    CENTUM

    Bulletin 33G1A51-01E

  • 7/27/2019 Yokogawa Centu Mcs

    2/6

  • 7/27/2019 Yokogawa Centu Mcs

    3/6

    COPSV HIS HIS

    ABC

    CPU

    I/OSC

    CPU

    I/OSC

    CPU

    CFCD2

    I/OSC

    CPU

    I/OSC

    General-

    purpose PC

    Internet/Intranet

    ERPenterprise resource

    planning

    HIS: Human interf

    FCS: Field control

    ABC:Bus converte

    SC: Signal condit

    Phased migration can be used to migrate a currently used system onecomponent at a time. This approach helps reduce or smooth levels ofinvestment due to the use of legacy resources, while minimizing

    opportunity costs thanks to reduced updating time requirements.

    Networking an existing system

    PhasedMigrationtoaNetworkedProductionControl Syste

    This step allows you to migrate to a networked production control sys-

    tem while using an existing system's facilities and resources. You can

    migrate to the latest model-the CS 3000 R3, which provides a bal-

    anced mixture of open-standard features and robustness-while main-

    taining the functionality, high reliability, and ease of use of the CENTUM

    Series.

    Step1: Upgrade to the latest HIS

    Benefits Enhancement of

    minimal investme Ability to seamles

    Step 1: Upgrade to the latest HMISeamless integration with information systems is achieved through networking an existingDCS. Connection with higher-level information systems such as ERP and MES provides

    a networked production control system.

    Step2 : Upgrade FCS CPUThis step provides the latest control functions while using existing I/O cards and field

    wiring. In addition, CPU power and application capacity are increased, and controlfunctions linked with MES functions are enabled.

    Step3 : Upgrade FCS I/OThis step upgrades to the latest I/O, which is function-interchangeable, interface-

    interchangeable, and nest structure-interchangeable, while using existing field wiring.

  • 7/27/2019 Yokogawa Centu Mcs

    4/6

    COPSV HIS HIS Ethernet

    No need to change field wiring

    New station

    following CPUreplacement

    CPU

    I/OSC

    CPU

    I/OSC

    CPU

    CFCD2

    I/OSC

    CPU

    I/OSC

    CS 3000 R3CS 3000 R3Internet/Intranet

    ABC

    This step enables networked control functions. In addition to increasing CPU power and application

    capacity, this step allows you to introduce the latest networked control functions.

    Benefits Significant increase in capacity for continuous control and sequence control

    applications. Integration of multiple control stations in a single new station. Existing I/O cards and cabinets can still be used, so costs are low and

    lead time is reduced.

    Enabling networked control functions

    Step2: Upgrade FCS CPU

  • 7/27/2019 Yokogawa Centu Mcs

    5/6

    HIS HIS Ethernet

    No need to change field wiring

    Field Network

    Upgrade tolatest I/O

    I/Os can be added inconjunction withproduction linemodifications.

    CS 3000 R3CS 3000 R3Internet/Intranet

    CPU

    FIOSC

    CPU

    FIOSC

    FIOSC

    CPU

    FIOSC

    CPU

    FIOSC

    This step seamlessly upgrades the existing I/O using a new Fieldnetwork I/O (FIO) which is

    function-interchangeable, interface-interchangeable, and nest structure-interchangeable. Sup-

    port for future versions of Fieldbus can also be provided.

    Benefits A remote node can be installed near field equipment. Better noise resistance (noise immunity EN50082-2; CE mark qualified). Better environmental durability (wider range of operating temperatures;

    resistant to corrosive gases in G3 environments).

    Full support for FOUNDATION Fieldbus.

    Enabling all new CS 3000 R3 functions

    Step3: Upgrade FCS I/O