TABLE  OF  CONTENT  

TOPIC PAGE

01 INTRODUCTION (LOON JING WEI / 0322074)

02 SITE AND SAFETY (MUHD MIRZA QAYYUM / 0324031)  

03 PRELIMINARIES WORK (CHUNG HOW CYONG / 0324152)  

04 FOUNDATION (YONG AI YI / 0321977)

05 SUPERSTRUCTURE   5.1 BEAM AND COLUMN (CHONG HAO FOONG / 0322343)   5.2 SLAB (CHONG HAO FOONG / 0322343)   5.3 WALL (QUAH KENG YEW / 0322893)   5.4 STAIRCASE (QUAH KENG YEW / 0322893)  

06 DOORS AND WINDOWS (CHONG YI HUI / 0324404)

07 ROOF (NGU XIAN LE / 0323898)

08 SUMMARY (LOON JING WEI / 0322074)

Page 3: Building Construction 1 Project 1 2016

THIS  IS  A  GROUP  PROJECT    WHERE  OUR  TASK  IS  TO  DECIDE  AN  

ONGOING  CONSTRUCTION  SITE  WHICH  INCLUDES  WHAT  WE  HAD  

LEARNED  IN  THE  SYLLABUS.  WE  HAD  SELECTED  A  SITE,  WHICH  IS  

LOCATED  IN  BANDAR  SUNGAI  LONG,  CHERAS  UNDER  PROJECT  NAME  AS  

D'ALTOS.    

DEVELOPER:  WIRA  CHERAS  DEVELOPMENT  SDN  BHD  TOTAL  LAND  DEVELOPMENT:  31.5  ACRES  TENURE:  FREEHOLD  TYPE:  3  /  4  STOREY  SEMI-­‐D  HOME  WITH  LIFT  FACILITIES  NUMBER  OF  UNITS  (PHASE  1):  37  UNITS    LAND  AREA  FROM  42'X80  TO  42'X90'    BUILD  UP  SIZE:  5,573  SQ  FT  TO  10,339  SQ  FT    

WE  WERE  REQUIRED  IDENTIFY  DIFFERENT  TYPE  OF  BUILDING  ELEMENTS  

AND  ITS  CONSTRUCTION  PROCESS,  DETAILS  AND  MATERIALS.  IN  

ADDITION,  WE  WERE  TO  STUDY  AND  RECORD  CONSTRUCTION  OF  

DIFFERENT  BUILDING  ELEMENTS  AS  DETAILED  AS  POSSIBLE.  OUR  GROUP  

CONSISTS  OF  8  MEMBERS  WHERE  EACH  OF  THEM  ARE  RESPONSIBLE  

FOR  DIFFERENT  CONSTRUCTION  PROCESS  AND  ITS  ELEMENTS.

1.0  INTRODUCTION

D'ALTOS  SEMI-­‐D  IN  CHERAS  IS  HERE  TO  CELEBRATE  EACH  STAGE  OF  LIFE.  THEY  HAVE  CREATED  A  SELF-­‐FULFILLED  COMMUNITY  WHERE  BOTH  THE  YOUNGER  AND  OLDER  GENERATIONS  WILL  EACH  FIND  THEIR  NICHE.    

IT  IS  TRULY  A  DIFFERENT  WORLD  HERE  -­‐  A  PLACE  THAT  TRANSFORMS  NATURE  INTO  SANCTUARY,  BLUEPRINTS  INTO  HOMES.  

SITE  MAP1.1  INTRODUCTION  TO  SITE

Page 4: Building Construction 1 Project 1 2016

TYPE  RB-­‐A  3-­‐STOREY  SEMI  VILLA  

TYPE  RB-­‐B  4-­‐STOREY  SEMI  VILLA

FLOOR  PLAN FLOOR  PLAN

Page 5: Building Construction 1 Project 1 2016

TYPE  RB-­‐C 3  -­‐  STOREY  SEMI-­‐VILLA

TYPE  RB-­‐D  4  -­‐  STOREY  SEMI-­‐VILLA  

FLOOR  PLAN FLOOR  PLAN

Page 6: Building Construction 1 Project 1 2016

TYPE  RB-­‐E4  STOREY  SEMI-­‐VILLA

FLOOR  PLAN

AREAL  VIEW

Page 7: Building Construction 1 Project 1 2016

2.0  SITE  AND  SAFETY

2.1  PERSONAL  PROTECTIVE  EQUIPMENT  

EYE  AND  FACE  PROTECTION  • SAFETY  GLASSES  SHOULD  BE  WORN  AT  ALL  TIMES  DURING  CONSTRUCTION  OPERATIONS  TO  PREVENT  FOREIGN  OBJECTS  FROM  GETTING  INTO  THE  EYE.  

• THE  SELECTION  OF  SAFETY  GLASSES  ARE  BASED  ON  THE  ANTICIPATED  HAZARD  

• FACE-­‐SHIELDS  PROTECTS  THE  FACE  TO  PREVENT  ANY  SPARKS  DURING  THE  HANDLING  OF  EQUIPMENT  WHEN  CUTTING  OBJECTS  

• DUST  MASK  PROTECTS  OUR  RESPIRATORY  SYSTEM  FROM  BEING  INTERRUPTED  BY  DUSTS  DURING  WORKING  HOURS  AT  THE  CONSTRUCTION  SITE

FIG  2.1A  :  CONSTRUCTION  SAFETY  GOGGLES

FOOT  PROTECTION  • WORKERS  AT  A  CONSTRUCTION  SITE  SHOULD  ALWAYS  WEAR  BOOTS  WITH  SLIP  RESISTANT  SOLES  

• SAFETY  TOED  FOOTWEAR  ARE  ALSO  WORN  TO  PREVENT  CRUSHED  TOES  WHEN  HANDLING  HEAVY  EQUIPMENT

HAND  PROTECTION  •  GLOVES  SHOULD  BE  WORN  AND  SHOULD  FIT  SNUGLY  AND  COMFORTABLE  FOR  THE  WORKER

HEAD  PROTECTION  • WORKERS  SHOULD  WEAR  HARD  HATS  IN  CASE  HEAD  INJURY  BECOMES  A  HIGH  RISK.  HELMETS  ARE  ALSO  TO  BE  INSPECTED  TO  IDENTIFY  DEFECTS  SHOULD  THERE  BE  ANY  HARNESSING  

• MUST  BE  USED  DURING  OPERATIONS  AT  HIGH-­‐LEVELS.  IT  IS  BECAUSE  THE  HARNESS  HAS  A  TIE-­‐OFF  POINT  TO  PREVENT  THE  USER  FROM  FALLING  GREAT  HEIGHTS

FIG  2.1B  :  BOOTS

HARNESS  IS  USED  DURING  HIGH-­‐LEVEL  OPERATIONS

FIG  2.1C  :  HELMET

2.2  SITE  SAFETY  OBJECTS  

FIRST  AIDS  IT  IS  IDEAL  TO  PREPARE  A  FIRST  AID  KIT  IN  THE  EVENT  A  MINOR  INJURY  GOT  INFLICTED  ON  THE  WORKERS  

FIRE  EXTINGUISHER  A  MUST  HAVE  TOOL  AS  A  SAFETY  PRECAUTION  IN  CASE  A  FIRE  RELATED  INCIDENT  OCCURRED

FIG  2.2A  :  A  SIGN  FOUND  AT  THE  SIGHT  THAT  EMPHASISES  THE  IMPORTANCE  OF  SAFETY  FOR  EVERYONE  WHO  VISITS  THE  SITE

SIGN  BOARDS  IT  IS  MAINLY  USED  TO  NOTIFY  AND  WARN  SURROUNDING  VISITORS  AND  WORKERS  OF  THE  VARIOUS  HAZARDS  ON  THE  SITE.  THERE  IS  ALSO  A  SIGN  WHICH  PROVIDES  THE  DETAILS  OF  THE  SAID  PROJECT  FOR  LEGAL  PURPOSES.  

FIG  2.2B  :  A  SIGN  WHICH  CONTAINS  THE  DETAILS  OF  THE  PROJECT

Page 8: Building Construction 1 Project 1 2016

2.5  MACHINERY  2.3  STRUCTURES  DURING  CONSTRUCTION  

CONSTRUCTION  MEETING  PLACE  -­‐ THERE  IS  A  TEMPORARY  MEETING  PLACE  

THAT  FUNCTIONS  AS  A  DISCUSSION  ROOM  BETWEEN  THE  COMMITTEE  IN  CHARGE  OF  CONSTRUCTION  AND  THE  CONSTRUCTION  WORKERS  IF  ANY  PROBLEMS  ARE  ENCOUNTERED.  THIS  STRUCTURE  LASTS  UNTIL  THE  COMPLETION  OF  A  PARTICULAR  PROJECT.

2.4  WORK  AREAS  AT  ELEVATED  LEVELS  

• SIGNS  ARE  POSTED  TO  SHOW  THE  LOAD  CAPACITY  OF  THESE  ELEVATED  SURFACES  

• MATERIALS  ARE  PILED  IN  A  WAY  THAT  PREVENTS  IT  FROM  COLLAPSING  

SCAFFOLDING  -­‐ SCAFFOLDS  ALLOWS  THE  CONSTRUCTION  WORKERS  TO  REACH  THE  HIGHER  WORKING  

AREAS  PROPERLY  AND  IN  A  SAFE  MANNER  -­‐ SCAFFOLDS  ARE  SET  ON  SOUND  FOOTING  -­‐ THE  DAMAGED  PARTS  THAT  AFFECT  THE  STRENGTH  OF  THE  SCAFFOLD  ARE  TAKEN  OUT  

OF  SERVICE  -­‐ ALL  SCAFFOLDS  ARE  FULLY  PLANKED  AND  SHOULD  BE  STABLE

FIG  2.4A  :  SCAFFOLDING  FROM  A  DISTANCE  AND  A  CLOSE  VIEW  OF  THE  SCAFFOLDINGS

EXCAVATING  EQUIPMENT    

EQUIPMENTS  UNDER  THIS  CATEGORY  ARE  USUALLY  HEAVY-­‐DUTY  MACHINES  THAT  ARE  SPECIFICALLY  USED  IN  DIGGING  EXCAVATIONS  AND  ALSO  IN  TRENCHING  OPERATIONS.  EXCAVATING  EQUIPMENTS  NORMALLY  COMPRISES  OF  5  EQUIPMENT  SYSTEMS  WHICH  ARE  IMPLEMENT,  TRACTION,STRUCTURE,  POWER  TRAIN,  CONTROL  AND  INFORMATION.  SOME  OF  THESE  EQUIPMENTS  UTILISE  HYDRAULIC  DRIVES  AS  THEIR  PRIMARY  SOURCE  OF  MOVEMENT.

EXCAVATOR  

• USED  FOR  EXCAVATION

BULLDOZER  

• PUSH  LARGE  QUANTITIES  OF  SOIL,  SAND  OR  OTHER  SIMILAR  MATERIALS  DURING  CONSTRUCTION  OR  CONVERSION  WORK.

FORKLIFT  

• A  FORKLIFT  IS  AN  INDUSTRIAL  TRUCK  WHICH  FUNCTION  IS  TO  LIFT  AND  MOVE  MATERIALS  TO  SHORT  DISTANCES.

BACKHOE  LOADER  

• USED  FOR  SMALL  DEMOLITIONS,  LIGHT  TRANSPORTATION  OF  BUILDING  MATERIALS,  EXCAVATION  AS  WELL      

       AS  PAVING  ROADS.

Page 9: Building Construction 1 Project 1 2016

2.5  MACHINERY  

MOBILE  CRANE  (CRAWLER  CRANE)  

• THEIR  MAIN  ADVANTAGE  OVER  OTHER  TYPES  OF  CRANES  IS  THAT  THEY  CAN  MOVE  AROUND  AND  PERFORM  EACH  LIFT  WITH  LITTLE  SET  UP.

HYDRAULIC  PILE  DRIVER  

• A  MECHANICAL  DEVICE  USED  TO  DRIVE  PILES  INTO  THE  SOIL  TO  PROVIDE  FOUNDATION  SUPPORT  FOR  THE  BUILDING

CONCRETE  MIXING  TRANSPORT  

• FUNCTIONS  TO  HOMOGENEOUSLY  COMBINE  CEMENT,  AGGREGATES  SUCH  AS  SAND  AND  ALSO  WATER  TO  FORM  CONCRETE.

Page 10: Building Construction 1 Project 1 2016
Page 11: Building Construction 1 Project 1 2016
Page 12: Building Construction 1 Project 1 2016
Page 13: Building Construction 1 Project 1 2016

4.0  FOUNDATION

4.1  TYPE  OF  FOUNDATION  ON  SITE  

CONSTRUCTION  FOUNDATION  IS  THE  ELEMENT  OF  AN  ARCHITECTURAL  STRUCTURE  WHICH  CONNECTS  IT  TO  THE  GROUND,  AND  TRANSFERS  LOADS  FROM  THE  STRUCTURE  TO  THE  GROUND  WITHOUT  ANY  UNACCEPTABLE  MOVEMENT  DURING  CONSTRUCTION  PERIOD  AND  ENTIRE  LIFE  OF  BUILDING  ITSELF.    

FOUNDATIONS  ARE  GENERALLY  CONSIDERED  EITHER  SHALLOW  OR  DEEP.  THE  FOUNDATION  TYPE  THAT  THE  SITE  IS  USING  IS  DEEP  FOUNDATION  WHICH  IS  PILING.  THERE  ARE  2  TYPES  OF  PILING  WHICH  IS  END  BEARING  AND  FRICTION  PILES.  ON  THE  SITE,  THEY  USE  FRICTIONAL  PILES  FOR  THE  STRUCTURE  BECAUSE  IT  PROVIDES  A  STABLE  FOUNDATION  FOR  THE  BUILDING.  OTHER  THAN  THAT,  THE  REASONS  OF  USING  FRICTIONAL  PILES  FOR  THE  STRUCTURE  IS  DUE  TO  THE  SOFT  SOIL  CONDITION  AND  THE  HEIGHT  OF  THE  BUILDING.

4.2  DETERMINING  THE  FOUNDATION  TYPE  BASED  ON  :    

1. SOIL  CONDITION  

ON  THE  SITE,  THE  LAND  IS  NOT  FLAT  BUT  WITH  A  STEEP  SLOPE.  SO  THEY  DECIDED  TO  CUT  AND  FILL  THE  LAND  TO  PROVIDE  A  FLAT  SURFACE  FOR  EACH  BUILDING.  DUE  TO  THIS  CHANGES,  THE  SOIL  CONDITION  WILL  CONSOLIDATE  OVERTIME  CAUSING  THE  STRUCTURE  ABOVE  CANNOT  BE  PROPERLY  SUPPORTED.  SO,  THE  PROBABILITY  OF  USING  PILING  FOUNDATION  IS  HIGHER  BECAUSE  IT  HAS  A  STRONGER  SUPPORT  TO  STRUCTURE  COMPARE  TO  SHALLOW  FOUNDATION.

GROUND  SLOPE

Page 14: Building Construction 1 Project 1 2016

2.  TIME  FACTOR  

TIME  TAKEN  FOR  PILING  FOUNDATION  IS  LONGER  THAN  SHALLOW  FOUNDATION.  FROM  THE  SITE,  TIME  TAKEN  FOR  FINISHING  PILE  FOUNDATION  IS  3  MONTHS.

4.2  DETERMINING  THE  FOUNDATION  TYPE  BASED  ON  :    

3.  STRUCTURAL  LOADING  

THE  LOAD  OF  A  STRUCTURE  WILL  AFFECT  THE  CHOICE  OF  FOUNDATION.  FOR  THIS  SITE,  MOST  OF  THE  BUILDINGS  WERE  BUILT  IN  SEMI-­‐D  4-­‐STOREY  AND  SEMI-­‐D  3  STOREY  HOUSE.  MOSTLY  PILING  FOUNDATION  WAS  USED  FOR  BUILDING  THAT  MORE  THAN  3  LEVELS  DUE  TO  ITS  HEAVY  LOAD  OF  THE  BUILDING.

4.3  DRIVEN  PILES  

A  RELATIVELY  LONG  COLUMN  PILE  THAT  INSTALLED  INTO  THE  GROUND  BY  IMPACT  HAMMERING  INTO  THE  EARTH,  WHICH  CAN  PROVIDE  RESIST  FORCE.  ON  THE  SITE,  THE  PILES  ARE  HAMMERED  BY  PILE  DRIVER  AS  THE  PICTURE  SHOWN  BELOW.  DURING  INSTALLATION,  THE  PILES  CAN  BE  PHYSICALLY  PRIOR  BECAUSE  IT  HAS  STANDARD  SHAPE  AND  SIZE.  BEFORE  INSTALLATION  OF  PILES,  ENGINEER  AND  SURVEYOR  HAVE  TO  DONE  SEVERAL  INSPECTION  IN  ORDER  TO  AVOID  PROBLEMS  ARISE  IN  THE  FUTURE.  

Page 15: Building Construction 1 Project 1 2016

4.4  TYPE  OF  PILES  AND  PILE  CAP  ON  SITE  

ON  THE  SITE,  “2  PILE  CAP”  WAS  USED  WITH  THE  COMBINATION  OF  2  PILES  UNDER  THE  PILE  CAP.  BUT  SOME  OF  THE  AREA  USED  “1  PILE  CAPS”.  IF  THE  PILES  WERE  FAILED  TO  WITHSTAND  A  SPECIFIC  LOAD,  THEY  WILL  ADD  ANOTHER  PILE  SO  THE  PILE  CAP  HOLE  ARE  DIFFERENT.  

REINFORCE  CONCRETE  PILES  (SQUARE  SHAPE)        LENGTH:  17M  SIZE:  300MMX300MM

PILE  

PILE  CAP  

4.5  INSTALLATION  OF  PILES  

STEP  1  INVESTIGATION  WORKS  SHOULD  BE  CARRIED  OUT  TO  DETERMINE  THE  SOIL  CONDITION,  DEPTH  OF  THE  GROUND,  BEARING  CAPACITY  OF  WORKS,  SOIL  TYPE  AND  ANY  EXISTING  WORKING  THAT  MAY  CLASH  WITH  PILE  LOCATIONS.  THE  ENGINEER  DETERMINES  THE  PILE  POINT  NUMBERING  ON  SITE.  USUALLY  EACH  BOTTOM  CORNER  OF  THE  STRUCTURE  WILL  HAVE  PILES  UNDER  IT  TO  SUPPORT  THE  STRUCTURE  EVENLY.  

STEP  2    TOPSOIL  WAS  REMOVED  DUE  TO  THE  ORGANIC  MATTER  WHICH  MAKES  IT  UNSUITABLE  TO  BE  LOAD  BEARING  SOIL.  THE  SOIL  WAS  MARKED  AND  CONCRETE  PILES  ARE  DRIVEN  BY  DIESEL  PILE  DRIVER  ACCORDING  TO  THE  GROUND  PLAN.

FIG  4.5A  :  EXCAVATOR  REMOVE  TOP  SOIL

FIG  4.5B  :  DIESEL  PILE  DRIVE

STEP  3  THE  PILES  WERE  MARKED  BEFORE  THE  PILES  ARE  DRIVEN  INTO  THE  GROUND  WITH  A  DEPTH  OF  12M.  (IF  THERE  ARE  UNEVEN  HEIGHT  OF  THE  PILES,  IT  WILL  CUT  INTO  SAME  LEVEL)

STEP  4  THE  SURROUNDING  SOIL  OF  THE  PILE  CLUSTER  IS  EXCAVATED  BY  APPROXIMATELY  350MM  DEPTH  FOR  PILE  CAP  INSTALLATION.

Page 16: Building Construction 1 Project 1 2016

4.5  INSTALLATION  OF  PILES  

STEP  5  THE  MARKINGS  ON  THE  PILE  WAS  MARKED  FOR  THE  INSTALLATION  OF  PILE  CAP.  THIS  IS  TO  ENSURE  THE  DEPTH  OF  THE  PILE  CAP  ARE  CORRECTLY  INSTALLED.

STEP  6  THEN,  REBAR  WAS  INSTALLED  THE  SHAPE  OF  THE  REBAR  WAS  SUSTAINED  BY  USING  METAL  WIRE.  IT  WAS  INSTALLED  FOR  CONCRETE  REINFORCEMENT  PURPOSE.  

STEP  7  ONCE  THE  REBAR  IS  SET,  INSTALLATION  OF  TIMBER  FRAMEWORK  AROUND  THE  REBAR  HAS  TO  BE  DONE.  THIS  IS  TO  AVOID  SAGGING  AND  FRACTURE  WHILE  SETTING  THE  MIXTURE  OF  THE  PILE  CAP.  THE  FRAMEWORK  WAS  INSTALLED  TO  SUPPORT  THE  MIXTURE.

STEP  8  AFTER  THE  FRAMEWORK  HAS  INSTALLED,  CONCRETE  MIXTURE  WILL  POUR  INTO  THE  FRAMEWORK.  STIRRING  OF  MIXTURE  HAS  TO  BE  DONE  TO  REMOVE  AIR  POCKETS  BEFORE  THE  MIXTURE  WAS  COMPLETELY  HARDEN  THIS  IS  TO  AVOID  THE  AIR  POCKETS  WEAKEN  THE  CONCRETE.  FRAMEWORK  THEN  REMOVED  AFTER  THE  CONCRETE  WAS  SET

FIG  4.5C  :  STIRRING

STEP  9  TO  ENSURE  THE  PILES  CAN  SUPPORT  THE  SPECIFIC  LOAD,  THE  ENGINEER  WILL  CONDUCT  A  LOAD  TEST.  BLOCKS  CONCRETE  IS  STACKED  UP  ABOVE  THE  PILES.  A  GAUGES  READING  IS  USED  TO  TAKE  THE  READING.  (IF  THE  PILE  FAIL  TO  ACHIEVE  THE  DESIRED  LOAD  ADDITIONAL  PILES  WILL  BE  DRIVEN  BESIDES  IT  TO  CARRY  THE  WEIGHT).

STEP  10  10.  TRENCHES  ARE  DUG  AND  LEAN  CONCRETE  IS  POURED  TO  FORM  A  LAYER  ON  THE  GROUND.  REINFORCED  STEEL  BARS  ARE  PLACED  IN  IT  

FIG  4.5D  :  STEP  9

STEP  11  11.  CONCRETE  IS  POURED  TO  FORM  THE  GROUND  BEAMS  AND  CONCRETE  STABS  AND  STEEL  MESH  ARE  PLACED  IN  BETWEEN  THE  SLABS.  ONCE  THE  FOUNDATION  IS  DONE,  COLUMNS  AND  WALLS  CAN  BE  CREATED.    

Page 17: Building Construction 1 Project 1 2016

5.0  SUPERSTRUCTURESUPERSTRUCTURE  IS  THE  BUILDING  PARTS  LOCATED  ABOVE  THE  GROUND  LEVEL.  IT  IS  THE  PART  WHERE  THE  HEIGHT  OF  THE  BUILDING  START  TO  RISE  UP  WHETHER  IT  SERVES  AS  STRUCTURE,  ENCLOSURE,  OPENINGS  AND  FUNCTIONAL  PURPOSE.  

5.1  BEAMS  AND  COLUMNS  

BEAM  

A  BEAM  IS  A  STRUCTURAL  ELEMENT  THAT  IS  CAPABLE  OF  WITHSTANDING  LOAD  PRIMARILY  BY  RESISTING  BENDING.  BEAMS  ARE  TYPICALLY  MADE  OF  STEEL,  REINFORCED  CONCRETE,  WOOD,  COMPOSITES,  OR  CASED  FLUIDS.  

FUNCTION  -­‐ CARRY  VERTICAL  GRAVITATIONAL  FORCES  

GENERALLY  -­‐ DISTRIBUTE  THE  FORCES  ALONG  THE  SLAB,  

WHICH  ARE  THEN  DISPERSED  INTO  THE  COLUMNS.

FIG  5.1A  :  ON  SITE  BEAM

FIG  5.1B  :  CROSS  SECTION  OF  COLUMN  AND  BEAM

COLUMN  

THESE  ARE  THE  VERTICAL  LOAD  BEARING  MEMBERS  OF  THE  STRUCTURAL  FRAME  WHICH  TRANSMITS  THE  BEAM  LOADS  DOWN  TO  THE  FOUNDATIONS.  THEY  ARE  USUALLY  CONSTRUCTED  IN  STOREY  HEIGHTS  AND  THEREFORE  THE  REINFORCEMENT  MUST  BE  LAPPED  TO  PROVIDE  STRUCTURAL  CONTINUITY.

FUNCTION  -­‐ VERTICAL  SUPPORT  -­‐ TAKING  THE  LOAD  OF  BEAM  SLAB  -­‐ TRANSFER  THE  LOAD  TO  THE  EARTH  

INDEPENDENTLY  -­‐ CONSTRUCTED  WITH  THE  HELP  OF  STEEL  BARS  

AND  CEMENT  CONCRETE

FIG  5.1C  :    ON  SITE  COLUMN

Page 18: Building Construction 1 Project 1 2016

5.1.1  BEAMS  AND  COLUMNS  REINFORCEMENT  

TO  FORM  COLUMN  OR  BEAM,  FIRST  YOU  MUST  INSTALL  THE  METAL  ROD  FIRST.  THEN  YOU  BUILD  THE  FORMWORK  AND  CONTINUE  WITH  THE  CEMENT  POURING.    

THE  CONCRETE  USED  IS  MADE  FROM  CEMENT,  WATER  AND  AGGREGATE.  CONCRETE  HAS  HIGH  COMPRESSIVE  STRENGTH  AS  THE  AGGREGATE  EFFICIENTLY  CARRIES  THE  COMPRESSION  LOAD.  HOWEVER,  IT  IS  WEAK  INTENSION  AS  THE  CEMENT  HOLDING  THE  AGGREGATE  CAN  CRACK  ALLOWING  THE  STRUCTURE  TO  FAIL.  

THIS  IS  WHERE  REINFORCEMENT  COMES  IN.  IT  WAS  EXPLAINED  THAT  CONCRETE  HAS  LOW  TENSILE  STRENGTH,  THUS  IT  NEEDS  TO  BE  REINFORCED  WITH  STEEL  IN  ORDER  TO  RESISTS  ITS  TENSILE  STRESSES.  

A  REBAR  (SHORT  FOR  REINFORCING  BAR)  ,  ALSO  KNOWN  AS  REINFORCING  STEEL,  IS  A  COMMON  STEEL  BAR  AND  IS  COMMONLY  USED  AS  A  TENSIONING  DEVICE  IN  REINFORCED  CONCRETE  AND  REINFORCED  MASONRY  STRUCTURES  HOLDING  THE  CONCRETE  IN  COMPRESSION.  IT  IS  USUALLY  IN  THE  FORM  OF  CARBON  STEEL  BARS  OR  WIRES.

COLUMN  REINFORCEMENTWORKER  ON  SITE  PUTTING  BINDERS  ON  THE  MAIN  BARS

BEAM  REINFORCEMENT

Page 19: Building Construction 1 Project 1 2016

5.1.2  BEAMS  AND  COLUMNS  FORMWORK

FORMWORK  IS  TO  EITHER  TEMPORARY  OR  PERMANENT  MOULDS  INTO  WHICH  CONCRETE  OR  SIMILAR  MATERIALS  ARE  POURED.  IN  THE  CONTEXT  OF  CONCRETE  CONSTRUCTION,  THE  FALSEWORK  SUPPORTS  THE  SHUTTERING  MOULDS.

STEPS  TO  LAY  FORMWORK:  -­‐ SET  A  STRING  LINE  1  INCH  IN  FROM  THE  OUTSIDE  EDGE  OF  CONCRETE  ON  FORM  

LINE.  -­‐ DIG  OUT  FORM  TRENCH  IF  NECESSARY  -­‐ START  AT  ONE  CORNER  AND  LAY  FORMWORK  INTO  THE  HOLE,  LAY  IN  ALL  THE  

REGULAR  FORMS  -­‐ BEGIN  TO  STAND  AND  CONNECT  THE  FORMWORK  -­‐ SET  ALL  REGULAR  FORMS.  STAKE  THEM  VERTICALLY  WITH  REBAR  STAKES  AND  BRACE  

THEM  EVERY  6  FEET  USING  A  2  BY  4  KICKER  BOARD  -­‐ FIT  ALL  SPECIAL  FORMS

ON  SITE  COLUMN  

FORMWORK  USED  TO  CONSTRUCT  THE  BEAM  BEING  SUPPORTED  BY  SCAFFOLDING

SETTING  OF  TIMBER  CAST  FOR  COLUMNS

*USING  PLYWOOD  CAST  INSTEAD  OF  METAL  CAST  FOR  FORMWORK  RESULTS  IN  MORE  WASTE  AS  IT  CAN  ONLY  BE-­‐USE  THREE  TIMES  AT  MOST.  HOWEVER  IT  ALLOWS  FOR  CUSTOMISATION  OF  FORMWORK  COMPARED  TO  METAL  CASTS  THAT  ARE  ONLY  SUITABLE  FOR  STANDARDISED  FORMWORK  DUE  TO  THE  HIGH  COST  PRODUCTION.  

STEPS  TO  REMOVE  FORMWORK:  -­‐ ALLOW  THE  CONCRETE  TO  DRY  BEFORE  REMOVING  THE  FORMS.  -­‐ REMOVE  FORMS  STARTING  AT  THE  TOP  OF  SLOPING  SLABS.  -­‐ REMOVE  THE  STAKES  FROM  THE  GROUND  THAT  SUPPORT  THE  FORMS  WITH  A  STAKE  

PULLER  TO  AVOID  DAMAGING  THE  STAKES  OR  THE  FORMS.  -­‐ PULL  THE  FORMS  AWAY  FROM  THE  SIDES  OF  THE  CONCRETE  SLAB  -­‐ REMOVE  FORMS  ON  ALTERNATING  SIDES  OF  THE  SLAB  TO  MAINTAIN  THE  STRUCTURAL  

BALANCE.

THE  COLUMNS’  TIMBER  CASTS  WERE  STRUCK  AFTER  A  WEEK.  HOWEVER  FOR  BEAMS,  ONLY  THE  SIDES  OF  THE  TIMBER  CASTS  WERE  STRUCK  WITHIN  A  WEEK  WHILE  THE  SOFFITS  AND  PROPS  WOULD  BE  STRUCK  IN  ABOUT  A  MONTH  AFTER  CONCRETE  CASTING.  

SETTING  OF  TIMBER  CAST  FOR  GROUND  BEAM  

SETTING  OF  TIMBER  CAST  FOR  CEILING  BEAM  

FORMWORK  WILL  BE  PUT  AND  POINTED  STAKE  SET  IN  THE  GROUND.  STRENGTH  OF  FORMWORK  IS  IMPORTANT  TO  ENSURE  THAT  IT  DOES  NOT  EXPAND  WHEN  POURING  CONCRETE  INTO  IT

Page 20: Building Construction 1 Project 1 2016

5.1.3  BEAMS  AND  COLUMNS  CONSTRUCTION  DETAILS

DETAILS  ON  BEAM  STRUCTURE  

PRIMARY  BEAM  -­‐STRETCHES  OVER  FROM  COLUMN  TO  COLUMN  -­‐TRANSFER  THE  WHOLE  UPPER  LOAD  TO  COLUMN  THAT  CONSISTS  INSIDE  THE  BUILDING  STRUCTURE  

SECONDARY  BEAM  -­‐STRETCHES  OVER  THE  MAIN  BEAM  -­‐TRANSMITTED  TO  THE  LOAD  OF  THE  MAIN  BEAM  -­‐REDUCE  A  LENGTH  THAT  SUPPORT  THE  STRUCTURE  OR  CATCH  HE  LOAD  OF  STRUCTURE  

EDGE  BEAM  -­‐FUNCTION  AS  BUILDING  BEAM  TO  STRETCHES  BETWEEN  THE  EXTERNAL  COLUMNS

*DESPITE  STEEL  BEING  GENERALLY  STRONGER  THAN  CONCRETE,  STRUCTURAL  STEEL  IS  RARELY  EMPLOYED  LOCALLY  AS  REINFORCED  CONCRETE  IS  MORE  ECONOMICAL  CONSIDERING  THE  RELATIVELY  HIGH  COST  OF  STEEL.  THE  COMPOSITION  OF  STEEL  REBAR  IN  BEAMS  AND  COLUMN  ARE  ABOUT  1%  AND  6%  RESPECTIVELY  WITH  COLUMNS  BEARING  BOTH  TENSION  AND  AXIAL  FORCES.

IN  ORDER  FOR  STRUCTURAL  CONTINUITY,  THE  REINFORCEMENT  OF  COLUMNS  MUST  BE  LAPPED  AS  SUCH:

WHEN  A  CONTINUOUS  BEAM  SPANS  OVER  COLUMNS,  TENSION  IS  AT  THE  TOP  OF  THE  BEAM,  SO  REBAR  IS  NEEDED  AT  THE  TOP  OF  THE  BEAM  OVER  COLUMN  SUPPORTS.

Page 21: Building Construction 1 Project 1 2016

5.2  SLAB  

CONCRETE  SLAB  IS  ONE  OF  STRUCTURAL  ELEMENT  OF  A  BUILDING.  IT  IS  USUALLY  USED  TO  CONSTRUCT  FLOORS  AND  CEILINGS,  AND  ALSO  FOR  EXTERIOR  PAVING.

5.2.1  SLAB  DETAILS  

SLAB  IS  RELATIVELY  THIN  STRUCTURAL  MEMBER  COMPARED  TO  BEAM.  IT  SPANS  HORIZONTALLY  BETWEEN  SUPPORTS  AND  RELY  ENTIRELY  ON  THE  EXISTING  GROUND  FOR  SUPPORT.  BEFORE  THE  GROUND  FLOOR  CAN  BE  CONSTRUCTED,  THE  GROUND  MUST  BE  PREPARED  TO  ENSURE  THE  SLAB  HAS  CONSISTENT  SUPPORT.

FUNCTION:  -­‐RECEIVE  LOAD  FROM  THE  BUILDING  -­‐REDUCE  THE  PRESSURE  ON  THE  COLUMN  AND  STUMP  -­‐ACT  AS  THE  MAIN  BASE  OF  CONSTRUCTION    -­‐EASE  THE  JOB  ON  FLOOR  FINISHES

DAMP-­‐PROOF  MEMBRANE  -­‐THICK  POLYTHENE  SHEET  LAY  UNDER  THE  FLOOR  SLAB  -­‐TO  ACT  AS  BARRIER  IN  RESISTING  MOISTURE  THROUGH  THE  STRUCTURE  BY  CAPILLARY  ACTION  

BINDING  LAYER  -­‐TO  EVEN  OFF  THE  SURFACE  OF  HARDCORE  -­‐PREVENT  THE  DAMP-­‐PROOF  MEMBRANE  FROM  BEING  PUNCTURED  BY  THE  HARDCORE  

HARDCORE  -­‐TO  FILL  IN  ANY  SMALL  POCKETS  THAT  FORMED  DURING  OVER  SITE  EXCAVATION  -­‐TO  PROVIDE  A  FIRM  -­‐TO  HELP  SPREAD  ANY  POINT  LOADS  OVER  THE  GREATER  AREA  -­‐PREVENT  ANY  UNACCEPTABLE  SETTLEMENT  BENEATH  THE  SOLID  FLOOR

LAYER  OF  COMPONENT  AROUND  SLAB

Page 22: Building Construction 1 Project 1 2016

5.2.2  SLAB  CONSTRCUTION  PROCESS  

SMOOTHING  SURFACE  AND  REMOVE  FORMWORK

SCRAPED  AWAY  UNSTABLE  TOPSOIL

ASSEMBLE  AND  ERECT  FORMWORK

PREPARE  AND  PLACE  CRUSHED  STONE  LAYER  AND  WELDWIRE  FABRIC  REINFORCEMENT

POUR/VIBRATE  CONCRETE

5.2.2  SLAB  CONSTRCUTION  DETAILS  

AVERAGE  19MM-­‐  DIAMETER  CRUSH  STONE  (GRAVEL)  ARE  USED.  THE  THICKNESS  OF  GRAVEL  AT  LEAST  NEED  100MM  DEEP.  GRAVEL  ACT  AS  A  DRAINAGE  LAYER.

THE  PURPOSE  OF  IRON  GRID  IS  TO  PREVENT  CRACKING  OF  THE  CONCRETE.  EXAMPLE:  CONCRETE  SHRINKAGE,  TEMPERATURE  STRESS,  CONCENTRATED  LOAD.  THE  DIMENSION  OF  EACH  SQUARE  IS  15X15CM  AND  THE  DIAMETER  OF  THE  STRIPS  IS  3.43MM

FOR  THE  GROUND  SLAB,  VAPOUR  RETARDER  (PLASTIC  MEMBRANE)  IS  ADDED  TO  PREVENT  THE  MOISTURE  FROM  THE  GROUND.  FOR  SOME  CASE  THEY  USE  FINE  CRUSH  STONE  OR  SAND  TO  REPLACE  THE  MEMBRANE.

PIPING  SYSTEM  MUST  BE  INSTALLED  BEFORE  THE  LAYING  DOWN  OF  SLAB  TO  ALLOCATE  SPACE  FOR  WATER  SUPPLY  AND  EXCREMENT  DISPOSAL.

Page 23: Building Construction 1 Project 1 2016
Page 24: Building Construction 1 Project 1 2016
Page 25: Building Construction 1 Project 1 2016
Page 26: Building Construction 1 Project 1 2016

6.2.3  WINDOW  OPERATION  ON  SITE  

SLIDING  WINDOW  • USED  IN  TOILET  • CONVINIENT  FOT  USER  TO  OPEN  AND  CLOSE  WNDOW  • USAGE  OF  DOUBLE  GLAZED  GLASS  • CONSIST  OF  TWO  SLIDING  PANELS

CASEMENT  WINDOW  • USED  IN  LIVING  ROOM,  BEDROOM  AND  ETC.  EXCEPT  TOILET  • CONVINIENT  FOT  USER  TO  OPEN  AND  CLOSE  WNDOW  • USAGE  OF  TINTED  GLASS  • ALLOWS  NATURAL  LIGHT  IN  AND  ALSO  GIVES  PRIVACY  

• CONSIST  OF  MULTIPLE  OPERATING  SASHES  THAT  ARE  SIDE  HINGED  WHICH  SWINGS  OUTWARDS

FIXED  WINDOW  • USED  IN  LIVING  ROOM  AND  BATHROOM  • LOWER  WINDOW  FOR  LIVING  ROOM  • HIGHER  WINDOW  FOR  BATHROOM  

• ZERO  VENTILATION  • USAGE  OF  TINTED  GLASS  AND  DOUBLE  GLAZED  GLASS

6.2.4  WINDOW  INSTALLATION  

STEP  1  POSITIONING  OF  SUB-­‐FRAME  USING  ALUMINIUM  SHIN  OR  RIDE  UP  BLOCKS.

STEP  2  CHECK  PLUMP  BOB  FOR  SUB-­‐FRAME  ALIGNMENT.

STEP  3  TEMPORARY  STIFFEN  FRAME  NEAR  BOLTING  POINTS  USING  TEMPORARY  STIFFENER.

STEP  4  FIX  SUB-­‐FRAME  TO  WALL

STEP  5  SEAL  ANCHOR  HEADS  AND  JOINTS  WITH  WALL  WITH  PROTECTIVE  TAPE.  (BLACK  COLOUR=PROTECTIVE  TAPE)

STEP  6  PREPARE  TO  INSTALL  MAIN  FRAME  USING  MALLET.

Page 27: Building Construction 1 Project 1 2016

7.0  ROOF

7.1  TYPE  OF  ROOF  ON  SITE  

BUTTERFLY  FLAT  ROOF  

• IT  IS  FOR  LARGE/COMPLICATED  SHAPED  BUILDING  • LOW  PITCHED  ROOF  (14  DEGREES  OR  LESS)  • SUITABLE  FOR  SPANS  UP  TO  4000MM  • SPACING  OF  ROOF  JOINTS  IS  CONTROLLED  BY  THE  WIDTH  OF  DECKING  MATERIAL/  CEILING  BOARD  

• TO  FALL  IN  ONE  DIRECTION  TOWARDS  A  GUTTER/  OUTLET  BY  FIXING  FITTINGS  TO  THE  TOP  OF  THE  JOINTS  

ASPHALT  FLAT  ROOF  

• CONSISTS  OF  AN  AGGREGATE  WITH  A  BITUMINOUS  BINDER,  WHICH  IS  CAST  INTO  BLOCKS  READY  FOR  REHEATING  ON  SITE  

• LAYING  TO  SLOPING  SURFACE  15  DEGREE  PITCH  • SLOPING  SURFACE  REQUIRES  3  COATS,  BUILD  UP  TO  A  20MM  TOTAL  THICKNESS    • CAN  BE  LAID  TO  FALLS  SO  THE  RUN-­‐OFF  OF  WATER  IS  RAPID  AND  EFFICIENT

Page 28: Building Construction 1 Project 1 2016

7.2  CONSTRUCTION  PROCESS  

STEP  1  THE  ROOF  TRUSSES,  WHICH  ARE  MADE  FROM  METAL  ARE  FABRICATED  IN  A  FACTORY  AND  IT  IS  THEN  DELIVERED  TO  SITE  FOR  FIXING.  THIS  METHOD  IS  MUCH  SIMPLER  COMPARED  TO  THE  TRADITIONAL  METHOD  OF  ROOFING,  WHICH  WAS  DONE  ENTIRELY  ON  SITE.

STEP  2  THE  NEXT  STEP  IS  THE  INSTALLATION  OF  THE  ROOF  FRAME,  WHICH  FUNCTIONS  TO  PROVIDE  STRUCTURE  THAT  SPANS  THE  WALLS  OF  THE  BUILDING  AND  SUPPORTS  THE  ROOF  COVERING.  THE  SLOPE  ALLOWS  RAINWATER  TO  RUN  OFF  AND  DRAINED  AWAY  FROM  THE  DWELLING.  

STEP  3  THE  INSTALLATION  OF  THE  ACOUSTIC  INSULATION  PANEL  ON  TOP  OF  THE  ROOF  FRAME.  ITS  PURPOSE  IS  TO  PREVENT  HEAT  TO  FLUX  THROUGH  THE  ROOF,  AND  IT  IS  SET  BELOW  THE  WATER  PROOF  MEMBRANE.  

STEP  4  FINALLY  COMES  THE  PROCESS  OF  FLASHING,  WHICH  IS  BASICALLY  THE  INSTALLATION  OF  THE  ASPHALT  SHINGLES  ON  TOP  OF  THE  INSULATION  PANEL.  IT  CAN  BE  LAID  TO  FALLS  SO  THAT  THE  RUN-­‐OFF  FOR  WATER  IS  SMOOTH  AND  EFFICIENT.  

Page 29: Building Construction 1 Project 1 2016

8.0  SUMMARY8.1  REFERENCES  

ARMA  -­‐  Asphalt  Roofing  Manufacturers  Associaeon.  (n.d.).  Retrieved  

Audrey  Team's  -­‐  KL  &  Selangor  Properees  For  Sales.  (n.d.).  Retrieved    

Audrey  Team's  -­‐  KL  &  Selangor  Properees  For  Sales.  (n.d.).  Retrieved  October  19,  2016,  from  hlp://www.audreyklselangorproperty.com/d-­‐altos-­‐  semi-­‐d-­‐cheras-­‐sungai-­‐long    

Be  con  -­‐  slideshare.net.  (n.d.).  Retrieved  October  19,  2016,  from  hlp://www.slideshare.net/kychong1105/be-­‐con  

Ching  ,  frank  (2009)  Building  Structure  Illustrated  :  palerns  ,  system  and  design  .  Hoboken,  NJ  :  john  Wiley.  

Ching,  F.  D.  K.  (2014).  Building  Construceon  Illustrated  (5).  Somerset,  US:  Wiley.  Construceon  Equipments.  (n.d.).  Retrieved  October  19,  2016,  from  hlp://www.engineeringcivil.com/theory/construceon-­‐  equipments        

Chudley,  R.,  &  Greeno,  R.  (2014).  Building  Construceon  Handbook  (10).  Abingdon,  Oxon,  GB:  Routledge.    Deplazes  ,  andrea  (2008)  Construceng  Architecture  :  materials  ,  processes  ,  Structure  –  a  handbook  .  basel  :  birkhauser  

Ford  ,  Edward  R  (1996)  The  Details  of  modern  architecture  .  Cambridge  ,  MA  :  MIT  Press  

Foster  ,  J.S.  and  greeno  roger  (2007)  Mitchell  `  Building  Series  ,  Part  2  :  structure  and  fabric  (7th  edieon  )  .  Horlow  :  prenece  hall  

Guidance  Flat  Roof  Types.  (n.d.).  Retrieved  October  19,  2016,  from    

How  to  install  internal  &  external  sliding  doors  -­‐  Homebase.  (n.d.).  Retrieved  October  19,  2016,  from  hlp://www.homebase.co.uk/en/staec/how-­‐to-­‐install-­‐sliding-­‐doors  

hlp://www.buildingregs4plans.co.uk/guidance_flat_roof_types.php    

hlp://www.site-­‐safety.com/    

October  19,  2016,  from  hlp://www.audreyklselangorproperty.com/d-­‐altos-­‐semi-­‐d-­‐cheras-­‐sungai-­‐long    

Personal  Proteceve  Equipment.  (n.d.).  UNITED  STATES  DEPARTMENT  OF  LABOR.  Retrieved  October  19,  2016,  from  hlps://www.osha.gov/Publicaeons/osha3151.html    

Sew,  I.  S.,  &  Meng,  I.  C.  (n.d.).  PILED  FOUNDATION  PILED  FOUNDATION  DESIGN  &  CONSTRUCTION.  Retrieved  October  18,  2016,  from  hlp://www.gnpgeo.com.my/download/publicaeon/L2009_03.pdf  

Welcome  to  Site  Safety®,  LLC.  (n.d.).  Retrieved  October  19,  2016,  from    

Window  &  Door  Installaeon  Instruceons  |  Pella.com.  (n.d.).  Retrieved  October  19,  2016,  from  hlp://www.pella.com/support-­‐center/installaeon-­‐instruceons/default.aspx

Page 30: Building Construction 1 Project 1 2016

7.0  ROOF

ROOF  IS  DESIGN  FOR  KEEP  OUT  RAIN  AND  ALSO  PREVENT  WARMTH  .  

7.1  CONSTRUCTION  PROCESS  

ROOF  IS  BEING  INSTALLED  AFTER  THE  WHOLE  STRUCTURE  IS  BEING  BUILT  .  TO  BUILT  A  ROOF  ,  THEY  START  BY  MAKING  TRUSSES  .  THEN  THEY  USES  BRACE  TO  HOLD  THE  TRUSSES  TO  MAKE  THEM  STABLE  AND  MINIMIZE  THE  IMPACT  OF  LATERAL  LOADS  .AFTER  THAT  INSULATION  IS  FIXED  BETWEEN  THE  TRUSSES  THEN  COVER  BY  WATERPROOF  MEMBRANE  .  LASTLY  INSTALL  THE  METAL  DECK.  

7.2  DRAINAGE  

IN  THE  SITE  WE  VISIT  ,  THE  HOUSE  HAVE  2  ROOFS  .  SMALLER  ROOF  WILL  LEAD  THE  WATER  DIRECTLY  TO  THE  GROUND  INFRONT  OF  THE  HOUSE  ,  AND  THE  LARGER  ROOF  WILL  GUIDE  THE  WATER  INTO  THE  AREA  IN  2ND  FLOOR  WHICH  HAVE  DRAINAGE  SYSTEM  

Page 31: Building Construction 1 Project 1 2016

7.3  INSTALLATION  PROCESS  

STEP  4  THE  ROOF  IS  COVERED  BY  METAL  DECK  ,  PIECE  BY  PIECE  

STEP  3  INSULATION  IS  FIXED  BETWEEN  THE  TRUSSES  ,  AND  ITS  COVERED  BY  WATERPROOF  MEMBRANE  .  

STEP  2  BRACE  IT  WITH  STEEL  BARS  ,  THIS  MAKES  THE  TRUSSES  MORE  STABLE  AND  CAN  WITHSTAND  MORE  IMPACT  .  

STEP  1  STEP  TO  CONSTRUCT  THE  ROOF  IS  TO  TRUSSES