

Inta

ngib

le a

sset

s1

146

2711

476

084

8607

471

297

138

263

243

528

Hmot

ný in

vest

ičný

maj

etok

/ Ta

ngib

le a

sset

s3

882

127

435

819

55

005

373

555

235

45

952

059

649

575

96

417

194

Fina

nčné

inve

stíc

ie s

účet

/ To

tal f

inan

cial

inve

stm

ents

246

145

368

152

399

779

440

625

359

753

254

405

860

834

Obež

né a

ktíva

/ C

urre

nt a

sset

s93

223

297

513

978

664

153

425

958

424

51

396

545

106

264

2

Záso

by s

účet

/ To

tal i

nven

torie

s50

206

5229

238

855

3753

330

016

3093

532

908

Dlho

dobé

poh

ľadá

vky s

účet

/ To

tal l

ong-

term

rece

ivabl

es4

492

458

24

570

458

74

588

459

34

642

Krát

kodo

bé p

ohľa

dávk

y súč

et /

Tota

l sho

rt-te

rm re

ceiva

bles

562

259

503

833

610

945

323

066

383

815

444

796

380

179

Fina

nčný

maj

etok

súč

et /

Cas

h an

d sh

ort-t

erm

inve

stm

ents

315

275

414

432

132

271

169

073

165

826

916

221

644

913

Os. a

ktíva

- pr

ech.

účt

y akt

ív sú

čet /

Oth

er a

sset

s: p

repa

id e

xpen

ses

tota

l18

347

2918

417

912

4348

232

564

8211

326

800

PASÍ

VA C

ELKO

M /

TOT

AL E

QUIT

Y AN

D LI

ABIL

ITIE

S5

079

997

575

778

46

285

789

665

679

46

999

918

836

708

58

610

998

Vlas

tné

iman

ie /

Equ

ity4

770

497

531

765

05

734

862

600

098

96

258

722

627

118

56

757

624

Zákl

adné

iman

ie /

Reg

iste

red

capi

tal

190

000

01

900

000

190

000

01

900

000

190

000

01

900

000

190

000

0

Kapi

tálo

vé fo

ndy s

účet

/ To

tal c

apita

l fun

ds30

341

830

341

830

341

830

341

830

341

830

341

833

175

8

Fond

y zo

zisku

/ F

unds

cre

ated

from

pro

fit1

713

856

254

044

93

098

216

351

452

13

706

285

397

002

14

055

539

Hosp

odár

sky v

ýsle

dok

min

ulýc

h ro

kov /

Pro

fit/l

oss

from

pre

vious

yea

rs0

00

00

00

HV b

ežné

ho (+

-) /

Pro

fit/l

oss

from

cur

rent

yea

r (+

-)85

322

357

378

343

322

828

305

034

901

997

746

470

327

Cudz

ie zd

roje

/ L

iabi

litie

s29

551

042

259

553

554

464

857

273

350

32

015

503

167

504

8

Reze

rvy /

Res

erve

s60

144

7515

084

497

100

859

6154

146

834

392

Dlho

dobé

závä

zky s

účet

/ To

tal n

on-c

urre

nt li

abili

ties

00

00

00

0

Krát

kodo

bé zá

väzk

y súč

et /

Tota

l cur

rent

liab

ilitie

s13

036

626

244

523

182

716

174

532

463

41

068

870

334

927

Bank

ové

úver

y a vý

pom

oci s

účet

/ To

tal b

ank

loan

s10

500

085

000

219

220

385

968

347

328

899

799

133

972

9

Osta

tné

pasív

a - p

rech

. účt

y pas

ív /

Othe

r lia

bilit

ies:

acc

rual

s13

990

1753

915

383

723

37

693

8039

717

832

6

* v t

isíc

och

Sk /

in S

KK th

ousa

nds

Transpetrol 16.7.2002 8:28 Stránka 34

Page 35: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

35

Výsledovka Income StatementŠT

ATUT

ÁRNY

NEK

ONSO

LIDO

VANÝ

VÝK

AZ Z

ISKO

V A

STRÁ

T * /

STA

TUTA

TORY

INCO

ME

STAT

EMEN

T**

v tis

ícoc

h S

k /

in S

KK th

ousa

nds*

1995

1996

1997

1998

1999

2000

2001

Tržb

a za

pre

daj t

ovar

u /

Sale

s of

goo

ds72

913

460

245

234

816

348

291

263

431

855

204

7Ná

klad

y vyn

al. n

a pr

edan

ý tov

ar /

Cos

t of g

oods

sol

d57

713

207

244

831

936

244

973

959

416

651

598

3Ob

chod

ná m

arža

/ M

argi

n15

22

530

428

801

3317

340

152

3606

4Tr

žby z

a pr

edaj

vl. v

ýrob

kov /

Sal

es o

f own

pro

duct

s2

144

211

165

643

11

600

481

166

789

91

642

154

143

926

31

537

315

Spot

reba

mat

eriá

lu a

ene

rgie

/ P

urch

ased

con

sum

able

s16

221

112

798

620

780

315

514

215

267

514

636

716

350

2Sl

užby

/ P

urch

ased

ser

vices

193

622

167

525

200

967

309

422

293

949

337

389

351

378

Osob

né n

ákla

dy /

Per

sonn

el c

ost

8314

296

249

110

255

122

812

138

855

150

976

158

658

Dane

a p

opla

tky /

Taxe

s, fe

es a

nd c

harg

es1

885

290

62

750

283

13

348

547

06

529

Odpi

sy N

IM a

HIM

/De

prec

iatio

n an

d am

ortis

atio

n of

inta

ngib

le a

nd ta

ngib

le a

sset

s24

099

329

967

531

026

737

097

343

270

747

043

451

480

5Tr

žby z

pre

daja

IM a

mat

. /In

com

e fro

m s

ale

of n

on-c

urre

nt a

sset

s an

d in

vent

ory

562

05

078

524

38

960

754

56

312

1323

6Zo

stat

ková

cena

pre

d. IM

a m

at. /

Net b

ook v

alue

of n

on-c

urre

nt a

sset

s and

inve

ntor

y sol

d3

528

461

33

482

570

54

725

386

937

738

Zúčt

. rez

erv a

čas

. roz

. PV

/ Re

leas

e of

rese

rves

300

010

000

1200

069

250

2900

00

0Tv

orba

reze

rv a

čas

. roz

. PN

/ Cr

eatio

n of

rese

rves

3005

025

050

2105

067

650

868

00

Zúčt

ovan

ie o

prav

ných

pol

ožie

k do

PV

/ Re

leas

e of

pro

visio

ns0

00

229

540

22

878

368

2Tv

orba

opr

avný

ch p

olož

iek

do P

N /

Crea

tion

of p

rovis

ions

06

826

3100

094

592

646

48

260

1932

6Os

tatn

é pr

ev. v

ýnos

y /Ot

her o

pera

ting

inco

me

524

216

487

2883

627

035

1473

222

960

6704

5Os

tatn

é pr

ev. n

ákla

dy /

Oth

er o

pera

ting

expe

nses

1046

212

421

1740

09

480

1224

733

741

4052

9Pr

evád

zkov

ý hos

podá

rsky

výsl

edok

/ O

pera

ting

prof

it/lo

ss1

432

332

947

275

741

590

665

633

681

168

355

059

364

877

Tržb

y z p

reda

ja c

en. p

ap. a

vkla

dov /

Inco

me

from

sal

e of

sec

uriti

es20

00

028

883

00

5500

0Pr

edan

é ce

nné

papi

ere

a vk

lady

/ C

ost o

f sec

uriti

es s

old

200

00

2734

30

055

000

Výno

sy z

finan

č. in

vest

ícií

/ In

com

e fro

m fi

nanc

ial i

nves

tmen

ts85

111

932

1781

318

230

1232

39

551

873

7Vý

nosy

z kr

átko

dobé

ho fi

n. m

ajet

ku /

Inco

me

from

sho

rt-te

m fi

nanc

ial i

nves

tmen

ts39

00

08

324

484

250

488

5Zú

čtov

anie

reze

rv d

o fin

. výn

osov

/ R

elea

se o

f res

erve

s17

444

029

718

259

707

346

452

Tvor

ba re

zerv

na

fin. n

ákla

dy /

Cre

atio

n of

rese

rves

440

297

1825

97

073

4683

410

Zúčt

ovan

ie o

prav

.pol

ožie

k do

fin.

výno

sov /

Rel

ease

of p

rovis

ions

00

099

53

277

048

900

Tvor

ba o

prav

ných

pol

ožie

k do

fin.

nákl

adov

/ C

reat

ion

of p

rovis

ions

00

427

10

2551

083

330

260

451

Výno

sové

úro

ky /

Inte

rest

inco

me

2459

520

940

1558

25

976

858

210

523

882

0Ná

klad

ové

úrok

y / In

tere

st e

xpen

ses

2518

612

096

2444

745

578

4379

957

115

6610

7Os

tatn

é fin

ančn

é vý

nosy

/ O

ther

fina

ncia

l inc

ome

3108

629

490

4944

533

906

1538

426

231

1472

8Os

tatn

é fin

ančn

é ná

klad

y / O

ther

fina

ncia

l exp

ense

s23

890

1992

125

670

4319

050

554

2290

160

305

HV z

finan

čnýc

h op

erác

ií /

Fina

ncia

l pro

fit/l

oss

762

530

389

2815

5-4

608

3-6

078

7-1

5196

024

564

9Da

ň z p

ríjm

ov za

bež

nú č

inno

sť /

Inco

me

tax o

n or

dina

ry a

ctivi

ties

587

332

405

486

336

873

336

667

271

815

106

592

140

296

Mim

oria

dne

výno

sy /

Ext

raor

dina

ry in

com

e2

527

382

52

200

416

149

15

041

184

4M

imor

iadn

e ná

klad

y / E

xtra

ordi

nary

exp

ense

s1

412

102

71

475

6358

33

260

170

3Da

ň z p

ríjm

ov z

mim

oria

dnej

čin

nost

i / In

com

e ta

x on

extra

ordi

nary

act

ivitie

s51

71

193

369

186

455

542

44M

imor

iadn

y HV

/ Ex

trao

rdin

ary

prof

it/lo

ss59

81

605

356

167

453

123

997

HV za

účt

ovné

obd

obie

/ P

rofit

/los

s fo

r the

per

iod

853

223

573

783

433

228

283

050

349

019

9774

647

032

7

Transpetrol 16.7.2002 8:28 Stránka 35

Page 36: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

36

Správa nezávislého audítora

Transpetrol 16.7.2002 8:28 Stránka 36

Page 37: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

37

Independent Auditors’ Report

Transpetrol 16.7.2002 8:28 Stránka 37

Page 38: VÝROČNÁ SPRÁVA ANNUAL REPORT - Transpetrol€¦ · ISO 14001 certificate, without any reservations, for the whole pipeline system in the Slovak Republic. Thus Transpetrol became

ÚSTREDIE

TRANSPETROL, a.s.Šumavská č. 38

821 08 Bratislava 2Tel.: 02/ 5064 1701Fax: 02/ 5557 7105

E-mail: [email protected]

DCÉRSKE SPOLOČNOSTI

TRANSPETROL TRANZIT, a.s.Šumavská č. 38

821 08 Bratislava 2Tel.: 02/ 5064 1786Fax: 02/ 5064 1738

E-mail: [email protected]

TRANSPETROL SERVIS, a.s.936 01 Šahy

Tel.: 036/ 741 1728Fax: 036/ 741 1728

TPF LEASING, s.r.o.Šumavská č. 38

821 08 Bratislava 2Tel.: 02/5064 1830Fax: 02/5064 1714

HEADQUARTERS

TRANSPETROL, a.s.Šumavská č. 38821 08 Bratislava 2Tel.: +421 2 5064 1701Fax: +421 2 5557 7105E-mail: [email protected]

SUBSIDIARIES

TRANSPETROL TRANZIT, a.s.Šumavská č. 38821 08 Bratislava 2Tel.: +421 2 5064 1786Fax: +421 2 5064 1738E-mail: [email protected]

TRANSPETROL SERVIS, a.s.936 01 ŠahyTel.: +421 36 741 1728Fax: +421 36 741 1728

TPF LEASING, s.r.o.Šumavská č. 38821 08 Bratislava 2Tel.: +421 2 5064 1830Fax: +421 2 5064 1714

38

Kontaktné adresy Contact Addresses