  • 8/12/2019 07 BMS CheckList

    1/13

    BRIEF SCOPE OF WORK

    The brief scope of work comprises of, but not limited to, the following:

    a. Design, supply, installation and commissioning of Integrated Building Management system

    comprising of the following:

    i. Building Automation system forHVAC Lower Side (AHUs etc). Electrical System (HT/LT) including DG operation, Vertical Transportation

    (Lift Management) system and Water Management System

    ii. Integrated building management system including the IBMS software to integrate and monitor

    the following services from a central location

    Fire Detection & Alarm

    Public Address

    Access Control

    Closed Circuit Surveillance & Digital Video Recording

    Lighting ControlWater Management

    Fire Fighting

    Iii The following system specific to the requirement of the Data centre.:

    Gas based Fire Suppression systems.

    Water leak detection

    Smoke Detection

    Ultrasonic Pest Repellent system

  • 8/12/2019 07 BMS CheckList

    2/13

    CHECK LIST FOR BMS

    SUB-SECTION-1

    INPUT AND OUTPUT SUMMARY FOR BAS.

    S l.NO

    DESCRIPTION FUNCTI ONS LOCATION

    AI A O D

    I

    D

    O

    STA

    TUS

    ALA

    RM

    CON

    TROL

    CONTROL/

    MONITORING

    1 DDC TYPE - A (For chiller) -

    Chillers: - AHUROO

    M -1

    AT

    SEC

    ON D

    FLO

    O R.

    1

    Chiller ON/OFF command. Command from

    PC/DDC to the ch il le r

    MCC panel.

    2 Chiller ON/OFF status. From chiller panel

    3 Chiller Auto / Manual status. signal from A/M switch.

    4Chiller trip status. signal from potential

    free contact.

    5Motorized Vavle ON/OFF Command signal from potential

    free contact.

    6 Motorized Vavle ON/OFF Status

    7Immersion type Temp sensor for In

    and out

    Signal from Immersion

    type Temp sensor .

    Primary Chilled Water Pumps-

    8

    Primary Chilled Water pumps ON /

    OFF command.

    Command from

    PC/DDC to the primary

    CHW Pumps panel.

    9Primary Chilled Water pumps ON /

    OFF Status.

    Differential pressure

    switch.

    10Primary Chilled Water pumps Auto /

    Manual status.

    signal from A/M switch.

    11Primary Chilled Water pumps trip

    status.

    signal from potential

    free contact.

    12Immersion type Flow switch signal For dry run

    status

  • 8/12/2019 07 BMS CheckList

    3/13

    13 Secondary Chilled Water Pumps-

    14 Secondary CHW pumps ON / OFF

    Command.

    Command fromPC/DDC to theMCC panel.

    15 Secondary CHW pumps ON / OFFstatus.

    Differentialpressure switch.

    16 Secondary CHW pumps VFD speed

    Control.

    Proportional

    signal from

    DDC to the VFD

    17 Secondary CHW pumps VFD speed

    feedback.

    signal from VFD.

    18 Secondary CHW pumps trip status. VFD trip status .

    19 Secondary CHW pumps A/M status &

    Bypass status.

    signal from A/M

    switch.

    20 Immersion type Flow switch signal for DryRun status

    21 Differential pressure Switch across the

    supply & return headers.(4 nos Pr

    Pump, 3 Nos Sec pump)

    Signal from DP

    switch for flow.

    22 Differential pressure sensor across the

    common supply & return headers.

    Differential

    pressure

    sensor.23 CHW flow measurement Pulse O/P from

    flow meter.

    24 MCC power supply status. Command from

    PC/DDC to the

    MCC panel.

    Total

    2 TYPE - B ( For 1 NO AHU with VFD.) -

    4Nos

    1 AHU ON/OFF Command. 1 * At local control R E

    F

    D D

    CLO

    CA

    TIO

    N

    DR

    2AHU ON/OFF Status. 1 * At local control

    panel

    3 AHU Auto/Manual Status 1 * At Auto / Manualswitch

    4 Filter status. 1 * DP switch

    5RA Temparature status 1 * F r o m

    Temparature

    7 CHW 2-Way Valve Control. 1 2 Way Valve

  • 8/12/2019 07 BMS CheckList

    4/13

    6 RA Rh status From Rh sensor AWI

    NG.

    with Actuator

    8Fire trip status. From Fire Relay

    9

    Fire Damper On/Off Status At local control

    panel

    10VFD speed control. At VFD Panel

    11VFD speed refference. At VFD Panel

    12VFD trip status. At VFD Panel

    13Duct static pressure sensor. Pressure sensor

    14VFD Bypass status. At VFD Panel

    Total

    3 TYPE - C (3 Nos AHU's/CAHU with Starter

    ) - 2 Nos

    1 AHU ON/OFF Command. At local control

    panel

    REF

    DDC

    LOCA

    TION

    DRA

    W

    ING.

    2 AHU ON/OFF Status. At local control

    panel

    3 AHU Auto/Manual Status At Auto / Manual

    switch

    4 Filter status. DP switch

    5 RA Temparature status F r o m

    Temparature

    6 RA Rh status From Rh sensor

    6 CHW 2-Way Valve Control. 2 Way Valve with

    Actuator

    7 Fire trip status. From Fire Relay

    8 Fire Damper On/Off Status At local control

    panel

    9 Duct static pressure sensor. Pressure sensor

    Total

  • 8/12/2019 07 BMS CheckList

    5/13

    4 TYPE -D(4 Nos CAHU's with Starter )- 1

    No

    1 AHU ON/OFF Command. At local control

    panel

    REF

    DDC

    LOCA

    TIONDRA

    W

    ING.

    2 AHU ON/OFF Status. At local control

    panel3 AHU Auto/Manual Status At Auto / Manual

    switch

    4 Filter status. DP switch

    5 RA Temparature status F r o m

    Temparature

    sensor

    6 RA Rh status From Rh sensor

    6 CHW 2-Way Valve Control. 2 Way Valve with

    Actuator7 Fire trip status. From Fire Relay

    8 Fire Damper On/Off Status At local control

    panel

    9 Duct static pressure sensor. Pressure sensor

    Total

    5 TYPE -E (22 Nos PAC )- 1 No

    1 AHU ON/OFF Command. At local controlpanel

    PACROO

    M AT

    1ST

    Total

    6 TYPE -F (7 Nos PAC )- 1 No

    1 AHU ON/OFF Command. At local control

    panel

    PAC

    ROO

    M AT

    1ST

    Total

  • 8/12/2019 07 BMS CheckList

    6/13

    SUB-SECTION2

    I/O SUMMARY

    SECTION I: I/O LIST FOR HT/LT ELECTRICAL MONITORING

    S.No.

    DESCRIPTION DI AI STATUS ALARM CONTROL

    LINK LOCATION

    SUBSTATIION FUNCTIONS Signalsareto beacquiredfromCircuitBreakers

    &Relaysoverserialinterface.ElectricalcontractorshallmakeavailableCBs andrelays

    withRS 485port andMODBUSRTUPROTOCOL

    SUB-STATIONBLDG-HTROOM

    1. 0 11KV SWITCHGEAR SIGNALS(HPCL HT PANEL SIDE)

    1. 1 11 KV INCOMING VCB 630A350 MVA

    ON/OFF/Auto trip - functions

    I n c o m i n g H Tvoltage/current/frequency,power,M VA - Measurements

    1.2 MICROPROCESSOR BASEDRELAYS - Trip circuit Un-Healthy

    1.3 MANUAL OPERATIONSTATUS -

    1.4 11 KV RECEIVING VCB 630A350 MVA

    ON/OFF/trip - functions

    I n c o m i n g H Tvoltage/current/frequency,power,M VA - Measurements

    1.5 MANUAL OPERATIONSTATUSon/off

    1.6 MICROPROCESSOR BASEDRELAYS - Trip circuit Un-Healthy

    BATTERY CHARGER:

    1.7 BATTERY CHARGER - Mainson/ DC supply on/fails

  • 8/12/2019 07 BMS CheckList

    7/13

    1.8 BATTERY VOLTAGE -Measurement

    S.No.

    DESCRIPTION DI AI STATUS ALARM CONTROL

    LINK LOCATION

    MAIN POWER CONTROL

    CENTER

    Signals

    areto beacquiredfromCircuitBreakers&Relaysoverserialinterface.Electrical

    contractorshallmakeavailableCBs andrelayswithRS 485port andMODBUSRTUPROTOC

    OL

    SUB-

    STATIONBLDG-MPCCROOM

    2.0 433 V INCOMING FEEDERSFor TRANSFORMERS

    2.1 INCOMING 433 V 3200 AMPSACBS

    2.2 ON/OFF/Auto trip - functions

    2.3 I n c o m i n g L Tvoltage/current/frequency,power,M VA - Measurements

    2.4 MICROPROCESSOR BASEDRELAYS - Trip circuit Un-Healthy

    2.5 MANUAL OPERATIONSTATUS

    BUSCOUPLER: - 1 NO

    2.6 BUS Coupler - On/off/trip

    2.7 MANUAL OPERATION STATUS- On/off

    DG INCOMER feeders: - 2 NOS

    2.8 DG INCOMER - ACBS -On/off/trip

    2.9 I n c o m i n g L Tvoltage/current/frequency, KW,kVA - Measurements

    3.0 MICROPROCESSOR BASEDRELAYS - Trip circuit Un-Healthy

    3.1 MANUAL OPERATIONSTATUS-

    4.0 UPS MONITORING

  • 8/12/2019 07 BMS CheckList

    8/13

    1.0 STATUS MONITORING,VOLTAGE, CURRENT, LOAD,BATTERY VOLTAGE ETC6 NOS 200 AND 2 NOS 100KVA UPS - Total around 80soft points

    RS 485port andMODBUSR T UPROTOCOL to be

    providedby UPSvendor

    Groundfloor

    U P S

    room

    S.No.

    DESCRIPTION DI AI STATUS ALARM CONTROL

    LINK LOCATION

    2.0 KW. Voltage, Amps from eachfeeder through DATA Loadmanager meter - Total 28feeder each 5 soft points =140 soft points

    * RS 485port andMODBUSR T UPROTOCO L tobeprovidedbyElectricalvendor

    ATMETERLEVEL

    SUB-STATIONBLDG-MPCC.Thewiringshall betakenoutandterminted at onecommonchamberbyelectricalvendor.

    3.0 DG set - ON/Off status, KW,Amps, Voltage, Frequency

    etc through PLC -Approximately - 50 soft point

    RS 485port and

    MODBUSR T UPROTOCO L tobeprovidedbyElectricalvendor INPLCPANEL

    SUB-STATION

    BLDG-MPCCROOM

    Total

    DI = DIGITAL INPUTS AI= ANALOG INPUTS

  • 8/12/2019 07 BMS CheckList

    9/13

    SECTION-II

    I/O LIST FOR /LT ELECTRICAL MONITERING

    S.No.

    DESCRIPTION DI AI STATUSALARM

    CONTROL

    LINK

    4.00433V OUTGOING FEEDERS -On/off/Trip status

    LIFT FEEDER- 2NOS

    4.10 FIRE HYDRANT PANEL--1 ThorughDDCcontrollers.BMSvendorto providethecontrolleralong withwiring.

    Electricalvendor toprovide thenecessaryPotentialfreecontact inthe eachbreakers.The wiringshall betaken out

    andterminatedatonecommonchamberbyelectricalvendor

    4.20CHILLER NO.1 ,2,3, AND STAND BYFEEDER

    4.30 CHILLER PUMPS PANEL - 2 NOS

    4.40 WORKSTATION UPS- 2NOS

    4.50 APFC PANEL - 2 NOS

    4.60 SPARES- 4 NOS

    4.70 SUBSTATIION PANEL4.80 EMERGENCY LIGHTING FEEDER

    4.90 AC PANELS- 5 NOS

    5.00LIGHTING AND POWER FEEDER -2NOS

    5.10 UPS FEEDERS- 2NOS

  • 8/12/2019 07 BMS CheckList

    10/13

    SECTION-III

    WATER MANAGEMENT SYSTEM I/O LIST

    FUNCTIONS

    S.No DESCRIPTION AI DO AO STATUS ALARM CONTROL CONTROL/MONITORING

    LOCATION

    THROUGHDDC.Local displayshall beprovidedindicating waterlevel andpumps status

    UG SUMPAREAANDTERRACEOH TANK

    1 Pump ON/OFF

    2 P u m ptrip,ON/OFF status

    3 Linear levels for allthe sumps and tanks

    Total

  • 8/12/2019 07 BMS CheckList

    11/13

    SECTION-IV

    LIGHTING MANAGEMENT SYSTEM - I/O LIST

    SrNo.

    DESCRIPTION FUNCTION CONTROL /MONITORINGDI AI DO AO STATU

    SALARM CONTROL LOCATI

    ON

    I LIGHTINGMANAGEMENTSYSTEM -Controller-1

    1 External Street Lighting&

    ON/OFFContactor

    shall beprovided bytheElectricalvendor.ControllojngthroughDDCby BMSvendor

    SUBSTATIO

    FACADE LIGHTING SUB

    Lighting MCCBON/OFF

    SUBSTATION

    Controller-2 - 6 sets

    2 Incomer MCCB switchon/OFF at Ground floor,Second floor LSSB

    At floor level,shall beprovided bytheElectricalvendor.Controllojngthrough DDCby BMSvendor

    At floorlevel

    3 Induvidual circuitON/OFF controlls -Each controller - 20circuits

    TOTAL

  • 8/12/2019 07 BMS CheckList

    12/13

    SECTION-V

    FIRE FIGHTING PUMPS I/O LIST

    FUNCTION

    Sr.No DESCRIPTION DI DO AI AO STATUS ALARM CONTROL CONROL/MONITORING

    A) HYDRANT andSPRINKLER PUMPS:

    Statusmonitoringthrough DDC.Suitablepotential-freecontacts shall be

    Made availableby the FireFightingcontractor

    1 JOCKEYPUMP: -1 NOS

    Pump Trip/ON/OFFStatus

    2 HYDRANTPUMP:- 2NOS

    Pump TripON/OFF Status

    3 SPRINLERPUMPSTANDBYPUMP- 2 NOS

    Pump Trip/ON/OFF Status

    TOTAL

  • 8/12/2019 07 BMS CheckList

    13/13

    SECTION-VI

    I/O LIST FOR LIFTS

    FUNCTION CONTROL

    /MONITORING

    LOCAT

    ION

    Sr.NO

    DISCRIPTION SP DI AI DO AO STATUS

    ALARM CONTROL

    1 Monitor alarmbell status oflifts

    FormonitoringthroughDDG.Potential freecontactsshall be

    madeavailable byElevatorssupplier.

    L i f tmachine room

    2 M o n i t o rFireman'semergencyoperation

    status3 Monitor

    operation ofelevator in'Attendantmode'

    4 Monitor liftu n d e rinspection/testdrive

    5 Monitor lift

    under fire drive6 Trip Alarm

    7 ON/OFF Status

    8 FLOOR LEVELStatus(eachlift 3 levels= 2nos x 3 levels)

    Total