The company was founded in 1998 witha task to design, develop & operate theregional Integrated Waste ManagementSystem (IWMS) of Western Macedonia,according to the Strategic Plan approved bythe Regional Council in 1995.
Shareholders are the Municipalitiesof Grevena, Kastoria, Florina, Kozani &Ptolemaida and the Local Unions of themunicipalities of the four prefectures ofthe region.
-
8/14/2019 DIADYMA Presentation (27!08!08)
3/15
Mechanical CollectionTransferringRecovery and RecyclingMechanical Treatment and RecoverySanitary LandfillingLandfill restoration
Companys main activities:
-
8/14/2019 DIADYMA Presentation (27!08!08)
4/15
System Design & feasibility studiesEnvironmental Studies & Risk AssessmentTechnical Studies for needed infrastructureConstructions supervisionSystems development & implementationResource allocation & cost minimization
Companys main activities:
Providing services to Local Authorities (LA)
-
8/14/2019 DIADYMA Presentation (27!08!08)
5/15
Regional Systems of Integrated WasteManagement
Kozani
Deskati
Kastoria
Florina
ServiaGrevena
AmindeoPtolemaida
TsotyliSiatista
The IWMS of W. Macedonia includes the CentralFacilities of Integrated Waste Management which issupplied by 10 Local Waste Management Facilities(LWMF). Mixed waste is being transported and alsorecyclable materials, to serve the needs of the localcollection system. That integrated system serves theneeds of 61 municipalities of W. Macedonia and300.000 residents.
CFIWM
-
8/14/2019 DIADYMA Presentation (27!08!08)
6/15
The Central Facilities of IntegratedWaste Managemt include:
(1) The Landfills 2 cells
(2) The leachate monitoring system
(3) The biogas monitoring system
(4) Other facilities (administration building,maintenance building etc)
In the near future(1) Mechanical Treatment Plant (MTP)
(2) Landfill
(3) Targeted Waste Streams
(4) Sludge Treatment Facility
-
8/14/2019 DIADYMA Presentation (27!08!08)
7/15
Area: 8 hectares (total area 327 hectares)Upon the completion of the second cell the
facilities capacity will be doubled
The Regional Landfill ( 5 m)
Nine transfer stations have been completed andone more in Grevena is currently under construction.
Local Transfer Stations ( 2,5 m)
-
8/14/2019 DIADYMA Presentation (27!08!08)
8/15
receives 300 tonnes of paper and100 tonnes of used mineral oils
receives 2,500 truckloads
more than 10,000 tonnes ofurban waste are being transferred
Each month the Local Waste ManagementFacility (LWMF) network of W. Macedonia
-
8/14/2019 DIADYMA Presentation (27!08!08)
9/15
-
8/14/2019 DIADYMA Presentation (27!08!08)
10/15
Dump restoration works were completed in mid2007. Environmental inspections and riskassessment studies for more than 200 siteswere conducted and also technical studies forall high risk dumps. Funding was provided bythe EU for restoration works in 40 sites,
-
8/14/2019 DIADYMA Presentation (27!08!08)
11/15
40 high risk dumpsites (cost: 9 m)
76 low risk dumpsites (cost: 3,2 m)
Restoration works for all high-riskdumps have been completed in mid-2007. Total cost have reached 9m.
91 restored low risk dumpsites financed by LocalMunicipalities (cost: 1,5 m)
-
8/14/2019 DIADYMA Presentation (27!08!08)
12/15
The MTP has a capacity of 150.000tonnes, and it will maximize therecovery of recyclables, doubling thelandfills lifecycle.
The project is a Public PrivatePartnership (PPP) scheme and todayis at a stage of hiring a FinancialAdviser.
DIADYMA SA is moving towardsthe construction of infrastructures forwaste treatment and development.
The Mechanical Treatment Plant
-
8/14/2019 DIADYMA Presentation (27!08!08)
13/15
-
8/14/2019 DIADYMA Presentation (27!08!08)
14/15
European Programs
Partners: Italy-Spain-GreeceCountryside and Landscape: Opportunities from Renewable Energies
Partners: Italy-Morocco-GreeceWaste Management on Mountainous Regions
Development of Innovation in the Field of Solid Waste
Management in Western Macedonia
Recycling and Material recovery: Regional Environmental
Management capacity and infrastructure
Partners: Greece - FYROM
SMART II: NatuReshaping Landscape
SMART I: Former mining sites and industrial heritage: Recovery
and Redevelopment
Patrners: Germany-Spain-Greece
Western Macedonia
-
8/14/2019 DIADYMA Presentation (27!08!08)
15/15
Thank you for your attention