2009 civil engineering modern date

98
CIVIL ENGINEERING MODERN DATE 交交交交交交交交交 交交交

Upload: -

Post on 06-May-2015

636 views

Category:

Business


2 download

DESCRIPTION

這也是2009年交大土木營講課的檔案。

TRANSCRIPT

Page 1: 2009 civil engineering modern date

CIVIL ENGINEERINGMODERN DATE

交通大學土木工程系 單信瑜

Page 2: 2009 civil engineering modern date

MONUMENTS OF THE MILLENNIUM

Page 3: 2009 civil engineering modern date

MONUMENTS OF THE MILLENNIUM

Airport Design And Development Kansai International Airport

Dams Hoover Dam

The Interstate Highway System Long-Span Bridges

Golden Gate Bridge Rail Transportation

Eurotunnel Rail System

Page 4: 2009 civil engineering modern date

Kansai International Airport

Page 5: 2009 civil engineering modern date

Hoover Dam

Page 6: 2009 civil engineering modern date
Page 7: 2009 civil engineering modern date
Page 8: 2009 civil engineering modern date

Sanitary Landfills/Solid Waste Disposal Skyscrapers

The Empire State Building Wastewater Treatment

Chicago Wastewater System Water Supply and Distribution

The California Water Project Water Transportation

The Panama Canal

Page 9: 2009 civil engineering modern date

STEEL AND THE SKYSCRAPER

Henry Bessemer (1813-1898) is the man whose name we associate today with one of the major processes of producing steel.

It was Bessemer's discovery of a process for making steel cheaply which led to its use in the construction industry.

George A. Fuller (1851-1900), as a young man, was employed in his uncle's architectural office, drawing building plans. He soon became interested in the problem of load bearing capacities and how much weight each part of a building would carry.

Page 10: 2009 civil engineering modern date
Page 11: 2009 civil engineering modern date
Page 13: 2009 civil engineering modern date

Structural height508 m (1667 ft)Height to roof448 m (1470 ft)Height to top floor438 m (1437 ft)Floors  101TopoutOctober 17, 2003OpeningDecember 31, 2004Gross floor area450,000m² 380 piles @80 m

Taipei 101

Page 14: 2009 civil engineering modern date

A 660-ton tuned mass damper is held at the 88th floor, stabilizing the tower against earthquakes, typhoons, and wind. The damper can reduce up to 40% of the tower's movements.

Page 15: 2009 civil engineering modern date

SEVEN WONDERS OF THE MODERN WORLD

1996

Page 17: 2009 civil engineering modern date

CHANNEL TUNNEL

The 31-mile Channel Tunnel (Chunnel) fulfilled a centuries-old dream by linking Britain and the rest of Europe.

Three 5-feet thick concrete tubes plunge into the earth at Coquelles, France, and burrow through the chalky basement of the English Channel.

Page 18: 2009 civil engineering modern date

The Channel Tunnel terminal at Cheriton near Folkston in Kent, from the Pilgrims' Way on the escarpment on the southern edge of Cheriton Hill, part of the North Downs.

Page 19: 2009 civil engineering modern date

NUMBER OF DRIVES ( tunnels excavated )12 - 6 undersea, 6

underland

NUMBER OF TBMS11 - 6 undersea, 5

underland ( a French machine bored 2 underland tunnels)

Page 20: 2009 civil engineering modern date
Page 21: 2009 civil engineering modern date
Page 22: 2009 civil engineering modern date

GOLDEN GATE BRIDGE

Official name Golden Gate Bridge

Carries Motor vehicles, pedestrians and bicycles

Crosses Straits of the Golden Gate

Locale San Francisco, California

Maintained by Golden Gate Bridge, Highway and Transportation District[1]

Design Suspension, Truss Arch & Truss Causeways

Longest span 4200 feet (1280 m)

Total length 1.7 miles (2,727 m)

Width 90 feet

Vertical clearance 14 ft at toll gates, higher truck loads possible

Opening date May 27, 1937

Page 23: 2009 civil engineering modern date

Golden Gate Bridge

When the bridge opened in 1937, with a main suspension span length of 4,200 feet, it was the longest in the world. The engineering obstacles poised by the mile-wide, turbulent Golden Gate Strait led engineers to devise a bridge that required four years to build, 83,000 tons of steel, 389,000 cubic yards of concrete, and enough cable to encircle the earth three times.

Page 24: 2009 civil engineering modern date

Previous ASCE designations for the Golden Gate Bridge include: the National Civil Engineering Landmark (1984) and Seven Wonders of the World (1955). Other significant bridges include the Verrazano-Narrows Bridge, the George Washington Bridge, the Akashi Kaikyo (Japan) and the Humber Bridge (England).

Page 25: 2009 civil engineering modern date
Page 26: 2009 civil engineering modern date
Page 27: 2009 civil engineering modern date
Page 28: 2009 civil engineering modern date
Page 29: 2009 civil engineering modern date
Page 30: 2009 civil engineering modern date
Page 31: 2009 civil engineering modern date
Page 32: 2009 civil engineering modern date

NETHERLANDS NORTH SEA PROTECTION WORKS This singularly unique,

vast and complex system of dams, floodgates, storm surge barriers and other engineered works literally allows the Netherlands to exist

The North Sea Protection Works exemplifies the ability of humanity to exist side-by-side with the forces of nature.

Page 33: 2009 civil engineering modern date
Page 34: 2009 civil engineering modern date

The Oosterschelde storm surge barrier

Page 35: 2009 civil engineering modern date

Bottom consolidation

Page 36: 2009 civil engineering modern date

The piers The piers were the most important elements of the dam. They were produced in a building excavation with a surface area of about one square kilometre, located 15.2 metres below sea level. A ring-dike kept the sea water outside the excavation. The dry dock consisted of four parts. When the piers of one part were finished, this part would be flooded. The lifting ship then sailed into the dock, lifted the heavy pier and shipped it off to its place in the barrier. Each pier consisted of 7,000 cubic metre of concrete. Therefore, the dock may also be typified as a large concrete factory in which 450,000 cubic metre of concrete was manufactured between 1979 and 1983.

The construction of each pier almost took one and a half years. One started building a new pier every two weeks. This way, thirty piers were in production at the same time. It took an enormous amount of organisation and planning to finish the giant and complex structures in time. People worked day and night, because otherwise the concrete could not harden properly. The sixty-five piers were each between 30.25 and 38.75 metres high and weighed 18,000 tonnes. Two extra piers were built, for safety’s sake. Visitors of Neeltje Jans, the former artificial island, can now climb one of these left-over piers.

Page 37: 2009 civil engineering modern date

The placement

When all the piers were finished, the building excavation in which they were built, was flooded. Two ships took the piers to the right place. The ship Ostrea could lift the piers one by one and sailed them to a floating pontoon. This pontoon marked the place where the pier should be sunk.

Slides When the piers stood firmly on the bottom of the Oosterschelde, the construction of the barrier could be finished. The piers were raised with the top-pieces, upon which the slides were fixed. Hollow tubes were placed on the piers, and on top of this came a road. The tubes provided room for the equipment responsible for making the slides move.

Page 38: 2009 civil engineering modern date

Mytilus (mussel)

This ship made sure that the bottom of the Oosterschelde was compressed along the section were the barrier would be built. When the bottom is compressed, the sand and clay parts are compacted more closely to each other. The bottom becomes more solid.

Without the work of the Mytilus, the barrier would not have been as firm. The entire compression process took place under water and continued twenty-four hours per day. The needles transferred vibrations to the sea bottom, with a frequency of between 25 and 30 Hertz and an amplitude of 4 to 5 millimetres.

Page 39: 2009 civil engineering modern date

Cardium (cockle)

Although the Ostrea was the most impressive ship of the fleet, the Cardium was the most expensive one. The Cardium carried out an important task: putting down the mats. These mats which were thirty-six centimetres thick, forty-two metres wide and two hundred metres long. The synthetic mats were filled with sand and gravel in a factory. The mats were put on the sea bottom at a rate of ten metres every hour. An extra mat was put at the areas where the piers were to be placed. This was to protect the mats against wear, which could be developed through the opening and closure of the slides.

Page 40: 2009 civil engineering modern date

The Ostrea (oyster)

The Ostrea was the flagship of the Delta fleet. With its length of eighty-seven metres, the typical U-shape and a capability of 8,000 horsepower, it was the most impressive ship. The ship lifted the piers from the dry dock and sailed them to the place of the barrier. With the open side of the ‘U’, the ship manoeuvred around the pier.

The ship could steer easily, thanks to its four screw propellers. On both sides there were two porches fifty metres high. The piers were fixed to these porches. The porches could not lift more than 10,000 tonnes however, whereas the piers weighed 18,000 tonnes. So how did the Ostrea put the piers in the right place? Fortunately, the levers did not have to lift the piers completely out of the water. The most important factor was that they did not touch the bottom of the sea during transportation. Because of the upward pressure of the water, the levers needed to provide less power.

Page 41: 2009 civil engineering modern date

Macoma (nun)

This pontoon, named after a shellfish, was situated exactly in front of the place where a pier would be placed. When the Ostrea had taken a pier, it moored against the Macoma. To offer the Ostrea some stability, the pontoon had a coupling mechanism with a power of six hundred tonnes. The Macoma also had a second function: an enormous vacuum cleaner was used to ensure there was no sand between the pier and the bottom. This was an extremely difficult job, because the tidal movements moved large amounts of sand each day.

Page 42: 2009 civil engineering modern date

Another ship, the Jan Heijmans, helped the Cardium place the mattresses. The Jan Heijmans was also responsible for the filling of the holes between the mattresses and the gravel. The Macoma worked together with the Sepia and the Donax I during the placement of gravel ballast mats on the bottom.

Jan Heijmans

Page 43: 2009 civil engineering modern date

Maeslant barrier

The most important demand for the design was that the barrier should not hinder the shipping. The barrier should only be closed under exceptional circumstances - no more than once or twice every ten years. In 1991, four years after the competition was held, construction started. Which design had won? Out of six submissions, the design of the Building Combination Maeslant Barrier won. The Maeslant barrier would consist of two steel doors which could be sunk down and could be turned away in the docks in the shores.

Page 44: 2009 civil engineering modern date

BOS and BESThe Maeslantkering is operated by a computer. In the case of a storm flood, the decision of whether or not to close the barrier is left to a computer system (BOS). The chance of mistakes is greatly increased if people were to make the decision. A computer will only follow predefined procedures, it doesn’t get its own ideas and it is not affected by poor environmental conditions. The system only takes into account the water and weather forecasts. On that basis it calculates the expected water levels in Rotterdam, Dordrecht and Spijkenisse. When the BOS decides to close the barrier, it gives orders to another computer system, the BES. The BES carries out the orders of the BOS. The system operates entirely automatically, but remains under constant human supervision with regards to the procedures.

Page 45: 2009 civil engineering modern date

Movement works

The movement works are operated from control buildings at the north and south side. The movement works consist of three parts: the dock gate, the locomotive and the ballast system of the retaining wall. The dock gate opens when the barrier is activated. The barrier is driven into the New Waterway by the locomotive. The ballast system allows the barrier to sink.

Page 46: 2009 civil engineering modern date
Page 47: 2009 civil engineering modern date
Page 48: 2009 civil engineering modern date
Page 49: 2009 civil engineering modern date

The Millau Viaduct (French: le Viaduc de Millau) is a large cable-stayed road-bridge that spans the valley of the River Tarn near Millau in southern France.

Designed by Lord Foster of Foster and Partners, and bridge engineer Michel Virlogeux, it is the tallest vehicular bridge in the world, with one mast's summit at 343 metres (1,125 ft) — slightly taller than the Eiffel Tower and only 38 m (125 ft) shorter than the Empire State Building.

The viaduct is part of the A75-A71 autoroute axis from Paris to Béziers. It was formally dedicated on 14 December 2004 and opened to traffic two days later.

Page 50: 2009 civil engineering modern date

Official name Le Viaduc de Millau

Carries 4 lanes of the A75 autoroute

Crosses Valley of the River Tarn

Locale Millau, France

Design Cable-Stayed

Longest span 342 m (1,122 ft)

Total length 2,460 metres (8,071 ft)

Width 32 m (105 ft)

Clearance below

270 m (886 ft) at maximum

Opening date

December 14, 2004

Page 51: 2009 civil engineering modern date
Page 52: 2009 civil engineering modern date
Page 54: 2009 civil engineering modern date
Page 55: 2009 civil engineering modern date

WE DON’T JUST BUILD BRIDGES, WE BUILD DREAMS!

Page 56: 2009 civil engineering modern date

ARCHITECTURE IS STRUCTURE, STRUCTURE IS ARCHITECTURE.

Page 57: 2009 civil engineering modern date
Page 58: 2009 civil engineering modern date
Page 59: 2009 civil engineering modern date
Page 60: 2009 civil engineering modern date
Page 61: 2009 civil engineering modern date
Page 62: 2009 civil engineering modern date
Page 63: 2009 civil engineering modern date
Page 64: 2009 civil engineering modern date
Page 65: 2009 civil engineering modern date
Page 66: 2009 civil engineering modern date
Page 67: 2009 civil engineering modern date
Page 68: 2009 civil engineering modern date
Page 69: 2009 civil engineering modern date
Page 70: 2009 civil engineering modern date
Page 71: 2009 civil engineering modern date
Page 72: 2009 civil engineering modern date

AGAIN! 品質改善的手法

思考問題的本質 產品問題 or 找錯客戶、時間 ?

提升服務品質 提升內部效率 降低成本

Page 73: 2009 civil engineering modern date

新材料

HPC Polymeric materials BIPV ………

Page 74: 2009 civil engineering modern date

設計工具

Computer Software Internet Data storage and exchange

Page 75: 2009 civil engineering modern date

GIS civil engineering http://www.esri.com/industries/civil_engineering/index.html

Page 76: 2009 civil engineering modern date

Contamination site map has ortho set at 30 percent transparency to depict underground contamination, concrete footings and columns, and concrete structures on top of the slabs. Circular and square meshes are concrete supports for storage tanks, which were long since removed. This map makes it easy for anyone to understand where excavation must be done.

This fully rotatable model is an underground perspective looking up at the concrete and the contamination surface.

Page 77: 2009 civil engineering modern date

Reinforced Concrete Design

http://www.structurepoint.org/index.asp

Page 78: 2009 civil engineering modern date
Page 79: 2009 civil engineering modern date
Page 80: 2009 civil engineering modern date
Page 81: 2009 civil engineering modern date
Page 82: 2009 civil engineering modern date
Page 83: 2009 civil engineering modern date
Page 84: 2009 civil engineering modern date
Page 85: 2009 civil engineering modern date
Page 86: 2009 civil engineering modern date
Page 87: 2009 civil engineering modern date

新技術

Transportation Structure Hydraulic Geotechnical ………

Page 88: 2009 civil engineering modern date

PUBLIC/PRIVATE TECHNOLOGY PARTNERSHIPS

Challenge Identify, commercialize,

deployexisting capital projects-related technologies from govt. labs

Approach Form teams to identify ripe

techs,determine and implement effectivepath to commercialization

Technologies Smart Chips Cybernetic Buildings Spatial Data Acquisition Construction Process

Simulation Digital As-Builts

Page 89: 2009 civil engineering modern date

DIGITAL-AS-BUILT DOCUMENTATION

Challenge Accelerate deployment of

toolsto capture as-built conditionsdigitally and deliver datamodels for use during O&M

Approach Develop user requirements for

accurate, intelligent digitalmodels interoperable withcommercial CAD, GIS,CMMS, and CAFM systems

Demonstrate with pilot projects

Page 90: 2009 civil engineering modern date

施工技術

Machines Vehicles Ships

Automation Robots

………

Page 91: 2009 civil engineering modern date

管理工具

Computer Software Internet Wireless technology Data storage and exchange

Page 92: 2009 civil engineering modern date

MEMS (Micro-Electro-Mechanical-Systems)

Fig 1. Scheme for wireless sensing of large structures using radio frequency transmission techniques and MEMS [2, 4]. Data are sending from the base station to the supervisor using e.g. internet

WIRELESS MONITORING TECHNIQUES BASED ON MEMS

Page 93: 2009 civil engineering modern date
Page 94: 2009 civil engineering modern date
Page 95: 2009 civil engineering modern date
Page 96: 2009 civil engineering modern date

The MicroWIS-XG system is a set of miniature wireless units that asynchronously transmit data to a receiver

attached to a standard RS-232 port on a PC.  The remote units are capable of interfacing with any type

of resistive sensor: strain, temperature, pressure, humidity, etc.

1998-MicroWIS™Micro-Miniature Wireless Instrumentation System

The development effort included the conceptual design, fabrication, and demonstration of a battery-powered, miniature wireless temperature sensor.

MicroWIS™-XGMicro-Miniature Wireless Instrumentation System - Next Generation

Page 97: 2009 civil engineering modern date

The MicroWIS system is being used to monitor external grout pressure during construction of two tunnels in the Netherlands. Grout pressure determines the amount of grout that is deposited on the outside of the tunnel and is critical to the water-seal and durability of the tunnel.

Page 98: 2009 civil engineering modern date

LET’S HAVE A BREAK!