boeing casestudy

Upload: prakhar-sharma

Post on 01-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/9/2019 boeing casestudy

    1/8

    Office staff planning at Boeing Aircraft

     

    Executive Summary:

    Boeing Aircraft has been asked by the federal government to resubmit its bid to be prime

    contractor for a modified version of the space station. Boeing’s design division is expected to

    need temporary additional secretarial support to handle a substantial increase in paperwork.

    The whole process will be continued until the bid is completed. Boeing can hire temporary

     personnel from Techhelp, a local temporary help firm. Techhelp is specialized in technical

    secretarial support, or it can temporarily transfer secretarial staff from other divisions within

    the company. The house secretary who is transferred can produce around ! pages daily, two

    hours a day with technical assistance from supervisory personnel .As he or she is less familiar 

    with the Boeing environment than Boeing employees, it is estimated that a Techhelp

    employee can produce only "! pages of work per day. But on the other hand the Techhelp

    employee’s higher degree of technical secretarial training, however, each employee only

    re#uires approximately one hour of technical assistance from supervisory personnel.

    Boeing has allocated up to $! workstations to the design division for additional secretarial

    support and one full%time employee for technical assistance providing eight hours of technical

    support time available daily.

    By: Section C Group 1

    14010 AKAS KA!"#

    140$1 BA"A! K%&A" '

    140() *A*'EES & S

    140+) *#!#S K%&A" SA&A*!A

    141$1 SAES , *A#K 

    141)( S"AS!# SA"A*

    'ate of Su-mission: $r. /e-ruary 01)

  • 8/9/2019 boeing casestudy

    2/8

    Statement of te 2ro-lem

     

    Boeing’s design division needs more paperwork to resubmit the bid for being the

     prime contractor for a modified version of the work station.

     

    &ack of in house personnel to complete the re#uired paperwork

    Causes of te 2ro-lem

    Boeing has to resubmit the bid for being the prime contractor for a modified version of the

    work station.

    'ecision Criteria an. Alternative Solutions3

    • Boeing can hire for Technical additional secretarial support from Techhelp 'a local

    temporary help firm(.

    • Temporarily Boeing can transfer secretarial staff from other divisions within the

    company.

    • Boeing can use a combination of employees from Techhelp as well as temporary

    transfers from other divisions in the company.

    "ecommen.e. Solution #mplementation an. 5ustification

    • )e will recommend for increase or decrease of Additional hours and workstations

    with allowable increase or decrease to gain maximum profit.

    • )e came to this recommended solutions after analysing the &* model and sensitivity

    report.

    En.6of6case 7uestions

    a( +ormulate a linear program to determine the optimal number of temporary Techhelp

    employees to hire and in%house transfers needed to maximize the total potential

    number of pages produced per day. Assume that fractional values represent workers

    assigned part time to the division.

    O-8ective:  To maximize the total potential number of pages

    ,aria-les:

    -$ /n house 0ecretary

    -1 2utsourced

  • 8/9/2019 boeing casestudy

    3/8

    #n ouse Secretary91; Outsource.9;

    !ec

    assistance9!ecelp;

    r 1r

    )e can formulate this &* problem as follows3

    4aximize3 ! -$5"! -1,

    0ub6ected to the constraints3

      1-$5-178

      -$ 5-17$!

      -$, -19!

     b( )hy is there a nonzero reduced cost associated with the output of in%house transfers but

    not with the output of Techhelp employees: )hat is the reduced cost for the output of in%

    house transfers:

    • Associated with each variable is a reduced cost value. ;owever, the reduced cost

    value is only non%zero when the optimal value of a variable is zero.

    • The reduced cost value indicates how much the ob6ective function coefficient on the

    corresponding variable must be improved before the value of the variable will be

     positive in the optimal solution.

    • /n this case of a maximization problem,

  • 8/9/2019 boeing casestudy

    4/8

     c( >alculate the range of optimality for each ob6ective function coefficient. ?xplain in simple

    terms why the lower limit for the range of optimality for the output of in%house transfer is  

    infinity:

    The range of optimality

    Variable Original Value Lower

    Bound

    Upper Bound

    -$ ! %infinity @!

    -1 "! 1! 5infinity

    &ower bound shows infinity, because it does not affects our final profit.

    d( etermine and interpret the range of feasibility for the availability of the number of 

    workstations and the number of hours of technical assistance available.

    Constraints Original

    Value

    Lower

    Bound

    Upper

    Bound

    Shado

    w

    price

    fnal

    >onstraint$';ours( 8 ! $! "! 8

    >onstraint1'work stn( $! 8 5infinity ! 8

    +or every unit of allowable increase 'upper bound(, we get profit of "!units, but the range is

    allowable till $!maximum and we can’t decrease here.

    +or every unit of allowable increase 'upper bound(, we get no profit, but the range is

    allowable till infinity and we can decrease it till 8unit.

    e( ?xplain in simple terms why the upper limit of the range of feasibility for the number of 

    workstations is 5 infinity.

    )orkstation is the redundant constraint, which does not affect feasible region solution after 

    refereeing to graph. 0o upper limit range could be 5infinity.

  • 8/9/2019 boeing casestudy

    5/8

     f( 0uppose, in monetary terms, Boeing feels that each additional potential page is worth $

    and the cost of a supervisor’s time for technical assistance is 1C per hour. Dsing shadow

     prices, show why having up to two additional hours of supervisory assistance is profitable tothe company. 0how 'by re%solving the problem( why hiring a second full time employee

    'increasing the hours of available technical support to $@( would not be in Boeing’s best

    interest.

    *art $3

    ?ach additional potential page $

    The cost of a supervisor’s time for technical assistance is1CEhour 

    Fes, having up to two additional hours of supervisory assistance is profitable to the company.

    Because, we get maximum value"!!

    0o, Boeing get "!!%1!@! more investing G 1 additional hours of supervisory assistance

    1 additional hours of supervisory assistance3 1H1CC!'hence profitable(

    *art 13

    After increasing the hours of available technical support to $@,

    4aximum value"@!

    0o, "@!%1!$1! extra profit with investing more 8 hrs.

    8hrs38H1C1!!

    ue to loss, hiring a second full time employee would not be in Boeing’s best interest.

  • 8/9/2019 boeing casestudy

    6/8

    etailed report '*art$(

    Answer report3

    0ensitivity report3

    &imits report3

    etailed report 'part1(

    Answer report3

  • 8/9/2019 boeing casestudy

    7/8

    0ensitivity report3

    &imits report3

  • 8/9/2019 boeing casestudy

    8/8

    "eferences

    Balakrishnan, R. S. (n.d.). Managerial Decision Making Modeling with

    Spreadsheets. 

    Schedlbauer, M. (n.d.). Interpreting Solver Sensitivity Report . Retrieved from

    https://www.outube.com/watch!v"#l$$RMM%sno.

    Schrimshaw, &. '. (n.d.). Sensitivity report in Excel. Retrieved from

    https://www.outube.com/watch!v"#l$$RMM%sno.