hydrography projects - planning and considerations

Post on 13-Apr-2017

228 Views

Category:

Presentations & Public Speaking

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

University of Otago

OVERVIEW

• Me – Background

• IXSURVEY – Background

• Discussing Projects:

– Planning – creating the solution

– Preparation – proposal to actual

– Project – execution time

– Products – wrapping it up

• Session 2 – Case Studies

– Tsunamis, Zambezi River, MBES Installations, LINZ

process,

Otago Uni Presentation, Oct 2015. Dave Field

ME – DAVE FIELD

Otago Uni Presentation, Oct 2015. Dave Field

IXSURVEY

Otago Uni Presentation, Oct 2015. Dave Field

• Part of IXBLUE Group

– Sea Operation: Australia

and France

– Navigation Systems

– Acoustic Systems

– Photonic Solutions

– Motion Systems

– Marine Works

KEYS TO A SUCCESSFUL

PROJECT

Otago Uni Presentation, Oct 2015. Dave Field

Know your Client

Understand their “end goal”

Engage with them early and often

PLANNING

Survey Time Planning

• MBES Swath widths

• Survey Lines and/or

coverage

• End of Line (EOL) turns

• Sound Velocity dips

• Vessel and Survey

system maintenance

• Crew Rotations &

Resupply

• Weather

Vessels

• Size and weather

• Size and fuel

• Availability and location

• Cost $$$$$

• HSE inductions – vessels

and/or site

Otago Uni Presentation, Oct 2015. Dave Field

PLANNING

Equipment

• Suitability for task

• Spares carried or not?

• Availability and location

• Export approvals

Personnel

• Number of

• Suitability for project

• Qualifications

• HSE - OGUK Medicals &

BOSIETS

• Visa’s

• Site and off-site

personnel

• Durations & hours

Otago Uni Presentation, Oct 2015. Dave Field

PREPARATION

Pre-Mobilisation

• Bench Testing

• Shipping

• Survey Preps

– Coastline

– Reports & Templates

• Kick-off Meeting

• Risk Management /

HAZIDS

Mobilisation

• Installation

• Alongside checks

– Position & Datum

– Offsets

• Underway checks

– Patch Test

– Reference Surface

– Target detection

– Bar Check

– Squat

Otago Uni Presentation, Oct 2015. Dave Field

PROJECT

Utilisation of Assets and Resources

Otago Uni Presentation, Oct 2015. Dave Field

PROJECT

Solutions for the Task

Otago Uni Presentation, Oct 2015. Dave Field

PROJECT

Reporting and Management

Otago Uni Presentation, Oct 2015. Dave Field

PRODUCTS

Processing & Records

• Data, Records, Reports

• On-site effort

• Off-site effort

– During or After project

• QC

• Time

Products

• Clients needs

• Formats

Otago Uni Presentation, Oct 2015. Dave Field

Otago Uni Presentation, Oct 2015. Dave Field

QUESTIONS????

Otago Uni Presentation, Oct 2015. Dave Field

Dave Field

Operations Director

IXSURVEY Australia Pty Ltd

E: david.field@ixsurvey.com

top related