lcc-es evaluation rep⑱醍 匡$醍国難明月 · 2020. 11. 10. · " 2015, 2012, 2009 and...
TRANSCRIPT
lCC-ES Evaluation Rep⑱醍 匡$醍国難明月
Reissued October 2020
77Jis reporf is subiect fo renewaI October 2021.
WWW.icc-eS"O「鋼l (800) 423-6587 I (562) 699巾543 A Subs肋aryofme /nfematわna/ Code Counc〃⑧
DiVISION: 03 OO OO-CONCRETE
Section: 03 21 00-Reinforcing SteeI
REPORT HOしDER:
COMPOSiTE BUl」DING SYSTE州S, INC,
EVALUAT看ON SUBJECT:
MetaiStudC「ete⑪ (MSC〉 SHEAR TRANSFER STRiP
l,O EVALUATION SCOPE
Compliance with the following codes:
" 2015, 2012, 2009 and 2006 hfemafronaI Bui/ding
Code⑲ (IBC)
看2015, 2012, 2009 and 2006 /ntemaf/Ona/ Residen存aI
Code⑪ (IRC)
Prope舶es evaiuated:
St「ucturai
2.O DESCRiPTiON
2.1 General:
MetaiStudC「ete is a lighトgage steei connector strip used
to t「ansfe「 Shea「 st「esses in composite paneI systems
used as a「chitectu「al ciadding. The use of the st「ip is not
=mited to any seismic design catego「y. The composite
PaneIs consist of Iight-gage SteeI studs and a 「einfo「ced
COnC「ete facing o「 topping on one side of the studs, With
the MetaIStudC「ete metaI connector p「oviding a sheaト¶ow
COnneCtion between the steeI studs and the conc「ete. See
Figu「e l for a typieaI panel const「ucted with the
MetaiStudC 「ete comector strip.
2.2 Mate「iaIs:
2.2,1 Steei Studs: Whe「e the MetaIStudC「ete comecto「
iS uSed, Steei studs in ∞mPOSite paneis must be
recognized in a cu「「ent lCC-ES evaIuation report. PhysicaI
and section p「operties are found in the evaiuation report on
the steel stud. Minimum steel thickness and yieId st「ength
fo「 the studs must compiy with TabIe l ofthis 「eport.
2,2,2 MetaiStudCrete Connecto「: The MetaIStudCrete
COmectO「 t「anSfe「s shea「 st「esses between the concrete
faci=g and the lighトgage steel stud. The strip is fastened to
the web o「 flange of the stud and the ¶ange of the t「ack,
and the st「ip/flange is then embedded into the concrete
facing. The st「ip is fab「icated f「om No. 18 gage
[0.047 inch (1.19 mm)] steel, COmPIying with ASTM A653SS, Grade 33. The gaIvanized coating compiies with
ASTM A924. See Figure 2 fo「 dimensions of the
MetaIStudC「ete connecto「.
2・2・3 Concrete: The conc「ete facing is no「ma」Weight
COnC「ete COmPIying with the p「ovisions of IBC Chapter 19
O「 IRC Section R402.2, aS aPP=cable. The minimum
COmPreSSive strength, f6, muSt be 2,500 psi (17.2 MPa) at
28 days.
2・2"4 Steei Reinfo「cement: Conc「ete panels must be
「einforced in a∞O「dance with the st「ucturaI design, a=d the
Steel 「einfo「∞ment muSt COmPly with the iBC.
2,2.5 Screws: The MetaIStudC「ete connector must be
atfached to the stud using galvanjzed, Seif-d輔ng, SeIf-
tapping sheet metal screws confo「ming to SAE J78 and
AiSi CF 92-1. Table l shows caiculated a=owable shea「
Values for various sc「ew sizes fo「 the stud st「ip attached to
Va「IOuS thicknesses of stud. The vaiues have been
calculated using a factor of safety of 3.O and the gene「al
fastene「 formulas given in the cu「rent edition of the AISi
COld formed steei design manual, “North Ame「ican
Specification for the Design of CoId Formed Steel
Structu「ai Membe「s・’’Screw manufactu「er,s design vaiues
must be deveIoped using the test provisions of the
SPeCification. The design engineer must calcuiate the
Shear, Pullout and tension 「equi「ements and seIect a screw
Which has su簡cjent capacity.
2.3 Design:
The paneIs a「e designed using the accepted enginee「i=g
P「inciples of transfo「med section p「operties and a=owable
StreSS design. The design mus=nciude conslde「ation of
Ijght-gage Steel desjgn 「equi「ements specified in the
Specification fo「 Design of Cold-fo「med Steel Structu「aI
Membe「s, Published by the Ame「ican l「on and Steel
lnstitute. Additionaliy言he design must consider the shear
flow capacity, q, Of the comection between the
MetaIStudCrete ∞nnectO「 and the steeI stud, and the
Shea「 flow capacity, q, Of the connection between the
MetalStudC「ete comecto「 and the ∞nCrete. The design
must aIso consider the strength and serviceabi=ty of the
CO nC「ete.
The shear ¶ow capacity of the MetaIStudC「ete comector
embedded in mininum 2,5OO psi (17.2 MPa) concrete,
havjng a m面mum thickness of牛/2 inches (38 mm)言S 62O
POunds pe「 =neaI foot (9052 Nlm). Refe「 to Table 2 fo「
Shea「 flow capacity, q, Of the MetalStudCrete comecto「
embedded in conc「ete of othe「 strengths. Refe「 to Tabie l
for the shea「 flow capac時 q, Of the MetaiStudC「ete
COnnectOr fastened to a steeI stud.
roC-郎Eval“a/′On R呼orts c're 7’0/ ′0 be co脚励edos rqresen/′ng ae融e′JCS Or叩y O‘her a仰b“′e踊0‘やec!舶/4)′の九九essed ”Or are /砂Io be cons融ed
as on m。orsemen/ dvんe s均ecI Qrlhe r‘pOγI or 。 reCO棚e履z#onjZ)r JIs ase Z7,ere ′S ”O Waγ′t’砂d画fC Evc'んa′,On Sen,’Ce, ZJ,C, eやreSS Or ′叩/一ed膏s
/O a′少の肋ng oγ Olher mlleγ面h′S γや,r4 or as 10 a′ayprOd′C/ COVered dy, /he γ印Or/.
Copyright ◎ 2020 1CC EvaIuation Servi∞, LLC. All rights reserved. Page l of4
ESR-2511 1 Most MdelyAccepted and 7+usted Page 2 of4
The pu=-Out CaPaCity of the MetalStudC「ete connector
embedded in conc「ete having a minimum thickness of牛/2
inches (38 mm) is shown in Tabie 3.
The axiai-1oad capacity of the ∞mPOSite panei must be a
function of the capacity of the steeI studs only. The
transve「Se load capacity of the composite pane=s based
On the transfo「med section of the composite steel stud and
CO n Crete.
Conc「ete p「otection fo「 「einfo「Cement muSt COmPly with
the iBC.
2.4 Fabrication:
The panels may be fabricated at the jobsite or at
manufactu「ing locations app「oved by Composite Bu脚ng
Systems言nc., and ICC-ES.
丁he MetaIStudCrete shea「 t「ansfe「 connectors are
fab「jcated at manufactu「ing locations app「oved by
Composite Bu咽ng Systems, lnc., and lCC-ES.
Fab「ication of paneis at the jobsite must be witnessed by
a speciaI inspecto「 app「oved by the buiiding o怖ciai in
ac∞「dance with Chapter 17 of the iBC. AIte「nativeIy,
Periodic speciai inspection is pe「mitted in acco「dance with
Sections1704 and 1705 of the lBC. 1n eithe「 case, the
SPeCia=nspector must submit a finai signed 「eport to the
bu胴ng o緬ciaI, Stating tha=he wo「k 「equiring special
inspection was conducted in confo「mance with the
approved pians and specifications, and the applicable
WO「kmanship p「OVisions of the iBC.
Offsite fabrication of panels must be by approved
fab「icators compIying with Section 1704.2.5.2 of the 2012
1BC, and Section 1704.2.2 of the 2009 and 2006旧C, aS
app=cable.
2,5 1nsta=ation:
The paneIs a「e insta=ed in a∞O「dan∞ With the app「oved
design d「awings and specifications.
2。6 1dentificationこ
2,6.1 The steeI studs a「e iden輔ed in acco「dance with
their 「espective evaluation reports. When the
MetalStudCrete ∞mectO「 is de=vered to the jobsite fo「
field fa師cation of the paneIs, the strip bears a stamp
identifying the product as MetalStudCrete, a問i the
manufactu「e「 as Composite Bu脚ng Systems, lnc. The
StamP aIso includes仙e evaiuation 「eport numbe「 (ESR-
2511).
2.6.2 The 「eport hoider’s contact information js the
fa川owi ng ’
COMPOSiTE BUILDiNG SYSTEMS, iNC.
938 SOUTH ORANGE GROVE BOULE¥IARD, UNIT A
PASADENA, CALIFORNIA 91 105
(818) 6064703WWW.metalcrete・COm
3.O EViDENCE SUBMITTED
Reports of st「uctu「a=oad tests; CaIoulations; and =terature.
4.O FINDINGS
The MetalStudCrete@ (MSC) Shear Transfer Strip
COnneCtor described in this report comp=es with the ∞des
listed in Section l.0, Subject to the fo=owing ∞nC圃OnS:
4"1 Caicuiattons and pIans fo「仙e ∞mPOSite panels a「e
Submitted to the bu冊ng offlciaI fo「 app「ova上
CaIcuIatione must be signed by a 「egistered design
P「Ofessional when 「equired by the sta山tes of the
j両Sdiction in which the paneIs a「e insta=ed.
4,2 Composite paneIs a「e instalIed in ac∞rdance with the
app「OVed desjgn drawings and specmcations.
4"3 Composite paneIs a「e fa上面Cated in accordance w軸
Section 2.4 of this evaIuation report.
This 「epo印s subject to rerexaminatien in one yea「.
SCREWSIZE �META」STUD ��CAPACiTY PERSCREW �AしLOWABしESHEARF」OW,q(PIf)1
YieIdStrength, �Thickness ��12incheso,C. �8incheso.c. �6incheso,C. �4incheso.c,
句(ksi) �(盲nch) �(Pounds)
SeIトd「輔ng,Selト tappingsheet metalsc「ew (0.164-inch Shankdiamete「) �33 �0.0283 �121 �121 �182 �242 �363 33 �0.0346 �164 �164 �246 �328 �492
33 �0.0451 �244 �244 �366 �488 �732
50 �0.0566 �300 �300 �450 �600 �900
50 �0.0713 �300 �300 �450 �600 �900
50 �0.1017 �300 �300 �450 �600 �900
看 SeIf-d珊ng,Selト tappingsheet metaIscrew (0.190-inch Shankdiamete「) �33 �0.0283 �131 �131 �197 �262 �393
33 �0.0346 �17了 �177 �266 �354 �531
33 �0.0451 �263 �263 �395 �526 �789
50 �0.0566 �347 �347 �521 �694 �1,041
50 �0.0713 �347 �347 �521 �694 �1,041
50 �0.1017 �347 �347 �521 �694 �1,041
Fo「Si:1jnch=25.4mm,1pound/foot=14.6N/m,1 ���ksi=6.89MPa,1pound=4.45N.
ESR-2511 1 Most W7de小Acc印ted and 77.usted Page 3 of4
CONCR訂ECOIVIPRESSIVESTRENGTH,/。(psi) �A」LOWABLESHEARFLOW,q(pif)
2,500 �620
3,000 �680
3,500 �735
4,000 �785
4,500 �830
5,000 �875
5,500 �920
6,000 �960
6,500 �1,000
7,000 �1,040
8,000 �1,110
9,000 �1,175
10,000 �1,240
Fo「SI:1psi=6.89kPa,1pound川oot=14.6NIm.
CONCRETECOMPRESSIVESTRENGTH,f七(PSi) �A」」OWABしEPU」L-OUTCAPACITY(P叩
2,500 �150
3,000 �165
3,500 �185
4,000 �200
4,500 �220
Fo「SI:1psi=6.89kPa,1pound/foot=14.6N/m.
ESR-2511 1 Mbst Mde小Accepted and 77t/Sted Page 4 of4