small steam turbines for cogeneration application … ana… · small steam turbines for...
TRANSCRIPT
SMALL STEAM TURBINES FOR COGENERATION APPLICATION
FROM TRIVENI
2
Conventional scheme(Isolated generation of power & heat)
PROCESS MILL
Power from grid Steam from
low pressure process boiler
3
MILL
High pressure
boiler
~
Power toProcess
MIlls
Process steam to
Mill
Additional Power from grid
Co-generation scheme
4
Co-generation benefits
• Incidental Power • Uninterrupted Steam and Power Supply• Option of Grid Synchronsing .• Attractive Paybacks on investment.
5
CO – Generation Industries
• Paper – 3.5 kg /cm2g
• Rice – 3 kg/cm2g
• Oil extractions – 5 kg/cm2g
• Distelleries – 4 kg/cm2g
Above Segments contribute to 75% of the total market
potential
6
Remaining Market Segment contributing to 25% of the Potential
• Textile – 7 kg/cm2g• Solvent Extractions – 8 kg/cm2g• Food Processing – 8 kg/cm2g• Rubber – 10kg/cm2g• Pharma – 11 kg/cm2g
Back Pressure Turbine : The Panacea for small Cogeneration Industries
• Purely Incidental / Bonus Power
• Simplicity in Operation and Maintenance
• Lower Investments and hence Earlier Paybacks compared to Condensing Turbines.
• Optimum Balance achieved to cater both the Steam and Power requirements of the plant.
7
SCHEMATICS-BACK PRESSURE TURBINE
8
Steam from outlet of Boiler
Steam to Process
Incidental Power
9
Subsidy Schemes for Bio Mass cogenplants
• Rs 20 lakh / MW subsidy from MNRE for all Bio mass based COGEN plants.
• Excise duty completely subsidised (100% exemption) for Boiler package in Rice mills.
Overview of Triveni – The Market Leader
• Manufacturing steam turbines from 1968. • Over 2000 installations across a range of
industries. • Market leaders with consistent market share of
above 60%. • More than 400 TG sets in Process co-generation
and over 100 TG sets for Bio-mass based IPP’s.
10
• Largest manufacturer of TG sets in India in the range up to 3 MW with a manufacturing capacity to produce 150 turbines a year (totaling to 1200 MW / year)
• 100% Inhouse Manufacturing
• Turbines are tested at Full speed no Load Mechanical steam Run Test (MRT) prior to dispatch of turbine.
11
• Fourteen Services / spares centers across India ensuring that service will be rendered within 8 hrs from the call
• AMC and Operation and Maintenance services with periodic assessment and overhauling of turbines.
• Periodic training programs to customers Technical team
12