2 kien pham cv en vn with project experience

23
Kien Pham’s CV Page 1 of 7 Pages CURRICULUM VITAE - LÝ LCH NG VIÊN 1. PERSONAL DETAILS / THÔNG TIN CÁ NHÂN Full Name (Hvà tên): Kiên Phm Date of Birth (ngày sinh): 27/05/1979 Marital Status (tình trng hôn nhân): Married/đã có gia đình Gender (gii tính): Male/nam E-Mail Address (địa chthư đin t): [email protected] Contact Number (sđin thoi liên lc ) +66 96 254 8088 or +84988.72.22.36 Skype Address (địa chskype): Kienlecturer Contact Address (địa chliên lc): Hanoi-Vietnam 25/27, Lane 27 – Thanh Đàm Street - Hoàng Mai District – Hà Ni Capital Bangkok-Thailand No 3409 Meechai Mansion, Soil 3 Ratchadapisek road, Bangkok, Thailand 2. WORKING EXPERIENCES / KINH NGHIM LÀM VIC Most Recent Employer (Công ty làm vic hin ti): Currently, Pham Trung Kien is a Senior Structural Engineer, Project leader of Aurecon Bangkok, Thailand with more than 14 years professional engineering experience with many large projects around Viet Nam and other countries. He also used to be a structural leader for Aurecon Vietnam/Hin ti Phm Trung Kiên ksư kết cu cao cp và lãnh đạo dán ca công ty Aurecon Bangkok, Thái Lan vi 14 năm kinh nghim trong lĩnh vc kthut kết cu vi nhiu dán ln Vit Nam và các nước. Cũng đã tng là lãnh đạo đội kết cu công trình ca công ty Aurecon ca Úc ti Vit Nam Experience/ Tóm tt kinh nghim 14 years/ Kinh nghim làm vic 14 năm Oversee working experience (New Zealand, Singapore, HongKong, Thailand)/ Kinh nghim làm vic nước ngoài Working for Australia Aurecon Group (aurecongroup.com) for more than 8 years/Kinh nghim làm vic cho Tp đoàn Aurecon Úc lin tc trên năm Key Achievements Built a very strong structural team for a company and delivered

Upload: kien-pham

Post on 24-Jan-2017

26 views

Category:

Recruiting & HR


7 download

TRANSCRIPT

Page 1: 2 kien pham cv en  vn with project experience

Kien Pham’s CV Page 1 of 7 Pages

CURRICULUM VITAE - LÝ L ỊCH ỨNG VIÊN

1. PERSONAL DETAILS / THÔNG TIN CÁ NHÂN

Full Name (Họ và tên):

Kiên Ph ạm

Date of Birth (ngày sinh):

27/05/1979

Marital Status (tình trạng hôn nhân):

Married/ đã có gia đình

Gender (giới tính):

Male/nam

E-Mail Address (địa chỉ thư điện tử ): [email protected]

Contact Number (số điện thoại liên lạc )

+66 96 254 8088 or +84988.72.22.36

Skype Address (địa chỉ skype):

Kienlecturer

Contact Address (địa chỉ liên lạc):

Hanoi-Vietnam 25/27, Lane 27 – Thanh Đàm Street -

Hoàng Mai District – Hà N ội Capital

Bangkok-Thailand No 3409 Meechai Mansion, So il 3

Ratchadapisek road, Bangkok, Thailand

2. WORKING EXPERIENCES / KINH NGHIỆM LÀM VIỆC

Most Recent Employer (Công ty làm việc hiện tại):

Currently, Pham Trung Kien is a Senior Structural Engineer, Project leader of Aurecon Bangkok,

Thailand with more than 14 years professional engineering experience with many large projects

around Viet Nam and other countries. He also used to be a structural leader for Aurecon

Vietnam/Hiện tại Phạm Trung Kiên kỹ sư kết cấu cao cấp và lãnh đạo dự án của công ty

Aurecon Bangkok, Thái Lan với 14 năm kinh nghiệm trong lĩnh vực kỹ thuật kết cấu với nhiều

dự án lớn ở Việt Nam và các nước. Cũng đã từng là lãnh đạo đội kết cấu công trình của công ty

Aurecon của Úc tại Việt Nam

Experience /

Tóm t ắt kinh

nghi ệm

• 14 years/ Kinh nghiệm làm việc 14 năm

• Oversee working experience (New Zealand, Singapore, HongKong,

Thailand)/ Kinh nghiệm làm việc ở nước ngoài

• Working for Australia Aurecon Group (aurecongroup.com) for more

than 8 years/Kinh nghiệm làm việc cho Tập đoàn Aurecon Úc liện tục

trên năm

Key Achievement s • Built a very strong structural team for a company and delivered

Page 2: 2 kien pham cv en  vn with project experience

Kien Pham’s CV Page 2 of 7 Pages

/ Kết quả đạt được

effective projects/Xây dựng được một đội ngũ chuyên gia kết cấu

mạnh cho công ty và hoàn thành các dự án hiệu quả

• Complete structural design and construction up to 70 storys highrise

buildings with high quality delivered/Hoàn thành thiết kế và thi công

trình 70 tầng với chất lượng cao

• Complete design for 150m high Macau Eiffel Tower/Hoàn thành thiết

kế tháp thép ở Macau cao 150m.

WORK HISTORY / QUÁ TRÌNH CÔNG TÁC

From 5/2007 to present Job description (Mô tả công việc):

• Leading and coordinating projects with Architects and

Contractors and face clients for both technical and

commercial issues/Lãnh đạo và điều phối dự án với các

đối tác kiến trúc, nhà thầu thi công. Giao tiếp với chủ

đầu tư cả về vấn đề kỹ thuật và thương mại.

• Structural Design of reinforced concrete and structural

steel buildings/Thiết kế kết cấu thép và bê tông cốt thép

• Computer modelling and analysis of Structural High-rise

Buildings/Mô hình hóa và phân tích kết cấu nhà cao

tầng

• Design of Structures for Earthquake resistances with

current standards/Thiết kế kết cấu kháng trấn theo các

tiêu chuẩn trong nước và quốc tế.

• Providing Consultancy Services of Façade Engineering

and curtain wall/Tư vấn về kỹ thuật Façade và tường

kính.

• Authorship supervision/giám sát tác giả

Company (Công ty):

Aurecon Vietnam & Bangkok (Connel Wagner) Website: Aurecongroup.com Job title (Chức danh công việc)

Vietnam Structural Leader/ lãnh

đạo kết cấu Vietnam

Applied Softwares (danh mục phần

mềm sử dụng):

- Etabs & Safe 12

- Sap2000

- Space Gass

- Strand 7

- Rapt

- Ramp Concept

- Wallap

- Prokon

- Tedds

- Tekla view

- Autocad.....

- Exel Spreadsheet

From 12/2004 to 5/2007 Job description (Mô tả công việc):

• Teaching about the quality management in design and

construction for learners who are supervisors, site

engineers, senior site manager and the directors of

companies in ministry of construction /Giảng dạy về

quản lý chất lượng trong thiết kế và thi công cho các kỹ

sư giám sát, kỹ sư công trường xây dựng, giám đốc các

công ty xây dựng.

• Scientific researching, studying objects in term of

structural design, construction and management./

Nghiên cứu khóa học trong lĩnh vực kết cấu, thiết kế, thi

công và quản lý xây dựng

Company (Công ty):

Academy of Construction

Management/H ọc Viện Đào tạo

Cán Bộ Ngành Xây d ựng

Job title (Chức danh công việc)

A lecturer/Gi ảng Viên

Page 3: 2 kien pham cv en  vn with project experience

Kien Pham’s CV Page 3 of 7 Pages

From 02/2002 to 12/2004 Job des cription (Mô tả công việc):

• Consulting and design the structure of civil and, industrial

works and transportation works/Tư vấn thiết kế các công

trình dân dụng và công nghiệp, giao thông.

• Supervising of civil works, industrial works and

transportation works/giám sát thiết kế các công trình dân

dụng và công nghiệp, giao thông.

Company (Công ty):

Airport Construction and Design

Consultant/Công ty T ư vấn Thi ết

kế và Xây dựng Công Trình Hàng

Không

Job title (Chức danh công việc)

Structural engineer

3. EDUCATION BACKGROUND / QUÁ TRÌNH H ỌC TẬP

1997-2002

Institution (Tên trường):

National University of Civil Engineering/Tr ường Đại Học Xây dựng

Degree Attained (bằng đạt được): Structural and Civil engineer

with the excellent thesis (score 9/10)/Bằng kỹ sư kết cấu xây dựng với đồ

án xuất sắc đạt điểm 9/10

2004-2007

Institution (Tên trường):

National University of Civil Engineering/Tr ường Đại Học Xây dựng

Degree Attained (bằng đạt được): Master’s Degree of S tructural

Engineering in civil and industrial Works with the excellent thesis (score

9.5/10)/Thạc sỹ kỹ thuật kết cấu với luận văn xuất sắc đạt điểm 9.5/10

Key Qualifications and Memberships • Master’s Degree of structural Engineering in civil and industrial Works with the excellent

thesis/Bằng thạc sỹ kỹ thuật công trình xây dựng dân dụng và công nghiệp

• Engineer degree of structures in civil and industrial construction in 12/2001/Bằng kỹ sư xây dựng

12//2001

• Practising Certificate of Civil and Industrial Contruction Design issued Ministry of Contruction,

2007/Chứng chỉ hành nghề thiết kế xây dựng dân dụng và công nghiệp

• Member of Academy of Construction Management/Thành viên Học viện Đào tạo Cán bộ - Bộ Xây

dựng

4. TRAINING COURSES ATTENDED / QUÁ TRÌNH ĐÀO TẠO

4.1 From 25/08/2004 to 20/09/2004

(thời gian)

Conducted by/tổ chức bởi:

College of training and retraining construction staff

(Trường Đào tạo Bồi dưỡng Cán bộ Ngành Xây dựng)

Name of course:

Training Supervisor/Khóa đào tạo về tư

vấn giám sát xây dựng

Certificate Attained/chứng chỉ đạt được:

Exellent (giỏi)

Page 4: 2 kien pham cv en  vn with project experience

Kien Pham’s CV Page 4 of 7 Pages

4.2 From 05/02/2000 to 05/04/2000

(thời gian)

Conducted by/tổ chức bởi:

Vietnam Association for information Processing

Name of course (tên khóa học):

The informatics training course - Level

B/Khóa đào tạo tin học

Certificate Attained/chứng chỉ đạt được:

Good (tốt)

4.3 From 06/2001 to 10/2001

(thời gian)

Conducted by/tổ chức bởi:

HANOI UDP Foreign Languages Informatic centre

Name of course (tên khóa học):

Language training course on English

(Khóa học tiếng Anh)

Certificate Attained/chứng chỉ đạt được:

Good (Tốt)

4.4 From 09/01/2006 to 10/05/2006

(thời gian)

Conducted by/tổ chức bởi:

Language Link VietNam

Name of course (tên khóa học):

International English course

(Khóa học tiếng anh Quốc tế)

Certificate Attained/chứng chỉ đạt được:

has successfully completed this course

4.5 From 13/10/2003 to 14/11/2003

(thời gian)

Conducted by/tổ chức bởi:

National University of Civil Engineer

Name of course (tên khóa học):

Estimating of construction work/Đo bóc

tiên lượng và tính dự toán

Certificate Attained/chứng chỉ đạt được:

successful finished course

4.6 From 10/11/2001 to 15/01/2002

(thời gian)

Conducted by/tổ chức bởi:

University of economics/Đại Kinh tế Quốc dân

Name of course (tên khóa học):

Additional Awareness Training of

accounting works in companies/Khóa

học nhận thức thêm về công tác kế

toán trong doanh nghiệp

Certificate Attained/chứng chỉ đạt được:

Good (Tốt)

4.7 From 27/04/2004 to 06/05/2004

(thời gian)

Conducted by/tổ chức bởi:

Academy of administration/Học viện Hành chính

Name of course (tên khóa học):

Modern methods of teaching and

delivering a speech/Khóa học về

phương pháp thuyết trình

Certificate Attained/chứng chỉ đạt được:

Exellent (giỏi)

4.8 From 30/05/2005 to 10/06/2005

(thời gian)

Conducted by/tổ chức bởi:

PSD Corporation, Singapor, sponsored by Ministry of

Foreign Affair, Singapor in collaboration with Ministry of

Page 5: 2 kien pham cv en  vn with project experience

Kien Pham’s CV Page 5 of 7 Pages

foreign Affairs, Vietnam/Tổng công ty PSD Sinagpore

hợp tác với Bộ Ngoại giao

Name of course (tên khóa học):

Productivity Management/quản lý năng

suất

Certificate Attained/chứng chỉ đạt được:

Passed the course

4.9 From 03/10/2005 to 19/10/2005

(thời gian)

Conducted by/tổ chức bởi:

University of economics /Trường Đại học Kinh tế

Name of course (tên khóa học):

Human resource management/Quản lý

nguồn nhân lực

Certificate Attained/chứng chỉ đạt được:

has successful finished the course

/Hoàn thành thành công khóa học

4.10 From 23/5/2011 to 25/5/2011 Conducted by/tổ chức bởi:

German Association of Consulting Engineers and

Vietnam Engineering Consultant Association

Name of course (tên khóa học):

Capacity Building and Sustainable

Development – Green Building/ Phát

Triển Bền Vững, Công Trình Xanh

Certificate Attained/chứng chỉ đạt được:

has successful finished the course

/Hoàn thành thành công khóa học

English Skill /kỹ năng tiếng anh : Very good (rất tốt)

Page 6: 2 kien pham cv en  vn with project experience

Kien Pham’s CV Page 6 of 7 Pages

5. PROJECT EXPERIENCE / KINH NGHIỆM DỰ ÁN

RECENT PROJECTS

• Adventz Tower (70 storeys) in Dubai. Involved

Review Schematic Design

• Raffles Jeddah in Saudi Arabia, that includes 24

storeys hotels and 60 storeys residential Tower.

Involved Structural Detailed Design for Lateral

Stability System

• 2014-2015 SouthPoint project in Brisbane,

Australia

• 2013-2014 Macau Eiffel Tower in Macau.

Senior Structural Engineer, Project Leader

• 2013-2014 New Children Hospital in Perth

Autralia. Senior Structural Engineer

• 2011/12 Riviera Point Project in District 7 – HCM

city (three 40 – storey Buildings for phase 1A)

Chief Structural Engineer & Project Leader

• 2010/11 Anh Duong Project in Danang city (47

storeys). Senior Structural Engineer

• 2011 Parkcity high rise building project

(34storeys). Senior Structural Engineer & Project

Coordinator.

• 2009/10 Noibai International Airport – Terminal 2

Project. Senior Structural Engineer & Project

Coordinator.

• 2008/09 Viettel Head Office and Commercial

Centre. Senior Structural Engineer & Project

Coordinator.

• 2007 HCM City Garden project - Phase 1.

Senior Structural Engineer

• 2007 Hanoi Plaza 5 Star Hotel. Reviewer

• 2007 Hanoi JW Marriott Hotel project.

Structural Facade Design

• 2007 HCM - BIDV – TOWER project Structural Facade Design. Project Coordinator.

OTHER PROJECTS:

Từ 2002 đến 2008 :

� Hong River Import & Export and Construction

Development Company

� Transportation Office Building - Power

Transmission Company No 1

� Dong Xuan Secondary school – Bac Ninh Hoa

Thuy Tien Kinder garten

� Sanatorium 40 Cua Hoi, IV Military region – Cua

Lo – Nghe An

� Tan Minh primary school – Soc Son – Hanoi

� Phu Bai Air Station, Hue

� Ai Nghia Bomb store project, Hoa Vang, Da Nang

� A45 Factory, Gia Lam, Ha Noi

� Thai Nguyen Science Library project

� Senior Structural Engineer

� Phu Quoc Airline Station

� Cuu Long Company Limited Head Quarter

Building – Vinh Phuc

� Ministry of High Command Building and Air and

Air Defence Force Service Office

� Brigade 26 of Air and Air Defence Force Service

Building

� Steel and Industrial material Company

Transaction Head Quarter

� Vietnam Auditing Company Project

Page 7: 2 kien pham cv en  vn with project experience

Kien Pham’s CV Page 7 of 7 Pages

6. EXPECTED JOB & WORK LOCATION / CÔNG VI ỆC MONG MUỐN VÀ NƠI LÀM VIỆC

Target Job Description (Công việc mong muốn):

Team Leader/Senior Structural Engineer/ Project Man ager/Technical Director

Trưởng nhóm/K ỹ sư Kết cấu Cao cấp/ Quản lý Dự án/Giám đốc Kỹ thuật

Expected Profession (Ngành nghề tìm kiếm):

Civil and Industrial Construction/ Xây dựng Dân d ụng và Công nghi ệp

Expected Job Location (Nơi làm việc mong

muốn) Hà Nội

Willing to Relocate (Sẵn sàng di chuyển chỗ ở)

Negociation before relocating/ Thỏa thuận

trước khi di chuy ển chỗ ở

Expected Salary (mức lương mong muốn)

US$2000-3000 (net) Depending on Wo rk

Requirements

Page 8: 2 kien pham cv en  vn with project experience

1. Macau Eiffel Tower (Macau)1. Macau Eiffel Tower (Macau) Project leaderProject leader

2. 2. Riviera Point Development (HCM, VIETNAM)Riviera Point Development (HCM, VIETNAM) Project le aderProject leader

3. 3. NoibaiNoibai International Airport Terminal 2 Project International Airport Terminal 2 Project (Hanoi, Vietnam)(Hanoi, Vietnam)

Project leaderProject leader

4. 4. ViettelViettel Head Office and Commercial Centre Head Office and Commercial Centre (HCM, Vietnam)(HCM, Vietnam)

Project leaderProject leader

5. City Garden (HCM, Vietnam)5. City Garden (HCM, Vietnam) Project leaderProject leader

KIEN PHAM’S STRUCTURAL DESIGN EXPERIENCE WITH AURECON

5. City Garden (HCM, Vietnam)5. City Garden (HCM, Vietnam) Project leaderProject leader

6. Watermark (Hanoi, Vietnam)6. Watermark (Hanoi, Vietnam) Project leaderProject leader

7. 7. AdventzAdventz Tower (70 storeys) in DubaiTower (70 storeys) in Dubai Involved Review Schemati c Involved Review Schematic DesignDesign

8. Raffles Jeddah (in Saudi Arabia) that includes 2 4 8. Raffles Jeddah (in Saudi Arabia) that includes 2 4 storeys hotels and 60 storeys residential Towerstoreys hotels and 60 storeys residential Tower

Involved Structural Detailed Involved Structural Detailed Design for Lateral Stability Design for Lateral Stability SystemSystem

9.SouthPoint project (in Brisbane, Australia)9.SouthPoint project (in Brisbane, Australia) Involv ed Steelwork designInvolved Steelwork design

10. New Children Hospital ( in Perth, 10. New Children Hospital ( in Perth, AutraliaAutralia)) Involved PT designInvolved PT design

Page 9: 2 kien pham cv en  vn with project experience

Mau Eiffel Towerproject has donestructural analysis anddesign by using SpaceGass software

Number of Nodes:10 363 nodes

MACAU EIFFEL TOWER IN MACAU MACAU EIFFEL TOWER IN MACAU

10 363 nodes

Number of member:11 662 frame members

Number of section types :302

Page 10: 2 kien pham cv en  vn with project experience

MACAU EIFFEL TOWER SPACE GASS MODELMACAU EIFFEL TOWER SPACE GASS MODEL

Page 11: 2 kien pham cv en  vn with project experience

REVIEW TEKLA SHOP DRAWINGS AND SITE ADVICEREVIEW TEKLA SHOP DRAWINGS AND SITE ADVICE

Page 12: 2 kien pham cv en  vn with project experience

MET LOWER PARTMET LOWER PART-- DESIGN CONSTRUCTIONDESIGN CONSTRUCTION

Space Space Space Space GassGassGassGass ModellingModellingModellingModelling Actual ConstructionActual ConstructionActual ConstructionActual Construction on Siteon Siteon Siteon Site

Page 13: 2 kien pham cv en  vn with project experience

MET 3D VIEWMET 3D VIEW–– DESIGN AND CONSTRUCTIONDESIGN AND CONSTRUCTION

Space Space Space Space GassGassGassGass ModellingModellingModellingModelling Actual ConstructionActual ConstructionActual ConstructionActual Construction on Siteon Siteon Siteon Site

Page 14: 2 kien pham cv en  vn with project experience

MET 3D VIEWMET 3D VIEW––TOPPING OUTTOPPING OUT

Space Space Space Space GassGassGassGass ModellingModellingModellingModelling Actual ConstructionActual ConstructionActual ConstructionActual Construction on Siteon Siteon Siteon Site

Page 15: 2 kien pham cv en  vn with project experience

MET 3D VIEWMET 3D VIEW––TOPPING OUT (15/10/2015)TOPPING OUT (15/10/2015)

Space Space Space Space GassGassGassGass ModellingModellingModellingModelling Actual ConstructionActual ConstructionActual ConstructionActual Construction on Siteon Siteon Siteon Site

Page 16: 2 kien pham cv en  vn with project experience

RIVIERA POINT DEVELOPMENTRIVIERA POINT DEVELOPMENT

� Project (in District 7, HCM city)

� ItItItIt hashashashas aaaa totaltotaltotaltotal areaareaareaarea ofofofof 12121212hahahaha.... AureconAureconAureconAurecon hashashashas beenbeenbeenbeen

involvedinvolvedinvolvedinvolved totototo provideprovideprovideprovide MEPMEPMEPMEP andandandand StructureStructureStructureStructure ServicesServicesServicesServices

forforforfor PhasePhasePhasePhase 1111AAAA ofofofof thisthisthisthis projectprojectprojectproject.... PhasePhasePhasePhase 1111AAAA includesincludesincludesincludes

threethreethreethree 40404040----storeystoreystoreystorey blocksblocksblocksblocks (Tower(Tower(Tower(Tower 3333,,,,4444,,,,5555)))) whichwhichwhichwhich offerofferofferoffer

549549549549 apartmentsapartmentsapartmentsapartments plusplusplusplus oneoneoneone ShopShopShopShop HouseHouseHouseHouse BuildingBuildingBuildingBuilding....

� Client

� SsangYong E&C SsangYong E&C SsangYong E&C SsangYong E&C –––– Main Contractor for Design Main Contractor for Design Main Contractor for Design Main Contractor for Design

and Build. Keppeland Build. Keppeland Build. Keppeland Build. Keppel----Land is a owner.Land is a owner.Land is a owner.Land is a owner.

� Project leader

Page 17: 2 kien pham cv en  vn with project experience

• 39-40 STOREY APARTMENT TOWERS

RIVIERA POINT DEVELOPMENTRIVIERA POINT DEVELOPMENT

1 BASEMENT PARKING & MEP

Page 18: 2 kien pham cv en  vn with project experience

RIVIERA POINT DEVELOPMENTRIVIERA POINT DEVELOPMENT

Structural Structural Structural Structural SolutionSolutionSolutionSolution

� Spun Piles Foundation has been adopted for 5Spun Piles Foundation has been adopted for 5Spun Piles Foundation has been adopted for 5Spun Piles Foundation has been adopted for 5----Storey Shop House Storey Shop House Storey Shop House Storey Shop House

Building with the Roof Swimming Pool. Building with the Roof Swimming Pool. Building with the Roof Swimming Pool. Building with the Roof Swimming Pool.

� The The The The 80 m deep bored piles with the diameter of 1500 have been applied 80 m deep bored piles with the diameter of 1500 have been applied 80 m deep bored piles with the diameter of 1500 have been applied 80 m deep bored piles with the diameter of 1500 have been applied

for 40for 40for 40for 40----storey storey storey storey Blocks. Blocks. Blocks. Blocks.

� Central Central Central Central Core Walls combined with Single shear wall is the Main Lateral Core Walls combined with Single shear wall is the Main Lateral Core Walls combined with Single shear wall is the Main Lateral Core Walls combined with Single shear wall is the Main Lateral

stability System for the high rise stability System for the high rise stability System for the high rise stability System for the high rise buildings. buildings. buildings. buildings.

� The Building The Building The Building The Building has been designed for Earthquake has been designed for Earthquake has been designed for Earthquake has been designed for Earthquake Resistance Resistance Resistance Resistance based EN8 or based EN8 or based EN8 or based EN8 or

TCXDVN TCXDVN TCXDVN TCXDVN 375375375375----2006200620062006

Page 19: 2 kien pham cv en  vn with project experience

• Client JAC

• Location Noi Bai International Airport

• Type viaDuct & Terminal Building

• Total GFA 138,000 sq.m

• Duration 4 years

• Architects JAC

NOI BAI INTERNATIONAL AIRPORT TERMINAL 2NOI BAI INTERNATIONAL AIRPORT TERMINAL 2

Page 20: 2 kien pham cv en  vn with project experience

• Client JAC

• Location Noi Bai International Airport

• Type viaDuct & Terminal Building

• Total GFA 138,000 sq.m

• Duration 4 years

• Architects JAC

NOI BAI INTERNATIONAL AIRPORT TERMINAL 2NOI BAI INTERNATIONAL AIRPORT TERMINAL 2

Page 21: 2 kien pham cv en  vn with project experience

• Client Viettel Corp.

• Location District 10 – Ho Chi Minh City

• Type Retails, Hotels, Offices Bldgs

• Total GFA 160,000 sq.m

• Duration 4 years

• Architects PTW Architects

VIETTEL HEAD OFFICE AND COMMERCIAL CENTREVIETTEL HEAD OFFICE AND COMMERCIAL CENTRE

Page 22: 2 kien pham cv en  vn with project experience

• Client Refico

• Location BT District – Ho Chi Minh City

• Type Retails & Residential Bldgs

• Total GFA 150,000 sq.m

• Duration 6 years

• Architects PTW Architects

CITY GARDEN PROJECT CITY GARDEN PROJECT

Page 23: 2 kien pham cv en  vn with project experience

• Client Refico

• Location Ao Ai Cau Giay – Ha Noi City

• Type Retails & Residential Building

• Total GFA 22,000 sq.m

• Duration 2 years

• Architects AEDAS (Vietnam)

WATERMARK PROJECTWATERMARK PROJECT