Table of Contents Chapter 1 Project Background
1.1Project Background……………………………………………………………………………………………………..……………....…................................................................... .. 09
Table no: 1 Basic Project Information ……………………………………………….……………………………..……………………................................................................. .. 10
Figure, 1 Geographic location of Kondh Project.................................................................................................................................................................................... ... ..10
1.2 Need of Watershed Development Programme. ………………………………………………………………………………................................................................. …. 11
Table no. 2: Weightage of the project. …………………………………………………………………….……...…….................................................................................…….… 11
Table no. 2.1 Criteria and weightage for selection of watershed ……………………………………………………………………............………….................. ............. 12
Table no.3: Watershed information …….………………………………………………………………………………………………........................................……………… .…… 13
1.3 Other developmental projects/schemes running in the Kondh Project …………….……………………….............................................. ……………..…….. 14
Table no.4: Developmental programmes running in the project area: .............................................................................................................................................. 15
Table no. 5: Previous Watershed programmes in the project area ..................................................................................................................................................... 15
Chapter 2 Project Implementing Agency
2.1. Project Implementing Agency ............................................................................................................................................................................... 16
2.2 About Project implementing Agency West Forest Division - Rajpipla........................................................................................................................................ 16
2.2.1 The organization and its objectives: .................................................................... ................................................................................................................................. 16
2.3 SWOT Analysis of the PIA: ............................................................................................................................................................................................................................. 17
Table no. 6: PIA: .......................................................................................................................................................... .............................................................................................. 18
Table no. 7: Staff at PIA level: ....................................................................................................................................................... ...................................................................... 18
PIA- District Watershed Development Unit Bharuch Page 3
Chapter 3 Basic Information of the Project Area
3.1. Geography and Geo-hydrology .................. ....................................................................... .............................................................................................. ......................... 19
3.1.1 Land use pattern: .................................................................................................................................................................................................................................... ...... 19
Table no. 8: Land use pattern: ............................................................................................................................................................................................................................ 19
Figure,2 Geographical Condition of Valia project........................................................................................................................................................ ............................... 20
3.1.2 Soil and topography: ..................................................................................................................................................................................................... .............................. 21
Table no. 9: Soil type and topography: ........................................................................................................................... ................................................................................ 21
Table no. 10: Flood and drought condition: .................................................................................................................................................................................................. 22
Table no. 11: Soil Erosion ........................................................................................................................................................................................ .................... ........................ 22
Table no. 11.1:Water logging condition ......................................................................................................................... ............................................................................... 23
Table no.12: Climatic conditions .................................................................................................................................................................. .................................................... 23
Table no. 13: Physiography and relief .............................................................................................................................................................................................................. 23
3.1.3 Land and Agriculture: ................................................................................................................................................................................................................................... 24
Table no. 14: Land ownership details......................................................................................................................................................... ...................................................... 24
Figure 3 Photographs of Bio-Physical Survey. ............................................................................................................................................................................................. 25
Table no. 15: Agriculture ....................................................................................................................................................................................................................................... 26
Table no. 16: Irrigation ........................................................................................................................................................................................................................................... 26
Table no. 17: Crop details: ..................................................................................................................................................................................................................................... 27
3.1.4 Livestock: .................................................................................................................................................................... ...................................................................................... 27
Table no. 18: Livestock .......................................................................................................................................................................................................................................... 28
3.1.5 Drinking water ............................................................................................................................................................................................................ ................................... 28
PIA- District Watershed Development Unit Bharuch Page 4
Table no. 19 : Drinking water...................................................................................................................................................................................................................... ......... 28
Table no. 20: Details of Common Property Resources ....................... ...................................................................................................................................................... 29
3.2. Socio-Economic Profile ................................................................................................................................................................................................................................... 31
3.2.1 Demographic Status: ................................................................................................................................ .................................................................................................... 31
Table no. 21: Demographic information ................................................................................................................................ ............................................ ........................... 31
Table no. 22: Literacy rate ...................................................................................................................................................................................... .............................................. 32
3.2.2 Migration Pattern: ..................................................................................................................................................................................................................... .................... 32
Table no. 23: Migration details ........................................................................................................................................................................................................................... 32
Table no. 24: Poverty................................................................................................................................................................................................................................................ 33
3.2.3 Infrastructure facilities: ................................................................................................................................. ............................................................................................ 33
Table no. 25: Village infrastructure ............................................................................................................................................... ................................................................... 33
Table no. 26: Facilities / HH assets .................................................................................................................................................................................................................... 34
3.3. Livelihood pattern: .......................................................................................................................................................................................................................... ............... 34
Table no. 27: Per capita Income .......................................................................................................................................................................................................................... 34
3.4 Dependence on Common Property Resource.............................................................. ..................................................................................................................... ... 35
Table no.28: Dependence on Forest/CPR ........................................................................................................... .................................................................................... ..... 35
Table no. 29: Livelihood pattern (Occupational distribution)................................................................................................................................................................ 35
3.5 Comparative data of the crop productivity of the area: project area vs. District vs. State vs. Country: ..................................................................... 36
Figure, 4 Comparative Productivity of tur and Cotton in the project area Valiya, Bharuch dist., State and India Level.............................. ............... 37
Chapter 4 Watershed Activities
4.1. Scientific Planning: .............................................................................................. ........................................................... ............................................................................. 39
PIA- District Watershed Development Unit Bharuch Page 5
Table no. 30: Details of Scientific Planning and Inputs in IWMP projects ........................... ......................................................................................................... 41
Table no.31: Details of PRA Activities conducted in the project area..................................................................................................................... 43
Figure 5 Photographs of Focussed Group Discussion......................................................................................... ................................................................................... 46
Figure 6 Photographs of PRA.................................................................................................................................................................... ........................................................ 47
4.2. Institution building .......................................................................................................................................................................................................... ............................. 48
Table no. 32: Watershed Committee details.................................................................................................................................................................................................. 48
Table no. 33: SHG details.............................................................................................................................. ......................................................................................................... 53
4.2.3 User Group: .................................................................................................................................................................... ................................................................................. 54
Table no. 34: UG detail................................................................................................................................................................................ ............................. ............................. 54
4.3. Physical activities to be undertaken under IWMP-9, Kondh.................................................................................................................................................... 56
4.3.1 Entry Point activity (EPA) ............................................................................................................................................................................................................. ........... 56
Table no.35: Entry point activities (EPA) (All financial figures in lakh Rs. )...................................................................................................................... ............ 56
35.1 Estimation of Hawada.................................................................................................................................................................................................................................. 57
35.2 Estimation of Drinking Water Pipe Line.............................................................................................................................................................................................. 58
Figure 7 Photographs of EPA in Kondh Project........................................................................................................................................................................................... 59
4.3.2.Watershed Development Works............................................................................................................................................................................................................. 59
Table no.36: Details of ridge line treatment / land based activities in watershed works*.............................................................................. ....... 62
Table no.37: Activities related to Surface water resources in the project areas (all financial figures in lakh Rs.).......................................... ............... 64
Table no. 38: Activities related to recharging ground water resources in the project areas (all financial figures in lakh Rs.).............................. 64
Table no.39: Details of activities related to livelihood, production system and micro-enterprises......................................................................... 66
Table no. 40: Activities related to livelihoods by Self Help Groups (SHGs) in the project areas............................................................................... ............ 72
PIA- District Watershed Development Unit Bharuch Page 6
Table no. 41: Linkages developed at village level.................................................................................................................................................... 83
Table no.42: Details of activities connected with vegetative cover in watershed works ....................................................................................... 83
Table no.43: Details of activities in the CPRs in the project areas..................................................... ................................................................................................ 87
4.4. Capacity Building: ...................................................................................................................................................................................................................................... 90
Table no. 44: Capacity Building Institution:.......................................................................................................................... ...................................................................... 91
Figure,8 Photographs of Capacity Building : ............................................................................................................................................................................................. 91
Table no. 45: Capacity Building plan................................................................................................................................................................................................................. 92
Table no.46: Information, education and Communication Activities................................................................................................................................................. 92
Chapter 5 Budgeting
Table no. 47: Village wise- activity wise budget....................................................................................................................................................................................... 93
Table no. 48: Budget at a glance ........................................................................................................ .......................... ................................................................................. 94
Table no.49: Village wise gap in fund Requirement................................................................................................................................................................................ 94
Table no.50: Details of Convergence of IWMP with other Schemes cost in lakh........................................................................................................................ 95
Chapter 6 Expected Outcome
6.1 Expected Outcomes ......................................... ............................................................................................................................................... 98
6.1.1 Employment .......................................................................... ..................................................... ................................................................................... ......................... 98
Table no. 51: Public-Private Partnership in the IWMP projects...................................................................................................................... .............................. 99
Table no. 52: Employment in Project area .................................................. ............................................................................................................ .............................. 99
6.1.2.Migration ................................................................................................................................ .................................................................................................................... 100
PIA- District Watershed Development Unit Bharuch Page 7
Table no. 53: Details of seasonal migration from Project area ......................................................... ............................................................................................. 100
Table no. 6.1.3: Ground water Table .................................................................................................................... ..................................................................................... 100
Table no. 54: Details of average ground water table depth in the project areas (in meters)............................................................................................. 100
6.1.4 Drinking water ........................................................................................................ .......................................................................................... ....................................... 101
Table no. 55: Status of Drinking water........................................................................................................................................................................................................ 101
6.1.5 Crops .............................................................................................................................. ............................................................................................................................... 101
Table no. 56 : Details of crop area and yield in the project area .................................................................................................................................................... 102
6.1.6 Horticulture ......................................................................................................................... ..................................................................................................................... 102
Table no. 57: Area under horticulture....................................................................................................................................................................................................... 102
6.1.7 Vegetative cover ...................................................................................................................................................................................................................................... 103
Table no. 58: Forest/vegetative cover ............................................................................... ....................................................................... ............................................. 103
6.1.8 Livestock ....................................................................... ........................................................ .................................................................................................................... 103
Table no. 59: Details of livestock in the project areas ................................................................................................................................ ...................................... 104
6.1.9 Linckages..................................................................................................................................... ................................................................................................................ 104
Table no. 60: Backward-Forward linkages .................................................................................................... ........................................................................................ 104
6.2 Logical Framework Analysis ................................................................................................................................................................................................................. 105
Chapter 7 Quality and Sustainability Issue
7.1 Plans for Monitoring and Evaluation.................................................................................................................................................................................................. 110
7.2 Plans For Project management: .................................................. ..................................................................................................................... .................................. 111
7.3 Watershed Development Fund: ........................................................................................................................................................................................................... 111
PIA- District Watershed Development Unit Bharuch Page 8
7.4 User Charges: ................................................................................................................................................................................ .............................................................. 111
Chapter 8 Mapping
Figure.8.1: Map of Ground water ................................................................................................................................................................................................................ 112
Figure.8.2: Land use map ............................................................................................................................................................................................................................... 113
Figure.8.3: River waterbody map................................................................................................................................................................................................................ 114
Figure.8.4: Slope map ...................................................................................................................................................................................................................................... 115
Figure.8.5: Soil map ........................................................................................................................................................................................................................................... 116
PIA- District Watershed Development Unit Bharuch Page 9
CHAPTER-1
PROJECT BACKGROUND
1.1 Project Background
Bharuch district comes under South Gujarat zone. It is situated between the parellels of latitude 72 28 and longitude 21 26 and 22
16’. Total geographical area of Bharuch district is 5,24,683 ha. There are 543 village panchayats and 663 villages in the district. District is
drained by Narmada, Dhadhar and Kim rivers. It covers total area is 20,686.90 ha. Community of the Bharuch district is mainly Tribal. The
climate of this district is characterised by a hot summer and dryness in the noon rainy season. The soil of two types viz black cotton and
yellowish. Main agriculture crops in the district are cotton, paddy, sorghum, wheat, tur and sugarcane. In 2010-11 there are 5 projects in
Bharuch district namely Kochbar, Dharoli, Pathar, Kondh and Kava.
Kondh (IWMP-9) project is located in Valia taluka, Bharuch district of
Gujarat. This project is a cluster approach of 12 micro-watershed and 6
villages. Total geographical area of 6 villages is 4898.10 ha, out of which
4585.10 ha. has been undertaken to be treated under Integrated Watershed
Management Program in the 2010-2011. Project Implementing Agency of
this project is District Watershed Development Unit Bharuch.
The nearest town of the project is Valia which is about 0 to 20 km
away from the villages. The major community of the villages are Schedule
Tribe, Choudhary, Vasava and Gamit. Only schedule Tribe covers 47.38 % of
PIA- District Watershed Development Unit Bharuch Page 10
the total community. The livelihood of the project area is based on Agriculture, Animal Husbandry and wage labour.
Table no.1: Basic project information
Sr. No.
Name of the project
Villages
Gram Panchayats Taluka District
Area of the
project
Area Proposed
to be treated
Total project
cost PIA Name C2K code
1
IWMP-9 Kondh
Kondh 210080161270000 Kondh
Valiya Bharuch
1931.50 1795.50 215.46
DWDU-BHARUCH
2 Vatariya 210080161260000 Vatariya 908.10 908.10 108.97
3 Kanerav 210080161480000 Kanerav 247.30 174.30 20.92
4 Desad 210080161470000 Desad 754.40 754.40 90.53
5 Karsad 210080161540000 Karsad 402.80 402.80 48.34
6 Valiya 210080161300000 Valiya 654.00 550.00 66.00
TOTAL:- 4898.10 4585.10 550.21
Figure1, Geographic location of Kondh project
Bharuch District Kondh Project
PIA- District Watershed Development Unit Bharuch Page 11
1.2 Need of watershed development program
Watershed Development Programme is prioritised on the basis of thirteen parameters namely Poverty Index, Percentage of SC/ST,
Actual wages, Percentage of small and marginal farmers, Ground water status, Moisture Index, Area under rainfed agriculture, Drinking
water situation in the area, Percentage of the degraded land, Productivity potential of the land, Continuity of another watershed that has
already developed/treated, Cluster approach for plain and Cluster approach for hilly terrain. Based on these thirteen parameters a
composite ranking was given to Kondh Watershed project as given in table no. 2.
Total number of BPL families in this project are about 47%, hence the score is allotted 5. The percentage of ST population in the area
is about 47.38 % and others are mostly OBC and general category; hence the score is allotted 10. The wage labour is 33.2% in the project
area; hence the score is 5 resectively.
Primary occupation of the project area is agriculture, based on rainfall. But due to the undulating land, water is not available for
cultivation purpose. So the production of the area is very low; hence the score is 10.
All the parameters taken together give a cumulative score of 88 to the watershed. (Reference Table 2.1 below).
Area proposed to be treated
Table no. 2: Weightage of the project
Project Name
Project type Weightage
i ii iii iv v Vi Vii viii ix X xi xii xiii
Kondh IWMP-9 5 10 5 5 3 10 10 5 5 10 5 15 0
PIA- District Watershed Development Unit Bharuch Page 12
Table no. 2.1 Criteria and weightage for selection of watershed
S. No.
Criteria Maximum
score Ranges & scores
i Poverty index (% of poor to population)
10 Above 80 % (10) 80 to 50 % (7.5) 50 to 20 % (5) Below 20 % (2.5)
ii % of SC/ ST population 10 More than 40 % (10) 20 to 40 % (5) Less than 20 % (3) iii Actual wages 5 Actual wages are
significantly lower than minimum wages (5)
Actual wages are equal to or higher than minimum wages (0)
iv % of small and marginal farmers
10 More than 80 % (10) 50 to 80 % (5) Less than 50 % (3)
v Ground water status 5 Over exploited (5) Critical (3) Sub critical (2) Safe (0)
vi Moisture index/ DPAP/ DDP Block
15 -66.7 & below (15) DDP Block
-33.3 to -66.6 (10) DPAP Block
0 to -33.2 (0) Non DPAP/ DDP Block
vii Area under rain-fed agriculture
15 More than 90 % (15) 80 to 90 % (10) 70 to 80% (5) Above 70 % (Reject)
viii Drinking water 10 No source (10) Problematic village (7.5)
Partially covered (5) Fully covered (0)
ix Degraded land 15 High – above 20 % (15) Medium – 10 to 20 % (10)
Low- less than 10 % of TGA (5)
x Productivity potential of the land
15 Lands with low production & where productivity can be significantly enhanced with reasonable efforts (15)
Lands with moderate production & where productivity can be enhanced with reasonable efforts (10)
Lands with high production & where productivity can be marginally enhanced with reasonable efforts (5)
xi Contiguity to another watershed that has already been developed/ treated
10 Contiguous to previously treated watershed & contiguity within the microwatersheds in the project (10)
Contiguity within the microwatersheds in the project but non contiguous to previously treated
Neither contiguous to previously treated watershed nor contiguity within the microwatersheds in
PIA- District Watershed Development Unit Bharuch Page 13
watershed (5) the project (0) xii Cluster approach in the
plains (more than one contiguous micro-watersheds in the project)
15 Above 6 micro-watersheds in cluster (15)
4 to 6 microwatersheds in cluster (10)
2 to 4 microwatersheds in cluster (5)
xiii Cluster approach in the hills (more than one contiguous micro-watersheds in the project)
15 Above 5 micro-watersheds in cluster (15)
3 to 5 microwatersheds in cluster (10)
2 to 3 microwatersheds in cluster (5)
Total 150 150 90 41 2.5
Project type: Hilly/desert/Other Table no.3: Watershed information
Name of the project Name of the Village No. Of watersheds to
be treated Watershed code
Watershed regime/type/order
IWMP-9, Kondh
Kondh 1 5D1A3b1d
Mini Watershed
Vatariya 3 5d1a3b1e,5d1a3b1d,5d1a3b1c
Kanerav 1 5C1B3d1a
Desad 2 5c1b3d1b,5c1b3d2a
Karsad 2 5C1B3d1a,5C1B3d2a
Valiya 3 5c1b3d1a,5C1B3d2a,5c1b3d1b
Total 12
PIA- District Watershed Development Unit Bharuch Page 14
1.3 Other developmental projects/schemes running in the Kondh project
Valiya taluka is very back ward area, has been on top priority of a number of developmental projects. These programmes are namely
Indira Awas Yojana (IAY), Social Forestry Development Committee (S.F.D.C), Total Sanitation Campaign (TSC), Mahatma Gandhi National
Rural Employment Guarantee Scheme (MGNREGS), Tribal Area sub Plan (TASP), Swarnajayanti Gram Swarojgar Yojana (SGSY) and Water
and sanitation management organisation (WASMO).
i. MGNREGS: Construction of check dams, deepening of village pond, farm bunding, stone bunding and some Afforestation activity has
been taken-up under NREGA.
ii. S.F.D.C: About two villages have covered by S.F.D.C. This works for CPR development in the village, provides employment to the
people and conduct capacity building programs for villagers.
iii. Total Sanitation Campaign (TSC): Toilets are constructed under TSC programme in every village at each household level.
iv. Swarnjayanti Gram Swarozgar Yojana (SGSY) – Provide 50% subsidy linkage with bank for Animal Husbandry and some other
livelihood activities like cattering in the project area.
v. TASP: This scheme works in only tribal area. This provides lift irrigation system, fisheries, Horticulture and others activities in the
project area.
vi. Indira Awas Yojana: This scheme provides home with toilet to the BPL families.
vii. WASMO: All villages have covered by this scheme for drinking water facility.
PIA- District Watershed Development Unit Bharuch Page 15
Table no.4: Developmental programmes running in the project area:
Sr. no
Name of the programme/
scheme Sponsoring agency Objectives of the programme/scheme
Year of commencement
Villages covered
Estimated number of
beneficiaries 1 IAY D.R.D.A Housing 2005-06 6 410
2 S.F.D.C FOREST CPR Devlopment,Employment,Capacity building 2009-2010 2 45
3 TSC DRDA Total sanitation Campaign 2005-06 6 1639
4 MGNREGA DRDA Employment Generation 2007-08 6 9113
5 TASP TASP Help trible people 2000-01 6 201
6 SGSY DRDA Livelihood Promotion 2006 6 405
7 WASMO IRRIGATION Drinking water 2007-08 6 3250
Table no. 5: Previous Watershed programmes in the project area:
Sr.no
Project name
Year started
Name of villages
No. of micro
watershed Watershed
codes
Area under
treatment Funding source
Nodal agency PIA
Total cost
Expenditure incurred up to start of IWMP
% financial completion
% physical completion
1
IWMP-9
Kondh
0 Kondh 0 0 0 0 0 0 0 0 0 0
2 0 Vatariya 0 0 0 0 0 0 0 0 0 0
3 0 Kanerav 0 0 0 0 0 0 0 0 0 0
4 0 Desad 0 0 0 0 0 0 0 0 0 0
5 0 Karsad 0 0 0 0 0 0 0 0 0 0
6 0 Valiya 0 0 0 0 0 0 0 0 0 0
PIA- District Watershed Development Unit Bharuch Page 16
CHAPTER-2
PROJECT IMPLEMENTING AGENCY
2.1. Project Implementing Agency
The Project Implementing Agencies (PIA) is selected by an appropriate mechanism by Gujarat State Watershed Management Agency
(GSWMA), the State Level Nodal Agency (SLNA) for Integrated Watershed Management Programme (IWMP) in Gujarat. The PIAs are
responsible for implementation of watershed project. These PIAs may include relevant line departments, autonomous organizations under
State/ Central Governments, Government Institutes/ Research bodies, Intermediate Panchayats, Voluntary Organizations (VOs).The PIA
for Kondh watershed Project is District Watershed Development Unit Bharuch.
2.2 About Project Implementing Agency, DWDU Bharuch
2.2.1 The organization and its objectives:
PIA of the Kondh watershed Project is District Watershed Development Unit Bharuch. Project Director is the head of PIA. PIA has
dedicated and experienced staff comprising one Nodal officer and a watershed development team of civil engineer, agriculture expert and
community mobilizer, Data Entry Operator, surveyor, and accountant. The objective of the PIA is supervising, planning, implementing,
documenting and promoting watershed development projects and related developmental activities at project level as per guidelines. This
also submits all documents at the district level.
PIA- District Watershed Development Unit Bharuch Page 17
2.3 SWOT Analysis of the PIA:
Strength:
(1) Dedicated and experienced staff with Multi Disipilinary team.
(2) State level Govt department.
(3) Strong linkages with national, state and district level institutions, agricultural universities, KVKs and NGOs for capacity building and
technical guidance.
(4) Scientific planning in watershed projects with the help of BISAG, Gandhinagar.
(5) Project level monitoring, coordination & Co-operation Committee.
Opportunities:
(1) A number of different other development schemes of the government are running; so, there can be horizontal integration and
convergence of programmes.
(2) Better financial provision under IWMP.
(3) Usage of new ICT tools like GIS, GPS.
Threats:
(1) Low productive land in the project area, the activities planned to be taken up may yield limited impact
PIA- District Watershed Development Unit Bharuch Page 18
Table no. 6: PIA:
Sl. No.
Names of project Details of PIA
1 IWMP 9 Kondh
(i) Type of organization DWDU-BHARUCH
(ii) Name of organization DWDU-BHARUCH
(iii) Designation & Address Nodal Officer A-9 Jalaram Society,Near petrol pump,Valiya
(iv) Telephone 02643-270511
(v) Fax -
(vi) E-mail [email protected]
Table no. 7: Staff at PIA level:
Sr. No.
Name Age Sex Designation Qualification Experience (in years) Job assigned Monthly
remuneration (Rs.)
1
Patel Kishorkumar
dahyabhai M MDT (Engg.) Diploma civil engg. 7 years in watershed Nodel officer 15000
2
Survaiya Nileshbhai
Kishorbhai M WDT (Engg.) Diploma civil engg. WDT (Engg.) 12000
3
Prajapati Keyulbhai
Ganpatbhai M WDT (Agri.) BRS, MRS WDT (Agri.) 9000
4 Vasava Santuben D. M WDT ( Com.) BRS WDT ( Com.) 9000
5 Patel Jagdishbhai M WDT ( DEO ) BA WDT ( DEP ) 5000
PIA- District Watershed Development Unit Bharuch Page 19
CHAPTER-3
BASIC INFORMATION OF THE PROJECT AREA
3.1. Geography and Geo-hydrology
3.1.1 Land use pattern:
The net geographical area of Kondh project is 4898.10 ha and proposed project area is 4585.10 ha. Out of which 55% is rainfed area.
About 69% of land is under agriculture which is almost rain-fed; mainly Kharif crops are taken in the Project area. Somehow extent farmers
take Rabi crops in their field. But they don’t cultivate Zaid crops in their fields. About 31% of the total land is classified under wasteland out
of which 21 percent land is cultivable and rest is uncultivable. About 21% land is also comes under permanent pasture land.
Table no. 8: Land use pattern:
Sr. No. Names of villages
Geographical Area of the
village Forest Area
Land under agricultural
use Irrigated Rainfed
area
Perm-anent
pastu-res
Wasteland
Cultivable Non-
cultivable
1 KONDH 1931.50 0.00 1164.30 28.50 1135.80 767.30 767.20 0.00
2 VATARIYA 908.10 0.00 725.70 50.40 675.30 56.70 56.60 125.80
3 KANERAV 247.30 2.10 209.60 9.60 200.00 0.00 0.00 35.60
4 DESAD 754.40 0.00 634.10 415.00 219.10 46.10 46.00 74.30
5 KARSAD 402.80 0.00 312.70 12.70 300.00 0.00 0.00 90.10
6 VALIYA 654.00 0.00 317.10 149.00 168.10 177.60 177.60 159.30
TOTAL 4898.10 2.10 3363.50 665.20 2698.30 1047.70 1047.40 485.10
PIA- District Watershed Development Unit Bharuch Page 20
Figure-2: Geographical condition of the project
PIA- District Watershed Development Unit Bharuch Page 21
3.1.2 Soil and topography:
Kondh watershed project falls under south Gujarat Agro Climatic Zone. The soil is mainly yellowish black in surface colour. Depth of
the soil is moderate to deep about 15 to 20cm. The predominant texture of soil is loamy and clay. The soil fertility is very poor with low
Nitrogen and Phosphorus. The topography of the area is flat - Moderate to undulating ranging from 0-3% slope. Soil pH in the project area is
about 8-8.5. Maximum temperature in the project area is 45 C0 in summer season and minimum is 22 C0 in winter season.
The average rainfall of this area is about 988.20 mm (from past five year data). This uneven distribution is leading to runoff of soil
every year to the streams and rivulets.
Table no. 9: Soil type and topography:
S. No.
Name of the Agro-climatic zone covers
project area Area in
ha Names of the
villages
Major soil types
Topo-graphy a)Type b) Area in
ha
# Flat, undulating, moderate slope, Steep slope
1
South Gujarat
1931.50 Kondh Yellowish 1931.50 Flat - Moderate to undulating
2 908.10 Vatariya Yellowish 908.10 Flat - Moderate to undulating
3 247.30 Kanerav Yellowish 247.30 Flat - Moderate to undulating
4 754.40 Desad Yellowish 754.40 Flat - Moderate to undulating
5 402.80 Karsad Yellowish 402.80 Flat - Moderate to undulating
6 654.00 Valiya Yellowish 654.00 Flat - Moderate to undulating
4898.10 4898.10 Flat - Moderate to undulating
PIA- District Watershed Development Unit Bharuch Page 22
Table no. 10: Flood and drought condition:
Sr.No Village Flood (Incidence) Drought (Incidence) 1 Kondh NA 4to5 year
2 Vatariya NA 4to5 year
3 Kanerav NA 4to5 year 4 Desad NA 4to5 year
5 Karsad NA 4to5 year
6 Valiya NA 4to5 year
11. Edaphic Factors Table no. 11: Soil Erosion
Cause Type of erosion Area affected (ha)
Run off
Average soil loss (Tonnes/ ha/ year) (mm/ year)
Water erosion
a Sheet 3450.5
988.20
Yet not measured
b Rill 825
c Gully 622.6
Sub-Total 4898.1
Wind erosion 4898.1 NA
Total 4898.10
PIA- District Watershed Development Unit Bharuch Page 23
Table no. 11.1: Waterlogging Conditions
Name of the Village Survey Number Reasons
Kondh
NA Undual condition
Vatariya
Kanerav
Desad
Karsad
Valiya
Table no. 12: Climatic conditions:
Project Type Name of project Average rainfall- last 5
years
Average temperature ( C0 ) Summer Winter
Max Min Max Min IWMP Kondh 988.20 45 35 37 22
Table no. 13: Physiography and relief
Project Type Name of project Elevation (MSL) Slope range (%) Major streams
IWMP Kondh 53.00M 0-3% Amravati,Kim
PIA- District Watershed Development Unit Bharuch Page 24
3.1.3 Land and Agriculture:
In the project area people use their own land. They don’t use leased land. Due to undulating soil and lack of surface water sources,
ground water has sufficient base for irrigation as well as for drinking purpose in every village. The average land holding of the project is
about 2.03 ha ranging from 1 to 3 ha village to village. Lack of irrigation source forces the majority of the farmers to migrate to ensure their
livelihood or work as a wage labour in another farmer’s field. This affects directly the demographic profile of the village. The major crops in
the project area cultivated by the farmers are Tur, Cotton, Sorghum and Sugercane in kharif season. Some of the farmers take sorghum crop
in Rabi Season if irrigation facility is good. The land conservation measures such as River and open well in the villages help them to take up a
Rabi crop of wheat in the residual moisture. But other soil and water conservation structures like farm bunding, nala plug, checkdam, gully
plug, gabion structure and new pond will also help the farmers to taken up other crops like sugarcane, irrigated wheat, vegetables and Zaid
crops also
Table no. 14: Land ownership details
Sr. no Village
Total owned land
HHs giving land on lease HHs taking land on lease Gen OBC SC ST
1 Kondh 378 0 34 132 0 0
2 Vatariya 98 0 27 97 0 0
3 Kanerav 28 0 4 57 0 0
4 Desad 383 0 0 53 0 0
5 Karsad 164 0 2 28 0 0
6 Valiya 127 0 6 37 0 0
PIA- District Watershed Development Unit Bharuch Page 26
Table no. 15: Agriculture
Sr.no Village Net sown area
One time Two times Three times
1 KONDH 617.00 97
2 VATARIYA 485.00 28
3 KANERAV 187.00 12
4 DESAD 245.00 91
5 KARSAD 275.00 39
6 VALIYA 152.00 38
Total 1961.00 305.00
Table no. 16: Irrigation
Sr.no Village
Source 1 : Canal Source 2 : Check dam / Pond Source 3 : Well/bore/river
Availability months Net area
Gross area
Availability months
Net area
Gross area
Availability months
Net area
Gross area Total
1 Kondh 0 0 0 3 9.50 9.50 8 19.00 19.00 28.50
2 Vatariya 0 0 0 3 12.40 12.40 8 38.00 38.00 50.40
3 Kanerav 0 0 0 3 2.50 2.50 9 7.10 7.10 9.60
4 Desad 5 215.00 215.00 3 56.00 56.00 9 144.00 144.00 415.00
5 Karsad 0 0 0 3 2.70 2.70 9 10.00 10.00 12.70
6 Valiya 0 0 0 3 28.00 28.00 9 121.00 121.00 149.00
TOTAl:- 215.00 111.10 339.10 665.20
PIA- District Watershed Development Unit Bharuch Page 27
Table no. 17: Crop details:
Sr.no
Village
Kharif (Monsoon) Rabi (Winter)
Tur Cotton Sorghum Sorghum Sugarcane
Area Producti
on Product
ivity Area
Production
Productivity Area
Production
Productivity
Area
Production
Productivity Area
Production
Productivity
1 Kondh 135 50625 375 95 29925 315 72.5 45312.5 625 58 40890 705 24.5 704375 28750
2 Vatariya 109 35425 325 83 29465 355 62 37510 605 39 30810 790 35 1142750 32650
3 Kanerav 59 22420 380 35 12075 345 17 10795 635 28 25900 925 5 175000 35000
4 Desad 86 36550 425 65 22620 348 38 23750 625 76 55860 735 326 8313000 25500
5 Karsad 38 13300 350 48 16896 352 21 13041 621 49 35035 715 9 238500 26500
6 Valiya 120 39000 325 52 18044 347 32 20416 638 55 40425 735 89 2536500 28500
547 197320 360.7313 378 129025 341.336 242.5 150824.5 621.9567 305 228920 750.5574 488.5 13110125 26837.51
3.1.4 Livestock:
In the Kondh project, there are 876 cows, 454 buffaloes, 1039 goats, 87 bullocks and 4961 hens. In majority of the, villages poultry is
the main source of livelihood and remaining villages cows and buffaloes are the source of income. Mainly animal breeds are local so
productivity is very low. Lack of surface water, the fodder and pasture availability for the animals has reduced their numbers in the area.
This leads to heavy migration of the villagers to other parts of the state. Average milk production of the buffalo’s is 2 lit. and cow’s is 1.6 lit.
that is very low. In some villages, there is no dairy cooperative also.
PIA- District Watershed Development Unit Bharuch Page 28
Table no. 18: Livestock
Sr.no Village Buffalo ( Lit/Annum ) Cow Total Milk
(Buffalo+Cow) Goat Sheep Bullock Hen Others
No milk No Milk No Milk
1 Kondh 196 141120 125 75000 216120 498 767 290
2 Vatariya 54 38880 76 45600 84480 179 248 75
3 Kanerav 28 20160 35 21000 41160 65 467 43
4 Desad 65 46800 145 87000 133800 23 288 530 113
5 Karsad 35 25200 45 27000 52200 110 107 95
6 Valiya 76 54720 450 270000 324720 164 87 2842 229
TOTAL:- 454 326880 876 525600 852480 1039 0 288 87 4961 845
3.1.5 Drinking water:
Sources of drinking water in the project area are handpump and Tap. These provide drinking water facilites to the villagers up to 9-
10 month. But the remaining months they face a lot of problem. The quality of the water is contaminated also. Ground water table is also
very low in the project area.
Table no. 19: Drinking water
Sr.no Village Ground water table (mt) Source of drinking water Availability in months Quality
1 Kondh 40-45 mt Handpump,bore well 9to10
Contaminated
2 Vatariya 40-45 mt Handpump,bore well 9to10
3 Kanerav 40-45 mt Handpump,bore well 9to10
4 Desad 40-45 mt Handpump,bore well 9to10
5 Karsad 40-45 mt Handpump,bore well,River 9to10
6 Valiya 40-45 mt Handpump,bore well 9to10
PIA- District Watershed Development Unit Bharuch Page 29
Table no. 20: Details of Common Property Resources
Sr. No. Names of
project
CPR Total Area (ha)
Area available for treatment (ha)
Particulars
Area owned/ In possession of
Pvt. persons
Govt.
PRI
Any other (Pl. Specify)
Pvt. persons
Govt.
PRI
Any other (Pl. Specify)
(specify deptt.)
(specify deptt.)
1
Kondh
Wasteland/ degraded land 17.17 4.00
Pastures 119.36 12.00
Orchards
Village Woodlot 19.57
Forest
Village Ponds/ Tanks 24.31 1.00
Community Buildings
Samshan 2.93
Permanent markets
Temples/ Places of worship
Others (Pl. specify)
2
Vatariya
Wasteland/ degraded land 32.29 4.00
Pastures 19.93 11.00
Orchards
Village Woodlot 31.79
Forest
Village Ponds/ Tanks 16.12 3.00
Community Buildings
Samshan 1.09
Permanent markets
Temples/ Places of worship
Others (Pl. specify)
3 Kanerav Wasteland/ degraded land 3.1
Pastures 9.28 1.00
PIA- District Watershed Development Unit Bharuch Page 30
Orchards
Village Woodlot 3.1
Forest
Village Ponds/ Tanks 5.65
Community Buildings
Weekly Markets
Permanent markets
Temples/ Places of worship
Others (Pl. specify) Canal 5.93
4
Desad
Wasteland/ degraded land 15.76
Pastures 54.63 13.00
Orchards
Village Woodlot 15.70
Forest
Village Ponds/ Tanks 6.71 3.00
Community Buildings
Weekly Markets
Permanent markets
Temples/ Places of worship
Others (Pl. specify) Canal 14.42
5
Karsad
Wasteland/ degraded land 45.35
Pastures 20.05 6.00
Orchards
Village Woodlot 4.1
Forest
Village Ponds/ Tanks 3.66 2.00
Community Buildings
Samshan 1.13
Permanent markets
Temples/ Places of worship
Others (Pl. specify) Canal 7.47
PIA- District Watershed Development Unit Bharuch Page 31
6
Valiya
Wasteland/ degraded land 4.01
Pastures 52.47 6.00
Orchards
Village Woodlot 1.97
Forest
Village Ponds/ Tanks 11.8 8.00
Community Buildings
Weekly Markets
Permanent markets
Temples/ Places of worship
Others (Pl. specify)
3.2. Socio-Economic Profile 3.2.1 Demographic Status:
Kondh project covers 6 villages in Valia taluka. It has a total of 3530 household with 16762 populations (as per base-line survey) out
of which 8821 are male and 7941 are female. Sex ratio of the area is 900 female to 1000 male. This ratio varies from village to village. Area
covers maximum ST population about 47.38%, which also varies from 43% to 65%. The average family size is 5. The literacy rate of the area
is 62.47%, out of which male literacy rate is 70.28% and female literacy rate is 53.79%. Majority of population is involved as a wage labour
in agriculture and animal husbandry.
Table no. 21: Demographic information
Sr. no Village Population SC ST
Total Male Female Total Male Female % Total Male Female %
1 Kondh 4233 2231 2002 131 61 70 3.09 1908 955 953 45.07
2 Vatariya 2505 1400 1105 59 33 26 2.36 1362 681 681 54.37
3 Kanerav 800 432 368 0.00 800 432 368 100.00
4 Desad 2101 1048 1053 19 9 10 0.90 1376 693 683 65.49
5 Karsad 931 477 454 0 0 0 0.00 576 302 274 61.87
6 Valiya 6192 3233 2959 201 112 89 3.25 2719 1416 1303 43.91
16762 8821 7941 410 215 195 2.45 7941 4047 3894 47.38
PIA- District Watershed Development Unit Bharuch Page 32
Table no. 22: Literacy rate
Sr.no Village
Literacy
Total population Total % Male % Female %
1 Kondh 4233 2660 62.840 1614 38.129 1046 24.7106
2 Vatariya 2505 1489 59.441 977 39.002 512 20.4391
3 Kanerav 800 515 64.375 320 40 195 24.375
4 Desad 2101 1065 50.690 591 28.1295 474 22.5607
5 Karsad 931 415 44.576 230 24.7046 185 19.8711
6 Valiya 6192 4328 69.897 2468 39.8579 1860 30.0388
TOTAL:- 16762 10472 62.47 6200 34.97 4272 23.666
3.2.2 Migration Pattern:
Migration percentage of the project area is 0.46% to 4.5%. People migrate during summer season to different parts of the state like
Surat and Ankleshwar as daily wage labours, agricultural labours and construction workers. Lack of landholding, Lack of fodder availability
and grazing land for smaller ruminant force these people to migrate to other places. There are 1649 BPL families in the project area. About
48-50% BPL families are landless families.
Table no. 23: Migration details
Sr.no Village Total
population
Migration Migration by months
Main reason for migration
Income during migration / month Total Male Female Up to 3 months
3-6 months
More than 6
months
1 Kondh 4233 111 67 44 3 Months Lack of employment 6000-7000
2 Vatariya 2505 98 58 40 3 Months Lack of employment 6000-7000
3 Kanerav 800 36 24 12 3 Months Lack of employment 6000-7000
4 Desad 2101 62 42 20 3 Months Lack of employment 6000-7000
5 Karsad 931 32 22 10 3 Months Lack of employment 6000-7000
6 Valiya 6192 29 21 8 3 Months Lack of employment 6000-7000
TOTAL :- 16762 368 234 134
PIA- District Watershed Development Unit Bharuch Page 33
Table no. 24: Poverty
Sr.no Village Total Household
BPL
0-16 17-20 Total
1 Kondh 831 126 122 248
2 Vatariya 544 27 71 98
3 Kanerav 181 34 33 67
4 Desad 467 257 113 370
5 Karsad 199 107 45 152
6 Valiya 1308 557 157 714
TOTAL:- 3530 1108 541 1649
3.2.3 Infrastructure facilities:
Each village of the project is connected with pucca road. There are Lower primary and upper primary schools are in every village but
there is only 2 villages have high school. People go to the Valia taluka for their higher education which is 10 km away from the villages.
Villages do not have any Primary Health Centre and bank except Valia for which villagers have to go to Valia. In some villages post office is
there but remaining villages don’t have and they go to the nearest village for this. People go the nearest taluka place for selling and buying of
the products. Majority of villagers have electric facility in their home and some have latrine facility also. Villagers have mobile phones in
their home but don’t have landline. Some extent of the villagers has two whellers and TV set at their home.
Table no. 25: Village infrastructure
Sr. no Village
Pucca road
to the village (Y/N)
Schools
Colleges (Number)
Post Office (Distance)
Banks (Number)
Distance from
nearest market
yard
Milk collection
centre (Number)
Milk cooperative (Number)
Other cooperatives
/ CBIs (Number)
Any other institution LP UP HS
1 Kondh Y 1 1 1 0 1 0 10 km 1 0 1 Aganwadi,Madresa 2 Vatariya Y 1 1 0 0 1 0 5 km 1 0 1 Aganwadi 3 Kanerav Y 1 0 0 0 3.00 km Valiya 0 3 km 1 0 0 Aganwadi 4 Desad Y 1 1 0 0 1 0 5 km 1 0 0 Aganwadi 5 Karsad Y 1 1 0 0 3.00 km Desad 0 5 km 1 0 0 Aganwadi 6 Valiya Y 1 1 1 1 1 3 0 1 0 1 Aganwadi,College
PIA- District Watershed Development Unit Bharuch Page 34
Table no. 26 : Facilities / HH assets
Sl no Village HHs with electricity
HHs with safety
latrines
HHs with phones HHs with vehicle HHs
with TV set
HHs with
cooking gas
HHs with Drinking
water
HHs with
freedge Land line/Mobile 2-
wheeler 4-
wheeler
1 Kondh 650 245 342 108 12 298 655 173
2 Vatariya 218 87 80 30 1 74 218 21
3 Kanerav 119 45 43 24 2 43 0 13
4 Desad 371 140 161 67 3 144 366 60
5 Karsad 185 72 63 29 11 53 189 34
6 Valiya 1388 1050 1127 505 111 945 1406 598
3.3. Livelihood pattern:
The villagers earn their livelihood from agriculture and animal husbandry and during summer seasons they migrate for daily wage
labourers in Surat and Ankleshwar. They earn some money from other works like forest things and handicrafts.
Table no. 27: Per capita Income
Sr. no Village Agriculture Animal husbandry Casual labour Others Total
1 Kondh 5529.84 2200 8577 4755 21061.84
2 Vatariya 10582.6 1570 4500 4188 20840.6
3 Kanerav 16519.2 2300 3500 1155 23474.2
4 Desad 11994.61 1100 5700 3300 22094.61
5 Karsad 13780.53 798.165 6600 1677 22855.7
6 Valiya 5663.3 3355 3095.31 5600 17713.61
PIA- District Watershed Development Unit Bharuch Page 35
3.4 Dependence on forest/Common Property Resource
People use the CPR and forest resources as fodder purpose, fuel purpose. They use all these things for self consumption. Only few
people earn income from fuel and other forest products like bamboo, Mahua oil and timbaru pan.
Table no.28: Dependence on Forest/CPR
Sr.no Village
Fodder Fuil Wood other product Total
income % sells Income % sells Income % sells Income
1 Kondh - Self consumption - Self consumption - - -
2 Vatariya - Self consumption - Self consumption - - -
3 Kanerav - Self consumption - Self consumption - - -
4 Desad - Self consumption - Self consumption - - -
5 Karsad - Self consumption - Self consumption - - -
6 Valiya - Self consumption - Self consumption - - -
Table no. 29: Livelihood pattern (Occupational distribution)
Sr.no Village Total
workforce Agriculture
Animal husbandry
(AH) Agriculture + AH Casual labour Services Handicraft Others
1 Kondh 1132 525 135 102 308 20 4 38
2 Vatariya 1025 322 127 151 325 45 0 55
3 Kanerav 490 75 112 115 154 12 0 22
4 Desad 984 224 85 170 405 38 0 62
5 Karsad 494 105 45 95 217 21 0 11
6 Valiya 2315 325 28 85 900 655 12 310
PIA- District Watershed Development Unit Bharuch Page 36
3.5. Comparative data of the crop productivity of the area: project area vs. District vs. State vs. Country
“The term productivity in general means the total output per unit of factor input. For example land productivity means output per
hectare of land. Productivity is an average and is calculated by dividing the total output of a particular crop by the total cultivated area under
that crop.”
Data are made available by the Baseline survey (for all six villages), Handbook of Agriculture, ICAR publication 2006 (For Gujarat and
India), and Final district action plan (DAP) of Dept. of Agriculture (for Bharuch). The results indicate that Kondh project has very low
productivity compared to world, India, Gujarat and Bharuch district. The productivity is low not only because of the land is unproductive or
the farmer’s lack the skill to manage their crops but also due lack of source of irrigation.
In Kondh project people grow crops like Tur, Cotton, Sorghum and Sugercane in Kharif season. And if irrigation facility is available,
they take Rabi crops like Rabi sorghum.
The main crop of the project area is Tur. The productivity of Tur in India is 678 kg/ha. In Gujarat state the productivity of this is 989
kg/ ha. In Bharuch district this is 725 kg/ha. In the project area out of 1656 ha, Tur is grown in only 547 ha area with the production of 197.3
tonne. So the productivity of the area is 360.73 kg/ha. This is very low with respective to district, state as well as national level.
The productivity of Paddy in India is 2278 kg/ha. In Gujarat state the productivity of this is 1699 kg/ ha. In Bharuch district this is
1897 kg/ha. In the project area out of 4457.9 ha, Paddy is grown in only 1525 ha area with the production of 724.37 tonne. So the
productivity of the area is 350 kg/ha. This is also very low with respective to district, state as well as national level.
PIA- District Watershed Development Unit Bharuch Page 37
Figure-4 Comparative productivity of Tur crop and Cotton crops in project area, Bharuch district, state and India level
Kondh project has low productivity because of following reason:
1 Traditional Farming Method:
In Kondh project farmers use traditional farming system. They don’t use new technology or we can say systematic method of cultivation
and high yield varieties of crops in their farms. Farmers don’t use proper FYM, Vermi-compost in their farms. That leads to low yield in
their farm.
2 Small land holding:
Average landholding of the project area is very low so farmers are unable to adopting new cultivation practices in their farms.
0
100
200
300
400
500
600
700
800
India Gujarat Bharuch Kondh Project
678 700743
341.36
Tur Productivity (Kg/Ha)
0
100
200
300
400
500
600
700
800
India Gujarat Bharuch Kondh Project
678 700743
341.36
Cotton Productivity (Kg/Ha)
PIA- District Watershed Development Unit Bharuch Page 38
3 Soil erosion:
Due to the undulating topography soil erosion is very high in the project area. So top layer of the soil/ fertile soil is just replaced by new
one and fertility of the land is degraded.
4 Soil fertility very low:
In Kondh project fertility of the soil is very low because of Soil is less nutritive in nitrogen and phosphorus.
5 No irrigation facilities:
Water conservation structures are very less in Kondh project. So rain water is not conserve in the project area. Irrigation facility is also
very less. Farmers use only rainfed farming in their field.
6 Lack of finance for farmer:
In Kondh project above 46.71% of the villagers are BPL. So they can’t purchase high yielding varieties seeds and other machineries for
their farm. They are also unable to adopting new farming technologies in the field also.
7 Lack of storage, marketing and transport facility:
Farmers use their products for domestic purpose and remaining they sell in the nearest market and get less amount of money. They have
no storage facility and transport facility so that they can’t sell their products in good market and get good return.
PIA- District Watershed Development Unit Bharuch Page 39
CHAPTER-4
WATERSHED ACTIVITY
Watershed Activities Watershed management as a strategy has been adopted by Government of India especially in the rain-fed regions of semi-arid tropics.
These regions are characterized by low and undependable rain, low soil fertility, poor infrastructure development, low literacy and high
incidence of migration. Several studies have identified that there is a dire need of a systematic and scientific approach to deal with
watershed development. The common guidelines generate a fresh and flexible framework for the next generation watershed development.
4.1. Scientific Planning:
i) Cluster Approach
This envisages a broader vision of Geo-hydrological unit which involves treating a cluster of micro-watershed. The Kondh
project consists of 12 micro- watersheds. Further this watershed project is in continuation with other watershed projects namely
Kochbar, Dharoli, Pathar, Kava Projects this gives an element of continuation of the programme.
ii) Base line Survey
To access the impact of any watershed development programme a detailed baseline survey has to be conducted. This acts a
benchmark for any intervention during and post implementation of any development programme. A detailed baseline survey was
undertaken which involved household census survey, Bio-physical survey and Village level data collection from Talati –cum mantri.
Household census survey includes a detailed questionnaire which was been filled by visiting each and every household in the village.
This gave in the details of the demographic profile of the village, acerage of land, the literacy percentage, SC/ST population, number of
PIA- District Watershed Development Unit Bharuch Page 40
BPL household, cattle population, net consumption rate in the village, average milk production of the cattle and various schemes
running and their benefits.
Bio-physical survey was undertaken to identify various natural resources available in the village. It included the soil typology,
well in the area, crop taken in the field, Cropping pattern, fertilizer used and various sources of irrigation in the field.
iii) Participatory Rural Appraisal (PRA)
The past experience of watershed has given tremendous input to focus on creating accountability of the stakeholders towards
the programme. This has created an emphasis to include all the stakeholder communities and their local and indigenous
Technological Knowledge (ITK) while planning for any activity. Participatory approach provides a new path for planning,
implementing, monitoring and post- withdrawal activities with a complete accountability of the stakeholders. Various PRA
techniques like resource mapping, social mapping and season calendars were used to understand the physical and social orientation
of the village in general and watershed in specific. These tools put the villagers in ease than the complicated questionnaires. Various
tools like Matrix ranking, Venn diagram were used to identify various local vegetations, Fodders crops, various institutions and their
significance in the life of the farmers. Daily routine activity helps the daily chart or life span of the villagers.
iv) Use of GIS and Remote sensing for planning
Use of various high science tools has been promoted at various stages of watershed development.
a) Prioritization
Geographical Information System (GIS) has been used for prioritization process. Various layer maps were created like Geo-
morphological, Soil, BPL Population, SC/ST population, Ground water Status, Drinking water situation Slope percent. These were all
given proper weightage according to the DoLR specification. This helped in prioritization of various watershed areas.
b) Planning
PIA- District Watershed Development Unit Bharuch Page 41
An action plan matrix was formulated by State Level Nodal Agency (SLNA) taking into account various features like the slope percent,
soil Depth, Soil Texture, Soil erosion in the area for wasteland, forest land and agricultural land. Global positioning System (GPS) was
used to identify each and every water conservation structures available in the project area. This was used to create a map. Contour
Map of vertical interval of 1 meter at a scale of 1:8000 was used for identifying various locations for soil and water conservation
structures.
Table no. 30: Details of Scientific Planning and Inputs in IWMP projects
S. No. Scientific criteria/ inputs used Whether scientific criteria was used
(A) Planning
Cluster approach Yes
Whether technical back-stopping for the project has been arranged? If yes, mention the name of the Institute
Baseline survey Yes
Hydro-geological survey Yes
Contour mapping Yes
Participatory Net Planning (PNP) Yes
Remote sensing data-especially soil/ crop/ run-off cover
Ridge to Valley treatment Yes
Online IT connectivity between
(1) Project and DRDA cell/ZP Yes
(2) DRDA and SLNA Yes
(3) SLNA and DoLR Yes
Availability of GIS layers
1. Cadastral map Yes
2. Village boundaries Yes
3. Drainage Yes
4. Soil (Soil nutrient status) Yes
5. Land use Yes
PIA- District Watershed Development Unit Bharuch Page 42
6. Ground water status Yes
7. Watershed boundaries Yes
8. Activity Yes
Crop simulation models# No Integrated coupled analyzer/ near infrared visible spectroscopy/ medium spectroscopy for high speed soil nutrient analysis
Normalized difference vegetation index (NDVI)# No
(B) Inputs
1. Bio-pesticides No
2. Organic manures No
3. Vermicompost Yes
4. Bio-fertilizer
5. Water saving devices Yes
6. Mechanized tools/ implements Yes
7. Bio-fencing Yes
8. Nutrient budgeting No
9. Automatic water level recorders & sediment samplers No
Any other (please specify)
#NDVI - Ratio of the differences of the response of vegetation in the near infrared & red regions of the electromagnetic spectrum
PIA- District Watershed Development Unit Bharuch Page 43
Table no.31: Details of PRA Activities conducted in the project area
Sr. No.
Name of the PRA Activity / FGD Date
Number of people present Lessons learnt / Understanding of the problem/situation
1 Resource Mapping:
July to November
62
Resource of income- Agriculture, Animal Husbandry Drinking water sources, i.e. Hand pumps and open well are available for 9 months regularly and remaining months they face water problem
Small land holding
2 Social Mapping: 75 90% ST population
scattered hamlets (falias)
3 Transect walk: 72
Water source for irrigation- pond
Majors crops grown- tur and cotton
Cropping on undulating topography
Bamboo, mahua and teak plantation
4 Focused group
discussion: 85
Women were mostly interested in vermi compost, animal husbandry & vegetable nursery and other micro enterprises Agriculture productivity was low & men were interested in HYV and horticulture
Land holding-1.25 ha
5 Seasonal Calendar: 36
Cropping pattern: mono cropping, mainly Tur and Cotton
Period of availability of water for agriculture: 3-4 months
Migration period- November to may
6 Daily Routine chart 30
Availability of leisure time for women is afternoon during Winter and Summer
Women is only house wife
7 Venn Diagram: 48
Primary schools are there,
No facility for upper education,
No Banking facility,
Dairy Co-operative society is very far from the villages,
PIA- District Watershed Development Unit Bharuch Page 44
Problem Analysis for low agriculture production
Low agriculture Production
Less of water
conservation measures
Small land holding
Soil erosion
Low land productivity
Lack of Irrigation
Traditional farming
Low water table
Less Capital
Lack of awareness
Less irrigation
PIA- District Watershed Development Unit Bharuch Page 48
4.2 Institution Building
i) Watershed Committee (WC)
It is a committee that is constituted by Gram Sabha to implement the watershed project with technical support of WDT in the village.
This committee is registered under society Registration Act 1860. The Gram Sabha of the village selects the chairman of the watershed
committee with the secretary who will be a paid functionary. A watershed Committee was formed accordingly in each village of the Kondh
project. Capacity building training to the watershed committee is given by WDT as well as PIA. The watershed committee has a pivotal role
to play during and after the project implementation period. In the watershed committee one members should be female, one member is
SHG member, one is landless and other members detail are given below.
Table no. 32: Watershed Committee details
Sl. No.
Names of
WCs
Date of Registration as a Society (dd/mm/
yyyy) Designation Name
M F SC ST SF MF LF Land-less
UG SHG GP Any other
1
Wat
ers
hed
Co
mm
itte
e K
on
dh
Un
der
pro
gres
s
President Vasava Budhabhai Chaniyabhai √ - √
2 Secretary
Vasava Maheshbhai Deepsangbhai √
- √
3 Member Vasava Ramilaben Sanjaybhai √ - √ √
4 Member Vasava Jasangbhai Chaganbhai √ - √ √
5 Member Vasava Rameshbhai Ambubhai √ - √ √
6 Member Vasava Geetaben Sanjaybhai √ - √ √
7 Member Vasava Sikhajibhai Ramanbhai √ - √ √
8 Nodal Officer
Patel kishorkumar Dahyabhai √
√
9 Member Bobat Mehboobbhai Salejibhai √ - √ √
PIA- District Watershed Development Unit Bharuch Page 49
10 Member Vasava Manjilaben Rajeshbhai √ - √ √
11 Member Vasava Rajeshbhai Danjibhai √ √ √
12 WDT
(Engg) Sarvaiya Nilesh Kishorbhai
√
√
1 W
ate
rsh
ed
Co
mm
itte
e V
ata
riya
Un
de
r p
rogr
ess
President Vasava Virambhai jinabhai √ √
2 Secretary Vasava Mukeshbhai Maljibhai √ √
3 Member Vasava Puspaben Natvarbhai √ √ √
4 Member
Vasava Bhimsangbhai Laxmanbhai √ √ √
5 Member Vasava Pravinbhai Badharbhai √ √ √
6 Member Prasad Manjuben Fulenabhai √ √ √
7 Member Vasava Ishwarbhai Kikabhai √ √ √
8 Nodal Officer
Patel kishorkumar Dahyabhai √
√
9 Member Patel Manishaben Kishorbhai √ √
10 Member Vasava Chandubhai Ganpatbhai √ √ √
11 Member Zaveri Dixitkumar Bharatbhai √ √
12 WDT
(Engg) Sarvaiya Nilesh Kishorbhai
√
1
Wat
ers
he
d C
om
mit
tee
Kan
erav
Un
der
pro
gres
s
President Vasava Shivrambhai Ramsingbhai √
- √
2 Secretary
Vasava Pravinbhai Mariyabhai √
- √
3 Member Vasava Amarsing Chotiyabhai √ -
√
4 Member Vasava Devanbhai Virambhai √ -
√ √
5 Member Vasava Ambubhai Ichhubhai √ -
√ √
6 Member
Vasava Bhanuben Virendrabhai
√
- √
√
7 Member Vasava Rajubhai Budhiyabhai √ -
√ √
PIA- District Watershed Development Unit Bharuch Page 50
8
Nodal Officer
Patel kishorkumar Dahyabhai √
√
9 Member
Vasava Ramubhai Parsottambhai
√ -
√ √
10 Member Vasava Vinodbhai Vajirbhai √ -
√ √
11 Member Vasava Jasuben Raysingbhai √ -
√ √
12
WDT (Engg)
Sarvaiya Nilesh Kishorbhai √
1
Wat
ers
hed
Co
mm
itte
e D
esa
d
Un
der
pro
gre
ss
President Vasava Ambubhai D. √ -
√
2 Secretary
Mangrola Balvantsinh Nathusinh
√ -
3 Member
Vashi Prabhavatiben Bhavsinh
√
-
√
4 Member
Karmariya Hetalkumar Umangsinh √
-
√
5 Member Vasava Sukvantiben Tinubhai √ -
√
6 Member Vasava Laxmiben Vinodbhai √ -
√ √
7 Member
Vasava Laxmanbhai Maganbhai √
- √
√
8
Nodal Officer
Patel kishorkumar Dahyabhai √
√
9 Member Panchal Nathubhai Chitubhai
√ -
√
10
Member Bharthaniya Rajendrasinh Hamirsnh
√
-
√
11 Member
Mahida Bharatsinh Mohansinh √
- √
√
12 WDT(Agri)
Prajapati Keyulkumar Ganpatbhai
√
PIA- District Watershed Development Unit Bharuch Page 51
1
Wat
ers
he
d C
om
mit
tee
Kar
sad
Un
de
r p
rogr
ess
President Rana Jaydeepsinh Vinaysinh √ - -
2 Secretary
Bharthaniya Devendrasinh mahendrasinh √
-
3 Member Niporiya Kalaben Vikramsinh √ - -
√
4 Member
Sunva Sanjaykumar Narendrasinh √
- -
√
5 Member
Vasava Shivrambhai Vineshbhai √
- √
¡
6 Member
Bharthaniya Lalitaben Sukhdevsinh
√
- √
7 Member
Vasadiya Deepaksinh Chhatrasinh √
- √
8
Nodal Officer
Patel kishorkumar Dahyabhai √
√
9 Member Vasiya Ishwarsinh Nathusinh √ -
√
10 Member Vasava Ravjibhai Ratiyabhai √ -
√
11 Member Rana Manojkumar Rupsinh √ -
√
12 WDT(Agri)
Prajapati Keyulkumar Ganpatbhai
√
1
Wat
ers
hed
Co
mm
itte
e V
aliy
a
Un
der
pro
gres
s
President Vasava Jagdishbhai √ -
√
2 Secretary Vasava Vinaybhai ivanbhai √ -
√
3 Member Vasava Kusumben Kantilal √ -
√ √
4 Member Modi Kanchanlal Manilal √ - -
√
5 Member Vasava Mukeshbhai Devabhai √ -
√ √
6 Member
Vasava Padmaben Chhatrasinh
√
- √
7 Member
Vasava Ishwarbhai Babarbhai √
- √
√
PIA- District Watershed Development Unit Bharuch Page 52
8
Nodal Officer
Patel kishorkumar Dahyabhai √
√
9 Member
Vasava Jayantibhai Chandubhai √
- √
10 Member
Piludariya Rajendrasinh Raysinh √
- - √
11 Member
Vasava Vechanbhai Ramlabhai √
- √
√
12 WDT(Agri)
Prajapati Keyulkumar Ganpatbhai √
√
ii) Self help Groups:
Self Help Groups are motivated, small homogenous groups organized together through credit and thrift activities. Self help group
initiative especially for women help uplift their livelihood. Generally self help groups include landless and poor women.
Before formation of the SHGs, during PRA activities, Focussed Group Discussions (FGDs) were held with the women, which came up
with the following observations:
a) Lack of proper credit facilities due to low intervention of formal financial credit institution.
b) Excessive exploitation of weaker section by money lenders
c) Lack of attitude for saving among poor people
d) Lack of knowledge on credit and thrift activity and banking.
e) Lack of contribution of female in any activities.
With a detailed discussion with some of the local NGOs working in the area like AKRSP, it was planned to have some capacity building
training regarding SHG activities. It was also proposed to have some livelihood activities which will promote women empowerment.
PIA- District Watershed Development Unit Bharuch Page 53
Table no. 33: SHG detail
S. No.
Total no. of registered SHGs No. of members No. of SC/ST in each
category No. of BPL in each
category
With only Men
With only
Women With both Total Categories M F Total M F Total M F Total
1 Kondh
0 8 0 8
(i) Landless 45 45 35 35 45 45
(ii) SF 25 25 13 13 12 12
(iii) MF 10 10 0 6 6
(iv) LF
Total 0 8 0 8 0 80 80 0 48 48 0 63 63
2 Vatariya
4 4
(i) Landless 22 22 13 13 3 3
(ii) SF 12 12 7 7 0
(iii) MF 10 10 5 5 0
(iv) LF
Total 0 4 0 4 0 44 44 0 25 25 0 3 3
3 Kanerav
0 4 0 4
(i) Landless 16 16 16 16 16 16
(ii) SF 11 11 11 11 7 7
(iii) MF 13 13 13 13 4 4
(iv) LF
Total 0 4 0 4 0 40 40 0 40 40 0 27 27
4 Desad
0 6 0 6
(i) Landless 22 22 20 20 15 15
(ii) SF 25 25 13 13 8 8
(iii) MF 19 19 11 11 0
(iv) LF
PIA- District Watershed Development Unit Bharuch Page 54
Total 0 6 0 6 0 66 66 0 44 44 0 23 23
5 Karsad
0 4 0 4
(i) Landless 22 22 16 16 10 10
(ii) SF 12 12 7 7 0
(iii) MF 14 14 0 0
(iv) LF
Total 0 4 0 4 0 48 48 0 23 23 0 10 10
6 Valiya
0 5 0 5
(i) Landless 22 22 22 22 18 18
(ii) SF 14 14 15 15 9 9
(iii) MF 17 17 2 2 0
(iv) LF
Total 0 5 0 5 0 53 53 0 39 39 0 27 27
G.TOTAL 0 31.00 0.00 31.00 0.00 0.00 331.00 331.00 0.00 219.00 219.00 0.00 153.00 153.00
4.2.3 User Group:
User Groups are normally formed to manage an activity or asset created under the programme on a long term basis. The user group
collect user charges from their members, oversee the works and manage the benefits.
It was decided that each group would formulate certain internal rules and have a feeling of ownership with community spirit.
Table no. 34: UG detail
S. No. Village
Total no. of UGs No. of members No. of SC/ST in each
category No. of BPL in each
category
Men Women Both Total Categories M F Total M F Total M F Total
1
Kondh 9 9
(i)Landless 30 30 30 30 17
(ii) SF 22 22 5 5 5
(iii) MF 24 24 9 9 9
(iv) LF 6 6 2 2
PIA- District Watershed Development Unit Bharuch Page 55
Total 9 0 0 9 82 0 82 46 0 46 31 0 0
2
Vatariya 8 8
(i)Landless 22 22 22 22 9
(ii) SF 32 32 15 15 2
(iii) MF 19 19 12 12 2
(iv) LF 2 2 0
Total 8 0 0 8 75 0 75 49 0 49 13 0 0
3
Kanerav 2 2
(i)Landless 10 10 10 10 8
(ii) SF 5 5 5 5 3
(iii) MF 5 5 5 5 3
(iv) LF 0 0
Total 2 0 0 2 20 0 20 20 0 20 14 0 0
4
Desad 7 7
(i)Landless 22 22 18 18 15
(ii) SF 17 17 12 12 8
(iii) MF 15 15 8 8 4
(iv) LF 2 2 0
Total 7 0 0 7 56 0 56 38 0 38 27 0 0
5
Karsad 3 3
(i)Landless 12 12 5 5 5
(ii) SF 15 15 8 8 6
(iii) MF 15 15 7 7 5
(iv) LF 0 0
Total 3 0 0 3 42 0 42 20 0 20 16 0 0
6
Valiya 4 4
(i)Landless 18 18 14 14 7
(ii) SF 10 10 8 8 5
(iii) MF 14 14 9 9 6
(iv) LF 0 0
Total 4 0 0 4 42 0 42 31 0 31 18 0 0
Grant Total 33 0 0 33 0 317 0 317 204 0 204 119 0 0
PIA- District Watershed Development Unit Bharuch Page 56
4.3. Physical activities to be undertaken under IWMP, Kondh
4.3.1 Entry Point activity (EPA)
EPA activities are taken up under watershed projects to build a rapport with the village community at the beginning of the project;
generally, certain important works which are in urgent demand of the local community are taken up. A group Discussion was conducted
with village people in Gram Sabha regarding the EPA activity. The villagers discussed various activities which they felt is important, which
revive the common natural resources. EPA was selected on the basis of Drinking water problem, repairing of structures for irrigation water
facilities and for animal drinking problem. It was also taken into priority that there should be an instrument of convergence which will result
in sustainability of activities. In EPA some activities like pipeline, sintax tank, bore well, electrical motor have taken for drinking water
facility and other activities like check dam repairing and Desilting, Hawada etc. have taken for irrigation purpose in the villages. In some
villages Protection and cause way has taken in EPA activity.
Table no.35: Entry point activities (EPA) (All financial figures in lakh Rs.)
Sr. No.
Names of Villages
Amount earmark
ed for EPA
Entry Point Activities planned
No.of work
s Net exp. In IWMP
convergence
Total estima
ted cost Expected outcome
1 KONDH 8.62
Drinking waterPipe line 1 2.85 2.85 Solution of drinking water problems Hawada Repairing 1 0.45 0.45 Solution of Animal drinking water problems Causeway Repairig 1 3.00 3.00 Solution of two villages connectivity Protection wall 1 2.32 2.32 To protect demage causeway
2 VATARIYA 4.36 Pond deepening 1 3.00 3.00 recharging & Irrigation Facilities Checkdam Repairing 1 1.36 1.36 recharging & Irrigation Facilities
3 KANERAV 0.84
Borewell with single face(School) 1 0.84 0.84 Solution of drinking water problems
4 DESAD 3.62
Causeway 1 3.62 3.62 Solution of villages to farm field connectivity
5 KARSAD 1.93 Pond deepening 1 1.93 1.93 recharging & Irrigation Facilities
6 VALIYA 2.64 Causeway 1 1.94 1.94 Solution of school connectivity Animal Water through (hawada) Bharvadvas 1 0.70 0.70 Solution of Animal drinking water problems
TOTAL :- 22.01 11 22.01 22.01
PIA- District Watershed Development Unit Bharuch Page 57
Table No. 35.1 Estimation of Hawada At village Valiya
NO DESCRIPTION NO L B D/H QTY T.QTY Rate per Amount
1 Excavation for foundation
* Foundation 1 8.30 5.00 0.20 8.30 8.30 87.00 Cu.m 722.10
2 Cement concrete in 1:4:8
1 8.30 5.00 0.20 8.30 8.30 2838.6 Cu.m 23560.38
3 Cement concrete in 1:2:4
* Bottom Layer 1 8.30 5.00 0.10 4.15
* Long Vertical wall O/o 2 5.30 0.15 0.50 0.80
* Short vertical wall I/I 2 1.20 0.15 0.50 0.18 5.13 4018.10 Cu.m 20592.76
4 Providing cement plaster in 20mm tk
* Bottom 1 8.30 5.00 41.50
* Long vertical wall O/o 2 5.30 0.50 5.30
* Short vertical wall O/o 2 1.50 0.50 1.50
* Long vertical wall I/I 2 5.00 0.50 5.00
* Short vertical wall I/I 2 1.20 0.50 1.20
* Long wall top 2 5.30 0.15 1.59
* Short wall top 2 1.20 0.15 0.36 56.45 141.60 Sq.m 7993.32
5 Mild Steel bars
( S.O.R.P.No. 62 Sr.No. 5 )
* Bottom base steel ( both side )
* 8 mm dia. 0.15m c/c
Nos=8.30/0.15+1=56.33 say 56 nos 56 X 5.00 X 0.395 110.60
* 8 mm dia. 0.15m c/c
Nos=5.00/0.15+1=34.33 say 34 nos 34 X 8.30 X 0.395 111.47
* Vertical Bars
* long wall- 10mm dia. Bars o.15 m c/c
PIA- District Watershed Development Unit Bharuch Page 58
Nos=5.15/0.15+1=35.33 say 35 nos 2 X 35 X 0.75 X 0.62 32.55
* Short wall
Nos=1.35/0.15+1=10 nos 2 X 10 X 0.75 X 0.62 9.30
* Distribution bars 8mm dia
* L=5.15+5.15+1.35+1.35=13.00m
Nos=0.55/0.15+1=4.667say 5 nos 2 X 5.00 X 13.00 X 0.75 X 0.395 38.51 302.43 54.88 Kg 16597.30
6 Name Plate 1 Nos.
1 nos 1 nos 1200 Nos 1200.00
TOTAL AMOUNT :- 70665.87
SAY :- 70000.00
ESTIMATION OF DRINKING WATER PIPELINE AT:- KONDH NO DESCRIPTION NO L B D/H QTY T.QTY RATE AMOUNT
1 Excavation for pipe line 1 760 0.45 0.75 256.50 256.50 87.00 22315.5
2 Sand filling in bed 1 760 0.45 0.10 34.20 34.20 650.00 22230.00
3 110mm P.V.C Pipe line 6 kg/Sq.cm 1 760 760 ( S.O.R.P.NO. 68. SR.NO. 170/7 )
760.00 275.00 209000.00
4 10 % of cost for bend ,t,Valve etc.
20900.00
5 Labour Charges of P.V.C pipe fitting 1 760 760 760.00 15.00 11400.00 TOTAL AMOUNT:- 285845.50 SAY:- 285000.00
PIA- District Watershed Development Unit Bharuch Page 59
Figure-7, EPA acitivity in Kondh project
4.3.2. Watershed Development Works:
Watershed development works are to be done during second phase of watershed project. A multi-tier ridge to valley sequence
approach should be approached towards implementation of watershed development projects. A net budget of 56 percent is allotted for this
work.
PIA- District Watershed Development Unit Bharuch Page 60
Ridge Area Treatment Plans:
It is very important to treat the ridge as this is where the major water resources originate. For the ridge area treatment of Kondh watershed
following structure are been Proposed after interaction among Gram sabha, watershed committee, Technical Experts, Project Manager and
other field staff of project.after preparing DPR all these activities list was approved in again Gram Sabha.
1. Check dam 2. Gully plug 3. Stone bunding 4. Gabion structure 5. Farm pond 6. Outlet 7. Farm weist weir 8. Farm bunding
1. Check dams
Check Dam is a structure constructed using cement and concrete across the river of comparatively wider water channel. This
structure is preferred where the height of both the banks of river is considerably high and the width of river channel or stream is less.
Advantages of check dams
The advantages of check dams are that they store surface water for use both during and after the monsoon. They help in ground water
recharge of the area. Recharge of water helps in raising the water table in the area. Avaiability of water ensures the increase of agricultural
yield by multi-cropping.
2. Gully plug
A small gully bund like this one Prevents a new Gully being formed in the middle of the farm, thus preventing erosion from the beginning
itself. Such bunds would make two parts of one field, thus making it difficult to plough, but some farmers are ready to do it.
PIA- District Watershed Development Unit Bharuch Page 61
3. Gabion structure
Gabions are used to stabilize shorelines or slopes against erosion. Other uses include retaining walls, temporary floodwalls, to filter silt
from runoff, for small or temporary/permanent dams, river training, channel lining. They may be used to direct the force of a flow of flood
water around a vulnerable structure. Gabions are also used as fish barriers on small streams.
4. Farm pond
Farm pond provides a unique water management runoff facility that could feed pond with seasonal fresh water. This water will be useful
for feeding your livestock in the summer or it could serve as a very effective backup source of freshwater to meet the needs of farm in case
there is a drought like condition in the area.
5. Stone bunding:
After filling the Staggered Trenches, the excess water flows out in the form of little streams. To stop these streams, the obstruction walls
of the length equal to the width of the streams are made with the help of stones. Such walls are created at an interval of 200 to 300 meters
along the channels of the streams. These walls are known as Stone bunding.
6. Percolation tank
Percolation Tank is the arrangement in which the retaining walls of clay are made and a dam (waste weir) is constructed using cement
concrete. This tank is preferred at the site where two to three rain water streams meet. The outlet is also planned so that excess water
overflows out of it. The Storage Tank is a good basin for water storage.
PIA- District Watershed Development Unit Bharuch Page 62
Table no.36: Details of ridge line treatment / land based activities in watershed works*
Sr. No.
Village name
Name of structures
Type of treatment Type of land Executing
agency Target
(i) Ridge area (R)
(ii) Drainage
line (iii) (i)
(ii) Community
(iii) Others
(pl. specify)
(i) UG
No. of units (No./
Cu.m./ rmt)
Estimated cost (Rs. in lakh) (D)
Land dev. (L)
Private (ii)SHG
(iii) Others
(pl. specify) M W O T
1 Kondh
Gully plug R L P P 75 15.0038154 Land Levelling L P P 70 20.07745
Farmbunding L P P 17420
rmt 14.549184
Farm outlet L P P 70 1.05 Stone bunding R L P P
275 rmt 1.655775
Nala plug L P P 73 38.8755
TOTAL:- 91.21172
2 Vatariya
Gully plug R L P P 27 3.8519112 Land Levelling L P P 13 3.59249
Farmbunding L P P 10600
rmt 8.85312
Farm outlet L P P 42 0.63 Stone bunding R L P P
430 rmt 2.58903
Nala plug L P P 25 14.9145
TOTAL:- 34.43105
PIA- District Watershed Development Unit Bharuch Page 63
3 Kanerav
Gully plug R L P P 33 1.0251054 Land Levelling L P P 2 0.48384
Farmbunding L P P 2475 rmt 2.06712
Farm outlet L P P 11 0.165 Stone bunding R L P P 45 rmt 0.270945
Nala plug L P P 4 2.445
TOTAL:- 6.45701
4 Desad
Gully plug R L P P 21 4.814889 Land Levelling L P P 9 2.694
Farmbunding L P P 7500 rmt 6.264
Farm outlet L P P 37 0.555 Stone bunding R L P P 65 rmt 0.391365
Nala plug L P P 13 7.335
TOTAL:- 22.05425
5 karsad
Gully plug R L P P 39 6.5855256 Land Levelling L P P 11 2.2043
Farmbunding L P P 7397 rmt 6.1779744
Farm outlet L P P 45 0.675 Stone bunding R L P P
110 rmt 0.66231
Nala plug L P P 17 7.7425
TOTAL:- 24.04761
PIA- District Watershed Development Unit Bharuch Page 64
6 Valiya
Gully plug R L P P 13 3.0442524 Land Levelling L P P 13 3.752
Farmbunding L P P 2550 rmt 2.12976
Farm outlet L P P 12 0.18 Stone bunding R L P P 65 rmt 0.391365
Nala plug L P P 15 8.7205
18.21788
G.TOTAL:- 196.419527
Table no.37: Activities related to Surface water resources in the project areas (all financial figures in lakhs .)
S. No.
Village name Type of structures
Proposed target Augmentation/ repair of existing
structures Construction of new structures Total target
No.
Area to be
irrigated (ha)
Storage capacity
Estimated cost No.
Area to be
irrigated (ha)
Storage capacity
(cum) Estimated cost No.
Area to be
irrigated (ha)
Storage
capacity
(cum) Estimated cost
1 Kondh
New Pond 6 21 29000 10.8879 6 21 29000 10.8879
Pond depning 1 5 8000 1.52 1 5 8000 1.52
Weist weir 1 2.5 2500 0.6 1 2.5 2500 0.6
Check dam 5 9 17000 3.6 5 9 17000 3.6
Recharge channel 1 2 2000 0.3752 1 2 2000 0.3752 Farm Pond Depning 2 4.5 7500 1.25 2 4.5 7500 1.25
Outlet 5 19 27000 10.5 5 19 27000 10.5
Drainage Line 6 6.5 11500 2.85621 6 6.5 11500 2.85621
PIA- District Watershed Development Unit Bharuch Page 65
Total :- 1 5 8000 1.52 26 64.5 96500 30.0693 27 69.5 10450
0 31.5893
2 Vatari
ya
New Pond 1 8.5 16500 3 1 8.5 16500 3
Check dam 4 23 31500 11.5 4 23 31500 11.5
Recharge channel 1 8 16500 3 1 8 16500 3 Farm Pond Depning 1 3.75 6500 0.85 1 3.75 6500 0.85
Outlet 2 8.5 16500 3.5 2 8.5 16500 3.5
Drainage Line 1 3.25 6000 0.75 1 3.25 6000 0.75 Disilting of checkdam 1 5.5 10500 2.7364 1 5.5 10500 2.7364 Checkdam Repairing 1 4.75 7800 1.5 1 4.75 7800 1.5
Total :- 2 8.5 14300 2.35 10 56.75 97500 24.4864 12 65.25 11180
0 26.8364
3 Kanera
v
Checkdam 1 5 10000 2.74 1 5 10000 2.74
Farm Pond 1 4.5 5500 0.5 1 4.5 5500 0.504
Drainage Line 3 4 7500 1.26 3 4 7500 1.26
Total :- 0 0 0 0 5 13.5 23000 4.5 5 13.5 23000 4.504
4 Desad
New pond 3 19 27500 8.157 3 19 27500 8.157
Pond deepening 1 5.75 9000 2 1 5.75 9000 2
Outlet 3 14.5 25500 7.5 3 14.5 25500 7.5 Checkdam Repairing 3 9.25 18000 5 3 9.25 18000 5
Farm Pond 1 5.75 9000 2 1 5.75 9000 2
Drainage Line 3 9.25 17000 3.75 3 9.25 17000 3.75
Total :- 4 15 27000 7 10 48.5 79000 21.407 14 63.5 10600
0 28.407
5 Karsad
Checkdam Repairing 2 6.5 12000 2.986 2 6.5 12000 2.986 Disilting of checkdam 1 3 6500 0.9 1 3 6500 0.9
Total :- 3 9.5 18500 3.886 0 0 0 0 3 9.5 18500 3.886
PIA- District Watershed Development Unit Bharuch Page 66
6 Valiya
Pond deepening 3 13 24500 7.29 3 13 24500 7.29 Pondbund pitching work 1 6.5 14500 2.5 1 6.5 14500 2.5
Outlet 2 9 18575 6 2 9 18575 6 Checkdam Repairing 1 5.75 9000 2 1 5.75 9000 2
Drainage Line 1 0.75 1 0 0 0.75
Total :- 4 18.75 33500 9.29 4 15.5 33075 9.25 8 34.25 66575 18.54
G.TOTAl:-
14.00 56.75
101300.00 24.05
55.00 198.75
329075.00
89.71271 69 255.5
430375
113.76271
Table no.39: Details of activities related to livelihood, production system and micro-enterprises
S. No.
Name of
village Name of activity
Type of land Executing agency Target
(i) Private
(ii) Commu
nity (iii) Others (pl. specify)
(i) UG Estimated cost
(ii)SHG (Rs. in lakh)
(iii) Others (pl.
specify)
1 Kondh Nursery Raising P C Shg 2.80
Vegetable Nursery (Chilli, Tomato, Brinjal and Onion)
P C Shg 2.10
Vermi compost unit P C Shg 0.50
Low cost green house P Shg 2.00
Poultry unit ( Small) P C Shg 6.00
Fishries C Ugs 1.00
PIA- District Watershed Development Unit Bharuch Page 67
Paper dish making P Shg 2.00
Utensils Services Shg 2.99
TOTAL:- 19.39
Horticulture plantation P Individual 1.20
Floriculture demo plot(Rose) P Individual 2.50
Floriculture demo plot(Merigold) P Individual 1.20
Horticulture demo. plot P Individual 1.50
Crop demonstration plot P Individual 1.50
Crop demonstration plot with sprinkler P Individual
Fruit demo.plot (Ha.) P Individual
Vegetable crop. demo. Plot P Individual 2.00
High yielding varieties seeds bank P Individual 0.50
Drip irrigation P Individual 2.40
Lift irrigation System C Ugs 6.00
Farm implements Individual 0.80
Irrigation pump set P Individual 0.75
Dal processing unit P Shg
Mini oil mill unit P Shg
Fodder development C Ugs 0.60
Cattle camp O Community 0.90
Mineral Mixture O Individual 0.63
Sewing machine P Individual 0.80
Sugarcane Juicer Machine P Individual 0.50
fall stiching machine P Individual 0.10
TOTAL:- 23.88
PIA- District Watershed Development Unit Bharuch Page 68
2 Vatariya Nursery raising P C Shg 1.25
Vegetable Nursery (Chilli, Tomato, Brinjal and Onion)
P C Shg 1.50
Vermi compost unit P C Shg 0.70
Low cost green house P Shg 1.00
Poultry unit ( Small) P C Shg 2.50
Fishries C Ugs 1.86
Paper dish making P Shg 1.00
TOTAL:- 9.81
Horticulture plantation P Individual 0.60
Floriculture demo plot P Individual 0.60
Horticulture demo. plot P Individual 0.50
Crop demonstration plot P Individual 0.60
Crop demonstration plot with sprinkler P Individual 0.60
Fruit demo.plot (Ha.) P Individual 0.50
Vegetable crop. demo. Plot P Individual 0.40
High yielding varieties seeds bank P Individual 0.50
Drip irrigation P Individual 1.20
Lift irrigation System C Ugs 2.65
Farm implements Individual 0.50
Irrigation pump set P Individual 0.25
Dal processing unit P Shg 1.00
Mini oil mill unit P Shg 0.00
Fodder development P Ugs 0.40
Cattle camp O Community 0.60
Mineral Mixture O Individual 0.50
Sewing machine Individual 0.80
Sugarcane Juicer Machine P Individual 0.50
PIA- District Watershed Development Unit Bharuch Page 69
fall stiching machine P Individual 0.10
TOTAL:- 12.80
3 Kanerav Nursery raising P C Shg 0.25
Vegetable Nursery (Chilli, Tomato, Brinjal and Onion)
P C Shg 0.25
Low cost green house P C Shg 0.38
Poultry unit ( Small) P Shg 0.50
Fishries C Ugs 0.50
Utensils Services Shg 2.00
TOTAL:- 3.88
Horticulture plantation P Individual 0.12
Floriculture demo plot P Individual 0.30
Horticulture demo. plot P Individual 0.25
Crop demonstration plot P Individual 0.62
High yielding varieties seeds bank P Individual 0.25
Farm implements Individual 0.30
Irrigation pump set P Individual 0.25
Cattle camp P Community 0.30
Sewing machine P Individual 0.40
TOTAL:- 2.79
4 Desad Nursery raising P C Shg 1.50
Vegetable Nursery (Chilli, Tomato, Brinjal and Onion)
P C Shg 1.00
Vermi compost unit P C Shg 0.70
Low cost green house P Shg 1.00
Poultry unit ( Small) P C Shg 2.50
Fishries C Ugs 1.45
TOTAL:- 8.15
Horticulture plantation P Individual 0.60
Floriculture demo plot P Individual 0.60
Horticulture demo. plot P Individual 0.75
Crop demonstration plot P Individual 1.20
PIA- District Watershed Development Unit Bharuch Page 70
Vegetable crop. demo. Plot P Individual 1.20
High yielding varieties seeds bank P Individual 0.45
Drip irrigation P Individual 1.20
Lift irrigation System Ugs 1.50
Farm implements P Individual 0.90
Irrigation pump set P Individual 0.50
Fodder development C Ugs 0.60
Cattle camp O Community 0.60
Mineral Mixture O Individual 0.63
Sewing machine P Individual 0.40
Sugarcane Juicer Machine P Individual 0.25
fall stiching machine P Individual 0.10
TOTAL:- 11.48
5 Karsad Nursery raising P C Shg 0.50
Vegetable Nursery (Chilli, Tomato, Brinjal and Onion)
P C Shg 0.50
Vermi compost unit P C Shg 0.35
Low cost green house P Shg 0.50
Poultry unit ( Small) P C Shg 2.50
Fishries C Ugs 1.00
TOTAL:- 5.35
Horticulture plantation P Individual 0.30
Floriculture demo plot P Individual 0.60
Horticulture demo. plot P Individual 0.50
Crop demonstration plot P Individual 0.60
Vegetable crop. demo. Plot P Individual 0.83
High yielding varieties seeds bank P Individual 0.25
Drip irrigation P Individual 1.20
Farm implements Individual 0.30
Irrigation pump set P Individual 0.25
Fodder development C Ugs 0.20
Cattle camp O Community 0.90
Mineral Mixture O Individual 0.25
Sewing machine P Individual 0.40
PIA- District Watershed Development Unit Bharuch Page 71
Sugarcane Juicer Machine P Individual 0.50
fall stiching machine P Individual 0.10
TOTAL:- 7.18
6 Valiya Nursery raising P C Shg 0.75
Vegetable Nursery (Chilli, Tomato, Brinjal and Onion)
P C Shg 0.75
Vermi compost unit P C Shg 0.35
Low cost green house P Shg 0.50
Poultry unit ( Small) P C Shg 2.00
Fishries C Ugs 0.59
Leaf plate & cup making machine Shg 0.00
Paper dish making Shg 1.00
TOTAL:- Individual 5.94
Horticulture plantation P Individual 0.30
Floriculture demo plot P Individual 0.60
Horticulture demo. plot P Individual 1.00
Crop demonstration plot P Individual 1.20
Fruit demo.plot (Ha.) P Individual 0.50
Vegetable crop. demo. Plot P Individual 0.40
High yielding varieties seeds bank P Individual 0.35
Drip irrigation P Individual 1.03
Lift irrigation System P Ugs 1.00
Farm implements Individual 0.00
Irrigation pump set P Individual 0.25
Fodder development C Ugs 0.40
Cattle camp O Community 0.90
Mineral Mixture O Individual 0.50
Sewing machine P Individual 0.80
Sugarcane Juicer Machine P Individual 0.50
fall stiching machine P Individual 0.10
TOTAL:- 9.83
PIA- District Watershed Development Unit Bharuch Page 72
Table no. 40 : Activities related to livelihood by Self Help Groups (SHGs) in the project areas
Sr. No. Names of Major activities of the SHGs
Project Name of activity No. of SHGs
involved Average annual income from activity per SHG
1
IWMP -9 Kondh
Nursery Raising 12 35000
2 Vermicomost unit 8 30000
3 Fishries 7 75000
4 Gaucher dev.& Fruit tree Plantation 2 90000
5 Poltry unit 5 78000
6 Dalmill Unit 1 36000
7 Floriculture 6 70000
8 Vegetable Nursery 6 3500
9 Paper dish Making 3 45000
PIA- District Watershed Development Unit Bharuch Page 73
Table No. 40.1 ESTIMATION OF GULLY PLUG
SR.NO DESCRIPTION No L B H Qty Rate Amount
1 Excavation 1 1.00 2.25 0.35 0.79 87.00 68.73
2 Below G.L Stone 1 1.00 2.25 0.35 0.79 1003.50 792.50
3 Above G.l 1 1.00 2.25+1.25/2 1.30
4 1 1.00 1.7500 1.30 2.28 1003.50 2282.96
5 Per 1 mt cost 3149.21
TECHNICAL SPECIFICATION GULLY PLUG SR.No PARTICULARS VALUE UNITS
1 Top width of bund 1.25 M
2 Bottom width of bund 2.25 M
3 Depth above G.L 1.25 M
4 Depth of foundation 0.35 M
5 Cross section of bund 1.75 SQ.M
PIA- District Watershed Development Unit Bharuch Page 74
Table no. 40.2 ESTIMATION OF STONE BUNDING
SR.NO DESCRIPTION No L B H Qty Rate Amount
1 Above G.l stone bund 1 1.00 1.00+0.60/2 0.75
2 1 1.00 0.80 0.75 0.60 1003.50 602.10
3 Per 1 mt cost 602.10
SR.No PARTICULARS VALUE UNITS
1 Top width of bund 0.60 M
2 Bottom width of bund 1.00 M
3 Depth above G.L 0.75 M
5 Cross section of bund 0.60 Sq.m
1.00 M
0.60 M
0.75 M
PIA- District Watershed Development Unit Bharuch Page 75
Table no. 40.3 Estimation of Farm Bunding
SR.NO DESCRIPTION No L B H Qty Rate Amount (Rs)
1 Farm Bund 1 1.00 2.2+1.00/2 0.6
1 1.00 1.60 0.6 0.96 87 83.5
SR. No PARTICULARS VALUE UNITS
1 Top width of bund 1 M
2 Bottom width of bund 2.2 M
3 Hight of bund 0.6 M
4 Cross section of bund 0.96 Sq.m
PIA- District Watershed Development Unit Bharuch Page 76
Table No. 40.4 Estimation of Nala plug 7.00 m Long DESCRIPTION NO L B D/H QTY T.QTY Rate Per Amount
1
Excavation for foundation ….
14.80
Body wall 1 3.00 1.20 1.20 4.32
Apron 1 2.70 1.20 0.60 1.94
End wall 1 2.70 0.60 0.60 0.97
Wing wall 2 1.80 0.90 0.90 2.92
Key wall - L & R side 2 2.15 1.20 0.90 4.64 87.00 Cu.m 1287.252
2
Cement concrete in 1:4:8
2.244
Body wall 1 3.00 1.20 0.10 0.36
Apron 1 3.00 2.85 0.10 0.86
End wall 1 2.70 0.60 0.10 0.16
Wing wall 2 1.95 0.90 0.10 0.35
Key wall - L & R side 2 2.15 1.20 0.10 0.52 2838.60 Cu.m 6369.8184
3
coarse rubble masonary in c.m 1:6
16.00
Body wall up to g.l 1 3.00 0.90 1.10 2.97
Body wall up to g.l to top( B= 0.9+0.6/2=.75) 1 3.00 0.75 1.00 2.25
Apron 1 3.00 1.50 0.30 1.35
End wall up to top 1 3.00 0.30 0.50 0.45
Wing wall up to g.l. 2 1.80 0.60 0.80 1.73
Wing wall up to g.l to top. ( h = 1.30+0.30/2 ) 2 1.80 0.60 0.80 1.73
Key wall - L & R side up to g.l. 2 2.00 0.60 1.10 2.64
Key wall - L g.l to top 2 2.00 0.60 1.20 2.88 2368 Cu.m 37878.528
4 concrete ( 1 : 2 : 4 ) with black stone
1.65
Body wall 1 3.00 0.60 0.10 0.18
PIA- District Watershed Development Unit Bharuch Page 77
Apron 1 3.00 1.50 0.20 0.90
End wall 1 3.00 0.30 0.10 0.09
Wing wall 2 2.00 0.60 0.10 0.24
Key wall - L & R side 2 2.00 0.60 0.10 0.24 4018.1 Cu.m 6629.865
5
cement plastering in cm 1:3 ( 20mm tk )
27.18
Body wall 2 3.00 1.10 6.60
Apron 1 3.00 1.50 4.50
End wall 2 3.00 0.45 2.70
End wall top 1 3.00 0.30 0.90
Wing wall top 2 2.00 0.60 2.40
Fair side of wing wall 2 1.80 0.80 2.88
Key wall - L & R side top 2 2.00 0.60 2.40
Key wall - L & R both side 4 2.00 0.60 4.80 141.6 Sq.m 3848.688
6 Name plate. 1 nos 1200 Nos 1200
TOTAL :- 57214.1514
SAY :- 57000.00
PIA- District Watershed Development Unit Bharuch Page 79
Table No. 40.5 Quantity & cost Estimation of checkdam
NO DESCRIPTION NO L B D/H QTY T.QTY RATE PER AMOUNT
1
Excavation for foundation …
47.94 87.00 Cu.m 4170.78
Body wall...... 1 5.00 2.00 1.50 15.00
Key wall (L) side........ 1 2.25 2.00 1.50 6.75
Key wall (R) side........ 1 2.25 2.00 1.50 6.75
Side wall......... 2 1.80 2.00 1.50 10.80
End wall....... 1 9.00 0.60 0.60 3.24
Apron..... 1 5.00 1.80 0.60 5.40
2
C.C 1:4:8 …..
13.23
Cu.m
Body wall...... 1 5.00 2.00 0.30 3.00
Key wall (L) side........ 1 2.25 2.00 0.30 1.35
Key wall (R) side........ 1 2.25 2.00 0.30 1.35
Side wall......... 2 1.80 2.00 0.30 2.16
End wall....... 1 9.00 0.60 0.30 1.62
Apron..... 1 5.00 2.50 0.30 3.75
2838.60 37554.68
3
C.C 1:2:4 …..
23.64
Cu.m
Body wall up to G.L....... 1 5.00 1.50 1.20 9.00
Body wall up to G.L to top… 1 5.50 1.125 1.50 9.28
(B=.75+1.5/2=1.125)
PIA- District Watershed Development Unit Bharuch Page 80
Key wall top 2 2.25 0.75 0.15 0.51
End wall top..... 1 5.50 0.30 0.15 0.25
Side wall top..... 2 2.50 0.75 0.15 0.56
Apron.... 1 5.50 2.45 0.30 4.04
4018.10 94987.88
4
C.C 1:3:6
41.45
Cu.m
Key wall up to G.L........ 2 2.25 1.50 1.20 8.10
Key wall up to G.L to top...... 2 2.25 1.125 2.00 10.13
.(B=.75+1.5/2=1.125)
Side wall up to G.L...... 2 2.75 1.50 1.20 9.90
Side wall up to G.L to top… 2 2.75 1.125 2.00 12.38
(B.=.75+1.5/2=1.125) 0.00
End wall up to G.L... 1 5.00 0.30 0.30 0.45
End wall up to G.L to top..... 1 5.50 0.30 0.30 0.50
3136.60 129996.4
5
Cement plaster in 20 mm tk
45.29
Sq.m
Body wall top.. 1 5.50 0.75 4.13
Body wall D/S side... 1 5.50 1.50 8.25
Body wall u/S side... 1 5.50 1.50 8.25
Side wall top... 2 2.75 0.75 4.13
Side wall inner side.. 2 2.50 2.15 10.75
Side wall front side.. 2 1.125 2.15 4.84
PIA- District Watershed Development Unit Bharuch Page 81
Endwall side…. 2 5.50 0.30 3.30
End wall top… 1 5.50 0.30 1.65
141.60 6412.71
6 Name plate 1 1 Nos 1200 1200
TOTAL AMOUNT :- 274322.44
SAY :- 274000.00
Cross section of check dam
PIA- District Watershed Development Unit Bharuch Page 82
Table No. 40.6 Quantity & cost Estimation of New pond
NO DESCRIPTION NO L B D/H QTY T.QTY RATE PER AMOUNT
1 Exacavation work of pond 1 65+40/2 58+40/2 1.50
55.00 49.00 1.50 4042.50 4042.50 50.40 203742.00
SAY :- 200000.00
PIA- District Watershed Development Unit Bharuch Page 83
Table no. 41: Linkages developed at village level
Sr. No. Project Name of activity Forward linkage Backward linkage
1 IWMP-9 Kondh
Vermi compost unit Local area Local area
Nursery raising Local market Local area
Net house (vegitable and fruit seedling). Local area Local market and Jhagadiya
Leaf plate & cup Making Machine Local area Local market
Paper dish Making Local area Local market
Oil mill (mahuda,ground nut) Local area Local market
Fodder development Local area Local market
Fishries Local area Local market Valiya ,
Ankleshwar and Bharuch
Dal mill Local area Local market Valiya and
Ankleshwar Table no.42: Details of activities connected with vegetative cover inwatershed works
No. Name of village Name of structure/ work
Type of treatment Type of land Executing
agency Target
(i) Ridge area (R)
(ii) Drainage line (
D )
(iii) Land dev. (L)
(i) Private
(ii) Communi
ty
(iii) Others (pl. specify
)
(i) UG
Area (ha)
No. of plants
Estimated cost
Expected
month & year
of completion (mm/ yyyy)
(ii)SHG (Rs. in lakhs)
(iii) Others
1 Kondh
Farm Forestry L P Private 45.0045 50000 5.00 Teackwood Plantation with Staggered trench ( 1.hac) R C UGS 1 1111 0.70 Teackwood Plantation with Staggered trench ( 1.hac) R C UGS 1 1111 0.70
PIA- District Watershed Development Unit Bharuch Page 84
Teackwood Plantation with Staggered trench ( 1.hac) R C UGS 1 1111 0.70 Afforestation with Staggered trench ( 2.hac) R C UGS 2 2222 1.00 Afforestation with Staggered trench ( 2.hac) R C UGS 2 2222 1.00 Afforestation with Staggered trench ( 2.hac) R C UGS 2 2222 1.00 Afforestation with Staggered trench ( 2.hac) R C UGS 2 2222 1.00
TOTAL:- 56.0045 62221 11.10
2 Vatariya
Farm Forestry L P Private 13.5014 15000 1.50
Staggered trench ( 2.hac) R C UGS 2 0.40
Staggered trench ( 2.hac) R C UGS 2 0.40
Gaucher dev. With horticulture plantation(2.00) R C SHG 2 5000 3.00
Afforestation with trench(Teak wood) R C UGS 2 5000 2.00
Afforestation with trench R C UGS 2 2222 1.00
Afforestation with trench R C UGS 0.8 888 0.40
TOTAL:- 24.3014 28110 8.70
3 Kanerav Farm Forestry L P Private 4.50045 5000 0.5
Afforestation with trench R C 1.5 1666 0.75
TOTAL:- 6.00045 6666 1.25
4 Desad
Farm Forestry L P Private 9.0009 10000 1.00
Afforestationwith trench R C UGS 1.5 1111 0.75
Afforestationwith trench R C UGS 1.5 1111 0.75
Afforestationwith trench R C UGS 1.5 1111 0.75
Gaucher dev. With horticulture plantation(1.00)
C
SHG 1 933 1.80
PIA- District Watershed Development Unit Bharuch Page 85
TOTAL:- 14.5009 14266 5.05
5 Karsad
Farm Forestry L P Private 6.30063 7000 0.70
Afforestation(1.00) R C UGS 1 1111 0.50
Gaucher dev. With horticulture plantation(2.00) C SHG 1 933 1.00
Afforestation with trench R C UGS 1 1111 1.00
TOTAL:- 9.30063 10155 3.20
6 Valiya
Farm Forestry L P Private 13.5014 15000 1.50 Afforestation with staggered trench R C UGS 1 1111 0.50
Afforestation with trench R C UGS 2 2222 1.00
Afforestation with trench R C UGS 1 1111 0.50
TOTAL:- 17.5014 19444 3.50
Table No. 42.1 Estimation of Fruit tree plantation
SR.No DESCRIPTION No L B H QTY T.QTY RATE T.AMOUNT No
1 excavation of plant pit 533 0.45 0.45 0.45 48.57 48.57 87 4225.56
2 Excavation for trenches 1 400 1 0.6 240 240 87 20880.00
3 No.of Horticulture plants ( Mango) 400 400 85 34000.00
4 No.of Drum stick plants 133 133 15 1995.00
5 Three times of weeding &soil work,with transportationcharges 533 533 8.5 4530.50
6 400 mt fencing work 400 Per Rmt 400 273 109200.00
7 TOTAL :- 180331.06
PIA- District Watershed Development Unit Bharuch Page 86
SAY :- 180000.00
Table 42.2 Estimation of Vermi compost unit No Description No L B H Qty T.Qty Rate Per Amount
1 Excavtion for pole foundation 6 0.6 0.6 0.6 1.296
Excavation Long wall 2 6 0.45 0.45 2.43
2 3 0.45 0.45 1.215 4.941 87 Cu.m 429.867
2 c.c. 1:2:4 6 0.6 0.6 0.6 1.296
2 6 0.45 0.1 0.54
2 3 0.45 0.1 0.27 2.106 4018.1 Cu.m 8462.1186
3
Outer side brick Masonary up to top
2 6 0.23 0.8 2.208
2 3 0.23 0.8 1.104 3.312 2639.1 Cu.m 8740.6992
4 Cement plaster Long side wall 4 6 0.35 8.4
short side wall 4 3 0.35 4.2
long wall top 2 6 0.23 2.76
short wall top 2 3 0.23 1.38 16.74 103.8 Sq.m. 1737.612
5 M.S.Pole 1.25 " 6 3 18
Vertical pole 4 3 12
Top horizontal long side 3 3 9
Top horizontal Short Side 39 129 kg 5031.00
6 90% Green net
Long side 2 7 3 21
short side 2 4 3 12
Top of green house 1 6 3 18
51 60 Sq.m. 3060.00
7 Esiana fortyda verm. 25 30 30 250 kg 7500.00
9 Nat bulots , labour charges Lump sump 500 500.00
T.AMOUNT:- 35031.4298
SAY :- 35000.00
PIA- District Watershed Development Unit Bharuch Page 87
Table no.43: Details of activities in the CPRs in the project areas
S. No. Name(s) of the villages
CPR particulars
Activity proposed
Target
Target area under the
activity (ha)
Estimated expenditure
(Rs.)
Expected no. of beneficiaries
1 Khondh
Waist Land
New pond (3.52 h)-850 2.5 2.00 8
New pond (0.56 h)-577 2.5 2.00 8
New pond (0.78 h) ( 40 x 40 )-698 2 1.50 7
Pond Depning-850 2 1.52 7
Outlet-850 2.4 2.50 9
Outlet-850 2.4 2.00 8
Outlet-577 2 1.50 7
Gaucher
New pond (1.62 h)-1.90 2.4 1.90 8
Outlet-305 2.75 2.50 5
New pond (1.95 h)-2.00 2.5 2.00 8
New pond (0.92 h)-1.49 1.5 1.49 6
Outlet-200 2.4 2.00 7
Small Checkdam ( 6.00m)-682 0.75 0.60 4
Afforestation with Staggered trench ( 2.hac) 2 1.00 8
Afforestation with Staggered trench ( 2.hac) 2 1.00 8
Afforestation with Staggered trench ( 2.hac) 2 1.00 8
Afforestation with Staggered trench ( 2.hac) 2 1.00 8
TOTAL:- 27.51
2
Vatariya Gaucher
Staggered trench ( 2.hac) 2 2.00 8
Staggered trench ( 2.hac) 2 2.00 8
Gaucher dev. With horticulture plantation(2.00) 2 2.00 8
Afforestation with trench(Teak wood) 2 2.00 11
Afforestation with trench 2 2.00 11
Afforestation with trench 1 0.80 5
Checkdam 2.5 3.00 9
PIA- District Watershed Development Unit Bharuch Page 88
Recharge channel 2 3.00 5
Checkdam 2.4 3.00 7
Small Checkdam ( 8.00m) 2.25 2.50 5
Checkdam Repairing 1 1.50 6
Waist Land
New pond 3.25 3.00 8
Outlet 2.7 3.00 7
Disilting of checkdam 2.2 2.7364 6
Checkdam 2.75 3.00 9
TOTAL:- 35.5364
3 Kanerav Gaucher Afforestation with trench 1 0.750 8
TOTAL:- 0.750
4 Desad Gaucher
Gully plug 0.5 0.217 4
Farmbunding 0.25 0.167 2
Stone bunding 0.15 0.151 2
Stone bunding 0.23 0.120 2
Nala plug 0.5 0.571 3
Nala plug 0.5 0.571 3
Nala plug 0.6 0.571 3
Afforestationwith trench(1.00) 1 0.750 8
Afforestationwith trench(1.00) 1 0.750 8
Afforestationwith trench(1.00) 1 0.750 8
Afforestationwith trench(1.00) 1 1.800 8
New pond 2.35 2.657 8
New pond 2.4 2.500 9
New pond 2.75 3.000 11
Pond deepening 1.85 2.000 7
Outlet 1.1 1.500 6
Outlet 2.4 3.000 9
Outlet 2.35 3.000 9
Checkdam Repairing 1.9 2.000 7
Checkdam Repairing 1.95 1.500 7
Farm Pond 1.75 2.000 3
PIA- District Watershed Development Unit Bharuch Page 89
Drainage Line 2 2.250 3
TOTAL:- 31.82
5 Karsad
Gaucher
Farmbunding 0.25 0.1670 1
Nala plug 0.45 0.0815 1
Nala plug 0.45 0.0815 1
Nala plug 0.45 0.0815 1
Afforestation(1.00) 0.75 0.5000 8
Gaucher dev. With horticulture plantation(2.00) 1.25 1.0000 11
Afforestation with trench 1 1.0000 8
Waste land Checkdam Repairing 1.65 2.0000 5
Checkdam Repairing 0.65 0.9859 5
TOTAL:- 5.8974
6 Valiya Gaucher
Afforestation with staggered trench 0.75 0.5000 7
Afforestation with trench 1 1.0000 9
Afforestation with trench 0.5 0.5000 9
Checkdam Repairing 1.75 2.0000 5
Outlet 2.25 3.0000 5
Pond deepening 1.35 1.8300 7
Pondbund pitching work 1.85 2.5000 5
Pond deepening 2.45 3.0000 8
Outlet 2.65 3.0000 5
Pond deepening 2.35 2.5000 6
TOTAL:- 19.83
PIA- District Watershed Development Unit Bharuch Page 90
4.4 Capacity building
Capacity building is a process to strengthen the abilities of people, organizations and systems to make effective and efficient use of
resources in order to make achieve their own goals on a sustainable basis” (German Technical Corporation). The definition pretty much
captures the essence of capacity building exercise in a holistic way by mentioning organization and system along with people. From a long
time, the focus has been on people only. This leads to a distorted and suboptimal outcome of the whole capacity building exercise. No
wonder, the realization has dawned upon the policymakers and they have started to emphasize upon the holistic approach rather than a
piecemeal one.
Scope of capacity building in Kondh project
Scientific technique for soil and water conservation
Improved technology (Integrated Farming and organic farming) of crop production
Vermi-compost
Micro propagation technology of Horticulture plantlets
Post Harvest Technology
Horticulture training, Floriculture
Organic farming
Nursery
Cropping pattern (Intercropping and Crop rotation)
Drip irrigation
Poultry
Fodder bank
Fisheries
Dairy maintenance
PIA- District Watershed Development Unit Bharuch Page 91
Table no. 44: Capacity Building Institution:
S. No.
Name of the Training Institute
Full Address with contact
no., website & e-mail
Type of Institute# Area(s) of speciali-zation$
Accredita-tion details
Trainings
Reference Year
No. of trainings assigned
No. of trainees to be trained
1 KVK Chaswad Research institute
Agriculture/Horticulture/Animal husbundary GoI
2011-2016 3 550
2 AKRSP Netrang NGO Capacity building 2010-2013 3 450
3
Navsari Agriculture
uni. Navsari University Agriculture/Horticulture/Animal
husbundary GoI 2011-2014 2 125
4 BISAG Gandhinagar Space
Application Remote sensing & GIS GoG 2011-2016 3 12
Figure no. 8: Photographs of Capacity building
PIA- District Watershed Development Unit Bharuch Page 92
Table no. 45: Capacity Building plan:
S. No. State Project
Project Stakeholders
Total no. of persons
No. of persons to be
trained No. of training programmes Estimated cost
1 Gujarat IWMP 9-
Kondh
PIA 5 5 5 0.43
WDTs 4 4 5 0.34
UGs 676 50 8 12.84
SHGs 420 45 5 10.08
WCs 150 36 2 2.40
Other 150 1.42
TOTAL :- 27.51
Table no.46: Information, education and Communication Activities:
S. No. Activity Executing agency Estimated expenditure
(Rs.)
Outcome
(may quantify, wherever possible)
1 Video show Dwdu-Bharuch 8000
Awarness 2 Banners,Hordings Dwdu-Bharuch 8500
3 Pamplets and posters Dwdu-Bharuch
7200
4 Street plays Local drama group 14000
PIA- District Watershed Development Unit Bharuch Page 93
CHAPTER-5
BUDGETING
The first step in budgeting is dividing the cost of the project into various components as detailed in the common guidelines and done
accordingly in table no. 47. It helps us in further identifying activities under different components and allocate appropriate funds.
table 47. Budget at glance
No Village Project
area ( ha )
Total fund in lakhs
Administrative costs
Monitoring
Evaluation
Entry Point
activity
Institution and Capacity Building
Detailed Project Report
Watershed Development Works
Livelihood activities for asset less
Production systems and micro-enterprises
Consolidation phase Total
10% 1% 1% 4% 5% 1% 56% 9% 10% 3% 100%
1 Kondh 1795.50 215.46 21.55 2.15 2.15 8.62 10.77 2.15 120.66 19.39 21.55 6.46 215.46
2 Vatariya 908.10 108.97 10.90 1.09 1.09 4.36 5.45 1.09 61.02 9.81 10.90 3.27 108.97
3 Kanerav 174.30 20.92 2.09 0.21 0.21 0.84 1.05 0.21 11.71 1.88 2.09 0.63 20.92
4 Desad 754.40 90.53 9.05 0.91 0.91 3.62 4.53 0.91 50.70 8.15 9.05 2.72 90.53
5 Karsad 402.80 48.34 4.83 0.48 0.48 1.93 2.42 0.48 27.07 4.35 4.83 1.45 48.34
6 Valiya 550.00 66.00 6.60 0.66 0.66 2.64 3.30 0.66 36.96 5.94 6.60 1.98 66.00
4585.10 550.21 55.02 5.50 5.50 22.01 27.51 5.50 308.12 49.52 55.02 16.51 550.21
TOTAL :- 121.05 412.66 16.51 550.21
PIA- District Watershed Development Unit Bharuch Page 94
Table no. 48:Village wise budget available under IWMP-9
Sr. no
Village EPA Institution
and CB DPR
Watershed developmen
t Work
Livelihood for asset less
Production system and
Microenterprises
Consolidation Total
1 Kondh 8.62 36.63 2.15 120.66 19.39 21.55 6.46 215.46
2 Vatariya 4.36 18.53 1.09 61.02 9.81 10.90 3.27 108.97
3 Kanerav 0.84 3.56 0.21 11.71 1.88 2.09 0.63 20.92
4 Desad 3.62 15.39 0.91 50.70 8.15 9.05 2.72 90.53
5 Karsad 1.93 8.22 0.48 27.07 4.35 4.83 1.45 48.34
6 Valiya 2.64 11.22 0.66 36.96 5.94 6.60 1.98 66.00
TOTAL:- 22.01 93.54 5.50 308.12 49.52 55.02 16.51 550.21
Table -49 Village wise gap in fund Requirement
S.No Village Total cost requirement Total fund Available under iwmp Gap in fund Requirement
1 Kondh 177.171 161.60 15.571
2 Vatariya 92.57745 81.73245 10.845
3 Kanerav 18.88101 15.68101 3.200
4 Desad 75.1415 67.90 7.2415
5 Karsad 43.66361 36.25011 7.41350
6 Valiya 56.0299974 49.4999974 6.53000
TOTAL:- 463.4645674 412.6635674 50.801
PIA- District Watershed Development Unit Bharuch Page 95
Table no.50: Details of Convergence of IWMP with other Schemes
S. No. Name of village
Names of Departments with
Schemes converging with IWMP
Fund made available to
IWMP due to convergence (Rs. in lakh)
Was this fund included in Rs.12,000/ 15,000 per
ha.
Name of activity/task/structure
undertaken with converged funds
Reference no. of activity/
task/ structure in DPR
Level at which
decision for convergence
was taken Yes No
(a) Structures
(b) livelihoods
(c ) Any other (pl. specify)
1
Kondh
Mgnrega 1.141
Yes
Nalaplug
District level
2 Forest 5.000 Farm Forestry
3 Mgnrega 2.000 Afforestation with Staggered trench
4 Mgnrega 4.500 Outlet
5 Mgnrega 0.600 Small Checkdam
6 A.H DEPT. 0.900 Cattle camp
7 A.H DEPT. 0.630 Mineral Mixture
8 DIC 0.800 Sewing machine
15.571 1
Vatariya
Mgnrega 2.445
Yes
Nalaplug
District level
2 Forest 2.500 Farm Forestry
3 Mgnrega 2.500 Small Checkdam
4 Mgnrega 1.500 Checkdam Repairing
5 A.H DEPT. 0.600 Cattle camp
6 A.H DEPT. 0.500 Minral mixer
7 DIC 0.800 Sewing machine
10.845
1
Kanerav
Forest 0.50
Yes
Farm Forestry
District level 2 Sgsy 2.00 Utensils Services
3 A.H.dept 0.30 Cattle camp
4 DIC 0.40 Sewing machine
3.20
PIA- District Watershed Development Unit Bharuch Page 96
1
Desad
Mgnrega 1.7115
Yes
Nalaplug
District level
2 Mgnrega 1.0000 Farm Forestry
3 Mgnrega 0.6000 Afforestationwith trench
4 Mgnrega 1.5000 Checkdam Repairing
5 Ggrc 1.2000 Drip irrigation
6 A.H DEPT. 0.6000 Cattle camp
7 A.H DEPT. 0.6300 Mineral Mixture
7.2415
1
Karsad
Mgnrga 2.3635
Yes
Nala plug
District level
2 Foreat 0.7000 Farm Forestry
3 Foreat 1.0000 Afforestation with trench
4 Mgnrga 2.0000 Checkdam Repairing
5 Fish.Dept. 1.0000 Fishries
6 A.H DEPT. 0.9000 Cattle camp
7.964
1
Valiya
Forest 1.500
Yes
Farm Forestry
District level
2 Mgnrega 0.200 Afforestation with staggered trench
3 Mgnrega 0.400 Afforestation with trench
4 Mgnrega 0.200 Afforestation with trench
5 Mgnrega 2.000 Checkdam Repairing
6 Mgnrega 3.000 Outlet
7 A.H DEPT. 0.900 Cattle camp
8 A.D DEPT. 0.500 Mineral Mixture
9 DIC 0.800 Sewing machine
9.500
54.321
PIA- District Watershed Development Unit Bharuch Page 97
Total village requirement is 464.69 lakh Rs. And total fund available under IWMP is 410.10 lakh. So gap in fund in this project is 54.32 lakh.
This fund is available with other schemes like MGNREGS, Forest, SGSY, TASP, WASMO, GEDA, Animal Husbandry and other like this.
PIA- District Watershed Development Unit Bharuch Page 98
CHAPTER-6
EXPECTED OUTCOME
6.1 Expected Outcomes
6.1.1 Employment
Employment is a big problem in the Kondh project. Main occupation of the villagers is agriculture, animal husbandry and wage
labour. However, due to lack of irrigation, farmers take only kharif crops. Only few farmers take Rabi crops. Lack of fodder, animal
husbandry is very difficult in the villages. So farmers mainly depend on wage labour whole over the year.
Project will provide wage employment as well as self employment to the villagers. Wage employment would be created by engaging
the people in watershed development work like construction of check dam, farm bunding, nala plug, staggered contour trenches, and
Afforestation work. Self employment would be created by providing different agriculture activities like nursery, vermin-compost, and fruit
tree plantation and in animal husbandry by improving animals and providing fodder directly to the farmers. Project would provide
indirectly self employment to the women through training activities of tailoring, poultry, fisheries, cattereing, mini oil mill, leaf plate and cup
making machine. So through this project we can decline the migration upto 80%.
PIA- District Watershed Development Unit Bharuch Page 99
Table no. 51: Public-Private Partnership in the IWMP projects
S. No.
Name of Private Sector
Partner Agency
Type of agreement signed Financial contribution
Partnership Interventions
Expected Outcomes Comments a)MoU b)Contract
c) Any other (pl. specify) IWMP
Private sector
1 0 0 0 0 0 0 0
Table no. 52: Employment in Project area:
Sr. NO.
Names of Villages
Wage employment Self employment
No. of mandays No. of beneficiaries No. of beneficiaries
SC ST Others Women Total SC ST Others Women Total SC ST Others Women Total 1 KONDH 131 1908 0 953 2039 14 18 0 14 32 30 80 0 22 110 2 VATARIYA 59 1362 0 681 1421 8 15 0 8 23 15 65 0 18 80 3 KANERAV 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 DESAD 19 1376 0 683 1395 4 22 0 9 26 4 58 0 14 62 5 KARSAD 0 576 0 274 576 0 8 0 5 8 0 35 0 12 35 6 VALIYA 201 2719 0 1303 2920 22 32 0 20 54 45 96 0 30 141
TOTAL:- 410 7941 0 3894 8351 48 95 0 56 143 94 334 0 96 428
PIA- District Watershed Development Unit Bharuch Page 100
6.1.2. Migration
Now people go other place for employment for 3 month. But this Project would decrease up to 80 % migration by providing
employment to the villagers.
Table no. 53: Details of seasonal migration from Project area
Sl. No. Names of villages No. of persons migrating No. of days per year of migration
Pre-project Expected post project Pre-project Expected post project
1 Kondh 111 75 85 17
2 Vatariya 98 46 70 14
3 Kanerav 36 22 78 15
4 Desad 62 31 90 18
5 Karsad 32 19 85 17
6 Valiya 29 14 90 18
TOTAL:- 368 207 498 99
6.1.3. Ground water table
Due to the lack of recharge structure, ground water table is very low 40-45m. Proper soil and water conservation activities, ground
water table would increase upto 37-42 m.
Table no. 54: Details of average ground water table depth in the project areas (in meters)
Sr. No. Names of Villages
Sources Pre-Project level Expected Increase/decrease
(Post- Project)
1 Kondh Handpump,bore well 40m to 45m 37m to 42m
2 Vatariya Handpump,bore well 40m to 45m 37m to 42m
3 Kanerav Handpump,bore well 40m to 45m 37m to 42m
4 Desad Handpump,bore well 40m to 45m 37m to 42m
5 Karsad Handpump,bore well,River 40m to 45m 37m to 42m
6 Valiya Handpump,bore well 40m to 45m 37m to 42m
PIA- District Watershed Development Unit Bharuch Page 101
6.1.4 Drinking water
People use handpump, bore well and river for drinking purpose. These structures provide only 9-10 month water to the villagers. But
in the summer season, villagers face a lot of problem. Water quality is also not good.
After the project, villagers can get all over the year drinking water near by house with good quality.
Table no. 55: Status of Drinking water
Sr. No.
Names of Villages Availability of drinking water
Quality of drinking water (no. of months in a year)
Pre-project Expected Post project Pre-project Expected Post-project
1 Kondh 9 Months 12 th month Average Portable water
2 Vatariya 9 Months 12 th month Average Portable water
3 Kanerav 9 Months 12 th month Average Portable water
4 Desad 9 Months 12 th month Average Portable water
5 Karsad 9 Months 12 th month Average Portable water
6 Valiya 9 Months 12 th month Average Portable water
6.1.5 Crops
All agriculture activities are specially based on monsoon. In the Kondh project, due to lack of irrigation agriculture productivity of the
crops is very less. Farmers don't use proper farming pattern in their field also. There is no irrigation facility for the cultivation of the crops
which is directly affected of the crop yield. Due to the erosion (gully and rill), fertility of the land is low.
Project would increase the productivity of the crops by proving proper irrigation facility to the farmers as well as the different
training programmes for new farming technology by crop demonstration and distributing High yielding varieties seeds to the farmers.
Fertility of the land would increase by using vermi-compost and proper cropping pattern in the land. Erosion would be decreased by
constructing different soil and water conservation measures.
PIA- District Watershed Development Unit Bharuch Page 102
Table no. 56: Details of crop area and yield in the project areas
Name of project Name of crops
Pre-project Expected Post-project
Area
Average Yield (Qtl) per ha.
Area
Average Yield per ha (qtl) (ha) (ha)
Iwmp-9 Kondh
Kharif
Tur 1 3.63 4.75
Cotton 1 3.43 4.5
Sorghum 1 6.24 8.25
Rabi
Sorghum 1 7.68 8.5
Sugarcane 1 2.94 3.75
6.1.6 Horticulture
Table no. 57: Area under horticulture
S. No. Name of Village Existing area under horticulture (ha) Area under horticulture proposed to be
covered through IWMP ( ha )
1 Kondh 3.50 7.40
2 Vatariya 3.00 5.30
3 Kanerav 0.85 0.90
4 Desad 2.75 4.70
5 Karsad 2.25 3.05
6 Valiya 1.75 2.85
TOTAL:- 14.10 24.20
PIA- District Watershed Development Unit Bharuch Page 103
6.1.7 Vegetative cover
Project covers about 15-20% area under vegetative cover. In the project area nilgiri, bamboo, subabool, neem, tik and mahua can be
seen anywhere.
Project would cover 120.61 ha area through farm forestry, fuel and timber plantation and fruit tree plantation.
Table no. 58: Forest/vegetative cover
S. No. Name of Village Existing area under tree cover (ha) Area under tree cover proposed
1 Kondh 22.00 56.00
2 Vatariya 11.40 18.30
3 Kanerav 2.20 6.00
4 Desad 12.25 13.50
5 Karsad 7.25 9.30
6 Valiya 7.00 17.50
Total 62.10 120.61
6.1.8 Livestock
Project area covers milch animal like cow and buffaloes, drought animals, small ruminents and hens. Different activities like
improving quality of indigenous cows and buffaloes, poultry farming, provide fodder by establishment of fodder bank, veterinary services
etc.
It is expected that the post project period would see a substantial increase in livestock population and yield from them.
PIA- District Watershed Development Unit Bharuch Page 104
Table no. 59: Details of livestock in the project areas (for liquid please mention in litres, for solids please mention in kgs. and income in Rs.)
Sr. No.
Name of
project Type of Animal
Pre-Project Expected Post-project
Remarks No. Yield Income No. Yield Income
1 IWMP -
9 Kondh
Milch-animals
Cow 876 2 18 1122 4.5 22
Buffalows 454 3 22 625 6 27
Draught Purpose animals 87 225
Hen 4961 1.75 kg 130 13500 2.5 kg 150
Goat ( Meat Rs/Kg ) 1039 7 kg 180 2200 9.50 kg 200
6.1.9 Linkages
The direct livelihood activities need good forward and backward support. Without such support system the activities may fail to
deliver the desired results. These linkages would involve credit, machinery, input supply, marketing, etc.
Table no. 60: Backward-Forward linkages
S. No. Project Type of Marketing Facility
Pre-project (no.) During the project (no.) Post-project (no.)
1
IWMP-9 Kondh
Backward linkages
2 Seed certification
3 Seed supply system 1 1
4 Fertilizer supply system 1 1
5 Pesticide supply system 1 1
6 Credit institutions Bank Bank
7 Water supply
8 Extension services
KVK Chaswad,Akrsp - Netrang
KVK Chaswad,Akrsp - Netrang
9 Nurseries 1 1
10 Tools/machinery suppliers 1 1
PIA- District Watershed Development Unit Bharuch Page 105
11 Price Support system
12 Labour
13 Any other (please specify)
14 Forward linkages
15 Harvesting/threshing machinery 1 1
16 Storage (including cold storage) Y
17 Road network Y
18 Transport facilities Y
19 Markets / Mandis Y
20 Agro and other Industries
21 Milk and other collection centres Y 1
22 Labour
23 Any other (please specify) Vermi compost unit Vermi compost unit
6.2 Logical Framework Analysis
Components Activities Outputs Effect
Village Institution Formation
Formation of Watershed Committee, User Group and SHGs
One Watershed Committee in each village
Number of User groups depending on
the coverage of particular intervention
Number of SHGs groups depending on
the different livelihood activities.
Project can be implemented and managed in a democratic and
participatory way ensuring equity.
PIA- District Watershed Development Unit Bharuch Page 106
Strengthening Village
Institutions
Organize training and awareness programme for Village institutions
Awareness workshop to be organized.
Trainings and exposure visits UGs and WCs to be held
IEC activities to be conducted at village
level
Quality management of common
resources will improve.
Improvement the knowledge of
watershed in village level.
Capacity building workshops and exposure visits User Group, SHGs
and Watershed Committee
Awareness will increase at village level
Quality product among people will be improved.
Facilitating and monitoring the functioning of UGs and WCs
Strengthen linkages between UGs and WCs and Panchayat
Institutions and village people.
Gender sensitization in WC, UGs, SHGs.
Increased awareness amongst women about village resources.
Women participation enhanced in
decision-making of GVCs.
Sensitise village communities to involve childern and youth in
development.
Involvement of youth and childern in village development work.
Fund Management
Improve management and utilisation of UGs, SHGs and WCs.
UGs, SHGs and WCs operating bank account and managing resources on
their own
Purpose, frequency and volume of use of the fund enhanced.
Prepare communities to explore other sources of income for UGs,
SHGs and others.
Volume of funds generated for UGs, SHGs and WCs from other sources of
income increased.
PIA- District Watershed Development Unit Bharuch Page 107
Ecological Restoration
Protection, treatment and regeneration of common and
private resources.
Common and private lands to be
brought under new plantations and agro-horti-forestry like Neem, Babool, Drum stick, Mahua, Mango and Sapota
etc.
Fodder availability from common and private lands increased.
Plantation of fruits and forest species
Trainings, exposure visits and meetings to be organized for
communities, village volunteers and staff
Money saving from purchasing of Domestic products.
Other micro-enterprise activities can
be used at domestic level.
Rainfed Area Development
Treatment of land through improved soil and moisture conservation practices on
watershed area basis
Land to be brought under improved soil moisture conservation practices
Improved productivity of treated land
Construct water harvesting structures for conserving water on
rainy season.
Water can be conserve for a long time.
Increased availability of water in wells, pond and checkdam and other structure. Water table will increase.
Promotion of good agricultural practices- horticulture, improved
crop and vegetable
Good agricultural practices to be promoted.
Increase in annual agriculture
production
Promotion of organic farming practices
Organic farming to be promoted
Farmers adopt organic farming practices.
Use of domestic product properly
Formation of Fodder banks to increase fodder security and promote dairy development
among communities
Fodder banks to be established Fodder security of farmers enhanced.
Identification and promotion of agri-produce based income
generation activities like grading, processing and packaging.
Agriculture based livelihood income generation activities to be promoted
PIA- District Watershed Development Unit Bharuch Page 108
Promotion of better Irrigation practices like drip irrigationand lift
irrigation
Water harvesting structures to be constructed.
Drip and Lift irrigation facilities to be
distributed among farmers
Increase availability of water for 12 months
Increased availability of water for
livestock
Availability of irrigation water
established
Farmers take two or three crops in a
year
Increase in agricultural productivity
of land
Availability of drinking water
enhanced
Impart trainings, conduct meetings and organise exposure visits of communities, village volunteers
and staff to effectively plan, execute and monitor activities
Trainings, exposure visits and meetings to be organized for
communities, village volunteers and staff
Women’s Socio-political and
economic empowerment
Formation & Strengthening of
women’s SHG groups
Women’s SHG groups to be formed
Enhanced capacities of leaders of
women's group in taking initiatives to solve problems at different levels.
Training programmes for SHGs groups
Exposure visit for the groups for
awareness development
Federation of Women’s SHGs to be formed
PIA- District Watershed Development Unit Bharuch Page 109
Linking SHGs with external financial institutions like bank and
others Increased household income.
Increase saving of SHGs group Financial improvement of women Sustainable livelihood development
for women
PIA- District Watershed Development Unit Bharuch Page 110
CHAPTER -7
QUALITY AND SUSTAINABILITY ISSUES
7 Quality and Sustainability Issues
7.1 Plans for Monitoring and Evaluation
A Web-based GIS System is being developed for monitoring and evaluating the project in its planning & implementation phases. The
system would be available on a public domain and can be accessed by all the stakeholders of the project. The system shows the entire state
of Gujarat and all of those areas selected over the next 18 years. Filtering allows the user to zoom onto one particular project. Details related
to soil type, Land-use classification, inhabitation etc., can be obtained village-wise. Furthermore, survey-number wise details related to
ownership, irrigation source, yield etc., can also be accessed by the users of the system. This system is being used for pooling up the details
obtained from the DPR. In other words, the DPR is made available online in the form of a database which will help the stakeholders know
areas of importance viz., already treated areas/historical works in the area, proposed areas for treatment etc., for further treatment and
planning. The system would also show the satellite imageries of various years from the project inception stage to the project closing stages.
This allows the user to evaluate the effectiveness of the treatment and thereby plan corrective measures for the project area. The system
would serve as an aiding tool to the planners and evaluators for judging the efficacy of the project.
Yet another component of the Web-based GIS system is the Mobile based Monitoring & Evaluation System, which will help the ground
staff alias WDTs (Watershed Development Team) to transmit information from the ground level to the central server. Also, any higher-up
official in charge of the project can obtain information regarding the project area on their mobile phone by means of an SMS. The system
works in the following manner. The WDT equipped with a GPS instrument marks the latitude-longitude information of various treatment
PIA- District Watershed Development Unit Bharuch Page 111
areas during the DPR. The probable sites are then transferred onto the central server. During the works phase, any progress in the treatment
areas is reported to the server by means of an SMS by the WDT. Similarly, any nodal officer or higher-up official can view the progress in a
project by means of summarized reports generated over frequent periods of time.
7.2 Plans for Project management:
The Project management of any watershed programme is very important. It mainly depends upon the community organisation and
the village level institutes. In Kondh project, watershed committee, various user groups and SHGs have been formulated for post project
operation and maintenance of assets created during project period. Major emphasis will be on equity and sustainable benefit of the project
even after implementation stage. A proper link-up will be built during project period with various institutes and capacity building
organisation. They will act as a major kingpin during post implementation for scaling up the successful experience during project.
7.3 Watershed Development Fund:
The major source of financial assistance after post implementation period is watershed Development Fund. The contribution of it will
comes mainly fund the following:
7.4 User Charges:
Various user groups will be formed in village. These user groups will collect user charges according to the designated rules formed
during the formation of user group. These funds will be transferred to the WDF funds as per these formulated rules. The secretary of
watershed committee (WC) shall maintain the records of the following.
PIA- District Watershed Development Unit Bharuch Page 112
Chapter-8
Mapping
Figure.8.1: Map of Ground water