bill of quantity

191
TIME SCHEDULE PELAKSANAAN KEGIATAN RENOVASI GEDUNG KANTOR WILAYAH IV BANK BTN DI JL. SULTAN HASANUDDIN NO. 1 MAKASSAR Pekerjaan RENOVASI GEDUNG KANTOR WILAYAH IV BANK BTN DI JL. SULTAN HASANUDDIN NO. 1 MAKASSAR Lokasi GEDUNG KANTOR WILAYAH IV BANK BTN DI JL. SULTAN HASANUDDIN NO. 1 MAKASSAR Tahun 2012 LOKASI MAKASSAR NO URAIAN PEKERJAAN JUMLAH (Rp.) JADWAL PELAKSANAAN HARI KALENDER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 I ARSITEKTUR & INTERIOR LANTAI 1 - - - - A PEKERJAAN PERSIAPAN 21,443,171.40 100.00 ### ### ### B PEKERJAAN BONGKARAN - - - - - - - - C PEKERJAAN LANTAI - - D PEKERJAAN DINDING - - - - - - - - - - - - E PEKERJAAN PLAFOND - - F PEKERJAAN PENGECATAN - - - - - - - - - - - - - - - - G PEKERJAAN PINTU JENDELA - - H PEKERJAAN TOILET - - - - - - - - - - I PEKERJAAN LAIN-LAIN - - J PEKERJAAN FINISHING R. PANTRY, R. WUDHU - - K PEMBUATAN POS JAGA DAN RUANG ATM - - II ARSITEKTUR & INTERIOR LANTAI 2 A PEKERJAAN BONGKARAN - - B PEKERJAAN LANTAI - - C PEKERJAAN DINDING - - D PEKERJAAN PLAFOND - - E PEKERJAAN PENGECATAN - - F PEKERJAAN PINTU JENDELA - - G PEKERJAAN TOILET - - H PEKERJAAN LAIN-LAIN - - III PEKERJAAN GUDANG LANTAI 3 - - IV PEKERJAAN MEKANIKAL - - V PEKERJAAN ELETRIKAL - - JUMLAH ( a ) 21,443,171.40 100.00 PPn 10% ( b ) 2,144,317.14 JUMLAH TOTAL ( a + b ) 23,587,488.54 Pembulatan 23,587,000.00 JUMLAH 100.00 JUMLAH MINGGUAN ### ### ### - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - KOMULATIF MINGGUAN - ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### MAKASSAR 28 MEI 2012 Penawar # PT. A P R O # A. M. AMIN KARAKA Direktur Utama BOBOT (%)

Upload: ackorifice

Post on 30-Jul-2015

450 views

Category:

Documents


12 download

TRANSCRIPT

Page 1: Bill of Quantity

TIME SCHEDULE PELAKSANAAN KEGIATANRENOVASI GEDUNG KANTOR WILAYAH IV BANK BTN DI JL. SULTAN HASANUDDIN NO. 1 MAKASSAR

Pekerjaan RENOVASI GEDUNG KANTOR WILAYAH IV BANK BTN DI JL. SULTAN HASANUDDIN NO. 1 MAKASSAR

Lokasi GEDUNG KANTOR WILAYAH IV BANK BTN DI JL. SULTAN HASANUDDIN NO. 1 MAKASSAR

Tahun 2012LOKASI MAKASSAR

NO URAIAN PEKERJAAN JUMLAH (Rp.)JADWAL PELAKSANAAN

HARI KALENDER1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

I ARSITEKTUR & INTERIOR LANTAI 1 - - - -

A PEKERJAAN PERSIAPAN 21,443,171.40 100.00 33.33 33.33 33.33

B PEKERJAAN BONGKARAN - - - - - - - -

C PEKERJAAN LANTAI - -

D PEKERJAAN DINDING - - - - - - - - - - - -

E PEKERJAAN PLAFOND - -

F PEKERJAAN PENGECATAN - - - - - - - - - - - - - - - -

G PEKERJAAN PINTU JENDELA - -

H PEKERJAAN TOILET - - - - - - - - - -

I PEKERJAAN LAIN-LAIN - -

J PEKERJAAN FINISHING R. PANTRY, R. WUDHU - -

K PEMBUATAN POS JAGA DAN RUANG ATM - -

II ARSITEKTUR & INTERIOR LANTAI 2A PEKERJAAN BONGKARAN - -

B PEKERJAAN LANTAI - -

C PEKERJAAN DINDING - -

D PEKERJAAN PLAFOND - -

E PEKERJAAN PENGECATAN - -

F PEKERJAAN PINTU JENDELA - -

G PEKERJAAN TOILET - -

H PEKERJAAN LAIN-LAIN - -

III PEKERJAAN GUDANG LANTAI 3 - -

IV PEKERJAAN MEKANIKAL - -

V PEKERJAAN ELETRIKAL - -

JUMLAH ( a ) 21,443,171.40 100.00

PPn 10% ( b ) 2,144,317.14

JUMLAH TOTAL ( a + b ) 23,587,488.54

Pembulatan 23,587,000.00 JUMLAH 100.00

JUMLAH MINGGUAN 33.33 33.33 33.33 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

KOMULATIF MINGGUAN - 33.33 66.67 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###

MAKASSAR 28 MEI 2012Penawar

### PT. A P R O###

A. M. AMIN KARAKADirektur Utama

BOBOT (%)

Page 2: Bill of Quantity

REKAPITULASIRENCANA ANGGARAN BIAYAPROYEK : PERENCANAAN DAN PENGAWASAN GEDUNG BANK BTN KANWIL IV MAKASAR

NO. ITEM PEKERJAAN JUMLAH HARGARp.

1 ARSITEKTUR & INTERIOR LANTAI 1A PEKERJAAN PERSIAPAN 21,443,171.40 B PEKERJAAN BONGKARAN - C PEKERJAAN LANTAI - D PEKERJAAN DINDING - E PEKERJAAN PLAFOND - F PEKERJAAN PENGECATAN - G PEKERJAAN PINTU JENDELA - H PEKERJAAN TOILET - I PEKERJAAN LAIN-LAIN - J PEKERJAAN FINISHING R. PANTRY, R. WUDHU - K PEMBUATAN POS JAGA DAN RUANG ATM -

2 ARSITEKTUR & INTERIOR LANTAI 2A PEKERJAAN BONGKARAN - B PEKERJAAN LANTAI - C PEKERJAAN DINDING - D PEKERJAAN PLAFOND - E PEKERJAAN PENGECATAN - F PEKERJAAN PINTU JENDELA - G PEKERJAAN TOILET - H PEKERJAAN LAIN-LAIN -

3 PEKERJAAN GUDANG LANTAI 3 -

4 PEKERJAAN MEKANIKAL - 5 PEKERJAAN ELETRIKAL -

JUMLAH 21,443,171.40 PPN 10 % 2,144,317.14 JUMLAH TOTAL 23,587,488.54 DIBULATKAN 23,587,000.00

.

Page 3: Bill of Quantity

RENCANA ANGGARAN BIAYAPROYEK : PERENCANAAN DAN PENGAWASAN GEDUNG BANK BTN KANWIL IV MAKASAR

ARSITEKTUR & INTERIOR LT 1NO. ITEM PEKERJAAN VOL. SAT. HARGA SAT. JUMLAH BIAYA KETERANGAN

Rp. Rp.

A PEKERJAAN PERSIAPAN 21,443,171.40 1 705.00 M2 9,858.00 6,949,890.00 Pembersihan lahan dan ruangan2 Pekerjaan Bedeng/ Loss Kerja 9.00 M2 1,150,047.00 10,350,423.00 Untuk gudang barang dan ruang rapat3 Listrik kerja 2.00 Bln - Asumsi 2 bulan4 Air kerja 2.00 Bln - Asumsi 2 bulan5 Mobilisasi dan keamanan proyek 2.00 Ls -

6 Shop drawing dan as built drawing 3.00 Set - Shop drawing untuk pelaksanaan, asbuilt buatperawatan7 Pemagaran proyek 20.20 M2 205,092.00 4,142,858.40

B PEKERJAAN BONGKARAN - 1 Pengupasan keramik lantai toilet 6.60 M2 - 2 Pengupasan keramik dinding toilet 43.80 M2 - 3 Pembongkaran wastafel 2.00 Unit - 4 Pembongkaran kloset duduk 2.00 Unit - 5 Pembongkaran pintu eksisting 3.00 Unit - 6 Pembongkaran aksesories elektrikal 1.00 Ls - Instalasi stopkontak, saklar7 Pembongkaran alat utama ME 1.00 Ls - Outdoor, indoor, exhaust, AHU

8 20.20 M' - 9 Pembongkaran partisi 26.00 M2 - area partisi yang digeser

10 215.00 M2 - Bekas armature lampu dan plafond yang rusak

C PEKERJAAN LANTAI - 1 Poles lantai marmer teras entrance 27.00 M2 - 2 Pemasangan karpet (termasuk mushola) 180.00 M2 - Lokal3 Pemasangan karpet untuk border 24.00 M2 - Lokal

D PEKERJAAN DINDING -

1 Pemasangan partisi 151.00 M2 - Gypsum board 9mm, rangka hollow Galvanis 40x40

2 Backdrob area kankas 8.00 M2 - Lihat gambar kerja3 Wallpaper area Mushola 38.10 M2 - Ex. Lokal4 Pembuatan backdrob untuk louge 1.00 Unit - Lihat gambar kerja5 Counter teller area kantor kas 2.50 M' - Lihat gambar kerja6 Plint kayu 2x10 cm finish melamik 56.00 M - Kayu kamper 2/10 Finish melamik

E PEKERJAAN PLAFOND - 1 Pemasangan plafond baru 224.00 M2 - Gypsum board 9mm, rangka hollow Galvanis 40x402 Drop plafond area Louge 22.98 M2 - Gypsum board 9mm, rangka hollow Galvanis 40x40

F PEKERJAAN PENGECATAN - 1 Pengecatan dinding luar & pagar 347.68 M2 - Dulux Pentalite warna putih2 Pengecatan lisplank beton 96.13 M2 - Kerok cat lama, cat baru dengan cat kayu3 Pengecatan plafond dalam 224.00 M2 - Dulux Pentalite warna putih4 Pengecatan dinding partisi 338.50 M2 - Refinish ulang

G PEKERJAAN PINTU JENDELA LANTAI 1 -

1 2.00 Unit - Lihat gambar kerja

2 Pemasangan pintu framless 2 daun 1.00 Unit - Penambahan (lihat gambar kerja)2 Pemasangan pintu frameless 1 daun 1.00 Unit - Lihat gambar kerja3 Pemasangan pintu kamuflase (P03) 1.00 Unit - Lihat gambar kerja4 Pemasangan pintu besi 1.00 Unit - Lihat gambar kerja5 Pemasangan pintu Rg Teller (P04) 1.00 Unit - Lihat gambar kerja6 Pemasangan pintu Rg meeting (P05) 1.00 Unit - Lihat gambar kerja

Pekerjaan Pembersihan (Lt.1, Lt. 2 & Lt. 3)

Pembongkaran pagar depan termasuk perapihan kembali

Pembongkaran plafond eksisting dan List plafond

Pemasangan pintu frameless 2 daun pakai gawangan

Page 4: Bill of Quantity

7 Pemasangan pintu office (PG) 3.00 Unit - Lihat gambar kerja8 Pemasangan pintu toilet (P08) 2.00 Unit - Lihat gambar kerja9 Pemasangan pintu toilet (P09) 2.00 Unit - Lihat gambar kerja

10 Pemasangan pintu Rg pantry 1.00 Unit - Lihat gambar kerja11 Pemasangan pintu Mushola 1.00 Unit - Lihat gambar kerja12 Pemasangan pintu gudang (P07) 1.00 Unit - Lihat gambar kerja13 Pemasangan Door closer 8.00 Unit - Lihat gambar kerja14 Pemasangan pintu gudang kantor kas 1.00 Unit - Lihat gambar kerja

Page 5: Bill of Quantity

H PEKERJAAN TOILET - 1 Pemasangan keramik lantai toilet 6.60 M2 - Ex. Roman 33.3 x 33.32 Pasang keramik dinding toilet 43.80 M2 - ex. Roman 20 x 403 Pemasangan kran toilet & R. Wudhu 3.00 Buah - Ex. Toto4 Pemasangan kloset duduk 2.00 Unit - Ex. Toto5 Pemasangan wastafel 2.00 Unit - Ex. Toto6 Pemasangan cermin 2.00 Unit - Kaca t: 8 mm dibevel 3 cm7 Pemasangan tempat sabun 2.00 Buah - Ex. Toto8 Pemasangan floor drain 2.00 Buah - Ex. San-ei9 Exhaust 2.00 Buah - Ex. Panasonic

10 Pemasangan kloset urinoir 1.00 Unit - Ex Toto (penambahan)

I PEKERJAAN LAIN-LAIN - 1 Pembuatan kitchen set 3.00 M' - Rangka kamper, multipleks 12 mm, finish melamik2 Perbaikan taman 1.00 Ls - Penanaman tanaman3 Pembuatan signage/papan nama 1.00 Unit - Lihat gambar kerja4 Pengecekan dan perbaikan atap 1.00 Ls - Pembersihan atap dan perbaikan atap5 Horizontal sign 1.00 Unit - Lihat gambar kerja6 Pylon vertikal 1.00 Unit Lihat gambar kerja

J PEKERJAAN FINISHING R. PANTRY, R. WUDHU - 1 Cat dinding dalam 38.94 M2 - Ex. Dulux Pentalite2 Cat plafond 23.25 M2 - Ex. Dulux Pentalite

3 22.00 M2 - Keramik 20x20 ex. Roman4 Pasang kran 1.00 Buah - Ex. Toto5 Pasang floor drain 1.00 Buah - Ex. San-ei6 Dinding Area wudhu 1.00 Unit -

K PEMBUATAN POS JAGA DAN RUANG ATM - 1 Pekerjaan pondasi batu kali termasuk salura 5.25 M2 - Lihat gambar kerja2 Pek. Sloof, kolom, balok, plat betob bertulan 3.35 M2 - Lihat gambar kerja3 Pekerjaan dinding bata 22.00 M2 - Lihat gambar kerja4 Pekerjaan plesteran 44.00 M2 - Lihat gambar kerja5 Pekerjaan acian 44.00 M2 - Lihat gambar kerja6 Pekerjaan keramik ATM 3.75 M2 - Ex. Roman 40 x 407 Pekerjaan keramik pos jaga 7.65 M2 - Ex. Roman 30 x 308 Pekerjaan pengecatan 44.00 M2 - Lihat gambar kerja9 Pekerjaan plafon gypsum + pengecatan 10.15 M2 - Lihat gambar kerja

10 Pekerjaan Waterproofing plat atap 1.00 M2 - Lihat gambar kerja11 Tempered glass + sanblast (kaca ATM) 5.90 M2 - Lihat gambar kerja12 Pemasangan pintu ATM 1.00 Unit - Lihat gambar kerja

13 1.00 Unit - PVC14 Pemasangan closet jongkok security 1.00 Bh - 15 Pemasangan wallsing ATM 1.00 Bh

JUMLAH 21,443,171.40

Refinish lantai Service area samping tangga (termasuk pantry, rg. Wudhu)

Pemasangan pintu toilet security & termasuk kusen

Page 6: Bill of Quantity

RENCANA ANGGARAN BIAYAPROYEK : PERENCANAAN DAN PENGAWASAN GEDUNG BANK BTN KANWIL IV MAKASAR

ARSITEKTUR & INTERIOR LT 2NO. ITEM PEKERJAAN VOL. SAT. HARGA SAT. JUMLAH BIAYA KETERANGAN

Rp. Rp.

A PEKERJAAN BONGKARAN - 1 Pembongkaran partisi 40.00 M2 - 2 Pembongkaran plafond eksisting 215.00 M2 - 3 Pengupasan keramik lantai toilet 6.60 M2 - 4 Pengupasan keramik dinding toilet 43.80 M2 - 5 Pembongkaran wastafel 3.00 Unit - 6 Pembongkaran kloset 3.00 Unit -

7 Pembongkaran pintu eksisting 2.00 Unit - Pintu kearah sekretaris dan ruang meeting8 Pembongkaran aaksesories elektrikal 1.00 Ls - Instalasi listrik9 Pembongkaran alat utama ME 1.00 Ls - Indoor & oudoor AC

B PEKERJAAN LANTAI -

1 Pemasangan karpet 215.00 M2 -

2 Pemasangan karpet untuk border 16.00 M2 - 3 Pemasangan karpet untuk area tangga 22.00 M2 - Dari lantai 1 ke lantai 2

C PEKERJAAN DINDING -

1 211.50 M2 -

2 Pemasangan partisi 176.50 M2 -

3 Pemasangan dinding bata 1.00 ls Sudah diperhitungkan pengacian dan pengecetan area sisi luar

D PEKERJAAN PLAFOND -

1 Pemasangan plafond 224.00 M2 -

2 Drop plafond diruang meeting 13.36 M2 - 3 Pengecatan plafond dalam 237.60 M2 - Ex. Dulux Pentalite

E PEKERJAAN PENGECATAN - 1 Pengecatan dinding 73.20 M2 - Ex. Dulux Pentalite

F PEKERJAAN PINTU JENDELA LANTAI 2 - 1 Pemasangan pintu frameless 2 daun (P01) 1.00 Unit - Lihat gambar kerja2 Pemasangan pintu office (PG) 6.00 Unit - Lihat gambar kerja3 Pemasangan pintu Rg meeting (P05) 2.00 Unit - Lihat gambar kerja4 Pemasangan pintu Rg. Server (P12) 1.00 Unit - Lihat gambar kerja5 Pemasangan pintu toilet (P08) 2.00 Unit - Lihat gambar kerja6 Pemasangan pintu toilet (P09) 2.00 Unit - Lihat gambar kerja7 Pemasangan pintu Rg pantry 1.00 Unit - 8 Pemasangan pintu double office (P11) 1.00 Unit - Lihat gambar kerja

Pembongkaran karpet eksisting + pasang karpet ex lokal

Pembongkaran karpet eksisting + pasang karpet ex lokal

Pemasangan wallpaper pada lounge, ruang metting & Kepala Regional

Pengupasan wallpaper eksisting dan pasang wallpaper ex. Lokal

Gypsum board 9mm, rangka hollow Galvanis 40x40

Gypsum board 9mm, rangka hollow Galvanis 40x40

Page 7: Bill of Quantity

G PEKERJAAN TOILET - 1 Pemasangan keramik lantai toilet 18.25 M2 - 2 Waterproofing toilet 18.25 M2 - 3 Pasang keramik dinding toilet 83.80 M2 - 4 Pemasangan kran 3.00 Buah - Ex. Toto5 Pemasangan kloset duduk 3.00 Unit - Ex. Toto6 Pemasangan wastafel 3.00 Unit - Ex. Toto7 Pemasangan cermin 3.00 Unit - 8 Pemasangan tempat sabun 3.00 Buah - Ex. Toto9 Pemasangan floor drain 3.00 Buah - Ex. San-ei

10 Pemasangan floor drain 3.00 Buah - Panasonic 4"11 Pekerjaan kran Shower R. RO Manager 1.00 set - Ex. Toto12 Pekerjaan kran Jet Shower RO Manager 1.00 set - Ex. Toto13 Pemasangan kloset urinoir 1.00 unit - Ex. Toto

H PEKERJAAN LAIN-LAIN - 1 Pemasangan list border karpet 5.00 M' - List Stainless steel2 White board ruang meeting 1.00 Unit -

JUMLAH -

Page 8: Bill of Quantity

RENCANA ANGGARAN BIAYAPROYEK : PERENCANAAN DAN PENGAWASAN GEDUNG BANK BTN KANWIL IV MAKASAR

ARSITEKTUR & INTERIOR LT 3NO. ITEM PEKERJAAN VOL. SAT. HARGA SAT. JUMLAH BIAYA KETERANGAN

Rp. Rp.

A PEKERJAAN GUDANG -

1 Pemasangan Partisi 25.50 M2 - 2 Pengecatan dinding 25.50 M2 - Ex. Dulux Pentalite 3 Pemasangan pintu gudang Finish cat 1.00 Unit - Lihat gambar kerja

JUMLAH -

Gypsum board 9mm, rangka hollow Galvanis 40x40

Page 9: Bill of Quantity

RENCANA ANGGARAN BIAYAPROYEK : PERENCANAAN DAN PENGAWASAN GEDUNG BANK BTN KANWIL IV MAKASAR

PEKERJAAN : Mekanikal

NO. URAIAN VOL. SAT. HARGA SAT. JUMLAH BIAYA KET. Rp. Rp.

I PEKERJAAN MEKANIKALI.1 PEKERJAAN AC

A PEKERJAAN PERALATAN UTAMA

A.1 LANTAI 11 AC Split LT.1 2.00 Unit -

Kap. : 0,5 PKType : Wall MountedDaya : 395 WLokasi : ATM, Office staf pada Kantor Kas

2 AC Split LT.1 2.00 Unit - Kap. : 3/4 PKType : Wall MountedDaya : 600 W

Lokasi : Metting Room, Deputy Regional Commercial

3 AC Split LT.1 2.00 Unit - Kap. : 3 PKType : CassetteDaya : 3500 WLokasi : Area kerja consummer & Commercial

4 AC Split LT.1 2.00 Unit - Kap. : 2,5 PKType : CassetteDaya : 2600 WLokasi : Banking hall & Lounge

A.2 LANTAI 21 AC Split LT.2 1.00 Unit -

Kap. : 1,5 PKType : Wall MountedDaya : 1100 WLokasi : Regional Office Manager

2 AC Split LT.2) 4.00 Unit - Kap. : 2.5 PKType : CassetteDaya : 2.600 WLokasi : Meeting Room, Area kerja Supporting, Lounge

3 AC Split LT.2 2.00 Unit - Kap. : 3/4 PKType : Wall MountedDaya : 600 W

Lokasi

TOTAL PEKERJAAN AC -

: Deputy Regional Consummer, Deputy Supporty regional office

Page 10: Bill of Quantity

RENCANA ANGGARAN BIAYAPROYEK : PERENCANAAN DAN PENGAWASAN GEDUNG BANK BTN KANWIL IV MAKASAR

PEKERJAAN : Elektrikal

NO. URAIAN VOL. SAT. HARGA SAT. JUMLAH BIAYA KET. Rp. Rp.

II PEKERJAAN ELETRIKALII.1 PEKERJAAN LISTRIK

1 PEKERJAAN PANELa Panel COS 1 Lot -

- 1 Bh COS 125A, $p, 3 Phase- 1 Unit Box Panel + Accessories

b Panel Distribusi 1 Lot - - 1 Bh MCCB 100-125 A, 3P, 3F, 36 kA- 1 Bh MCCB 50-63 A, 3P, 3F, 36 kA- 1 Bh MCCB 40-50 A, 3P, 3F, 36 kA- 1 Bh MCCB 32-40 A, 3P, 3F, 36 kA- 1 Bh MCCB 20-25 A, 3P, 3F, 36 kA- 3 Bh pilot Lamp- 3 Bh ampere meter 0-7000A+CT 700/54- 1 Bh Volt meter 0-500V + Selector Switch 7 posisi- 1 Unit Box Panel + Accessories- 1 lot Pentanahan

c Panel Penerangan dan AC Lantai 1 1 Lot - - 1 Bh MCCB 50-63A, 3P, 3F, 36 kA- 17 Bh MCB 16 A, 1P, 1F, 6kA- 5 Bh MCB 10 A, 1P, 1F, 6kA- 3 Bh Pilot Lamp- 1 Unit Box Panel + Accessories

d Panel Penerangan dan AC Lantai 2 1 Lot - - 1 Bh MCCB 40-50A, 3P, 3F, 36 kA- 10 Bh MCB 16 A, 1P, 1F, 6kA- 5 Bh MCB 10 A, 1P, 1F, 6kA- 3 Bh Pilot Lamp- 1 Unit Box Panel + Accessories

e Panel UPS 1 Lot - - 1 Bh MCCB 32-40A, 3P, 3F, 36 kA- 13 Bh MCB 16 A, 1P, 1F, 6kA- 3 Bh Pilot Lamp- 1 Unit Box Panel + Accessories

Page 11: Bill of Quantity

Sub Total - 2 PEKERJAAN KABEL FEEDERa Kabel dari Kwh PLN ke Panel COS

- NYY 4x50 mm 50.00 m - b Kabel dari Panel Genset ke Panel COS

- NYY 4x16 mm 15.00 m - c Kabel dari Panel COS ke Panel Distribus

- NYY 4x50 mm 5.00 m - d Kabel dari Panel Distribusi ke

1. Panel Penerangan danAC Lantai 1 - NYY 4x16 mm 10.00 m - - BC 10 mm2 10.00 m - 2. Panel Penerangan danAC Lantai 1 - NYY 4x16 mm 20.00 m - - BC 10 mm2 20.00 m - 3. Panel Penerangan danAC Lantai 1 - NYY 4x10 mm 60.00 m - - BC 10 mm2 60.00 m -

e Kabel dari Panel Penerangan danAC Lantai 1 ke1 Unit ACS-1/LT.1 - NYM 3 x 2,5 mm2 40.00 m - 2 Unit ACS-2/LT.1 - NYM 3 x 2,5 mm2 35.00 m - 3 Unit ACS-3/LT.1 - NYM 3 x 2,5 mm2 8.00 m - 4 Unit ACS-4/LT.1 - NYM 3 x 2,5 mm2 15.00 m - 5 Unit ACS-5/LT.1 - NYM 3 x 2,5 mm2 20.00 m - 6 Unit ACS-6/LT.1 - NYM 3 x 2,5 mm2 25.00 m - 7 Unit ACS-6/LT.1 - NYM 3 x 2,5 mm2 25.00 m - 8 Unit ACC-1/LT.1 - NYM 4 x 4 mm2 20.00 m - 9 Unit ACC-2/LT.1 - NYM 4 x 4 mm2 30.00 m - 10 Unit ACC-3/LT.1 - NYM 4 x 4 mm2 35.00 m -

f Kabel dari Panel Penerangan danAC Lantai 2 ke1 Unit ACC-1/LT.2 - NYM 4 x 4 mm2 10.00 m - 2 Unit ACC-2/LT.2 - NYM 4 x 4 mm2 8.00 m - 3 Unit ACC-3/LT.2 - NYM 4 x 4 mm2 15.00 m - 4 Unit ACC-4/LT.2 - NYM 4 x 4 mm2 15.00 m - 5 Unit ACC-5/LT.2 - NYM 4 x 4 mm2 18.00 m -

Sub Total -

Page 12: Bill of Quantity

3 PEKERJAAN ARMATURE LAMPU- LP.TL 2 x 36 Watt, TKI + RM M1 64.00 bh - - LP.TL 2 x 36 Watt, V-SHAPE 2.00 bh - - LP. DOWNLIGHT PLC 13 Watt 45.00 bh - - LP. DOWNLIGHT 50 Watt, Halogen 10.00 bh - - SAKLAR TUNGGAL 18.00 bh - - SAKLAR GANDA 19.00 bh - - STOP KONTAK 32.00 ttk - - STOP KONTAK UPS 22.00 ttk - - INSTALASI TITIK LAMPU 111.00 ttk - (Kabel NYM 3x2,5 lengkap dengan klem pipa, sekrup, pipa konduit, fisher, pipe, dll)- INSTALASI STOP KONTAK 84.00 ttk - (Kabel NYM 3x2,5 lengkap dengan klem pipa, sekrup, pipa konduit, fisher, pipe, dll)

Sub Total -

TOTAL PEKERJAAN LISTRIK -

II.2 PEKERJAAN PENANGKAL PETIR(Sistem Konvensional)

1 Splitzen dia 1" 4.00 bh - Dengan tiang 1 meter (Pipa Galvanis)Lengkap dengan peralatan bantu

2 Kabel BC 50 mm2 dan Peralatan bantu 150.00 m - 3 Pentanahan lengkap dengan : 4.00 ttk -

a. Grounding Sistem 1 x Cooper Rod 5/8" dengan panjang 6 metermaks. 2 Ohmb. Bak Kontrol 40 x 40 x 40 cmc. Material Bantu

4 Instalasi dan Material Bantu 1.00 lot -

PEKERJAAN PENANGKAL PETIR -

II.3 PEKERJAAN TELEPON & DATA

A PERALATAN UTAMA1 PABX kapasitas 2/16 lengkap dengan 1.00 unit By Owner

- Back up batere- Magazine Arresster- Setting Pemasangan, Programming- Fitting & Accessories

2 Penyambungan Telkom 5.00 Line -

B INSTALASI & FIXTURESB.1 LANTAI 1

a Pekerjaan Telepon- Instalasi Telepon Tidak Langsung/ Extension 21.00 ttk - - Outlet Telepon 21.00 bh - - Fitting & Accessories 1.00 lot -

b Pekerjaan Kabel Data- UTP Cable Cat 6 with conduit 22.00 ttk - - Outlet Data 22.00 bh - - Fitting & Accessories 1.00 lot -

B.2 LANTAI 2a Pekerjaan Telepon

Page 13: Bill of Quantity

- Instalasi Telepon Langsung 2.00 ttk - - Instalasi Telepon Tidak Langsung/ Extension 10.00 ttk - - Instalasi 1.00 ttk - - Outlet Telepon 13.00 bh - - Fitting & Accessories 1.00 lot -

b Pekerjaan Kabel Data- UTP Cable Cat 6 with conduit 10.00 ttk - - Outlet Data 10.00 bh - - Fitting & Accessories 1.00 lot -

c Testing & Commissioning 1.00 lot -

TOTAL PEKERJAAN TELEPON & DATA -

II.4 PEKERJAAN CCTV & MATVA PERALATAN UTAMA1 Digital Vidio Recorder 80 GB Channel w/Network IF 1.00 unit - 2 Colour monitor 17" LCD 1.00 unit - 3 Keyboard Controller 1.00 bh - 4 MATV 1.00 unit -

B INSTALASI & FIXTURESB.1 LANTAI 1

- Fixed Dome Camera (Indoor) CCD Infra Red 5.00 bh - - Instalasi CCTV 5.00 ttk - - Instalasi TV 4.00 ttk - - Fitting & Accessories 1.00 lot -

B.2 PEKERJAAN INSTALASI SCURITY ALARM1 Push Button (PB 68) ex. Secolarm 2.00 Bh - 2 Kick bar (HE 2216) 1.00 Bh - 3 Door contact ex. Secolarm (SM-226RUL) 2.00 Bh - 4 Motion infra red detector (550P) 2.00 Bh - 5 Titik nyala alarm keamanan 7.00 Titik - 6 Material bantu 1.00 Lot -

B.3 LANTAI 2- Fixed Dome Camera (Indoor) CCD Infra Red 2.00 bh - - Instalasi CCTV 2.00 ttk - - Instalasi TV 3.00 ttk - - Fitting & Accessories 1.00 lot -

C Testing & Commissioning 1.00 lot -

TOTAL PEKERJAAN CCTV & MATV -

TOTAL PEKERJAAN ELEKTRIKAL -

Page 14: Bill of Quantity

BILL OF QUANTITY ( BQ)

PERENCANAAN DAN PENGAWASANGEDUNG BANK BTN KANWIL IV

MAKASAR

TAHUN 2012

Page 15: Bill of Quantity

Analisa Gedung - 15

ANALISA SATUAN PEKERJAAN

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

PEKERJAAN PERSIAPAN AK 100.00 Pekerjaan Pengukuran Gedung

8.0000 org Pekerja @ Rp. 44,750.00 358,000.00 -

2.0000 org Mandor @ Rp. 89,750.00 179,500.00 -

0.5000 org Pengawas @ Rp. 37,200.00 18,600.00 -

2.0000 org Asisten Ahli Ukur @ Rp. 87,200.00 174,400.00 -

1.0000 hr Sewa alat ukur @ Rp. 75,000.00 75,000.00 -

JUMLAH ( BELUM PPN ) 805,500.00 - 805,500.00

JASA 10 % 80,550.00 80,550.00

JUMLAH 886,050.00 886,050.00

DIBULATKAN 886,050.00 886,050.00

1.0000 Pekerjaan Pengukuran

0.01 x 886,050.00 8,860.50 - 8,860.50

SNI 1.0000 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran

6.4 0.0120 Kayu meranti 5/7 @ Rp. 2,500,000.00 30,000.00

03-2835-2002 0.0200 kg Paku reng @ Rp. 17,000.00 340.00

0.0070 Kayu meranti papan 3/20 @ Rp. 2,500,000.00 17,500.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 12,096.25 47,840.00 59,936.25

JASA 10 % 1,209.63 4,784.00 5,993.63

JUMLAH 13,305.88 52,624.00 65,929.88

DIBULATKAN 13,305.00 52,624.00 65,929.00

SNI 1.0000 Membersihkan lapangan dan perataan

6.8 0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

03-2835-2002 0.0500 org Mandor @ Rp. 89,750.00 4,487.50

JUMLAH ( BELUM PPN ) 8,962.50 - 8,962.50

JASA 10 % 896.25 896.25

JUMLAH 9,858.75 9,858.75

DIBULATKAN 9,858.00 9,858.00

A4 1.0000 bh Membuat Papan Nama Proyek 80x120 cm

0.0350 Kayu meranti @ Rp. 2,500,000.00 87,500.00

1.4000 Seng plat lebar 90 cm @ Rp. 25,000.00 35,000.00

0.6000 kg Paku @ Rp. 10,000.00 6,000.00

1.5000 kg Cat kayu @ Rp. 32,000.00 48,000.00

16.8000 kg PC @ Rp. 1,025.00 17,220.00

0.0270 Pasir beton @ Rp. 90,000.00 2,430.00

0.0405 Kerikil beton @ Rp. 125,000.00 5,062.50

0.0175 org Tukang batu @ Rp. 64,750.00 1,133.13

1.0000 org Tukang kayu @ Rp. 64,750.00 64,750.00

1.0000 org Tukang cat @ Rp. 64,750.00 64,750.00

2.1000 org Pekerja @ Rp. 44,750.00 93,975.00

1.0050 org Mandor @ Rp. 89,750.00 90,198.75

JUMLAH ( BELUM PPN ) 314,806.88 201,212.50 516,019.38

JASA 10 % 31,480.69 20,121.25 51,601.94

JUMLAH 346,287.56 221,333.75 567,621.31

DIBULATKAN 346,287.00 221,333.00 567,621.00

SNI 1.0000 Pembuatan jalan sementara, tebal 25 cm

6.16 0.2750 Batu belah @ Rp. 80,000.00 22,000.00

0.0300 Kerikil @ Rp. 125,000.00 3,750.00

0.0500 Pasir @ Rp. 120,000.00 6,000.00

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.1000 org Mandor @ Rp. 89,750.00 8,975.00

JUMLAH ( BELUM PPN ) 53,725.00 31,750.00 85,475.00

JASA 10 % 5,372.50 3,175.00 8,547.50

JUMLAH 59,097.50 34,925.00 94,022.50

DIBULATKAN 59,097.00 34,925.00 94,022.00

m2

m2

m1

m3

m3

m2

m3

m1

m3

m3

m2

m3

m3

m3

Page 16: Bill of Quantity

Analisa Gedung - 16

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pembuatan kantor sementara, dengan lantai plesteran

6.5 1.2500 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 15,000.00 18,750.00

0.1800 Kayu meranti @ Rp. 2,500,000.00 450,000.00

0.8500 kg Paku biasa @ Rp. 17,000.00 14,450.00

1.1000 kg Baja strip @ Rp. 11,500.00 12,650.00

35.0000 kg PC @ Rp. 1,025.00 35,875.00

0.1500 Pasir pasang @ Rp. 120,000.00 18,000.00

0.1000 Pasir beton @ Rp. 90,000.00 9,000.00

0.1500 Kerikil beton @ Rp. 125,000.00 18,750.00

30.0000 bh Bata merah @ Rp. 500.00 15,000.00

0.2500 lbr Seng plat 3" x 6 " @ Rp. 40,000.00 10,000.00

2.0000 bh Jendela nako @ Rp. 52,000.00 104,000.00

0.0800 Kaca polos @ Rp. 77,000.00 6,160.00

0.1500 bh Kunci tanam @ Rp. 126,000.00 18,900.00

0.0600 lbr Plywood 4 mm @ Rp. 80,000.00 4,800.00

2.0000 org Tukang kayu @ Rp. 64,750.00 129,500.00

1.0000 org Tukang batu @ Rp. 64,750.00 64,750.00

0.3000 org Kepala tukang @ Rp. 69,750.00 20,925.00

2.0000 org Pekerja @ Rp. 44,750.00 89,500.00

0.0500 org Mandor @ Rp. 89,750.00 4,487.50

JUMLAH ( BELUM PPN ) 309,162.50 736,335.00 1,045,497.50

JASA 10 % 30,916.25 73,633.50 104,549.75

JUMLAH 340,078.75 809,968.50 1,150,047.25

DIBULATKAN 340,078.00 809,968.00 1,150,047.00

SNI 1.0000 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter

6.2 1.2500 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 15,000.00 18,750.00

03-2835-2002 2.5000 kg PC @ Rp. 1,025.00 2,562.50

1.2000 lbr Seng gelombang 2"-5" BJLS 24 @ Rp. 52,000.00 62,400.00

0.0050 Pasir beton @ Rp. 90,000.00 450.00

0.0090 Kerikil beton @ Rp. 125,000.00 1,125.00

0.0250 Kaso 5/7 kayu meranti @ Rp. 2,500,000.00 62,500.00

0.0600 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,020.00

0.4000 kg Meni besi @ Rp. 9,000.00 3,600.00

0.2000 org Tukang kayu @ Rp. 64,750.00 12,950.00

0.0200 org Kepala tukang kayu @ Rp. 69,750.00 1,395.00

0.4000 org Pekerja @ Rp. 44,750.00 17,900.00

0.0200 org Mandor @ Rp. 89,750.00 1,795.00

JUMLAH ( BELUM PPN ) 34,040.00 152,407.50 186,447.50

JASA 10 % 3,404.00 15,240.75 18,644.75

JUMLAH 37,444.00 167,648.25 205,092.25

DIBULATKAN 37,444.00 167,648.00 205,092.00

PEKERJAAN TANAH SNI 1.0000 Galian tanah biasa sedalam sampai 1 meter

6.1 0.4000 org Pekerja @ Rp. 44,750.00 17,900.00

0.0400 org Mandor @ Rp. 89,750.00 3,590.00

JUMLAH ( BELUM PPN ) 21,490.00 - 21,490.00

JASA 10 % 2,149.00 2,149.00

JUMLAH 23,639.00 23,639.00

DIBULATKAN 23,639.00 23,639.00

SNI 1.0000 Galian tanah biasa sedalam 1 - 2 meter

6.2 0.5260 org Pekerja @ Rp. 44,750.00 23,538.50

0.0526 org Mandor @ Rp. 89,750.00 4,720.85

JUMLAH ( BELUM PPN ) 28,259.35 - 28,259.35

JASA 10 % 2,825.94 2,825.94

JUMLAH 31,085.29 31,085.29

DIBULATKAN 31,085.00 31,085.00

SNI 1.0000 Galian tanah biasa sedalam 2 - 3 meter

6.3 0.7350 org Pekerja @ Rp. 44,750.00 32,891.25

0.0735 org Mandor @ Rp. 89,750.00 6,596.63

JUMLAH ( BELUM PPN ) 39,487.88 - 39,487.88

JASA 10 % 3,948.79 3,948.79

JUMLAH 43,436.66 43,436.66

DIBULATKAN 43,436.00 43,436.00

m2

m3

m3

m3

m3

m2

m1

m3

m3

m3

m3

m3

m3

Page 17: Bill of Quantity

Analisa Gedung - 17

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Galian tanah keras sedalam sampai 1 meter

6.4 0.6250 org Pekerja @ Rp. 44,750.00 27,968.75

0.0620 org Mandor @ Rp. 89,750.00 5,564.50

JUMLAH ( BELUM PPN ) 33,533.25 - 33,533.25

JASA 10 % 3,353.33 3,353.33

JUMLAH 36,886.58 36,886.58

DIBULATKAN 36,886.00 36,886.00

SNI 1.0000 Galian tanah cadas sedalam sampai 1 meter

6.5 1.2500 org Pekerja @ Rp. 44,750.00 55,937.50

0.1250 org Mandor @ Rp. 89,750.00 11,218.75

JUMLAH ( BELUM PPN ) 67,156.25 - 67,156.25

JASA 10 % 6,715.63 6,715.63

JUMLAH 73,871.88 73,871.88

DIBULATKAN 73,871.00 73,871.00

SNI 1.0000 Galian tanah lumpur sedalam 1 meter

6.6 0.8230 org Pekerja @ Rp. 44,750.00 36,829.25

0.0830 org Mandor @ Rp. 89,750.00 7,449.25

JUMLAH ( BELUM PPN ) 44,278.50 - 44,278.50

JASA 10 % 4,427.85 4,427.85

JUMLAH 48,706.35 48,706.35

DIBULATKAN 48,706.00 48,706.00

Mod. SNI 6.3 1.0000 Membuat sumur

2.0000 bh Buis beton D. 80 cm @ Rp. 32,000.00 64,000.00

1.0000 org Tukang gali sumur @ Rp. 34,900.00 34,900.00

0.7350 org Pekerja @ Rp. 44,750.00 32,891.25

0.0735 org Mandor @ Rp. 89,750.00 6,596.63

JUMLAH ( BELUM PPN ) 74,387.88 64,000.00 138,387.88

JASA 10 % 7,438.79 6,400.00 13,838.79

JUMLAH 81,826.66 70,400.00 152,226.66

DIBULATKAN 81,826.00 70,400.00 152,226.00

A6 1.0000 Mengangkut tanah sejauh 30 meter

0.3300 org Pekerja @ Rp. 44,750.00 14,767.50

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 15,665.00 15,665.00

JASA 10 % 1,566.50 1,566.50

JUMLAH 17,231.50 17,231.50

DIBULATKAN 17,231.00 17,231.00

SNI 1.0000 Pembuangan tanah sejauh 150 meter

6.8 0.5160 org Pekerja @ Rp. 44,750.00 23,091.00

0.0500 org Mandor @ Rp. 89,750.00 4,487.50

JUMLAH ( BELUM PPN ) 27,578.50 - 27,578.50

JASA 10 % 2,757.85 2,757.85

JUMLAH 30,336.35 30,336.35

DIBULATKAN 30,336.00 30,336.00

A14 1.0000 Membuang tanah dengan menghampar

0.2500 org Pekerja @ Rp. 44,750.00 11,187.50

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 12,085.00 12,085.00

JASA 10 % 1,208.50 1,208.50

JUMLAH 13,293.50 13,293.50

DIBULATKAN 13,293.00 13,293.00

SNI 1.0000 Urug kembali bekas galian

6.9 0.1920 org Pekerja @ Rp. 44,750.00 8,592.00

0.0190 org Mandor @ Rp. 89,750.00 1,705.25

JUMLAH ( BELUM PPN ) 10,297.25 10,297.25

JASA 10 % 1,029.73 1,029.73

JUMLAH 11,326.98 11,326.98

DIBULATKAN 11,326.00 11,326.00

m3

m3

m3

m1

m3

m3

m3

m3

Page 18: Bill of Quantity

Analisa Gedung - 18

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

1.0000 Meratakan tanah ditumbuk halus

0.2500 org Pekerja @ Rp. 44,750.00 11,187.50

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 12,085.00 12,085.00

JASA 10 % 1,208.50 1,208.50

JUMLAH 13,293.50 13,293.50

DIBULATKAN 13,293.00 13,293.00

A18 1.0000 Urug pasir

1.2000 Pasir urug @ Rp. 55,000.00 66,000.00

0.3000 org Pekerja @ Rp. 44,750.00 13,425.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 14,322.50 66,000.00 80,322.50

JASA 10 % 1,432.25 6,600.00 8,032.25

JUMLAH 15,754.75 72,600.00 88,354.75

DIBULATKAN 15,754.00 72,600.00 88,354.00

MOD 1.0000 Urug tanah mendatangkan

A18 1.2000 Tanah urug @ Rp. 35,000.00 42,000.00

0.3000 org Pekerja @ Rp. 44,750.00 13,425.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 14,322.50 42,000.00 56,322.50

JASA 10 % 1,432.25 4,200.00 5,632.25

JUMLAH 15,754.75 46,200.00 61,954.75

DIBULATKAN 15,754.00 46,200.00 61,954.00

SNI 1.0000 Urugan sirtu

6.15 1.2000 Sirtu @ Rp. 66,000.00 79,200.00

0.2500 org Pekerja @ Rp. 44,750.00 11,187.50

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 13,431.25 79,200.00 92,631.25

JASA 10 % 1,343.13 7,920.00 9,263.13

JUMLAH 14,774.38 87,120.00 101,894.38

DIBULATKAN 14,774.00 87,120.00 101,894.00

SNI 1.0000 Pemasangan lapisan ijuk

6.14 1.2000 Ijuk @ Rp. 75,000.00 90,000.00

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0150 org Mandor @ Rp. 89,750.00 1,346.25

JUMLAH ( BELUM PPN ) 8,058.75 90,000.00 98,058.75

JASA 10 % 805.88 9,000.00 9,805.88

JUMLAH 8,864.63 99,000.00 107,864.63

DIBULATKAN 8,864.00 99,000.00 107,864.00

MOD 1.0000 Gebalan rumput

B3 0.2000 btg Bambu @ Rp. 7,000.00 1,400.00

1.0000 Gebalan rumput @ Rp. 5,000.00 5,000.00

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 24,618.75 6,400.00 31,018.75

JASA 10 % 2,461.88 640.00 3,101.88

JUMLAH 27,080.63 7,040.00 34,120.63

DIBULATKAN 27,080.00 7,040.00 34,120.00

m2

m3

m3

m3

m3

m3

m3

m3

m3

m2

m2

Page 19: Bill of Quantity

Analisa Gedung - 19

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

PEKERJAAN PASANGAN

SNI 1.0000 Pasangan pondasi batu kosong

6.14 1.2000 Batu belah 15/20 cm @ Rp. 80,000.00 96,000.00

03-2836-2002 0.3000 Pasir urug @ Rp. 55,000.00 16,500.00

0.3900 org Tukang batu @ Rp. 64,750.00 25,252.50

0.0390 org Kepala tukang batu @ Rp. 69,750.00 2,720.25

0.7800 org Pekerja @ Rp. 44,750.00 34,905.00

0.0390 org Mandor @ Rp. 89,750.00 3,500.25

JUMLAH ( BELUM PPN ) 66,378.00 112,500.00 178,878.00

JASA 10 % 6,637.80 11,250.00 17,887.80

JUMLAH 73,015.80 123,750.00 196,765.80

DIBULATKAN 73,015.00 123,750.00 196,765.00

SNI 1.0000 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps

6.9 1.1000 Batu belah (hitam) 15/20 cm @ Rp. 80,000.00 88,000.00

03-2836-2002 0.2290 Kapurr pasang @ Rp. 72,500.00 16,602.50

0.2290 Semen merah @ Rp. 80,000.00 18,320.00

0.5440 Pasir pasang @ Rp. 120,000.00 65,280.00

0.6000 org Tukang batu @ Rp. 64,750.00 38,850.00

0.0600 org Kepala tukang batu @ Rp. 69,750.00 4,185.00

1.5000 org Pekerja @ Rp. 44,750.00 67,125.00

0.0750 org Mandor @ Rp. 89,750.00 6,731.25

JUMLAH ( BELUM PPN ) 116,891.25 188,202.50 305,093.75

JASA 10 % 11,689.13 18,820.25 30,509.38

JUMLAH 128,580.38 207,022.75 335,603.13

DIBULATKAN 128,580.00 207,022.00 335,603.00

1.0000 Pasangan pondasi 1 Pc : 3 Kp : 5 Ps

1.2000 Batu belah (hitam) 15/20 cm @ Rp. 80,000.00 96,000.00

95.4200 kg PC @ Rp. 1,025.00 97,805.50

0.2290 Kapurr pasang @ Rp. 72,500.00 16,602.50

0.3820 Pasir pasang @ Rp. 120,000.00 45,840.00

0.6000 org Tukang batu @ Rp. 64,750.00 38,850.00

0.0600 org Kepala tukang batu @ Rp. 69,750.00 4,185.00

1.5000 org Pekerja @ Rp. 44,750.00 67,125.00

0.0750 org Mandor @ Rp. 89,750.00 6,731.25

JUMLAH ( BELUM PPN ) 116,891.25 256,248.00 373,139.25

JASA 10 % 11,689.13 25,624.80 37,313.93

JUMLAH 128,580.38 281,872.80 410,453.18

DIBULATKAN 128,580.00 281,872.00 410,453.00

SNI 1.0000 Pasangan pondasi 1 Pc : 3 Kp : 10 Ps

6.12 1.1000 Batu belah (hitam) 15/20 cm @ Rp. 80,000.00 88,000.00

03-2835-2002 61.0000 kg PC @ Rp. 1,025.00 62,525.00

0.1470 Kapurr pasang @ Rp. 72,500.00 10,657.50

0.4920 Pasir pasang @ Rp. 120,000.00 59,040.00

0.6000 org Tukang batu @ Rp. 64,750.00 38,850.00

0.0600 org Kepala tukang batu @ Rp. 69,750.00 4,185.00

1.5000 org Pekerja @ Rp. 44,750.00 67,125.00

0.0750 org Mandor @ Rp. 89,750.00 6,731.25

JUMLAH ( BELUM PPN ) 116,891.25 220,222.50 337,113.75

JASA 10 % 11,689.13 22,022.25 33,711.38

JUMLAH 128,580.38 242,244.75 370,825.13

DIBULATKAN 128,580.00 242,244.00 370,825.00

SNI 1.0000 Pasangan pondasi 1 Pc : 4 Ps

6.5 1.1000 Batu belah 15/20 cm @ Rp. 80,000.00 88,000.00

03-2836-2002 163.0000 kg PC @ Rp. 1,025.00 167,075.00

0.5200 Pasir pasang @ Rp. 120,000.00 62,400.00

0.6000 org Tukang batu @ Rp. 64,750.00 38,850.00

0.0600 org Kepala tukang batu @ Rp. 69,750.00 4,185.00

1.5000 org Pekerja @ Rp. 44,750.00 67,125.00

0.0750 org Mandor @ Rp. 89,750.00 6,731.25

JUMLAH ( BELUM PPN ) 116,891.25 317,475.00 434,366.25

JASA 10 % 11,689.13 31,747.50 43,436.63

JUMLAH 128,580.38 349,222.50 477,802.88

DIBULATKAN 128,580.00 349,222.00 477,802.00

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

Page 20: Bill of Quantity

Analisa Gedung - 20

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps

6.15 70.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00 35,000.00

03-2837-2002 4.5000 kg PC @ Rp. 1,025.00 4,612.50

0.0150 Kapur pasang @ Rp. 72,500.00 1,087.50

0.0500 Pasir pasang @ Rp. 120,000.00 6,000.00

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang batu @ Rp. 69,750.00 697.50

0.3200 org Pekerja @ Rp. 44,750.00 14,320.00

0.0150 org Mandor @ Rp. 89,750.00 1,346.25

JUMLAH ( BELUM PPN ) 22,838.75 46,700.00 69,538.75

JASA 10 % 2,283.88 4,670.00 6,953.88

JUMLAH 25,122.63 51,370.00 76,492.63

DIBULATKAN 25,122.00 51,370.00 76,492.00

SNI 1.0000 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps

6.11 70.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00 35,000.00

03-2837-2002 11.5000 kg PC @ Rp. 1,025.00 11,787.50

0.0430 Pasir pasang @ Rp. 120,000.00 5,160.00

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang batu @ Rp. 69,750.00 697.50

0.3200 org Pekerja @ Rp. 44,750.00 14,320.00

0.0150 org Mandor @ Rp. 89,750.00 1,346.25

JUMLAH ( BELUM PPN ) 22,838.75 51,947.50 74,786.25

JASA 10 % 2,283.88 5,194.75 7,478.63

JUMLAH 25,122.63 57,142.25 82,264.88

DIBULATKAN 25,122.00 57,142.00 82,264.00

SNI 1.0000 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps

6.7 140.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00 70,000.00

03-2837-2002 10.0800 kg PC @ Rp. 1,025.00 10,332.00

0.0275 Kapur pasang @ Rp. 72,500.00 1,993.75

0.0925 Pasir pasang @ Rp. 120,000.00 11,100.00

0.2000 org Tukang batu @ Rp. 64,750.00 12,950.00

0.0200 org Kepala tukang batu @ Rp. 69,750.00 1,395.00

0.6500 org Pekerja @ Rp. 44,750.00 29,087.50

0.0300 org Mandor @ Rp. 89,750.00 2,692.50

JUMLAH ( BELUM PPN ) 46,125.00 93,425.75 139,550.75

JASA 10 % 4,612.50 9,342.58 13,955.08

JUMLAH 50,737.50 102,768.33 153,505.83

DIBULATKAN 50,737.00 102,768.00 153,505.00

SNI 1.0000 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps

6.4 140.0000 bh Bata merah 5 x 11 x 22 cm @ Rp. 500.00 70,000.00

03-2837-2002 26.4500 kg PC @ Rp. 1,025.00 27,111.25

0.0980 Pasir pasang @ Rp. 120,000.00 11,760.00

0.2000 org Tukang batu @ Rp. 64,750.00 12,950.00

0.0200 org Kepala tukang batu @ Rp. 69,750.00 1,395.00

0.6500 org Pekerja @ Rp. 44,750.00 29,087.50

0.0300 org Mandor @ Rp. 89,750.00 2,692.50

JUMLAH ( BELUM PPN ) 46,125.00 108,871.25 154,996.25

JASA 10 % 4,612.50 10,887.13 15,499.63

JUMLAH 50,737.50 119,758.38 170,495.88

DIBULATKAN 50,737.00 119,758.00 170,495.00

SNI 1.0000 Pasangan dinding bataco

6.18 12.5000 bh Bataco @ Rp. 1,500.00 18,750.00

12.5000 kg PC @ Rp. 1,025.00 12,812.50

0.0400 Pasir pasang @ Rp. 120,000.00 4,800.00

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang batu @ Rp. 69,750.00 697.50

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 31,791.25 36,362.50 68,153.75

JASA 10 % 3,179.13 3,636.25 6,815.38

JUMLAH 34,970.38 39,998.75 74,969.13

DIBULATKAN 34,970.00 39,998.00 74,969.00

m2

m3

m3

m2

m3

m2

m3

m3

m2

m3

m2

m3

Page 21: Bill of Quantity

Analisa Gedung - 21

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasangan roster 25/25 cm

6.19 16.0000 bh Roster 25/25 cm @ Rp. 2,000.00 32,000.00

12.5000 kg PC @ Rp. 1,025.00 12,812.50

0.0400 Pasir pasang @ Rp. 120,000.00 4,800.00

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang batu @ Rp. 69,750.00 697.50

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 31,791.25 49,612.50 81,403.75

JASA 10 % 3,179.13 4,961.25 8,140.38

JUMLAH 34,970.38 54,573.75 89,544.13

DIBULATKAN 34,970.00 54,573.00 89,544.00

PEKERJAAN BETON SNI 1.0000 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr -

6.13 336.0000 kg PC @ Rp. 1,025.00 344,400.00

0.5400 Pasir beton @ Rp. 90,000.00 48,600.00

0.8100 Kerikil beton @ Rp. 125,000.00 101,250.00

0.3500 org Tukang batu @ Rp. 64,750.00 22,662.50

0.0350 org Kepala tukang batu @ Rp. 69,750.00 2,441.25

2.0000 org Pekerja @ Rp. 44,750.00 89,500.00

0.1000 org Mandor @ Rp. 89,750.00 8,975.00

JUMLAH ( BELUM PPN ) 123,578.75 494,250.00 617,828.75

JASA 10 % 12,357.88 49,425.00 61,782.88

JUMLAH 135,936.63 543,675.00 679,611.63

DIBULATKAN 135,936.00 543,675.00 679,611.00

SNI 1.0000 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr

6.1 218.0000 kg PC @ Rp. 1,025.00 223,450.00

0.5200 Pasir beton @ Rp. 90,000.00 46,800.00

0.8700 Kerikil beton @ Rp. 125,000.00 108,750.00

0.2500 org Tukang batu @ Rp. 64,750.00 16,187.50

0.0250 org Kepala tukang batu @ Rp. 69,750.00 1,743.75

1.6500 org Pekerja @ Rp. 44,750.00 73,837.50

0.0800 org Mandor @ Rp. 89,750.00 7,180.00

JUMLAH ( BELUM PPN ) 98,948.75 379,000.00 477,948.75

JASA 10 % 9,894.88 37,900.00 47,794.88

JUMLAH 108,843.63 416,900.00 525,743.63

DIBULATKAN 108,843.00 416,900.00 525,743.00

AK 1.0000 Beton cyclope 1pc:3ps:5kr

0.7000 Batu kali (hitam) @ Rp. 80,000.00 56,000.00

61.2500 kg PC @ Rp. 1,025.00 62,781.25

0.4000 Pasir pasang @ Rp. 120,000.00 48,000.00

0.6500 Kerikil beton @ Rp. 125,000.00 81,250.00

1.0000 org Tukang batu @ Rp. 64,750.00 64,750.00

0.1000 org Kep. Tk. Batu @ Rp. 69,750.00 6,975.00

6.0000 org Pekerja @ Rp. 44,750.00 268,500.00

0.3000 org Mandor @ Rp. 89,750.00 26,925.00

JUMLAH ( BELUM PPN ) 367,150.00 248,031.25 615,181.25

JASA 10 % 36,715.00 24,803.13 61,518.13

JUMLAH 403,865.00 272,834.38 676,699.38

DIBULATKAN 403,865.00 272,834.00 676,699.00

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

Page 22: Bill of Quantity

Analisa Gedung - 22

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Membuat beton bertulang, 1 Pc : 1,5 Ps : 2,5 Kr

6.16 400.0000 kg PC @ Rp. 1,025.00 410,000.00

0.4800 Pasir beton @ Rp. 90,000.00 43,200.00

0.8000 Kerikil beton @ Rp. 125,000.00 100,000.00

0.3500 org Tukang batu @ Rp. 64,750.00 22,662.50

0.0350 org Kepala tukang batu @ Rp. 69,750.00 2,441.25

2.0000 org Pekerja @ Rp. 44,750.00 89,500.00

1.0000 org Mandor @ Rp. 89,750.00 89,750.00

JUMLAH ( BELUM PPN ) 204,353.75 553,200.00 757,553.75

JASA 10 % 20,435.38 55,320.00 75,755.38

JUMLAH 224,789.13 608,520.00 833,309.13

DIBULATKAN 224,789.00 608,520.00 833,309.00

SNI 1.0000 Membuat beton dengan mutu K 225

6.35 388.0000 kg PC @ Rp. 1,025.00 397,700.00

0.6500 Pasir beton @ Rp. 90,000.00 58,500.00

0.6500 Kerikil beton @ Rp. 125,000.00 81,250.00

1.0000 org Tukang batu @ Rp. 64,750.00 64,750.00

0.1000 org Kepala tukang batu @ Rp. 69,750.00 6,975.00

6.0000 org Pekerja @ Rp. 44,750.00 268,500.00

0.3000 org Mandor @ Rp. 89,750.00 26,925.00

JUMLAH ( BELUM PPN ) 367,150.00 537,450.00 904,600.00

JASA 10 % 36,715.00 53,745.00 90,460.00

JUMLAH 403,865.00 591,195.00 995,060.00

DIBULATKAN 403,865.00 591,195.00 995,060.00

SNI 1.0000 Membuat beton dengan mutu K 275

6.36 400.0000 kg PC @ Rp. 1,025.00 410,000.00

0.4000 Pasir beton @ Rp. 90,000.00 36,000.00

0.8200 Kerikil beton @ Rp. 125,000.00 102,500.00

1.0000 org Tukang batu @ Rp. 64,750.00 64,750.00

0.1000 org Kepala tukang batu @ Rp. 69,750.00 6,975.00

6.0000 org Pekerja @ Rp. 44,750.00 268,500.00

0.3000 org Mandor @ Rp. 89,750.00 26,925.00

JUMLAH ( BELUM PPN ) 367,150.00 548,500.00 915,650.00

JASA 10 % 36,715.00 54,850.00 91,565.00

JUMLAH 403,865.00 603,350.00 1,007,215.00

DIBULATKAN 403,865.00 603,350.00 1,007,215.00

1.0000 Membuat beton dengan mutu K 300

430.0000 kg PC @ Rp. 1,025.00 440,750.00

0.5160 Pasir beton @ Rp. 90,000.00 46,440.00

0.6900 Kerikil beton @ Rp. 125,000.00 86,250.00

1.0000 org Tukang batu @ Rp. 64,750.00 64,750.00

0.1000 org Kepala tukang batu @ Rp. 69,750.00 6,975.00

6.0000 org Pekerja @ Rp. 44,750.00 268,500.00

0.3000 org Mandor @ Rp. 89,750.00 26,925.00

JUMLAH ( BELUM PPN ) 367,150.00 573,440.00 940,590.00

JASA 10 % 36,715.00 57,344.00 94,059.00

JUMLAH 403,865.00 630,784.00 1,034,649.00

DIBULATKAN 403,865.00 630,784.00 1,034,649.00

SNI 1.0000 kg Pembesian dengan besi polos

6.25 1.0500 kg Besi beton polos @ Rp. 12,500.00 13,125.00

0.0150 kg Kawat beton @ Rp. 9,400.00 141.00

0.0070 org Tukang besi @ Rp. 64,750.00 453.25

0.0007 org Kepala tukang besi @ Rp. 69,750.00 48.83

0.0070 org Pekerja @ Rp. 44,750.00 313.25

0.0003 org Mandor @ Rp. 89,750.00 26.92

JUMLAH ( BELUM PPN ) 842.25 13,266.00 14,108.25

JASA 10 % 84.23 1,326.60 1,410.83

JUMLAH 926.48 14,592.60 15,519.08

DIBULATKAN 926.00 14,592.00 15,519.00

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

Page 23: Bill of Quantity

Analisa Gedung - 23

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 kg Pembesian dengan besi ulir

6.25 1.0500 kg Besi beton ulir @ Rp. 13,000.00 13,650.00

0.0150 kg Kawat beton @ Rp. 9,400.00 141.00

0.0070 org Tukang besi @ Rp. 64,750.00 453.25

0.0007 org Kepala tukang besi @ Rp. 69,750.00 48.83

0.0070 org Pekerja @ Rp. 44,750.00 313.25

0.0003 org Mandor @ Rp. 89,750.00 26.92

JUMLAH ( BELUM PPN ) 842.25 13,791.00 14,633.25

JASA 10 % 84.23 1,379.10 1,463.33

JUMLAH 926.48 15,170.10 16,096.58

DIBULATKAN 926.00 15,170.00 16,096.00

F.8 1.0000 Cetakan beton / begisting memakai papan

0.0170 Usuk meranti @ Rp. 2,500,000.00 42,500.00

0.0240 Papan cetakan @ Rp. 1,000,000.00 24,000.00

0.4000 kg Paku @ Rp. 17,000.00 6,800.00

0.5000 org Tukang kayu @ Rp. 64,750.00 32,375.00

0.0500 org Kep. Tk. Kayu @ Rp. 69,750.00 3,487.50

0.2000 org Pekerja @ Rp. 44,750.00 8,950.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 45,710.00 73,300.00 119,010.00

JASA 10 % 4,571.00 7,330.00 11,901.00

JUMLAH 50,281.00 80,630.00 130,911.00

DIBULATKAN 50,281.00 80,630.00 130,911.00

F.8 1.0000 Cetakan beton / begisting memakai multiplek

0.0170 Usuk meranti @ Rp. 2,500,000.00 42,500.00

0.3470 lbr Multiplek @ Rp. 90,000.00 31,230.00

0.4000 kg Paku @ Rp. 17,000.00 6,800.00

0.5000 org Tukang kayu @ Rp. 64,750.00 32,375.00

0.0500 org Kep. Tk. Kayu @ Rp. 69,750.00 3,487.50

0.2000 org Pekerja @ Rp. 44,750.00 8,950.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 45,710.00 80,530.00 126,240.00

JASA 10 % 4,571.00 8,053.00 12,624.00

JUMLAH 50,281.00 88,583.00 138,864.00

DIBULATKAN 50,281.00 88,583.00 138,864.00

F.V 1.0000 Membongkar cetakan

4.0000 org Pekerja @ Rp. 44,750.00 179,000.00

JUMLAH ( BELUM PPN ) 179,000.00 - 179,000.00

JASA 10 % 17,900.00 17,900.00

JUMLAH 196,900.00 196,900.00

DIBULATKAN 196,900.00 196,900.00

Sup

muko2 0.7000 Perancah/dolken @ Rp. 1,000,000.00 700,000.00

hal 10.5000 org Tukang kayu @ Rp. 64,750.00 679,875.00

332 1.0500 org Kep. Tk. Kayu @ Rp. 69,750.00 73,237.50

3.5000 org Pekerja @ Rp. 44,750.00 156,625.00

0.1750 org Mandor @ Rp. 89,750.00 15,706.25

JUMLAH ( BELUM PPN ) 925,443.75 700,000.00 1,625,443.75

JASA 10 % 92,544.38 70,000.00 162,544.38

JUMLAH 1,017,988.13 770,000.00 1,787,988.13

DIBULATKAN 1,017,988.00 770,000.00 1,787,988.00

m2

m3

m3

m2

m3

m3

Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken )

m3

Page 24: Bill of Quantity

Analisa Gedung - 24

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

32.0000 unit Scafolding @ Rp. 20,000.00 640,000.00

3.5000 org Tukang kayu @ Rp. 64,750.00 226,625.00

0.3500 org Kep. Tk. Kayu @ Rp. 69,750.00 24,412.50

2.2000 org Pekerja @ Rp. 44,750.00 98,450.00

0.1200 org Mandor @ Rp. 89,750.00 10,770.00

JUMLAH ( BELUM TERMASUK PPN ) 360,257.50 640,000.00 1,000,257.50

JASA 10 % 36,025.75 64,000.00 100,025.75

JUMLAH 396,283.25 704,000.00 1,100,283.25

DIBULATKAN 396,283.00 704,000.00 1,100,283.00

REKAPITULASI (CONTOH UNTUK 100 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 100 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 100 kg 92,647.50 1,459,260.00 1,551,907.50

C. 502,810.00 806,300.00 1,309,110.00

D. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 928,294.13 2,809,235.00 3,737,529.13

DIBULATKAN 928,294.00 2,809,235.00 3,737,529.00

REKAPITULASI (CONTOH UNTUK 125 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 125 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 125 kg 115,809.38 1,824,075.00 1,939,884.38

C. 502,810.00 806,300.00 1,309,110.00

D. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 951,456.00 3,174,050.00 4,125,506.00

DIBULATKAN 951,456.00 3,174,050.00 4,125,506.00

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 150 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 150 kg 138,971.25 2,188,890.00 2,327,861.25

C. 502,810.00 806,300.00 1,309,110.00

E. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 974,617.88 3,538,865.00 4,513,482.88

DIBULATKAN 974,617.00 3,538,865.00 4,513,482.00

REKAPITULASI (CONTOH UNTUK 175 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 175 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 175 kg 162,133.13 2,553,705.00 2,715,838.13

C. 502,810.00 806,300.00 1,309,110.00

D. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 997,779.75 3,903,680.00 4,901,459.75

DIBULATKAN 997,779.00 3,903,680.00 4,901,459.00

REKAPITULASI (CONTOH UNTUK 200 KG BESI)

Pek. Beton 1:2:3 tanpa dolken, 200 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 200 kg 185,295.00 2,918,520.00 3,103,815.00

C. 502,810.00 806,300.00 1,309,110.00

D. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 1,020,941.63 4,268,495.00 5,289,436.63

DIBULATKAN 1,020,941.00 4,268,495.00 5,289,436.00

REKAPITULASI (CONTOH UNTUK 100 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 100 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 100 kg 92,647.50 1,459,260.00 1,551,907.50

C. 502,810.00 806,300.00 1,309,110.00

D. Stut werk / perancah 1,017,988.13 770,000.00 1,787,988.13

E. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 1,946,282.25 3,579,235.00 5,525,517.25

DIBULATKAN 1,946,282.00 3,579,235.00 5,525,517.00

Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding )

Cetakan memakai papan ( 10 m2 )

Cetakan memakai papan ( 10 m2 )

Cetakan memakai papan ( 10 m2 )

Cetakan memakai papan ( 10 m2 )

Cetakan memakai papan ( 10 m2 )

Cetakan memakai papan ( 10 m2 )

Page 25: Bill of Quantity

Analisa Gedung - 25

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

REKAPITULASI (CONTOH UNTUK 125 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 125 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 125 kg 115,809.38 1,824,075.00 1,939,884.38

C. 502,810.00 806,300.00 1,309,110.00

D. Stut werk / perancah 1,017,988.13 770,000.00 1,787,988.13

E. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 1,969,444.13 3,944,050.00 5,913,494.13

DIBULATKAN 1,969,444.00 3,944,050.00 5,913,494.00

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 150 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 150 kg 138,971.25 2,188,890.00 2,327,861.25

C. 502,810.00 806,300.00 1,309,110.00

D. Stut werk / perancah 1,017,988.13 770,000.00 1,787,988.13

E. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 1,992,606.00 4,308,865.00 6,301,471.00

DIBULATKAN 1,992,606.00 4,308,865.00 6,301,471.00

REKAPITULASI (CONTOH UNTUK 175 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 175 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 175 kg 162,133.13 2,553,705.00 2,715,838.13

C. 502,810.00 806,300.00 1,309,110.00

D. Stut werk / perancah 1,017,988.13 770,000.00 1,787,988.13

E. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 2,015,767.88 4,673,680.00 6,689,447.88

DIBULATKAN 2,015,767.00 4,673,680.00 6,689,447.00

REKAPITULASI (CONTOH UNTUK 200 KG BESI)

Pek. Beton 1:2:3 dengan memakai dolken, 200 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 200 kg 185,295.00 2,918,520.00 3,103,815.00

C. 502,810.00 806,300.00 1,309,110.00

D. Stut werk / perancah 1,017,988.13 770,000.00 1,787,988.13

E. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 2,038,929.75 5,038,495.00 7,077,424.75

DIBULATKAN 2,038,929.00 5,038,495.00 7,077,424.00

REKAPITULASI (CONTOH UNTUK 100 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 100 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 100 kg 92,647.50 1,459,260.00 1,551,907.50

C. 502,810.00 806,300.00 1,309,110.00

D. Scafolding / perancah 396,283.25 704,000.00 1,100,283.25

E. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 1,324,577.38 3,513,235.00 4,837,812.38

DIBULATKAN 1,324,577.00 3,513,235.00 4,837,812.00

REKAPITULASI (CONTOH UNTUK 125 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 125 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 125 kg 115,809.38 1,824,075.00 1,939,884.38

C. 502,810.00 806,300.00 1,309,110.00

D. Scafolding / perancah 396,283.25 704,000.00 1,100,283.25

E. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 1,347,739.25 3,878,050.00 5,225,789.25

DIBULATKAN 1,347,739.00 3,878,050.00 5,225,789.00

Cetakan memakai papan ( 10 m2 )

Cetakan memakai papan ( 10 m2 )

Cetakan memakai papan ( 10 m2 )

Cetakan memakai papan ( 10 m2 )

Cetakan memakai papan ( 10 m2 )

Cetakan memakai papan ( 10 m2 )

Page 26: Bill of Quantity

Analisa Gedung - 26

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

REKAPITULASI (CONTOH UNTUK 150 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 150 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 150 kg 138,971.25 2,188,890.00 2,327,861.25

C. 502,810.00 806,300.00 1,309,110.00

D. Scafolding / perancah 396,283.25 704,000.00 1,100,283.25

E. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 1,370,901.13 4,242,865.00 5,613,766.13

DIBULATKAN 1,370,901.00 4,242,865.00 5,613,766.00

REKAPITULASI (CONTOH UNTUK 175 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 175 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 175 kg 162,133.13 2,553,705.00 2,715,838.13

C. 502,810.00 806,300.00 1,309,110.00

D. Scafolding / perancah 396,283.25 704,000.00 1,100,283.25

E. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 1,394,063.00 4,607,680.00 6,001,743.00

DIBULATKAN 1,394,063.00 4,607,680.00 6,001,743.00

REKAPITULASI (CONTOH UNTUK 200 KG BESI)

Pek. Beton 1:2:3 dengan memakai scaffolding, 200 kg besi

A. Beton cor 1pc:2ps:3kr 135,936.63 543,675.00 679,611.63

B. Tulangan 200 kg 185,295.00 2,918,520.00 3,103,815.00

C. 502,810.00 806,300.00 1,309,110.00

D. Scafolding / perancah 396,283.25 704,000.00 1,100,283.25

E. Membongkar cetakan 196,900.00 - 196,900.00

JUMLAH 1,417,224.88 4,972,495.00 6,389,719.88

DIBULATKAN 1,417,224.00 4,972,495.00 6,389,719.00

PEKERJAAN PELESTERAN

G.50.q 1.0000 Plesteran batu kali 1pc:4ps

6.5110 kg PC @ Rp. 1,025.00 6,673.78

0.0209 Pasir pasang @ Rp. 120,000.00 2,508.00

0.2000 org Tukang batu @ Rp. 64,750.00 12,950.00

0.0200 org Kep. Tk. Batu @ Rp. 69,750.00 1,395.00

0.4000 org Pekerja @ Rp. 44,750.00 17,900.00

0.0200 org Mandor @ Rp. 89,750.00 1,795.00

JUMLAH ( BELUM PPN ) 34,040.00 9,181.78 43,221.78

JASA 10 % 3,404.00 918.18 4,322.18

JUMLAH 37,444.00 10,099.95 47,543.95

DIBULATKAN 37,444.00 10,099.00 47,543.00

Cetakan memakai papan ( 10 m2 )

Cetakan memakai papan ( 10 m2 )

Cetakan memakai papan ( 10 m2 )

m2

m3

Page 27: Bill of Quantity

Analisa Gedung - 27

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm

6.9 1.8400 kg PC @ Rp. 1,025.00 1,886.00

03-2837-2002 0.0060 Kapurr pasang @ Rp. 72,500.00 435.00

0.0140 Pasir pasang @ Rp. 120,000.00 1,680.00

0.1500 org Tukang batu @ Rp. 64,750.00 9,712.50

0.0150 org Kepala tukang batu @ Rp. 69,750.00 1,046.25

0.2000 org Pekerja @ Rp. 44,750.00 8,950.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM TERMASUK PPN ) 20,606.25 4,001.00 24,607.25

JASA 10 % 2,060.63 400.10 2,460.73

JUMLAH 22,666.88 4,401.10 27,067.98

DIBULATKAN 22,666.00 4,401.00 27,067.00

SNI 1.0000 Plesteran 1 Pc : 4 Ps, tebal 15 mm

6.4 5.2000 kg PC @ Rp. 1,025.00 5,330.00

03-2837-2002 0.0200 Pasir pasang @ Rp. 120,000.00 2,400.00

0.1500 org Tukang batu @ Rp. 64,750.00 9,712.50

0.0150 org Kepala tukang batu @ Rp. 69,750.00 1,046.25

0.2000 org Pekerja @ Rp. 44,750.00 8,950.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 20,606.25 7,730.00 28,336.25

JASA 10 % 2,060.63 773.00 2,833.63

JUMLAH 22,666.88 8,503.00 31,169.88

DIBULATKAN 22,666.00 8,503.00 31,169.00

SNI 1.0000 Plesteran beton 1 Pc : 3 Ps, tebal 15 mm

6.30 7.0700 kg PC @ Rp. 1,025.00 7,246.75

03-2837-2002 0.0210 Pasir pasang @ Rp. 120,000.00 2,520.00

0.2000 org Tukang batu @ Rp. 64,750.00 12,950.00

0.0200 org Kepala tukang batu @ Rp. 69,750.00 1,395.00

0.2600 org Pekerja @ Rp. 44,750.00 11,635.00

0.0130 org Mandor @ Rp. 89,750.00 1,166.75

JUMLAH ( BELUM PPN ) 27,146.75 9,766.75 36,913.50

JASA 10 % 2,714.68 976.68 3,691.35

JUMLAH 29,861.43 10,743.43 40,604.85

DIBULATKAN 29,861.00 10,743.00 40,604.00

SNI 1.0000 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung )

6.31 0.5000 kg PC @ Rp. 1,025.00 512.50

03-2837-2002 0.0020 Pasir pasang @ Rp. 120,000.00 240.00

0.0380 org Tukang batu @ Rp. 64,750.00 2,460.50

0.0380 org Kepala tukang batu @ Rp. 69,750.00 2,650.50

0.0570 org Pekerja @ Rp. 44,750.00 2,550.75

0.0020 org Mandor @ Rp. 89,750.00 179.50

JUMLAH ( BELUM PPN ) 7,841.25 752.50 8,593.75

JASA 10 % 784.13 75.25 859.38

JUMLAH 8,625.38 827.75 9,453.13

DIBULATKAN 8,625.00 827.00 9,453.00

SNI 1.0000 Plesteran siar adukan 1 Pc : 2 Ps

6.35 4.3200 kg PC @ Rp. 1,025.00 4,428.00

03-2837-2002 0.0160 Pasir pasang @ Rp. 120,000.00 1,920.00

0.0700 org Tukang batu @ Rp. 64,750.00 4,532.50

0.0070 org Kepala tukang batu @ Rp. 69,750.00 488.25

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0080 org Mandor @ Rp. 89,750.00 718.00

JUMLAH ( BELUM PPN ) 12,451.25 6,348.00 18,799.25

JASA 10 % 1,245.13 634.80 1,879.93

JUMLAH 13,696.38 6,982.80 20,679.18

DIBULATKAN 13,696.00 6,982.00 20,679.00

m2

m3

m3

m2

m3

m2

m3

m1

m3

m2

m3

Page 28: Bill of Quantity

Analisa Gedung - 28

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Plesteran Ciprat, 1 Pc : 2 Ps

6.34 4.3200 kg PC @ Rp. 1,025.00 4,428.00

0.0160 Pasir pasang @ Rp. 55,000.00 880.00

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang batu @ Rp. 69,750.00 697.50

0.2500 org Pekerja @ Rp. 44,750.00 11,187.50

0.0150 org Mandor @ Rp. 89,750.00 1,346.25

JUMLAH ( BELUM PPN ) 19,706.25 5,308.00 25,014.25

JASA 10 % 1,970.63 530.80 2,501.43

JUMLAH 21,676.88 5,838.80 27,515.68

DIBULATKAN 21,676.00 5,838.00 27,515.00

Analisa ZAZ 1.0000 Acian dinding bata

3.5000 kg PC @ Rp. 1,025.00 3,587.50

0.0330 org Tukang batu @ Rp. 64,750.00 2,136.75

0.0033 org Kep. Tk. Batu @ Rp. 69,750.00 230.18

0.0700 org Pekerja @ Rp. 44,750.00 3,132.50

0.0035 org Mandor @ Rp. 89,750.00 314.13

JUMLAH ( BELUM PPN ) 5,813.55 3,587.50 9,401.05

JASA 10 % 581.36 358.75 940.11

JUMLAH 6,394.91 3,946.25 10,341.15

DIBULATKAN 6,394.00 3,946.00 10,341.00

SNI 1.0000 Pasang dinding batu hias tempel

6.74 1.0500 Batu tempel hitam @ Rp. 60,000.00 63,000.00

11.7500 kg PC @ Rp. 1,025.00 12,043.75

0.0350 Pasir pasang @ Rp. 120,000.00 4,200.00

0.3500 org Tukang batu @ Rp. 64,750.00 22,662.50

0.0350 org Kepala tukang batu @ Rp. 69,750.00 2,441.25

0.6500 org Pekerja @ Rp. 44,750.00 29,087.50

0.0300 org Mandor @ Rp. 89,750.00 2,692.50

JUMLAH ( BELUM TERMASUK PPN ) 56,883.75 79,243.75 136,127.50

JASA 10 % 5,688.38 7,924.38 13,612.75

JUMLAH 62,572.13 87,168.13 149,740.25

DIBULATKAN 62,572.00 87,168.00 149,740.00

PEKERJAAN PASANG TEGEL AK 1.0000 Pasang tegel abu-abu 30/30

1.0000 Tegel abu-abu uk. 30/30 @ Rp. 28,000.00 28,000.00

0.0160 Kapur pasang @ Rp. 72,500.00 1,160.00

0.0320 Pasir pasang @ Rp. 120,000.00 3,840.00

1.0000 kg PC @ Rp. 1,025.00 1,025.00

0.2500 org Tukang batu @ Rp. 64,750.00 16,187.50

0.0250 org Kep. Tk. Batu @ Rp. 69,750.00 1,743.75

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 42,550.00 34,025.00 76,575.00

JASA 10 % 4,255.00 3,402.50 7,657.50

JUMLAH 46,805.00 37,427.50 84,232.50

DIBULATKAN 46,805.00 37,427.00 84,232.00

m2

m3

m2

m2

m2

m3

m2

m2

m3

m3

Page 29: Bill of Quantity

Analisa Gedung - 29

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

AK 1.0000 Pasang tegel abu-abu 20/20

1.0000 Tegel abu-abu uk. 20/20 @ Rp. 20,000.00 20,000.00

0.0160 Kapur pasang @ Rp. 72,500.00 1,160.00

0.0320 Pasir pasang @ Rp. 120,000.00 3,840.00

1.0000 kg PC @ Rp. 1,025.00 1,025.00

0.2500 org Tukang batu @ Rp. 64,750.00 16,187.50

0.0250 org Kep. Tk. Batu @ Rp. 69,750.00 1,743.75

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 42,550.00 26,025.00 68,575.00

JASA 10 % 4,255.00 2,602.50 6,857.50

JUMLAH 46,805.00 28,627.50 75,432.50

DIBULATKAN 46,805.00 28,627.00 75,432.00

PEKERJAAN KERAMIK

An. 1.0000 Pasang ubin porselin

G.69.c 1.0000 Tegel porselin @ Rp. 40,500.00 40,500.00

4.6800 kg PC @ Rp. 1,025.00 4,797.00

0.0090 Pasir pasang @ Rp. 120,000.00 1,080.00

1.0000 kg Semen putih @ Rp. 1,312.50 1,312.50

0.5000 org Tukang batu @ Rp. 64,750.00 32,375.00

0.0500 org Kep. Tk. Batu @ Rp. 69,750.00 3,487.50

0.2500 org Pekerja @ Rp. 44,750.00 11,187.50

0.0125 org Mandor @ Rp. 89,750.00 1,121.88

JUMLAH ( BELUM PPN ) 48,171.88 47,689.50 95,861.38

JASA 10 % 4,817.19 4,768.95 9,586.14

JUMLAH 52,989.06 52,458.45 105,447.51

DIBULATKAN 52,989.00 52,458.00 105,447.00

AK 1.0000 Pasang tegel keramik 20/20 dan 30/30

1.0000 Tegel keramik (std) @ Rp. 42,500.00 42,500.00

4.0800 kg PC @ Rp. 1,025.00 4,182.00

0.0090 Pasir pasang @ Rp. 120,000.00 1,080.00

0.6000 kg Semen putih @ Rp. 1,312.50 787.50

0.5000 org Tukang batu @ Rp. 64,750.00 32,375.00

0.0500 org Kep. Tk. Batu @ Rp. 69,750.00 3,487.50

0.2500 org Pekerja @ Rp. 44,750.00 11,187.50

0.0125 org Mandor @ Rp. 89,750.00 1,121.88

JUMLAH ( BELUM PPN ) 48,171.88 48,549.50 96,721.38

JASA 10 % 4,817.19 4,854.95 9,672.14

JUMLAH 52,989.06 53,404.45 106,393.51

DIBULATKAN 52,989.00 53,404.00 106,393.00

AK 1.0000 Pasang tegel keramik 10/20 berglasir

1.0000 Tegel keramik 10/20 @ Rp. 30,000.00 30,000.00

4.0800 kg PC @ Rp. 1,025.00 4,182.00

0.0090 Pasir pasang @ Rp. 120,000.00 1,080.00

0.6000 kg Semen putih @ Rp. 1,312.50 787.50

0.5000 org Tukang batu @ Rp. 64,750.00 32,375.00

0.0500 org Kep. Tk. Batu @ Rp. 69,750.00 3,487.50

0.2500 org Pekerja @ Rp. 44,750.00 11,187.50

0.0125 org Mandor @ Rp. 89,750.00 1,121.88

JUMLAH ( BELUM PPN ) 48,171.88 36,049.50 84,221.38

JASA 10 % 4,817.19 3,604.95 8,422.14

JUMLAH 52,989.06 39,654.45 92,643.51

DIBULATKAN 52,989.00 39,654.00 92,643.00

m2

m2

m3

m3

m2

m2

m3

m2

m2

m3

m2

m2

m3

Page 30: Bill of Quantity

Analisa Gedung - 30

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

AK 1.0000 Pasang tegel keramik 20/20 berglasir

1.0000 Tegel keramik 20/20 @ Rp. 32,000.00 32,000.00

4.0800 kg PC @ Rp. 1,025.00 4,182.00

0.0090 Pasir pasang @ Rp. 120,000.00 1,080.00

0.6000 kg Semen putih @ Rp. 1,312.50 787.50

0.5000 org Tukang batu @ Rp. 64,750.00 32,375.00

0.0500 org Kep. Tk. Batu @ Rp. 69,750.00 3,487.50

0.2500 org Pekerja @ Rp. 44,750.00 11,187.50

0.0125 org Mandor @ Rp. 89,750.00 1,121.88

JUMLAH ( BELUM PPN ) 48,171.88 38,049.50 86,221.38

JASA 10 % 4,817.19 3,804.95 8,622.14

JUMLAH 52,989.06 41,854.45 94,843.51

DIBULATKAN 52,989.00 41,854.00 94,843.00

AK 1.0000 Pasang tegel keramik 30/30 berglasir

1.0000 Tegel keramik 30/30 @ Rp. 32,500.00 32,500.00

4.0800 kg PC @ Rp. 1,025.00 4,182.00

0.0090 Pasir pasang @ Rp. 120,000.00 1,080.00

0.6000 kg Semen putih @ Rp. 1,312.50 787.50

0.5000 org Tukang batu @ Rp. 64,750.00 32,375.00

0.0500 org Kep. Tk. Batu @ Rp. 69,750.00 3,487.50

0.2500 org Pekerja @ Rp. 44,750.00 11,187.50

0.0125 org Mandor @ Rp. 89,750.00 1,121.88

JUMLAH ( BELUM PPN ) 48,171.88 38,549.50 86,721.38

JASA 10 % 4,817.19 3,854.95 8,672.14

JUMLAH 52,989.06 42,404.45 95,393.51

DIBULATKAN 52,989.00 42,404.00 95,393.00

SNI 1.0000 Pasang plint keramik ukuran 10 x 40 cm

6.24 0.2300 Keramik 40/40 @ Rp. 40,000.00 9,200.00

1.2000 kg PC @ Rp. 1,025.00 1,230.00

0.0030 Pasir pasang @ Rp. 120,000.00 360.00

0.1000 kg Semen warna @ Rp. 6,000.00 600.00

0.0300 org Tukang batu @ Rp. 64,750.00 1,942.50

0.0030 org Kepala tukang batu @ Rp. 69,750.00 209.25

0.0600 org Pekerja @ Rp. 44,750.00 2,685.00

0.0030 org Mandor @ Rp. 89,750.00 269.25

JUMLAH ( BELUM TERMASUK PPN ) 5,106.00 11,390.00 16,496.00

JASA 10 % 510.60 1,139.00 1,649.60

JUMLAH 5,616.60 12,529.00 18,145.60

DIBULATKAN 5,616.00 12,529.00 18,145.00

m2

m2

m3

m2

m2

m3

m1

m2

m3

Page 31: Bill of Quantity

Analisa Gedung - 31

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasang plint keramik ukuran 10 x 30 cm

6.25 0.1800 Keramik 30/30 @ Rp. 32,500.00 5,850.00

1.6500 kg PC @ Rp. 1,025.00 1,691.25

0.0032 Pasir pasang @ Rp. 120,000.00 384.00

0.1000 kg Semen warna @ Rp. 6,000.00 600.00

0.0300 org Tukang batu @ Rp. 64,750.00 1,942.50

0.0030 org Kepala tukang batu @ Rp. 69,750.00 209.25

0.0600 org Pekerja @ Rp. 44,750.00 2,685.00

0.0030 org Mandor @ Rp. 89,750.00 269.25

JUMLAH ( BELUM TERMASUK PPN ) 5,106.00 8,525.25 13,631.25

JASA 10 % 510.60 852.53 1,363.13

JUMLAH 5,616.60 9,377.78 14,994.38

DIBULATKAN 5,616.00 9,377.00 14,994.00

1.0000 Pasang keramik stepnosing granito 5/30

3.6000 bh Stepnosing granito @ Rp. 9,350.00 33,660.00

0.4080 kg PC @ Rp. 1,025.00 418.20

0.0009 Pasir @ Rp. 120,000.00 108.00

0.0600 kg Semen putih @ Rp. 1,312.50 78.75

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Batu @ Rp. 69,750.00 697.50

0.0500 org Pekerja @ Rp. 44,750.00 2,237.50

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 9,634.38 34,264.95 43,899.33

JASA 10 % 963.44 3,426.50 4,389.93

JUMLAH 10,597.81 37,691.45 48,289.26

DIBULATKAN 10,597.00 37,691.00 48,289.00

1.0000 Pasang list keramik dinding 5/20

5.0000 bh List keramik dinding motif @ Rp. 5,000.00 25,000.00

0.4080 kg PC @ Rp. 1,025.00 418.20

0.0009 Pasir @ Rp. 120,000.00 108.00

0.0600 kg Semen putih @ Rp. 1,312.50 78.75

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Batu @ Rp. 69,750.00 697.50

0.0500 org Pekerja @ Rp. 44,750.00 2,237.50

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 9,634.38 25,604.95 35,239.33

JASA 10 % 963.44 2,560.50 3,523.93

JUMLAH 10,597.81 28,165.45 38,763.26

DIBULATKAN 10,597.00 28,165.00 38,763.00

1.0000 Pasang keramik dinding 20/25

1.0000 Tegel keramik 20/25 @ Rp. 37,500.00 37,500.00

9.3000 kg PC @ Rp. 1,025.00 9,532.50

0.0180 Pasir pasang @ Rp. 120,000.00 2,160.00

1.5000 kg Semen putih @ Rp. 1,312.50 1,968.75

0.6500 org Tukang batu @ Rp. 64,750.00 42,087.50

0.0650 org Kep. Tk. Batu @ Rp. 69,750.00 4,533.75

0.3200 org Pekerja @ Rp. 44,750.00 14,320.00

0.0160 org Mandor @ Rp. 89,750.00 1,436.00

JUMLAH ( BELUM PPN ) 62,377.25 51,161.25 113,538.50

JASA 10 % 6,237.73 5,116.13 11,353.85

JUMLAH 68,614.98 56,277.38 124,892.35

DIBULATKAN 68,614.00 56,277.00 124,892.00

m1

m2

m3

m1

m3

m1

m3

m2

m2

m3

Page 32: Bill of Quantity

Analisa Gedung - 32

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

PEKERJAAN CONBLOCK

AK 1.0000 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200

1.0000 Conblock @ Rp. 38,250.00 38,250.00

0.0500 Pasir urug @ Rp. 55,000.00 2,750.00

0.2500 org Tukang batu @ Rp. 64,750.00 16,187.50

0.0250 org Kep. Tk. Batu @ Rp. 69,750.00 1,743.75

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 42,550.00 41,000.00 83,550.00

JASA 10 % 4,255.00 4,100.00 8,355.00

JUMLAH 46,805.00 45,100.00 91,905.00

DIBULATKAN 46,805.00 45,100.00 91,905.00

AK 1.0000 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200

1.0000 Conblock @ Rp. 46,700.00 46,700.00

0.0500 Pasir urug @ Rp. 55,000.00 2,750.00

0.2500 org Tukang batu @ Rp. 64,750.00 16,187.50

0.0250 org Kep. Tk. Batu @ Rp. 69,750.00 1,743.75

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 42,550.00 49,450.00 92,000.00

JASA 10 % 4,255.00 4,945.00 9,200.00

JUMLAH 46,805.00 54,395.00 101,200.00

DIBULATKAN 46,805.00 54,395.00 101,200.00

AK 1.0000 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200

1.0000 Conblock @ Rp. 38,100.00 38,100.00

0.0500 Pasir urug @ Rp. 55,000.00 2,750.00

0.2500 org Tukang batu @ Rp. 64,750.00 16,187.50

0.0250 org Kep. Tk. Batu @ Rp. 69,750.00 1,743.75

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 42,550.00 40,850.00 83,400.00

JASA 10 % 4,255.00 4,085.00 8,340.00

JUMLAH 46,805.00 44,935.00 91,740.00

DIBULATKAN 46,805.00 44,935.00 91,740.00

AK 1.0000 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200

1.0000 Conblock @ Rp. 46,700.00 46,700.00

0.0500 Pasir urug @ Rp. 55,000.00 2,750.00

0.2500 org Tukang batu @ Rp. 64,750.00 16,187.50

0.0250 org Kep. Tk. Batu @ Rp. 69,750.00 1,743.75

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 42,550.00 49,450.00 92,000.00

JASA 10 % 4,255.00 4,945.00 9,200.00

JUMLAH 46,805.00 54,395.00 101,200.00

DIBULATKAN 46,805.00 54,395.00 101,200.00

m2

m2

m3

m2

m2

m3

m2

m2

m3

m2

m2

m3

Page 33: Bill of Quantity

Analisa Gedung - 33

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

AK 1.0000 Pasang conblock tipe segi-empat warna 6 cm, K-200

1.0000 Conblock @ Rp. 43,500.00 43,500.00

0.0500 Pasir urug @ Rp. 55,000.00 2,750.00

0.2500 org Tukang batu @ Rp. 64,750.00 16,187.50

0.0250 org Kep. Tk. Batu @ Rp. 69,750.00 1,743.75

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 42,550.00 46,250.00 88,800.00

JASA 10 % 4,255.00 4,625.00 8,880.00

JUMLAH 46,805.00 50,875.00 97,680.00

DIBULATKAN 46,805.00 50,875.00 97,680.00

AK 1.0000 Pasang conblock tipe segi-empat warna 8 cm, K-200

1.0000 Conblock @ Rp. 52,000.00 52,000.00

0.0500 Pasir urug @ Rp. 55,000.00 2,750.00

0.2500 org Tukang batu @ Rp. 64,750.00 16,187.50

0.0250 org Kep. Tk. Batu @ Rp. 69,750.00 1,743.75

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 42,550.00 54,750.00 97,300.00

JASA 10 % 4,255.00 5,475.00 9,730.00

JUMLAH 46,805.00 60,225.00 107,030.00

DIBULATKAN 46,805.00 60,225.00 107,030.00

AK 1.0000 Pasang conblock tipe segi-enam warna 6 cm, K-200

1.0000 Conblock @ Rp. 43,500.00 43,500.00

0.0500 Pasir urug @ Rp. 55,000.00 2,750.00

0.2500 org Tukang batu @ Rp. 64,750.00 16,187.50

0.0250 org Kep. Tk. Batu @ Rp. 69,750.00 1,743.75

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 42,550.00 46,250.00 88,800.00

JASA 10 % 4,255.00 4,625.00 8,880.00

JUMLAH 46,805.00 50,875.00 97,680.00

DIBULATKAN 46,805.00 50,875.00 97,680.00

AK 1.0000 Pasang conblock tipe segi-enam warna 8 cm, K-200

1.0000 Conblock @ Rp. 52,000.00 52,000.00

0.0500 Pasir urug @ Rp. 55,000.00 2,750.00

0.2500 org Tukang batu @ Rp. 64,750.00 16,187.50

0.0250 org Kep. Tk. Batu @ Rp. 69,750.00 1,743.75

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 42,550.00 54,750.00 97,300.00

JASA 10 % 4,255.00 5,475.00 9,730.00

JUMLAH 46,805.00 60,225.00 107,030.00

DIBULATKAN 46,805.00 60,225.00 107,030.00

1.0000 Pasang grassblock bulat tebal 10 cm

1.0000 Grassblock @ Rp. 41,400.00 41,400.00

0.0500 Pasir urug @ Rp. 55,000.00 2,750.00

0.2500 org Tukang batu @ Rp. 64,750.00 16,187.50

0.0250 org Kep. Tk. Batu @ Rp. 69,750.00 1,743.75

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 42,550.00 44,150.00 86,700.00

JASA 10 % 4,255.00 4,415.00 8,670.00

JUMLAH 46,805.00 48,565.00 95,370.00

DIBULATKAN 46,805.00 48,565.00 95,370.00

m2

m2

m3

m2

m2

m3

m2

m2

m3

m2

m2

m3

m2

m2

m3

Page 34: Bill of Quantity

Analisa Gedung - 34

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

1.0000 Pasang grassblock tebal 10 cm

1.0000 Grassblock @ Rp. 41,400.00 41,400.00

0.0500 Pasir urug @ Rp. 55,000.00 2,750.00

0.2500 org Tukang batu @ Rp. 64,750.00 16,187.50

0.0250 org Kep. Tk. Batu @ Rp. 69,750.00 1,743.75

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0250 org Mandor @ Rp. 89,750.00 2,243.75

JUMLAH ( BELUM PPN ) 42,550.00 44,150.00 86,700.00

JASA 10 % 4,255.00 4,415.00 8,670.00

JUMLAH 46,805.00 48,565.00 95,370.00

DIBULATKAN 46,805.00 48,565.00 95,370.00

AK 1.0000 bh Pasang buis beton dia. 80 cm

1.0000 bh Buis beton @ Rp. 32,000.00 32,000.00

0.1250 org Tukang batu @ Rp. 64,750.00 8,093.75

0.0125 org Kep. Tk. Batu @ Rp. 69,750.00 871.88

0.2500 org Pekerja @ Rp. 44,750.00 11,187.50

JUMLAH ( BELUM PPN ) 20,153.13 32,000.00 52,153.13

JASA 10 % 2,015.31 3,200.00 5,215.31

JUMLAH 22,168.44 35,200.00 57,368.44

DIBULATKAN 22,168.00 35,200.00 57,368.00

PEKERJAAN RANGKA ATAP

SNI 1.0000 Membuat kuda-kuda kayu kamper

6.28 1.1000 Kayu kamper @ Rp. 4,750,000.00 5,225,000.00

03-3434-2002 15.0000 kg Besi strip @ Rp. 11,500.00 172,500.00

0.8000 kg Paku biasa 2" - 5" @ Rp. 17,000.00 13,600.00

12.0000 org Tukang kayu @ Rp. 64,750.00 777,000.00

1.2000 org Kepala tukang kayu @ Rp. 69,750.00 83,700.00

4.0000 org Pekerja @ Rp. 44,750.00 179,000.00

0.2000 org Mandor @ Rp. 89,750.00 17,950.00

JUMLAH ( BELUM PPN ) 1,057,650.00 5,411,100.00 6,468,750.00

JASA 10 % 105,765.00 541,110.00 646,875.00

JUMLAH 1,163,415.00 5,952,210.00 7,115,625.00

DIBULATKAN 1,163,415.00 5,952,210.00 7,115,625.00

SNI 1.0000 Membuat kuda-kuda kayu kruing

6.30 1.1000 Kayu kruing @ Rp. 4,350,000.00 4,785,000.00

03-3434-2002 15.0000 kg Besi strip @ Rp. 11,500.00 172,500.00

0.8000 kg Paku biasa 2" - 5" @ Rp. 17,000.00 13,600.00

12.0000 org Tukang kayu @ Rp. 64,750.00 777,000.00

1.2000 org Kepala tukang kayu @ Rp. 69,750.00 83,700.00

4.0000 org Pekerja @ Rp. 44,750.00 179,000.00

0.2000 org Mandor @ Rp. 89,750.00 17,950.00

JUMLAH ( BELUM PPN ) 1,057,650.00 4,971,100.00 6,028,750.00

JASA 10 % 105,765.00 497,110.00 602,875.00

JUMLAH 1,163,415.00 5,468,210.00 6,631,625.00

DIBULATKAN 1,163,415.00 5,468,210.00 6,631,625.00

SNI 1.0000 Membuat kuda-kuda kayu bengkirai

1.1000 Kayu bengkirai @ Rp. 5,750,000.00 6,325,000.00

03-3434-2002 15.0000 kg Besi strip @ Rp. 11,500.00 172,500.00

0.8000 kg Paku biasa 2" - 5" @ Rp. 17,000.00 13,600.00

12.0000 org Tukang kayu @ Rp. 64,750.00 777,000.00

1.2000 org Kepala tukang kayu @ Rp. 69,750.00 83,700.00

4.0000 org Pekerja @ Rp. 44,750.00 179,000.00

0.2000 org Mandor @ Rp. 89,750.00 17,950.00

JUMLAH ( BELUM PPN ) 1,057,650.00 6,511,100.00 7,568,750.00

JASA 10 % 105,765.00 651,110.00 756,875.00

JUMLAH 1,163,415.00 7,162,210.00 8,325,625.00

DIBULATKAN 1,163,415.00 7,162,210.00 8,325,625.00

m2

m2

m3

m3

m3

m3

m3

m3

m3

Page 35: Bill of Quantity

Analisa Gedung - 35

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasang kuda-kuda kayu lama

03-3434-2002 15.0000 kg Besi strip @ Rp. 11,500.00 172,500.00

0.8000 kg Paku biasa 2" - 5" @ Rp. 17,000.00 13,600.00

12.0000 org Tukang kayu @ Rp. 64,750.00 777,000.00

1.2000 org Kepala tukang kayu @ Rp. 69,750.00 83,700.00

4.0000 org Pekerja @ Rp. 44,750.00 179,000.00

0.2000 org Mandor @ Rp. 89,750.00 17,950.00

JUMLAH ( BELUM PPN ) 1,057,650.00 186,100.00 1,243,750.00

JASA 10 % 105,765.00 18,610.00 124,375.00

JUMLAH 1,163,415.00 204,710.00 1,368,125.00

DIBULATKAN 1,163,415.00 204,710.00 1,368,125.00

SNI 1.0000 Pasang Nook,Goording dan Jurai kayu bengkirai

1.1000 Kayu bengkirai @ Rp. 5,750,000.00 6,325,000.00

0.8000 kg Paku biasa 2" - 5" @ Rp. 17,000.00 13,600.00

12.0000 org Tukang kayu @ Rp. 64,750.00 777,000.00

1.2000 org Kepala tukang kayu @ Rp. 69,750.00 83,700.00

4.0000 org Pekerja @ Rp. 44,750.00 179,000.00

0.2000 org Mandor @ Rp. 89,750.00 17,950.00

JUMLAH ( BELUM PPN ) 1,057,650.00 6,338,600.00 7,396,250.00

JASA 10 % 105,765.00 633,860.00 739,625.00

JUMLAH 1,163,415.00 6,972,460.00 8,135,875.00

DIBULATKAN 1,163,415.00 6,972,460.00 8,135,875.00

SNI 1.0000 Pasang Goording Lama

0.8000 kg Paku biasa 2" - 5" @ Rp. 17,000.00 13,600.00

12.0000 org Tukang kayu @ Rp. 64,750.00 777,000.00

1.2000 org Kepala tukang kayu @ Rp. 69,750.00 83,700.00

4.0000 org Pekerja @ Rp. 44,750.00 179,000.00

0.2000 org Mandor @ Rp. 89,750.00 17,950.00

JUMLAH ( BELUM PPN ) 1,057,650.00 13,600.00 1,071,250.00

JASA 10 % 105,765.00 1,360.00 107,125.00

JUMLAH 1,163,415.00 14,960.00 1,178,375.00

DIBULATKAN 1,163,415.00 14,960.00 1,178,375.00

F.16 1.0000 Pasang usuk 5/7, reng 2/3 lama

0.1500 kg Paku usuk @ Rp. 17,000.00 2,550.00

0.1000 kg Paku reng @ Rp. 17,000.00 1,700.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 11,871.88 4,250.00 16,121.88

JASA 10 % 1,187.19 425.00 1,612.19

JUMLAH 13,059.06 4,675.00 17,734.06

DIBULATKAN 13,059.00 4,675.00 17,734.00

F.16 1.0000 Pasang usuk 5/7, reng 2/3 kayu jati

2.2000 Usuk kayu jati 5/7 @ Rp. 70,000.00 154,000.00

5.0000 Reng jati 2/3 @ Rp. 12,000.00 60,000.00

0.1500 kg Paku usuk @ Rp. 17,000.00 2,550.00

0.1000 kg Paku reng @ Rp. 17,000.00 1,700.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 11,871.88 218,250.00 230,121.88

JASA 10 % 1,187.19 21,825.00 23,012.19

JUMLAH 13,059.06 240,075.00 253,134.06

DIBULATKAN 13,059.00 240,075.00 253,134.00

m3

m3

m3

m3

m2

m2

m1

m1

Page 36: Bill of Quantity

Analisa Gedung - 36

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

AK 1.0000 Pasang usuk 5/7 kayu jati, reng 2/3 kayu bengkirai

2.2000 Usuk kayu jati 5/7 @ Rp. 70,000.00 154,000.00

5.0000 Reng kayu bengkirai 2/3 @ Rp. 3,450.00 17,250.00

0.1500 kg Paku usuk @ Rp. 17,000.00 2,550.00

0.1000 kg Paku reng @ Rp. 17,000.00 1,700.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 11,871.88 175,500.00 187,371.88

JASA 10 % 1,187.19 17,550.00 18,737.19

JUMLAH 13,059.06 193,050.00 206,109.06

DIBULATKAN 13,059.00 193,050.00 206,109.00

AK 1.0000 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati

2.2000 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00

5.0000 Reng jati 2/3 @ Rp. 12,000.00 60,000.00

0.1500 kg Paku usuk @ Rp. 17,000.00 2,550.00

0.1000 kg Paku reng @ Rp. 17,000.00 1,700.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 11,871.88 108,525.00 120,396.88

JASA 10 % 1,187.19 10,852.50 12,039.69

JUMLAH 13,059.06 119,377.50 132,436.56

DIBULATKAN 13,059.00 119,377.00 132,436.00

AK 1.0000 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu bengkirai

2.2000 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00

5.0000 Reng kayu bengkirai 2/3 @ Rp. 3,450.00 17,250.00

0.1500 kg Paku usuk @ Rp. 17,000.00 2,550.00

0.1000 kg Paku reng @ Rp. 17,000.00 1,700.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 11,871.88 65,775.00 77,646.88

JASA 10 % 1,187.19 6,577.50 7,764.69

JUMLAH 13,059.06 72,352.50 85,411.56

DIBULATKAN 13,059.00 72,352.00 85,411.00

m2

m1

m1

m2

m1

m1

m2

m1

m1

Page 37: Bill of Quantity

Analisa Gedung - 37

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

F.16 1.0000 Pasang usuk 5/7, reng 3/4 kayu jati

2.2000 Usuk kayu jati 5/7 @ Rp. 70,000.00 154,000.00

4.0000 Reng jati 3/4 @ Rp. 24,000.00 96,000.00

0.1500 kg Paku usuk @ Rp. 17,000.00 2,550.00

0.1000 kg Paku reng @ Rp. 17,000.00 1,700.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 11,871.88 254,250.00 266,121.88

JASA 10 % 1,187.19 25,425.00 26,612.19

JUMLAH 13,059.06 279,675.00 292,734.06

DIBULATKAN 13,059.00 279,675.00 292,734.00

AK 1.0000 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati lokal

2.2000 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00

4.0000 Reng kayu jati 3/4 lokal @ Rp. 9,600.00 38,400.00

0.1500 kg Paku usuk @ Rp. 17,000.00 2,550.00

0.1000 kg Paku reng @ Rp. 17,000.00 1,700.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 11,871.88 86,925.00 98,796.88

JASA 10 % 1,187.19 8,692.50 9,879.69

JUMLAH 13,059.06 95,617.50 108,676.56

DIBULATKAN 13,059.00 95,617.00 108,676.00

AK 1.0000 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu bengkirai

2.2000 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00

4.0000 Reng kayu bengkirai 3/4 @ Rp. 6,900.00 27,600.00

0.1500 kg Paku usuk @ Rp. 17,000.00 2,550.00

0.1000 kg Paku reng @ Rp. 17,000.00 1,700.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 11,871.88 76,125.00 87,996.88

JASA 10 % 1,187.19 7,612.50 8,799.69

JUMLAH 13,059.06 83,737.50 96,796.56

DIBULATKAN 13,059.00 83,737.00 96,796.00

PEKERJAAN PINTU DAN JENDELA SNI 1.0000 Membuat kusen pintu / jendela kayu jati (klas plitur)

6.1 1.1000 Kayu jati (klas plitur) @ Rp. 20,000,000.00 22,000,000.00

03-3434-2002 20.0000 org Tukang kayu @ Rp. 64,750.00 1,295,000.00

2.0000 org Kepala tukang kayu @ Rp. 69,750.00 139,500.00

6.0000 org Pekerja @ Rp. 44,750.00 268,500.00

0.3000 org Mandor @ Rp. 89,750.00 26,925.00

JUMLAH ( BELUM PPN ) 1,729,925.00 22,000,000.00 23,729,925.00

JASA 10 % 172,992.50 2,200,000.00 2,372,992.50

JUMLAH 1,902,917.50 24,200,000.00 26,102,917.50

DIBULATKAN 1,902,917.00 24,200,000.00 26,102,917.00

SNI 1.0000 Membuat kusen pintu / jendela kayu jati (lokal)

6.1 1.1000 Kayu jati (lokal) @ Rp. 8,000,000.00 8,800,000.00

03-3434-2002 20.0000 org Tukang kayu @ Rp. 64,750.00 1,295,000.00

2.0000 org Kepala tukang kayu @ Rp. 69,750.00 139,500.00

6.0000 org Pekerja @ Rp. 44,750.00 268,500.00

0.3000 org Mandor @ Rp. 89,750.00 26,925.00

JUMLAH ( BELUM PPN ) 1,729,925.00 8,800,000.00 10,529,925.00

JASA 10 % 172,992.50 880,000.00 1,052,992.50

JUMLAH 1,902,917.50 9,680,000.00 11,582,917.50

DIBULATKAN 1,902,917.00 9,680,000.00 11,582,917.00

m2

m1

m1

m2

m1

m1

m2

m1

m1

m3

m3

m3

m3

Page 38: Bill of Quantity

Analisa Gedung - 38

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Membuat kusen pintu / jendela kayu kamper

6.2 1.2000 Kayu kamper @ Rp. 4,750,000.00 5,700,000.00

03-3434-2002 18.0000 org Tukang kayu @ Rp. 64,750.00 1,165,500.00

2.0000 org Kepala tukang kayu @ Rp. 69,750.00 139,500.00

6.0000 org Pekerja @ Rp. 44,750.00 268,500.00

0.3000 org Mandor @ Rp. 89,750.00 26,925.00

JUMLAH ( BELUM PPN ) 1,600,425.00 5,700,000.00 7,300,425.00

JASA 10 % 160,042.50 570,000.00 730,042.50

JUMLAH 1,760,467.50 6,270,000.00 8,030,467.50

DIBULATKAN 1,760,467.00 6,270,000.00 8,030,467.00

SNI 1.0000 Membuat kusen pintu / jendela kayu kruing

1.2000 Kayu kruing @ Rp. 4,350,000.00 5,220,000.00

03-3434-2002 18.0000 org Tukang kayu @ Rp. 64,750.00 1,165,500.00

2.0000 org Kepala tukang kayu @ Rp. 69,750.00 139,500.00

6.0000 org Pekerja @ Rp. 44,750.00 268,500.00

0.3000 org Mandor @ Rp. 89,750.00 26,925.00

JUMLAH ( BELUM PPN ) 1,600,425.00 5,220,000.00 6,820,425.00

JASA 10 % 160,042.50 522,000.00 682,042.50

JUMLAH 1,760,467.50 5,742,000.00 7,502,467.50

DIBULATKAN 1,760,467.00 5,742,000.00 7,502,467.00

SNI 1.0000 Membuat kusen pintu / jendela kayu bengkirai

1.2000 Kayu bengkirai @ Rp. 5,750,000.00 6,900,000.00

03-3434-2002 18.0000 org Tukang kayu @ Rp. 64,750.00 1,165,500.00

2.0000 org Kepala tukang kayu @ Rp. 69,750.00 139,500.00

6.0000 org Pekerja @ Rp. 44,750.00 268,500.00

0.3000 org Mandor @ Rp. 89,750.00 26,925.00

JUMLAH ( BELUM PPN ) 1,600,425.00 6,900,000.00 8,500,425.00

JASA 10 % 160,042.50 690,000.00 850,042.50

JUMLAH 1,760,467.50 7,590,000.00 9,350,467.50

DIBULATKAN 1,760,467.00 7,590,000.00 9,350,467.00

SNI 1.0000 Pasang pintu teakwood rangkap, rangka kayu jati

6.19 0.0196 Papan kayu jati @ Rp. 22,000,000.00 431,200.00

03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 17,000.00 510.00

0.3000 kg Lem kayu @ Rp. 11,000.00 3,300.00

1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00 69,500.00

2.0000 org Tukang kayu @ Rp. 64,750.00 129,500.00

0.2000 org Kepala tukang kayu @ Rp. 69,750.00 13,950.00

0.6000 org Pekerja @ Rp. 44,750.00 26,850.00

0.0300 org Mandor @ Rp. 89,750.00 2,692.50

JUMLAH ( BELUM PPN ) 172,992.50 504,510.00 677,502.50

JASA 10 % 17,299.25 50,451.00 67,750.25

JUMLAH 190,291.75 554,961.00 745,252.75

DIBULATKAN 190,291.00 554,961.00 745,252.00

SNI 1.0000 Pasang pintu teakwood rangkap, rangka kayu jati lokal

6.19 0.0196 Papan kayu jati lokal @ Rp. 8,200,000.00 160,720.00

03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 17,000.00 510.00

0.3000 kg Lem kayu @ Rp. 11,000.00 3,300.00

1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00 69,500.00

2.0000 org Tukang kayu @ Rp. 64,750.00 129,500.00

0.2000 org Kepala tukang kayu @ Rp. 69,750.00 13,950.00

0.6000 org Pekerja @ Rp. 44,750.00 26,850.00

0.0300 org Mandor @ Rp. 89,750.00 2,692.50

JUMLAH ( BELUM PPN ) 172,992.50 234,030.00 407,022.50

JASA 10 % 17,299.25 23,403.00 40,702.25

JUMLAH 190,291.75 257,433.00 447,724.75

DIBULATKAN 190,291.00 257,433.00 447,724.00

m3

m3

m3

m3

m3

m3

m2

m3

m2

m3

Page 39: Bill of Quantity

Analisa Gedung - 39

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasang pintu teakwood rangkap, rangka kayu kamper

6.20 0.0196 Papan kayu kamper @ Rp. 5,500,000.00 107,800.00

03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 17,000.00 510.00

0.3000 kg Lem kayu @ Rp. 11,000.00 3,300.00

1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00 69,500.00

2.0000 org Tukang kayu @ Rp. 64,750.00 129,500.00

0.2000 org Kepala tukang kayu @ Rp. 69,750.00 13,950.00

0.6000 org Pekerja @ Rp. 44,750.00 26,850.00

0.0300 org Mandor @ Rp. 89,750.00 2,692.50

JUMLAH ( BELUM PPN ) 172,992.50 181,110.00 354,102.50

JASA 10 % 17,299.25 18,111.00 35,410.25

JUMLAH 190,291.75 199,221.00 389,512.75

DIBULATKAN 190,291.00 199,221.00 389,512.00

SNI 1.0000 Pasang pintu teakwood rangkap, rangka kayu kruing

0.0196 Papan kayu kruing @ Rp. 4,750,000.00 93,100.00

03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 17,000.00 510.00

0.3000 kg Lem kayu @ Rp. 11,000.00 3,300.00

1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00 69,500.00

2.0000 org Tukang kayu @ Rp. 64,750.00 129,500.00

0.2000 org Kepala tukang kayu @ Rp. 69,750.00 13,950.00

0.6000 org Pekerja @ Rp. 44,750.00 26,850.00

0.0300 org Mandor @ Rp. 89,750.00 2,692.50

JUMLAH ( BELUM PPN ) 172,992.50 166,410.00 339,402.50

JASA 10 % 17,299.25 16,641.00 33,940.25

JUMLAH 190,291.75 183,051.00 373,342.75

DIBULATKAN 190,291.00 183,051.00 373,342.00

SNI 1.0000 Pasang pintu teakwood rangkap, rangka kayu bengkirai

0.0196 Papan kayu bengkirai @ Rp. 6,000,000.00 117,600.00

03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 17,000.00 510.00

0.3000 kg Lem kayu @ Rp. 11,000.00 3,300.00

1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00 69,500.00

2.0000 org Tukang kayu @ Rp. 64,750.00 129,500.00

0.2000 org Kepala tukang kayu @ Rp. 69,750.00 13,950.00

0.6000 org Pekerja @ Rp. 44,750.00 26,850.00

0.0300 org Mandor @ Rp. 89,750.00 2,692.50

JUMLAH ( BELUM PPN ) 172,992.50 190,910.00 363,902.50

JASA 10 % 17,299.25 19,091.00 36,390.25

JUMLAH 190,291.75 210,001.00 400,292.75

DIBULATKAN 190,291.00 210,001.00 400,292.00

SNI 1.0000 Pasang pintu dan jendela kaca kayu jati

6.9 0.0350 Kayu jati papan @ Rp. 22,000,000.00 770,000.00

03-3434-2002 2.0000 org Tukang kayu @ Rp. 64,750.00 129,500.00

0.2000 org Kepala tukang kayu @ Rp. 69,750.00 13,950.00

0.8000 org Pekerja @ Rp. 44,750.00 35,800.00

0.0400 org Mandor @ Rp. 89,750.00 3,590.00

JUMLAH ( BELUM PPN ) 182,840.00 770,000.00 952,840.00

JASA 10 % 18,284.00 77,000.00 95,284.00

JUMLAH 201,124.00 847,000.00 1,048,124.00

DIBULATKAN 201,124.00 847,000.00 1,048,124.00

SNI 1.0000 Pasang pintu dan jendela kaca kayu jati lokal

6.9 0.0350 Papan kayu jati lokal @ Rp. 8,200,000.00 287,000.00

03-3434-2002 2.0000 org Tukang kayu @ Rp. 64,750.00 129,500.00

0.2000 org Kepala tukang kayu @ Rp. 69,750.00 13,950.00

0.8000 org Pekerja @ Rp. 44,750.00 35,800.00

0.0400 org Mandor @ Rp. 89,750.00 3,590.00

JUMLAH ( BELUM PPN ) 182,840.00 287,000.00 469,840.00

JASA 10 % 18,284.00 28,700.00 46,984.00

JUMLAH 201,124.00 315,700.00 516,824.00

DIBULATKAN 201,124.00 315,700.00 516,824.00

m2

m3

m2

m3

m2

m3

m2

m3

m2

m3

Page 40: Bill of Quantity

Analisa Gedung - 40

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasang pintu dan jendela kaca kayu kamper

610 0.0350 Papan kayu kamper @ Rp. 5,500,000.00 192,500.00

03-3434-2002 2.0000 org Tukang kayu @ Rp. 64,750.00 129,500.00

0.2000 org Kep. Tk. Kayu @ Rp. 69,750.00 13,950.00

0.8000 org Pekerja @ Rp. 44,750.00 35,800.00

0.0400 org Mandor @ Rp. 89,750.00 3,590.00

JUMLAH ( BELUM PPN ) 182,840.00 192,500.00 375,340.00

JASA 10 % 18,284.00 19,250.00 37,534.00

JUMLAH 201,124.00 211,750.00 412,874.00

DIBULATKAN 201,124.00 211,750.00 412,874.00

SNI 1.0000 Pasang pintu dan jendela kaca kayu kruing

0.0350 Papan kayu kruing @ Rp. 4,750,000.00 166,250.00

03-3434-2002 2.0000 org Tukang kayu @ Rp. 64,750.00 129,500.00

0.2000 org Kep. Tk. Kayu @ Rp. 69,750.00 13,950.00

0.8000 org Pekerja @ Rp. 44,750.00 35,800.00

0.0400 org Mandor @ Rp. 89,750.00 3,590.00

JUMLAH ( BELUM PPN ) 182,840.00 166,250.00 349,090.00

JASA 10 % 18,284.00 16,625.00 34,909.00

JUMLAH 201,124.00 182,875.00 383,999.00

DIBULATKAN 201,124.00 182,875.00 383,999.00

SNI 1.0000 Pasang pintu dan jendela kaca kayu bengkirai

0.0350 Papan kayu bengkirai @ Rp. 6,000,000.00 210,000.00

03-3434-2002 2.0000 org Tukang kayu @ Rp. 64,750.00 129,500.00

0.2000 org Kep. Tk. Kayu @ Rp. 69,750.00 13,950.00

0.8000 org Pekerja @ Rp. 44,750.00 35,800.00

0.0400 org Mandor @ Rp. 89,750.00 3,590.00

JUMLAH ( BELUM PPN ) 182,840.00 210,000.00 392,840.00

JASA 10 % 18,284.00 21,000.00 39,284.00

JUMLAH 201,124.00 231,000.00 432,124.00

DIBULATKAN 201,124.00 231,000.00 432,124.00

SNI 1.0000 Mengerjakan daun pintu / jendela panil kayu jati

6.7 0.0400 Kayu jati papan @ Rp. 22,000,000.00 880,000.00

03-3434-2002 2.5000 org Tukang kayu @ Rp. 64,750.00 161,875.00

0.2500 org Kepala tukang kayu @ Rp. 69,750.00 17,437.50

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.0500 org Mandor @ Rp. 89,750.00 4,487.50

JUMLAH ( BELUM PPN ) 228,550.00 880,000.00 1,108,550.00

JASA 10 % 22,855.00 88,000.00 110,855.00

JUMLAH 251,405.00 968,000.00 1,219,405.00

DIBULATKAN 251,405.00 968,000.00 1,219,405.00

SNI 1.0000 Mengerjakan daun pintu / jendela panil kayu jati lokal

6.7 0.0400 Kayu jati papan lokal @ Rp. 8,200,000.00 328,000.00

03-3434-2002 2.5000 org Tukang kayu @ Rp. 64,750.00 161,875.00

0.2500 org Kepala tukang kayu @ Rp. 69,750.00 17,437.50

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.0500 org Mandor @ Rp. 89,750.00 4,487.50

JUMLAH ( BELUM PPN ) 228,550.00 328,000.00 556,550.00

JASA 10 % 22,855.00 32,800.00 55,655.00

JUMLAH 251,405.00 360,800.00 612,205.00

DIBULATKAN 251,405.00 360,800.00 612,205.00

SNI 1.0000 Mengerjakan daun pintu / jendela panil kayu kamper

6.8 0.0400 Kayu kamper papan @ Rp. 5,500,000.00 220,000.00

03-3434-2002 2.5000 org Tukang kayu @ Rp. 64,750.00 161,875.00

0.2500 org Kepala tukang kayu @ Rp. 69,750.00 17,437.50

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.0500 org Mandor @ Rp. 89,750.00 4,487.50

JUMLAH ( BELUM PPN ) 228,550.00 220,000.00 448,550.00

JASA 10 % 22,855.00 22,000.00 44,855.00

JUMLAH 251,405.00 242,000.00 493,405.00

DIBULATKAN 251,405.00 242,000.00 493,405.00

m2

m3

m2

m3

m2

m3

m2

m3

m2

m3

m2

m3

Page 41: Bill of Quantity

Analisa Gedung - 41

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Mengerjakan daun pintu / jendela panil kayu kruing

0.0400 Kayu kruing papan @ Rp. 4,750,000.00 190,000.00

03-3434-2002 2.5000 org Tukang kayu @ Rp. 64,750.00 161,875.00

0.2500 org Kepala tukang kayu @ Rp. 69,750.00 17,437.50

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.0500 org Mandor @ Rp. 89,750.00 4,487.50

JUMLAH ( BELUM PPN ) 228,550.00 190,000.00 418,550.00

JASA 10 % 22,855.00 19,000.00 41,855.00

JUMLAH 251,405.00 209,000.00 460,405.00

DIBULATKAN 251,405.00 209,000.00 460,405.00

SNI 1.0000 Mengerjakan daun pintu / jendela panil kayu bengkirai

0.0400 Kayu bengkirai papan @ Rp. 6,000,000.00 240,000.00

03-3434-2002 2.5000 org Tukang kayu @ Rp. 64,750.00 161,875.00

0.2500 org Kepala tukang kayu @ Rp. 69,750.00 17,437.50

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.0500 org Mandor @ Rp. 89,750.00 4,487.50

JUMLAH ( BELUM PPN ) 228,550.00 240,000.00 468,550.00

JASA 10 % 22,855.00 24,000.00 46,855.00

JUMLAH 251,405.00 264,000.00 515,405.00

DIBULATKAN 251,405.00 264,000.00 515,405.00

SNI 1.0000 Pasang pintu dan jendela jalusi kayu jati

6.12 0.0640 Kayu jati papan @ Rp. 22,000,000.00 1,408,000.00

03-3434-2002 3.0000 org Tukang kayu @ Rp. 64,750.00 194,250.00

0.3000 org Kepala tukang kayu @ Rp. 69,750.00 20,925.00

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.3000 org Mandor @ Rp. 89,750.00 26,925.00

JUMLAH ( BELUM PPN ) 286,850.00 1,408,000.00 1,694,850.00

JASA 10 % 28,685.00 140,800.00 169,485.00

JUMLAH 315,535.00 1,548,800.00 1,864,335.00

DIBULATKAN 315,535.00 1,548,800.00 1,864,335.00

SNI 1.0000 Pasang pintu dan jendela jalusi kayu jati

6.12 0.0640 Kayu jati papan lokal @ Rp. 8,200,000.00 524,800.00

03-3434-2002 3.0000 org Tukang kayu @ Rp. 64,750.00 194,250.00

0.3000 org Kepala tukang kayu @ Rp. 69,750.00 20,925.00

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.3000 org Mandor @ Rp. 89,750.00 26,925.00

JUMLAH ( BELUM PPN ) 286,850.00 524,800.00 811,650.00

JASA 10 % 28,685.00 52,480.00 81,165.00

JUMLAH 315,535.00 577,280.00 892,815.00

DIBULATKAN 315,535.00 577,280.00 892,815.00

SNI 1.0000 Pasang pintu dan jendela jalusi kayu kamper

6.13 0.0640 Kayu kamper papan @ Rp. 5,500,000.00 352,000.00

03-3434-2002 3.0000 org Tukang kayu @ Rp. 64,750.00 194,250.00

0.3000 org Kepala tukang kayu @ Rp. 69,750.00 20,925.00

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.0500 org Mandor @ Rp. 89,750.00 4,487.50

JUMLAH ( BELUM PPN ) 264,412.50 352,000.00 616,412.50

JASA 10 % 26,441.25 35,200.00 61,641.25

JUMLAH 290,853.75 387,200.00 678,053.75

DIBULATKAN 290,853.00 387,200.00 678,053.00

SNI 1.0000 Pasang pintu dan jendela jalusi kayu kruing

0.0640 Kayu kruing papan @ Rp. 4,750,000.00 304,000.00

03-3434-2002 3.0000 org Tukang kayu @ Rp. 64,750.00 194,250.00

0.3000 org Kepala tukang kayu @ Rp. 69,750.00 20,925.00

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.0500 org Mandor @ Rp. 89,750.00 4,487.50

JUMLAH ( BELUM PPN ) 264,412.50 304,000.00 568,412.50

JASA 10 % 26,441.25 30,400.00 56,841.25

JUMLAH 290,853.75 334,400.00 625,253.75

DIBULATKAN 290,853.00 334,400.00 625,253.00

m2

m3

m2

m3

m2

m3

m2

m3

m2

m3

m2

m3

Page 42: Bill of Quantity

Analisa Gedung - 42

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasang pintu dan jendela jalusi kayu bengkirai

0.0640 Kayu bengkirai papan @ Rp. 6,000,000.00 384,000.00

03-3434-2002 3.0000 org Tukang kayu @ Rp. 64,750.00 194,250.00

0.3000 org Kepala tukang kayu @ Rp. 69,750.00 20,925.00

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.0500 org Mandor @ Rp. 89,750.00 4,487.50

JUMLAH ( BELUM PPN ) 264,412.50 384,000.00 648,412.50

JASA 10 % 26,441.25 38,400.00 64,841.25

JUMLAH 290,853.75 422,400.00 713,253.75

DIBULATKAN 290,853.00 422,400.00 713,253.00

PEKERJAAN PLAFOND SNI 1.0000 Pasang rangka langit-langit (1,00 x 1,00) m, kayu lama

03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,700.00

0.2500 org Tukang kayu @ Rp. 64,750.00 16,187.50

0.0250 org Kepala tukang kayu @ Rp. 69,750.00 1,743.75

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0075 org Mandor @ Rp. 89,750.00 673.13

JUMLAH ( BELUM PPN ) 25,316.88 1,700.00 27,016.88

JASA 10 % 2,531.69 170.00 2,701.69

JUMLAH 27,848.56 1,870.00 29,718.56

DIBULATKAN 27,848.00 1,870.00 29,718.00

SNI 1.0000 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kamper

6.39 0.0120 Kayu kamper balok @ Rp. 4,750,000.00 57,000.00

03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,700.00

0.2500 org Tukang kayu @ Rp. 64,750.00 16,187.50

0.0250 org Kepala tukang kayu @ Rp. 69,750.00 1,743.75

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0075 org Mandor @ Rp. 89,750.00 673.13

JUMLAH ( BELUM PPN ) 25,316.88 58,700.00 84,016.88

JASA 10 % 2,531.69 5,870.00 8,401.69

JUMLAH 27,848.56 64,570.00 92,418.56

DIBULATKAN 27,848.00 64,570.00 92,418.00

SNI 1.0000 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kruing

0.0120 Kayu kruing @ Rp. 4,350,000.00 52,200.00

03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,700.00

0.2500 org Tukang kayu @ Rp. 64,750.00 16,187.50

0.0250 org Kepala tukang kayu @ Rp. 69,750.00 1,743.75

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0075 org Mandor @ Rp. 89,750.00 673.13

JUMLAH ( BELUM PPN ) 25,316.88 53,900.00 79,216.88

JASA 10 % 2,531.69 5,390.00 7,921.69

JUMLAH 27,848.56 59,290.00 87,138.56

DIBULATKAN 27,848.00 59,290.00 87,138.00

SNI 1.0000 Pasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai

0.0120 Kayu bengkirai @ Rp. 5,750,000.00 69,000.00

03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,700.00

0.2500 org Tukang kayu @ Rp. 64,750.00 16,187.50

0.0250 org Kepala tukang kayu @ Rp. 69,750.00 1,743.75

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0075 org Mandor @ Rp. 89,750.00 673.13

JUMLAH ( BELUM PPN ) 25,316.88 70,700.00 96,016.88

JASA 10 % 2,531.69 7,070.00 9,601.69

JUMLAH 27,848.56 77,770.00 105,618.56

DIBULATKAN 27,848.00 77,770.00 105,618.00

1.0000 Pasang rangka langit-langit (60 x 120) m, kayu kamper

0.0130 Kayu kamper @ Rp. 4,750,000.00 61,750.00

0.1200 kg Paku @ Rp. 17,000.00 2,040.00

0.2700 org Tukang kayu @ Rp. 64,750.00 17,482.50

0.0270 org Kepala tukang kayu @ Rp. 69,750.00 1,883.25

0.1700 org Pekerja @ Rp. 44,750.00 7,607.50

0.0085 org Mandor @ Rp. 89,750.00 762.88

JUMLAH ( BELUM PPN ) 27,736.13 63,790.00 91,526.13

JASA 10 % 2,773.61 6,379.00 9,152.61

JUMLAH 30,509.74 70,169.00 100,678.74

DIBULATKAN 30,509.00 70,169.00 100,678.00

m2

m3

m2

m2

m3

m2

m3

m2

m3

m2

m3

Page 43: Bill of Quantity

Analisa Gedung - 43

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

1.0000 Pasang rangka langit-langit (60 x 120) m, kayu kruing

0.0130 Kayu kruing @ Rp. 4,350,000.00 56,550.00

0.1200 kg Paku @ Rp. 17,000.00 2,040.00

0.2700 org Tukang kayu @ Rp. 64,750.00 17,482.50

0.0270 org Kepala tukang kayu @ Rp. 69,750.00 1,883.25

0.1700 org Pekerja @ Rp. 44,750.00 7,607.50

0.0085 org Mandor @ Rp. 89,750.00 762.88

JUMLAH ( BELUM PPN ) 27,736.13 58,590.00 86,326.13

JASA 10 % 2,773.61 5,859.00 8,632.61

JUMLAH 30,509.74 64,449.00 94,958.74

DIBULATKAN 30,509.00 64,449.00 94,958.00

1.0000 Pasang rangka langit-langit (60 x 120) m, kayu bengkirai

0.0130 Kayu bengkirai @ Rp. 5,750,000.00 74,750.00

0.1200 kg Paku @ Rp. 17,000.00 2,040.00

0.2700 org Tukang kayu @ Rp. 64,750.00 17,482.50

0.0270 org Kep. Tk. Kayu @ Rp. 69,750.00 1,883.25

0.1700 org Pekerja @ Rp. 44,750.00 7,607.50

0.0085 org Mandor @ Rp. 89,750.00 762.88

JUMLAH ( BELUM PPN ) 27,736.13 76,790.00 104,526.13

JASA 10 % 2,773.61 7,679.00 10,452.61

JUMLAH 30,509.74 84,469.00 114,978.74

DIBULATKAN 30,509.00 84,469.00 114,978.00

SNI 1.0000 Langit-langit asbes (1,00 x 1,00) m tanpa plepet

6.1 1.1000 lbr Pelat asbes @ Rp. 10,000.00 11,000.00

03-2838-2002 0.0100 kg Paku eternit @ Rp. 11,500.00 115.00

0.0700 org Tukang kayu @ Rp. 64,750.00 4,532.50

0.0070 org Kepala tukang kayu @ Rp. 69,750.00 488.25

0.0300 org Pekerja @ Rp. 44,750.00 1,342.50

0.0015 org Mandor @ Rp. 89,750.00 134.63

JUMLAH ( BELUM PPN ) 6,497.88 11,115.00 17,612.88

JASA 10 % 649.79 1,111.50 1,761.29

JUMLAH 7,147.66 12,226.50 19,374.16

DIBULATKAN 7,147.00 12,226.00 19,374.00

1.0000 Langit-langit asbes (1,00 x 1,00) m memakai plepet

1.1000 lbr Pelat asbes @ Rp. 10,000.00 11,000.00

2.6000 Plepet kayu @ Rp. 2,000.00 5,200.00

0.0100 kg Paku eternit @ Rp. 11,500.00 115.00

0.0100 kg Paku plepet @ Rp. 10,000.00 100.00

0.0700 org Tukang kayu @ Rp. 64,750.00 4,532.50

0.0070 org Kepala tukang kayu @ Rp. 69,750.00 488.25

0.0300 org Pekerja @ Rp. 44,750.00 1,342.50

0.0015 org Mandor @ Rp. 89,750.00 134.63

JUMLAH ( BELUM PPN ) 6,497.88 16,415.00 22,912.88

JASA 10 % 649.79 1,641.50 2,291.29

JUMLAH 7,147.66 18,056.50 25,204.16

DIBULATKAN 7,147.00 18,056.00 25,204.00

SNI 1.0000 Langit2 asbes (1,00 x 1,00) m, rangka kamper tanpa plepet

0.0120 Kayu kamper balok @ Rp. 4,750,000.00 57,000.00

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00 600.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00

0.3200 org Tukang kayu @ Rp. 64,750.00 20,720.00

0.0320 org Kepala tukang kayu @ Rp. 69,750.00 2,232.00

0.1800 org Pekerja @ Rp. 44,750.00 8,055.00

0.0090 org Mandor @ Rp. 89,750.00 807.75

JUMLAH ( BELUM PPN ) 31,814.75 68,600.00 100,414.75

JASA 10 % 3,181.48 6,860.00 10,041.48

JUMLAH 34,996.23 75,460.00 110,456.23

DIBULATKAN 34,996.00 75,460.00 110,456.00

m2

m3

m2

m3

m2

m2

m1

m2

m3

Page 44: Bill of Quantity

Analisa Gedung - 44

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Langit2 asbes (1,00 x 1,00) m, rangka kruing tanpa plepet

0.0120 Kayu kruing balok @ Rp. 4,350,000.00 52,200.00

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00 600.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00

0.3200 org Tukang kayu @ Rp. 64,750.00 20,720.00

0.0320 org Kepala tukang kayu @ Rp. 69,750.00 2,232.00

0.1800 org Pekerja @ Rp. 44,750.00 8,055.00

0.0090 org Mandor @ Rp. 89,750.00 807.75

JUMLAH ( BELUM PPN ) 31,814.75 63,800.00 95,614.75

JASA 10 % 3,181.48 6,380.00 9,561.48

JUMLAH 34,996.23 70,180.00 105,176.23

DIBULATKAN 34,996.00 70,180.00 105,176.00

SNI 1.0000 Langit2 asbes (1,00 x 1,00) m, rangka bengkirai tanpa plepet

0.0120 Kayu bengkirai balok @ Rp. 5,750,000.00 69,000.00

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00 600.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00

0.3200 org Tukang kayu @ Rp. 64,750.00 20,720.00

0.0320 org Kepala tukang kayu @ Rp. 69,750.00 2,232.00

0.1800 org Pekerja @ Rp. 44,750.00 8,055.00

0.0090 org Mandor @ Rp. 89,750.00 807.75

JUMLAH ( BELUM PPN ) 31,814.75 80,600.00 112,414.75

JASA 10 % 3,181.48 8,060.00 11,241.48

JUMLAH 34,996.23 88,660.00 123,656.23

DIBULATKAN 34,996.00 88,660.00 123,656.00

SNI 1.0000 Langit2 asbes (1,00 x 1,00) m, rangka kayu lama dg plepet

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00 600.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00

2.6000 Plepet kayu @ Rp. 2,000.00 5,200.00

0.0100 kg Paku eternit @ Rp. 11,500.00 115.00

0.0100 kg Paku plepet @ Rp. 10,000.00 100.00

0.3200 org Tukang kayu @ Rp. 64,750.00 20,720.00

0.0320 org Kepala tukang kayu @ Rp. 69,750.00 2,232.00

0.1800 org Pekerja @ Rp. 44,750.00 8,055.00

0.0090 org Mandor @ Rp. 89,750.00 807.75

JUMLAH ( BELUM PPN ) 31,814.75 17,015.00 48,829.75

JASA 10 % 3,181.48 1,701.50 4,882.98

JUMLAH 34,996.23 18,716.50 53,712.73

DIBULATKAN 34,996.00 18,716.00 53,712.00

SNI 1.0000 Langit2 asbes (1,00 x 1,00) m, rangka kayu kamper dg plepet

0.0120 Kayu kamper balok @ Rp. 4,750,000.00 57,000.00

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00 600.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00

2.6000 Plepet kayu @ Rp. 2,000.00 5,200.00

0.0100 kg Paku eternit @ Rp. 11,500.00 115.00

0.0100 kg Paku plepet @ Rp. 10,000.00 100.00

0.3200 org Tukang kayu @ Rp. 64,750.00 20,720.00

0.0320 org Kepala tukang kayu @ Rp. 69,750.00 2,232.00

0.1800 org Pekerja @ Rp. 44,750.00 8,055.00

0.0090 org Mandor @ Rp. 89,750.00 807.75

JUMLAH ( BELUM PPN ) 31,814.75 74,015.00 105,829.75

JASA 10 % 3,181.48 7,401.50 10,582.98

JUMLAH 34,996.23 81,416.50 116,412.73

DIBULATKAN 34,996.00 81,416.00 116,412.00

SNI 1.0000 Langit2 asbes (1,00 x 1,00) m, rangka kayu kruing dg plepet

0.0120 Kayu kruing balok @ Rp. 4,350,000.00 52,200.00

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00 600.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00

2.6000 Plepet kayu @ Rp. 2,000.00 5,200.00

0.0100 kg Paku eternit @ Rp. 11,500.00 115.00

0.0100 kg Paku plepet @ Rp. 10,000.00 100.00

0.3200 org Tukang kayu @ Rp. 64,750.00 20,720.00

0.0320 org Kepala tukang kayu @ Rp. 69,750.00 2,232.00

0.1800 org Pekerja @ Rp. 44,750.00 8,055.00

0.0090 org Mandor @ Rp. 89,750.00 807.75

JUMLAH ( BELUM PPN ) 31,814.75 69,215.00 101,029.75

JASA 10 % 3,181.48 6,921.50 10,102.98

JUMLAH 34,996.23 76,136.50 111,132.73

DIBULATKAN 34,996.00 76,136.00 111,132.00

m2

m3

m2

m3

m2

m1

m2

m3

m1

m2

m3

m1

Page 45: Bill of Quantity

Analisa Gedung - 45

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Langit2 asbes (1,00 x 1,00) m, rangka ky bengkirai dg plepet

0.0120 Kayu bengkirai balok @ Rp. 5,750,000.00 69,000.00

03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00 600.00

1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00

2.6000 Plepet kayu @ Rp. 2,000.00 5,200.00

0.0100 kg Paku eternit @ Rp. 11,500.00 115.00

0.0100 kg Paku plepet @ Rp. 10,000.00 100.00

0.3200 org Tukang kayu @ Rp. 64,750.00 20,720.00

0.0320 org Kepala tukang kayu @ Rp. 69,750.00 2,232.00

0.1800 org Pekerja @ Rp. 44,750.00 8,055.00

0.0090 org Mandor @ Rp. 89,750.00 807.75

JUMLAH ( BELUM PPN ) 31,814.75 86,015.00 117,829.75

JASA 10 % 3,181.48 8,601.50 11,782.98

JUMLAH 34,996.23 94,616.50 129,612.73

DIBULATKAN 34,996.00 94,616.00 129,612.00

6.13 1.0000 Langit2 gypsum t; 9 mm, rangka 60 x 120 kayu kamper

0.0130 Kayu kamper @ Rp. 4,750,000.00 61,750.00

0.3600 lbr Gypsum board 9 mm @ Rp. 42,000.00 15,120.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00 500.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00 1,575.00

0.0030 kg Alkasit @ Rp. 300,000.00 900.00

0.0500 kg Paku gypsum @ Rp. 20,000.00 1,000.00

0.1200 kg Paku usuk @ Rp. 17,000.00 2,040.00

0.3700 org Tukang kayu @ Rp. 64,750.00 23,957.50

0.0370 org Kepala tukang kayu @ Rp. 69,750.00 2,580.75

0.2400 org Pekerja @ Rp. 44,750.00 10,740.00

0.0120 org Mandor @ Rp. 89,750.00 1,077.00

JUMLAH ( BELUM PPN ) 38,355.25 82,885.00 121,240.25

JASA 10 % 3,835.53 8,288.50 12,124.03

JUMLAH 42,190.78 91,173.50 133,364.28

DIBULATKAN 42,190.00 91,173.00 133,364.00

6.13 1.0000 Langit2 gypsum t;l 9 mm, rangka 60 x 120 kayu kruing

0.0130 Kayu kruing @ Rp. 4,350,000.00 56,550.00

0.3600 lbr Gypsum board 9 mm @ Rp. 42,000.00 15,120.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00 500.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00 1,575.00

0.0030 kg Alkasit @ Rp. 300,000.00 900.00

0.0500 kg Paku gypsum @ Rp. 20,000.00 1,000.00

0.1200 kg Paku usuk @ Rp. 17,000.00 2,040.00

0.3700 org Tukang kayu @ Rp. 64,750.00 23,957.50

0.0370 org Kepala tukang kayu @ Rp. 69,750.00 2,580.75

0.2400 org Pekerja @ Rp. 44,750.00 10,740.00

0.0120 org Mandor @ Rp. 89,750.00 1,077.00

JUMLAH ( BELUM PPN ) 38,355.25 77,685.00 116,040.25

JASA 10 % 3,835.53 7,768.50 11,604.03

JUMLAH 42,190.78 85,453.50 127,644.28

DIBULATKAN 42,190.00 85,453.00 127,644.00

1.0000 Langit2 gypsum t; 9 mm, rangka 60 x 120 ky bengkirai

0.0130 Kayu bengkirai @ Rp. 5,750,000.00 74,750.00

0.3600 lbr Gypsum board 9 mm @ Rp. 42,000.00 15,120.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00 500.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00 1,575.00

0.0030 kg Alkasit @ Rp. 300,000.00 900.00

0.0500 kg Paku gypsum @ Rp. 20,000.00 1,000.00

0.1200 kg Paku usuk @ Rp. 17,000.00 2,040.00

0.3700 org Tukang kayu @ Rp. 64,750.00 23,957.50

0.0370 org Kepala tukang kayu @ Rp. 69,750.00 2,580.75

0.2400 org Pekerja @ Rp. 44,750.00 10,740.00

0.0120 org Mandor @ Rp. 89,750.00 1,077.00

JUMLAH ( BELUM PPN ) 38,355.25 95,885.00 134,240.25

JASA 10 % 3,835.53 9,588.50 13,424.03

JUMLAH 42,190.78 105,473.50 147,664.28

DIBULATKAN 42,190.00 105,473.00 147,664.00

1.0000 Langit-langit gypsum board tebal 9 mm, rangka hollow

4.5000 Rangka hollow 4x4 cm @ Rp. 9,500.00 42,750.00

0.3600 lbr Gypsum board 9 mm @ Rp. 42,000.00 15,120.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00 500.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00 1,575.00

m2

m3

m1

m2

m3

m2

m3

m2

m3

m2

m1

Page 46: Bill of Quantity

Analisa Gedung - 46

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

0.0030 kg Alkasit @ Rp. 300,000.00 900.00

0.1500 kg Paku skrup @ Rp. 10,000.00 1,500.00

5.0000 Kawat penggantung @ Rp. 500.00 2,500.00

0.3700 org Tukang kayu @ Rp. 64,750.00 23,957.50

0.0370 org Kepala tukang kayu @ Rp. 69,750.00 2,580.75

0.2400 org Pekerja @ Rp. 44,750.00 10,740.00

0.0120 org Mandor @ Rp. 89,750.00 1,077.00

JUMLAH ( BELUM PPN ) 38,355.25 64,845.00 103,200.25

JASA 10 % 3,835.53 6,484.50 10,320.03

JUMLAH 42,190.78 71,329.50 113,520.28

DIBULATKAN 42,190.00 71,329.00 113,520.00

m1

Page 47: Bill of Quantity

Analisa Gedung - 47

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

6.13 1.0000 Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky kamper

0.0130 Kayu kamper @ Rp. 4,750,000.00 61,750.00

0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00 16,632.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00 500.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00 1,575.00

0.0030 kg Alkasit @ Rp. 300,000.00 900.00

0.0500 kg Paku gypsum @ Rp. 20,000.00 1,000.00

0.1200 kg Paku usuk @ Rp. 17,000.00 2,040.00

0.3700 org Tukang kayu @ Rp. 64,750.00 23,957.50

0.0370 org Kepala tukang kayu @ Rp. 69,750.00 2,580.75

0.2400 org Pekerja @ Rp. 44,750.00 10,740.00

0.0120 org Mandor @ Rp. 89,750.00 1,077.00

JUMLAH ( BELUM PPN ) 38,355.25 84,397.00 122,752.25

JASA 10 % 3,835.53 8,439.70 12,275.23

JUMLAH 42,190.78 92,836.70 135,027.48

DIBULATKAN 42,190.00 92,836.00 135,027.00

6.13 1.0000 Langit2 kalsiboard t;l 3.5 mm, rangka 60 x 120 ky kruing

0.0130 Kayu kruing @ Rp. 4,350,000.00 56,550.00

0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00 16,632.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00 500.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00 1,575.00

0.0030 kg Alkasit @ Rp. 300,000.00 900.00

0.0500 kg Paku gypsum @ Rp. 20,000.00 1,000.00

0.1200 kg Paku usuk @ Rp. 17,000.00 2,040.00

0.3700 org Tukang kayu @ Rp. 64,750.00 23,957.50

0.0370 org Kepala tukang kayu @ Rp. 69,750.00 2,580.75

0.2400 org Pekerja @ Rp. 44,750.00 10,740.00

0.0120 org Mandor @ Rp. 89,750.00 1,077.00

JUMLAH ( BELUM PPN ) 38,355.25 79,197.00 117,552.25

JASA 10 % 3,835.53 7,919.70 11,755.23

JUMLAH 42,190.78 87,116.70 129,307.48

DIBULATKAN 42,190.00 87,116.00 129,307.00

1.0000 Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky bengkirai

0.0130 Kayu bengkirai @ Rp. 5,750,000.00 74,750.00

0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00 16,632.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00 500.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00 1,575.00

0.0030 kg Alkasit @ Rp. 300,000.00 900.00

0.0500 kg Paku gypsum @ Rp. 20,000.00 1,000.00

0.1200 kg Paku usuk @ Rp. 17,000.00 2,040.00

0.3700 org Tukang kayu @ Rp. 64,750.00 23,957.50

0.0370 org Kepala tukang kayu @ Rp. 69,750.00 2,580.75

0.2400 org Pekerja @ Rp. 44,750.00 10,740.00

0.0120 org Mandor @ Rp. 89,750.00 1,077.00

JUMLAH ( BELUM PPN ) 38,355.25 97,397.00 135,752.25

JASA 10 % 3,835.53 9,739.70 13,575.23

JUMLAH 42,190.78 107,136.70 149,327.48

DIBULATKAN 42,190.00 107,136.00 149,327.00

1.0000 Langit-langit kalsiboard tebal 3.5 mm, rangka hollow

4.5000 Rangka hollow 4x4 cm @ Rp. 9,500.00 42,750.00

0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00 16,632.00

0.0500 roll Kasa gypsum @ Rp. 10,000.00 500.00

0.4500 kg Tepung gypsum @ Rp. 3,500.00 1,575.00

0.0030 kg Alkasit @ Rp. 300,000.00 900.00

0.1500 kg Paku skrup @ Rp. 10,000.00 1,500.00

5.0000 Kawat penggantung @ Rp. 500.00 2,500.00

0.3700 org Tukang kayu @ Rp. 64,750.00 23,957.50

0.0370 org Kepala tukang kayu @ Rp. 69,750.00 2,580.75

0.2400 org Pekerja @ Rp. 44,750.00 10,740.00

0.0120 org Mandor @ Rp. 89,750.00 1,077.00

JUMLAH ( BELUM PPN ) 38,355.25 66,357.00 104,712.25

JASA 10 % 3,835.53 6,635.70 10,471.23

JUMLAH 42,190.78 72,992.70 115,183.48

DIBULATKAN 42,190.00 72,992.00 115,183.00

m2

m3

m2

m3

m2

m3

m2

m1

m1

Page 48: Bill of Quantity

Analisa Gedung - 48

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Langit-langit akustik 60 x 120 cm + rangka alumunium

03-3438-2002 3.6000 Profil alumunium "T" @ Rp. 20,000.00 72,000.00

6.18 0.1500 kg Kawat seng polos @ Rp. 9,500.00 1,425.00

1.0000 bh Ramset / dina bolt @ Rp. 2,500.00 2,500.00

1.5000 lbr Akustic Armstrong 60 x 120 cm @ Rp. 125,000.00 187,500.00

0.5000 org Tukang kayu @ Rp. 64,750.00 32,375.00

0.0500 org Kepala tukang kayu @ Rp. 69,750.00 3,487.50

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0075 org Mandor @ Rp. 89,750.00 673.13

JUMLAH ( BELUM PPN ) 43,248.13 263,425.00 306,673.13

JASA 10 % 4,324.81 26,342.50 30,667.31

JUMLAH 47,572.94 289,767.50 337,340.44

DIBULATKAN 47,572.00 289,767.00 337,340.00

1.0000 Pasang list profil cornees gypsum lebar sampai 5 cm

1.1000 List profil cornees gypsum @ Rp. 4,000.00 4,400.00

0.7000 kg Tepung gypsum @ Rp. 3,500.00 2,450.00

0.0035 kg Alkasit @ Rp. 300,000.00 1,050.00

0.0375 org Tukang kayu @ Rp. 64,750.00 2,428.13

0.0037 org Kepala tukang kayu @ Rp. 69,750.00 258.08

0.1125 org Pekerja @ Rp. 44,750.00 5,034.38

0.0065 org Mandor @ Rp. 89,750.00 583.38

JUMLAH ( BELUM PPN ) 8,303.95 7,900.00 16,203.95

JASA 10 % 830.40 790.00 1,620.40

JUMLAH 9,134.35 8,690.00 17,824.35

DIBULATKAN 9,134.00 8,690.00 17,824.00

1.0000 Pasang list profil cornees gypsum lebar 5 - 10 cm

1.1000 List profil cornees gypsum @ Rp. 8,000.00 8,800.00

0.8750 kg Tepung gypsum @ Rp. 3,500.00 3,062.50

0.0044 kg Alkasit @ Rp. 300,000.00 1,320.00

0.0375 org Tukang kayu @ Rp. 64,750.00 2,428.13

0.0037 org Kepala tukang kayu @ Rp. 69,750.00 258.08

0.1125 org Pekerja @ Rp. 44,750.00 5,034.38

0.0065 org Mandor @ Rp. 89,750.00 583.38

JUMLAH ( BELUM PPN ) 8,303.95 13,182.50 21,486.45

JASA 10 % 830.40 1,318.25 2,148.65

JUMLAH 9,134.35 14,500.75 23,635.10

DIBULATKAN 9,134.00 14,500.00 23,635.00

1.0000 Pasang list profil cornees gypsum lebar lebih dari 10 cm

1.1000 List profil cornees gypsum @ Rp. 15,000.00 16,500.00

1.0500 kg Tepung gypsum @ Rp. 3,500.00 3,675.00

0.0053 kg Alkasit @ Rp. 300,000.00 1,590.00

0.0400 org Tukang kayu @ Rp. 64,750.00 2,590.00

0.0040 org Kepala tukang kayu @ Rp. 69,750.00 279.00

0.1125 org Pekerja @ Rp. 44,750.00 5,034.38

0.0065 org Mandor @ Rp. 89,750.00 583.38

JUMLAH ( BELUM PPN ) 8,486.75 21,765.00 30,251.75

JASA 10 % 848.68 2,176.50 3,025.18

JUMLAH 9,335.43 23,941.50 33,276.93

DIBULATKAN 9,335.00 23,941.00 33,276.00

SNI 1.0000 List langit-langit kayu profil

6.19 1.1000 List kayu profil @ Rp. 5,500.00 6,050.00

03-2838-2002 0.0100 kg Paku @ Rp. 10,000.00 100.00

0.0500 org Tukang kayu @ Rp. 64,750.00 3,237.50

0.0050 org Kepala tukang kayu @ Rp. 69,750.00 348.75

0.0500 org Pekerja @ Rp. 44,750.00 2,237.50

0.0030 org Mandor @ Rp. 89,750.00 269.25

JUMLAH ( BELUM PPN ) 6,093.00 6,150.00 12,243.00

JASA 10 % 609.30 615.00 1,224.30

JUMLAH 6,702.30 6,765.00 13,467.30

DIBULATKAN 6,702.00 6,765.00 13,467.00

m2

m1

m1

m1

m1

m1

m1

m1

m1

m1

Page 49: Bill of Quantity

Analisa Gedung - 49

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

PEKERJAAN LISPLANG 1.0000 Pasang lisplank ukuran (2 x 20) cm, kayu jati

0.0048 Kayu jati papan @ Rp. 22,000,000.00 105,600.00

0.0600 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,020.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 12,096.25 106,620.00 118,716.25

JASA 10 % 1,209.63 10,662.00 11,871.63

JUMLAH 13,305.88 117,282.00 130,587.87

DIBULATKAN 13,305.00 117,282.00 130,587.00

SNI 1.0000 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu jati

0.0086 Kayu jati papan @ Rp. 22,000,000.00 189,200.00

03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,020.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 12,096.25 190,220.00 202,316.25

JASA 10 % 1,209.63 19,022.00 20,231.63

JUMLAH 13,305.88 209,242.00 222,547.88

DIBULATKAN 13,305.00 209,242.00 222,547.00

1.0000 Pasang lisplank ukuran (2 x 20) cm, kayu jati lokal

0.0048 Papan kayu jati lokal @ Rp. 8,200,000.00 39,360.00

0.0600 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,020.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 12,096.25 40,380.00 52,476.25

JASA 10 % 1,209.63 4,038.00 5,247.63

JUMLAH 13,305.88 44,418.00 57,723.88

DIBULATKAN 13,305.00 44,418.00 57,723.00

1.0000 Pasang lisplank ukuran (2 x 20) cm, kayu kamper

0.0048 Kayu kamper papan @ Rp. 5,500,000.00 26,400.00

0.0600 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,020.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 12,096.25 27,420.00 39,516.25

JASA 10 % 1,209.63 2,742.00 3,951.63

JUMLAH 13,305.88 30,162.00 43,467.88

DIBULATKAN 13,305.00 30,162.00 43,467.00

SNI 1.0000 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper

6.52 0.0086 Kayu kamper papan @ Rp. 5,500,000.00 47,300.00

03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,020.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 12,096.25 48,320.00 60,416.25

JASA 10 % 1,209.63 4,832.00 6,041.63

JUMLAH 13,305.88 53,152.00 66,457.88

DIBULATKAN 13,305.00 53,152.00 66,457.00

1.0000 Pasang lisplank ukuran (2 x 20) cm, kayu kruing

0.0048 Kayu kruing papan @ Rp. 4,750,000.00 22,800.00

0.0600 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,020.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 12,096.25 23,820.00 35,916.25

JASA 10 % 1,209.63 2,382.00 3,591.63

m1

m3

m1

m3

m1

m3

m1

m3

m1

m3

m1

m3

Page 50: Bill of Quantity

Analisa Gedung - 50

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

JUMLAH 13,305.88 26,202.00 39,507.88

DIBULATKAN 13,305.00 26,202.00 39,507.00

Page 51: Bill of Quantity

Analisa Gedung - 51

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing

6.52 0.0086 Kayu kruing papan @ Rp. 4,750,000.00 40,850.00

03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,020.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 12,096.25 41,870.00 53,966.25

JASA 10 % 1,209.63 4,187.00 5,396.63

JUMLAH 13,305.88 46,057.00 59,362.88

DIBULATKAN 13,305.00 46,057.00 59,362.00

1.0000 Pasang lisplank ukuran (2 x 20) cm, kayu bengkirai

0.0048 Kayu bengkirai papan @ Rp. 6,000,000.00 28,800.00

0.0600 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,020.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 12,096.25 29,820.00 41,916.25

JASA 10 % 1,209.63 2,982.00 4,191.63

JUMLAH 13,305.88 32,802.00 46,107.88

DIBULATKAN 13,305.00 32,802.00 46,107.00

SNI 1.0000 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai

6.52 0.0086 Kayu bengkirai papan @ Rp. 6,000,000.00 51,600.00

03-3434-2002 0.0600 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,020.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 12,096.25 52,620.00 64,716.25

JASA 10 % 1,209.63 5,262.00 6,471.63

JUMLAH 13,305.88 57,882.00 71,187.88

DIBULATKAN 13,305.00 57,882.00 71,187.00

AK 1.0000 Membuat listplank asbes plat ram kayu kamper

0.0250 Ram kayu kamper @ Rp. 4,750,000.00 118,750.00

1.0000 Asbes plat @ Rp. 10,000.00 10,000.00

0.3000 kg Paku reng @ Rp. 17,000.00 5,100.00

1.8000 org Tukang kayu @ Rp. 64,750.00 116,550.00

0.1800 org Kep. Tk. Kayu @ Rp. 69,750.00 12,555.00

0.6000 org Pekerja @ Rp. 44,750.00 26,850.00

0.0300 org Mandor @ Rp. 89,750.00 2,692.50

JUMLAH ( BELUM PPN ) 158,647.50 133,850.00 292,497.50

JASA 10 % 15,864.75 13,385.00 29,249.75

JUMLAH 174,512.25 147,235.00 321,747.25

DIBULATKAN 174,512.00 147,235.00 321,747.00

AK 1.0000 Membuat listplank asbes plat ram kayu kruing

0.0250 Ram kayu kruing @ Rp. 4,350,000.00 108,750.00

1.0000 Asbes plat @ Rp. 10,000.00 10,000.00

0.3000 kg Paku reng @ Rp. 17,000.00 5,100.00

1.8000 org Tukang kayu @ Rp. 64,750.00 116,550.00

0.1800 org Kep. Tk. Kayu @ Rp. 69,750.00 12,555.00

0.6000 org Pekerja @ Rp. 44,750.00 26,850.00

0.0300 org Mandor @ Rp. 89,750.00 2,692.50

JUMLAH ( BELUM PPN ) 158,647.50 123,850.00 282,497.50

JASA 10 % 15,864.75 12,385.00 28,249.75

JUMLAH 174,512.25 136,235.00 310,747.25

DIBULATKAN 174,512.00 136,235.00 310,747.00

AK 1.0000 Membuat listplank asbes plat ram kayu bengkirai

0.0250 Ram kayu bengkirai @ Rp. 5,750,000.00 143,750.00

1.0000 Asbes plat @ Rp. 10,000.00 10,000.00

0.3000 kg Paku reng @ Rp. 17,000.00 5,100.00

1.8000 org Tukang kayu @ Rp. 64,750.00 116,550.00

0.1800 org Kep. Tk. Kayu @ Rp. 69,750.00 12,555.00

0.6000 org Pekerja @ Rp. 44,750.00 26,850.00

0.0300 org Mandor @ Rp. 89,750.00 2,692.50

JUMLAH ( BELUM PPN ) 158,647.50 158,850.00 317,497.50

JASA 10 % 15,864.75 15,885.00 31,749.75

m1

m3

m1

m3

m1

m3

m2

m3

m2

m2

m3

m2

m2

m3

m2

Page 52: Bill of Quantity

Analisa Gedung - 52

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

JUMLAH 174,512.25 174,735.00 349,247.25

DIBULATKAN 174,512.00 174,735.00 349,247.00

Page 53: Bill of Quantity

Analisa Gedung - 53

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

1.0000 Mengerjakan papan ruiter kayu kamper 2/20

0.0040 Kayu kamper papan @ Rp. 5,500,000.00 22,000.00

0.0200 kg Paku biasa 2" - 5" @ Rp. 17,000.00 340.00

0.0800 org Tukang kayu @ Rp. 64,750.00 5,180.00

0.0080 org Kepala tukang kayu @ Rp. 69,750.00 558.00

0.0280 org Pekerja @ Rp. 44,750.00 1,253.00

0.0014 org Mandor @ Rp. 89,750.00 125.65

JUMLAH 7,116.65 22,340.00 29,456.65

JASA 10 % 711.67 2,234.00 2,945.67

JUMLAH 7,828.32 24,574.00 32,402.32

DIBULATKAN 7,828.00 24,574.00 32,402.00

1.0000 Mengerjakan papan ruiter kayu kruing 2/20

0.0040 Kayu kruing papan @ Rp. 4,750,000.00 19,000.00

0.0200 kg Paku biasa 2" - 5" @ Rp. 17,000.00 340.00

0.0800 org Tukang kayu @ Rp. 64,750.00 5,180.00

0.0080 org Kepala tukang kayu @ Rp. 69,750.00 558.00

0.0280 org Pekerja @ Rp. 44,750.00 1,253.00

0.0014 org Mandor @ Rp. 89,750.00 125.65

JUMLAH 7,116.65 19,340.00 26,456.65

JASA 10 % 711.67 1,934.00 2,645.67

JUMLAH 7,828.32 21,274.00 29,102.32

DIBULATKAN 7,828.00 21,274.00 29,102.00

1.0000 Mengerjakan papan ruiter kayu bengkirai 2/20

0.0040 Kayu bengkirai papan @ Rp. 6,000,000.00 24,000.00

0.0200 kg Paku biasa 2" - 5" @ Rp. 17,000.00 340.00

0.0800 org Tukang kayu @ Rp. 64,750.00 5,180.00

0.0080 org Kepala tukang kayu @ Rp. 69,750.00 558.00

0.0280 org Pekerja @ Rp. 44,750.00 1,253.00

0.0014 org Mandor @ Rp. 89,750.00 125.65

JUMLAH 7,116.65 24,340.00 31,456.65

JASA 10 % 711.67 2,434.00 3,145.67

JUMLAH 7,828.32 26,774.00 34,602.32

DIBULATKAN 7,828.00 26,774.00 34,602.00

PEKERJAAN TALANG SNI 1.0000 Pasang talang datar, seng BJLS 28, papan kayu kamper

6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00

0.0150 kg Paku biasa 1/2" - 1" @ Rp. 17,000.00 255.00

0.0096 Kayu kamper papan @ Rp. 5,500,000.00 52,800.00

0.2500 kg Flincoat @ Rp. 35,000.00 8,750.00

0.4000 org Tukang kayu @ Rp. 64,750.00 25,900.00

0.0250 org Kepala tukang kayu @ Rp. 69,750.00 1,743.75

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0013 org Mandor @ Rp. 89,750.00 112.19

JUMLAH ( BELUM PPN ) 34,468.44 83,805.00 118,273.44

JASA 10 % 3,446.84 8,380.50 11,827.34

JUMLAH 37,915.28 92,185.50 130,100.78

DIBULATKAN 37,915.00 92,185.00 130,100.00

SNI 1.0000 Pasang talang datar, seng BJLS 28, papan kayu kruing

6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00

0.0150 kg Paku biasa 1/2" - 1" @ Rp. 17,000.00 255.00

0.0096 Kayu kruing papan @ Rp. 4,750,000.00 45,600.00

0.2500 kg Flincoat @ Rp. 35,000.00 8,750.00

0.4000 org Tukang kayu @ Rp. 64,750.00 25,900.00

0.0250 org Kepala tukang kayu @ Rp. 69,750.00 1,743.75

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0013 org Mandor @ Rp. 89,750.00 112.19

JUMLAH ( BELUM PPN ) 34,468.44 76,605.00 111,073.44

JASA 10 % 3,446.84 7,660.50 11,107.34

JUMLAH 37,915.28 84,265.50 122,180.78

DIBULATKAN 37,915.00 84,265.00 122,180.00

m1

m3

m1

m3

m1

m3

m1

m3

m1

m3

Page 54: Bill of Quantity

Analisa Gedung - 54

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasang talang datar, seng BJLS 28, papan kayu bengkirai

6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00

0.0150 kg Paku biasa 1/2" - 1" @ Rp. 17,000.00 255.00

0.0096 Kayui bengkirai papan @ Rp. 6,000,000.00 57,600.00

0.2500 kg Flincoat @ Rp. 35,000.00 8,750.00

0.4000 org Tukang kayu @ Rp. 64,750.00 25,900.00

0.0250 org Kepala tukang kayu @ Rp. 69,750.00 1,743.75

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0013 org Mandor @ Rp. 89,750.00 112.19

JUMLAH ( BELUM PPN ) 34,468.44 88,605.00 123,073.44

JASA 10 % 3,446.84 8,860.50 12,307.34

JUMLAH 37,915.28 97,465.50 135,380.78

DIBULATKAN 37,915.00 97,465.00 135,380.00

SNI 1.0000 Pasang talang miring, seng BJLS 28, papan kayu kamper

6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00

0.0150 kg Paku biasa 1/2" - 1" @ Rp. 17,000.00 255.00

0.0190 Kayu kamper papan @ Rp. 5,500,000.00 104,500.00

0.2500 kg Flincoat @ Rp. 35,000.00 8,750.00

0.4000 org Tukang kayu @ Rp. 64,750.00 25,900.00

0.0250 org Kepala tukang kayu @ Rp. 69,750.00 1,743.75

0.0400 org Pekerja @ Rp. 44,750.00 1,790.00

0.0013 org Mandor @ Rp. 89,750.00 112.19

JUMLAH ( BELUM PPN ) 29,545.94 135,505.00 165,050.94

JASA 10 % 2,954.59 13,550.50 16,505.09

JUMLAH 32,500.53 149,055.50 181,556.03

DIBULATKAN 32,500.00 149,055.00 181,556.00

SNI 1.0000 Pasang talang miring, seng BJLS 28, papan kayu kruing

6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00

0.0150 kg Paku biasa 1/2" - 1" @ Rp. 17,000.00 255.00

0.0190 Kayu kruing papan @ Rp. 4,750,000.00 90,250.00

0.2500 kg Flincoat @ Rp. 35,000.00 8,750.00

0.4000 org Tukang kayu @ Rp. 64,750.00 25,900.00

0.0250 org Kepala tukang kayu @ Rp. 69,750.00 1,743.75

0.0400 org Pekerja @ Rp. 44,750.00 1,790.00

0.0013 org Mandor @ Rp. 89,750.00 112.19

JUMLAH ( BELUM PPN ) 29,545.94 121,255.00 150,800.94

JASA 10 % 2,954.59 12,125.50 15,080.09

JUMLAH 32,500.53 133,380.50 165,881.03

DIBULATKAN 32,500.00 133,380.00 165,881.00

SNI 1.0000 Pasang talang miring, seng BJLS 28, papan kayu bengkirai

6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00

0.0150 kg Paku biasa 1/2" - 1" @ Rp. 17,000.00 255.00

0.0190 Kayu bengkirai papan @ Rp. 6,000,000.00 114,000.00

0.2500 kg Flincoat @ Rp. 35,000.00 8,750.00

0.4000 org Tukang kayu @ Rp. 64,750.00 25,900.00

0.0250 org Kepala tukang kayu @ Rp. 69,750.00 1,743.75

0.0400 org Pekerja @ Rp. 44,750.00 1,790.00

0.0013 org Mandor @ Rp. 89,750.00 112.19

JUMLAH ( BELUM PPN ) 29,545.94 145,005.00 174,550.94

JASA 10 % 2,954.59 14,500.50 17,455.09

JUMLAH 32,500.53 159,505.50 192,006.03

DIBULATKAN 32,500.00 159,505.00 192,006.00

H.18 10.0000 Pasang talang torong

10.0000 Seng BJLS 0,30 ( 60 cm ) @ Rp. 20,000.00 200,000.00

225.0000 bh Paku sumbat @ Rp. 400.00 90,000.00

3.7500 org Tukang besi @ Rp. 64,750.00 242,812.50

0.3750 org Kep. Tk. Besi @ Rp. 69,750.00 26,156.25

2.2500 org Pekerja @ Rp. 44,750.00 100,687.50

0.1100 org Mandor @ Rp. 89,750.00 9,872.50

JUMLAH ( BELUM PPN ) 379,528.75 290,000.00 669,528.75

TIAP 1M1 ( BELUM PPN ) 37,952.88 29,000.00 66,952.88

JASA 10 % 3,795.29 2,900.00 6,695.29

JUMLAH 41,748.16 31,900.00 73,648.16

DIBULATKAN 41,748.00 31,900.00 73,648.00

m1

m3

m1

m3

m1

m3

m1

m3

m1

m1

Page 55: Bill of Quantity

Analisa Gedung - 55

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000

6.20 0.3000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 13,200.00

0.1000 kg Paku biasa 1/2" - 1" @ Rp. 17,000.00 1,700.00

0.0190 Kayu bengkirai papan @ Rp. 6,000,000.00 114,000.00

0.5000 kg Besi strip @ Rp. 8,800.00 4,400.00

0.2500 org Tukang kayu @ Rp. 64,750.00 16,187.50

0.0250 org Kepala tukang kayu @ Rp. 69,750.00 1,743.75

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0013 org Mandor @ Rp. 89,750.00 112.19

JUMLAH ( BELUM PPN ) 24,755.94 133,300.00 158,055.94

JASA 10 % 2,475.59 13,330.00 15,805.59

JUMLAH 27,231.53 146,630.00 173,861.53

DIBULATKAN 27,231.00 146,630.00 173,861.00

SNI 1.0000 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper

03-3434-2002 0.0195 Kayu kamper balok @ Rp. 4,750,000.00 92,625.00

6.56 0.0070 Kayu kamper papan @ Rp. 5,500,000.00 38,500.00

0.1000 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,700.00

0.5600 kg Lem kayu @ Rp. 11,000.00 6,160.00

1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00

0.4500 org Tukang kayu @ Rp. 64,750.00 29,137.50

0.0450 org Kepala tukang kayu @ Rp. 69,750.00 3,138.75

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0750 org Mandor @ Rp. 89,750.00 6,731.25

JUMLAH ( BELUM PPN ) 45,720.00 138,985.00 184,705.00

JASA 10 % 4,572.00 13,898.50 18,470.50

JUMLAH 50,292.00 152,883.50 203,175.50

DIBULATKAN 50,292.00 152,883.00 203,175.00

SNI 1.0000 Pas. dinding pemisah plywoodwood rangkap, rangka ky kamper

03-3434-2002 0.0195 Kayu kamper balok @ Rp. 4,750,000.00 92,625.00

6.57 0.0070 Kayu kamper papan @ Rp. 5,500,000.00 38,500.00

0.1000 kg Paku biasa 2" - 5" @ Rp. 17,000.00 1,700.00

0.5600 kg Lem kayu @ Rp. 11,000.00 6,160.00

1.0000 lbr Plywood 4' x 8' x 4 mm @ Rp. 80,000.00 80,000.00

0.6000 org Tukang kayu @ Rp. 64,750.00 38,850.00

0.0600 org Kepala tukang kayu @ Rp. 69,750.00 4,185.00

0.2000 org Pekerja @ Rp. 44,750.00 8,950.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 52,882.50 218,985.00 271,867.50

JASA 10 % 5,288.25 21,898.50 27,186.75

JUMLAH 58,170.75 240,883.50 299,054.25

DIBULATKAN 58,170.00 240,883.00 299,054.00

SNI 1.0000 Pasang plywood tebal 4 mm, untuk dinding

03-3434-2002 0.4000 lbr Plywood 4' x 8' x 4 mm @ Rp. 80,000.00 32,000.00

6.59 0.0500 kg Paku biasa 2" - 5" @ Rp. 17,000.00 850.00

0.0750 org Tukang kayu @ Rp. 64,750.00 4,856.25

0.0075 org Kepala tukang kayu @ Rp. 69,750.00 523.13

0.0250 org Pekerja @ Rp. 44,750.00 1,118.75

0.0013 org Mandor @ Rp. 89,750.00 116.68

JUMLAH ( BELUM PPN ) 6,614.80 32,850.00 39,464.80

JASA 10 % 661.48 3,285.00 3,946.48

JUMLAH 7,276.28 36,135.00 43,411.28

DIBULATKAN 7,276.00 36,135.00 43,411.00

m1 Pasang talang ½ lingkaran D - 10 cm, seng BJLS 28

m3

m2

m3

m3

m2

m3

m3

m2

Page 56: Bill of Quantity

Analisa Gedung - 56

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

PEKERJAAN ATAP

1.0000 Pasang genteng lama

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Batu @ Rp. 69,750.00 697.50

0.2000 org Pekerja @ Rp. 44,750.00 8,950.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 17,020.00 - 17,020.00

JASA 10 % 1,702.00 - 1,702.00

JUMLAH 18,722.00 - 18,722.00

DIBULATKAN 18,722.00 - 18,722.00

H.2 1.0000 Pasang genteng paris

25.0000 bh Genteng paris @ Rp. 600.00 15,000.00

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Batu @ Rp. 69,750.00 697.50

0.2000 org Pekerja @ Rp. 44,750.00 8,950.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 17,020.00 15,000.00 32,020.00

JASA 10 % 1,702.00 1,500.00 3,202.00

JUMLAH 18,722.00 16,500.00 35,222.00

DIBULATKAN 18,722.00 16,500.00 35,222.00

H.2A 1.0000 Pasang genteng paris untuk rumah tingkat

25.0000 bh Genteng paris @ Rp. 600.00 15,000.00

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Batu @ Rp. 69,750.00 697.50

0.3000 org Pekerja @ Rp. 44,750.00 13,425.00

0.0150 org Mandor @ Rp. 89,750.00 1,346.25

JUMLAH ( BELUM PPN ) 21,943.75 15,000.00 36,943.75

JASA 10 % 2,194.38 1,500.00 3,694.38

JUMLAH 24,138.13 16,500.00 40,638.13

DIBULATKAN 24,138.00 16,500.00 40,638.00

H.2A 1.0000

9.0000 bh Genteng beton natural @ Rp. 2,750.00 24,750.00

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Batu @ Rp. 69,750.00 697.50

0.2000 org Pekerja @ Rp. 44,750.00 8,950.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 17,020.00 24,750.00 41,770.00

JASA 10 % 1,702.00 2,475.00 4,177.00

JUMLAH 18,722.00 27,225.00 45,947.00

DIBULATKAN 18,722.00 27,225.00 45,947.00

H.2A 1.0000

9.0000 bh Genteng beton natural @ Rp. 2,750.00 24,750.00

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Batu @ Rp. 69,750.00 697.50

0.3000 org Pekerja @ Rp. 44,750.00 13,425.00

0.0150 org Mandor @ Rp. 89,750.00 1,346.25

JUMLAH ( BELUM PPN ) 21,943.75 24,750.00 46,693.75

JASA 10 % 2,194.38 2,475.00 4,669.38

JUMLAH 24,138.13 27,225.00 51,363.13

DIBULATKAN 24,138.00 27,225.00 51,363.00

m2

m2

m2

m2 Pasang genteng beton besar Natural ( isi 9 / m2 )

m2 Pas. genteng beton besar Natural ( isi 9 / m2 ) untuk r. tingkat

Page 57: Bill of Quantity

Analisa Gedung - 57

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

H.2A 1.0000

9.0000 bh Genteng beton Warna @ Rp. 4,420.00 39,780.00

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Batu @ Rp. 69,750.00 697.50

0.2000 org Pekerja @ Rp. 44,750.00 8,950.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 17,020.00 39,780.00 56,800.00

JASA 10 % 1,702.00 3,978.00 5,680.00

JUMLAH 18,722.00 43,758.00 62,480.00

DIBULATKAN 18,722.00 43,758.00 62,480.00

H.2A 1.0000

9.0000 bh Genteng beton Warna @ Rp. 4,420.00 39,780.00

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kep. Tk. Batu @ Rp. 69,750.00 697.50

0.3000 org Pekerja @ Rp. 44,750.00 13,425.00

0.0150 org Mandor @ Rp. 89,750.00 1,346.25

JUMLAH ( BELUM PPN ) 21,943.75 39,780.00 61,723.75

JASA 10 % 2,194.38 3,978.00 6,172.38

JUMLAH 24,138.13 43,758.00 67,896.13

DIBULATKAN 24,138.00 43,758.00 67,896.00

H.6 1.0000 Pasang bubungan genteng paris

5.0000 bh Bubungan genteng paris @ Rp. 1,650.00 8,250.00

0.0152 Kapur pasang @ Rp. 72,500.00 1,102.00

0.0152 Pasir pasang @ Rp. 120,000.00 1,824.00

1.5240 kg PC @ Rp. 1,025.00 1,562.10

0.2000 org Tukang batu @ Rp. 64,750.00 12,950.00

0.0200 org Kep. Tk. Batu @ Rp. 69,750.00 1,395.00

0.4000 org Pekerja @ Rp. 44,750.00 17,900.00

0.0200 org Mandor @ Rp. 89,750.00 1,795.00

JUMLAH ( BELUM PPN ) 34,040.00 12,738.10 46,778.10

JASA 10 % 3,404.00 1,273.81 4,677.81

JUMLAH 37,444.00 14,011.91 51,455.91

DIBULATKAN 37,444.00 14,011.00 51,455.00

H.6 1.0000 Pasang bubungan genteng beton Natural

5.0000 bh Bubungan genteng beton natural @ Rp. 2,460.00 12,300.00

0.0152 Kapur pasang @ Rp. 72,500.00 1,102.00

0.0152 Pasir pasang @ Rp. 120,000.00 1,824.00

1.5240 kg PC @ Rp. 1,025.00 1,562.10

0.2000 org Tukang batu @ Rp. 64,750.00 12,950.00

0.0200 org Kep. Tk. Batu @ Rp. 69,750.00 1,395.00

0.4000 org Pekerja @ Rp. 44,750.00 17,900.00

0.0200 org Mandor @ Rp. 89,750.00 1,795.00

JUMLAH ( BELUM PPN ) 34,040.00 16,788.10 50,828.10

JASA 10 % 3,404.00 1,678.81 5,082.81

JUMLAH 37,444.00 18,466.91 55,910.91

DIBULATKAN 37,444.00 18,466.00 55,910.00

m2 Pasang genteng beton besar Warna ( isi 9 / m2 )

m2 Pas. genteng beton besar Warna ( isi 9 / m2 ) untuk r. tingkat

m1

m3

m3

m1

m3

m3

Page 58: Bill of Quantity

Analisa Gedung - 58

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

H.6 1.0000 Pasang bubungan genteng beton Warna

4.0000 bh Bubungan genteng beton warna @ Rp. 4,260.00 17,040.00

0.0152 Kapur pasang @ Rp. 72,500.00 1,102.00

0.0152 Pasir pasang @ Rp. 120,000.00 1,824.00

1.5240 kg PC @ Rp. 1,025.00 1,562.10

0.2000 org Tukang batu @ Rp. 64,750.00 12,950.00

0.0200 org Kep. Tk. Batu @ Rp. 69,750.00 1,395.00

0.4000 org Pekerja @ Rp. 44,750.00 17,900.00

0.0200 org Mandor @ Rp. 89,750.00 1,795.00

JUMLAH ( BELUM PPN ) 34,040.00 21,528.10 55,568.10

JASA 10 % 3,404.00 2,152.81 5,556.81

JUMLAH 37,444.00 23,680.91 61,124.91

DIBULATKAN 37,444.00 23,680.00 61,124.00

1.0000 Pasang atap asbes gelombang (2,5 x 0,92 m) x 5 mm

SNI 0.5000 lbr Asbes gelombang @ Rp. 62,960.00 31,480.00

6.8 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00

03-3436-2002 0.0750 org Tukang kayu @ Rp. 64,750.00 4,856.25

0.0080 org Kepala tukang kayu @ Rp. 69,750.00 558.00

0.1400 org Pekerja @ Rp. 44,750.00 6,265.00

0.0080 org Mandor @ Rp. 89,750.00 718.00

JUMLAH ( BELUM PPN ) 12,397.25 32,602.00 44,999.25

JASA 10 % 1,239.73 3,260.20 4,499.93

JUMLAH 13,636.98 35,862.20 49,499.18

DIBULATKAN 13,636.00 35,862.00 49,499.00

SNI 1.0000 Pasang atap asbes gelombang (2,00 x 0,92 m) x 5 mm

6.10 0.6000 lbr Asbes gelombang @ Rp. 50,330.00 30,198.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00

0.0700 org Tukang kayu @ Rp. 64,750.00 4,532.50

0.0070 org Kepala tukang kayu @ Rp. 69,750.00 488.25

0.1400 org Pekerja @ Rp. 44,750.00 6,265.00

0.0070 org Mandor @ Rp. 89,750.00 628.25

JUMLAH ( BELUM PPN ) 11,914.00 31,320.00 43,234.00

JASA 10 % 1,191.40 3,132.00 4,323.40

JUMLAH 13,105.40 34,452.00 47,557.40

DIBULATKAN 13,105.00 34,452.00 47,557.00

SNI 1.0000 Pasang atap asbes gelombang (1,80 x 0,92 m) x 5 mm

6.11 0.7500 lbr Asbes gelombang @ Rp. 45,290.00 33,967.50

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00

0.0700 org Tukang kayu @ Rp. 64,750.00 4,532.50

0.0070 org Kepala tukang kayu @ Rp. 69,750.00 488.25

0.1400 org Pekerja @ Rp. 44,750.00 6,265.00

0.0070 org Mandor @ Rp. 89,750.00 628.25

JUMLAH ( BELUM PPN ) 11,914.00 35,089.50 47,003.50

JASA 10 % 1,191.40 3,508.95 4,700.35

JUMLAH 13,105.40 38,598.45 51,703.85

DIBULATKAN 13,105.00 38,598.00 51,703.00

SNI 1.0000 Pasang atap asbes gelombang (300 x 1,05 m) x 4 mm

6.12 0.3500 lbr Asbes gelombang @ Rp. 71,350.00 24,972.50

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00

0.0700 org Tukang kayu @ Rp. 64,750.00 4,532.50

0.0070 org Kepala tukang kayu @ Rp. 69,750.00 488.25

0.1400 org Pekerja @ Rp. 44,750.00 6,265.00

0.0070 org Mandor @ Rp. 89,750.00 628.25

JUMLAH ( BELUM PPN ) 11,914.00 26,094.50 38,008.50

JASA 10 % 1,191.40 2,609.45 3,800.85

JUMLAH 13,105.40 28,703.95 41,809.35

DIBULATKAN 13,105.00 28,703.00 41,809.00

m1

m3

m3

m2

m2

m2

m2

Page 59: Bill of Quantity

Analisa Gedung - 59

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm

6.14 0.4400 lbr Asbes gelombang @ Rp. 61,000.00 26,840.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00

0.0670 org Tukang kayu @ Rp. 64,750.00 4,338.25

0.0070 org Kepala tukang kayu @ Rp. 69,750.00 488.25

0.1400 org Pekerja @ Rp. 44,750.00 6,265.00

0.0070 org Mandor @ Rp. 89,750.00 628.25

JUMLAH ( BELUM PPN ) 11,719.75 27,962.00 39,681.75

JASA 10 % 1,171.98 2,796.20 3,968.18

JUMLAH 12,891.73 30,758.20 43,649.93

DIBULATKAN 12,891.00 30,758.00 43,649.00

SNI 1.0000 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm

6.15 0.5100 lbr Asbes gelombang @ Rp. 57,500.00 29,325.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00

0.0670 org Tukang kayu @ Rp. 64,750.00 4,338.25

0.0070 org Kepala tukang kayu @ Rp. 69,750.00 488.25

0.1400 org Pekerja @ Rp. 44,750.00 6,265.00

0.0070 org Mandor @ Rp. 89,750.00 628.25

JUMLAH ( BELUM PPN ) 11,719.75 30,447.00 42,166.75

JASA 10 % 1,171.98 3,044.70 4,216.68

JUMLAH 12,891.73 33,491.70 46,383.43

DIBULATKAN 12,891.00 33,491.00 46,383.00

SNI 1.0000 Pasang atap asbes gelombang (1,50 x 1,05 m) x 4 mm

6.16 0.8000 lbr Asbes gelombang @ Rp. 35,950.00 28,760.00

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00

0.0670 org Tukang kayu @ Rp. 64,750.00 4,338.25

0.0070 org Kepala tukang kayu @ Rp. 69,750.00 488.25

0.1400 org Pekerja @ Rp. 44,750.00 6,265.00

0.0070 org Mandor @ Rp. 89,750.00 628.25

JUMLAH ( BELUM PPN ) 11,719.75 29,882.00 41,601.75

JASA 10 % 1,171.98 2,988.20 4,160.18

JUMLAH 12,891.73 32,870.20 45,761.93

DIBULATKAN 12,891.00 32,870.00 45,761.00

SNI 1.0000 Pasang atap asbes gelombang (3,00 x 1,08 m) x 6 mm

6.17 0.3700 lbr Asbes gelombang @ Rp. 112,830.00 41,747.10

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00

0.0670 org Tukang kayu @ Rp. 64,750.00 4,338.25

0.0070 org Kepala tukang kayu @ Rp. 69,750.00 488.25

0.1400 org Pekerja @ Rp. 44,750.00 6,265.00

0.0070 org Mandor @ Rp. 89,750.00 628.25

JUMLAH ( BELUM PPN ) 11,719.75 42,869.10 54,588.85

JASA 10 % 1,171.98 4,286.91 5,458.89

JUMLAH 12,891.73 47,156.01 60,047.74

DIBULATKAN 12,891.00 47,156.00 60,047.00

SNI 1.0000 Pasang atap sbes gelombang (2,40 x 1,08 m) x 6 mm

6.19 0.4600 lbr Asbes gelombang @ Rp. 90,265.00 41,521.90

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00

0.0670 org Tukang kayu @ Rp. 64,750.00 4,338.25

0.0070 org Kepala tukang kayu @ Rp. 69,750.00 488.25

0.1400 org Pekerja @ Rp. 44,750.00 6,265.00

0.0070 org Mandor @ Rp. 89,750.00 628.25

JUMLAH ( BELUM PPN ) 11,719.75 42,643.90 54,363.65

JASA 10 % 1,171.98 4,264.39 5,436.37

JUMLAH 12,891.73 46,908.29 59,800.02

DIBULATKAN 12,891.00 46,908.00 59,800.00

m2

m2

m2

m2

m2

Page 60: Bill of Quantity

Analisa Gedung - 60

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasang atap asbes gelombang (2,10 x 1,08 m) x 6 mm

6.20 0.4900 lbr Asbes gelombang @ Rp. 78,980.00 38,700.20

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00

0.0670 org Tukang kayu @ Rp. 64,750.00 4,338.25

0.0070 org Kepala tukang kayu @ Rp. 69,750.00 488.25

0.1400 org Pekerja @ Rp. 44,750.00 6,265.00

0.0070 org Mandor @ Rp. 89,750.00 628.25

JUMLAH ( BELUM PPN ) 11,719.75 39,822.20 51,541.95

JASA 10 % 1,171.98 3,982.22 5,154.20

JUMLAH 12,891.73 43,804.42 56,696.15

DIBULATKAN 12,891.00 43,804.00 56,696.00

SNI 1.0000 Pasang atap asbes gelombang (1,80 x 1,08 m) x 6 mm

6.21 0.5700 lbr Asbes gelombang @ Rp. 67,690.00 38,583.30

03-3436-2002 0.1200 kg Paku pancing 60 x 230 @ Rp. 9,350.00 1,122.00

0.0670 org Tukang kayu @ Rp. 64,750.00 4,338.25

0.0070 org Kepala tukang kayu @ Rp. 69,750.00 488.25

0.1400 org Pekerja @ Rp. 44,750.00 6,265.00

0.0070 org Mandor @ Rp. 89,750.00 628.25

JUMLAH ( BELUM PPN ) 11,719.75 39,705.30 51,425.05

JASA 10 % 1,171.98 3,970.53 5,142.51

JUMLAH 12,891.73 43,675.83 56,567.55

DIBULATKAN 12,891.00 43,675.00 56,567.00

SNI 1.0000 Pasang bubung stel gelombang 0,92 m

6.22 2.4000 lbr Bubung stel gelombang @ Rp. 29,000.00 69,600.00

03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00 4,500.00

0.1250 org Tukang kayu @ Rp. 64,750.00 8,093.75

0.0130 org Kepala tukang kayu @ Rp. 69,750.00 906.75

0.0840 org Pekerja @ Rp. 44,750.00 3,759.00

0.0040 org Mandor @ Rp. 89,750.00 359.00

JUMLAH ( BELUM PPN ) 13,118.50 74,100.00 87,218.50

JASA 10 % 1,311.85 7,410.00 8,721.85

JUMLAH 14,430.35 81,510.00 95,940.35

DIBULATKAN 14,430.00 81,510.00 95,940.00

SNI 1.0000 Pasang nok stel gelombang 1,05 m

6.23 2.1000 lbr Nok stel gelombang @ Rp. 29,000.00 60,900.00

03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00 4,500.00

0.1250 org Tukang kayu @ Rp. 64,750.00 8,093.75

0.0130 org Kepala tukang kayu @ Rp. 69,750.00 906.75

0.0840 org Pekerja @ Rp. 44,750.00 3,759.00

0.0040 org Mandor @ Rp. 89,750.00 359.00

JUMLAH ( BELUM PPN ) 13,118.50 65,400.00 78,518.50

JASA 10 % 1,311.85 6,540.00 7,851.85

JUMLAH 14,430.35 71,940.00 86,370.35

DIBULATKAN 14,430.00 71,940.00 86,370.00

SNI 1.0000 Pasang nok stel gelombang 1,08 m

6.24 2.0500 lbr Nok stel gelombang @ Rp. 29,000.00 59,450.00

03-3436-2002 6.0000 bh Paku sekrup 3,5" @ Rp. 750.00 4,500.00

0.1250 org Tukang kayu @ Rp. 64,750.00 8,093.75

0.0130 org Kepala tukang kayu @ Rp. 69,750.00 906.75

0.0840 org Pekerja @ Rp. 44,750.00 3,759.00

0.0040 org Mandor @ Rp. 89,750.00 359.00

JUMLAH ( BELUM PPN ) 13,118.50 63,950.00 77,068.50

JASA 10 % 1,311.85 6,395.00 7,706.85

JUMLAH 14,430.35 70,345.00 84,775.35

DIBULATKAN 14,430.00 70,345.00 84,775.00

m2

m2

m1

m1

m1

Page 61: Bill of Quantity

Analisa Gedung - 61

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasang atap genteng metal zinc alume type prima roof

03-3436-2002 1.0200 Genteng metal @ Rp. 95,400.00 97,308.00

6.32 0.2000 kg Paku anti karat @ Rp. 20,000.00 4,000.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.2000 org Pekerja @ Rp. 44,750.00 8,950.00

0.0010 org Mandor @ Rp. 89,750.00 89.75

JUMLAH ( BELUM PPN ) 16,212.25 101,308.00 117,520.25

JASA 10 % 1,621.23 10,130.80 11,752.03

JUMLAH 17,833.48 111,438.80 129,272.28

DIBULATKAN 17,833.00 111,438.00 129,272.00

Mod. SNI 1.0000 Pasang atap metal gelombanmg

03-3436-2002 1.0200 Atap metal gelombang t 3,5 mm @ Rp. 60,000.00 61,200.00

6.32 4.0000 bh Paku/skrup atap anti karat @ Rp. 1,200.00 4,800.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.2000 org Pekerja @ Rp. 44,750.00 8,950.00

0.0010 org Mandor @ Rp. 89,750.00 89.75

JUMLAH ( BELUM PPN ) 16,212.25 66,000.00 82,212.25

JASA 10 % 1,621.23 6,600.00 8,221.23

JUMLAH 17,833.48 72,600.00 90,433.48

DIBULATKAN 17,833.00 72,600.00 90,433.00

SNI 1.0000 Pasang alumunium foil / sisalation

03-3436-2002 1.0500 Sisalation / alumunium foil @ Rp. 25,000.00 26,250.00

6.42 0.0500 org Tukang kayu @ Rp. 64,750.00 3,237.50

0.0050 org Kepala tukang kayu @ Rp. 69,750.00 348.75

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0080 org Mandor @ Rp. 89,750.00 718.00

JUMLAH ( BELUM PPN ) 11,016.75 26,250.00 37,266.75

JASA 10 % 1,101.68 2,625.00 3,726.68

JUMLAH 12,118.43 28,875.00 40,993.43

DIBULATKAN 12,118.00 28,875.00 40,993.00

Empiris 1.0000 Pasang atap polikarbonat

1.0500 Plykarbhonat @ Rp. 225,000.00 236,250.00

7.0000 kg Besi rangka @ Rp. 8,800.00 61,600.00

9.0000 bh Paku sekrup @ Rp. 1,200.00 10,800.00

0.5000 org Tukang besi @ Rp. 64,750.00 32,375.00

0.0500 org Kepala tukang besi @ Rp. 69,750.00 3,487.50

0.5000 org Pekerja @ Rp. 44,750.00 22,375.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 58,461.88 308,650.00 367,111.88

JASA 10 % 5,846.19 30,865.00 36,711.19

JUMLAH 64,308.06 339,515.00 403,823.06

DIBULATKAN 64,308.00 339,515.00 403,823.00

m2

m2

m2

m2

m2

m2

m2

m2

Page 62: Bill of Quantity

Analisa Gedung - 62

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

PEKERJAAN CAT-CATAN

SNI 1.0000 Mengikis / mengerok permukaan cat tembok lama

6.1 0.0500 kg Soda api @ Rp. 15,000.00 750.00

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 6,936.88 750.00 7,686.88

JASA 10 % 693.69 75.00 768.69

JUMLAH 7,630.56 825.00 8,455.56

DIBULATKAN 7,630.00 825.00 8,455.00

SNI 1.0000 Pengecatan bidang kayu lama

6.7 0.1500 kg Plamir @ Rp. 12,000.00 1,800.00

0.1700 kg Cat dasar @ Rp. 32,000.00 5,440.00

0.1700 kg Cat penutup @ Rp. 32,000.00 5,440.00

0.0750 org Tukang cat @ Rp. 64,750.00 4,856.25

0.0075 org Kepala tukang cat @ Rp. 69,750.00 523.13

0.0700 org Pekerja @ Rp. 44,750.00 3,132.50

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 8,736.25 12,680.00 21,416.25

JASA 10 % 873.63 1,268.00 2,141.63

JUMLAH 9,609.88 13,948.00 23,557.88

DIBULATKAN 9,609.00 13,948.00 23,557.00

SNI 1.0000 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup

6.8 0.2000 kg Cat meni @ Rp. 12,000.00 2,400.00

0.1500 kg Plamir @ Rp. 12,000.00 1,800.00

0.1700 kg Cat dasar @ Rp. 32,000.00 5,440.00

0.2600 kg Cat penutup @ Rp. 32,000.00 8,320.00

0.0900 org Tukang cat @ Rp. 64,750.00 5,827.50

0.0060 org Kepala tukang cat @ Rp. 69,750.00 418.50

0.0700 org Pekerja @ Rp. 44,750.00 3,132.50

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 9,602.88 17,960.00 27,562.88

JASA 10 % 960.29 1,796.00 2,756.29

JUMLAH 10,563.16 19,756.00 30,319.16

DIBULATKAN 10,563.00 19,756.00 30,319.00

m2

m2

m2

Page 63: Bill of Quantity

Analisa Gedung - 63

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup

6.9 0.2000 kg Cat meni @ Rp. 12,000.00 2,400.00

0.1500 kg Plamir @ Rp. 12,000.00 1,800.00

0.1700 kg Cat dasar @ Rp. 32,000.00 5,440.00

0.3500 kg Cat penutup @ Rp. 32,000.00 11,200.00

0.1050 org Tukang cat @ Rp. 64,750.00 6,798.75

0.0040 org Kepala tukang cat @ Rp. 69,750.00 279.00

0.0700 org Pekerja @ Rp. 44,750.00 3,132.50

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 10,434.63 20,840.00 31,274.63

JASA 10 % 1,043.46 2,084.00 3,127.46

JUMLAH 11,478.09 22,924.00 34,402.09

DIBULATKAN 11,478.00 22,924.00 34,402.00

SNI 1.0000 Pelaburan bidang kayu dengan politur

6.11 0.1500 ltr Politur @ Rp. 20,000.00 3,000.00

0.3720 ltr Politur jadi @ Rp. 20,000.00 7,440.00

2.0000 lbr Amplas @ Rp. 2,500.00 5,000.00

0.0600 org Tukang cat @ Rp. 64,750.00 3,885.00

0.0160 org Kepala tukang cat @ Rp. 69,750.00 1,116.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 5,225.38 15,440.00 20,665.38

JASA 10 % 522.54 1,544.00 2,066.54

JUMLAH 5,747.91 16,984.00 22,731.91

DIBULATKAN 5,747.00 16,984.00 22,731.00

SNI 1.0000 Pelaburan bidang kayu dengan vernis

6.13 0.1500 ltr Vernis @ Rp. 12,500.00 1,875.00

0.0500 kg Dempul @ Rp. 10,000.00 500.00

0.1000 lbr Amplas @ Rp. 2,500.00 250.00

0.0100 bh Kuas @ Rp. 8,000.00 80.00

0.1600 org Tukang cat @ Rp. 64,750.00 10,360.00

0.0160 org Kepala tukang cat @ Rp. 69,750.00 1,116.00

0.1600 org Pekerja @ Rp. 44,750.00 7,160.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 18,860.38 2,705.00 21,565.38

JASA 10 % 1,886.04 270.50 2,156.54

JUMLAH 20,746.41 2,975.50 23,721.91

DIBULATKAN 20,746.00 2,975.00 23,721.00

m2

m2

m2

Page 64: Bill of Quantity

Analisa Gedung - 64

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)

6.14 0.1000 kg Plamir tembok @ Rp. 8,500.00 850.00

0.1000 kg Cat dasar @ Rp. 9,500.00 950.00

0.2600 kg Cat penutup 2 x @ Rp. 9,500.00 2,470.00

0.0630 org Tukang cat @ Rp. 64,750.00 4,079.25

0.0063 org Kepala tukang cat @ Rp. 69,750.00 439.43

0.0200 org Pekerja @ Rp. 44,750.00 895.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 5,638.05 4,270.00 9,908.05

JASA 10 % 563.81 427.00 990.81

JUMLAH 6,201.86 4,697.00 10,898.86

DIBULATKAN 6,201.00 4,697.00 10,898.00

SNI 1.0000 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)

6.15 0.1200 kg Cat dasar @ Rp. 9,500.00 1,140.00

0.1800 kg Cat penutup 2 x @ Rp. 9,500.00 1,710.00

0.0420 org Tukang cat @ Rp. 64,750.00 2,719.50

0.0042 org Kepala tukang cat @ Rp. 69,750.00 292.95

0.0280 org Pekerja @ Rp. 44,750.00 1,253.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 4,489.83 2,850.00 7,339.83

JASA 10 % 448.98 285.00 733.98

JUMLAH 4,938.81 3,135.00 8,073.81

DIBULATKAN 4,938.00 3,135.00 8,073.00

SNI 1.0000 Pengecatan tembok tidak terlindung dari panas dan hujan

6.14 0.1000 kg Cat alkali resisting primer @ Rp. 27,200.00 2,720.00

0.3600 kg Cat ICI Weathershield @ Rp. 50,000.00 18,000.00

0.0630 org Tukang cat @ Rp. 64,750.00 4,079.25

0.0063 org Kepala tukang cat @ Rp. 69,750.00 439.43

0.0200 org Pekerja @ Rp. 44,750.00 895.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 5,638.05 20,720.00 26,358.05

JASA 10 % 563.81 2,072.00 2,635.81

JUMLAH 6,201.86 22,792.00 28,993.86

DIBULATKAN 6,201.00 22,792.00 28,993.00

SNI 1.0000 Melabur tembok dengan kapur sirih

6.17 0.1000 lbr Amplas @ Rp. 2,500.00 250.00

0.2500 ikat Alang-alang @ Rp. 500.00 125.00

0.0020 Perancah kayu @ Rp. 1,000,000.00 2,000.00

0.1500 kg Kapur sirih @ Rp. 500.00 75.00

0.0010 org Tukang cat @ Rp. 64,750.00 64.75

0.0001 org Kepala tukang cat @ Rp. 69,750.00 6.98

0.1500 org Pekerja @ Rp. 44,750.00 6,712.50

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 7,008.60 2,450.00 9,458.60

JASA 10 % 700.86 245.00 945.86

JUMLAH 7,709.46 2,695.00 10,404.46

DIBULATKAN 7,709.00 2,695.00 10,404.00

m2

m2

m2

m2

m3

Page 65: Bill of Quantity

Analisa Gedung - 65

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Melabur tembok lama dengan kapur sirih (untuk pemeliharaan)

6.18 0.0020 Perancah kayu @ Rp. 1,000,000.00 2,000.00

0.3000 kg Kapur sirih @ Rp. 500.00 150.00

0.0050 org Tukang cat @ Rp. 64,750.00 323.75

0.0005 org Kepala tukang cat @ Rp. 69,750.00 34.88

0.0400 org Pekerja @ Rp. 44,750.00 1,790.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 2,373.00 2,150.00 4,523.00

JASA 10 % 237.30 215.00 452.30

JUMLAH 2,610.30 2,365.00 4,975.30

DIBULATKAN 2,610.00 2,365.00 4,975.00

SNI 1.0000 Pengecatan bidang besi ( 3 x )

6.9 0.1670 kg Cat meni besi @ Rp. 9,000.00 1,503.00

0.2000 kg Cat besi @ Rp. 32,000.00 6,400.00

0.1500 ltr Thinner @ Rp. 9,000.00 1,350.00

0.1050 org Tukang cat @ Rp. 64,750.00 6,798.75

0.0040 org Kepala tukang cat @ Rp. 69,750.00 279.00

0.0700 org Pekerja @ Rp. 44,750.00 3,132.50

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 10,434.63 9,253.00 19,687.63

JASA 10 % 1,043.46 925.30 1,968.76

JUMLAH 11,478.09 10,178.30 21,656.39

DIBULATKAN 11,478.00 10,178.00 21,656.00

SNI 1.0000 Pengecacatan permukaan baja dengan meni besi

6.20 0.1000 kg Meni besi sinkromat @ Rp. 22,500.00 2,250.00

0.0100 bh Kuas @ Rp. 8,000.00 80.00

0.2000 org Tukang cat @ Rp. 64,750.00 12,950.00

0.0200 org Kepala tukang cat @ Rp. 69,750.00 1,395.00

0.0200 org Pekerja @ Rp. 44,750.00 895.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 16,137.50 2,330.00 18,467.50

JASA 10 % 1,613.75 233.00 1,846.75

JUMLAH 17,751.25 2,563.00 20,314.25

DIBULATKAN 17,751.00 2,563.00 20,314.00

SNI 1.0000 Pengecacatan permukaan baja dengan meni besi memakai perancah

6.21 0.1000 kg Meni besi sinkromat @ Rp. 22,500.00 2,250.00

0.0100 bh Kuas @ Rp. 8,000.00 80.00

0.0020 Perancah kayu @ Rp. 1,000,000.00 2,000.00

0.2250 org Tukang cat @ Rp. 64,750.00 14,568.75

0.0225 org Kepala tukang cat @ Rp. 69,750.00 1,569.38

0.2250 org Pekerja @ Rp. 44,750.00 10,068.75

0.0075 org Mandor @ Rp. 89,750.00 673.13

JUMLAH ( BELUM PPN ) 26,880.00 4,330.00 31,210.00

JASA 10 % 2,688.00 433.00 3,121.00

JUMLAH 29,568.00 4,763.00 34,331.00

DIBULATKAN 29,568.00 4,763.00 34,331.00

m2

m3

m2

m2

m2

m3

Page 66: Bill of Quantity

Analisa Gedung - 66

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pengetiran kayu ( 2 x )

0.3500 kg Tir @ Rp. 8,000.00 2,800.00

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 4,923.75 2,800.00 7,723.75

JASA 10 % 492.38 280.00 772.38

JUMLAH 5,416.13 3,080.00 8,496.13

DIBULATKAN 5,416.00 3,080.00 8,496.00

Empiris 1.0000 Pekerjaan cat duco 3 x

0.4250 kg Cat duco @ Rp. 60,000.00 25,500.00

0.0570 ltr Thinner @ Rp. 13,000.00 741.00

0.1000 lbr Amplas @ Rp. 2,500.00 250.00

0.3000 org Tukang cat @ Rp. 64,750.00 19,425.00

0.0300 org Kep. Tk. Cat @ Rp. 69,750.00 2,092.50

0.2000 org Pekerja @ Rp. 44,750.00 8,950.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 31,615.00 26,241.00 57,856.00

JASA 10 % 3,161.50 2,624.10 5,785.60

JUMLAH 34,776.50 28,865.10 63,641.60

DIBULATKAN 34,776.00 28,865.00 63,641.00

Empiris 1.0000 Mengerjakan Cat Sungging

Mengerjakan cat dasar

0.1200 kg Cat menie kayu @ Rp. 12,000.00 1,440.00

0.0400 org Tukang cat @ Rp. 25,000.00 1,000.00

0.0040 org Kep. Tk. Cat @ Rp. 27,000.00 108.00

0.0667 org Pekerja @ Rp. 20,000.00 1,334.00

0.0033 org Mandor @ Rp. 32,500.00 107.25

JUMLAH ( A ) 2,549.25 1,440.00 3,989.25

Mengecat dan membuat gradasi tutulan berkali-kali

0.4250 kg Cat kayu @ Rp. 32,000.00 13,600.00

0.1000 ltr Minyak cat @ Rp. 10,000.00 1,000.00

5.0000 org Tukang cat sungging @ Rp. 40,000.00 200,000.00

0.5000 org Kep. Tk. Cat sungging @ Rp. 45,000.00 22,500.00

0.2000 org Pekerja @ Rp. 20,000.00 4,000.00

0.0100 org Mandor @ Rp. 32,500.00 325.00

JUMLAH ( B ) 226,825.00 14,600.00 241,425.00

JUMLAH A + B ( BELUM PPN ) 229,374.25 16,040.00 245,414.25

JASA 10 % 22,937.43 1,604.00 24,541.43

JUMLAH 252,311.68 17,644.00 269,955.68

DIBULATKAN 252,311.00 17,644.00 269,955.00

31 1.0000 Mengecat genteng

0.3600 kg Cat genteng air ICI Weathershield @ Rp. 42,000.00 15,120.00

0.0630 org Tukang cat @ Rp. 64,750.00 4,079.25

0.0063 org Kep. Tk. Cat @ Rp. 69,750.00 439.43

0.0200 org Pekerja @ Rp. 44,750.00 895.00

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH 5,638.05 15,120.00 20,758.05

JASA 10 % 563.81 1,512.00 2,075.81

JUMLAH 6,201.86 16,632.00 22,833.86

DIBULATKAN 6,201.00 16,632.00 22,833.00

PEKERJAAN BONGKARAN

AK 1.0000 Membongkar pasangan batu kali

4.0000 org Tukang batu @ Rp. 64,750.00 259,000.00

0.4000 org Pekerja @ Rp. 44,750.00 17,900.00

JUMLAH ( BELUM PPN ) 276,900.00 - 276,900.00

JASA 10 % 27,690.00 - 27,690.00

JUMLAH 304,590.00 - 304,590.00

DIBULATKAN 304,590.00 - 304,590.00

AK 1.0000 Membongkar pasangan batu merah dan membersihkan

2.0000 org Tukang batu @ Rp. 64,750.00 129,500.00

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

JUMLAH ( BELUM PPN ) 133,975.00 - 133,975.00

JASA 10 % 13,397.50 - 13,397.50

JUMLAH 147,372.50 - 147,372.50

DIBULATKAN 147,372.00 - 147,372.00

m2

m2

m2

m2

m3

m3

Page 67: Bill of Quantity

Analisa Gedung - 67

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

AK 1.0000 Membongkar beton bertulang dan membersihkan

0.2000 org Tukang batu @ Rp. 64,750.00 12,950.00

8.0000 org Pekerja @ Rp. 44,750.00 358,000.00

0.1000 org Mandor @ Rp. 89,750.00 8,975.00

JUMLAH ( BELUM PPN ) 379,925.00 - 379,925.00

JASA 10 % 37,992.50 - 37,992.50

JUMLAH 417,917.50 - 417,917.50

DIBULATKAN 417,917.00 - 417,917.00

m3

Page 68: Bill of Quantity

Analisa Gedung - 68

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

AK 10.0000 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi

2.0000 org Pekerja @ Rp. 44,750.00 89,500.00

0.1000 org Mandor @ Rp. 89,750.00 8,975.00

JUMLAH ( BELUM PPN ) 98,475.00 - 98,475.00

TIAP 1M2 ( BELUM PPN ) 9,847.50 - 9,847.50

JASA 10 % 984.75 - 984.75

JUMLAH 10,832.25 - 10,832.25

DIBULATKAN 10,832.00 - 10,832.00

I.6 10.0000 Mengupas plesteran lama

1.2500 org Pekerja @ Rp. 44,750.00 55,937.50

0.1250 org Mandor @ Rp. 89,750.00 11,218.75

JUMLAH ( BELUM PPN ) 67,156.25 - 67,156.25

TIAP 1M2 ( BELUM PPN ) 6,715.63 - 6,715.63

JASA 10 % 671.56 - 671.56

JUMLAH 7,387.19 - 7,387.19

DIBULATKAN 7,387.00 - 7,387.00

I.7 10.0000 Membongkar genteng / sirap untuk dipergunakan lagi

2.0000 org Pekerja @ Rp. 44,750.00 89,500.00

0.1000 org Mandor @ Rp. 89,750.00 8,975.00

JUMLAH ( BELUM PPN ) 98,475.00 - 98,475.00

TIAP 1M2 ( BELUM PPN ) 9,847.50 - 9,847.50

JASA 10 % 984.75 - 984.75

JUMLAH 10,832.25 - 10,832.25

DIBULATKAN 10,832.00 - 10,832.00

I.8 10.0000 Membongkar atap seng

0.5000 org Tukang besi @ Rp. 64,750.00 32,375.00

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

JUMLAH ( BELUM PPN ) 77,125.00 - 77,125.00

TIAP 1M2 ( BELUM PPN ) 7,712.50 - 7,712.50

JASA 10 % 771.25 - 771.25

JUMLAH 8,483.75 - 8,483.75

DIBULATKAN 8,483.00 - 8,483.00

I.9 10.0000 Membongkar usuk / reng dipakai lagi

0.6000 org Tukang kayu @ Rp. 64,750.00 38,850.00

0.0600 org Kep. Tk. Kayu @ Rp. 69,750.00 4,185.00

2.0000 org Pekerja @ Rp. 44,750.00 89,500.00

0.1000 org Mandor @ Rp. 89,750.00 8,975.00

JUMLAH ( BELUM PPN ) 141,510.00 - 141,510.00

TIAP 1M2 ( BELUM PPN ) 14,151.00 - 14,151.00

JASA 10 % 1,415.10 - 1,415.10

JUMLAH 15,566.10 - 15,566.10

DIBULATKAN 15,566.00 - 15,566.00

10.0000 Membongkar usuk / reng tidak dipakai lagi

2.0000 org Pekerja @ Rp. 44,750.00 89,500.00

0.1000 org Mandor @ Rp. 89,750.00 8,975.00

JUMLAH ( BELUM PPN ) 98,475.00 - 98,475.00

TIAP 1M2 ( BELUM PPN ) 9,847.50 - 9,847.50

JASA 10 % 984.75 - 984.75

JUMLAH 10,832.25 - 10,832.25

DIBULATKAN 10,832.00 - 10,832.00

m2

m2

m2

m2

m2

m2

Page 69: Bill of Quantity

Analisa Gedung - 69

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

L.12 1.0000 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi

6.0000 org Tukang kayu @ Rp. 64,750.00 388,500.00

0.6000 org Kep. Tk. Kayu @ Rp. 69,750.00 41,850.00

4.0000 org Pekerja @ Rp. 44,750.00 179,000.00

0.2000 org Mandor @ Rp. 89,750.00 17,950.00

JUMLAH ( BELUM PPN ) 627,300.00 - 627,300.00

JASA 10 % 62,730.00 - 62,730.00

JUMLAH 690,030.00 - 690,030.00

DIBULATKAN 690,030.00 - 690,030.00

1.0000 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.2000 org Mandor @ Rp. 89,750.00 17,950.00

JUMLAH ( BELUM PPN ) 62,700.00 - 62,700.00

JASA 10 % 6,270.00 - 6,270.00

JUMLAH 68,970.00 - 68,970.00

DIBULATKAN 68,970.00 - 68,970.00

L.14 1.0000 Mengerjakan kembali bangunan kayu yang telah dibongkar

12.0000 org Tukang kayu @ Rp. 64,750.00 777,000.00

1.2000 org Kep. Tk. Kayu @ Rp. 69,750.00 83,700.00

4.0000 org Pekerja @ Rp. 44,750.00 179,000.00

0.2000 org Mandor @ Rp. 89,750.00 17,950.00

JUMLAH ( BELUM PPN ) 1,057,650.00 - 1,057,650.00

JASA 10 % 105,765.00 - 105,765.00

JUMLAH 1,163,415.00 - 1,163,415.00

DIBULATKAN 1,163,415.00 - 1,163,415.00

ANALISA SUPLEMEN

3 1.0000 M Pengelasan Single ( las listrik )

3.0000 kg Kawat las @ Rp. 6,500.00 19,500.00

1.0000 hari Peralatan las @ Rp. 75,000.00 75,000.00

0.5000 org Tukang las @ Rp. 64,750.00 32,375.00

0.0500 org Kepala tukang las @ Rp. 69,750.00 3,487.50

1.0000 Org Pekerja @ Rp. 64,750.00 64,750.00

1.0000 Org Mandor @ Rp. 89,750.00 89,750.00

JUMLAH ( BELUM PPN ) 190,362.50 94,500.00 284,862.50

JASA 10 % 19,036.25 9,450.00 28,486.25

JUMLAH 209,398.75 103,950.00 313,348.75

DIBULATKAN 209,398.00 103,950.00 313,348.00

m3

m3

m3

Page 70: Bill of Quantity

Analisa Gedung - 70

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

PEKERJAAN SANITASI SNI 1.0000 bh Memasang kloset duduk/monoblock

1.0000 bh Kloset duduk / monoblock @ Rp. 1,250,000.00 1,250,000.00

6.1 6% x Harga kloset (Perlengkapan) @ Rp. 1,250,000.00 75,000.00

1.1000 org Tukang batu @ Rp. 64,750.00 71,225.00

0.0010 org Kepala tukang batu @ Rp. 69,750.00 69.75

3.3000 org Pekerja @ Rp. 44,750.00 147,675.00

0.1600 org Mandor @ Rp. 89,750.00 14,360.00

JUMLAH ( BELUM PPN ) 233,329.75 1,325,000.00 1,558,329.75

JASA 10 % 23,332.98 132,500.00 155,832.98

JUMLAH 256,662.73 1,457,500.00 1,714,162.73

DIBULATKAN 256,662.00 1,457,500.00 1,714,162.00

SNI 1.0000 bh Memasang kloset jongkok porselen

1.0000 bh Kloset jongkok porselen @ Rp. 75,000.00 75,000.00

6.2 6.0000 kg PC @ Rp. 1,025.00 6,150.00

0.0100 Pasir pasang @ Rp. 120,000.00 1,200.00

1.5000 org Tukang batu @ Rp. 64,750.00 97,125.00

1.5000 org Kepala tukang batu @ Rp. 69,750.00 104,625.00

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.1600 org Mandor @ Rp. 89,750.00 14,360.00

JUMLAH ( BELUM PPN ) 260,860.00 82,350.00 343,210.00

JASA 10 % 26,086.00 8,235.00 34,321.00

JUMLAH 286,946.00 90,585.00 377,531.00

DIBULATKAN 286,946.00 90,585.00 377,531.00

SNI 1.0000 bh Memasang urinoir

1.0000 bh Urinoir @ Rp. 785,000.00 785,000.00

6.4 30% x Harga urinoir (Perlengkapan) @ Rp. 785,000.00 235,500.00

6.0000 kg PC @ Rp. 1,025.00 6,150.00

0.0100 Pasir pasang @ Rp. 120,000.00 1,200.00

1.0000 org Tukang batu @ Rp. 64,750.00 64,750.00

0.1000 org Kepala tukang batu @ Rp. 69,750.00 6,975.00

1.0000 org Pekerja @ Rp. 44,750.00 44,750.00

0.1000 org Mandor @ Rp. 89,750.00 8,975.00

JUMLAH ( BELUM PPN ) 125,450.00 1,027,850.00 1,153,300.00

JASA 10 % 12,545.00 102,785.00 115,330.00

JUMLAH 137,995.00 1,130,635.00 1,268,630.00

DIBULATKAN 137,995.00 1,130,635.00 1,268,630.00

SNI 1.0000 bh Memasang wastafel

1.0000 bh Wastafel @ Rp. 271,340.00 271,340.00

6.5 12% x Harga wastafel (Perlengkapan) @ Rp. 271,340.00 32,560.80

6.0000 kg PC @ Rp. 1,025.00 6,150.00

0.0100 Pasir pasang @ Rp. 120,000.00 1,200.00

1.4500 org Tukang batu @ Rp. 64,750.00 93,887.50

0.1500 org Kepala tukang batu @ Rp. 69,750.00 10,462.50

1.2000 org Pekerja @ Rp. 44,750.00 53,700.00

0.1000 org Mandor @ Rp. 89,750.00 8,975.00

JUMLAH ( BELUM PPN ) 167,025.00 311,250.80 478,275.80

JASA 10 % 16,702.50 31,125.08 47,827.58

JUMLAH 183,727.50 342,375.88 526,103.38

DIBULATKAN 183,727.00 342,375.00 526,103.00

m3

m3

m3

Page 71: Bill of Quantity

Analisa Gedung - 71

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 bh

1.0000 bh Bak fiberglass @ Rp. 275,000.00 275,000.00

6.7 18% x Harga bak(Perlengkapan) @ Rp. 275,000.00 49,500.00

2.7000 org Tukang batu @ Rp. 64,750.00 174,825.00

0.5400 org Kepala tukang batu @ Rp. 69,750.00 37,665.00

1.8000 org Pekerja @ Rp. 44,750.00 80,550.00

0.1100 org Mandor @ Rp. 89,750.00 9,872.50

JUMLAH ( BELUM PPN ) 302,912.50 324,500.00 627,412.50

JASA 10 % 30,291.25 32,450.00 62,741.25

JUMLAH 333,203.75 356,950.00 690,153.75

DIBULATKAN 333,203.00 356,950.00 690,153.00

SNI 1.0000 bh Memasang badkip porselen

1.0000 bh Badkip @ Rp. 150,000.00 150,000.00

6.9 20% x Harga badkip (Perlengkapan) @ Rp. 150,000.00 30,000.00

0.0750 org Tukang batu @ Rp. 64,750.00 4,856.25

0.7500 org Kepala tukang batu @ Rp. 69,750.00 52,312.50

org Pekerja @ Rp. 44,750.00 -

0.2500 org Mandor @ Rp. 89,750.00 22,437.50

JUMLAH ( BELUM PPN ) 79,606.25 180,000.00 259,606.25

JASA 10 % 7,960.63 18,000.00 25,960.63

JUMLAH 87,566.88 198,000.00 285,566.88

DIBULATKAN 87,566.00 198,000.00 285,566.00

SNI 1.0000 bh

1.0000 bh Bak fiberglass @ Rp. 825,000.00 825,000.00

6.11 12% x Harga bak (Perlengkapan) @ Rp. 825,000.00 99,000.00

4.5000 org Tukang batu @ Rp. 64,750.00 291,375.00

0.9000 org Kepala tukang batu @ Rp. 69,750.00 62,775.00

3.0000 org Pekerja @ Rp. 44,750.00 134,250.00

0.9000 org Mandor @ Rp. 89,750.00 80,775.00

JUMLAH ( BELUM PPN ) 569,175.00 924,000.00 1,493,175.00

JASA 10 % 56,917.50 92,400.00 149,317.50

JUMLAH 626,092.50 1,016,400.00 1,642,492.50

DIBULATKAN 626,092.00 1,016,400.00 1,642,492.00

SNI 1.0000 Memasang pipa beton, diameter 15 cm - 20 cm

1.1000 bh Pipa beton @ Rp. 24,000.00 26,400.00

6.14 16.0000 bh Batu bata @ Rp. 500.00 8,000.00

3.9200 kg PC @ Rp. 1,025.00 4,018.00

0.0560 Pasir pasang @ Rp. 120,000.00 6,720.00

0.0240 Pasir urug @ Rp. 55,000.00 1,320.00

0.0700 org Tukang batu @ Rp. 64,750.00 4,532.50

0.0070 org Kepala tukang batu @ Rp. 69,750.00 488.25

0.1400 org Pekerja @ Rp. 44,750.00 6,265.00

0.0070 org Mandor @ Rp. 89,750.00 628.25

JUMLAH ( BELUM PPN ) 11,914.00 46,458.00 58,372.00

JASA 10 % 1,191.40 4,645.80 5,837.20

JUMLAH 13,105.40 51,103.80 64,209.20

DIBULATKAN 13,105.00 51,103.00 64,209.00

SNI 1.0000 Memasang pipa beton, diameter 30 cm - 100 cm

1.1000 bh Pipa beton @ Rp. 25,000.00 27,500.00

6.15 330.0000 bh Batu bata @ Rp. 500.00 165,000.00

10.3000 kg PC @ Rp. 1,025.00 10,557.50

0.0610 Pasir pasang @ Rp. 120,000.00 7,320.00

0.0690 Pasir urug @ Rp. 55,000.00 3,795.00

0.1900 org Tukang batu @ Rp. 64,750.00 12,302.50

0.0190 org Kepala tukang batu @ Rp. 69,750.00 1,325.25

0.3800 org Pekerja @ Rp. 44,750.00 17,005.00

0.0190 org Mandor @ Rp. 89,750.00 1,705.25

JUMLAH ( BELUM PPN ) 32,338.00 214,172.50 246,510.50

JASA 10 % 3,233.80 21,417.25 24,651.05

JUMLAH 35,571.80 235,589.75 271,161.55

DIBULATKAN 35,571.00 235,589.00 271,161.00

SNI 1.0000 bh Memasang bak kontrol pas.bata (30 x 30) cm, tinggi 35 cm

87.0000 bh Batu bata @ Rp. 500.00 43,500.00

6.16 44.0000 kg PC @ Rp. 1,025.00 45,100.00

0.0700 Pasir pasang @ Rp. 120,000.00 8,400.00

0.0700 Batu kerikil @ Rp. 55,000.00 3,850.00

1.6000 kg Besi beton @ Rp. 12,500.00 20,000.00

Memasang bak mandi fiberglass volume 0,30 m3

Memasang bak fiberglass volume 1 m3 air

m1

m3

m3

m1

m3

m3

m3

m3

Page 72: Bill of Quantity

Analisa Gedung - 72

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

0.0600 Pasir beton @ Rp. 90,000.00 5,400.00

1.0150 org Tukang batu @ Rp. 64,750.00 65,721.25

0.0015 org Kepala tukang batu @ Rp. 69,750.00 104.63

3.2000 org Pekerja @ Rp. 44,750.00 143,200.00

0.0160 org Mandor @ Rp. 89,750.00 1,436.00

JUMLAH ( BELUM PPN ) 210,461.88 126,250.00 336,711.88

JASA 10 % 21,046.19 12,625.00 33,671.19

JUMLAH 231,508.06 138,875.00 370,383.06

DIBULATKAN 231,508.00 138,875.00 370,383.00

m3

Page 73: Bill of Quantity

Analisa Gedung - 73

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 bh Memasang bak kontrol pas. bata (45 x 45) cm, tinggi 50 cm

150.0000 bh Batu bata @ Rp. 500.00 75,000.00

6.17 77.0000 kg PC @ Rp. 1,025.00 78,925.00

0.1300 Pasir pasang @ Rp. 120,000.00 15,600.00

0.0200 Batu kerikil @ Rp. 55,000.00 1,100.00

2.6000 kg Besi beton @ Rp. 12,500.00 32,500.00

0.0900 Pasir beton @ Rp. 90,000.00 8,100.00

0.4730 org Tukang batu @ Rp. 64,750.00 30,626.75

0.0470 org Kepala tukang batu @ Rp. 69,750.00 3,278.25

1.4200 org Pekerja @ Rp. 44,750.00 63,545.00

0.0710 org Mandor @ Rp. 89,750.00 6,372.25

JUMLAH ( BELUM PPN ) 103,822.25 211,225.00 315,047.25

JASA 10 % 10,382.23 21,122.50 31,504.73

JUMLAH 114,204.48 232,347.50 346,551.98

DIBULATKAN 114,204.00 232,347.00 346,551.00

SNI 1.0000 bh Memasang bak kontrol pas. bata (60 x 60) cm, tingg 65 cm

222.0000 bh Batu bata @ Rp. 500.00 111,000.00

6.18 114.0000 kg PC @ Rp. 1,025.00 116,850.00

0.1840 Pasir pasang @ Rp. 120,000.00 22,080.00

0.0330 Batu kerikil @ Rp. 55,000.00 1,815.00

4.8500 kg Besi beton @ Rp. 12,500.00 60,625.00

0.1200 Pasir beton @ Rp. 90,000.00 10,800.00

0.7200 org Tukang batu @ Rp. 64,750.00 46,620.00

0.0720 org Kepala tukang batu @ Rp. 69,750.00 5,022.00

2.1600 org Pekerja @ Rp. 44,750.00 96,660.00

0.1000 org Mandor @ Rp. 89,750.00 8,975.00

JUMLAH ( BELUM PPN ) 157,277.00 323,170.00 480,447.00

JASA 10 % 15,727.70 32,317.00 48,044.70

JUMLAH 173,004.70 355,487.00 528,491.70

DIBULATKAN 173,004.00 355,487.00 528,491.00

SNI 1.0000 Memasang pipa galvanis diameter 1/2"

1.2000 Pipa galvanis @ Rp. 15,000.00 18,000.00

6.19 35% x Harga pipa (Perlengkapan) @ Rp. 15,000.00 5,250.00

0.0900 org Tukang batu @ Rp. 64,750.00 5,827.50

0.0090 org Kepala tukang batu @ Rp. 69,750.00 627.75

0.0540 org Pekerja @ Rp. 44,750.00 2,416.50

0.0270 org Mandor @ Rp. 89,750.00 2,423.25

JUMLAH ( BELUM PPN ) 11,295.00 23,250.00 34,545.00

JASA 10 % 1,129.50 2,325.00 3,454.50

JUMLAH 12,424.50 25,575.00 37,999.50

DIBULATKAN 12,424.00 25,575.00 37,999.00

SNI 1.0000 Memasang pipa galvanis diameter 3/4"

1.2000 Pipa galvanis @ Rp. 25,000.00 30,000.00

6.20 35% x Harga pipa (Perlengkapan) @ Rp. 25,000.00 8,750.00

0.0900 org Tukang batu @ Rp. 64,750.00 5,827.50

0.0090 org Kepala tukang batu @ Rp. 69,750.00 627.75

0.0540 org Pekerja @ Rp. 44,750.00 2,416.50

0.0270 org Mandor @ Rp. 89,750.00 2,423.25

JUMLAH ( BELUM PPN ) 11,295.00 38,750.00 50,045.00

JASA 10 % 1,129.50 3,875.00 5,004.50

JUMLAH 12,424.50 42,625.00 55,049.50

DIBULATKAN 12,424.00 42,625.00 55,049.00

SNI 1.0000 Memasang pipa galvanis diameter 1"

1.2000 Pipa galvanis @ Rp. 37,500.00 45,000.00

6.21 35% x Harga pipa (Perlengkapan) @ Rp. 37,500.00 13,125.00

0.0900 org Tukang batu @ Rp. 64,750.00 5,827.50

0.0090 org Kepala tukang batu @ Rp. 69,750.00 627.75

0.0540 org Pekerja @ Rp. 44,750.00 2,416.50

0.0270 org Mandor @ Rp. 89,750.00 2,423.25

JUMLAH ( BELUM PPN ) 11,295.00 58,125.00 69,420.00

JASA 10 % 1,129.50 5,812.50 6,942.00

JUMLAH 12,424.50 63,937.50 76,362.00

DIBULATKAN 12,424.00 63,937.00 76,362.00

SNI 1.0000 Memasang pipa galvanis diameter 1 1/2"

1.2000 Pipa galvanis @ Rp. 50,000.00 60,000.00

6.22 35% x Harga pipa (Perlengkapan) @ Rp. 50,000.00 17,500.00

0.1800 org Tukang batu @ Rp. 64,750.00 11,655.00

m3

m3

m3

m3

m3

m3

m1

m1

m1

m1

m1

m1

m1

m1

Page 74: Bill of Quantity

Analisa Gedung - 74

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

0.0180 org Kepala tukang batu @ Rp. 69,750.00 1,255.50

0.1080 org Pekerja @ Rp. 44,750.00 4,833.00

0.0054 org Mandor @ Rp. 89,750.00 484.65

JUMLAH ( BELUM PPN ) 18,228.15 77,500.00 95,728.15

JASA 10 % 1,822.82 7,750.00 9,572.82

JUMLAH 20,050.97 85,250.00 105,300.97

DIBULATKAN 20,050.00 85,250.00 105,300.00

Page 75: Bill of Quantity

Analisa Gedung - 75

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Memasang pipa PVC tipe AW diameter 1/2"

1.2000 Pipa PVC @ Rp. 3,162.50 3,795.00

6.25 35% x Harga pipa (Perlengkapan) @ Rp. 3,162.50 1,106.88

0.0600 org Tukang batu @ Rp. 64,750.00 3,885.00

0.0060 org Kepala tukang batu @ Rp. 69,750.00 418.50

0.0360 org Pekerja @ Rp. 44,750.00 1,611.00

0.0018 org Mandor @ Rp. 89,750.00 161.55

JUMLAH ( BELUM PPN ) 6,076.05 4,901.88 10,977.93

JASA 10 % 607.61 490.19 1,097.79

JUMLAH 6,683.66 5,392.06 12,075.72

DIBULATKAN 6,683.00 5,392.00 12,075.00

SNI 1.0000 Memasang pipa PVC tipe AW diameter 3/4"

1.2000 Pipa PVC @ Rp. 4,250.00 5,100.00

6.26 35% x Harga pipa (Perlengkapan) @ Rp. 4,250.00 1,487.50

0.0600 org Tukang batu @ Rp. 64,750.00 3,885.00

0.0060 org Kepala tukang batu @ Rp. 69,750.00 418.50

0.0360 org Pekerja @ Rp. 44,750.00 1,611.00

0.0018 org Mandor @ Rp. 89,750.00 161.55

JUMLAH ( BELUM PPN ) 6,076.05 6,587.50 12,663.55

JASA 10 % 607.61 658.75 1,266.36

JUMLAH 6,683.66 7,246.25 13,929.90

DIBULATKAN 6,683.00 7,246.00 13,929.00

SNI 1.0000 Memasang pipa PVC tipe AW diameter 1"

1.2000 Pipa PVC @ Rp. 5,125.00 6,150.00

6.27 35% x Harga pipa (Perlengkapan) @ Rp. 5,125.00 1,793.75

0.0600 org Tukang batu @ Rp. 64,750.00 3,885.00

0.0060 org Kepala tukang batu @ Rp. 69,750.00 418.50

0.0360 org Pekerja @ Rp. 44,750.00 1,611.00

0.0018 org Mandor @ Rp. 89,750.00 161.55

JUMLAH ( BELUM PPN ) 6,076.05 7,943.75 14,019.80

JASA 10 % 607.61 794.38 1,401.98

JUMLAH 6,683.66 8,738.13 15,421.78

DIBULATKAN 6,683.00 8,738.00 15,421.00

SNI 1.0000 Memasang pipa PVC tipe AW diameter 1 1/2"

1.2000 Pipa PVC @ Rp. 11,250.00 13,500.00

6.28 35% x Harga pipa (Perlengkapan) @ Rp. 11,250.00 3,937.50

0.0600 org Tukang batu @ Rp. 64,750.00 3,885.00

0.0060 org Kepala tukang batu @ Rp. 69,750.00 418.50

0.0360 org Pekerja @ Rp. 44,750.00 1,611.00

0.0018 org Mandor @ Rp. 89,750.00 161.55

JUMLAH ( BELUM PPN ) 6,076.05 17,437.50 23,513.55

JASA 10 % 607.61 1,743.75 2,351.36

JUMLAH 6,683.66 19,181.25 25,864.91

DIBULATKAN 6,683.00 19,181.00 25,864.00

m1

m1

m1

m1

m1

m1

m1

m1

Page 76: Bill of Quantity

Analisa Gedung - 76

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Memasang pipa PVC tipe AW diameter 2"

1.2000 Pipa PVC @ Rp. 15,000.00 18,000.00

6.29 35% x Harga pipa (Perlengkapan) @ Rp. 15,000.00 5,250.00

0.0900 org Tukang batu @ Rp. 64,750.00 5,827.50

0.0090 org Kepala tukang batu @ Rp. 69,750.00 627.75

0.0544 org Pekerja @ Rp. 44,750.00 2,434.40

0.0027 org Mandor @ Rp. 89,750.00 242.33

JUMLAH ( BELUM PPN ) 9,131.98 23,250.00 32,381.98

JASA 10 % 913.20 2,325.00 3,238.20

JUMLAH 10,045.17 25,575.00 35,620.17

DIBULATKAN 10,045.00 25,575.00 35,620.00

SNI 1.0000 Memasang pipa PVC tipe AW diameter 2 1/2"

1.2000 Pipa PVC @ Rp. 20,500.00 24,600.00

6.30 35% x Harga pipa (Perlengkapan) @ Rp. 20,500.00 7,175.00

0.0600 org Tukang batu @ Rp. 64,750.00 3,885.00

0.0060 org Kepala tukang batu @ Rp. 69,750.00 418.50

0.0360 org Pekerja @ Rp. 44,750.00 1,611.00

0.0018 org Mandor @ Rp. 89,750.00 161.55

JUMLAH ( BELUM PPN ) 6,076.05 31,775.00 37,851.05

JASA 10 % 607.61 3,177.50 3,785.11

JUMLAH 6,683.66 34,952.50 41,636.16

DIBULATKAN 6,683.00 34,952.00 41,636.00

SNI 1.0000 Memasang pipa PVC tipe AW diameter 3"

1.2000 Pipa PVC @ Rp. 20,500.00 24,600.00

6.31 35% x Harga pipa (Perlengkapan) @ Rp. 20,500.00 7,175.00

0.1350 org Tukang batu @ Rp. 64,750.00 8,741.25

0.0135 org Kepala tukang batu @ Rp. 69,750.00 941.63

0.0810 org Pekerja @ Rp. 44,750.00 3,624.75

0.0410 org Mandor @ Rp. 89,750.00 3,679.75

JUMLAH ( BELUM PPN ) 16,987.38 31,775.00 48,762.38

JASA 10 % 1,698.74 3,177.50 4,876.24

JUMLAH 18,686.11 34,952.50 53,638.61

DIBULATKAN 18,686.00 34,952.00 53,638.00

SNI 1.0000 Memasang pipa PVC tipe AW diameter 4"

1.2000 Pipa PVC @ Rp. 33,750.00 40,500.00

6.32 35% x Harga pipa (Perlengkapan) @ Rp. 33,750.00 11,812.50

0.1350 org Tukang batu @ Rp. 64,750.00 8,741.25

0.0135 org Kepala tukang batu @ Rp. 69,750.00 941.63

0.0810 org Pekerja @ Rp. 44,750.00 3,624.75

0.0410 org Mandor @ Rp. 89,750.00 3,679.75

JUMLAH ( BELUM PPN ) 16,987.38 52,312.50 69,299.88

JASA 10 % 1,698.74 5,231.25 6,929.99

JUMLAH 18,686.11 57,543.75 76,229.86

DIBULATKAN 18,686.00 57,543.00 76,229.00

m1

m1

m1

m1

m1

m1

m1

m1

Page 77: Bill of Quantity

Analisa Gedung - 77

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 bh Memasang bak cuci piring stainless steel

1.0000 bh Bak cuci stainless steel @ Rp. 500,000.00 500,000.00

6.33 1.0000 set Water drain + asesories @ Rp. 75,000.00 75,000.00

0.3000 org Tukang batu @ Rp. 64,750.00 19,425.00

0.0300 org Kepala tukang batu @ Rp. 69,750.00 2,092.50

0.0300 org Pekerja @ Rp. 44,750.00 1,342.50

0.0015 org Mandor @ Rp. 89,750.00 134.63

JUMLAH ( BELUM PPN ) 22,994.63 575,000.00 597,994.63

JASA 10 % 2,299.46 57,500.00 59,799.46

JUMLAH 25,294.09 632,500.00 657,794.09

DIBULATKAN 25,294.00 632,500.00 657,794.00

SNI 1.0000 bh Memasang kran diameter 3/4" atau 1/2"

1.0000 bh Kran air @ Rp. 25,000.00 25,000.00

6.35 0.0250 bh Seal tape @ Rp. 2,500.00 62.50

0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang batu @ Rp. 69,750.00 697.50

0.0100 org Pekerja @ Rp. 44,750.00 447.50

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 8,068.75 25,062.50 33,131.25

JASA 10 % 806.88 2,506.25 3,313.13

JUMLAH 8,875.63 27,568.75 36,444.38

DIBULATKAN 8,875.00 27,568.00 36,444.00

SNI 1.0000 bh Memasang floor drain

1.0000 bh Floor drain @ Rp. 55,000.00 55,000.00

6.35 0.1000 org Tukang batu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang batu @ Rp. 69,750.00 697.50

0.0100 org Pekerja @ Rp. 44,750.00 447.50

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 8,068.75 55,000.00 63,068.75

JASA 10 % 806.88 5,500.00 6,306.88

JUMLAH 8,875.63 60,500.00 69,375.63

DIBULATKAN 8,875.00 60,500.00 69,375.00

PEKERJAAN BESI DAN ALUMUNIUM

3 1.0000 M Pengelasan Single ( las listrik )

3.0000 kg Kawat las @ Rp. 6,500.00 19,500.00

1.0000 hari Peralatan las @ Rp. 75,000.00 75,000.00

0.5000 org Tukang las @ Rp. 27,500.00 13,750.00

0.0500 org Kepala tukang las @ Rp. 29,000.00 1,450.00

1.0000 Org Pekerja @ Rp. 27,500.00 27,500.00

1.0000 Org Mandor @ Rp. 32,500.00 32,500.00

JUMLAH ( BELUM PPN ) 75,200.00 94,500.00 169,700.00

JASA 10 % 7,520.00 9,450.00 16,970.00

JUMLAH 82,720.00 103,950.00 186,670.00

DIBULATKAN 82,720.00 103,950.00 186,670.00

SNI 1.0000 kg Pasang rangka atap baja

1.1000 kg Baja profil IWF @ Rp. 8,800.00 9,680.00

6.1 0.0800 kg Meni besi @ Rp. 22,500.00 1,800.00

0.0060 org Tukang besi @ Rp. 64,750.00 388.50

0.0060 org Kepala tukang besi @ Rp. 69,750.00 418.50

0.0600 org Pekerja @ Rp. 44,750.00 2,685.00

0.0003 org Mandor @ Rp. 89,750.00 26.92

JUMLAH ( BELUM PPN ) 3,518.93 11,480.00 14,998.93

JASA 10 % 351.89 1,148.00 1,499.89

JUMLAH 3,870.82 12,628.00 16,498.82

DIBULATKAN 3,870.00 12,628.00 16,498.00

Page 78: Bill of Quantity

Analisa Gedung - 78

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasang pintu besi baja

1.0000 Pintu besi baja @ Rp. 750,000.00 750,000.00

6.2 0.6500 org Tukang besi konstruksi @ Rp. 64,750.00 42,087.50

0.0650 org Kepala tukang besi @ Rp. 69,750.00 4,533.75

0.6500 org Pekerja @ Rp. 44,750.00 29,087.50

0.0320 org Mandor @ Rp. 89,750.00 2,872.00

JUMLAH ( BELUM PPN ) 78,580.75 750,000.00 828,580.75

JASA 10 % 7,858.08 75,000.00 82,858.08

JUMLAH 86,438.83 825,000.00 911,438.83

DIBULATKAN 86,438.00 825,000.00 911,438.00

SNI 1.0000 Pasang pintu gulung besi

1.0000 Pintu gulung besi @ Rp. 250,000.00 250,000.00

6.5 1.2000 org Tukang besi konstruksi @ Rp. 64,750.00 77,700.00

0.1200 org Kepala tukang besi @ Rp. 69,750.00 8,370.00

1.2000 org Pekerja @ Rp. 44,750.00 53,700.00

0.0060 org Mandor @ Rp. 89,750.00 538.50

JUMLAH ( BELUM PPN ) 140,308.50 250,000.00 390,308.50

JASA 10 % 14,030.85 25,000.00 39,030.85

JUMLAH 154,339.35 275,000.00 429,339.35

DIBULATKAN 154,339.00 275,000.00 429,339.00

SNI 1.0000 Pasang pintu lipat

1.0000 Pintu lipat @ Rp. 500,000.00 500,000.00

6.6 1.0500 org Tukang besi konstruksi @ Rp. 64,750.00 67,987.50

0.1050 org Kepala tukang besi @ Rp. 69,750.00 7,323.75

1.0500 org Pekerja @ Rp. 44,750.00 46,987.50

0.0052 org Mandor @ Rp. 89,750.00 466.70

JUMLAH ( BELUM PPN ) 122,765.45 500,000.00 622,765.45

JASA 10 % 12,276.55 50,000.00 62,276.55

JUMLAH 135,042.00 550,000.00 685,042.00

DIBULATKAN 135,041.00 550,000.00 685,041.00

m2

m2

m2

m2

m2

m2

Page 79: Bill of Quantity

Analisa Gedung - 79

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasang Rolling door

1.0000 Roll door @ Rp. 200,000.00 200,000.00

6.8 1.5000 org Tukang besi konstruksi @ Rp. 64,750.00 97,125.00

0.1050 org Kepala tukang besi @ Rp. 69,750.00 7,323.75

1.0500 org Pekerja @ Rp. 44,750.00 46,987.50

0.0052 org Mandor @ Rp. 89,750.00 466.70

JUMLAH ( BELUM PPN ) 151,902.95 200,000.00 351,902.95

JASA 10 % 15,190.30 20,000.00 35,190.30

JUMLAH 167,093.25 220,000.00 387,093.25

DIBULATKAN 167,093.00 220,000.00 387,093.00

SNI 1.0000 Pasang pintu alumunium

1.0000 Pintu alumunium @ Rp. 400,000.00 400,000.00

6.9 1.0500 org Tukang besi konstruksi @ Rp. 64,750.00 67,987.50

0.1050 org Kepala tukang besi @ Rp. 69,750.00 7,323.75

1.0500 org Pekerja @ Rp. 44,750.00 46,987.50

0.0052 org Mandor @ Rp. 89,750.00 466.70

JUMLAH ( BELUM PPN ) 122,765.45 400,000.00 522,765.45

JASA 10 % 12,276.55 40,000.00 52,276.55

JUMLAH 135,042.00 440,000.00 575,042.00

DIBULATKAN 135,041.00 440,000.00 575,041.00

SNI 1.0000 Pasang teralis besi

11.5000 Baja strip 2 x 3 @ Rp. 8,800.00 101,200.00

6.12 1.2000 org Tukang las @ Rp. 64,750.00 77,700.00

0.0120 org Kepala tukang las @ Rp. 69,750.00 837.00

1.2000 org Pekerja @ Rp. 44,750.00 53,700.00

0.0006 org Mandor @ Rp. 89,750.00 53.85

JUMLAH ( BELUM PPN ) 132,290.85 101,200.00 233,490.85

JASA 10 % 13,229.09 10,120.00 23,349.09

JUMLAH 145,519.94 111,320.00 256,839.94

DIBULATKAN 145,519.00 111,320.00 256,839.00

SNI 1.0000 Pasang kawat harmonika

1.1000 Kawat harmonika @ Rp. 25,000.00 27,500.00

6.13 0.0200 kg Paku biasa 1/2" - 1" @ Rp. 10,000.00 200.00

0.0018 Kayu kamper papan @ Rp. 5,500,000.00 9,900.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0005 org Mandor @ Rp. 89,750.00 44.88

JUMLAH ( BELUM PPN ) 11,692.38 37,600.00 49,292.38

JASA 10 % 1,169.24 3,760.00 4,929.24

JUMLAH 12,861.61 41,360.00 54,221.61

DIBULATKAN 12,861.00 41,360.00 54,221.00

m2

m2

m2

m2

m2

m1

m2

m2

m3

Page 80: Bill of Quantity

Analisa Gedung - 80

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

SNI 1.0000 Pasang kawat nyamuk

1.1000 Kawat nyamuk @ Rp. 8,250.00 9,075.00

6.14 0.0200 kg Paku biasa 1/2" - 1" @ Rp. 10,000.00 200.00

0.0018 Kayu kamper papan @ Rp. 5,500,000.00 9,900.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0005 org Mandor @ Rp. 89,750.00 44.88

JUMLAH ( BELUM PPN ) 11,692.38 19,175.00 30,867.38

JASA 10 % 1,169.24 1,917.50 3,086.74

JUMLAH 12,861.61 21,092.50 33,954.11

DIBULATKAN 12,861.00 21,092.00 33,954.00

SNI 1.0000 Pasang kawat kassa

1.1000 Kawat kassa @ Rp. 10,000.00 11,000.00

6.15 0.0200 kg Paku biasa 1/2" - 1" @ Rp. 10,000.00 200.00

0.0018 Kayu kamper papan @ Rp. 5,500,000.00 9,900.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.1000 org Pekerja @ Rp. 44,750.00 4,475.00

0.0005 org Mandor @ Rp. 89,750.00 44.88

JUMLAH ( BELUM PPN ) 11,692.38 21,100.00 32,792.38

JASA 10 % 1,169.24 2,110.00 3,279.24

JUMLAH 12,861.61 23,210.00 36,071.61

DIBULATKAN 12,861.00 23,210.00 36,071.00

SNI 1.0000 Pasang jendela nako & tralis

1.1000 Jendela nako @ Rp. 52,000.00 57,200.00

6.17 0.0200 kg Paku skrup @ Rp. 10,000.00 200.00

0.0250 Besi strip @ Rp. 11,500.00 287.50

0.2000 org Tukang kayu @ Rp. 64,750.00 12,950.00

0.0200 org Kepala tukang kayu @ Rp. 69,750.00 1,395.00

0.2000 org Pekerja @ Rp. 44,750.00 8,950.00

0.0010 org Mandor @ Rp. 89,750.00 89.75

JUMLAH ( BELUM PPN ) 23,384.75 57,687.50 81,072.25

JASA 10 % 2,338.48 5,768.75 8,107.23

JUMLAH 25,723.23 63,456.25 89,179.48

DIBULATKAN 25,723.00 63,456.00 89,179.00

PEKERJAAN KUNCI DAN KACA

6.1 1.0000 bh Pasang kunci tanam antik

1.0000 bh Kunci tanam antik @ Rp. 250,000.00 250,000.00

0.6000 org Tukang kayu @ Rp. 64,750.00 38,850.00

0.0600 org Kepala tukang kayu @ Rp. 69,750.00 4,185.00

0.0600 org Pekerja @ Rp. 44,750.00 2,685.00

0.0030 org Mandor @ Rp. 89,750.00 269.25

JUMLAH ( BELUM PPN ) 45,989.25 250,000.00 295,989.25

JASA 10 % 4,598.93 25,000.00 29,598.93

JUMLAH 50,588.18 275,000.00 325,588.18

DIBULATKAN 50,588.00 275,000.00 325,588.00

m2

m2

m3

m2

m2

m3

m2

m2

m2

Page 81: Bill of Quantity

Analisa Gedung - 81

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

6.2 1.0000 bh Pasang kunci tanam biasa

1.0000 bh Kunci tanam biasa @ Rp. 125,000.00 125,000.00

0.5000 org Tukang kayu @ Rp. 64,750.00 32,375.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.0100 org Pekerja @ Rp. 44,750.00 447.50

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 33,968.75 125,000.00 158,968.75

JASA 10 % 3,396.88 12,500.00 15,896.88

JUMLAH 37,365.63 137,500.00 174,865.63

DIBULATKAN 37,365.00 137,500.00 174,865.00

6.3 1.0000 bh Pasang kunci tanam kamar mandi

1.0000 bh Kunci tanam kamar mandi @ Rp. 50,000.00 50,000.00

0.5000 org Tukang kayu @ Rp. 64,750.00 32,375.00

0.0050 org Kepala tukang kayu @ Rp. 69,750.00 348.75

0.0050 org Pekerja @ Rp. 44,750.00 223.75

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 33,171.88 50,000.00 83,171.88

JASA 10 % 3,317.19 5,000.00 8,317.19

JUMLAH 36,489.06 55,000.00 91,489.06

DIBULATKAN 36,489.00 55,000.00 91,489.00

6.4 1.0000 bh Pasang kunci tanam silinder

1.0000 bh Kunci silinder @ Rp. 75,000.00 75,000.00

0.5000 org Tukang kayu @ Rp. 64,750.00 32,375.00

0.0050 org Kepala tukang kayu @ Rp. 69,750.00 348.75

0.0050 org Pekerja @ Rp. 44,750.00 223.75

0.0003 org Mandor @ Rp. 89,750.00 22.44

JUMLAH ( BELUM PPN ) 32,969.94 75,000.00 107,969.94

JASA 10 % 3,296.99 7,500.00 10,796.99

JUMLAH 36,266.93 82,500.00 118,766.93

DIBULATKAN 36,266.00 82,500.00 118,766.00

6.5 1.0000 bh Pasang engsel pintu

1.0000 bh Engsel pintu @ Rp. 11,000.00 11,000.00

0.1500 org Tukang kayu @ Rp. 64,750.00 9,712.50

0.0150 org Kepala tukang kayu @ Rp. 69,750.00 1,046.25

0.0150 org Pekerja @ Rp. 44,750.00 671.25

0.0008 org Mandor @ Rp. 89,750.00 67.31

JUMLAH ( BELUM PPN ) 11,497.31 11,000.00 22,497.31

JASA 10 % 1,149.73 1,100.00 2,249.73

JUMLAH 12,647.04 12,100.00 24,747.04

DIBULATKAN 12,647.00 12,100.00 24,747.00

6.6 1.0000 bh Pasang engsel jendela kupu-kupu

1.0000 bh Engsel jendela @ Rp. 7,500.00 7,500.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.0100 org Pekerja @ Rp. 44,750.00 447.50

0.0050 org Mandor @ Rp. 89,750.00 448.75

JUMLAH ( BELUM PPN ) 8,068.75 7,500.00 15,568.75

JASA 10 % 806.88 750.00 1,556.88

JUMLAH 8,875.63 8,250.00 17,125.63

DIBULATKAN 8,875.00 8,250.00 17,125.00

6.7 1.0000 bh Pasang engsel angin

1.0000 bh Engsel angin @ Rp. 3,000.00 3,000.00

0.2000 org Tukang kayu @ Rp. 64,750.00 12,950.00

0.0200 org Kepala tukang kayu @ Rp. 69,750.00 1,395.00

0.0200 org Pekerja @ Rp. 44,750.00 895.00

0.0100 org Mandor @ Rp. 89,750.00 897.50

JUMLAH ( BELUM PPN ) 16,137.50 3,000.00 19,137.50

JASA 10 % 1,613.75 300.00 1,913.75

JUMLAH 17,751.25 3,300.00 21,051.25

DIBULATKAN 17,751.00 3,300.00 21,051.00

Page 82: Bill of Quantity

Analisa Gedung - 82

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

6.8 1.0000 bh Pasang spring knip

1.0000 bh Spring knip @ Rp. 7,500.00 7,500.00

0.1500 org Tukang kayu @ Rp. 64,750.00 9,712.50

0.0150 org Kepala tukang kayu @ Rp. 69,750.00 1,046.25

0.0150 org Pekerja @ Rp. 44,750.00 671.25

0.0008 org Mandor @ Rp. 89,750.00 67.31

JUMLAH ( BELUM PPN ) 11,497.31 7,500.00 18,997.31

JASA 10 % 1,149.73 750.00 1,899.73

JUMLAH 12,647.04 8,250.00 20,897.04

DIBULATKAN 12,647.00 8,250.00 20,897.00

6.9 1.0000 bh Pasang kait angin

1.0000 bh Kait angin @ Rp. 3,000.00 3,000.00

0.1500 org Tukang kayu @ Rp. 64,750.00 9,712.50

0.0150 org Kepala tukang kayu @ Rp. 69,750.00 1,046.25

0.0150 org Pekerja @ Rp. 44,750.00 671.25

0.0008 org Mandor @ Rp. 89,750.00 67.31

JUMLAH ( BELUM PPN ) 11,497.31 3,000.00 14,497.31

JASA 10 % 1,149.73 300.00 1,449.73

JUMLAH 12,647.04 3,300.00 15,947.04

DIBULATKAN 12,647.00 3,300.00 15,947.00

6.10 1.0000 bh Pasang door closer

1.0000 bh Door closer @ Rp. 150,000.00 150,000.00

0.5000 org Tukang kayu @ Rp. 64,750.00 32,375.00

0.0500 org Kepala tukang kayu @ Rp. 69,750.00 3,487.50

0.0500 org Pekerja @ Rp. 44,750.00 2,237.50

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 38,324.38 150,000.00 188,324.38

JASA 10 % 3,832.44 15,000.00 18,832.44

JUMLAH 42,156.81 165,000.00 207,156.81

DIBULATKAN 42,156.00 165,000.00 207,156.00

6.11 1.0000 bh Pasang kunci selot

1.0000 bh Kunci selot @ Rp. 50,000.00 50,000.00

0.2000 org Tukang kayu @ Rp. 64,750.00 12,950.00

0.0200 org Kepala tukang kayu @ Rp. 69,750.00 1,395.00

0.0200 org Pekerja @ Rp. 44,750.00 895.00

0.0010 org Mandor @ Rp. 89,750.00 89.75

JUMLAH ( BELUM PPN ) 15,329.75 50,000.00 65,329.75

JASA 10 % 1,532.98 5,000.00 6,532.98

JUMLAH 16,862.73 55,000.00 71,862.73

DIBULATKAN 16,862.00 55,000.00 71,862.00

6.12 1.0000 bh Pasang pegangan pintu / door holder

1.0000 bh Door holder @ Rp. 15,000.00 15,000.00

0.5000 org Tukang kayu @ Rp. 64,750.00 32,375.00

0.0500 org Kepala tukang kayu @ Rp. 69,750.00 3,487.50

0.0500 org Pekerja @ Rp. 44,750.00 2,237.50

0.0025 org Mandor @ Rp. 89,750.00 224.38

JUMLAH ( BELUM PPN ) 38,324.38 15,000.00 53,324.38

JASA 10 % 3,832.44 1,500.00 5,332.44

JUMLAH 42,156.81 16,500.00 58,656.81

DIBULATKAN 42,156.00 16,500.00 58,656.00

6.13 1.0000 bh Pasang door stop

1.0000 bh Door stop @ Rp. 15,000.00 15,000.00

0.1000 org Tukang kayu @ Rp. 64,750.00 6,475.00

0.0100 org Kepala tukang kayu @ Rp. 69,750.00 697.50

0.0100 org Pekerja @ Rp. 44,750.00 447.50

0.0005 org Mandor @ Rp. 89,750.00 44.88

JUMLAH ( BELUM PPN ) 7,664.88 15,000.00 22,664.88

JASA 10 % 766.49 1,500.00 2,266.49

JUMLAH 8,431.36 16,500.00 24,931.36

DIBULATKAN 8,431.00 16,500.00 24,931.00

Page 83: Bill of Quantity

Analisa Gedung - 83

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

6.14 1.0000 bh Pasang rel pintu dorong

1.0000 bh Rel pintu dorong @ Rp. 200,000.00 200,000.00

0.6000 org Tukang kayu @ Rp. 64,750.00 38,850.00

0.0600 org Kepala tukang kayu @ Rp. 69,750.00 4,185.00

0.0600 org Pekerja @ Rp. 44,750.00 2,685.00

0.0030 org Mandor @ Rp. 89,750.00 269.25

JUMLAH ( BELUM PPN ) 45,989.25 200,000.00 245,989.25

JASA 10 % 4,598.93 20,000.00 24,598.93

JUMLAH 50,588.18 220,000.00 270,588.18

DIBULATKAN 50,588.00 220,000.00 270,588.00

6.15 1.0000 bh Pasang kunci lemari

1.0000 bh Kunci lemari @ Rp. 12,000.00 12,000.00

0.2500 org Tukang kayu @ Rp. 64,750.00 16,187.50

0.0250 org Kepala tukang kayu @ Rp. 69,750.00 1,743.75

0.0250 org Pekerja @ Rp. 44,750.00 1,118.75

0.0013 org Mandor @ Rp. 89,750.00 112.19

JUMLAH ( BELUM PPN ) 19,162.19 12,000.00 31,162.19

JASA 10 % 1,916.22 1,200.00 3,116.22

JUMLAH 21,078.41 13,200.00 34,278.41

DIBULATKAN 21,078.00 13,200.00 34,278.00

6.16 1.0000 Pasang kaca, tebal 3 mm

1.1000 Kaca polos @ Rp. 49,500.00 54,450.00

0.1500 org Tukang kayu @ Rp. 64,750.00 9,712.50

0.0150 org Kepala tukang kayu @ Rp. 69,750.00 1,046.25

0.0150 org Pekerja @ Rp. 44,750.00 671.25

0.0008 org Mandor @ Rp. 89,750.00 67.31

JUMLAH ( BELUM PPN ) 11,497.31 54,450.00 65,947.31

JASA 10 % 1,149.73 5,445.00 6,594.73

JUMLAH 12,647.04 59,895.00 72,542.04

DIBULATKAN 12,647.00 59,895.00 72,542.00

6.17 1.0000 Pasang kaca, tebal 5 mm

1.1000 Kaca polos @ Rp. 77,000.00 84,700.00

0.1500 org Tukang kayu @ Rp. 64,750.00 9,712.50

0.0150 org Kepala tukang kayu @ Rp. 69,750.00 1,046.25

0.0150 org Pekerja @ Rp. 44,750.00 671.25

0.0008 org Mandor @ Rp. 89,750.00 67.31

JUMLAH ( BELUM PPN ) 11,497.31 84,700.00 96,197.31

JASA 10 % 1,149.73 8,470.00 9,619.73

JUMLAH 12,647.04 93,170.00 105,817.04

DIBULATKAN 12,647.00 93,170.00 105,817.00

6.20 1.0000 Pasang kaca cermin, tebal 5 mm

1.1000 Kaca cermin @ Rp. 120,000.00 132,000.00

0.1500 org Tukang kayu @ Rp. 64,750.00 9,712.50

0.0150 org Kepala tukang kayu @ Rp. 69,750.00 1,046.25

0.0150 org Pekerja @ Rp. 44,750.00 671.25

0.0008 org Mandor @ Rp. 89,750.00 67.31

JUMLAH ( BELUM PPN ) 11,497.31 132,000.00 143,497.31

JASA 10 % 1,149.73 13,200.00 14,349.73

JUMLAH 12,647.04 145,200.00 157,847.04

DIBULATKAN 12,647.00 145,200.00 157,847.00

6.24 1.0000 Pasang kaca patri, tebal 5 mm

1.1000 Kaca patri @ Rp. 300,000.00 330,000.00

0.1500 org Tukang kayu @ Rp. 64,750.00 9,712.50

0.0150 org Kepala tukang kayu @ Rp. 69,750.00 1,046.25

0.0150 org Pekerja @ Rp. 44,750.00 671.25

0.0008 org Mandor @ Rp. 89,750.00 67.31

JUMLAH ( BELUM PPN ) 11,497.31 330,000.00 341,497.31

JASA 10 % 1,149.73 33,000.00 34,149.73

JUMLAH 12,647.04 363,000.00 375,647.04

DIBULATKAN 12,647.00 363,000.00 375,647.00

m2

m2

m2

m2

m2

m2

m2

m2

Page 84: Bill of Quantity

Analisa Gedung - 84

No. Macam Pekerjaan Upah Bahan Jumlah

(1) (2) (3) (4) (5)

6.17 1.0000 Pasang kusen alumunium

1.1000 Kusen alumunium @ Rp. 55,000.00 60,500.00

15% x Harga kusen (Perlengkapan) @ Rp. 55,000.00 8,250.00

0.1500 oh Tukang alumunium @ Rp. 64,750.00 9,712.50

0.0150 oh Kepala tukang @ Rp. 69,750.00 1,046.25

0.0150 oh Pekerja @ Rp. 44,750.00 671.25

0.0008 oh Mandor @ Rp. 89,750.00 67.31

JUMLAH ( BELUM PPN ) 11,497.31 68,750.00 80,247.31

JASA 10 % 1,149.73 6,875.00 8,024.73

JUMLAH 12,647.04 68,750.00 81,397.04

DIBULATKAN 12,647.00 68,750.00 81,397.00

m1

m1

Page 85: Bill of Quantity

DAFTAR HARGA UPAH DAN HARGA MATERIALNO UPAH KERJA/GAJI SATUAN JUMLAH HARGA

A.MATERIAL DASAR1 Batu kali utuh m3 Rp 135,000.00 2 Batu gunung m3 Rp 150,000.00 3 Batu pecah 7-10 cm m3 Rp 200,000.00 4 Batu pecah 5-7 cm m3 Rp 220,000.00 5 Batu pecah 3-5 cm m3 Rp 230,000.00 6 Batu pecah 2-3 cm m3 Rp 250,000.00 7 Abu batu m3 Rp 250,000.00 8 Kerikil beton m3 Rp 125,000.00 9 Tanah timbunan/Tanah urug m3 Rp 75,000.00

10 Sirtu m3 Rp 158,000.00 11 Pasir timbunan m3 Rp 75,000.00 12 Pasir Pasang m3 Rp 90,000.00 13 Pasir beton m3 Rp 120,000.00 14 Semen PC kg Rp 1,025.00 15 Semen Warna kg Rp 15,000.00 16 Batu bata bh Rp 500.00 17 Beton Ready Mix K.300 m3 Rp 650,000.00

B. MATERIAL KAYU

1 Papan kayu klas I (Sawmil) m3 Rp 8,500,000.00 2 Balok kayu klas I (Sawmil) m3 Rp 7,500,000.00 3 Papan kayu klas II m3 Rp 4,000,000.00 4 Balok kayu klas II m3 Rp 4,500,000.00 5 Papan kayu klas III m3 Rp 2,300,000.00 6 Balok Kayu Klas III m3 Rp 2,500,000.00 7 m3 Rp 15,000.00

C. MATERIAL BESI/BAJA

1 Besi beton polos kg Rp 12,500.00 2 Besi beton ulir kg Rp 13,000.00 3 Kawat beton kg Rp 15,000.00 4 Roof mesh,uk. 1,8x30 meter (uk.Kotak 7.5x7.5 cm) roll Rp 550,000.00 5 Besi baja IWF. 250x125x6x9 kg Rp 25,000.00 6 Besi baja UNP kg Rp 7,659.80 7 Besi siku 70.70.7 kg Rp 3,500.00 8 Besi siku 40.40.4-4 meter btg Rp 148,500.00 9 Besi siku 60.60.6-4 meter btg Rp 165,000.00

10 Besi Ulir dia. 14mm m' Rp 11,500.00 11 Besi canal UNP 125x50x20x2.3 (spesifikasi standar) btg Rp 180,000.00 12 Besi Plat 16 mm uk.120x240 mm lbr Rp 3,120,000.00 13 Besi plat 3 mm uk. 120x240 mm lbr Rp 900,000.00 14 Mour baut dia. 12mm bh Rp 20,000.00 15 Angkur dia. 16mm-90 cm bh Rp 25,000.00 16 Turn Buckle bh Rp 20,000.00 17 Fisher bh Rp 7,500.00 18 Besi hollow 60x40x2,2 mm m' Rp 57,500.00

Dolken kayu ф 8-10/4 meter

Page 86: Bill of Quantity

19 Besi hollow 60x40x2,2 mm m' Rp 31,750.00 20 Besi hollow 60x40x2,2 mm m' Rp 30,000.00

D. MATERIAL PAKU/SKRUP

1 Paku biasa kg Rp 17,000.00 2 Paku Beton dos Rp 25,000.00 3 Paku skrup kg Rp 17,000.00 4 Skrup atap bj Rp 1,040.00 5 skrup nok bj Rp 780.00 6 Paku rivet bj Rp 30,000.00

E. MATERIAL FINISHING LANTAI DAN DINDING

1 Tegel 60x60 cm (polish/terang) 1 m2 Rp 300,000.00 2 Tegel 40x40 cm (polish/terang) 1 m2 Rp 289,000.00 3 Tegel 20x20 cm (polish/terang) 1 m2 Rp 45,000.00 4 Tegel dinding 20x20 cm (polish/terang) 1 m2 Rp 46,500.00 5 Chafdur semen warna kg Rp 30,000.00 6 Batu alam m2 Rp 220,000.00 7 Plastik lantai m' Rp 49,930.00

F. MATERIAL KACA DAN AKSESORIS

1 Kaca bening 5 mm m2 Rp 77,000.00 2 Kaca bening 6 mm m2 Rp 93,500.00 3 Kaca riben 6 mm m2 Rp 198,000.00 4 Karet seal m' Rp 3,850.00

G. MATERIAL ATAP

1 Seng Plat BJLS 0.30 mm lbr Rp 40,000.00 2 Seng gelombang BJLS 0.28 mm kk Rp 6,800.00

H. MATERIAL ALUMINIUM

1 Kusen aluminium m' Rp 100,000.00 2 Tiang Bingkai Pintu aluminium m' Rp 84,700.00 3 Ambang atas bingkai pintu aluminium m' Rp 92,400.00 4 Ambang bawah bingkai pintu aluminium m' Rp 123,200.00 5 Bingkai jendela aluminium m' Rp 92,400.00 6 Jendela nako lengkap terali set/daun Rp 52,000.00

I. MATERIAL PIPA

1 m' Rp 15,000.00 2 Pipa galvanise (GIP) Ø 1 " m' Rp 19,000.00 3 Pipa galvanise (GIP) Ø 2 " m' Rp 36,000.00 4 m' Rp 3,300.00 5 Pipa paralon PVC Ø 1" (air bersih) m' Rp 4,750.00 6 Pipa paralon PVC Ø 11/2" (air bersih) m' Rp 6,500.00 7 Pipa paralon PVC Ø 2" (air bersih) m' Rp 7,500.00 8 Pipa paralon PVC Ø 21/2" (air bersih) m' Rp 12,500.00 9 Pipa paralon PVC Ø 3" (air bersih) m' Rp 17,666.00

10 Pipa paralon PVC Ø 4" (air bersih) m' Rp 45,900.00

Pipa galvanise (GIP) Ø 3/4 "

Pipa paralon PVC Ø 3/4" (air bersih)

Page 87: Bill of Quantity

J. MATERIAL RANGKA PLAFON DAN PARTISI

1 Rangka hollow 40x40x0.7 mm btg Rp 44,000.00 2 Rangka hollow 40x20x0.7 mm btg Rp 34,100.00 3 Wall angle btg Rp 14,000.00 4 Suspention Road (pjg=3.6m') unit Rp 10,000.00 5 Scrup dinding partisi dos Rp 20,000.00 6 Cornice adhesive zak Rp 66,000.00 7 Paku Rivet dos Rp 30,000.00 8 Cotton tape roll Rp 15,000.00

K. MATERIAL PLAFOND DAN PARTISI

1 Tripleks 3mm (120x240)cm lbr Rp 47,500.00 2 Tripleks 3mm (120x240)cm lbr Rp 80,000.00 3 Tripleks 3mm (120x240)cm lbr Rp 125,000.00 4 Taekwood (120x240x0.3)cm lbr Rp 80,000.00 5 Gypsum Board, t=9mm lbr Rp 79,000.00

L. MATERIAL PENGGANTUNG

1 Kunci Tanam Picaso 1 slag set Rp 126,000.00 2 Lockcase ex.Kend set Rp 250,000.00 3 Casement 16" ex. Kend psg Rp 50,000.00 4 Casement 20" ex. Kend psg Rp 50,000.00 5 Handle+kunci stainless pintu kayu ex. Kend set Rp 350,000.00 6 Grendel pintu stainless set Rp 75,000.00 7 Engsel pintu bh Rp 75,000.00

M. MATERIAL SANITER

1 Kloset duduk TOTO Type CW660J/SW660J(warna)+Aks set Rp 2,700,000.00 2 Kloset jongkok set Rp 345,000.00 3 Urinoir type U57 M(warna) set Rp 1,700,000.00 4 Partis urinoir type A100 (warna) +aksesories set Rp 844,000.00 5 Westafel TOTO type L521V1A (warna) +aksesories set Rp 1,695,000.00 6 Cermin kaca westafel bevel pinngir 6 mm set Rp 500,000.00 7 Kitchen zink set Rp 750,000.00 8 Shoap TOTO type SN6 set Rp 125,000.00 9 Tissue holder TOTO type S20T3 set Rp 150,000.00

10 Gantungan Baju TOTO type TS118WS set Rp 300,000.00 11 Jet spray TOTO type TB19C5NN5 set Rp 248,000.00 12 Room shower set Rp 7,500,000.00 13 Shower set Rp 2,000,000.00 14 Kran air kuningan uk.3/4" bh Rp 35,000.00 15 Floordrain anti serangga bh Rp 80,000.00 16 Roof Drain Stainles bh Rp 50,000.00 17 Clean out bh Rp 90,000.00 18 bh Rp 1,800,000.00 19 m' Rp 35,000.00 20 Gorong-gorong Ø 80 cm (t=8cm ; h= 60 cm) bh Rp 82,500.00

N. MATERIAL CAT

1 Cat tembok Interior setara mowilex kg Rp 59,000.00

Reservoir Atas Fiber (2m³) + Tempat DuduknyaGorong-gorong 1/2 Ø 30 cm

Page 88: Bill of Quantity

2 Cat tembok Eksterior (Weathersheild) Setara Mowilex kg Rp 83,400.00 3 Cat Kayu setara mowilex kg Rp 66,500.00 4 Cat Besi setara mowilex kg Rp 66,500.00 5 Cat dasar setara mowilex kg Rp 35,000.00 6 Meni kayu kg Rp 9,000.00 7 Meni seng kg Rp 9,000.00 8 Minyak cat ltr Rp 18,000.00 9 Plamir Tembok (skim coat) kg Rp 6,500.00

10 Plamir Kayu kg Rp 20,000.00 11 Thinner A ltr Rp 45,000.00 12 Super Thinner ltr Rp 16,000.00 13 Kertas amplas lbr Rp 2,500.00 14 Dempul kayu kg Rp 20,000.00 15 Residu ltr Rp 4,300.00 16 Membrane Fibre (100x25) cm lbr Rp 8,500.00 17 Cat water proofing kg Rp 42,500.00 18 Lem Kayu ltr Rp 29,970.00 19 oli ltr Rp 15,000.00 20 solar ltr Rp 8,500.00

O Material Semen,Besi Beton dan Rangka Baja

1 Portland Cement @50 kg zak Rp 50,000.00 2 Portland Cement @40 kg zak Rp 40,000.00 3 Besi Beton SI-1 ф 6 kg Rp 7,350.00 4 Besi Beton SI-1 ф 8 kg Rp 8,400.00 5 Besi Beton SI-1 ф 10 kg Rp 12,750.00 6 Besi Beton SI-1 ф 12 kg Rp 11,750.00 7 Besi Beton SI-1 ф 14 kg Rp 13,750.00 8 Besi Beton SI-1 ф 16 kg Rp 15,900.00 9 Besi Beton SI-1 ф 18 kg Rp 16,750.00

10 Besi Beton SI-1 ф 22 kg Rp 17,850.00 11 Besi Baja IWF 250x125 kg Rp 22,800.00 12 Besi Baja IWF 100x50 kg Rp 20,000.00 13 Rangka Baja Ringan btg Rp 82,500.00

Page 89: Bill of Quantity

DAFTAR HARGA UPAH DAN HARGA MATERIALNO UPAH KERJA/GAJI SATUAN JUMLAH HARGA1 Tukang Kayu Org/Hari Rp 64,750.00 2 Tukan Batu Org/Hari Rp 64,750.00 3 Tukang Listrik Org/Hari Rp 64,750.00 4 Tukang Cat Org/Hari Rp 64,750.00 5 Tukang Besi Org/Hari Rp 64,750.00 6 Kepala Tukang Kayu Org/Hari Rp 69,750.00 7 Kepala Tukang Batu Org/Hari Rp 69,750.00 8 Kepala Tukang Cat Org/Hari Rp 69,750.00 9 Kepala Tukang Listrik Org/Hari Rp 69,750.00

10 Kepala Tukang Besi Org/Hari Rp 69,750.00 11 Mandor Org/Hari Rp 89,750.00 12 Pekerja Org/Hari Rp 44,750.00

Page 90: Bill of Quantity

Bahan - 90

DAFTAR SATUAN UPAH DAN BAHAN DI LINGKUNGAN PEMERINTAH KOTA MAKASSAR

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

TENAGA

1 Tukang kayu hari 64,750.00

2 Kepala tukang kayu hari 69,750.00

3 Tukang batu hari 64,750.00

4 Kepala tukang batu hari 69,750.00

5 Tukang besi hari 64,750.00

6 Kepala tukang besi hari 69,750.00

7 Tukang las hari 64,750.00

8 Kepala tukang las hari 69,750.00

9 Tukang cat hari 64,750.00

10 Kepala tukang cat hari 69,750.00

11 Tukang plitur hari 64,750.00

12 Kepala tukang plitur hari 69,750.00

13 Tukang bor hari 64,750.00

14 Kepala tukang bor hari 69,750.00

15 Tukang listrik hari 64,750.00

16 Tukanng pipa ledeng hari 64,750.00

17 Tukang kapur hari 64,750.00

18 Pekerja hari 44,750.00

19 Mandor hari 89,750.00

20 Pengawas / Ahli Teknik hari 37,200.00

21 Ahli ukur hari 116,300.00

22 Asisten ahli ukur hari 87,200.00

23 Sopir hari 26,000.00

24 Masinis hari 24,900.00

25 Kernet / pembantu sopir hari 22,000.00

26 Mekanik terlatih hari 29,000.00

27 Operator tak terlatih hari 24,000.00

28 Operator terlatih hari 29,000.00

29 Operator semi terlatih hari 25,000.00

30 Butuh terlatih hari 22,600.00

31 Buruh semi terlatih hari 21,200.00

32 Buruh tak terlatih hari 19,600.00

33 Tukang gali hari 34,900.00

34 Juru godog aspal hari 20,000.00

35 Penjaga hari 20,000.00

36 Penyemprot hari 17,500.00

37 Tukang Sungging hari 40,000.00

38 Kepala Tukang Sungging hari 45,000.00

39 Tukang Ukir hari 40,000.00

40 Kepala Tukang Ukir hari 45,000.00

41 Tukang Prodo hari 40,000.00

42 Kepala Tukang Prodo hari 45,000.00

43 Tukang Gambar hari 35,000.00

44 Tukang Grouting hari 30,000.00

45 Kepala tukang Grouting hari 32,500.00

46 Operator mesin sondir hari 75,000.00

47 Analis test sondir hari 120,000.00

CAT

1 Cat kayu se kualitas Patna kg 10,450.00

2 Cat kayu se kualitas Emco biasa kg 32,000.00

3 Cat kayu se kualitas Emco Bintang kg 42,000.00

4 Cat kayu se kualitas Par kg 29,000.00

5 Cat besi se kualitas Patna kg 10,450.00

6 Cat besi se kualitas Emco biasa kg 32,000.00

7 Cat besi se kualitas Emco Bintang kg 42,000.00

8 Cat kayu se kualitas Avian kg 24,750.00

9 Cat tembok/cat semen Maxilite kg 7,600.00

10 Cat tembok/cat emulsi dasar minyak Express kg 8,250.00

11 Cat tembok/cat polivynyl asetat Dulux kg 25,000.00

12 Cat tembok/cat kilap/cat acrilyc Dulux kg 35,000.00

13 Cat ICI Catylac kg 12,000.00

14 Cat tembok se kualitas Decolith kg 9,500.00

15 Cat Sintex kg 7,500.00

16 Cat dasar meni besi type A (cepat kering) Jago kg 9,000.00

17 Cat dasar meni besi type A (cepat kering) Par kg 22,500.00

18 Cat dasar meni kayu Jago kg 12,000.00

19 Cat duco kg 60,000.00

20 Cat genteng air ICI weathershield kg 42,000.00

21 Cat dasar undercoat / alkali resisiting primer kg 27,200.00

22 Cat dinding weathershield Dulux kg 50,000.00

23 Dempul kayu typa A (putih) Jago kg 10,000.00

24 Dempul lilin / kayu bj 9,000.00

25 Plamur Fuji kg 8,500.00

26 Plamur kayu Jago kg 12,000.00

27 Plamur tembok acrilyc kg 17,500.00

28 Plamur jenis sirlak kuning ltr 17,500.00

29 Sirlak putih batangan kg 65,000.00

Page 91: Bill of Quantity

Bahan - 91

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

30 Sirlak kuning serbuk kg 65,000.00

31 Oker kuning kg 12,000.00

32 Oker hitam kg 9,500.00

33 Oker pewarna politur merah / coklat bks 1,200.00

34 Kalkarium kg 5,000.00

35 Politur jadi ltr 20,000.00

36 Teak oil Fuji ltr 27,500.00

37 Pernis ltr 12,500.00

38 Glass bit ltr 12,000.00

39 Thermo plastik / cat marka kg 49,000.00

40 Cat rettar kg 49,000.00

41 Terpentin ltr 11,500.00

42 Minyak cat ltr 10,000.00

43 Thinner ltr 13,000.00

44 Spiritus ltr 6,500.00

45 Batu kambang kg 7,700.00

46 Kuas roll bh 8,500.00

47 Kuas ukuran 3,5" bh 8,000.00

48 Kuas ukuran 2,5" bh 5,000.00

49 Kuas ukuran kecil 1" bh 2,000.00

50 Soda api kg 15,000.00

51 Sabun deterjen kg 12,000.00

52 Amplas lbr 2,500.00

53 Prodo Mas 3,000,000.00

54 Kertas 100 x 100 cm lbr 2,000.00

55 Karbon lbr 3,500.00

BETON DAN BARANG DARI BETON

BATAKO

1 Batako pejal ( 40x20x10 ) bj 2,750.00

Batako beton berlubang ( 40x20x15 ) bh 2,500.00

2 Panel beton pracetak lbr 175,000.00

3 Kolom beton pracetak btg 250,000.00

PIPA

1 Pipa beton 20 x 30 0anjang 1 m m 28,000.00

2 Pipa beton tanpa tulangan dia. 20 cm panjang 1 m m 24,000.00

3 Pipa beton tanpa tulangan dia. 30 cm panjang 1 m m 25,000.00

4 Pipa beton tanpa tulangan dia. 60 cm panjang 0,5 m m 28,000.00

5 Pipa beton tanpa tulangan dia. 80 cm panjang 0,5 m m 32,000.00

6 Pipa beton tanpa tulangan 1/2 dia. 20 cm m 12,000.00

BUIS BETON / KERB

1 Buis beton 1/2 D 20 cm 12,000.00

2 Buis beton 1/2 D 25 cm 13,000.00

3 Buis beton bulat dia. 15 cm 22,000.00

4 Buis beton bulat dia. 20 cm 24,000.00

5 Buis beton bulat dia. 30 cm 30,000.00

6 Buis beton bulat dia. 40 cm 32,000.00

7 Buis beton bulat dia. 50 cm P=0,50 m bh 26,000.00

8 Buis beton bulat dia. 80 cm P=0,5 m bh 32,000.00

9 Buis beton oval dia. 20/30 panjang 1 m 30,000.00

10 Buis beton oval dia. 25/37,5 panjang 1 m 35,000.00

11 Buis beton oval dia. 30/40, 30/45 panjang 1 m 45,000.00

12 Buis beton oval dia. 35/52,5 panjang 1 m 65,000.00

13 Buis beton oval dia. 40/60 panjang 1 m 50,000.00

14 Buis beton oval dia. 50/75 panjang 0,5 m bh 35,000.00

15 Buis beton oval dia. 60/90 panjang 0,5 m bh 38,000.00

16 Buis beton oval dia. 70/105 panjang 0,5 m bh 47,000.00

17 Buis beton oval dia. 80/120 panjang 0,5 m bh 55,000.00

PERALATAN SANITASI

BAK MANDI

1 Bak mandi teraso uk. 50x50x50 cm bh 150,000.00

2 Bak mandi teraso uk. 60x60x60 cm bh 175,000.00

3 Bak mandi teraso uk. 90x80x80 cm bh 220,000.00

4 Bak mandi (bathtube) dengan shower lux bh 3,250,000.00

5 Bak mandi (bathtube) standar bh 2,475,000.00

6 Bak mandi fiber glass 0,30 m3 bh 275,000.00

7 Bak mandi fiber glass 0,50 m3 bh 825,000.00

KLOSET

1 Kloset jongkok porselin type CE7 standar bh 75,000.00

2 Kloset jongkok porselin type CE8 standar bh 85,000.00

3 Kloset jongkok putih INA bh 65,000.00

4 Kloset jongkok warna INA bh 75,000.00

5 Kloset duduk standar/porselin (dengan tangki KIA standart) "Lolo" bh 950,000.00

6 Kloset duduk porselin lux ( dengan tangki "Toto" ) bh 1,250,000.00

7 Kloset duduk putih dengan tangki "Toto" set 1,250,000.00

8 Kloset duduk warna dengan tangki "Toto" set 1,350,000.00

9 Kloset duduk putih dengan tangki "KIA" set 700,000.00

10 Kloset duduk warna dengan tangki "KIA" set 925,000.00

11 Kloset jongkok standar / keramik bh 55,600.00

12 Kloset jongkok teraso bh 25,000.00

WASTAFEL

1 Wastafel standar INA bh 255,000.00

2 Wastafel lux INA bh 265,000.00

m2

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

Page 92: Bill of Quantity

Bahan - 92

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

3 Wastafel putih (KIA) set 139,150.00

4 Wastafel warna (KIA) set 271,340.00

5 Badkip bh 150,000.00

6 Bak cuci stainless steel bh 500,000.00

7 Water drain + asesories set 75,000.00

URINOIR

1 Urinoir standar TOTO U 57 set 785,000.00

2 Urinoir putih set 1,050,000.00

4 Urinoir warna (KIA) set 379,500.00

5 Meja cuci dapur 125 x 50 cm bh 175,000.00

6 Tempat sabun tunggal bh 22,500.00

7 Kran air diameter 3/4" atau 1/2" bh 25,000.00

8 Seal tape bh 2,500.00

9 Floordrain bh 55,000.00

BATA HALAMAN / PAVING BLOCK

1 WARNA NATURAL / ABU-ABU

2 Tipe segi empat, uni, segi 6 tebal = 8 cm K 400 55,000.00

3 Tipe uni dan segi empat tebal = 8 cm K 300 50,400.00

4 Tipe segi empat tebal = 6 cm K 200 38,250.00

5 Tipe segi empat tebal = 8 cm K 200 46,700.00

6 Tipe segi enam tebal = 6 cm K 200 38,100.00

7 Tipe segi enam tebal = 8 cm K 200 46,700.00

8 Tipe uni / tikar tebal = 6 cm K200 38,200.00

9 Tipe uni / tikar tebal = 8 cm K 200 46,800.00

10 Tipe trihex / sarang lebah tebal = 6 cm K 200 38,200.00

11 Tipe lampion tebal = 8 cm K 200 46,800.00

12 Tipe beteng kecil tebal = 6 cm K 200 38,200.00

13 Tipe beteng kecil tebal = 8 cm K 200 46,700.00

14 Tipe kipas tebal = 8 cm K 200 46,800.00

WARNA MERAH / HITAM

1 Tipe segi empat, uni, segi 8 tebal = 8 cm warna K 400 61,700.00

2 Tipe uni dan segi empat tebal = 8 cm warna K 300 56,700.00

3 Tipe segi empat tebal = 6 cm warna K 200 43,500.00

4 Tipe segi empat tebal = 8 cm warna K 200 52,000.00

5 Tipe segi enam tebal = 6 cm warna K 200 43,500.00

6 Tipe segi enam tebal = 8 cm warna K 200 52,000.00

7 Tipe uni / tikar tebal = 6 cm warna K200 43,500.00

8 Tipe uni / tikar tebal = 8 cm warna K 200 52,000.00

9 Tipe trihex / sarang lebah tebal = 6 cm warna K 200 43,500.00

10 Tipe lampion tebal = 8 cm warna K 200 52,000.00

11 Tipe beteng kecil tebal = 6 cm warna K 200 43,500.00

12 Tipe beteng kecil tebal = 8 cm warna K 200 52,000.00

13 Tipe kipas tebal = 8 cm warna K 200 52,000.00

14 Tipe grass blok bulat tebal = 10 cm 41,400.00

15 Tipe grass blok tebal = 10 cm 41,400.00

ASBES

1 Asbes plat ( 100 x 100 x 0,3 ) lbr 10,000.00

2 Asbes plat ( 200 x 100 x 0,3 ) lbr 19,000.00

3 Asbes plat ( 100 x 100 x 0,6 ) lbr 17,500.00

4 Asbes plat ( 100 x 100 x 0,5 ) lbr 15,000.00

5 Asbes plat ( 100 x 100 x 0,4 ) lbr 12,500.00

6 Asbes plat ( 100 x 100 x 0,35 ) lbr 11,000.00

7 Asbes plat ( 100 x 100 x 0,32 ) lbr 10,000.00

8 Asbes gelombang besar ( 300 x 110 x 0,5 ) lbr 90,275.00

9 Asbes gelombang besar ( 200 x 110 x 0,5 ) lbr 74,900.00

10 Asbes gelombang besar ( 180 x 110 x 0,5 ) lbr 57,354.00

11 Asbes gelombang besar ( 150 x 110 x 0,5 ) lbr 45,650.00

12 Asbes gelombang besar ( 300 x 92 x 0,5 ) lbr 75,495.00

13 Asbes gelombang besar ( 250 x 92 x 0,5 ) lbr 62,960.00

14 Asbes gelombang besar ( 225 x 92 x 0,5 ) lbr 56,620.00

15 Asbes gelombang besar ( 200 x 92 x 0,5 ) lbr 50,330.00

16 Asbes gelombang besar ( 180 x 92 x 0,5 ) lbr 45,290.00

17 Asbes gelombang besar ( 300 x 108 x 0,6 ) lbr 112,830.00

18 Asbes gelombang besar ( 270 x 108 x 0,6 ) lbr 101,500.00

19 Asbes gelombang besar ( 240 x 108 x 0,6 ) lbr 90,265.00

20 Asbes gelombang besar ( 210 x 108 x 0,6 ) lbr 78,980.00

21 Asbes gelombang besar ( 180 x 108 x 0,6 ) lbr 67,690.00

22 Asbes gelombang kecil ( 300 x 105 x 0,4 ) lbr 71,350.00

23 Asbes gelombang kecil ( 270 x 105 x 0,4 ) lbr 69,250.00

24 Asbes gelombang kecil ( 210 x 105 x 0,4 ) lbr 57,500.00

25 Asbes gelombang kecil ( 180 x 105 x 0,4 ) lbr 42,850.00

26 Asbes gelombang kecil ( 150 x 105 x 0,4 ) lbr 35,950.00

27 Asbes gelombang kecil ( 240 x 105 x 0,4 ) lbr 61,000.00

28 Asbes nok gelombang besar lbr 29,000.00

29 Asbes nok gelombang kecil lbr 23,000.00

30 Nok paten lbr 50,000.00

31 Nok stel rata lbr 25,000.00

GENTENG & KERAMIK

1 Genteng beton besar natural 1m 9 biji bh 2,750.00

2 Genteng beton besar warna 1m 9 biji bh 4,420.00

3 Genteng beton kecil natural 1m 11 biji bh 2,350.00

4 Genteng beton kecil warna 1m 11 biji bh 3,950.00

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 93: Bill of Quantity

Bahan - 93

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

5 Genteng beton kecil natural 1m 20 biji bh 2,000.00

6 Genteng beton kecil warna 1m 20 biji bh 2,640.00

7 Genteng bubungan beton bh 2,460.00

8 Genteng Wuwung warna bh 4,260.00

9 Nok press beton bh 37,000.00

GENTENG & NOK

1 Genteng keramik lengkung cekung / vlaams bh 600.00

2 Genteng keramik lengkung rata bh 450.00

3 Genteng keramik rata / kodok bh 1,500.00

4 Genteng keramik berglasir KIA, Kanmuri Natural bh 4,500.00

5 Genteng monier bh 2,000.00

6 Genteng paris bh 600.00

7 Nok genteng vlaams tanah liat bh 4,000.00

8 Nok genteng kodok bh 3,000.00

9 Nok genteng kodok berglasir bh 6,050.00

10 Nok genteng vlaams berglasir bh 6,050.00

11 Nok genteng paris bh 1,650.00

12 Nok genteng keramik berglasir KIA, Kanmuri Natural bh 13,500.00

ATAP GENTENG METAL

1 Genteng metal Zinc Alume type Prima Roof 95,400.00

2 Genteng metal Zinc Alume type Prima Colour 77,760.00

3 Genteng metal Zinc Alume type Super Colour 54,000.00

4 Atap metal gelombang t 0,35 mm 60,000.00

5 Nok atas (U) type Prima Roof ( 110 x 5 x 6 ) cm bh 35,000.00

6 Nok atas (U) type Prima Colour ( 110 x 5 x 6 ) cm bh 25,000.00

7 Nok atas (U) type Super Colour ( 110 x 5 x 6 ) cm bh 22,000.00

8 Nok atas bulat (C) type Prima Roof, P = 40 cm bh 25,000.00

9 Nok atas bulat (C) type Prima Colour, P = 40 cm bh 20,000.00

10 Nok atlas bulat (C) type Super Colour, P = 40 cm bh 20,000.00

11 Nok pinggir (P) type Prima Roof ( 110 x 7 x 10 ) cm bh 40,000.00

12 Nok pinggir (P) type Prima Colour ( 110 x 7 x 10 ) cm bh 38,000.00

13 Nok pinggir (P) type Super Colour ( 110 x 7 x 10 ) cm bh 28,000.00

14 Wall Flashing type Prima Roof, P = 110 cm, L = 10 cm bh 38,000.00

15 Wall Flashing type Prima Colour, P = 110 cm, L = 10 cm bh 32,000.00

16 Wall Flashing type Super Colour, P = 110 cm, L = 10 cm bh 27,000.00

17 Paku anti karat kg 20,000.00

18 Atap polykarbonat 225,000.00

19 Paku skrup anti karat atap metal/polykarbonat bh 1,200.00

KERAMIK BERMOTIF

1 Tegel keramik Roman Bella (25 x 25) dos 47,500.00

2 Tegel keramik Roman Bella (10 x 25) dos 38,000.00

3 Tegel keramik Roman Alice (20 x 20) dos 38,500.00

4 Tegel keramik Roman Latanza (20 x 25) dos 38,000.00

5 Tegel keramik Roman Latanza (8 x 20) bj 20,000.00

6 Tegel keramik Roman Tulip (20 x 25) dos 37,500.00

7 Tegel keramik Roman Tulip (8 x 20) bj 14,000.00

8 Tegel keramik Roman Milano (20 x 25) dos 38,000.00

9 Tegel keramik Roman Milano (8 x 20) bj 20,000.00

ISOLATOR

1 Isolator keramik bentuk rol bh 6,600.00

2 Isolator keramik bentuk T - I bh 1,650.00

3 Isolator keramik bentuk sungkup bh 1,650.00

TEGEL / KERAMIK

1 Tegel teraso 30/30 32,000.00

2 Tegel abu-abu 20/20 20,000.00

3 Tegel warna 20/20 26,000.00

4 Tegel abu-abu 30/30 28,000.00

5 Plint tegel abu-abu 15/20 bh 525.00

6 Tegel warna 20/20 26,000.00

7 Tegel warna 30/30 37,600.00

8 Plint tegel abu-abu 10/20 bh 350.00

9 Plint tegel abu-abu 10/30 bh 750.00

10 Plint tegel warna 10/20 bh 400.00

11 Plint tegel warna 10/30 bh 825.00

12 Tegel porselin 11/11 40,500.00

13 Tegel keramik 10/20 berglasir 30,000.00

14 Tegel keramik 20/20 berglasir 32,000.00

15 Tegel keramik 30/30 berglasir 32,500.00

16 Tegel keramik 40/40 berglasir 40,000.00

17 Tegel keramik standar ( MULIA) 20/20 dan 30/30 42,500.00

18 Tegel keramik mosaik 52,500.00

19 Stepnosing granito bh 9,350.00

20 List keramik dinding motif 5/20 bh 5,000.00

21 Plint keramik 10 x 30 bh 1,500.00

22 Keramik dinding 20/25 37,500.00

KERB TAMAN

1 Devider Mutiara m 66,000.00

2 Devider /kans teen tebal 30 Mutiara m 22,000.00

3 Devider /kans teen tebal 25 Mutiara m 18,800.00

4 Devider /kans teen tebal 20 Mutiara bh 15,300.00

5 Devider /kans teen tebal 15 Mutiara bh 11,250.00

6 Ramp ( terpasang ) bh 26,000.00

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 94: Bill of Quantity

Bahan - 94

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

7 Devider terpasang bh 30,000.00

8 Kerb terpasang bh 28,000.00

KAYU

1 KAYU JATI

2 Kayu jati balok 8/12 ( klas plitur ) 20,000,000

3 Kayu jati papan 22,000,000

4 Balok kayu kelas I ukuran 8/12 192,000.00

5 Balok kayu kelas I ukuran 8/10 160,000.00

6 Balok kayu kelas I ukuran 6/12 144,000.00

7 Balok kayu kelas I ukuran 6/10 120,000.00

8 Balok kayu kelas I ukuran 6/8 96,000.00

9 Bingkai kayu kelas I ukuran 5/7 70,000.00

10 Bingkai kayu kelas I ukuran 4/6 48,000.00

11 Bingkai kayu kelas I ukuran 3/4, 3/5 24,000.00

12 Bingkai kayu kelas I ukuran 2/3 12,000.00

13 Papan kayu kelas I ukuran 3/20 132,000.00

14 Papan kayu kelas I ukuran 3/18 118,800.00

15 Papan kayu kelas I ukuran 2/25 110,000.00

16 Papan kayu kelas I ukuran 2/20 88,000.00

17 Papan kayu kelas I ukuran 2/15 66,000.00

18 Lis Dan jalusi kayu kelas I ukuran 2/6 24,000.00

19 Lis Dan jalusi kayu kelas I ukuran 2/4 16,000.00

20 Lis Dan jalusi kayu kelas I ukuran 1/5 10,000.00

21 Lis Dan jalusi kayu kelas I ukuran 1/3 6,000.00

22 Kayu jati balok 8/12 (lokal) 8,000,000

23 Kayu jati papan (lokal) 8,200,000

24 Kaui jati lokal ukuran 5/7 28,000.00

25 Kayu jati lokal ukuran 2/3 4,800.00

26 Kayu jati lokal ukuran 3/4 9,600.00

KAYU KAMPER

1 Kayu kamper balok 4,750,000

2 Kayu kamper papan 5,500,000

3 Balok kayu kelas I ukuran 8/12 45,600.00

4 Balok kayu kelas I ukuran 8/10 38,000.00

5 Balok kayu kelas I ukuran 6/12 34,200.00

6 Balok kayu kelas I ukuran 6/10 28,500.00

7 Balok kayu kelas I ukuran 6/8 22,800.00

8 Bingkai reng & kaso kayu kelas I ukuran 5/7 16,625.00

9 Bingkai reng & kaso kayu kelas I ukuran 4/6 11,400.00

10 Bingkai reng & kaso kayu kelas I ukuran 3/4 5,700.00

11 Bingkai reng & kaso kayu kelas I ukuran 2/3 2,850.00

12 Papan kayu kelas I ukuran 2/15 16,500.00

13 Papan kayu kelas I ukuran 2/20 22,000.00

14 Papan kayu kelas I ukuran 2/25 27,500.00

15 Papan kayu kelas I ukuran 3/18 29,700.00

16 Papan kayu kelas I ukuran 3/20 33,000.00

17 Papan kayu kelas I ukuran 3/30 49,500.00

18 Lis Dan jalusi kayu kelas I ukuran 1/3 1,425.00

19 Lis Dan jalusi kayu kelas I ukuran 1/5 2,375.00

20 Lis Dan jalusi kayu kelas I ukuran 2/4 2,850.00

KAYU BENGKIRAI

1 Kayu bengkirai balok 5,750,000

2 Kayu bengkirai papan 6,000,000

3 Balok kayu kelas I ukuran 8/12 55,200.00

4 Balok kayu kelas I ukuran 8/10 46,000.00

5 Balok kayu kelas I ukuran 6/12 41,400.00

6 Balok kayu kelas I ukuran 6/10 34,500.00

7 Balok kayu kelas I ukuran 6/8 27,600.00

8 Bingkai reng & kaso kayu kelas I ukuran 5/7 20,125.00

9 Bingkai reng & kaso kayu kelas I ukuran 4/6 13,800.00

10 Bingkai reng & kaso kayu kelas I ukuran 3/4 6,900.00

11 Bingkai reng & kaso kayu kelas I ukuran 2/3 3,450.00

12 Papan kayu kelas I ukuran 2/15 18,000.00

13 Papan kayu kelas I ukuran 2/20 24,000.00

14 Papan kayu kelas I ukuran 2/25 30,000.00

15 Papan kayu kelas I ukuran 3/18 32,400.00

16 Papan kayu kelas I ukuran 3/20 36,000.00

17 Papan kayu kelas I ukuran 3/30 54,000.00

18 Lis Dan jalusi kayu kelas I ukuran 1/3 1,725.00

19 Lis Dan jalusi kayu kelas I ukuran 1/5 2,875.00

20 Lis Dan jalusi kayu kelas I ukuran 2/4 4,600.00

KAYU KRUING

1 Kayu kruing balok 4,350,000

2 Kayu kruing papan 4,750,000

3 Balok kayu kelas I ukuran 8/12 41,760.00

4 Balok kayu kelas I ukuran 8/10 34,800.00

5 Balok kayu kelas I ukuran 6/12 31,320.00

6 Balok kayu kelas I ukuran 6/10 26,100.00

7 Balok kayu kelas I ukuran 6/8 20,880.00

8 Bingkai reng & kaso kayu kelas I ukuran 5/7 15,225.00

9 Bingkai reng & kaso kayu kelas I ukuran 4/6 10,440.00

10 Bingkai reng & kaso kayu kelas I ukuran 3/4 5,220.00

m3

m3

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m3

m3

m1

m1

m1

m3

m3

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m3

m3

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m3

m3

m1

m1

m1

m1

m1

m1

m1

m1

Page 95: Bill of Quantity

Bahan - 95

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

11 Bingkai reng & kaso kayu kelas I ukuran 2/3 2,610.00

12 Papan kayu kelas I ukuran 2/15 14,250.00

13 Papan kayu kelas I ukuran 2/20 19,000.00

14 Papan kayu kelas I ukuran 2/25 23,750.00

15 Papan kayu kelas I ukuran 2/30 28,500.00

16 Papan kayu kelas I ukuran 3/18 25,650.00

17 Papan kayu kelas I ukuran 3/20 28,500.00

18 Papan kayu kelas I ukuran 3/25 35,625.00

19 Papan kayu kelas I ukuran 3/30 42,750.00

20 Lis Dan jalusi kayu kelas I ukuran 1/3 1,305.00

21 Lis Dan jalusi kayu kelas I ukuran 1/5 2,175.00

22 Lis Dan jalusi kayu kelas I ukuran 2/4 3,480.00

LIST KAYU PROFIL

1 List kayu profil 5,500.00

2 Kayu plepet eternit 1/5 cm 2,000.00

KAYU GLUGU, DOLKEN DAN BEGESTENG

1 Kayu glugu balok 1,458,000.00

2 Kayu glugu ukuran 5/7 6,300.00

3 Kayu meranti 2,500,000.00

4 Papan cetakan / begesteng 1,000,000.00

5 Kayu dolken 1,000,000.00

6 Kayu dolken Ø 8 - 10/400 cm btg 15,000.00

7 Kayu bakar 90,000.00

KAYU LAPIS

1 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,3 cm lbr 31,900.00

2 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,4 cm lbr 80,000.00

3 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,9 cm lbr 90,000.00

4 Kayu lapis mutu I AA 3 lapis uk. 122x244x1,2 cm lbr 101,750.00

5 Akustik soft board 60 x 120 lbr 125,000.00

6 Akustik soft board 40 x 60 lbr 73,000.00

7 Akustik soft board 30 x 60 lbr 55,000.00

8 Melamin wood 90 x 120 cm lbr 50,000.00

9 Melamin wood 120 x 240 cm lbr 65,000.00

10 Formika 4" x 8" x 0,3 cm lbr 65,000.00

11 Teak wood ( 90 x 240 ) lbr 69,500.00

BAHAN TUMBUHAN

1 Bambu petung btg 48,500.00

2 Bambu wulung btg 9,500.00

3 Bambu apus btg 7,000.00

4 Gedek bambu kulit 65,000.00

5 Gedek bambu daging 27,000.00

6 Ijuk 75,000.00

7 Ijuk kg 9,000.00

8 Alang-alang ikat 500.00

LISTRIK

1 Tusuk kontak 2 kutup tanpa pembumian/arde buah 3,900.00

2 Tusuk kontak 2 kutup dengan pembumian/arde buah 6,500.00

3 Tusuk kontak 2 kutup tanpa pembumian (timbul) buah 6,175.00

4 Tusuk kontak 2 kutup dengan pembumian (timbul) buah 6,500.00

5 Tusuk kontak 2 kutup tanpa pembumian (tanam) buah 7,800.00

6 Tusuk kontak 2 kutup dengan pembumian (tanam) buah 12,000.00

7 Fitting duduk buah 5,000.00

8 Pasang instalasi / titik titik 85,000.00

9 Lampu pijar 5 watt "Phillips" buah 2,275.00

10 Lampu pijar 10 watt "Phillips" buah 3,705.00

11 Lampu pijar 25 watt/ 40 watt "Phillips" buah 3,900.00

12 Lampu pijar 60 watt / 75 watt "Phillips" buah 4,550.00

13 Lampu pijar 100 watt "Phillips" buah 5,200.00

14 Lampu softone 100 watt "Phillips" buah 6,500.00

15 Lampu pijar 150 watt "Phillips" buah 10,400.00

16 Lampu pijar 200 watt "Phillips" buah 11,700.00

17 Lampu TL 10 watt "Phillips" buah 7,150.00

18 Lampu TL 15 watt "Phillips" buah 7,500.00

19 Lampu TL 18 watt "Phillips" buah 11,050.00

20 Lampu TL 36 watt "Phillips" buah 13,650.00

21 Lampu SLE 11 watt "Phillips" buah 71,500.00

22 Lampu SLE 15 watt "Phillips" buah 71,500.00

23 Lampu SLE 20 watt "Phillips" buah 74,750.00

24 Lampu Slang 2 jalur (sekualitas sinyoku) roll 2,400,000.00

25 Lampu Slang 3 jalur (sekualitas sinyoku) roll 2,795,000.00

26 Lampu Rice Light isi 100 "Phillips" pcs 60,000.00

27 Lampu Rice Light isi 140 "Phillips" pcs 72,000.00

28 Lampu Capsul isi 100 "Phillips" pcs 210,000.00

29 Lampu Capsul isi 140 "Phillips" pcs 222,000.00

30 Lampu Anggur isi 100 "Phillips" pcs 65,000.00

31 Lampu Anggur isi 140 "Phillips" pcs 78,000.00

32 Lampu Natal isi 50 "Phillips" pcs 23,000.00

33 Lampu Natal isi 100 "Phillips" pcs 103,500.00

34 Lampu Jenis H.PIT 400 watt "Phillips" buah 1,023,750.00

35 Lampu Jenis H.PIT 250 watt "Phillips" buah 700,000.00

36 Bolam Mercury 80 watt "Phillips" buah 45,500.00

37 Bolam Mercury 125 watt "Phillips" buah 96,000.00

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m3

m1

m3

m3

m3

m3

m2

m2

m3

Page 96: Bill of Quantity

Bahan - 96

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

38 Bolam Mercury 250 watt "Phillips" buah 97,500.00

39 Bolam Mercury 400 watt "Phillips" buah 123,500.00

40 Bolam Natrium 250 watt "Phillips" buah 208,000.00

41 Bolam Natrium 400 watt "Phillips" buah 221,000.00

42 Bolam SON 250 watt buah 227,500.00

43 Bolam SON 150 watt buah 215,800.00

44 Bolam SON 70 watt buah 137,150.00

45 Bolam SON-T 250 watt buah 241,000.00

46 Bolam SON-T 150 watt buah 155,000.00

47 Bolam SON-T 70 watt buah 96,000.00

48 Bolam Halogin 500 watt buah 39,000.00

49 Bolam Halogin 1000 watt buah 65,000.00

50 Bolam HPIT 150 watt buah 260,000.00

51 Bolam HPIT 250 watt buah 292,500.00

52 Bolam HPIT 400 watt buah 296,500.00

53 Bolam Metal Halide 70 watt buah 149,500.00

54 Bolam Metal Halide 100 watt buah 188,548.00

55 Bolam Metal Halide 150 watt buah 156,000.00

56 Bolam Metal Halide 250 watt buah 344,500.00

57 Photo Cell 3 Ampere buah 65,000.00

58 Photo Cell 6 Ampere buah 78,000.00

59 Photo Cell 10 Ampere buah 104,000.00

60 Starter TL 20/40 watt buah 4,550.00

61 Travo TL 10 watt buah 24,050.00

62 Travo TL 20 watt buah 26,000.00

63 Travo TL 40 watt buah 29,250.00

64 Balast Mercury 80 watt buah 96,000.00

65 Balast Mercury 125 watt buah 104,000.00

66 Balast Mercury 250 watt buah 162,500.00

67 Balast Mercury 400 watt buah 195,000.00

68 Balast Natrium 250 watt buah 162,500.00

69 Balast Natrium 400 watt buah 150,000.00

70 Balast SON 250 watt buah 221,000.00

71 Balast SON 150 watt buah 172,500.00

72 Balast SON 70 watt buah 127,000.00

73 Balast Metal Halide 70 watt buah 131,000.00

74 Balast Metal Halide 100 watt buah 256,939.00

75 Balast Metal Halide 150 watt buah 180,000.00

76 Magnetik Kontaktor SK-12 Kw 1 (SN-12) buah 210,000.00

77 Magnetik Kontaktor SK-12 Kw 2 buah 48,000.00

78 Magnetik Kontaktor SK-20 Kw 1 (SN-20) buah 240,000.00

79 Magnetik Kontaktor SK-20 Kw 2 buah 66,000.00

80 Fitting Goliath E.27 Gantung buah 19,500.00

81 Fitting Goliath E.40 Gantung buah 26,000.00

82 Fitting WD E.27 Tegak buah 4,550.00

83 Fitting WD E.40 Tegak buah 16,250.00

84 Fitting Kecil Lampu 2,5 Watt buah 325.00

85 Fitting Plastik Hitam buah 1,300.00

86 Fitting Gantung plastik gantung buah 1,000.00

87 Kap Alumunium E.27 buah 19,500.00

88 Kap Alumunium E.40 buah 19,500.00

89 Kabel Snoor 2 x 0,23 "Supreme" roll 72,000.00

90 Kabel NYA 2,5 sqmm "Supreme" roll 150,000.00

91 Kabel NYA 1,5 sqmm "Supreme" roll 95,000.00

92 Kabel NYA 2,5 sqmm "Supreme" m' 2,475.00

93 Kabel NYA 1,5 sqmm "Supreme" m' 1,650.00

94 Kabel NYM 2 x 1,5 sqmm "Supreme" 7,216.00

95 Kabel NYM 2 x 2,5 sqmm "Supreme" 10,633.00

96 Kabel NYM 2 x 4 sqmm "Supreme" 14,256.00

97 Kabel NYM 3 x 1,5 sqmm "Supreme" 9,257.00

98 Kabel NYM 3 x 2,5 sqmm "Supreme" 13,200.00

99 Kabel NYM 3 x 4 sqmm "Supreme" 19,096.00

100 Kabel NYY 3 x 6 sqmm "Supreme" 30,553.00

101 Kabel NYY 3 x 1,5 sqmm "Supreme" 12,584.00

102 Kabel NYY 3 x 2,5 sqmm "Supreme" 16,896.00

103 Kabel NYY 3 x 4 sqmm "Supreme" 23,056.00

104 Kabel NYY 3 x 6 sqmm "Supreme" 30,553.00

105 Kabel NYY 3 x 10 sqmm "Supreme" 45,408.00

106 Kabel NYY 4 x 10 sqmm "Supreme" 61,600.00

107 Kabel NYFGBY 3 x 10 sqmm "Supreme" 88,000.00

108 Kabel DX 2 x 10 sqmm "Supreme" 5,500.00

109 Kabel DX 2 x 16 sqmm "Supreme" 6,600.00

110 Kabel DX 2 x 25 sqmm "Supreme" 16,500.00

111 Kabel Ties 15 cm "Supreme" 11,050.00

112 Kabel Tis 10 cm "Supreme" 6,500.00

113 Ignitor 150 watt - 250 watt buah 45,000.00

114 Ignitor Metal Halide 70 watt buah 68,250.00

115 Ignitor Metal Halide 100 watt buah 50,000.00

116 Ignitor Metal Halide 150 watt buah 73,710.00

117 Firework lamp (DC-001) 8 meter Pcs 17,192,500.00

118 Firework lamp (DC-001) 6 meter Pcs 15,323,750.00

119 NT Fuse kaki besar buah 140,400.00

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

Page 97: Bill of Quantity

Bahan - 97

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

120 NT Fuse kaki kecil buah 52,000.00

121 Flassther Lampu Hias Buterfly buah 3,071,250.00

122 Flassther Lampu Hias Kembang Api Besar buah 3,071,250.00

123 Flassther Lampu Hias Kembang Api Kecil buah 3,071,250.00

124 Flassther Lampu Hias Kipas buah 3,071,250.00

125 Skaklar seri OB "Broco" buah 17,550.00

126 Skaklar seri IB "Broco" buah 17,550.00

127 Skaklar engkel OB "Broco" buah 13,000.00

128 Skaklar engkel IB "Broco" buah 13,000.00

129 Stop kontak IB "Broco" buah 13,650.00

130 Stop kontak OB "Broco" buah 13,650.00

131 Kapasitor 25 F buah 52,000.00

132 Kapasitor 20 F buah 48,750.00

133 Kapasitor 12,5 uF buah 26,000.00

134 Kapasitor 8 mF buah 22,750.00

135 Kapasitor Metal Halide 70 watt buah 61,450.00

136 Kapasitor Metal Halide 100 watt buah 115,842.00

137 Kapasitor Metal Halide 150 watt buah 71,650.00

138 MCB 25 Ampere / 16 Ampere "MG" buah 36,000.00

139 MCB 40 Ampere "MG" buah 57,330.00

140 MCB 63 Ampere "MG" buah 108,000.00

141 MCB 10 Ampere + box "MG" buah 42,000.00

142 MCB 6 Ampere "MG" buah 42,000.00

143 Cover MCB "MG" buah 5,200.00

144 Box Kwh Meter 25 x 35 x 20 buah 448,500.00

145 Box panel 30 x 40 x 20 buah 169,000.00

146 Box 25 x 25 x 20 buah 97,500.00

147 Box 20 x 40 x 50 buah 312,000.00

148 UZ 25 buah 6,500.00

149 UZ 63 buah 19,500.00

150 Armatur IP 65 Komplit (sekualitas SRP 822 SON 150 watt) unit 2,834,000.00

151 Armatur IP 65 Komplit (sekualitas SRP 822 SON 250 watt) unit 2,954,000.00

152 Armatur IP 65 Komplit (sekualitas SRP 328 SON 150 watt) unit 3,315,000.00

153 Armatur IP 65 Komplit (sekualitas SRP 328 SON 250 watt) unit 3,445,000.00

154 Armatur IP 65 Komplit (sekualitas SRP 810 SON 70 watt) unit 2,275,000.00

155 Armatur Ekorola Komplit / TLD 18 watt unit 471,900.00

156 Armatur Simbat 40 watt unit 70,200.00

157 Armatur HPIT 100 watt (DVP 311) unit 4,231,500.00

158 Armatur Kota Sorot (Kosong) unit 1,495,000.00

159 Timer Switch TB 388 buah 540,000.00

160 Timer Theben (pakai baterai) buah 660,000.00

161 Timer Heger (pakai baterai) buah 513,000.00

162 Timer Delay H3-BA (omron) buah 110,500.00

163 Timer Delay H3-CR-8 (omron) buah 175,500.00

164 Timer Digital Theben buah 1,033,500.00

165 Tiang Galvanit cb,1, h=9m, base plate unit 3,783,000.00

166 Tiang Galvanit cb,2, h=9m, base plate unit 3,055,500.00

167 Tiang Galvanit cb,2, h=6m, base plate unit 2,665,000.00

168 Tiang Galvanit cb,1, h=7m, base plate unit 2,783,000.00

169 Tiang Galvanit cb,1, h=5m, type tanam dia 2" unit 812,500.00

170 Tiang lampu Highment cb 4, h=20m, hidrolik unit 140,692,000.00

171 Tiang lampu Highment cb 2, h=20m, hidrolik unit 140,692,000.00

172 Tiang GIP cb 1. 2", 3", 4", 5", h = 9m, tanam unit 2,535,000.00

173 Tiang GIP cb 1. 2", 3", 4", h = 7m, tanam unit 2,275,000.00

174 Tiang GIP cb 1. 3", 4", 5", h = 9m, tanam unit 2,340,000.00

175 Slang Ornamenr GIP dia 1", L = 3m unit 162,825.00

176 Slang Ornamenr GIP dia 2", L = 2m unit 193,050.00

177 Slang Ornamenr GIP dia 2", L = 3m unit 210,600.00

178 Slang Ornamenr GIP dia 2", L = 4m unit 222,300.00

179 Slang Ornamenr GIP dia 2", L = 6m unit 305,500.00

180 Pilot Lamp buah 6,850.00

181 Seplendiel lamp (DC-002) Pcs 17,267,000.00

182 Windmill lamp (DC-003) Pcs 16,875,000.00

183 Cottonrose lamp (DC-004) Pcs 16,875,000.00

184 Lucky lamp (DC-005) Pcs 12,950,000.00

185 Fountain lamp Ball (DC-005) Pcs 14,284,000.00

186 Star Flower lamp (DC-007) Pcs 16,090,000.00

187 Chritmas lamp (DC-009) Pcs 14,127,000.00

188 Butterfly lamp (DC-009) Pcs 18,052,000.00

189 No. 1 lamp (DC-010) Pcs 16,482,000.00

190 Hepta lamp (DC-011) Pcs 16,089,000.00

191 Dragon Phonix lamp (DC-013) Pcs 16,089,000.00

192 Fountain lamp (DC-014) Pcs 16,089,000.00

193 Redbud Flower lamp (DC-015) Pcs 16,089,000.00

194 Dragon Flying lamp (DC-016) Pcs 14,520,000.00

195 Floor lamp (DC-017) Pcs 10,988,000.00

196 Octopus lamp (DC-018) Pcs 16,089,000.00

197 Double Plied Fountain lamp (DC-019) Pcs 16,877,000.00

198 Flower Pot lamp (DC-020) Pcs 17,267,000.00

199 Patron Sekering buah 2,050.00

200 Kop sekering buah 3,450.00

201 Isolasi besar buah 6,825.00

Page 98: Bill of Quantity

Bahan - 98

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

202 Spot + F.MP buah 75,075.00

203 Sabuk Pengaman buah 2,730,000.00

204 Tang Kombinasi buah 34,125.00

205 Obeng +/- buah 23,750.00

206 GZ 30 A buah 40,950.00

207 Multitester buah 116,000.00

208 Sekering buah 2,100.00

209 Bandet buah 4,750.00

210 Wadge Type buah 4,750.00

211 Servis link dan clem buah 4,750.00

212 Stenlist stell 20 x 0,70 roll 614,000.00

213 Stopyng bukie buah 2,100.00

214 BC 6 mm buah 4,750.00

215 Ground Rood buah / batang 30,750.00

216 Terminal Nol buah 23,850.00

217 Mata lampu pijar 25 W -75 W buah 4,350.00

218 Stabilizer 300 A unit 2,934,000.00

219 Tutup panel 30 x 30 buah / ls 28,750.00

220 Pasang panel kontrol unit / ls 86,250.00

221 Penyambungan beban unit 17,250.00

222 Penyetelan dan penyalaan titik 7,000.00

223 Biaya angkutan jam 7,143.00

224 Alat bantu set 86,250.00

225 Retur material existing unit 100,000.00

BAHAN LOGAM BESI/BAJA TULANGAN/BESI BETON

BESI BETON

1 Besi beton polos kg 12,500.00

2 Besi beton ulir kg 13,000.00

3 Besi baja profil kg 8,800.00

4 Besi tuang / cor kg 8,200.00

5 Besi strip kg 11,500.00

6 Besi baja cor ( ring ) 150 kg unit 825,000.00

7 Besi baja cor ( ring ) 80 kg unit 440,000.00

8 Besi baja cor ( ring ) 40 kg unit 220,000.00

9 Besi penutup mahkota assainering unit 57,000.00

10 Besi penutup inlet cor/tuang ( ring + tutup) unit 85,000.00

KAWAT

1 Kawat beton / bindrat kg 9,400.00

2 Kawat ayakan 10,000.00

3 Kawat bronjong kg 30,250.00

4 Kawat nyamuk 8,250.00

5 Kawat las kg 6,500.00

6 Kawat galvanis kg 7,755.00

7 Kawat duri kg 9,500.00

8 Besi jaring kawat baja kg 9,500.00

9 Kawat seng polos kg 9,500.00

10 Kawat kassa 10,000.00

11 Kawat burung 15,000.00

12 Kawat jaring lbr 35,000.00

13 Kawat harmonika 25,000.00

14 Kawat penggantung rangka hollow 500.00

15 Profil Alumunium "T" 20,000.00

16 Ramset / dina bolt bh 2,500.00

17 Pipa galvanis dia. 1/2" 15,000.00

18 Pipa galvanis dia. 3/4" 25,000.00

19 Pipa galvanis dia. 1" 37,500.00

20 Pipa galvanis dia. 1 1/2" 50,000.00

21 Pipa galvanis dia. 3" 85,000.00

22 Pipa galvanis dia. 4" 90,000.00

23 Pipa hollow 4 x 4 cm tebal 1.2 mm 9,500.00

24 Kusen alumunium uk 2"x4" tebal 1.2 mm sekualitas YKK putih 55,000.00

25 Jendela nako bh 52,000.00

26 Pintu besi baja 750,000.00

27 Jendela besi baja 750,000.00

28 Jendela besi tahan api 1,500,000.00

29 Pintu gulung besi 250,000.00

30 Pintu lipat besi 500,000.00

31 Sunscreen alumunium 250,000.00

32 Roll door 200,000.00

33 Pintu alumunium 400,000.00

34 Vertikal blind 250,000.00

35 Wall paper 40,000.00

SENG BJLS

1 Seng BJLS 0,20 gelombang P = 180 cm lbr 38,500.00

2 Seng BJLS 0,20 gelombang P = 200 cm (merk Fumira) lbr 42,000.00

3 Seng BJLS 0,20 gelombang P = 240 cm lbr 60,000.00

4 Seng BJLS 0,20 gelombang P = 300 cm lbr 70,000.00

5 Seng BJLS 0,28 lembaran 40 cm lebar 12,500.00

6 Seng BJLS 0,28 lembaran 50 cm lebar 16,000.00

7 Seng BJLS 0,20 lembaran 90 cm lebar 25,000.00

8 Seng BJLS 0,30 lembaran 40 cm lebar 20,000.00

9 Seng BJLS 0,30 lembaran 50 cm lebar 18,000.00

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

m1

m1

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m1

m1

m1

m1

m1

Page 99: Bill of Quantity

Bahan - 99

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

10 Seng BJLS 0,30 lembaran 60 cm lebar 20,000.00

11 Seng BJLS 0,30 lembaran 90 cm lebar 28,000.00

12 Seng plat 3" x 6" BJLS 28 lbr 44,000.00

13 Seng plat 3" x 6" BJLS 24 lbr 40,000.00

14 Seng gelombang 2" - 5" BJLS 24 lbr 52,000.00

15 Alumunium gelombang tebal 0,55 75,000.00

16 Alumunium foil 25,000.00

17 Nok alumunium standar 40 cm 18 SWG 22 25,000.00

PAKU

1 Paku gording 125 x 5,1 mm kg 17,000.00

2 Paku gording 100 x 4,2 mm kg 17,000.00

3 Paku usuk 80 x 3,8 mm kg 17,000.00

4 Paku reng 55 x 3,1 mm kg 17,000.00

5 Paku plepet 40 x 2,1 mm kg 10,000.00

6 Paku eternit 20 x 1,5 mm kg 11,500.00

7 Angkur / baut bh 10,000.00

8 Paku kait bh 8,500.00

9 Paku pancing bh 500.00

10 Paku pancing kg 9,350.00

11 Paku asbes bh 400.00

12 Paku sumbat bh 400.00

13 Paku sekrup 3.5" bh 750.00

14 Paku skrup kg 10,000.00

15 Paku gypsum kg 20,000.00

16 Paku hak panjang 15 cm kg 9,500.00

PENGGANTUNG / PENGUNCI

1 Engsel pintu bh 11,000.00

2 Engsel jendela bh 7,500.00

3 Grendel bh 2,500.00

4 Hak angin bh 5,500.00

5 Selot pintu Union kecil bh 37,500.00

6 Selot pintu Union besar bh 47,500.00

7 Engsel angin bh 3,000.00

8 Kait angin bh 3,000.00

9 Door holder bh 15,000.00

10 Door stop bh 15,000.00

11 Penggantung + rel pintu dorong bh 200,000.00

12 Kunci tanam bh 126,000.00

13 Kunci tanam antik bh 250,000.00

14 Kunci tanam biasa bh 125,000.00

15 Kunci kamar mandi bh 50,000.00

16 Kunci selot bh 50,000.00

17 Kunci silinder bh 75,000.00

18 Kunci lemari bh 12,000.00

19 Spring knip bh 7,500.00

20 Door closer bh 150,000.00

ASPAL

1 Aspal curah kg 9,500.00

2 Aspal drum kg 10,650.00

3 Aspal modifer / asphalt joint kg 60,000.00

4 Drum aspal bekas bh 8,250.00

5 Rubber Filler 9,000.00

6 Mata Kucing bh 215,000.00

7 Filler kg 750.00

BATU ALAM / AGREGAT / BAHAN TUMBUHAN

BATU ALAM

1 Batu kali 135,000.00

2 Batu hias tempel 60,000.00

3 Batu hias bulat putih 147,500.00

4 Ubin marmer ( 40 x 40 x 2 ) Baitik/Citatah 100,000.00

5 Ubin marmer ( 40 x 60 x 2 ) Baitik 450,000.00

6 Ubin marmer ( 15 x 30 x 2 ) Baitik 150,000.00

AGREGAT

1 Agregat hakus/pasir klas A ( Uk. butir 5 mm ) 79,750.00

2 Agregat kasar/krikil/pasir klas B ( Uk. 20 - 40 ) 126,500.00

3 Agregat kasar/krikil/pasir klas B ( Uk. 4½ - 19 ) 132,000.00

4 Batu pecah 2/3 ( split ) 250,000.00

5 Batu pecah 3/4 230,000.00

6 Batu pecah 4/6 220,000.00

7 Batu pecah 5/7 220,000.00

8 Batu pecah 1/2 190,000.00

9 Batu belah hitam 80,000.00

10 Batu belah putih 70,000.00

11 Sirtu Klas A lewat ayakan 1" 66,000.00

12 Sirtu klas B lewat ayakan 2½" 66,000.00

13 Pasir urug darat 55,000.00

14 Pasir pasang ( progo ) 90,000.00

15 Pasir pasang ( krasak ) 120,000.00

16 Krikil beton 125,000.00

17 Kerikil tidak tersaring 55,000.00

18 Split D 30 - 40 mm 120,000.00

19 Split D 10 - 20 mm 120,000.00

m1

m1

m2

m2

m1

m1

m3

m2

m3

m2

m2

m2

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

Page 100: Bill of Quantity

Bahan - 100

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

20 Split D 1 - 2 cm 125,000.00

21 Batu merah ( 5x11x23 ) bj 500.00

22 Batu merah ( 4x9x19 ) bj 250.00

23 Krokos 0,2/0,4 70,000.00

24 Tanah urug 35,000.00

25 Sirtu 66,000.00

26 Batako bh 1,500.00

27 Roster 25/25 bh 2,000.00

BAHAN PEREKAT HIDROLIS & ORGANIK

1 Portland Cement (PC) Tonasa 50 kg 51,250.00

40 kg 31,000.00

2 Portland Cement (PC) Tonasa 50 kg 51,250.00

40 kg 31,000.00

3 Portland Cement (PC) Tiga Roda 40 kg 31,000.00

4 Semen putih 40 kg 52,500.00

5 Semen warna kg 6,000.00

6 Lem kayu (putih) Fox kg 11,000.00

7 Lem plastik Acrylic kg 60,000.00

8 Lem plastik Vinyl kg 19,500.00

9 Lem Aica Aibon kg 27,500.00

KAPUR & GIPS

1 Kapur pasang 72,500.00

2 Kapur sirih 138,000.00

3 Kapur sirih kg 500.00

4 Semen batu bata 80,000.00

5 Tepung Gypsum kg 3,500.00

6 Alkasit kg 300,000.00

7 Gypsum board lbr 42,000.00

8 Kasa gypsum roll 10,000.00

9 List profil gypsum lebar sampai 5 cm 4,000.00

10 List profil gypsum lebar sampai 6 - 10 cm 8,000.00

11 List profil gypsum lebar lebih 10 cm 15,000.00

12 Kalsiboard ( 122 x 244 x 0,35 ) cm lbr 46,200.00

13 Kalsiboard ( 122 x 244 x 0,60 ) cm lbr 60,500.00

BAHAN PELARUT, PELUMAS

1 Oli SAE 30 ltr 21,000.00

2 Minyak bakar / kerosene ltr 1,000.00

3 Bensin premium ltr 4,500.00

4 Solar ltr 4,300.00

5 Minyak pelumas ltr 14,000.00

6 Vet kg 13,000.00

7 Gas Elpiji kg 4,500.00

8 Minyak bekisting ltr 5,000.00

BAHAN KIMIA PEMBANTU UNTUK BETON

1 Bahan kimia B (kuat ikat cepat ) kg 35,000.00

2 Bahan kimia E (kuat ikat cepat ) kg 30,000.00

BAHAN PENGAWET DANBITUMEN

1 Teer kayu box 8,000.00

2 Residu ltr 3,500.00

3 Flincoat ltr 35,000.00

BAHAN KACA

1 Genteng kaca lengkung cekung 3 mm bh 5,500.00

2 Genteng kaca lengkung cekung 5 mm bh 7,000.00

3 Genteng kaca lengkung rata 3 mm bh 5,500.00

4 Genteng kaca lengkung rata 5 mm bh 6,850.00

5 Genteng kaca 3 mm bh 4,000.00

6 Genteng kaca 5 mm bh 6,850.00

7 Kaca buram/kaca es 3 mm 53,900.00

8 Kaca buram/kaca es 5 mm 66,000.00

9 Kaca bening 3 mm 49,500.00

10 Kaca bening 5 mm 77,000.00

11 Kaca riben 3 mm 57,500.00

12 Kaca riben 5 mm 70,000.00

13 Kaca cermin 3 mm 75,000.00

14 Kaca cermin 5 mm 120,000.00

15 Kaca patri 300,000.00

16 Fiber glass lbr 28,000.00

BAHAN PLASTIK

1 Pipa PVC abu-abu dia. 1/2" Wavin btg 12,650.00

2 Pipa PVC abu-abu dia. 3/4" Wavin btg 17,000.00

3 Pipa PVC abu-abu dia. 1" Wavin btg 20,500.00

4 Pipa PVC abu-abu dia. 1 1/2" Wavin btg 45,000.00

5 Pipa PVC abu-abu dia. 2" Wavin btg 60,000.00

6 Pipa PVC abu-abu dia. 2 1/2" Wavin btg 82,000.00

7 Pipa PVC abu-abu dia. 3" Wavin btg 82,000.00

8 Pipa PVC abu-abu dia. 4" Wavin btg 135,000.00

9 Pipa PVC putih dia. 1/2" Wavin btg 12,000.00

10 Pipa PVC putih dia. 3/4" Wavin btg 15,000.00

11 Pipa PVC putih dia. 1" Wavin btg 21,000.00

12 Pipa PVC putih medium dia. 3" Wavin btg 48,000.00

13 Pipa PVC putih tebal dia. 3" Wavin btg 80,000.00

14 Pipa PVC putih medium dia. 4" Wavin btg 135,000.00

m3

m3

m3

m3

m3

m3

m3

m1

m1

m1

m2

m2

m2

m2

m2

m2

m2

m2

m2

Page 101: Bill of Quantity

Bahan - 101

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

15 Pipa PVC putih tebal dia. 4" Wavin btg 157,000.00

16 Atap plastik gelombang PVC lbr 67,500.00

TANAMAN HIAS / PERINDANG

TANAMAN PERINDANG

1 Angsana, tinggi +/- 2m dia 5 cm batang 75,000.00

2 Asem jawa, tinggi +/- 1,5 m dia 2 cm batang 20,000.00

3 Bauhmis (Orchid tree), tinggi +/- 2 m dia 2 cm batang 17,500.00

4 Beringin, tinggi +/- 1 m dia 2 cm putih batang 50,000.00

5 Beringin, tinggi +/- 2 m dia 3 cm putih batang 125,000.00

6 Biola cantik, tinggi +/- 3 m dia 5 cm batang 300,000.00

7 Biola cantik, tinggi +/- 1,5 m ia 3 cm batang 75,000.00

8 Filisium, tinggi +/- 1,5 m dia 2 cm batang 20,000.00

9 Gayam, tinggi +/- 1,5 m dia 2 cm batang 20,000.00

10 Gidogan Biasa, tinggi +/- 1 m dia 1,5 cm batang 20,000.00

11 Kenari, tinggi +/- 1,5 m dia 2 cm batang 16,000.00

12 Kepel, tinggi +/- 1,5 m dia 3 cm batang 40,000.00

13 Ketepang, tinggi +/- 1,5 m dia 2 cm batang 17,500.00

14 Mahoni, tinggi +/- 1,5 m dia 2 cm batang 25,000.00

15 Sawo Kecik, tinggi +/- 1,5 m dia 2 cm batang 17,500.00

16 Sentul, tinggi +/- 1,5 m dia 2 cm batang 20,000.00

17 Tanjung, tinggi +/- 1 m dia 2 cm batang 25,000.00

18 Tanjung, tinggi +/- 3 m dia 3 cm batang 75,000.00

19 Beringin , tinggi +/- 2-3 m batang 150,000.00

20 Beringin, tinggi +/- 3 m dia 4 cm batang 300,000.00

TANAMAN HIAS

RUMPUT

1 Rumput Gajah (tanam) 12,000.00

2 Rumput Gajah (gebalan) 15,000.00

3 Rumput Manila (gebalan) 10,000.00

4 Rumput golf 11,000.00

5 Rumput gebalan 5,000.00

PERDU

1 Bougenville, tinggi +/- 0, 5 m batang 40,000.00

2 Bougenville, tinggi +/- 0, 7 m batang 70,000.00

3 Bougenville, tinggi +/- 1, 0 m batang 100,000.00

4 Bougenville varigata, tinggi +/- 0, 8 m batang 150,000.00

5 Classia planisicua, tinggi +/- 0,5 m batang 15,000.00

6 Kembang Sepatu (Bangkok), tinggi +/- 0,2 m batang 10,000.00

7 Kembang Sepatu (lokal), tinggi +/- 0,4 m batang 5,000.00

8 Mawar, tinggi +/- 0,25 m batang 7,500.00

9 Palem botol, tinggi +/- 0,8 m kecil 15 cm rumpun 150,000.00

10 Palem kuning, tinggi +/- 0,6 m rumpun 12,500.00

11 Palem kuning, tinggi +/- 1 m rumpun 20,000.00

12 Palem kuning, tinggi +/- 1,5 - 2 m rumpun 125,000.00

13 Palem kuning, tinggi +/- 2 - 3 m rumpun 175,000.00

14 Palem merah, tinggi +/- 2 - 3 m rumpun 150,000.00

15 Palem wregu, tinggi +/- 0,6 m rumpun 15,000.00

16 Palem putri, tinggi +/- 1 m rumpun 75,000.00

17 Soka pagar, 0,3 m batang 5,000.00

18 Serut, tinggi +/- 1 - 1,5 m batang 450,000.00

19 Puring bangkok, tinggi +/- 0,6 m batang 12,500.00

20 Phonik, tinggi +/- 1 m batang 150,000.00

21 Batavia / Jatropa, tinggi +/- 0,5 m batang 15,000.00

22 Serut, tinggi +/- 1,5 m batang 750,000.00

POHON

1 Cemara kipas, tinggi +/- 0,5 m batang 20,000.00

2 Cemara kipas, tinggi +/- 1,5 m batang 75,000.00

3 Cemara lilin, tinggi +/- 1,5 m batang 40,000.00

4 Cemara rantes, tinggi +/- 1 m batang 40,000.00

5 Cemara udang, tinggi +/- 1 - 1,5 m batang 600,000.00

6 Cemara norvox, tinggi +/- 0,6 m batang 50,000.00

7 Cemara norvox, tinggi +/- 1,5 m batang 80,000.00

8 Cempokok mulyo, tinggi +/- 0,5 m batang 15,000.00

9 Cempokok mulyo, tinggi +/- 1 m batang 40,000.00

10 Ceplok Piring, tinggi +/- 0,5 m batang 7,500.00

11 Ceplok Piring, tinggi +/- 1 m batang 20,000.00

12 Glodogan Pecut, tinggi +/- 1 m batang 14,000.00

13 Glodogan Pecut, tinggi +/- 2 m batang 25,000.00

14 Kelapa gading, tinggi +/- 3 m batang 200,000.00

15 Nusa indah, tinggi +/- 0,5 m batang 10,000.00

16 Nusa indah, tinggi +/- 1 m batang 30,000.00

17 Palem ekor tupai, tinggi +/- 1 m batang 75,000.00

18 Palem ekor tupai, tinggi +/- 2 m batang 150,000.00

19 Palem jepang, tinggi +/- 1 m rumpun 50,000.00

20 Palem jepang, tinggi +/- 2 m rumpun 100,000.00

21 Palem raja, tinggi +/- 4 m batang 150,000.00

22 Palem raja, tinggi +/- 6 m batang 250,000.00

23 Palem raja, tinggi +/- 7 m batang 1,500,000.00

SEMAK

1 Alamanda, tinggi +/- 0,2 m rumpun 5,000.00

2 Canna holland, tinggi +/- 0,3 m rumpun 15,000.00

m2

m2

m2

m2

m2

Page 102: Bill of Quantity

Bahan - 102

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

3 Canna lokal, tinggi +/- 0,5 m rumpun 7,500.00

4 Cendrawasih, tinggi +/- 0,2 m batang 5,000.00

5 Cantik manis, tinggi +/- 0,2 m batang 3,000.00

6 Dieffenbachia, tinggi +/- 0,2 m batang 10,000.00

7 Dieffenbachia, tinggi +/- 0,5 m batang 20,000.00

8 Hanjuang, tinggi +/- 0,3 m batang 3,000.00

9 Helogenia, tinggi +/- 0,4 m rumpun 4,000.00

10 Kayu besi, tinggi +/- 0,5 m batang 7,500.00

11 Kuping gajah, tinggi +/- 0,3 m rumpun 7,500.00

12 Lantana, tinggi +/- 0,2 m rumpun 4,000.00

13 Lantana, tinggi +/- 0,3 m rumpun 5,000.00

14 Yuliana rumpun 5,000.00

15 Iler rumpun 5,000.00

16 Yuca, tinggi +/- 0,4 m batang 30,000.00

17 Yuca, tinggi +/- 0,75 m batang 70,000.00

18 Melati, tinggi +/- 0,2 m batang 10,000.00

19 Phylodendron, tinggi +/- 0,4 m rumpun 7,500.00

20 Phylodendron, tinggi +/- 0,7 m rumpun 15,000.00

21 Sansiswa rumpun 7,500.00

22 Sirig gading, tinggi +/- 0,3 m rumpun 3,000.00

23 Soka bangkok, tinggi +/- 0,2 m batang 7,500.00

24 Soka jepang, tinggi +/- 0,2 m batang 3,000.00

25 Stevanut, tinggi +/- 0,3 m batang 12,500.00

26 Taiwan beauty, tinggi +/- 0,2 m rumpun 3,000.00

27 Teh-tehan hijau bulat, tinggi +/- 0,3 m batang 5,000.00

28 Teh-tehan hijau bulat, tinggi +/- 0,5 m batang 20,000.00

29 Teh-tehan hijau bulat (pagar), tinggi +/- 0,4 m batang 3,000.00

30 Teh-tehan hijau bulat (pagar), tinggi +/- 0,3 m batang 1,000.00

31 Teh-tehan kuning, tinggi +/- 0,2 m batang 500.00

32 Teh-tehan kuning bulat, tinggi +/- 0,3 m batang 5,000.00

33 Tri colour, tinggi +/- 0,3 m batang 12,500.00

34 Dracaena, tinggi +/- 0,8 m rumpun 15,000.00

35 Bambu pangkas, tinggi +/- 0,2 m batang 12,000.00

36 Patah tulang, tinggi +/- 0,3 m rumpun 3,000.00

37 Kuncira, tinggi +/- 0,3 m rumpun 3,000.00

38 Varent, tinggi +/- 0,3 m rumpun 4,000.00

39 Anthurium tinggi +/- 0,3 m rumpun 20,000.00

40 Bakung tinggi +/- 0,3 m rumpun 4,000.00

41 Nanas merah tinggi +/- 0,2 m rumpun 25,000.00

42 Nanas kuning tinggi +/- 0,2 m rumpun 15,000.00

43 Krisdoren tinggi +/- 0,2 m rumpun 20,000.00

TANAMAN PENUTUP TANAH

1 Adam eva kecil tinggi +/- 0,1 m rumpun 1,500.00

2 Adam eva besar tinggi +/- 0,2 m rumpun 4,000.00

3 Agave, tinggi +/- 0,4 m rumpun 50,000.00

4 Agave, tinggi +/- 0,2 m rumpun 20,000.00

5 Andong, tinggi +/- 0,3 m batang 2,000.00

6 Andong, tinggi +/- 0,2 m batang 1,500.00

7 Aponika, tinggi +/- 0,2 m rumpun 500.00

8 Portulaka rendah/pendek rumpun 2,000.00

9 Portulaka bangkok rumpun 4,000.00

10 Lili paris rumpun 1,500.00

11 Mega mendung, tinggi +/- 0,3 m batang 7,500.00

12 Modogras, tinggi +/- 0,2 m rumpun 800.00

13 Suplier, tinggi +/- 0,4 m rumpun 20,000.00

14 Terang bulan, tinggi +/- 0,4 m rumpun 8,000.00

15 Lili paris brasil tinggi +/- 0,3 m rumpun 4,500.00

16 Pupuk kandang kg 500.00

17 Tanah untuk media tanam 60,000.00

PERALATAN KEBERSIHAN

1 Sapu lidi bh 3,000.00

2 Tangkai Sapu bh 5,000.00

3 Tomblok bh 3,500.00

4 Hareg bh 3,000.00

5 Kerug bh 5,000.00

6 Seragam bh 75,000.00

7 Sarung tangan bh 7,500.00

8 Masker bh 7,500.00

9 Gerobak (alat baru) bh 1,500,000.00

10 Gerobak (sewa) bh 1,500.00

11 Serok bh 5,000.00

12 Gunting pangkas bh 35,000.00

13 Mesin potong rumput bh 3,000,000.00

14 Gathul bh 10,000.00

15 Garpu tanah bh 15,000.00

16 Arit bh 20,000.00

17 Gerobak celeng bh 400,000.00

18 Sepatu ps 75,000.00

19 Ember bh 5,000.00

20 Bagor bh 600.00

21 Irus bh 10,000.00

22 Cetok bh 10,000.00

m3

Page 103: Bill of Quantity

Bahan - 103

NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)

23 Linggis bh 35,000.00

24 Martil bh 10,000.00

25 Betel bh 12,000.00

26 Pacul bh 30,000.00

27 Sewa kendaraan untuk membuang lumpur hr 118,000.00

28 Gas oksigen 5 kg tb 15,000.00

29 Nipel bh 10,000.00

30 Pipa dia. 3/8" - 15 cm bh 1,500.00

31 Nitobond EC kg 100,000.00

32 Conbextra EP kg 200,000.00

33 Cebex 100 kg 150,000.00

34 Sewa Compressor untuk pekerjaan grouting hr 250,000.00

35 Sewa Mesin Grouting hr 150,000.00

36 Sewa mesin gerinda untuk pekerjaan grouting hr 100,000.00

37 Sewa mixer ubtuk pekerjaan grouting hr 6,000.00

38 Alat bantu pekerjaan grouting ls 5,000.00

39 Alat bantu pekerjaan pekerjaan marka ls 130,000.00

40 Alat bantu pekerjaan pekerjaan expantion joint ls 130,000.00

41 Pelapisan kedap air lantai dengan coating ( terpasang ) 40,000.00

42 Pelapisan kedap air lantai dengan membran ( terpasang ) 60,000.00

LAIN-LAIN

1 Tiang bendera

-Pondasi umpak buah 31,000.00

-Ompak ornamen buah 65,800.00

-Tiang galvanis 3" m' 23,375.00

-Bendera 120 x 180 buah 39,825.00

2 Rambu lalu lintas (terpasang) buah 150,000.00

3 Papan nama jalan (terpasang) buah 250,000.00

4 Sumur peresapan 5 m buah 495,000.00

3 Minyak Flux liter 12,000.00

4 Asbuton kg 2,350.00

5 Tumpuan konstruksi m 66,700.00

4 Kerikil sungai - royalty m3 5,750.00

5 Batu gunung - royalty m3 5,750.00

6 Uji test besi ( 3 sampel tiap jenis diameter benda uji ) set 150,000.00

5 Uji test aspal ttk 100,000.00

6 Sewa alat sondir hr 100,000.00

7 Sewa Scaffolding unit 20,000.00

6 Benda uji silinder beton bh 3,000.00

7 Biaya tes beton per benda uji bh 5,000.00

8 Biaya analisis tes beton perbeda uji bh 15,000.00

m2