WASIM AKRAM BALAKRISHNAN PO Box: 2393, Dubai [email protected] 00971507853427/ 00971561403248 MIDDLE MANAGEMENT PROFESSIONAL Achievement-driven/High Performance Management Executive, seeking managerial level assignments in MEP Project Management with an organization of repute Profile Summary A dynamic professional with over 10 years of experience in the areas of: ~ MEP Project Management ~ Site Administration ~ Construction Management ~ Operations & Maintenance ~ Installation & Commissioning ~ Design Reviews ~ Resource Planning ~ Contract Management ~ Team Management Adept in handling multi-discipline contracts involving Civil, Mechanical, Electrical and Commissioning Jobs Deft in overseeing project activities from conceptualization to execution including technical specifications, stage inspections, progress monitoring, site management and manpower planning Excellence in carrying out erection & commissioning of machines & equipments and ensuring completion of project in minimum turnaround time effective resource utilization to maximize the output Expertise in managing maintenance operations for reducing breakdown / downtime & enhancing operational effectiveness of equipment Excellent relationship management, analytical and negotiation skills with deftness in swiftly ramping up projects in co-ordination with clients, contractors, vendors and consultants Proposed 60 Nos. of residential villas in Jumeirah Hills Development (B+G+1) Since May 2015 - Present Proposed G + 1 Primary and Nursery School Building in Arabian Ranches – Emaar school project Since January 2014 – May 2015 2 Tower Residential building in DSOA Free Zone Area with Dubai Silicon Oasis Authority Since September 2012 – January 2014 Bo rouge Innovation Center – Construction of Research Academy in Abu Dhabi with ADNOC. Since August 2011 – September 2012 Palace Construction in Seychelles Island for Department of Presidential Affairs (DOPA) Abu Dhabi. Since December 2009 – August 2011.

Upload: wasim-akram

Post on 22-Jan-2017

164 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Wasim's CV

WASIM AKRAM BALAKRISHNAN PO Box: 2393, Dubai [email protected] 00971507853427/ 00971561403248

MIDDLE MANAGEMENT PROFESSIONALAchievement-driven/High Performance Management Executive, seeking

managerial level assignments in MEP Project Management with an organization of repute

Profile Summary

A dynamic professional with over 10 years of experience in the areas of:~ MEP Project Management ~ Site Administration ~ Construction

Management~ Operations & Maintenance ~ Installation & Commissioning ~ Design Reviews

~ Resource Planning ~ Contract Management ~ Team Management Adept in handling multi-discipline contracts involving Civil, Mechanical, Electrical and

Commissioning Jobs Deft in overseeing project activities from conceptualization to execution including technical

specifications, stage inspections, progress monitoring, site management and manpower planning Excellence in carrying out erection & commissioning of machines & equipments and ensuring

completion of project in minimum turnaround time effective resource utilization to maximize the output

Expertise in managing maintenance operations for reducing breakdown / downtime & enhancing operational effectiveness of equipment

Excellent relationship management, analytical and negotiation skills with deftness in swiftly ramping up projects in co-ordination with clients, contractors, vendors and consultants

Proposed 60 Nos. of residential villas in Jumeirah Hills Development (B+G+1)Since May 2015 - PresentProposed G + 1 Primary and Nursery School Building in Arabian Ranches – Emaar school projectSince January 2014 – May 20152 Tower Residential building in DSOA Free Zone Area with Dubai Silicon Oasis Authority Since September 2012 – January 2014Bo rouge Innovation Center – Construction of Research Academy in Abu Dhabi with ADNOC.Since August 2011 – September 2012Palace Construction in Seychelles Island for Department of Presidential Affairs (DOPA) Abu Dhabi.Since December 2009 – August 2011.Burj Khalifa Project – Level 153 to Above Since March 2009 – December 2009

Rugby Stadium (Rugby Sevens) with Emirates AirlineSince April 2008 – March 2009

52 MW Power generating station with Penna Electricity LTD in India.Since June 2006 – April 2008

Page 2: Wasim's CV

Core Competencies

Executing projects with respect to budgeted cost, demand forecasts & time over-runs to ensure timely execution of the projects; conducting cost benefit analysis including feasibility studies, assessment of the requirements, etc.

Managing on-site activities and effective resource utilization to maximize output Reviewing contract drawings and specifications; ensuring the implementation of main contractor /

consultant review comments in timely manner Anchoring on-site erection & commissioning of plants; administering cost estimates for installation

& commissioning; reviewing contractor's change order proposals & submittals Inspecting field sites to observe & evaluate facilities & structures and to collect field survey data &

measurements Ensuring execution of preventive maintenance schedules/ shutdown maintenance to ensure trouble-

free and seamless plant operations Planning material and developing vendors for obtaining timely procurement of materials &

equipments at cost effective prices to ensure smooth execution of projects

Organizational Experience

Since Sep’12 with Al Basti & Muktha LLC (ABM), Dubai as MEP - Coordinator

Project: Proposed 60 Nos. of residential villas in Jumeirah Hills Development (B+G+1)Client: Tamdeen (Dubai Holdings)Consultant: DAR ConsultMain Contractor: AL Basti & Muktha LLCMEP Consultant: IBAMEP Contractor: Al Shirawi Electrical & Mechanical Engineering Company

Project Value: 600 Million Duration: 14 MonthsHighlight: Direct Coordination with Local Authorities like TECOM/DM, DEWA,DU/ Etisalat,

Dubai Civil Defense

Project: Proposed G + 1 Primary and Nursery School Building in Arabian Ranches – Emaar school projectClient: Emaar PropertiesConsultant: DAR ConsultMain Contractor: AL Basti & Muktha LLCMEP Consultant: IBAMEP Contractor: Al Shirawi Electrical & Mechanical Engineering Company

Project Value: 70 Million Duration: 12 MonthsHighlight: Direct Coordination with Local Authorities like Emaar/DM, DEWA,DU/ Etisalat,

Dubai Civil Defense

Project: 2 - Tower Residential Project in DSOA Free Zone Area with Dubai Silicon Oasis AuthorityClient: Dubai Silicon Oasis AuthorityConsultant: Arch Group ConsultantMain Contractor: AL Basti & Muktha LLCMEP Contractor: Juma Al Majid /Al Arabia Electro Mechanical LLC

Project Value: 400 Million Duration: 36 MonthsHighlight: Direct Coordination with Local Authorities like DSOA/DM, DEWA, Etisalat, Dubai

Civil Defense and DSOA FMD for Inspections, Approval and Building Maintenance

Since April’ 08 – Sept’ 2012 with Associated Constructions and Investments (ETA-ASCON, Dubai)

Project: Borouge Innovation Center – Construction of Research Academy in Abu Dhabi with ADNOC.

Page 3: Wasim's CV

Client: ADNOCConsultant: Hill InternationalMain Contractor: ETA - ASCONMEP Contractor: Aster Electro Mechanical LLC & Thermo Electro Mechanical LLC

Project Value: 600 Million Duration: 36 MonthsHighlight: Direct Coordination with Local Authorities like ADNOC/ADM, ADDC, Etisalat, Abu

Dhabi Civil Defense for Inspections, Approval and Building Maintenance

Project: Seychelles Project – Palace for Department of Presidential AffairsProject Value: Dhs-5.5 Billion USDDuration: 14 MonthsDescription: Buildings – Main Villa – B+G+1+Roof, Swimming Pool Villa – B+G+1, VVIP Villa –

B+G+Roof, Majliss –B+G, Challets - 5 Nos., Main Control Room, Sub Control Room & Majliss, Ancillary Buildings – Substations - 2 Nos., Pump Room – 3 Nos., Design & Built Project – Coordination B/W Civil & MEP Contractors (Coordination with All MEP Related Contractors Including CCTV)

Project: Burj Khalifa Tower – World’s Tallest Tower in DubaiProject Value: Dhs-1 Billion AEDPosition: MEP CoordinatorDuration: 48 MonthsDescription: From Level 154 & above Including Erection of Transformers, Switch Gears, ATS

Panel and Installation of Festival lights & Cabling in Top of the Burj Tower

Project: Rugby Stadium – Players Club House, Grand Stand, Ancillary Buildings (Substations – 3 Nos., Pump Rooms 2 Nos. & Chiller Yard)

Project Value: Dhs.300 Million Duration: 12Months Description: Players Club House: G+2 with Inbuilt Substation -1250 KVA, 11Kv/415V - 1 no Transformer, 01-

Pump Room –Underground Water Tank , 130 no’s of FCU’s, 555 Kw Chiller - 01 , Fire Fighting Systems, Drainage MH -13 with one Septic Tank including pressure reducing chamber

Grand Stand – G+1 with Inbuilt Substation -1250 KVA Transformer 11Kv/415 V, 555 Kw Chiller-01 with 105 FCU’s, Pump Room with Water Tank – 37.5 Cubic Meters, Fire fighting Systems, 12 nos. of Drainage Manholes with 01- Septic Tank including pressure reducing chamber

Ancillary Buildings – Substation-1250 KVA Transformer -11Kv/415V -02 Nos., RMU Rooms -02 Nos., External Pump Room with Water Tank – 90 Cubic Meters

External Car Park with Fire Hydrant Systems

Role: Reviewing contract drawing & forwarding it to the MEP sub-contractor to prepare shop drawing Receiving shop drawing from MEP sub-contractor & checking shop drawing with issue for

construction drawing as well as forwarding it to the consultant for the earlier approval Following up:

o Submitted shop drawing with the consultant reply for job executiono NOC’s & Local Authorities requirement of the project

Checking:o Materials submittal with the specification & forwarding it to the consultant for their earlier replyo Builders work requirement of MEP sub-contractors & offering necessary builders worko Manpower status of MEP sub-contractor & monitoring their progress of work whether it is going

on as per the target program of the project o Materials used by the MEP sub-contractors are approved by the consultant/Client

Forwarding all Civil IR’s to the MEP sub-contractor & obtaining MEP clearance from them for the civil works

Monitoring bill certification of MEP sub-contractors whether the bill matching with site progress & authorizing for the bill payment

Testing & commissioning of all types of CT’s & PT’s

Highlights: Handled key project in Seychelles – construction of presidential palace is the design and built

project’ ; executed the job as like HVAC, Plumbing & Electrical works with the shop drawing designed by own draughting team & implemented the works in that hill area according to the site

Page 4: Wasim's CV

condition and as per the client requirement that is including the sewerage treatment plant & Concrete batching plant Installation & Maintenance it is bit difficult to implement in such hill area even though the project successfully completed in a timely manner that project handled individually including civil construction and coordination of MEP works.

Took cost saving initiatives while handling MEP related works like ELV systems, Lift works, Swimming pool works, finalization of supplier for the Sanitary ware and light fittings , Acoustic consultant for the floating floor works and acoustic study for the noise level determination due to MEP equipments negotiating with the supplier and finalizing them in a profitable cost compare to the project budget/costing.

Looked after suppliers to comply all the clients/consultants specification or requirement with in the committed budget

Executed new Initiatives like reviewing of all the design drawings to issued by consultant and highlight the points wherever it is affecting/hampering he project like power load should not exceed from the design

Successfully reduced the power requirement during the selection of MEP equipment itself like selection of CHW pumps, FAHU/AHU, Chillers, Light fittings changing of normal lamp to LED energy savers to achieve the global environment of power/energy savings.

Selected the chillers accordingly by coordinating with supplier and consultant and accordingly we finalize the capacity of chilled water pumps, FCU’s etc.., to meet the project requirement

successfully completed fas5t track project in timely manner due to proper coordination with the suppliers ,domestic contractors, having technical discussion with consultant to obtain the approval of all long lead item and made supplier to deliver the equipment timely to do the execution and arrange the local authority inspection and obtaining the approval for the project completion like DEWA water & Electricity, Etisalat/Du, GSM works for mobile network and Dubai Civil Defence and Dubai Municipality Approval.

Bagged appreciations from all the clients and consultants worked for Efficiently undertook malfunctioning of Chiller, FCU, Generator etc., during the commissioning time.

Sep’06 to Mar’08 with Penna Electricity Ltd., Chennai, India as Assistant Engineer (Electrical Engineer) - Operations & Maintenance Engineer in Power Generating Station Joined as Graduate Trainee Engineer and rose to the position of Assistant EngineerProject: Constructions and Operations & Maintenance of Power Generating Station - Tamil Nadu, Ramanathapuram

Role: Performed testing in a Power Generating Station and oversaw HT/LT panel Erection, Testing &

Commissioning Checked all types of panels control wiring Carried out Erection, Testing and Commissioning of:

o 40/50 MVA Transformer o Extension Project 2*6.8MW Rolls Royce Gas Engine (Bergen Engines) and AVK Alternatorso NGR (Neutral Grounders Register Panel), 623.5 ohms

Worked on the operations & maintenance in a 52.8 MW Combined Cycle Power Plant Produced power using Gas & Steam Turbine Handled maintenance of 110kv Switchyard and commissioned SF6 & Air Circuit Breakers (L&T &

ABB Makes) Carried out testing & commissioning of all types of Relays

Professional Enhancements

Pursuing Certification in Lead Engineering and PMP Training

Education

Bachelor of Engineering (Electrical & Electronics) from Anna University, in 2006

Page 5: Wasim's CV

Personal Details

Date of Birth: 26th July 1984Permanent Address: No. 19B, Kooriyur, Achuthanvayal Post, Ramanathapuram – 623502, Tamil Nadu, IndiaLanguages Known: English, Tamil & Hindi