csi contracting & services for industry a commitment to quality, timing. & sustainable...

190
CSI Contracting & Services for Industry A Commitment to Quality , Timing. & Sustainable Progress. - 2008 1

Upload: javier-ohara

Post on 15-Dec-2015

218 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CSIContracting & Services for

Industry

A Commitment to Quality , Timing.&

Sustainable Progress.

- 2008

1

Page 2: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

2

CSI Contracting &

Services for Industry

Page 3: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Contracting & Services for

Industry (INDEX)

CSI

Corporate

Definition

Corporate Activities

& Services

Corporate Policies

Corporate Resources

ProjectsDivision.

Corporate

Leadership

Issues.

Certification

E&I Works. Human Resources

Equipment &Tools

Development Strategy.

Contact .Us.

Corporate Definition Mechanical

Works

Insulation Works

Sand Plating & Painting

Civil Works

Hvac &Fire Fighting

Corporate & Management

–Policies.

Quality & Timing Policies

3

General Manager Statement

Past Projects.

Present Projects

Projects-Listings.

Corporate Alliances & Consortium structures.

Professional &

Technical Operating Model.

Technical & Functional

Joint Ventures .

Projects References

Page 4: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CSICSIContracting & Services for Industry

Corporate Definition.

4

Page 5: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Contracting & Services for

Industry .

CSI

CSI - Contracting & Services for Industries is a growing Egyptian company established on 1992 as a multi-disciplined National & Regional Contracting organization operating in Egypt and in selective Middle Eastern Countries to provide a wide variety of construction services to the Commercial , Industrial Contracting & Engineering Services.

CSI- Head Office and associate offices – act as Resources center , Design , Engineering , Procurement, Construction, Operations and Commissioning with their associated Human Resources requirements.

CSI - Stands for Excellence , Reliability , Quality & Timing – this linked and associated with Flexible, Cost Effective Co-Operation , Highest Standards of Safety , Health and Environmental Awareness.

Corporate Definition

5

Page 6: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CSI Experiences & Proven Track Record became professional Covers the following Economic & Industrial Sectors:-

CSI Contracting &

Services for Industry

Since 1992 CSI – Main Activities & Services Packages include activities in the field of contracting and associated services within the frame of stringent Planning & Execution of different types of Construction Projects with their specialist fields of expertise in :-Civil Engineering , Industrial Construction and General Buildings.

Oil & Petrochemical Sector. Power & Transformer Sector. Utility & Water Treatment Sector. Industrial & Steel Sectors. Commercial Buildings Sector.

Corporate Definition

6

Page 7: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

7

CSI Contracting & Services for Industry

Professional & Technical - Operating Model.

Quality – Timing & Services For Industry.

Page 8: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

8

CSI Contracting & Services for Industry

Professional & Technical Operating Model – A Perspective

Due to the Changing Economic Environment for the last decade and the highly specific characteristics of the Contracting Industry – in our main market Egypt and our Other Regional Markets – we have developed a special Professional & Technical model –to sustain and develop our activities in addition to gaining serious sustainable advantages. This Model which is based on an articulate , professional and tested “Core Team of Contracting Multi-Disciplinary and Cross-functional Engineers and other Mix of Experts” – that permits the CSI and all its resources to be deployed to cover :- More than one Sector and in more than one Geographical area with a careful pre-selection of the Targeted Projects and the Scope of our Participation and Services provided. We are at the Stage where our Business / Professional Model is no longer Volume based – but quality oriented and designed to create a Balance between :- Sectors, Type of work undertaken and geographical spread & Quality of Clients and Projects- which essentially rather Guard against workload Volatility and Surprises from projects that are not well thought of and or not appropriately financed.

Page 9: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

9

CSI Contracting & Services for Industry

A Solid Data Base on our areas of specialization as elaborated on in CSI Activities & Services Section. Such a Data Base –

Dimensional support data base- (client, suppliers, materials, equipment’s, tools, human resources, time, cost, techniques that worked etc.).Operational data base -from operational systems that are organized to form a base for Historical Records.

A Privileged and Sustained Relation with a Significant Array of Technically and Professionally qualified :-Contracting, Sub-contracting organizations , Consultants , Suppliers , Design Offices, Equipment’s & Tools Manufacturers & Professional Associations & other entities to maintain the Up-to Date Competitiveness of our CSI core teams. 

Professional & Technical Operating Model – A Perspective

Page 10: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

10

CSI Contracting & Services for Industry

 

The overall Posture of CSI as a corporation is to places an Emphasis on Contracting Supply Chain – for the main elements and component of our work-  

A Significantly Expanded Commitment – to Networking –CSI organizations with main Foreign Contracting Firms Operating in our Target Markets – with whom we can act as specialized sub-contractors in our key areas of activities and services.

We also use our existing Business Model to “Research and Identify new business opportunities and developments” in the target markets in which we are already presents and those we are interested to stage entries in

Professional & Technical Operating Model – A Perspective

Page 11: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

ISO Certificate9001:2008

Certification

11

CSI Contracting &

Services for Industry

Page 12: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Certification

12

CSI Contracting &

Services for Industry

Page 13: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

The main business of the department a can be summarized as:1. Transformers plants (all

categories) installation2. Switchgears & GIS (Large

scale) assembly & installation.3. Control rooms (Large scale)

assembly & installation.4. All electrical systems (i.e. Fire

Fighting, Fire Alarm, Paging System, lighting System, Lightening System, Grounding System & Cathodes Protection).

5. Field Instrument & valves installation (all types).

6. Field calibration for instrument & valves (all types).

7. Commissioning & startup.

E&I WORKS

MECHANICAL WORKS

INSULATION WORKS

SAND PLASTING & PAINTING

CIVIL WORKS

HVAC &FIRE FIGHTING

Corporate Activities .

13

CSI Contracting &

Services for Industry

Page 14: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

The main business of the department can be summarized as:1. Steel structure installation.2. Piping work fabrication& installation

(all categories).3. Static & Rotary equipment (all

categories) installation, startup, & commissioning.

4. Boiler & Furnaces installation.5. Storage tanks fabrication &

installation.6. Fire fighting systems fabrication &

installation.

E&I WORKS

MECHANICAL WORKS

INSULATION WORKS

SAND PLASTING & PAINTING

CIVIL WORKS

HVAC &FIRE FIGHTING

Corporate Activities.

14

CSI Contracting &

Services for Industry

Page 15: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

The main business of the department can be summarized as:1. Hot insulation (all types).2. Cladding (all types).3. Heat Tracing Insulation.4. Refractory.5. Cold Insulation.6. Wrapping for piping.

E&I WORKS

MECHANICAL WORKS

INSULATION WORKS

SAND BLASTING & PAINTING

HVAC &FIRE FIGHTING

CIVIL WORKS

Corporate Activities.

15

CSI Contracting &

Services for Industry

Page 16: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

The main business of the department can be summarized as:1. Sand blasting.2. Grit blasting.3. Paints for industrial works (all

Types).4. Marine paints for platforms, Jetty

structure & Splash zone.5. Fire proofing activities.

E&I WORKS

MECHANICAL WORKS

INSULATION WORKS

SAND BLASTING & PAINTING

HVAC &FIRE FIGHTING

CIVIL WORKS

Corporate Activities.

16

CSI Contracting &

Services for Industry

Page 17: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

The main business of the department can be summarized as:1. Design, supply, fabrication &

installation of complete central HVAC systems (lager scale) for:

2. Domestic Buildings (Hotels & Banks)3. Industrial (Switch gears &

Substation Buildings).

E&I WORKS

MECHANICAL WORKS

INSULATION WORKS

SAND PLASTING & PAINTING

CIVIL WORKS

HVAC &FIRE FIGHTING

Corporate Activities.

17

CSI Contracting &

Services for Industry

Page 18: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

E&I WORKS

MECHANICAL WORKS

INSULATION WORKS

SAND BLASTING & PAINTING

HVAC &FIRE FIGHTING

CIVIL WORKS

Corporate Activities.

18

CSI Contracting &

Services for Industry

The main business of the department can be summarized as Follows:1. Piling and earthworks2. Equipment and tanks foundations.3. Control building & Sub-station

Building.4. Water Treatment Structure (i.e.

storage pit, clarifiers, water intake)5. Cable Trenches & Ducts.

Page 19: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

In addition to all previous activities, CSI offers supporting Management & Functional Services for large- scale projects trying to cover most industrial fields requirements such as:

CSI offers manpower supply for the following activities:1. Electrical & instrument installation & commissioning2. Mechanical installation3. Civil works4. NDT Inspectors.5. QA/QC supervisors.6. HSE supervisors.7. Pre-commissioning and commissioning (supervisors and

technicians).CSI is officially responsible for all (legal/social) issues related to the manpower we provide.

Manpower Services.

Corporate Activities.

19

CSI Contracting &

Services for Industry

Page 20: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CSI is qualified to recommend, select and supply the necessary equipment materials resources relevant to the industrial & construction activities in which we are involved whether direct short & Medium Term supplies or long term procurement Contracts.

CSI is the sole agent for the “Airless Spray Equipment “-“GRACO” in Egypt & Is associated with a significant number of accredited national, regional & International Suppliers.

CSI Policies & Practices in this area of operations is for the purpose of acting as a professional & Reliable facilitators to the Different Companies it is operating with whether independently and or part of a consortium.

Equipment & Materials Procurement & Supply.

Corporate Activities.

20

CSI Contracting &

Services for Industry

Page 21: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Technical & Functional Joint Ventures & Associate Agreements Activities.

21

CSI Contracting &

Services for Industry

Page 22: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CSI is organized to Act & Operate as part of specialized Technical and Functional Joint Ventures & at times through Consortium Structures & or Associate Agreements for specific assignments:

The Following are specific examples for such arrangements.

1. Sitie "Italian co." for electrical & instrument EPC projects.2. Technipro "French co." for mechanical EPC projects.3. C.C.C Insuworld "Italian Co." for insulation EPC projects.

Technical & Functional Joint Ventures & Associate Agreements Activities.

22

CSI Contracting &

Services for Industry

Page 23: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

C.C.C Insulworld

(Italy)

Technical Joint Ventures & Sub-Contracting Arrangements.

23

CSI Contracting &

Services for Industry

Page 24: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CSI

Associate Company – in the Cement Industry.

24

CSI Contracting &

Services for Industry

Page 25: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CSI cementation is a Group Associate company which has been established as an SPV ( Special Purpose Vehicle) specialist company by CSI to undertake construction works for the Cement Industry.

CSI Cementation depends on “Competent & Qualified Staff” specialized in the cement industry.

CSI Cementation Executive Manager is Engineer :- Mr Sayed Hamza.

The link below illustrates - a number of photos for previous cement contracting works which have been performed with CSI Cementation Equipment & Plant. (Qena Cement Factory).

CSI - CEMENT Associate Company.

25

CSI Contracting &

Services for Industry

Page 26: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Corporate

Policies.

Corporate Policies.

26

CSI Contracting &

Services for Industry

Page 27: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

The Main Policies of “CSI” in it’s corporate , technical & managerial Contexts are as follows:-

CSI is committed to execute its Contracts & Projects by using and depending on it’s “Own Qualified Human Resources & Technical Teams” without the use of external sub-contractors as the main Model of our operations to insure of the Integrity, Reliability and Quality of our Services. -Outsourcing the work reduces the amount of quality & Timing control.

CSI commit to maintain the “safety of our employees, and the public at Large”, as it is one of our highest priority. Accident prevention shall be considered of primary importance in all phases of construction, operations and administration. It is CSI’s intent to always maintain effective standards that will guard against injuries and illnesses occurring on the job.

CSI believes strongly in protecting the “Privacy, Proprietary Information & Confidentiality” of all “documentation & Communications Exchanges”, our Associates , Clients & suppliers share with us – while undertaking our Contracted work.

27

CSI Contracting &

Services for Industry

Corporate

Policies.

Page 28: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CSI is continually improving and maintaining the effectiveness of our Quality Management System, aiming to:

Continuously exceed the expectations of our clients.

Be an innovators and leaders in our discipline.

Understand our client's priorities and problems and create a relationship

built on mutual trust and respect.

Provide time-cost effective quality.

Corporate Quality Policies.

28

CSI Contracting &

Services for Industry

Page 29: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CSI –Organization Functional Structure & Staffing.

Corporate Organizational & Human Resources

General Manager.

Consultants.

Financial Department

Projects Manager

Technical Office.

AdministrationDepartment

Cost controlle

r

Accountants

QA/QCConstruction Department.

HSE

Painting Dept.Head

Insulation Dept. Head

Civil Dept.Head

Hvac Dept.Head

Mechanical Dept.Head

E&I Dept.Head

Superintend Dent

Technical Engineers

Purchasing man

Store- Keepers

Administrator

HumanResources

Engineers &

Supervisors

Engineers &

Supervisors

Engineers &

Supervisors

Engineers &

SupervisorsEngineers

& Supervisors

Engineers &

Supervisors 29

CSI Contracting &

Services for Industry

DeputyGeneral

Manager

Page 30: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Corporate Resources.

C.S.I. - TOOLS & EQUIPMENTS

30

CSI Contracting &

Services for Industry

Page 31: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

1. Calibration Laboratory.

2. Fully Equipped Work Shop.

3. Other Equipment , Tooling & Plants from Accredited Secondary Suppliers.

TOOLS & EQUIPMENTS

Corporate Resources.

31

CSI Contracting &

Services for Industry

Page 32: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CALIBRATION LABORATORY

CSI is fully equipped by calibration laboratory to serve any type of instrument, and ready to move to the work site to perform the calibration activities in big projects in order to save time.

Corporate Resources

32

CSI Contracting &

Services for Industry

Page 33: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Corporate Resources

33

CSI Contracting &

Services for Industry

Page 34: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Work Shop External Perspective.

El-Amerya, El-Kafoury,

Bourg El-Arab Road,

Alexandria Egypt (≅9,000

m2)

Bourg Al-Arab, 4th

industrial zone, Block No.

4, Piece 8, 9, 10, 11, 19,

20, 21, 22. (≅32,000 m2)

Corporate Resources.

34

CSI Contracting &

Services for Industry

Page 35: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Corporate Resources.Work Shop –Internal Perspective.

35

CSI Contracting &

Services for Industry

Page 36: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Projects – Past –Present &

Future

36

CSI Contracting &

Services for Industry

Page 37: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CSI-Projects Perspectives.

16%

16%

15%

27% 26%

E&I

Mechanical

Painting`

Insulation

Civil

CSI - Projects Turn Over

(1992-2012)

37

CSI Contracting &

Services for Industry

Page 38: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Running Projects

Completed Projects

Locations of Past Executed & Running projects by CSI

38

CSI Contracting &

Services for Industry

CSI-Projects Perspectives.

Page 39: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Egypt

• Moody International.

• Egypt Gas.• Epco.• Chipsy.• ABB.• Esaco.• Petrojet.• Daelim.• Kahromika.• Air Liquide

USA

• Bechtel.• LoTec, Inc.

France

• ADS• Degremont• Foster

Wheeler.

Italy

• Technip.• Technip-

coflexip.• Technifrigo.• Lurgi.• Garlo

Gavazzi• Icom

Engineering.

• TecnimontKT

• Rossetti Marino

Germany

• UHDE• DSD• Linde AG• AEG/

Alstom.• Siemens.• Bamag

Others

• HTI – Dubai.

• Besix- Belgium.

• Technicas Reunidas.- Spain.

• Nem-The Netherland.

• PETROFAC.• Air

Products-UK

• MI-SWACO-Spain

CSI - Geographical Listing of our Client’s

CSI- Projects Perspectives

39

CSI Contracting &

Services for Industry

Page 40: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

PROJECTS

RUNNING PROJECTS

PAST PROJECT

40

CSI Contracting &

Services for Industry

CSI-Projects Perspectives.

Page 41: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

PAST PROJECTS

E & I References

Mechanical References

Insulation References

Painting References

Civil References41

CSI Contracting &

Services for Industry

CSI-Projects Perspectives.

Page 42: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CLIENTS. PROJECTS.

Jacorossi - Italy NAF platform

Nem - Holland Damnhour / mahmoudia power plant

Linde - Germany Air separation plant 3000 m3/day

DSD -Germany Main lab.

DSD –Germany Rod mill plant 750000 ton/year

AEG/ALSTOM Germany 220/66 kv sub.

Siemens Germany Steel making /flat sheet plants

Carlo gavazzi Italy Suez steel plant

AEG/ALSTOM Germany Ameria cement factory substation

AEG/ALSTOM Germany Midalic substation

Technip Italy Naphtha reformer complex

E & I References (1of 3)

42

CSI Contracting &

Services for Industry

CSI-Projects Perspectives.

Page 43: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CLIENT PROJECT

AEG/ALSTOM Germany Helipolis GIS 200/66/11 kv

ICOM engineering Italy Platform reefers

Technip- coflexip Wafa LNG plants

Technip- coflexip Elruwais Unleaded gasoline plant

Bechtel overseas natural gas liquefaction Co.

LNG. Plant Calibration of instrument / valves

Technip Italy Thiopaq Plant

Technip KTI EMG Gas Compression Station

AirLiquide SILPA 140 Air Separation Unit

Technip Temporary Construction Facilities (warehouse & offices)

Thyssen Krupp Xervon E&I installation & Calibration work.

E & I References (2of 3)

CSI Contracting & Services for Industry

CSI – Past Perspectives

43

Page 44: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Client Project

Air Product Sphinx Glass, Sadat City

KTI EMG Gas Project Expansion -Elarish

E & I References (3of 3)

44

CSI Contracting &

Services for Industry

CSI – Past Perspectives

Page 45: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

NAF Platform

Client: Jacorossi- Italy.

Location: Wepco-med.sea

Duration: 8 Months

Scope of work:

Work Volume: 75,000 Hrs

CSI- Past Projects

45

CSI Contracting &

Services for Industry

Page 46: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CSI Contracting & Services for Industry

46

CSI- Past Projects

Page 47: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Damanhour / Mahmoudia Power Plant

Client: Nem.

Location: Damanhour

Duration: 10 Months

Work Volume: 350,000 Hrs

47

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 48: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

48

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 49: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Air Separation Plant (3000m3 / Day)

Owner : Alex. National Steel

Client: Linda - Germany.

Location: Dekhila – Alex.

Duration: 7 Months

Work Volume: 200,000 Hrs

No photos Available

49

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 50: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Main Lab.

Owner: Alex. National Steel

Client: DSD.

Location: Dekhila – Alex.

Duration: 2 Months

Work Volume: 75,000Hrs

No photos Available

50

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 51: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Rod Mill Plant 750,000 ton / Year

Owner: Alex. National Steel

Client: DSD.

Location: Dekhila – Alex.

Duration: 10 Months

Work Volume: 500,000Hrs

Photo Gallery

51

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 52: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

220 / 66 Kv Substation

Client: AEG / Alstom.

Location: Karmouz – Alex.

Duration: 10 Months

Work Volume: 250,000Hrs

Photo Gallery

52

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 53: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Steel making / Flat Steel Plants

Owner: Alex. National Steel.

Client: Siemens.

Location: Dekhila – Alex.

Duration: 11 Months

Work Volume: 500,000Hrs

Photo Gallery

53

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 54: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Suez Steel Plant

Owner: Alex. National Steel.

Client: Carlo Gavazzi.

Location: Adabya – Suez.

Duration: 12 Months

Work Volume: 70,000Hrs

No. Photos Available

54

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 55: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

America Cement Factory Substation

Owner: Alex. National Steel.

Client: AEG / Alstom.

Location: Wadi El-Kamar – Alex.

Duration: 17 Months

Work Volume: 200,000Hrs

55

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 56: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

56

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 57: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Midelec Substation

Client: AEG / Alstom.

Location: Free zone– Alex.

Duration: 11 Months

Work Volume: 100,000Hrs

57

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 58: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

58

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 59: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Naphta Reformer Complex

Client: Technip

Location: Wadi El-Kamar– Alex.

Duration: 16 Months

Work Volume: 150,000Hrs

Photo Gallery

59

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 60: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Heliopolis GIS 200/66/11 kv

Client: AEG / Alstom

Location: Heliopolis - Cairo

Duration: 14 Months

Work Volume: 160,000Hrs

Photo Gallery

60

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 61: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Platform Feeder

Client: ICOM Engineering

Location: Ein Soukhna -Suez

Duration: 3 Months

Work Volume: 50,000Hrs

No Photo available

61

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 62: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Wafa LNG Plants

Client: Technip- Coflexip

Location: Tripoli - Libya

Duration: 38 Months

Work Volume: 65,000Hrs

Scope of Work:• Off shore Site• On shore Site• 650 KM Pipeline

No Photo available

62

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 63: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

LNG. Inst. & valves calibration

Client: Bechtel Overseas

Location: Idku- Alex

Duration: 13 Months

No Photos Available

63

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 64: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Thiopaq Plant

Client: Technip

Location: AMOC - Alex.

Starting date: Jun 2006

Work Volume: 50,000Hrs

Scope of Work:Rehabilitation, Start up, Operation & Maintenance Activities

No Photos Available

64

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 65: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

EMG Gas Compression Station

Client: Technip KTI

Owner: EMG East Mediterranean Gas

Location: El-Arish.

Starting date: January 2007 to February 2008.

Scope of Work: Fabrication and Installation of all electrical works

Photo Gallery

65

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 66: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

SILPA 140 Air Separation Unit

Client: Air Liquide

Location: 6th of October, Cairo

Starting Date: June 2008

Scope of Work:Turn Key Job.

No Photo Gallery

66

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 67: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Temporary Construction Facilities (warehouse & offices)

Owner: Midor

Client: Technip

Location: El Amirya, Alexandria

Starting Date: June 2008

Scope of Work:Temporary Construction Facilities (warehouse & offices.

No Photo Gallery

67

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 68: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

BURULLUS Compression Station – Phase V

Client: ThyssenKrupp Xervon

Location: Alexandria

Starting Date: Jan-09

Scope of Work:E&I installation & Calibration work.

No Photo Gallery

68

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 69: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

SPHINX GLASS, SADAT CITY

Client: Air Product

Location: Sadat City, Cairo

Starting Date: October, 2009

Scope of Work:E&I and Mechanical.

Photo Gallery

69

CSIContracting & Services for Industry

CSI- Past Projects

Page 70: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

EMG Gas Project Expansion -Elarish

Client: KTI

Location: El-Arish

Starting Date: June, 2010

Scope of Work:All Construction Package

70

Photo Gallery

CSIContracting & Services for Industry

CSI- Past Projects

Page 71: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CLIENT PROJECTChlorine Liquefaction Plant Chlorine Liquefaction Plant

Main Drainage Pit Main Drainage Pit

Gas Pipe Lines Network Gas Pipe Lines Network

Naphtha Isomerization Plant Naphtha Isomerization Plant

Naphtha Reformer Complex Naphtha Reformer Complex

Middle East Oil Refinery Middle East Oil Refinery

Endico - Eco Varta Environment System

Technip-coflexip Wafa LNG plants

Technip-coflexip Elruwais Unleaded gasoline plant

Technip / DSD Thiopaq Plant

ADC France Crane girders

Mechanical References (1of 5)

71

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 72: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CLIENT PROJECTDegremont Al Gabel Elasfer Waste Water Treatment Unit

Chipsy New line for Food Processing

LoTec, Inc. (4) FH Intake System

Moody International Pre-commissioning of 8" / 11 km, gas line

Moody International Pre-commissioning of 12" / 16” & 24” gas line

Chipsy Conveyor Platform

HTI Trading L.L.C Fire And Raw Water Tank-2285 Mt3

Chipsy WM Local Built items

Kahromika Sugar Pulp Dryer Project

Technip KTI EMG Gas Compression Station

Mechanical References (2of 5)

72

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 73: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CLIENT PROJECTPetrofac Piping Fabrication Works- Kahlda, Elsalam Plant.

Chipsy Seasoning Machine Line 1, 2 & 3

Egyptian French Join Venture. Cairo metro line 3 / supply and fabrication of steel segment

Uhde-Germany Supply & fabrication of primary & secondary standard piping supports

ELNG Supply, Fabrication & Installation of A-Frame

MAS Engineering. Filmar Nile Textile Sewer System- piping fab. & Erection.

AirLiquide SILPA 140 Air Separation Unit

Mechanical References (3of 5)

73

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 74: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CLIENT PROJECTMAS Engineering Delta Factory Water Drainage Network

Technip Steel Structure Supply & Fabrication / DCU MIDOR EXPANSION PROJECT

Anchor Bolts Supply & Fabrication / DCU MIDOR EXPANSION PROJECT

Temporary Construction Facilities (warehouse & offices)

Elite Hydraulic lifting car machine

Arabian Cement Company 120 ton shop Fabrication of the plant equipments

Air Product SPHINX GLASS, SADAT CITY

Mechanical References (4of 5)

74

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 75: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CLIENT PROJECTAMCO Fabrication of Thermal Oxidizer.

Air Liquide SGG Air Separation Unit

Rossetti Ennpi Amer 8 Chemical Injection Package

Thermoengineering Elevated Flare Package supply, fab. & painting

Mechanical References (5of 5)

75

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 76: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Chlorine Liquefaction Plant

Owner: Epco.

Client: Technifrigo.

Location: El-Nahda - Alex

Duration: 10 Months

Work Volume: 200,000Hrs

Photo Gallery

76

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 77: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Main Drainage Pit

Owner: Epco.

Client: Epco.

Location: El-Nahda - Alex

Duration: 19 Months

Work Volume: 70,000Hrs

Photo Gallery

77

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 78: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Gas Pipeline Network

Owner: Ansdk.

Client: Esaco.

Location: Dekhila- Alex

Duration: 14Months

Work Volume: 120,000Hrs

No Photos Available

78

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 79: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Naphtha Isomerization Plant

Owner: Cairo Oil Refinery Co. / Enppi.

Client: Lurgi Resta.

Location: Cairo

Duration: 4 Months

Work Volume: 150,000Hrs

Photo Gallery

79

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 80: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Naphtha Reformer Complex

Owner: ANRPC.

Client: Technip.

Location: Wadi El-Kamar- Alex

Duration: 23 Months

Work Volume: 900,000Hrs

Photo Gallery

80

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 81: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Middle East Oil Refinery

Owner: Midor.

Client: Daelim.

Location: Free Zone - Alex

Duration: 7 Months

Work Volume: 240,000Hrs

No Photos Available

81

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 82: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Varta Environment System

Owner: Varta.

Client: Endico.

Location: Alex

Duration: 4 Months

Work Volume: 50,000Hrs

No Photos Available

82

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 83: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Wafa LNG plants

Owner: Agip.

Client: Technip- Coflexip.

Location: Tripoli - Libya

Duration: Oct 02 - Jan 06

Work Volume: 85,000Hrs

Scope of Work:• Off shore Site• On shore Site• 650 KM Pipeline

No Photos Available

83

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 84: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Thiopaq Plant

Owner: Amoc.

Client: Technip / DSD.

Location: Wadi El-Kamar- Alex.

Duration: Mar03 - Aug. 03

Work Volume: 78,000Hrs

Photo Gallery

84

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 85: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Crane Girders

Owner: ADC.

Client: ADC.

Location: Alex.

Duration: Feb07

Scope of Work: Supply & Fabrication

No Photo Available

85

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 86: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Al Gabal El-Asfar Waste Water Tret.

Owner: EGWSC.

Client: Degremont.

Location: Cairo.

Duration: Jan04 - Dec.05

Work Volume: 312,000Hrs.

Scope of Work: Fabrication and Installation of Piping & Steel Structure

Photo Gallery

86

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 87: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Chipsy

Owner: Chipsy.

Client: Chipsy.

Location: 6th of October.

Duration: Aug.04 - Oct.06

Scope of Work: Fabrication of Steel Structure

Photo Gallery

87

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 88: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

(4) FH Intake systems

Client: LoTec Inc (USA).

Location: Ganah

Starting Date: Feb07 – April 07

Work Volume: 85,000 Kg

Scope of work: Supply, Fabrication &Transportation to the place of installation (Ganah LNG Project)

Photo Gallery

88

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 89: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Pre-commissioning of 8" / 11 km, gas line

Owner: Natgas

Client: MOODY International.

Location:Nubaria (Cairo – Alex) Desert Road

Starting Date: November 2006

Scope of work: Hydrostatic Tests & pre-commissioning of the gas line

No Photos Available

89

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 90: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Owner: Natgas

Client: MOODY International.

Location: 6th of October city

Starting Date: April 2006

Scope of work: Hydrostatic Tests & pre-commissioning of the gas line Project Status: Completed

Pre-commissioning of 12“/16 / 24 km, gas line

No Photos Available

90

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 91: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Owner: Chipsy

Client: Chipsy

Location: 6th of October city

Starting Date: July 2008

Scope of Work:Supply, Fabrication, installation & Painting

Conveyor Platforms

No Photo Available

91

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 92: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Owner: EMG East Mediterranean Gas

Client:Technip KTI / HTI Dubai

Location: El-Arish

Starting Date: December 2006

Scope of Work:Design, Supply, Fabrication, installation & Painting

Fire and Raw water tank-2852Mt3

Photo Gallery

92

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 93: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Owner: Chipsy

Client: Chipsy

Location: 6th of October city

Starting Date: Aug 2008

Scope of Work:Supply, Fabrication, installation & Painting

WM Local Built Items

No Photo Available

93

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 94: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Owner: Nubaria Sugar and Refining Company

Client: Kahromika

Location: CSI Work Shop

Starting Date: January 2008

Scope of Work: Manufacturing of all factory equipment.

Work Volume: 415,000 kg (CS & SS).

Sugar Pulp Dryer Project

Photo Gallery

94

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 95: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Owner: EMG East Mediterranean Gas

Client: Technip KTI

Location: El-Arish.

Starting date: January 2007 toFebruary 2008.

Scope of Work: Fabrication and Installation of Piping and Mechanical Works

EMG Gas Compression Station

Photo Gallery

95

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 96: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Client: Petrofac

Location: CSI Workshop/Khalda (EL-Salam Plant).

Starting date: October 2007 to May 2008.

Work Volume: 115,000Hrs.

Piping Pre-fabrication Work

Photo Gallery

96

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 97: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Client: Chipsy

Location: Chipsy - 6th of October

Starting date: May-08 to July -08.

Scope of Work:Supply, Fabrication & Installation

Seasoning Machine Line 1, 2 & 3

No Photo Gallery

97

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 98: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Client: Egyptian French JV

Location: CSI Workshop

Starting date: April 2008 to August 2008.

Work Volume: 100 TON.

STEEL SEGMENT FABRICAION

Photo Gallery

98

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 99: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Client: UHDE / PDH-PP Plant

Location: CSI Workshop

Starting date: May 2008 to Nov 2008.

Work Volume: 250 TON.

PIPE SUPPORTS FABRICATION

Photo Gallery

99

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 100: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Client: ELNG

Location: CSI Workshop

Starting date: Nov 2008 to Nov 2008.

A FRAME FABRICATION

Photo Gallery

100

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 101: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Client: MAS

Location: Bourg El-Arab

Starting date: Mar-08 to Sept-08.

Scope of Work:Fabrication and installation

Filmar Nile Textile Sewer System piping fab. & Erection

No Photo Gallery

101

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 102: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

SILPA 140 Air Separation Unit

Client: Air Liquide

Location: 6th of October, Cairo

Starting Date: June 2008

Scope of Work:Turn Key Job.

Photo Gallery

102

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 103: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Delta Dyeing Water Discharge Network

Client: MAS Engineering

Location: Alexandria

Starting Date: Jan-09 to May-09No Photo Gallery

103

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 104: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Temporary Construction Facilities (warehouse & offices)

Owner: Midor

Client: Technip

Location: El Amirya, Alexandria

Starting Date: June 2008

Scope of Work:Temporary Construction Facilities (warehouse & offices.

No Photo Gallery

104

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 105: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Hydraulic Lifting Car Parking Machine

Client: Elite

Location: CSI Workshop

Starting Date: January 2008

Scope of Work:Sheet metal & steel structure fabrication work.

105

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 106: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

120 ton shop Fabrication of the plant equipments

Client: Hassan Allam

Location: CSI Worksho, Alexandria

Starting Date: October, 2009

Scope of Work:Fabrication of the plant equipments.

Photo Gallery

106

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 107: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

SPHINX GLASS, SADAT CITY

Client: Air Product

Location: Sadat City, Cairo

Starting Date: October, 2009

Scope of Work:E&I and Mechanical.

Photo Gallery

107

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 108: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Fabrication of Thermal Oxidizer.

Client: AMCO

Location: CSI Workshop, Alexandria, Egypt

Starting Date: February 2010

Scope of Work:Thermal Oxidizer Fabrication Work.

Photo Gallery

108

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 109: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

SGG Air Separation Unit

Client: Air Liquide

Location: El-Ain El Sokhna, Suez

Starting Date: July, 2009

Scope of Work:Civil & Mechanical Work.

Photo Gallery

109

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 110: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Ennpi Amer 8 Chemical Injection Package

Client: Rossetti

Location: CSI Workshop

Starting Date: April, 2011

Scope of Work:Supply of Chemical Skid.

Photo Gallery

110

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 111: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Elevated Flare Package supply, fabrication & painting

Client: Thermoengineering

Location: CSI Workshop

Starting Date: Jun-2011

Scope of Work:Elevated Flare Package supply, fab. & painting

No Photo Gallery

111

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 112: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CLIENT PROJECTTpl P.V.C Plant

Egypt Gas L.P.G Plant

Technip- Italy Boiler Plant

Technifrigo Chlorine Liquefaction Plant

Technip-Italy Naphtha Reformer Complex

F.W.F/ Cgi Lube Oil Expansion

Technip-coflexip Wafa LNG plants

Technip-coflexip Elruwais Unleaded gasoline plant

Technip-Italy Thiopaq Plant

Be-Six-Belgium Sahel & Sahara Bank Tripoli- Libya

Insulation References (1of 2)

112

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 113: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CLIENT PROJECTAirLiquide SILPA 140 Air Separation Unit

Insulation References (2of 2)

113

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 114: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

P.V.C Plant

Owner: Epco.

Client: Tpl.

Duration: 18 Months

Work Volume: 75,000 M2

No Photos Available

114

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 115: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

L.P.G Plant

Owner: Petropel.

Client: Egypt Gas.

Duration: 4 Months

Work Volume: 25,000 M2

No Photos Available

115

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 116: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Boiler Plant

Owner: Epco.

Client: Technip.

Duration: 6 Months

Work Volume: 12,000 M2

No Photos Available

116

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 117: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Clorine Liquefaction Plant

Owner: Alex Petrochemical Co.

Client: Technifrigo.

Duration: 12 Months

Work Volume: 10,000 M2

No Photos Available

117

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 118: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Naphtha Reformer Complex

Owner: Alex. Petroleum

Client: Technip.

Duration: 7 Months

Work Volume: 45,000 M2

Photo Gallery

118

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 119: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Lube Oil Expansion

Owner: Amoc.

Client: F.W.F / Cgi.

Duration: 10 Months

Work Volume: 45,000 M2

Photo Gallery

119

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 120: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Wafa LNG Plants

No Photos Available

Owner: Agip.

Client: Technip- Coflexip.

Location: Tripoli - Libya

Scope of Work:• Off shore Site• On shore Site• 650 KM Pipeline

120

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 121: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Thiopaq Plant

Owner: Amoc.

Client: Technip / DSD.

Location: Wadi El-Kamar- Alex.

Duration: Mar03 - Aug. 03

Work Volume: 40,000 Hrs.

121

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 122: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Sahel & Sahara Bank Tripoli

Owner: Libya Government.

Client: Be-Six.

Location: Tripoli - Libya.

Duration: Apr.05 - Feb.06

Work Volume: 114,400 Hrs.

Scope of Work: HVAC System.

Photo Gallery

122

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 123: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

SILPA 140 Air Separation Unit

Client: Air Liquide

Location: 6th of October, Cairo

Starting Date: June 2008

Scope of Work:Turn Key Job.

No Photo Gallery

123

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 124: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CLIENT PROJECTEgypt Gas Platform Revamping

Petrojet Alex Tires

Technifrigo Chlorine Liquefaction Plant

Lurgi Resta - Italy Isomarization Plant

Technip-Italy Naphtha Reformer Complex

T.R Asspc

ABB Acpa

Technip-coflexip Wafa LNG plants

Technip-coflexip Elruwais Unleaded gasoline plant

Technip-Italy Thiopaq Plant

LoTec, Inc - USA (4) Filter House Intake System.

Painting References (1of 2)

124

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 125: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CLIENT PROJECTTechnicas Reunidas Spain Special Petroleum Products

AirLiquide SILPA 140 Air Separation Unit

Rossetti Ennpi Amer 8 Chemical Injection Package

KTI EMG Gas Project Expansion -Elarish

Thermoengineering Elevated Flare Package supply, fab. & painting

Painting References (2of 2)

125

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 126: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Platform Revamping

Owner: Petrobel.

Client: Egypt Gas.

Duration: 18 Months

Work Volume: 100,000 M2.

Scope of Work: Sand blasting & Painting Inspection.

No Photos Available

126

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 127: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Alex Tires

Owner: Alex Tires.

Client: Petrojet.

Duration: 12 Months

Work Volume: 20,000 M2.

Scope of Work: Painting.

No Photos Available

127

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 128: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Chlorice Liquefaction Plant

Owner: Petrochemical Co.

Client: Technifrigo.

Duration: 12 Months

Work Volume: 10,000 M2.

Scope of Work: Painting.

No Photos Available

128

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 129: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Isommarization Plant

Owner: Cairo Petroleum.

Client: Lurgi Resta.

Duration: 6 Months

Work Volume: 10,000 M2.

Scope of Work: Sand Blasting & Painting.

No Photos Available

129

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 130: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Naphtha Reformer Complex

Owner: Alex Petroleum.

Client: Technip.

Duration: 18 Months

Work Volume: 150,000 M2.

Scope of Work: Sand Blasting & Painting.

Photo Gallery

130

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 131: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Asspc

Owner: Asspc.

Client: T.R.

Duration: Jan04 – Dec04

Work Volume: 10,000 M2.

Scope of Work: Sand Blasting & Painting.

No Photos Available

131

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 132: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Acpa

Owner: Acpa.

Client: ABB.

Duration: Jan04 – Jan06

Work Volume: 10,000 M2.

Scope of Work: Sand Blasting & Painting.

No Photos Available

132

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 133: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Wafa LNG Plants

No Photos Available

Owner: Agip.

Client: Technip- Coflexip.

Location: Tripoli - Libya

Duration: Oct 02 - Jan 06

Scope of Work:• Off shore Site• On shore Site• 650 KM Pipeline

133

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 134: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Thiopaq Plant

Owner: Amoc.

Client: Technip / DSD.

Location: Wadi El-Kamar- Alex.

Duration: Mar03 - Aug. 03

Work Volume: 20,000 Hrs.

Scope of Work: Sand Blasting & Painting.

Photo Gallery

134

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 135: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

(4) FH Intake systems

Client: LoTec Inc (USA).

Location: Ganah

Starting Date: Feb07 – April 07

Work Volume: 85,000 Kg

Scope of work: Sand Blasting & Painting

Photo Gallery

135

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 136: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Special Petroleum Products Plant

Owner: ASPEK

Client: Technicas Reunidas Spain

Scope of work: Painting Works

Photo Gallery

136

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 137: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

SILPA 140 Air Separation Unit

Client: Air Liquide

Location: 6th of October, Cairo

Starting Date: June 2008

Scope of Work:Turn Key Job.

No Photo Gallery

137

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 138: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Ennpi Amer 8 Chemical Injection Package

Client: Rossetti

Location: CSI Workshop

Starting Date: April, 2011

Scope of Work:Supply of Chemical Skid.

No Photo Gallery

138

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 139: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

EMG Gas Project Expansion -Elarish

Client: KTI

Location: El-Arish

Starting Date: June, 2010

Scope of Work:All Construction Package

No Photo Gallery

139

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 140: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Elevated Flare Package supply, fabrication & painting

Client: Thermoengineering

Location: CSI Workshop

Starting Date: Jun-2011

Scope of Work:Elevated Flare Package supply, fab. & painting

No Photo Gallery

140

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 141: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CLIENT PROJECTPetrojet Alex Tires

Technifrigo Chlorine Liquefaction Plant

Epco. Main Drainage Pit

DSD - Germany High Tolerance Concrete Slabs

Arab Contractor ABB Head quarter Building- Cairo

Esacontrasteel Contra Steel Work

ABB Gas Turbine Pilling works

Technip-coflexip Wafa LNG plants

Technip-coflexip Elruwais Unleaded gasoline plant

AirLiquide Air Liquide Helium Plant- civil work

Civil References (1 of 2)

141

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 142: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

142142142

CLIENT PROJECTNOVC -Cargill New Front Office/Gas Bottling storage/ New

Partetions

AirLiquide SILPA 140 Air Separation Unit

Technip Steel Structure Supply & Fabrication / DCU MIDOR EXPANSION PROJECT

Anchor Bolts Supply & Fabrication / DCU MIDOR EXPANSION PROJECT

Temporary Construction Facilities (warehouse & offices)

Civil References (2 of 3)

142

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 143: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

143143143

CLIENT PROJECTSaint Gobin Civil Work (Manholes, Inside Manholes & Gas

Reduction Slab)

Air Liquide SGG Air Separation Unit

KTI EMG Gas Project Expansion -Elarish

Civil References (3 of 3)

143

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 144: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

144144144144144144

Alex Tires

Owner: Alex Tires

Client: Petrojet.

Location: El-Nahda – Alex.

Duration: Jun93- Jun95.

Work Volume: 250,000 Hrs.

Scope of work: Civil Works

No Photos Available

144

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 145: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

145145145145145145

Chlorine Liquefaction Plant

Client: Technifrigo.

Location: El-Nahda – Alex.

Duration: Aug93- Jun94.

Work Volume: 50,000 Hrs.

Scope of work: Civil Works

No Photos Available

145

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 146: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

146146146146146146146146

Main Drainage Pit

Client: Epco.

Location: El-Nahda – Alex.

Duration: Sep94- Apr.96.

Work Volume: 150,000 Hrs.

Scope of work: Civil Works

No Photos Available

146

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 147: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

147147147147147147147147147

High Tolerance Concrete Slabs

Client: DSD.

Location: El-Dekhila – Alex.

Duration: Jun96- May97.

Work Volume: 20,000 Hrs.

Scope of work: Civil Works

No Photos Available

147

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 148: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

148148148148148

Owner: ABB

Client: Arab Contractor / ABB.

Location: Heliopolis-Cairo

Duration: 4 Months

Scope of work: Civil Works.

Work Volume: 50,000 Hrs.

ABB head quarter building

No Photos Available

148

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 149: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

149149149149149149149149149

Client: Esaco.

Location: Borg El-Arab, Alexandria

Duration: 12 Months

Scope of work: Civil Works.

Work Volume: 30,000 Hrs.

Contra Steel Factory

Photo Gallery

149

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 150: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

150150150150150150

Client: ABB.

Location: Al-Nahda, Alexandria

Duration: 13 Months

Scope of work: Civil Works.

Work Volume: 60,000 Hrs.

Gas Turbine Pilling works

No Photos Available

150

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 151: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

151151151151151151

Client: NOVC -Cargill.

Location: Borg El-Arab, Alexandria

Duration: From November 2007 to May 2008.

Scope of work: Civil Works.

New Front Office / Gas Storage / New Partetions

No Photos Available

151

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 152: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

152152

SILPA 140 Air Separation Unit

Client: Air Liquide

Location: 6th of October, Cairo

Starting Date: June 2008

Scope of Work:Turn Key Job.

Photo Gallery

152

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 153: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

153153

Temporary Construction Facilities (warehouse & offices)

Owner: Midor

Client: Technip

Location: El Amirya, Alexandria

Starting Date: June 2008

Scope of Work:Temporary Construction Facilities (warehouse & offices.

No Photo Gallery

153

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 154: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

154154

Civil Work (Manholes, Inside Manholes & Gas Reduction Slab)

Client: Saint Gobain

Location: El-Ain El Sokhna, Suez

Starting Date: August, 2009

Scope of Work:Civil Work.

No Photo Gallery

154

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 155: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

155155

SGG Air Separation Unit

Client: Air Liquide

Location: El-Ain El Sokhna, Suez

Starting Date: July, 2009

Scope of Work:Civil & Mechanical Work.

Photo Gallery

155

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 156: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

156156

EMG Gaas Project Expansion -Elarish

Client: KTI

Location: El-Arish

Starting Date: June, 2010

Scope of Work:All Construction Package

Photo Gallery

156

CSI Contracting &

Services for Industry

CSI- Past Projects

Page 157: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

157157157

CLIENT PROJECTAir Liquide Acetylene Filling Station

TOTAL TOTAL TEBU-Piping supply, fabrication & erection

TOTAL TOTAL TEBU-Supply, fabrication, erection, testing and painting of 11 tanks.

Running Projects

RUNNING PROJECTS

157

CSI Contracting &

Services for Industry

Page 158: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

158158

Acetylene Filling Station

Client: Air Liquide

Location: Sadat City, Egypt

Starting Date: January, 2012

Scope of Work:supply, fabrication & commissioning

No Photo Gallery

RUNNING PROJECTS

158

CSI Contracting &

Services for Industry

Page 159: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

159159

Total Proj. Piping Prefabrication & Erection

Client: MAS

Location: Borg El-Arab Zone, Alexandria, Egypt

Starting Date: April, 2011

Scope of Work:Piping Supply, Fabrication and Erection.

No Photo Gallery

RUNNING PROJECTS

159

CSI Contracting &

Services for Industry

Page 160: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

160160

TOTAL TEBU

Client: TOTAL

Location: Borg El-Aarab Industrial Zone

Starting Date: May, 2011

Scope of Work:Supply, fabrication, erection, testing and painting of 11 tanks.

Photo Gallery

RUNNING PROJECTS

160

CSI Contracting &

Services for Industry

Page 161: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

161161

SGG - Air Separation Unit

Client: Air Liquide

Location: El-Sukhna, Suze, Egypt

Starting Date: July, 2009

Scope of Work:Thermal Oxidizer Fabrication Work.

Photo Gallery

RUNNING PROJECTS

161

CSI Contracting &

Services for Industry

Page 162: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

162162162162162162162162

Professional References

162

CSI Contracting &

Services for Industry

Page 163: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Alstom Alex Cement Factory

163

Professional References

CSI Contracting &

Services for Industry

Page 164: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Alstom Heliopolis

164

Professional References

CSI Contracting &

Services for Industry

Page 165: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Alstom Karmouz

165

Professional References

CSI Contracting &

Services for Industry

Page 166: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Alstom Medelec

166

Professional References

CSI Contracting &

Services for Industry

Page 167: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Arab Contractor ABB Building

167

Professional References

CSI Contracting &

Services for Industry

Page 168: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

DSD ANSDK

168

Professional References

CSI Contracting &

Services for Industry

Page 169: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

169

Professional References

CSI Contracting &

Services for Industry

Esaco Mobil Oil Station

Page 170: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Esaco Mobil Oil Station

170

Professional References

CSI Contracting &

Services for Industry

Page 171: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Jacorossi Naf2 Platform

171

Professional References

CSI Contracting &

Services for Industry

Page 172: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

JOTUN Recommendation Various Projects

172

Professional References

CSI Contracting &

Services for Industry

Page 173: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

NEM

173

Professional References

CSI Contracting &

Services for Industry

Page 174: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

Foster Wheeler

174

Professional References

CSI Contracting &

Services for Industry

Page 175: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

T.R.

CSI Contracting & Services for Industry

175

Professional References

Page 176: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

AMCO.

176

Professional References

CSI Contracting &

Services for Industry

Page 177: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

AMCO.

177

Professional References

CSI Contracting &

Services for Industry

Page 178: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

TECHNIP.

178

Professional References

CSI Contracting &

Services for Industry

Page 179: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

TECHNIP.

179

Professional References

CSI Contracting &

Services for Industry

Page 180: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

TECHNIP.

180

Professional References

CSI Contracting &

Services for Industry

Page 181: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

TECHNIP.

181

Professional References

CSI Contracting &

Services for Industry

Page 182: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

TECHNIP.

182

Professional References

CSI Contracting &

Services for Industry

Page 183: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

TECHNIP.

183

Professional References

CSI Contracting &

Services for Industry

Page 184: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

DEGRÉMONT

184

references Professional

CSI Contracting &

Services for Industry

Page 185: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

185

CSI Contracting & Services for Industry

Our Business Development Strategy.

CSI – Commitment to Growth and Excellence – is designed to cope with the actual economic conditions in the world and at regional and national levels. In these instances – whether during “pre-recession, actual recession and post-recession phases” – we are continuously adapting our business development activities to address our markets, our clients needs, in addition to the development needs of our organization.   CSI Uses Its:- Experiences and Exposure in the seven countries in which we have undertaken contracting work, our Corporate Business R&D, Contracting Networks, Regional Institutions, Industry Associations , Chamber of commerce, Commercial attaches in addition to our business networks in the region, to continuously monitor developments in our existing and new markets in order to position ourselves to achieve our business growth plans.

Page 186: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

186

CSI Contracting & Services for Industry

General Manager Statement.

With over two decades of activities and experiences behind us , we as CSI have participated in the construction of multi-industries - industrial , Commercial , Institutional & Residential Projects –in the capacity of nominated specialist sub-contractors –working with main international contracting firms operating under – EPC / EPCM / EPCI contracts as well as FIDIC Contracts environments. CSI - has Grown from a Local Specialist Sub Contracting Engineering firm –to one of the most respected specialist sub-contracting firms –with an excellent Corporate reputation for quality and effectiveness. Over the years , a significant volume of our business has been secured through negotiated contracts, open and close ( pre-Selected) tenders and direct nominations.  Much of CSI Business has been With repeat customers, indicating the faith placed in our experience , expertise and services during all phases of the projects – in fact in certain instances from project inception and in single and two stages design and build contracts. The Balance of CSI Business volume comes from the competitive tendering process. At CSI – we pride ourselves on being a Service Oriented company that anticipates client requirements and our relationship with each of our clients is built on open communications , integrity and a continually striving to learn, gain & document experience and innovate.

Page 187: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

  Amerya, El-Kafoury, Borg El-Arab Road, Alexandria, EgyptTel/Fax: (+2) 03 448 8375Tel/Fax: (+2) 03 582 7131

[email protected]

 

CSI Contracting & Services for Industry

187

For more Information please contact us at:

Page 188: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CSI Contracting & Services for Industry

CONTACT US - INFORMATION

188

Page 189: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

THANK YOU FOR YOUR ATTINTION

Eng.Em AminGeneral Manager

CSI Contracting & Services for

Industry

189

Page 190: CSI Contracting & Services for Industry A Commitment to Quality, Timing. & Sustainable Progress. - 2008 1

CSI Contracting & Services for

Industry

190