recap clamp installation
DESCRIPTION
Recap Clamp Installation. RIKEN/RBRC Itaru Nakagawa. @RIKEN. @BNL. Clamp Schedule. Delivered to BNL. Octant-7 Clamp Status. Octant 7. 3710. 3710. 3710. 3711. 3711. 3711. 1-pin type . 1A. 3712. 1B. 3712. The dry air cover installed to here. 1B. 3713. 3713. - PowerPoint PPT PresentationTRANSCRIPT
1
Recap Clamp Installation
RIKEN/RBRCItaru Nakagawa
Clamp Schedule3 4 5 6 7 8 9 10 11
40 clamps production40 clamps Install 6/15Humidity Test @ test benchDesign Review 5/16 Basically OK, except for a few homework
Humidity test @ 1008Procurement BidProduction
Partial Delivery
QAInstall
Delivered to BNL
@RIKEN @BNL
2
3
Octant-7 Clamp Status
Octant 7
37103710
37103711
37113711
37123712
37133713
1-pin type 1A
1B
The dry air cover installed to here 1B
4
Octant-8 Clamp Status
Octant 8
38103810
38103811
38113811
38123812
38133813
Conductive Rubber Type
4-pin type
1B
2A2B
1A
1B
2A
5
Design Number of ClampsRubber Type 34-pins 31-pin 31-pin Old Design 281-pin New Design 8
Pre-installed
Idendical
6
38143814
38143815
38153815
38163816
38173817
40 Clamps Install(north St-3, oct7&oct8)
Octant 8
38103810
38103811
38113811
38123812
38133813
Max 20 clamps /gap
37143714
37143715
37153715
37163716
37173717
Octant 7
37103710
37103711
37113711
37123712
37133713
To be installed during nextmaintenance day on June 15to bottom region of Oct-7&8.
Old Design x 10
Old
Des
ign
x 11
Dry Air Coverx 8
Old Design x 10New
Des
ign
x 84p
in x
3
1A 1B 2A 2B
7
Dry Air Cover
Octant 7
37103710
37103711
37113711
37123712
37133713
Manifold -> Requested to Carter
10 additional dry air covers to be installed
Flow rate100ccm/clamp?
8
40 Clamps Install Man Power
Sanghwa, Kiyoshi@BNL
Itaru@BNLYoshimitsu@BNL
Maintenance Day
clamp Install
Hideyuki@BNL
Yoshimitsu@BNL~7/5
Sanghwa Park (SNU)
Yoshimitsu Imazu Yoshimitsu will stay in BNL until the end of Run11 just in case.
9
6/15 Access Day Install• Work plan is discussed in DC (June 8).• Itaru, Yoshimitu, Sangwha, and Hideyuki will work on install.
(All confined space trained)• Requested 8 hours access to CAD via Takao (RC).• Work permit, confined space survey are arranged. (Don Lynch).• Install as many as possible clamps up to 40 clamps.• Need to monitor stable condition for 1~2 hours after
completion of the installation until the hall close. • Successful contact rate, drawing current w/ HV will be closely
monitored during/after installation.• A new AC readout clamp is to be tested w/ anode calibration
pulse and a pulser input from the center cathode cable.
Installation Procedure (1)1. Take HV current snapshot.2. Remove Preinstalled
Clamps from Gap-0.3. Install new clamps to Gap-
1.4. Install clamps to Gap-0.
Oct-8
Oct-7
11
Installation Procedure (2)1. Inspect target anode pads and record
damaged/missing pad channels. 2. Apply conformal coating.3. Plug-in V-readout pins to a clamp.4. Mount the clamp.5. Record V-readouts. Try unscrew and
screw if contact is fragile.6. Remove V readout pins.7. Ramp up HV every 2 clamps install and
check drawing current.8. (Mount dry air cover)
12
Recording ContactsDamaged/missing pad
Damaged/missing resister
13
Material ReadinessQuantity Status
Pig Tail
2M Terminals 40 Mounted by default
2M Screws 100 Provided by F. Toldo
GND Holder 40 x 2 Manufactured by F. Toldo
Hex screwwrench
Regular 5 Delivered
Torque 1 To be delivered to RIKEN
Dry Air Cover
Manifold 1 AvailableAdupter 10 Ordered by Carter
AC Readout
New Board 1 DeliveredReadout cable 50
(long+short)Delivered
Pocket pulser 2 Delivered to RBRC
Cathode cable adupter
1 Custom made by Yoshimitsu
Oscilloscope 1 Available in 1008Inspection Fiber Scope 1 In test bench
Conformal coating+brush
14
Preparation
• Assemble GND Holders• Make/repair V readout
boards– 2 boards w/ long pins✔– 1 board w/ short pins ✔
(for AC readout)
6/13 ~ 14 @ 1008
15
AC ReadoutHV side
GND side
HV side
GND side
DC Voltage Readout
AC Voltage ReadoutOne AC readout clamp will be available for test on June 15th.