CASE STUDY CLIENT General Electric PROJECT Thepharak Wind Farm Thailand SCOPE Pitch Motor Exchange Tooling Equipment Fabrication [email protected] www.fpt-global.com FPT-CS003

Upload: others

Post on 26-Jul-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CASE STUDY - Home - FPT Global · CASE STUDY CLIENT General Electric PROJECT Thepharak Wind Farm Thailand SCOPE Pitch Motor Exchange Tooling Equipment Fabrication info@fpt-global.com

CASE STUDY

CLIENT General ElectricPROJECT Thepharak Wind Farm ThailandSCOPE Pitch Motor Exchange Tooling Equipment Fabrication

[email protected] FPT-CS003

Page 2: CASE STUDY - Home - FPT Global · CASE STUDY CLIENT General Electric PROJECT Thepharak Wind Farm Thailand SCOPE Pitch Motor Exchange Tooling Equipment Fabrication info@fpt-global.com

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Quisque imperdiet ut neque ut rhoncus. Vestibulum viverra rhoncus arcu non efficitur. Vestibulum commodo interdum lacus, a egestas nunc bibendum nec. Morbi sodales felis odio, ut ornare tellus accumsan non.

HEADLINE

20182019

The electrical maintenance teams from the FPT-Global Renewables Division were requested to replace a failed blade pitch motor in one of the wind turbine units at the Theparak Wind Farm Project, located in Chaiyaphum province, Thailand.

Before commencing work, a safety review of the replacement procedure was conducted to identify any possible hazards to the ongoing operations in the immediate area. The review was especially critical for this task given the weight of the motor, small workspace and configuration in which the motor needed to be lowered from the hub.

Specialised tooling was required for the pitch motor replacement, which had to be fabricated and certified locally per manufacture design as it was not available in Thailand. FPT-Global was tasked with the fabrication of this tooling equipment and ensured all standards were met to include the high-grade steel requirement. Work instructions issued by the client were strictly adhered to along with the creation of new temporary procedures due to the high risk involved. The combination of general instruction and specific operational challenges identified by the FPT Global teams ensured the project was carried out in an efficient and speedy manner.

[email protected]