service management status 106 th accu meeting 02 december 2014

18
Service Management Status 106 th ACCU Meeting 02 December 2014

Upload: ethan-ball

Post on 13-Jan-2016

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Service Management Status 106 th ACCU Meeting 02 December 2014

Service Management Status106th ACCU Meeting

02 December 2014

Page 2: Service Management Status 106 th ACCU Meeting 02 December 2014

Agenda

• Service Report (Performance, Availability, Customer Satisfaction, Complaints, Service Review Meetings)

• More info on impact budget cut for 2015• Report on ‘projects’• Miscellaneous

Page 3: Service Management Status 106 th ACCU Meeting 02 December 2014

Service Report- Volumes have risen ~12% this year

Page 4: Service Management Status 106 th ACCU Meeting 02 December 2014

Service Desk Satisfaction Survey

“Empty” corresponds to “GUEST”

The survey was launched on the 1st of October 2014.

This will be a continuous process

Scope: tickets resolved by the Service Desk

679 surveys send,

293 surveys completed, of which189 surveys completed by Users

Results: 4 being the best rating.

Page 5: Service Management Status 106 th ACCU Meeting 02 December 2014

Service Review Meetings Between key customers and service providers• Following service management good practice

(ISO20k)• Standard Format• Short (<1.5 hours)• Once or twice a year

Page 6: Service Management Status 106 th ACCU Meeting 02 December 2014

Report on 1st Hotel Service Review• https://indico.cern.ch/event/346999/

Page 7: Service Management Status 106 th ACCU Meeting 02 December 2014

Report on 1st Hotel Service Review• Format: appreciated by stakeholders• Content highlights:

• It was announced that the 5th floor building 38 is possibly not available till September 2015 35 rooms less during summer 2015!HOWEVER:After further clarification: the contractual delay will be the 15th of June; GS-SE prefers to take a ‘prudent’ approach and add 2 months of ‘contingency’ for one floorThe contract contains penalty clauses for the contractor which should help push the contractor to respect the deadlines.

• Multi year renovation plan impacts capacity.• Mitigation:

• Works are staged and scheduled in order to maintain hotel capacity (and corresponding revenues) as high as possible (and work around summer peaks)

• The hotel service will actively look for alternative capacity to reduce the impact.

• List of Actions: https://indico.cern.ch/event/346999/material/1/1.pdf

Page 8: Service Management Status 106 th ACCU Meeting 02 December 2014

Report on ‘projects’• Access control, parking and road safety

• Impact of OC2• Stickers&Parking

• Radar data collection• Route FEYNMAN reconfiguration

Page 9: Service Management Status 106 th ACCU Meeting 02 December 2014

OC2; some highlights• Art 21:

• “Other categories of vehicles, notably caravans, trailers, quadbikes, boats and aircraft, shall not be authorised.”

• In the event of non-compliance with the rules or if necessary for the proper functioning of the Organization, a vehicle may be moved without the prior agreement of the owner at his expense.

• § 21 of the Circular - Implementation measures relating to vehicle identification, road traffic and parking

• Ad hoc measures are put in place for ‘exceptional cases’ (we are flexible and reasonable).

Page 10: Service Management Status 106 th ACCU Meeting 02 December 2014

Parking• Parking issues complicate the daily lives of regular users of CERN. • These issues are:

• Abandoned vehicles that occupy parking space on the site• Uncoordinated long term parking, resulting in places in high demand being blocked for long periods• Asocial behavior that can result in risks to others (parking at emergency exits, pedestrian crossings,

handicapped parkings, or ‘dangerous places’).

• CERN will introduce measures to gradually tackle these issues, starting early 2015; this could involve• Moving ‘long parked’ vehicles to dedicated long term parking zones• Removal of wrecks from the site• Moving vehicles to a ‘fourrière’ site at CERN (in case of “serious acts”)

• The focus is on prevention, not punishment

• Rules for parking: https://admin-eguide.web.cern.ch/en/procedure/road-traffic-and-parking-regulations-cern-site

Page 11: Service Management Status 106 th ACCU Meeting 02 December 2014

‘Radar’• Speed measurement campaign 20 to 31 October 2014, Meyrin and Prevessin. • “Cyclope” radar, loan from Belgian company SIRIEN (one of the market leaders) 

• Results: 7770 measures• Max speed 83.24 km/h (where limit was 50), and 52.49 km/h (where limit was 30).• 22% are exceeding the limit.• More speeding at Meyrin (but radar at Prevessin was very visible).• 30 km/h Limits largely ignored.

• The results are shared with HSE and the mobility working group for follow up action

Page 12: Service Management Status 106 th ACCU Meeting 02 December 2014

Radar detailsLocation Average # # Excess % Excess Max Speed           

Overall results 40,79 7770 1721 22,1% 83,24Meyrin 41,29 6617 1607 24,3% 83,24Prevessin 37,94 1153 114 9,9% 75,01

Route Einstein 41,11 1320 274 20,8% 77.56

Route Bohr 34,28 1684 44 2,6% 72,35Route Democrite 46,89 2557 902 35,3% 83,24Route Adams 38,10 1119 113 10,1% 75,01Route Wu 33,54 106 1 0,9% 54,25Route Rutherford (30km/h) 33,53 170 110 64,7% 52,49Route Marie Curie 33,60 134 1 0,7% 51,58

Route Weisskopf 45,34 211 67 31,8% 75,01Route Schrodinger 44,79 64 23 35,9% 79,83Route Feynman 42,98 287 79 27,5% 67,95Tunnel (30km/h) 33,59 148 106 71,6% 47,54

Page 13: Service Management Status 106 th ACCU Meeting 02 December 2014

Accident prone areas

Final change proposals accepted:

18/12/2014 final costing: Implementation 2015

ROUTE FEYNMAN

Page 14: Service Management Status 106 th ACCU Meeting 02 December 2014

Report on ‘projects’• Library upgrade

• Currently the project is on hold since it has not been possible to agree on a plan to free the offices in 52-R needed for the project.

• If the space is free by Q2 2015; Implementation Q3 2015 still feasible

• “Place des Particules”:• The project is still waiting a new planning from the Geneva authorities. • No works will start before March 2015.

• Globe renovation• Will be done during summer 2015; Globe will be closed• Visits service is well aware of microcosm and globe refurbishment project plans and does

anything possible to mitigate the impact.

• Building 107• The worksite is closed. Works are being carried out to re-open the road by the beginning

of 2015 to reduce the impact on traffic around the site (the worksite remains closed).

Page 15: Service Management Status 106 th ACCU Meeting 02 December 2014

More info on impact budget cut• 5% Cut on operational budget 2015 (and beyond)• We’ll do all we can to minimize immediate impact on users• Priority on LHC and Safety• Known impact (apart from announced reductions in equipment renewal and

preventive maintenance as long as compatible with legal framework)

• Shuttle Service• Cleaning Service• Water bottle distribution Service• Library Service

Page 16: Service Management Status 106 th ACCU Meeting 02 December 2014

Reduction of Services Details• SHUTTLE SERVICE:

• Replace circuit 6 (Meyrin/Prevessin/Meyrin) (13 rotations per day)by2 additional rotations for circuit 2 (Meyrin/Prevessin/Meyrin) – early in the morning and later in the afternoon;

• Reduction of # of rotations for circuit 1 (Meyrin) - no more service during lunchtime• 2 instead of 3 drivers in the permanent pool (08h30-17h30)

• If extra resources needed this will be recharged to the requestor(if a driver and a CERN shuttle are available or outside service working hours)

• If no CERN shuttle available nor a driver: 2 options• External transportation contract (Helvetie)• Taxi credit vouchers: ask your departmental /group secretariat Telephone number Taxi Phone 022 33 141 33

• CLEANING SERVICE: • Drastic reduction annual floor reconditioning

• Water Bottle Distribution• Gradual replacement of the 220 EDEN fountains (with AQUADRINK?); new requests for EDEN

blocked, soft transition scenario’s are being worked on.. we’ll communicate in due time.

• Library: • Techniques de l’ingénieur (already implemented)• Web of Science• Springer Materials (the Landolt-Börnstein database)

MeyrinPrevessin 2014 every 20 mins 2015 every 45 mins

2014 every year2015 only infirmary, crèche, main building, ..

Page 17: Service Management Status 106 th ACCU Meeting 02 December 2014

Miscellaneous• Crowd management at Resto 1

• Thierry Lagrange will bring it up in the relevant committee

Page 18: Service Management Status 106 th ACCU Meeting 02 December 2014

Many thanks for your attention!