CREATED BY: ALEXANDER FACCHIN PROJECT NAME: GLEBE MULTI-PURPOSE HALL ADDRESS: 85 BAY STREET, GLEBE, NSW, 2037 DATE: 3-6-2015 COMBINED DA & CC SET DRAWING NUMBER: CC1 NORTH-EAST PERSPECTIVE NORTH-WEST PERSPECTIVE LOCATION PLAN PROPOSED SITE DRAWING LIST PAGE NUMBER DRAWING TITLE CC2 SITE PLAN CC3 GROUND FLOOR PLAN CC4 FIRST FLOOR PLAN CC5 REFLECTED CEILING PLAN GROUND FLOOR CC6 REFLECTED CEILING PLAN FIRST FLOOR CC7 EAST & WEST ELEVATION CC8 NORTH & SOUTH ELEVATION CC9 CROSS SECTION 1-1 & CROSS SECTION 2-2 CC10 LONG SECTION A-A & LONG SECTION B-B CC11 DETAILS A & B CC12 DETAILS C & D CC13 SUN STUDY - JUNE 21st CC 14 SUN STUDY - MARCH 21st

Upload: alexander-facchin

Post on 23-Jan-2017

595 views

Category:

Design


0 download

TRANSCRIPT

Page 1: TAFE Portfolio Semester 1 2015

CREATED BY: ALEXANDER FACCHIN

PROJECT NAME: GLEBE MULTI-PURPOSE HALL

ADDRESS: 85 BAY STREET, GLEBE, NSW, 2037

DATE: 3-6-2015

COMBINED DA & CC SETDRAWING NUMBER: CC1

NORTH-EAST PERSPECTIVE NORTH-WEST PERSPECTIVE

LOCATION PLAN

PROPOSED SITE

DRAWING LIST

PAGENUMBER

DRAWINGTITLE

CC2 SITE PLAN

CC3 GROUND FLOOR PLAN

CC4 FIRST FLOOR PLAN

CC5 REFLECTED CEILING PLANGROUND FLOOR

CC6 REFLECTED CEILING PLANFIRST FLOOR

CC7 EAST & WEST ELEVATION

CC8 NORTH & SOUTH ELEVATION

CC9 CROSS SECTION 1-1 &CROSS SECTION 2-2

CC10 LONG SECTION A-A &LONG SECTION B-B

CC11 DETAILS A & B

CC12 DETAILS C & D

CC13 SUN STUDY - JUNE 21st

CC 14 SUN STUDY - MARCH 21st

Page 2: TAFE Portfolio Semester 1 2015

DW

UP

5.0

0

5.5

0

6.0

0

6.5

0

7.0

0

8.00

8.50

9.0

0

7.50

Boundary 177.000 m

Boundary

20.6

09 m

Boundary 15.800 m

Boundary

7.1

00 m Boundary 15.800 m

Boundary

43.9

54 m

Boundary 6.0

00 m

Boundary 128.000 m

Boundary

131.0

00 m

Boundary 5.575 m

RL 5.000

RL 5.626

RL 5.549

A

B

C

D

E

F

G

H

1 2 3 4

BA

Y S

TR

EE

T

WENTWORTH STREETC

OW

PE

R S

TRE

ET

RL 15.158

RL 7.684

QUEEN STREET

RL 7.875

RL 7.707

RL 7.341

RL 7.215RL 7.168

RL 6.392

4000

4000

6000

6000

6000 6000

6000

FALL

OF

RO

OF

3 D

EG

RE

ES

FALL

OF

RO

OF

3 D

EG

RE

ES

12

34

56

78

910

1112

1314

1516

1718

1920

2122

2324

2526

2728

2930

3132

3334

3536

3738

3940

4142

4344

4546

4748

EN

TRY

/E

XIT

TO

CA

RP

AR

K

NE

W C

OM

MU

NIT

Y C

EN

TR

EN

O. 8

5

AM

EN

ITIE

S/C

AFE

CA

RP

AR

KA

SH

PA

LT

BU

S Z

ON

E

32786mm SETOUT TO G4

TO BOUNDARY

35973mm SETOUT TO G4TO BOUNDARY

2426

9mm

SE

TOU

T T

O A

1FR

OM

BO

UN

DA

RY

RL 6.337

RL 6.192 RL 5.662

RL 5.159

RL 5.172

RL 5.708RL 5.692

RL 5.814

GARBAGE PICK-UPZONE

SERVICEAREA

49 50

SO

FTLA

ND

SC

AP

ING

ACCESS DRIVEWAYASHPALT

PA

RK

ING

AIS

LE 1

PA

RK

ING

AIS

LE 2

RL 15.834

RL 15.651

FOO

TPA

THC

RO

SS

ING

RL 8.499

DISTANCE TO BOUNDARY

43543MM

8000

8000

8000

8000

5000

3850

1650

8000 8000 4000

RL 13.776

Commencement Date :

For :

Date :File Path :Scale:

Current Revision: Current Revision Date:

Alexander FacchinDrawn By:

Sheet Number:

Project Number:

Project Address

Project Name:

Sheet Name :NORTHPOINT

6/2/2015 12:40:09 AMC:\Users\Alexander\Desktop\TAFE SEM 1 2015\MajorProject\Major Revit Project\Major Project (CURRENT)30-4.rvt

1 : 500

Simon, Elise, Michelle

16/6/2015

85 Bay Street Glebe, NSW

Multi-Purpose Hall, Glebe

SITE PLAN

CC2

01A

1 : 500

Site Plan1

FLOOR/SPACE RATIO CALCULATIONS

AREA CALCULATIONS:

FLOOR SPACE RATIO CALCULATIONS:

SITE AREA: 15760m2

GROSS GROUND FLOOR AREA: 989.29m2GROSS FIRST FLOOR AREA: 213.52m2TOTAL FLOOR AREA: 1202.81m2FLOOR SPACE RATIO: 0.07:1

= 7%

LANDSCAPED AREA CALCULATIONS

SITE AREA: 15760m2HARD LANDSCAPE AREA: 5653.9m2SOFT LANDSCAPE AREA: 8903.29m2

0 25 50 m

Page 3: TAFE Portfolio Semester 1 2015

Up

DW

UP

A B C D E F G H

1

2

3

4

1CC10

1CC10

2CC9

2CC9

1CC9

1CC9

2CC10

2CC10

LIFT

12345

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

17181920212223242526

KITCHENAREA: 19M2

250X250CERAMIC TILES

AREA: 30M2POLISHED

CONCRETE

AREA: 30M2250X250

CERAMIC TILE

JANITORCLOSET

RL 6.910

RL 6.930

RL 6.910

RL 6.910

RL 7.250

RL 7.250

RL 7.250

RL 6.910POLISHED CONCRETE

CAFE60M2

TIMBER FLOORBOARD

URINAL

3525

4725

1495

2880

1607

ACCESSIBLEBATHROOMPOLISHED

CONCRETE

1510

RL6.910

1101445

110

1025

STEEL ROLLER SHUTTER DOORLOADING DOCK

EMERGENCYEXIT

EM

ER

GE

NC

YE

XIT

EMERGENCYEXIT

400X400RECTANGULAR

CONCRETE COLUMN

UNIVERSAL COLUMN200UB29.8

UNIVERSAL COLUMN410UB59.7

ADJUSTABLE CLEATREFER TO ENGINEERSPECIFICATION

KINGSPAN 1000RWWALL

EQUAL ANGLE BRACING75X75X5EA

1500X200 VERTICALPRE-CAST CONCRETE

PANEL WALL

UNIVERSAL COLUMN200UB29.8

200 REINFORCEDCONCRETE BLOCK WALL WITHVENEER BRICKWORK FINISH

400X400 RECTANGULARCONCRETE COLUMN

GLAZED CURTAINWALL

1M HIGH 200 CONCRETEBLOCK WALL

400MM REINFORCEDCONCRETE ROUNDCOLUMNREFER TO ENGINEERSPECIFICATION

400 REINFORCEDCONCRETE ROUNDCOLUMNREFER TO ENGINEERSPECIFICATION

GLAZED CURTAINWALL

ENTRY

GLAZED CURTAIN WALL

150X150 RECTANGULARMULLION

400X400 REINFORCEDCONCRETE COLUMN

EQUAL ANGLE BRACING75X75X5EA

EQUAL ANGLE BRACING75X75X5EA

EQUAL ANGLE BRACING75X75X5EA

SETOUTPOINT A4

SETOUT POINT G4

BASKETBALL VINYLCOURT MARKINGS

KINGSPAN 1000RWCONCRETE BLOCK

WALL & DULUX 'RED STOP'PAINT FINISH

RECEPTION AREA

POLISHED CONCRETE

AREA: 93m2

CUSTOM SINKREFER TO SPECIFICATION

110 SINGLE BRICKFACED BRICKWORK

CORRIDOR

OVERHEADROOFSHOWN DOTTED

32788mm

TO BOUND.

4354

3mm TO B

OUND.

D01

D02

D03

D04

D05

D06

D07

D08

D09

D10

D11 D12

D13

D14

41715

8000 8000 8000 8000 5000 3850 1650

100 365 32000 200 4650 150 3850 1650

2886

9

8000

8000

4000

7058

811

075

2715

610

920

000

109

200

1737

1877

5951

5000

5435

8000 8000 8000 8000 5000 3850 1650

41715

2595 1829 3576 34500

2886

9

8000

8000

4000

150

5035

0015

035

016

000

109

200

8000

8000

560

915

2525

4561

2200

GLAZED CURTAINWALL

HALF-FRAMESTEEL BEAM

REFER TO ENGINEERSPECIFICATION

MULTI-PURPOSE HALLAREA: 644.83m2

POLISHED CONCRETE

200 REINFORCEDCONCRETE BLOCK

WALL

TIMBER FEATURE,REFER TO SPECIFICATION

RAMP 1:8 GRADIENT

OUTDOORSEATING

MALEAMENITIES

FEMALEAMENITIES

1495

HORIZONTAL KINGSPANKS1000 CONCRETE WALL

HORIZONTAL KINGSPANKS1000 CONCRETE WALL

Commencement Date :

For :

Date :File Path :Scale:

Current Revision: Current Revision Date:

Alexander FacchinDrawn By:

Sheet Number:

Project Number:

Project Address

Project Name:

Sheet Name :NORTHPOINT

6/2/2015 12:40:11 AMC:\Users\Alexander\Desktop\TAFE SEM 1 2015\MajorProject\Major Revit Project\Major Project (CURRENT)30-4.rvt

1 : 100

Simon, Elise, Michelle

16/6/2015

85 Bay Street Glebe, NSW

Multi-Purpose Hall, Glebe

GROUND FLOOR PLAN

CC3

01A

1 : 100

GROUND FLOOR PLAN1 0 10 m521

Page 4: TAFE Portfolio Semester 1 2015

Up

A B C D E F G H

1

2

3

4

1CC10

1CC10

2CC9

2CC9

1CC9

1CC9

2CC10

2CC10

VOIDAREA

STEEL STRUTREFER TO ENGINEERSPECIFICATION

GLAZED CURTAINWALL

6 7 8 9 10 11 12 13 14 15 16

17181920212223242526

100 STEELSTUD WALLWITH 10 PLASTERBOARD

UNIVERSAL BEAM410UB59.7

STRUT SUPPORTREFER TO ENGINEERSPECIFICATION

MONOLITHIC CONCRETESTAIRCASE

STRUCTURALSTIFFINERREFER TO

ENGINEER DETAIL

GLAZED CURTAINWALL GLASS

PANEL

LIFTSHAFT

180 REINFORCEDCONCRETE FLOOR

43040

8000 8000 8000 8000

100 3658000 97 10 7893 8000 7970 30 171 2407 2422 3850 1575 150

2886

9

8000

8000

4000

150

8045

100

265

2000

010

920

0

43040

8000 8000 8000 8000 5000 3850 1650

100 365 32000 101 100 5425 150

2863

5

8000

8000

4000

150

8000

3925

150

8335

150

8000

4000

OFFICEAREA: 188.75m2

POLISHED CONCRETE

GLAZED GLASSPANEL

RL 11.650

RL 11.650

CAFE/ AMENTITIESBLOCK

32788mm TO BOUND.

433543mm TO BOUND.

7925

8000

4800

5000 3850 1650

HALF-FRAME STEELBEAM, REFER TO

ENGINEER SPECIFICATION

OVERHEAD ROOFSHOWN DOTTED

HORIZONTAL KINGSPANKS1000 WALL

PRE-CASTCONCRETE

BLOCK WALLEQUAL ANGLE BRACING

75X75X5EAUNIVERSAL COLUMN

200UB29.8EQUAL ANGLE BRACING

75X75X5EA

GLAZED CURTAIN WALL

GLAZED CURTAIN WALL

HORIZONTALKINGPSAN KS1000

GLAZED CURTAIN WALLACCORDING TO

MANUFACTURERSPECIFICATION

Commencement Date :

For :

Date :File Path :Scale:

Current Revision: Current Revision Date:

Alexander FacchinDrawn By:

Sheet Number:

Project Number:

Project Address

Project Name:

Sheet Name :NORTHPOINT

6/2/2015 12:40:11 AMC:\Users\Alexander\Desktop\TAFE SEM 1 2015\MajorProject\Major Revit Project\Major Project (CURRENT)30-4.rvt

1 : 100

Simon, Elise, Michelle

16/6/2015

85 Bay Street Glebe, NSW

Multi-Purpose Hall, Glebe

FIRST FLOOR PLAN

CC4

01A

1 : 100

FIRST FLOOR PLAN1

0 10 m521

Page 5: TAFE Portfolio Semester 1 2015

A B C D E F G H

1

2

3

4

2CC9

2CC9

1CC9

1CC9

2CC10

2CC10

LIF

T

RL 9.778

RL 10.105

BRUSHED ALUMINIUMFEATURE SUSPENDEDCEILING

400 ROUND CONCRETECOLUMN

400X400 SQUARECONCRETE COLUMN

RL 10.230

RL 9.850

RL 9.850

MALEAMENITIES

FEMALEAMENITIESACCESSIBLE

BATHROOM

AIR LOCK

HALLWAY

KITCHEN

CAFE

RECEPTION

POLISHED TIMBERDECORATIVE SUSPENDED

CEILING

STAIRWAYVOID

POLISHED TIMBERWALL BACKDROP

8000 8000 8000 8000 5000 3850 165080

0080

0040

00

GYMNASIUM

FRONT DOOR

JANITOR CLOSETCOMPOUND CEILING

COMPOUNDCEILING

COMPOUNDCEILING

COMPOUNDCEILING

COMPOUNDCEILING

RL 10.250

8560

37465 4050

8195

2067

4

D05

D06

D07

D08

D09

D12D11

D10

D13

D14D02

D03

D04

D01

----

----

OYSTER SQUARE CEILING LIGHT

EMERGENCY EXIT

CEILING PENDAT LIGHTING - ARTICHOKE

SMOKE DETECTOR

FLUORESCENT CEILING LIGHT

WALL MOUNTED VISA LIGHTING

LEGEND

SPRINKLER

LEGEND

HALOGEN SPOT LIGHT

600X600 T5 OFFICEFLUORESCENT LIGHT

1200X300 T5 OFFICEFLUORESCENT LIGHT

Commencement Date :

For :

Date :File Path :Scale:

Current Revision: Current Revision Date:

Alexander FacchinDrawn By:

Sheet Number:

Project Number:

Project Address

Project Name:

Sheet Name :NORTHPOINT

6/2/2015 12:40:12 AMC:\Users\Alexander\Desktop\TAFE SEM 1 2015\MajorProject\Major Revit Project\Major Project (CURRENT)30-4.rvt

1 : 100

Simon, Elise, Michelle

16/6/2015

85 Bay Street Glebe, NSW

Multi-Purpose Hall, Glebe

REFLECTED CEILING PLAN GROUNDFLOOR

CC5

01A

0 10 m521

1 : 100

GROUND FLOOR CEILING PLAN1

1 : 100

Reception Ceiling Plan Legend

1 : 100

AMENITIES CEILING LEGEND

Page 6: TAFE Portfolio Semester 1 2015

A B C D E F G H

1

2

3

4

1CC10

1CC10

2CC9

2CC9

1CC9

1CC9

2CC10

2CC10

RL 14.455

RL 14.600

8000 8000 8000 8000 5000 3850 1650

8000

8000

4000

CURTAIN WALLWITH BRUSHED

ALUMINIUM MULLION

POLISHED TIMBERFEATURE SUSPENDEDCEILING

GLAZED CURTAINWALL

100 32466 100 150 2186

OFFICE

CIRCULATION SPACE

RL 14.600

GYMNASIUM

10mm COMPOUNDCEILING

10 ALUMINIUMGUTTER

REFER TO DETAIL

STEEL OUTRIGGER

KINGSPAN 1000RWROOF

1850

150

1850

150

1850

150

1850

150

1850

150

1850

150

1850

150

1850

150

1850

150

1897

150

2023

2

45226

10225

----

----

OYSTER SQUARE CEILING LIGHT

EXIT SIGN

DECORATIVE PENDANT LIGHTING

SMOKE DETECTOR

LEGEND

SPRINKLER

FLUROESCENT CEILING LIGHT

4 BLADE ELECTRIC CEILING FAN

LEGEND

Commencement Date :

For :

Date :File Path :Scale:

Current Revision: Current Revision Date:

Alexander FacchinDrawn By:

Sheet Number:

Project Number:

Project Address

Project Name:

Sheet Name :NORTHPOINT

6/2/2015 12:40:13 AMC:\Users\Alexander\Desktop\TAFE SEM 1 2015\MajorProject\Major Revit Project\Major Project (CURRENT)30-4.rvt

1 : 100

Simon, Elise, Michelle

16/6/2015

85 Bay Street Glebe, NSW

Multi-Purpose Hall, Glebe

REFLECTED CEILING PLAN FIRSTFLOOR

CC6

01A

0 10 m521 1 : 100

FIRST FLOOR CEILING PLAN1

1 : 100

Office Ceiling Plan Legend 1 : 100

Gym Legend

Page 7: TAFE Portfolio Semester 1 2015

RL 02 Floor Level 17.250

RL 03 Ceiling Level 110.250

A B C D E F G H

RL 04 Floor Level 211.650

RL 05 Ceiling Level 214.600

RL 06 Portal Spring15.050

450

2950

1400

3000

RL Parapet17.206

RL Ridge Line16.575631

1525

ELEVATORSHAFT

PRE-CAST CONCRETEBLOCK WALL

FIBRE CEMENTFASCIA BOARD KINGSPAN

1000RW ROOF

STAINLESS STEELOUTRIGGER TOENGINEER SPEC.

STAINLESS STEELSTRUT TOENGINEER SPEC.

STEEL STRUTSUPPORTTO ENGINEER SPEC.

STEEL CAPPINGCHANNEL

REINFORCED CONCRETESTRUCTURALFRAMING

KINGSPAN KS1000ROOFING

KINGSPAN 1000EVOLUTION WALL

PANELS

FA

LL 1

8D

EG

RE

ES

STEEL ARCH RAILING125 HORIZONTAL BARS

RAILINGGLASS PANEL

WITH BRACKET

FALL 3DEGREES

902

1087

2170

KINGSPAN ROOF SHEETINGFIXED TO STEEL PURLIN

2215

2998

6002

DOTTED ROOFBEHIND PRE-CASTCONCRETE WALL

D02

9956

FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP

FP

FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP

FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP FP

FP

FP

CG CG CG CG

FP FP FP FP FP FP

FP

FPFPFPFPFP

OPOP OP OP OP

OPOPOPOPOP

OP OP OP OP OP OP

RL02 Floor Level 1 7.250

RL 03 Ceiling Level 110.250

ABCDEFGH

RL 04 Floor Level 211.650

RL 05 Ceiling Level 214.600

RL 06 Portal Spring15.050

RL Parapet17.206

RL Ridge Line16.575

3000

1400

2950

450

1525

631

200 CONCRETE BLOCK WALLWITH 10 CEMENT RENDER

REINFORCED CONCRETESTRUCTURAL FRAMING

TO ENG. SPECIFICATION

STEEL PARALLELFLANGE CHANNEL REFER

TO SPECIFICATION

STEEL STRUT TOENGINEER SPEC.

STEEL OUTRIGGERTO ENGINEER SPEC.

KINGSPAN1000RW ROOF

OUTRIGGER PURLINTO ENGINEER SPEC.

FALL 3 DEGREES

FIBRE CEMENTFASCIA BOARD

KINGSPAN KS 1000RW ROOFING

1485X200 VERTICALPRE-CAST

COCNRETE PANELWALL

STEEL STRUTSUPPORT TO

ENGINEER SPEC.

ALUMINIUM GUTTER

DOTTED ROOFOUTLINE BEHIND

PRE-CAST CONCRETEPANELS

9956

CG CG CG

CGCGCGCG

OP OP OP

OPOPOP

OP OP OP OP

CG

OP

FP

CLEAR GLASS

OPAQUE GLASS

FIXED PANEL CLEAR GLASS

Commencement Date :

For :

Date :File Path :Scale:

Current Revision: Current Revision Date:

Alexander FacchinDrawn By:

Sheet Number:

Project Number:

Project Address

Project Name:

Sheet Name :NORTHPOINT

6/2/2015 12:40:17 AMC:\Users\Alexander\Desktop\TAFE SEM 1 2015\MajorProject\Major Revit Project\Major Project (CURRENT)30-4.rvt

1 : 100

Simon, Elise, Michelle

16/6/2015

85 Bay Street Glebe, NSW

Multi-Purpose Hall, Glebe

EAST ELEVATION & WEST ELEVATION

CC7

01A

1 : 100

EAST ELEVATION1

1 : 100

WEST ELEVATION2

0 10 m521 1 : 100

FINISH LEGEND

Page 8: TAFE Portfolio Semester 1 2015

RL 02 Floor Level 17.250

RL 03 Ceiling Level 110.250

1234

RL 04 Floor Level 211.650

RL 05 Ceiling Level 214.600

RL 06 Portal Spring15.050

RL Parapet17.206

RL Ridge Line16.575631

1525

450

2950

1400

3000

STEEL STRUT TOENGINEER SPECIFICATION

STEEL STRUT SUPPORTTO ENGINEER SPECIFICATION

R.C. COLUMN TOENGINEERSPECIFICATION

200 R.C. BLOCKWALL

ALUMINIUMFASCIAGUTTER

275X50 ALUMINIUMMULLION

PRE-CASTCONCRETE BLOCKWALL

FIBRE CEMENTFASCIA BOARD

KINGSPAN1000RW ROOF

EAVESPURLIN

STRUCTURALSTIFFENERREFER TO

ENGINEER SPEC.

HALF MOMENTFRAME REFER TOENGINEER SPEC.

150X50 ALUMINIUMMULLION

ALUMINIUM BALUSTRADEWITH CLEAR GLASS PANELS

140

525

2425

150

1225

2025

1000

600

7523

2518

140

023

2521

19

900

900

400x600 SLAB EDGEREFER TO ENGINEER SPEC.

300mm R.C. SLAB

ROOF PITCH3 DEGREES

D01D06CG CG

CGCGCG

CG CG

CG CG

CG CG CG CG CG CG CG CG CG CG CG CG

OP OP OP OP OP OP OP OP OP OP OP OP

OPOPOPOPOPOPOPOPOPOPOPOP

FP FP FP FP FP FP FP FP FP FP FP FP

FP FP FP

FPFPFP

CG

RL 02 Floor Level 17.250

RL 03 Ceiling Level 110.250

1 2 3 4

RL 04 Floor Level 211.650

RL 05 Ceiling Level 214.600

RL 06 Portal Spring15.050

RL Parapet17.206

RL Ridge Line16.575631

1525

450

2950

1400

3000

PRE-CAST CONCRETEBLOCK WALL

KINGSPAN 1000 RWWALL

6242

2758

FALL 18 DEGREES

GLAZED CURTAIN WALLELEVATOR SHAFT

STRUCTURAL STIFFINERREFER TO ENGINEERSPECIFICATION

340

2660

3000

KINGSPAN 1000RWROOF

EAVESPURLIN

HALF MOMENT FRAMEREFER TO ENGINEERSPECIFICATION

2837

ROOF OUTLINE

D03D04

9956

CG CG CG CG

CG CG CG CG

CG CG CG

CG

OP

FP

CLEAR GLASS

OPAQUE GLASS

FIXED PANEL CLEAR GLASS

Commencement Date :

For :

Date :File Path :Scale:

Current Revision: Current Revision Date:

Alexander FacchinDrawn By:

Sheet Number:

Project Number:

Project Address

Project Name:

Sheet Name :NORTHPOINT

6/2/2015 12:40:19 AMC:\Users\Alexander\Desktop\TAFE SEM 1 2015\MajorProject\Major Revit Project\Major Project (CURRENT)30-4.rvt

1 : 100

Simon, Elise, Michelle

16/6/2015

85 Bay Street Glebe, NSW

Multi-Purpose Hall, Glebe

NORTH ELEVATION & SOUTHELEVATION

CC8

01A

1 : 100

NORTH ELEVATION1

1 : 100

SOUTH ELEVATION2

0 10 m521

1 : 100

FINISH LEGEND

Page 9: TAFE Portfolio Semester 1 2015

RL 02 Floor Level 17.250

RL 03 Ceiling Level 110.250

1234

RL 04 Floor Level 211.650

RL 05 Ceiling Level 214.600

RL 06 Portal Spring15.050

RL Parapet17.206

RL Ridge Line16.575

GYMNASIUM

631

1525

450

2950

1400

3000

KINGSPAN 1000RW WALL

WALL GIRT

UNIVERSAL BEAM410UB59.7

STEEL ANGLE CROSSBRACING 75X75X5EA

UNIVERSAL BEAM360UB50.7

600X600 SLAB EDGE

UNIVERSAL BEAM410UB59.7

UNIVERSAL BEAM410UB59.7

HORIZONTAL PRE-CAST CONCRETEPANELS

9956

10 PLASTERBOARDCEILING

FIBRE CEMENTFASCIA BOARD

150 REINFORCED CONCRETE

D03 D04

2

CC11

2

CC12

RL 02 Floor Level 17.250

RL 03 Ceiling Level 110.250

1 2 3 4

RL 04 Floor Level 211.650

RL 05 Ceiling Level 214.600

RL 06 Portal Spring15.050

RL Parapet17.206

RL Ridge Line16.575631

1525

450

2950

1400

3000

9956

RECEPTION

OFFICE

600X400 CONCRETERECTANGULAR BEAM

GLAZED CURTAIN WALLELEVATOR SHAFT

COMPOUND CEILING600X600 GRID

CEILING OYSTERSQUARE LIGHTING

200 PRE-CASTCONRETE WALL

600X600SLAB EDGE

600X400 CONCRETEBEAM

275X50 MULLION

UNIVERSAL BEAM250UB31.4

Z PURLINZ20019

PARALLEL FLANGECHANNEL 250PFC

COMPUND CEILING600X600 GRID

KINGSPAN1000RW ROOF

180 REINFORCED CONCRETEPOLISHED CONCRETE FINISH

SQUARE HOLLOW SECTION150X150X9.0

MONOLITHIC CONCRETESTAIRCASE

900 GLASS PANELSWITH BRACKETS

D01

CG CG CG CG CG CG CG CG CG CG CG CG

FP FP FP FP FP FP FP FP FP FP FP FP

FP FP FP

CG

OP OP OP OP OP OP OP OP OP OP OP OP

OP OP OP OP OP OP OP OP OP OP OP OP

PRE-CASTCONCRETE BLOCK

WALL

CG

OP

FP

CLEAR GLASS

OPAQUE GLASS

FIXED PANEL CLEAR GLASS

Commencement Date :

For :

Date :File Path :Scale:

Current Revision: Current Revision Date:

Alexander FacchinDrawn By:

Sheet Number:

Project Number:

Project Address

Project Name:

Sheet Name :NORTHPOINT

6/2/2015 12:40:21 AMC:\Users\Alexander\Desktop\TAFE SEM 1 2015\MajorProject\Major Revit Project\Major Project (CURRENT)30-4.rvt

1 : 100

Simon, Elise, Michelle

16/6/2015

85 Bay Street Glebe, NSW

Multi-Purpose Hall, Glebe

CROSS SECTION 1-1, 2-2

CC9

01A

1 : 100

Cross-Section 2-22

1 : 100

Cross-Section 1-11

0 10 m521 1 : 100

FINISH LEGEND

Page 10: TAFE Portfolio Semester 1 2015

RL 02 Floor Level 17.250

RL 03 Ceiling Level 110.250

A B C D E F G H

RL 04 Floor Level 211.650

RL 05 Ceiling Level 214.600

RL 06 Portal Spring15.050

RL Parapet17.206

RL Ridge Line16.575

RECEPTION

OFFICE

GYMNASIUM

1000

1176

1000

GLAZED GLASS CURTAIN WALL

ALUMINIUM GUTTER

STEEL STRUTTO ENGINEER SPECIFICATION

STRUCTURAL STEEL STIFFINERREFER TO ENGINEER SPEC.

UNIVERSAL BEAM250UB31.4

600X600 GRIDCOMPOUND

CEILINGTIMBER FINISH

FEATURE CEILING

MONOLITHIC CONCRETESTAIRCASE

600X600 REINFORCEDCONCRETE SLAB

EDGE

150 POLISHEDREINFORCED

CONCRETE SLAB

400X800RECTANGULAR

CONCRETE BEAM

2170

STEEL EQUAL ANGELS75X75X5EA

UNIVERSAL COLUMN410UB59.7

100 STEELSTUD WALL

WITH 10PLASTERBOARD

200 POLISHEDCONCRETE

BLOCK WALL

200 PRE-CASTCONCRETE WALL

KINGSPAN 1000RWROOF

STEEL Z PURLIN1500X200PRE-CAST CONCRETE

BLOCK WALL

FIBRE CEMENTFASCIA BOARD

1584

2816

631

1525

450

2950

1400

3000

9956

RL 16.553

ROOF RIDGE

FALL 3 DEGREESFALL 3 DEGREES

WALL GIRTREFER TO ENGINEER

SPECIFICATION

UNIVERSAL COLUMN410UB59.7

HORIZONTALKINGSPAN 1000RW

PRE-CAST CONCRETEBLOCK WALL

FIBRE CEMENTFASCIA BOARD

ALUMINIUM GUTTER

600X600 REINFORCEDCONCRETE SLAB

EDGE

STEELUNIVERSAL COLUMN

200UB29.8

CG CG CG

CG

CG CG CG

OP OP OP OP OP OP OP

OPOP

CG

1

CC12

RL 02 Floor Level 17.250

RL 03 Ceiling Level 110.250

ABCDEFGH

RL 04 Floor Level 211.650

RL 05 Ceiling Level 214.600

RL 06 Portal Spring15.050

RL Parapet17.206

RL Ridge Line16.575

GYMNASIUM

RECEPTION

OFFICE

KINGSPAN WALL 1000RW

WALL GIRT

UNIVERSAL BEAM410UB59.7

EQUAL ANGEL CROSSBEAM75X75X5EA

STRUCTURAL STIFFINER

150 REINFORCED CONRETE SLAB

600X600 REINFORCED CONCRETESLAB EDGE

UNIVERSAL BEAM360UB50.7

Z PURLINZ20019

KINGSPAN1000RW ROOF

UNIVERSAL COLUMN200UB29.8

400X800RECTANGULAR

SLAB EDGE600X600 GRID

COMPOUND CEILING

STEEL BEAM TOCONCEAL STAIRWAY

STRUCTURALSTIFFINER

REFER TO ENGINEERSPECIFICATION

400X400 RECTANGULARCONCRETE COLUMN

UNIVERSAL COLUMN410UB59.7

200 PRE-CASTCONCRETE WALL

400 ROUNDCONCRETE COLUMN

FIBRE CEMENTFASCIA BOARD

ALUMINIUMGUTTER

2195

2180

TIMBER FINISHFEATURE CEILING

600X600 GRIDCOMPOUND

CEILING

OUTRIGGERREFER TO ENGINEER

SPECIFICATION

STEEL STRUTTO ENGINEER

SPECIFICATION

OUTRIGGERREFER TOENGINEER

SPECIFICATION

KINGSPAN 1000RW

ALUMINIUM FEATURECEILING

UNIVERSAL BEAM250UB31.4

RL 16.553

D14D02

FP FP FP FP FP FP

FPFPFPFPFPFPFP

OP OP OP OP OP OP OP

OPOP

OP

OP OP OP

OPOP

CG CG CGCG CG

OP OP OP

1CC11

CG

OP

FP

CLEAR GLASS

OPAQUE GLASS

FIXED PANEL CLEAR GLASS

Commencement Date :

For :

Date :File Path :Scale:

Current Revision: Current Revision Date:

Alexander FacchinDrawn By:

Sheet Number:

Project Number:

Project Address

Project Name:

Sheet Name :NORTHPOINT

6/2/2015 12:40:25 AMC:\Users\Alexander\Desktop\TAFE SEM 1 2015\MajorProject\Major Revit Project\Major Project (CURRENT)30-4.rvt

1 : 100

Simon, Elise, Michelle

16/6/2015

85 Bay Street Glebe, NSW

Multi-Purpose Hall, Glebe

LONG SECTION A-A, B-B

CC10

01A

1 : 100

Long Section A-A1

0 10 m521

1 : 100

SECTION B-B2

FALL 3 DEGREES

FALL 3 DEGREESFALL 3 DEGREES

1 : 100

FINISH LEGEND

Page 11: TAFE Portfolio Semester 1 2015

RL 02 Floor Level 17.250

1

100D AG LINE SURROUNDEDBY 100 CRUSHED ROCK

25D DOWEL BOLTFIXED FROM COREPCCP THROUGHREINFORCED CONCRETESLAB

PRE-CASTCONCRETEPANEL

EQUAL ANGLEPORTAL CROSS

BRACING

150H TIMBERSKIRTING BOARD

150 REINFORCED CONCRETESLAB POLISHED CONCRETE

FINISH

WATERPROOF MEMBRANE50 SANDBLINDING LAYER

100 CRUSHED ROCK

5010

0

109 200

RL 02 Floor Level 17.250

A

WATERPROOFMEMBRANE

100 CRUSHED ROCK

50 SAND BED

150 REINFORCEDCONCRETE SLAB

POLISHED CONCRETEFINISH

100 AG PIPE WITHGEOTECH FABRIC &

SURROUNDED BY 100CRUSHED ROCK

BASEPLATE ONNON SHINK GROUT

UB PORTAL COLUMNAS PER ENGINNER

SPECIFICATION

KINGSPAN KS 1000 ECOLUTIONSIP HORIZONTALLY APPLIED

C-CHANNEL GIRTS FIXED TOPORTAL FRAME WITH CLEATSAS PER ENGINEERSPECIFICATION

150 TIMBER SKIRTINGBOARD

203 162 100

87

13090

100

50

100D AG LINE SURROINDEDBY CRUSHED ROCK

Commencement Date :

For :

Date :File Path :Scale:

Current Revision: Current Revision Date:

Alexander FacchinDrawn By:

Sheet Number:

Project Number:

Project Address

Project Name:

Sheet Name :NORTHPOINT

6/2/2015 12:40:26 AMC:\Users\Alexander\Desktop\TAFE SEM 1 2015\MajorProject\Major Revit Project\Major Project (CURRENT)30-4.rvt

1 : 10

Simon, Elise, Michelle

16/6/2015

85 Bay Street Glebe, NSW

Multi-Purpose Hall, Glebe

DETAILS A & B

CC11

01A

1 : 10

PCCP WALL PANEL FOOTING2

1 : 10

FOOTING & SIPS WALL PANEL1

0 40cm

1:10

10 20 30

Page 12: TAFE Portfolio Semester 1 2015

A

RL06 Portal Spring 15.050

RLParapet 17.206

RLRidge Line 16.575

KINGSPAN KS1000HORIZONTAL SIP

TOP HAT CHANNELS FIXED TOPORTAL FRAMES

HOOK BOLD FIXED TOPORTAL FRAMES

INSULATION TO BOXGUTTER SURROUNDS

SADDLE ANGLE

HAUNCH TOENGINEER SPECIFICATION

UNIVERSAL COLUMN TOENRINEER SPECIFICATION

PORTAL RAFTER TOENGINEER CONVERSATION

Z PURLIN FIXEDTO PORTAL RAFTERWITH CLEAT TOENGINEER SPEC.

HOOK BOLTS FIXEDOVER Z PURLIN

KINGSPANKS1000ROOF

FIXING TOZ PURLIN AS PERENGINEERSPECIFICATION

BOX GUTTER ONSTEEL DECKINGGUTTER BOARD

177 ROOF OVERHANG

FALL 1:50

VERTICAL C CHANELSTRUCTURAL FRAMINGTO TAKE GIRTS

10MM FIBRE CEMENTSHEET FIXED TOTOP HAT CHANELS AS PERENGINEER SPEC

ALUMINIUM PARAPETFLASHING

TIMBER INFILL BLOCK

1

RL 06 Portal Spring15.050

RL Parapet17.206

RL Ridge Line16.575

309

200

PRE-CAST CONCRETEWALL PANEL

10MM FC SHEET FIXEDTO TOP HAT CHANNELS

AS PER ENGINEERSPECIFICATION

STEEL CAPPING

Z PURLIN TOENGINEER

SPECIFICATION

UNIVERSAL BEAM360UB50.7 AS PERENGINEERSPECIFICATION

CLEAT FIXING PORTALRAFTER TO PURLINAS PER ENGINEERSPECIFICATION

PARAPET FLASHING AT12 DEGREE FALL

TIMBER INFILLBLOCK

6110

38

1525

631

Commencement Date :

For :

Date :File Path :Scale:

Current Revision: Current Revision Date:

Alexander FacchinDrawn By:

Sheet Number:

Project Number:

Project Address

Project Name:

Sheet Name :NORTHPOINT

6/2/2015 12:40:26 AMC:\Users\Alexander\Desktop\TAFE SEM 1 2015\MajorProject\Major Revit Project\Major Project (CURRENT)30-4.rvt

1 : 10

Simon, Elise, Michelle

16/6/2015

85 Bay Street Glebe, NSW

Multi-Purpose Hall, Glebe

DETAILS C & D

CC12

01A

1 : 10

ROOF, WALL & BOX GUTTER JUNCTION1

1 : 10

PCCP WALL PANEL PARAPET2

0 40cm

1:10

10 20 30

Page 13: TAFE Portfolio Semester 1 2015

WENTWORTH STREET

CO

WP

ER

STR

EE

T

QUEEN STREET

BA

Y S

TR

EE

T

WENTWORTH STREET

CO

WP

ER

STR

EE

T

QUEEN STREET

BA

Y S

TR

EE

TWENTWORTH STREET

CO

WP

ER

STR

EE

TQUEEN STREET

BA

Y S

TR

EE

T

Commencement Date :

For :

Date :File Path :Scale:

Current Revision: Current Revision Date:

Alexander FacchinDrawn By:

Sheet Number:

Project Number:

Project Address

Project Name:

Sheet Name :NORTHPOINT

1:1000

6/2/2015 12:40:32 AMC:\Users\Alexander\Desktop\TAFE SEM 1 2015\MajorProject\Major Revit Project\Major Project (CURRENT)30-4.rvt

Simon, Elise, Michelle

16/6/2015

85 Bay Street Glebe, NSW

Multi-Purpose Hall, Glebe

SHADOW STUDIES - JUNE 21st

CC13

01A

JUNE 21st 9AM1

JUNE 21st 12 NOON2

JUNE 21st 3PM3

0 50 100 m

Page 14: TAFE Portfolio Semester 1 2015

WENTWORTH STREET

BA

Y S

TR

EE

T

CO

WP

ER

STR

EE

T

QUEEN STREETQUEEN STREET

BA

Y S

TR

EE

T

WENTWORTH STREET

CO

WP

ER

STR

EE

T

WENTOWRTH STREET

BA

Y S

TR

EE

T

QUEEN STREET

CO

WP

ER

STR

EE

T

Commencement Date :

For :

Date :File Path :Scale:

Current Revision: Current Revision Date:

Alexander FacchinDrawn By:

Sheet Number:

Project Number:

Project Address

Project Name:

Sheet Name :NORTHPOINT

1:1000

6/2/2015 12:40:37 AMC:\Users\Alexander\Desktop\TAFE SEM 1 2015\MajorProject\Major Revit Project\Major Project (CURRENT)30-4.rvt

Simon, Elise, Michelle

16/6/2015

85 Bay Street Glebe, NSW

Multi-Purpose Hall, Glebe

SHADOW STUDIES MARCH 21st

CC14

01A

MARCH 21st 9AM1

MARCH 21st 12 NOON2

MARCH 21st 3PM3

0 50 100 m