lCC-ES Evaluation Rep⑱醍 匡$醍国難明月 Reissued October 2 77Jis reporf is subiect fo renewa WWW.icc-eS"O「鋼l (800) 423-6587 I (562) 699巾543 A Subs肋 DiVISION: 03 OO OO-CONCRETE Section: 03 21 00-Reinforcing SteeI REPORT HOしDER: COMPOSiTE BUl」DING SYSTE州S, INC, EVALUAT看ON SUBJECT: MetaiStudC「ete⑪ (MSC〉 SHEAR TRANSFER STRiP l,O EVALUATION SCOPE Compliance with the following codes: " 2015, 2012, 2009 and 2006 hfemafronaI Bui/ding Code⑲ (IBC) 看2015, 2012, 2009 and 2006 /ntemaf/Ona/ Residen存aI Code⑪ (IRC) Prope舶es evaiuated: St「ucturai 2.O DESCRiPTiON 2.1 General: MetaiStudC「ete is a lighトgage steei connector strip used to t「ansfe「 Shea「 st「esses in composite paneI systems used as a「chitectu「al ciadding. The use of the st「ip is not =mited to any seismic design catego「y. The composite PaneIs consist of Iight-gage SteeI studs and a 「einfo「ced COnC「ete facing o「 topping on one side of the studs, With the MetaIStudC「ete metaI connector p「oviding a sheaト¶ow COnneCtion between the steeI studs and the conc「ete. See Figu「e l for a typieaI panel const「ucted with the MetaiStudC 「ete comector strip. 2.2 Mate「iaIs: 2.2,1 Steei Studs: Whe「e the MetaIStudC「ete comecto「 iS uSed, Steei studs in ∞mPOSite paneis must be recognized in a cu「「ent lCC-ES evaIuation report. PhysicaI and section p「operties are found in the evaiuation report on the steel stud. Minimum steel thickness and yieId st「ength fo「 the studs must compiy with TabIe l ofthis 「eport. 2,2,2 MetaiStudCrete Connecto「: The MetaIStudCrete COmectO「 t「anSfe「s shea「 st「esses between the concrete faci=g and the lighトgage steel stud. The strip is fastened to the web o「 flange of the stud and the ¶ange of the t「ack, and the st「ip/flange is then embedded into the concrete facing. The st「ip is fab「icated f「om No. 18 gage [0.047 inch (1.19 mm)] steel, COmPIying with ASTM A653 SS, Grade 33. The gaIvanized coating compiies with ASTM A924. See Figure 2 fo「 dim MetaIStudC「ete connecto「. 2・2・3 Concrete: The conc「ete facing COnC「ete COmPIying with the p「ovision O「 IRC Section R402.2, aS aPP=c COmPreSSive strength, f6, muSt be 2, 28 days. 2・2"4 Steei Reinfo「cement: Conc「et 「einforced in a∞O「dance with the st「uctu Steel 「einfo「∞ment muSt COmPly with the 2,2.5 Screws: The MetaIStudC「ete atfached to the stud using galvanjze tapping sheet metal screws confo「m AiSi CF 92-1. Table l shows caicula Values for various sc「ew sizes fo「 the st Va「IOuS thicknesses of stud. The calculated using a factor of safety of fastene「 formulas given in the cu「rent COld formed steei design manual, Specification for the Design of Structu「ai Membe「s・’’Screw manufactu「er must be deveIoped using the test SPeCification. The design engineer Shear, Pullout and tension 「equi「ement Which has su簡cjent capacity. 2.3 Design: The paneIs a「e designed using the ac P「inciples of transfo「med section p「op StreSS design. The design mus=nciud Ijght-gage Steel desjgn 「equi「ement Specification fo「 Design of Cold-fo「me Membe「s, Published by the Ame「ica lnstitute. Additionaliy言he design mus flow capacity, q, Of the comec MetaIStudCrete ∞nnectO「 and the st Shea「 flow capacity, q, Of the conn MetalStudC「ete comecto「 and the ∞nC must aIso consider the strength and CO nC「ete. The shear ¶ow capacity of the MetaI embedded in mininum 2,5OO psi (1 havjng a m面mum thickness of牛/2 inch POunds pe「 =neaI foot (9052 Nlm). Ref Shea「 flow capacity, q, Of the Metal embedded in conc「ete of othe「 strengths for the shea「 flow capac時 q, Of the COnnectOr fastened to a steeI stud. roC-郎Eval“a/′On R呼orts c're 7’0/ ′0 be co脚励edos rqresen/′ng ae融e′JCS Or叩y O‘her a仰b“′e踊0‘やec!舶/4)′の九九 as on m。orsemen/ dvんe s均ecI Qrlhe r‘pOγI or 。 reCO棚e履z#onjZ)r JIs ase Z7,ere ′S ”O Waγ′t’砂d画fC Evc'んa′,O /O a′少の肋ng oγ Olher mlleγ面h′S γや,r4 or as 10 a′ayprOd′C/ COVered dy, /he γ印Or/. Copyright ◎ 2020 1CC EvaIuation Servi∞, LLC. All rights reserved. Page l of4

Upload: others

Post on 09-Mar-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: lCC-ES Evaluation Rep⑱醍 匡$醍国難明月 · 2020. 11. 10. · " 2015, 2012, 2009 and 2006 hfemafronaI Bui/ding Code⑲ (IBC) 看2015, 2012, 2009 and 2006 /ntemaf/Ona/ Residen存aI

lCC-ES Evaluation Rep⑱醍 匡$醍国難明月

Reissued October 2020

77Jis reporf is subiect fo renewaI October 2021.

WWW.icc-eS"O「鋼l (800) 423-6587 I (562) 699巾543 A Subs肋aryofme /nfematわna/ Code Counc〃⑧

DiVISION: 03 OO OO-CONCRETE

Section: 03 21 00-Reinforcing SteeI

REPORT HOしDER:

COMPOSiTE BUl」DING SYSTE州S, INC,

EVALUAT看ON SUBJECT:

MetaiStudC「ete⑪ (MSC〉 SHEAR TRANSFER STRiP

l,O EVALUATION SCOPE

Compliance with the following codes:

" 2015, 2012, 2009 and 2006 hfemafronaI Bui/ding

Code⑲ (IBC)

看2015, 2012, 2009 and 2006 /ntemaf/Ona/ Residen存aI

Code⑪ (IRC)

Prope舶es evaiuated:

St「ucturai

2.O DESCRiPTiON

2.1 General:

MetaiStudC「ete is a lighトgage steei connector strip used

to t「ansfe「 Shea「 st「esses in composite paneI systems

used as a「chitectu「al ciadding. The use of the st「ip is not

=mited to any seismic design catego「y. The composite

PaneIs consist of Iight-gage SteeI studs and a 「einfo「ced

COnC「ete facing o「 topping on one side of the studs, With

the MetaIStudC「ete metaI connector p「oviding a sheaト¶ow

COnneCtion between the steeI studs and the conc「ete. See

Figu「e l for a typieaI panel const「ucted with the

MetaiStudC 「ete comector strip.

2.2 Mate「iaIs:

2.2,1 Steei Studs: Whe「e the MetaIStudC「ete comecto「

iS uSed, Steei studs in ∞mPOSite paneis must be

recognized in a cu「「ent lCC-ES evaIuation report. PhysicaI

and section p「operties are found in the evaiuation report on

the steel stud. Minimum steel thickness and yieId st「ength

fo「 the studs must compiy with TabIe l ofthis 「eport.

2,2,2 MetaiStudCrete Connecto「: The MetaIStudCrete

COmectO「 t「anSfe「s shea「 st「esses between the concrete

faci=g and the lighトgage steel stud. The strip is fastened to

the web o「 flange of the stud and the ¶ange of the t「ack,

and the st「ip/flange is then embedded into the concrete

facing. The st「ip is fab「icated f「om No. 18 gage

[0.047 inch (1.19 mm)] steel, COmPIying with ASTM A653SS, Grade 33. The gaIvanized coating compiies with

ASTM A924. See Figure 2 fo「 dimensions of the

MetaIStudC「ete connecto「.

2・2・3 Concrete: The conc「ete facing is no「ma」Weight

COnC「ete COmPIying with the p「ovisions of IBC Chapter 19

O「 IRC Section R402.2, aS aPP=cable. The minimum

COmPreSSive strength, f6, muSt be 2,500 psi (17.2 MPa) at

28 days.

2・2"4 Steei Reinfo「cement: Conc「ete panels must be

「einforced in a∞O「dance with the st「ucturaI design, a=d the

Steel 「einfo「∞ment muSt COmPly with the iBC.

2,2.5 Screws: The MetaIStudC「ete connector must be

atfached to the stud using galvanjzed, Seif-d輔ng, SeIf-

tapping sheet metal screws confo「ming to SAE J78 and

AiSi CF 92-1. Table l shows caiculated a=owable shea「

Values for various sc「ew sizes fo「 the stud st「ip attached to

Va「IOuS thicknesses of stud. The vaiues have been

calculated using a factor of safety of 3.O and the gene「al

fastene「 formulas given in the cu「rent edition of the AISi

COld formed steei design manual, “North Ame「ican

Specification for the Design of CoId Formed Steel

Structu「ai Membe「s・’’Screw manufactu「er,s design vaiues

must be deveIoped using the test provisions of the

SPeCification. The design engineer must calcuiate the

Shear, Pullout and tension 「equi「ements and seIect a screw

Which has su簡cjent capacity.

2.3 Design:

The paneIs a「e designed using the accepted enginee「i=g

P「inciples of transfo「med section p「operties and a=owable

StreSS design. The design mus=nciude conslde「ation of

Ijght-gage Steel desjgn 「equi「ements specified in the

Specification fo「 Design of Cold-fo「med Steel Structu「aI

Membe「s, Published by the Ame「ican l「on and Steel

lnstitute. Additionaliy言he design must consider the shear

flow capacity, q, Of the comection between the

MetaIStudCrete ∞nnectO「 and the steeI stud, and the

Shea「 flow capacity, q, Of the connection between the

MetalStudC「ete comecto「 and the ∞nCrete. The design

must aIso consider the strength and serviceabi=ty of the

CO nC「ete.

The shear ¶ow capacity of the MetaIStudC「ete comector

embedded in mininum 2,5OO psi (17.2 MPa) concrete,

havjng a m面mum thickness of牛/2 inches (38 mm)言S 62O

POunds pe「 =neaI foot (9052 Nlm). Refe「 to Table 2 fo「

Shea「 flow capacity, q, Of the MetalStudCrete comecto「

embedded in conc「ete of othe「 strengths. Refe「 to Tabie l

for the shea「 flow capac時 q, Of the MetaiStudC「ete

COnnectOr fastened to a steeI stud.

roC-郎Eval“a/′On R呼orts c're 7’0/ ′0 be co脚励edos rqresen/′ng ae融e′JCS Or叩y O‘her a仰b“′e踊0‘やec!舶/4)′の九九essed ”Or are /砂Io be cons融ed

as on m。orsemen/ dvんe s均ecI Qrlhe r‘pOγI or 。 reCO棚e履z#onjZ)r JIs ase Z7,ere ′S ”O Waγ′t’砂d画fC Evc'んa′,On Sen,’Ce, ZJ,C, eやreSS Or ′叩/一ed膏s

/O a′少の肋ng oγ Olher mlleγ面h′S γや,r4 or as 10 a′ayprOd′C/ COVered dy, /he γ印Or/.

Copyright ◎ 2020 1CC EvaIuation Servi∞, LLC. All rights reserved. Page l of4

Page 2: lCC-ES Evaluation Rep⑱醍 匡$醍国難明月 · 2020. 11. 10. · " 2015, 2012, 2009 and 2006 hfemafronaI Bui/ding Code⑲ (IBC) 看2015, 2012, 2009 and 2006 /ntemaf/Ona/ Residen存aI

ESR-2511 1 Most MdelyAccepted and 7+usted Page 2 of4

The pu=-Out CaPaCity of the MetalStudC「ete connector

embedded in conc「ete having a minimum thickness of牛/2

inches (38 mm) is shown in Tabie 3.

The axiai-1oad capacity of the ∞mPOSite panei must be a

function of the capacity of the steeI studs only. The

transve「Se load capacity of the composite pane=s based

On the transfo「med section of the composite steel stud and

CO n Crete.

Conc「ete p「otection fo「 「einfo「Cement muSt COmPly with

the iBC.

2.4 Fabrication:

The panels may be fabricated at the jobsite or at

manufactu「ing locations app「oved by Composite Bu脚ng

Systems言nc., and ICC-ES.

丁he MetaIStudCrete shea「 t「ansfe「 connectors are

fab「jcated at manufactu「ing locations app「oved by

Composite Bu咽ng Systems, lnc., and lCC-ES.

Fab「ication of paneis at the jobsite must be witnessed by

a speciaI inspecto「 app「oved by the buiiding o怖ciai in

ac∞「dance with Chapter 17 of the iBC. AIte「nativeIy,

Periodic speciai inspection is pe「mitted in acco「dance with

Sections1704 and 1705 of the lBC. 1n eithe「 case, the

SPeCia=nspector must submit a finai signed 「eport to the

bu胴ng o緬ciaI, Stating tha=he wo「k 「equiring special

inspection was conducted in confo「mance with the

approved pians and specifications, and the applicable

WO「kmanship p「OVisions of the iBC.

Offsite fabrication of panels must be by approved

fab「icators compIying with Section 1704.2.5.2 of the 2012

1BC, and Section 1704.2.2 of the 2009 and 2006旧C, aS

app=cable.

2,5 1nsta=ation:

The paneIs a「e insta=ed in a∞O「dan∞ With the app「oved

design d「awings and specifications.

2。6 1dentificationこ

2,6.1 The steeI studs a「e iden輔ed in acco「dance with

their 「espective evaluation reports. When the

MetalStudCrete ∞mectO「 is de=vered to the jobsite fo「

field fa師cation of the paneIs, the strip bears a stamp

identifying the product as MetalStudCrete, a問i the

manufactu「e「 as Composite Bu脚ng Systems, lnc. The

StamP aIso includes仙e evaiuation 「eport numbe「 (ESR-

2511).

2.6.2 The 「eport hoider’s contact information js the

fa川owi ng ’

COMPOSiTE BUILDiNG SYSTEMS, iNC.

938 SOUTH ORANGE GROVE BOULE¥IARD, UNIT A

PASADENA, CALIFORNIA 91 105

(818) 6064703WWW.metalcrete・COm

3.O EViDENCE SUBMITTED

Reports of st「uctu「a=oad tests; CaIoulations; and =terature.

4.O FINDINGS

The MetalStudCrete@ (MSC) Shear Transfer Strip

COnneCtor described in this report comp=es with the ∞des

listed in Section l.0, Subject to the fo=owing ∞nC圃OnS:

4"1 Caicuiattons and pIans fo「仙e ∞mPOSite panels a「e

Submitted to the bu冊ng offlciaI fo「 app「ova上

CaIcuIatione must be signed by a 「egistered design

P「Ofessional when 「equired by the sta山tes of the

j両Sdiction in which the paneIs a「e insta=ed.

4,2 Composite paneIs a「e instalIed in ac∞rdance with the

app「OVed desjgn drawings and specmcations.

4"3 Composite paneIs a「e fa上面Cated in accordance w軸

Section 2.4 of this evaIuation report.

This 「epo印s subject to rerexaminatien in one yea「.

SCREWSIZE �META」STUD ��CAPACiTY PERSCREW �AしLOWABしESHEARF」OW,q(PIf)1

YieIdStrength, �Thickness ��12incheso,C. �8incheso.c. �6incheso,C. �4incheso.c,

句(ksi) �(盲nch) �(Pounds)

SeIトd「輔ng,Selト tappingsheet metalsc「ew (0.164-inch Shankdiamete「) �33 �0.0283 �121 �121 �182 �242 �363 33 �0.0346 �164 �164 �246 �328 �492

33 �0.0451 �244 �244 �366 �488 �732

50 �0.0566 �300 �300 �450 �600 �900

50 �0.0713 �300 �300 �450 �600 �900

50 �0.1017 �300 �300 �450 �600 �900

看 SeIf-d珊ng,Selト tappingsheet metaIscrew (0.190-inch Shankdiamete「) �33 �0.0283 �131 �131 �197 �262 �393

33 �0.0346 �17了 �177 �266 �354 �531

33 �0.0451 �263 �263 �395 �526 �789

50 �0.0566 �347 �347 �521 �694 �1,041

50 �0.0713 �347 �347 �521 �694 �1,041

50 �0.1017 �347 �347 �521 �694 �1,041

Fo「Si:1jnch=25.4mm,1pound/foot=14.6N/m,1 ���ksi=6.89MPa,1pound=4.45N.

Page 3: lCC-ES Evaluation Rep⑱醍 匡$醍国難明月 · 2020. 11. 10. · " 2015, 2012, 2009 and 2006 hfemafronaI Bui/ding Code⑲ (IBC) 看2015, 2012, 2009 and 2006 /ntemaf/Ona/ Residen存aI

ESR-2511 1 Most W7de小Acc印ted and 77.usted Page 3 of4

CONCR訂ECOIVIPRESSIVESTRENGTH,/。(psi) �A」LOWABLESHEARFLOW,q(pif)

2,500 �620

3,000 �680

3,500 �735

4,000 �785

4,500 �830

5,000 �875

5,500 �920

6,000 �960

6,500 �1,000

7,000 �1,040

8,000 �1,110

9,000 �1,175

10,000 �1,240

Fo「SI:1psi=6.89kPa,1pound川oot=14.6NIm.

CONCRETECOMPRESSIVESTRENGTH,f七(PSi) �A」」OWABしEPU」L-OUTCAPACITY(P叩

2,500 �150

3,000 �165

3,500 �185

4,000 �200

4,500 �220

Fo「SI:1psi=6.89kPa,1pound/foot=14.6N/m.

Page 4: lCC-ES Evaluation Rep⑱醍 匡$醍国難明月 · 2020. 11. 10. · " 2015, 2012, 2009 and 2006 hfemafronaI Bui/ding Code⑲ (IBC) 看2015, 2012, 2009 and 2006 /ntemaf/Ona/ Residen存aI