MEP Detailed Design Presentation

1.0 Electrical System

Table of Contents

2.0 Plumbing

3.0 Fire Fighting System

4.0 Mechanical System Design

5.0 Summary of Overall MEP Cost

Basis Of Design □Internal Electrical Distribution System □External Electrical Distribution System □Design Alternatives for Electrical Substations and DG Sets □Overall Electrical Cost □

Basis of Design □Water Supply Requirements □Water □ Distribution SystemSTP Scheme □Overall Plumbing Cost □

Basis of Design □Distribution System □Overall Fire Fighting Cost □

Basis Design Scheme □Ventilation Layouts □Overall Mechanical Cost □

Blossomcountythe greener side of life

Electrical S

ystem

Electrical System Detailed Design

Blossomcountythe greener side of life

Electrical S

ystem

Basis of DesignFollowing parameters have been considered for calculating Electrical Load

2 BHK (Type – 1,1A, 2, 2A,3A,9, 9A) : 5 KW per Flat•

3 BHK (Type – 3,4,5,6,7,7A, 9B) : 6 KW per Flat•

4 BHK (Type –8) : 8 KW per Flat•

Penthouse (Type – 1 to 7- Duplex) : 12 KW per penthouse•

Penthouse (Type – 1 to 7 Simplex) : 9 KW per penthouse•

Clubhouse : 15 W per Sq.Ft.•

Electrical Scheme

Main PowerTotal Power Demand for the Project □ : 10 MVA(approx.)

(Refer Electrical Load Calculation for details)

Number of 11KV Feeders for Supply of □ : 4 Nos. x 2.5 MVA Supplies

Powerconsidered(aspertheconfirmation)

Power Distribution Philosophy □ : 1No. Towerwise Compact Substation(CSS consisting of Ring Main Unit

(RMU), 11/0.433 KV Transformer and LT Panel inside enclosure.

Emergency Power Back-up(Light & Power) □ : 100% using - 2Nos. Silent DG Sets(1DG+1 Space-Tower wise)

Emergency additional Power Back-up(Lighting) □ : Thru’ invertor, for common areas and basements

2.

Blossomcountythe greener side of life

Electrical S

ystem

3.

Floor Metering Board : 1No. - Floorwise □

FlatMetering : 1No.–3phaseDualEnergyMetering/Flatwise(insidefloormeterboard) □

Sub main Distribution : From Meter Board to Flat DB, using Copper wires in recessed PVC conduits•

Lighting Fixtures : In common areas only •

Emergency Lighting : Thru’ invertor, for common areas and basements•

Telephone and TV System : Main Cable inside the LV shaft to be provided by Service providers•

Internal Electrical Distribution

Flats

• Flat Distribution : Thru’ 1No. TPN DB – Flatwise

Circuit Wiring : From Flat DB to various loads, using Copper wires in recessed PVC conduits•

Switches & Sockets : Modular Plate Type•

Telephone & TV Wiring : Provision only, by providing PVC conduit from LV shaft to Flats•

Air-conditioning provision : 25A Sockets provided for AC (Near window)•

Switches & Sockets : Modular Plate Type•

Electrical Distribution System • Main 415V LT Panel : 1No. - Towerwise

Rising Mains : 800A – Towerwise•

Floor Distribution : Thru’ Tap-offs from Rising Main •

Cables for other Distribution : Using XLPE Cables/ for Fire Pumps/Plumbing System and Other utilities •

Metering System

Blossomcountythe greener side of life

Electrical S

ystem

4.

External Electrical SystemsExternal/Basement/Common Areas

External Lighting – Road : Using 8M High Poles/ 150W HPSV/HPMV □External Lighting - Boundary : Using Flood Lights/ As above □Interior Roads : Upto 18W CFL Fixtures on 3M Poles/As advised by Architect/Landscape Consultant □Gate Lighting : CFL/ HPMV lamps on 1M High Pole/ /As advised by Architect/Landscape Consultant □Feeder Pillar/External DB : 2 Nos. x External Lighting Feeder Pillars □External Lighting Wiring : Using PVC insulated cables □Basement Lighting : Using CFL/ T5 & T8 Lighting Fixtures □Circuit & Wiring : By providing PVC conduit & copper wires □Lighting of Staircases : Using CFLs/ One Fixture fed from Invertor □Supply of Lighting Fixtures & Installations : Supplied by developer □Fire Alarm System : Conventional Fire Alarm System/ Wiring using FRLS Flexible Copper cables/ wires □

Mechanical S

ystem

Blossomcountythe greener side of life

DESIGN ALTERNATIVES FOR ELECTRICAL SUBSTATIONS AND DG SETS

Bulk Supply :

Maximum Demand : 10 MVA•

GenerallyPowerSupplyisreceivedat33KVsincetheloadisabove5MVA.ButitisconfirmedfromLogixthat4Nos.11KVSupplyshall•

be received for 10 MVA load.

Following options are available to distribute the bulk supply:Option -1

33 KV power supply received in ESS and provide 33 KV/433 V transformers and LT DG sets at 1 No. centralised location.•

LT Cables from 33 KV / 433 V Substation to feed Rising Mains of all the towers.•

5.

Mechanical S

ystem

Blossomcountythe greener side of life

Option-2

4 Nos. 11 KV power supply received in 4 Nos. Substations at different locations and provide 11 KV / 433 V Centralized Substations for 4 •

Nos. / 5 Nos. Towers on the Ground Floor)

Centralized LT DG sets for 4Nos./5Nos. provided along with Centralized Substations on the Ground Floor•

LT Cables from 11 KV / 433 V Substation to feed Rising Mains of 4 Nos. / 5 Nos Towers•

8.

Mechanical S

ystem

Blossomcountythe greener side of life

Option-3

4 Nos. 11 KV power supply received at 4 Nos. different locations and provide 11 KV / 433 V Compact •

Substations tower wise (17 Nos. for towers and 1 No. for Club & Utility) on the Ground Floor)

LT DG sets provided along with Compact Substations tower wise on the Ground Floor•

LT Cables from 11 KV / 433 V Compact Substation to feed Rising Mains of all the towers.•

It is recommended to adopt Option – 2 as this is economical.•

11.

Mechanical S

ystem

Blossomcountythe greener side of life13.

Summary of Cost(Location of Electrical Sub Station & DG Sets)

A. OPTION - 1 Rs. 200,850,000.00(33 KV / 433 V CENTRALISED SUBSTATION)

B. OPTION - 2 Rs. 186,638,000.004 NOS. 11 KV / 433 V CENTRALISED SUBSTATION

C. OPTION - 3 Rs. 190,928,330.0011 KV / 433 V Compact Substations tower wise (17 Nos.for towers and 1 No. for Club & Utility

Summary for External Electrical Works

Blossomcountythe greener side of life

Electrical S

ystem

14.

A. OPTION - 1

I. 33 KV / 433 V CENTRALISED SUBSTATION Rs. 72,000,000.00

II. LT DG SETS Rs. 93,750,000.00

III. LT CABLES & TERMINATIONS Rs. 35,100,000.00

TOTAL 200,850,000.00

B. OPTION - 2

I. 11 KV SWITCHING STATION Rs. 6,000,000.00

I. 11 KV / 433 V SUBSTATIONS (4 NOS.) Rs. 56,000,000.00

II. LT DG SETS Rs. 93,750,000.00

III. LT CABLES & TERMINATIONS Rs. 30,888,000.00

TOTAL 186,638,000.00

C. OPTION - 3

I. 11 KV HT WORKS Rs. 6,868,750.00

II. LT DG SETS (36 NOS.) Rs. 112,098,100.00

III. 11 KV / 433 V COMPACT SUBSTATIONS (18 NOS.) Rs. 57,921,480.00

Iv. LT CABLES & TERMINATIONS (17 Towers & Club House)Rs. 14,040,000.00

TOTAL 190,928,330.00

Summary for overall MEP Cost for all Towers, Basement, External Development

Blossomcountythe greener side of life

Electrical S

ystem

1. Tower-A 11,087,617.00

2. Tower-C 11,087,617.00

3. Tower-D 13,485,450.00

4. Tower-E 14,165,081.00

5. Tower-F 13,485,450.00

6. Tower-G 13,485,450.00

7. Tower-H 13,791,822.00

8. Tower-I 13,791,822.00

9. Tower-J 14,165,081.00

10. Tower-J1 14,314,575.00

11. Tower-K 14,165,081.00

12. Tower-L 14,165,081.00

13. Tower-M 14,165,081.00

14. Tower-N 13,485,450.00

15. Tower-O 13,485,450.00

16. Tower-P 13,588,713.00

17. Tower-Q 14,165,081.00

Grand Total for all Towers(A) Rs. 230,079,902.00

Overall Electrical Cost(External + Internal) Rs. 455,601,672.00

Summary for Internal Electrical Works all Towers

SL. No. Description Total(Rs.)

Summary for Internal Electrical Works all Towers

Summary for Non Tower Area and Extended Basement

Summary for External Electrical Works

SL. No. Description Total(Rs.)

SL. No. Description Total(Rs.)

SL. No. Description Total(Rs.)

1. D.G. Sets(with 100% Backup) 101,300,000.00

2. Miscellaneous Items 10,798,100.00

Grand Total for DG Set Works(D) Rs. 112,098,100.00

1. HT Works 6,868,750.00

2. Unitised Substation 21,940,000.00

3. Panels 35,677,080.00

4. Sub Panels & Meter Board 44,575,112.00

5. Earthing 304,400.00

6. Supply & Installation Of External Lighting 2,616,550.00

Grand Total for External Electrical Works(C) Rs. 111,981,892.00

1. Point Wiring For Parking Area, Stair Case, Lift Lobby 471,190.00

2. Distribution Boards & Submain Wiring 196,200.00

3. Supply Of Lighting Fixtures 492,400.00

4. Fixing Of Lighting Fixtures 56,900.00

5. Sub Panel & Submain Wiring 40,000.00

6. Supply & Laying Of Cables & Terminations 15,750.00

7. Earthing 48,288.00

8. Supply & Installation Of Fire Detection & Alarm System 49,050.00

9. Supply & Installation Of Inverter 72,000.00

Grand Total for Non Tower Basement(B) Rs. 1,441,778.00

16.

Highlights on Plumbing System

Blossomcountythe greener side of life

Plum

bing System

Occupancy• (Based on NBC -2005, Part -4 & IS-12183 Part-1 1987)

2BHK Flats : 5 Persons per Dwelling unit □

3BHK/4BHK Flats/Penthouses : 6 Persons per Dwelling unit □

Water Requirement• (NBC-2005 Part-9)

Residences : 135 Litre/Person/Day•

Staff Water Requirement : 45 Litre/Person/Day(assuming 10% staff)•

Floating Occupant : 15 Litre/Person/Day•

Restaurant / Food Court : 70 Litre/Seat/Day•

Club House : 15 Litre/Person/Day•

Overall Domestic Water Requirements:

Overall Water Requirements : • 1980 KLD UG Water storage requirement : • 1320 KLD

(Considering 16 Hours storage)

Overhead Water storage requirement : • 40 KLD(approx.)

(Considering 8 Hours storage) on terrace of each towers

Whole premises divided into two parts with one part having Tower B,C,D,E ,F,G,H, I and other Part with towers J,J1,K,L,M,N,O,P,Q , A :

Total Water Requirement for • Phase-1 : 775 KLD

Total Water Requirement for • Phase-2 : 1205 KLD

Basis of DesignFollowing parameters have been considered for designing of Plumbing and Fire Fighting System:

18.

Plum

bing System

Water Supply Requirement

Blossomcountythe greener side of life

Water balance Diagram for Phase INOTES

Waterdemandfiguresaretentative•andfinalizedduringDetailEngineering

Landscape Green Area not known but• Irrigation demand can be completely met through the recycled water from STP

DOMESTIC WATER DEMAND 775 KLDIRRIGATION DEMAND 135 KLDTOTAL WATER DEMAND 910 KLDRECYCLED WATER(STP) 135 KLDFRESH WATER(BOREWELL) 775 KLD

FRESH WATER SUPPLY775 KLD

DOMESTIC SEWAGE620 KLD(80%)

WATER GENERATION80% OF TOTAL WATER DAILYCONSUMPTION=STP CAPACITY

95% OFSEWAGE POTENTIAL

STP CAPACITY650 KLD

RECYCLE WATER POTENTIAL(TREATED SEWAGE)

EXCESS FOR EXTERNALDISPOSAL

135 KLD FOR IRRIGATIONPURPOSES

TOTAL WATER DEMAND910 KLD

19.

Water Supply Requirement

Blossomcountythe greener side of life

Water balance Diagram for Phase II

Plum

bing System

DOMESTIC WATER DEMAND 1205 KLDIRRIGATION DEMAND 135 KLDTOTAL WATER DEMAND 1340 KLDRECYCLED WATER(STP) 135 KLDFRESH WATER(BOREWELL) 1205 KLD

NOTES

Waterdemandfiguresaretentative•andfinalizedduringDetailEngineering

Landscape Green Area not known but• Irrigation demand can be completely met through the recycled water from STP

FRESH WATER SUPPLY1205 KLD

DOMESTIC SEWAGE964 KLD(80%)

WATER GENERATION80% OF TOTAL WATER DAILYCONSUMPTION

95% OF STP

SAY 1000 KLD FOR TERTIARYSTP ACAPACITY : 1000 KLD

RECYCLING POTENTIAL 915 KLD(TREATED SEWAGE)

EXCESS FOR EXTERNALDISPOSAL

135 KLD FOR IRRIGATIONPURPOSES

TOTAL WATER DEMAND1340 KLD

20.

Total Water Requirement

Blossomcountythe greener side of life

Overall Water Balance Diagram (Phase I +Phase II) Plum

bing System

DOMESTIC WATER DEMAND 1980 KLDIRRIGATION DEMAND 270 KLDTOTAL WATER DEMAND 2250 KLDRECYCLED WATER(STP) 270 KLDFRESH WATER(BOREWELL) 1980 KLD

NOTES

Waterdemandfiguresaretentative•andfinalizedduringDetailEngineering

Landscape Green Area not known but• Irrigation demand can be completely met through the recycled water from STP

FRESH WATER SUPPLY1980 KLD

DOMESTIC SEWAGE1584 KLD(80%)

WATER GENERATION80% OF TOTAL WATER DAILYCONSUMPTION=STP CAPACITY

95% OF STP

STP CAPACITY1650 KLD

RECYCLING POTENTIAL 1500 KLD(TREATED SEWAGE)

EXCESS FOR EXTERNALDISPOSAL

270 KLD FOR IRRIGATIONPURPOSES

TOTAL WATER DEMAND2250 KLD

21.

Blossomcountythe greener side of life

Plum

bing System

Sources of Water

Water Supply Distribution System

Overhead Water Storage Tanks (Typical for all Towers) (Based on calculations and as per minimum requirements of NBC)

Underground Domestic Water Storage Tanks (Based on calculations and as per minimum requirements of NBC)

Municipal Water Supply Connection shall be preferred to the maximum extent possible □

7 Numbers of Bore wells for Fresh potable water Demand are required considering 16 Hours of Pumping operation □ under the

condition that NO water supply is available from the Municipality

Recycled water from STP’s (Sewage Treatment plant) shall be used for Irrigation purpose □

Fire Water Tank • 300 KL ---

Raw Water Tank 250 KL(2X125 m) • 400 KL(2X200 KL)

Potable water tank • 250 KL(2X125 m) 400 KL(2X200 KL)

PHASE 1 PHASE 2

Domestic(Potable) Water Tank • 40 KL(approx.) varies with different towers

Fire Tank 10 KL(constant for all towers)•

Gravity Fed System• , excepttwoupperfloorswhichshallbefedthruHydro-Pneumatic SystemPipe materials for water supply shall be CPVC for concealed and GI for exposed•

24.

Water Distribution System

Blossomcountythe greener side of life

Plum

bing System

OverheadFire Tank

(10KL)

OverheadDomestic

Tank(varies)

TYPICAL TOWER(Kitchen and Toilets)

Underground Tank

Underground Fire Tank

STP (Recycled UGWater Tank)

Bore wells/Municipality

Irrigation

OVERFLOW

OVERFLOW

GRAVITY FLOW

GRAVITY FLOW

25.

Blossomcountythe greener side of life

Plum

bing System

STP & UG Recycled Water Storage TanksWhole premises divided into two parts with one part having Tower B,C,D,E ,F,G,H, I and other Part with towers J,J1,K,L,M,N,O,P,Q ,A :

STP Capacity worked out: Capacity of Centralised STP : 1650 KLD •

Capacity for Part-1 : 650 KLD•

Capacity for Part-2 : 1000 KLD•

Recycled Water Storage Tanks : 180 KLD•

(for Gardening)

MBBR Technology has been presently proposed for Sewerage Treatment System □

CentralizedSTPcanbebuiltinmoduleforflexibilityandbetterefficiency. □

Recycled water from STP’s (Sewage Treatment plant) shall be used for Irrigation/gardening, □

additional water shall be disposed off to municipal drain.

26.

Blossomcountythe greener side of life

Plum

bing System

Schematic Diagram of Sewage Treatment Plant

Treated Sewage Centrifuge/Filter Press/

Sludge Drying Beds

Raw Sewage

Bar Screen Chamber

Oil & Grease Trap chamber

Equalization Tank

Tertiary Treatment Chlorination Tube Settler

MBBR Reactors (Two in Series)

27.

SLUDGE TANK

SLUDGE THICKENER

CENTRIFUGE/ FILTER PRESS SLUDGE DRYING BEDS

FILTRATE SUMP

Chlorine Dosing

DRIED SLUDGE FOR SUITABLE DISPOSAL

BAR SCREEN CHAMBERS

OIL AND GREASE CHAMBER

EQUALISATION TANK

ATTACHED GROWTH BIOLOGICAL SYSTEM OR OTHER SUITABLE

SECONDARY TREATMENT

SETTLING TANK

CHLORINE CONTACT TANK

RAW SEWAGE

TERTIARY TREATMENT FOR SUITABLE USE OR

DISPOSAL

Plum

bing System

Blossomcountythe greener side of life

Advantages - Disadvantages

CentralizedSTPAdvantages:

Capacity - 1650 cumLess Footprint requiredOptimized CostLower Power consumptionCentralized sludge Handling and DisposalCentralized Operation and MaintenanceFlexible in Operation - can be designed in two modules

Disadvantages:

Deeper Sewerage System - High Cost

DecentralizedSTP

Capacity - 650 sqmt and 1000 cumMore Footprint requiredHigher CostHigh Power requirementDecentralized sludge Handling and DisposalDecentralized Operation and MaintenanceModules will further add up the cost

Disadvantages:

Conventional Sewerage System - Low Cost

30.

Blossomcountythe greener side of life

Plum

bing System

Rain Water Harvesting System Rain water pipes from terraces shall be UPVC within the building and RCC for external network up to RWH pit•

In addition to the terrace water, surface water shall also be collected and taken to RWH pits•

Based on the requirements, 14 • Nos. Rain Water Harvesting Pits has been provided

Rain Water shall be used for charging the ground water level•

Other Plumbing Systems in External Development

Collection and Disposal of Solid Waste:For solid waste management each tower shall have its own dedicated garbage room•

17Nos. Garbage collection rooms of approx. 12 Sq. m each(consisting of 2 No’s containers of size 1.5mx1.5mx1.2m each are proposed). •

Garden HydrantWater to the garden hydrants shall be supplied from Recycled treated storage water tank located in STP by pumping at required pressure. •

A garden ring shall be provided to run at Periphery of the building or as per site conditions to supply the irrigation water to the•

lawns/garden/green areas etc.

Arrangement for Landscaped areasWater shall be supplied to the garden hydrants from treated water from STP.•

Drainage shall be made through surface drainage channels and catch basins and storm water manholes. •

Provision of electricity shall be made for all the landscaped areas, wherever required, for pumping.•

31.

Blossomcountythe greener side of life

Plum

bing System

Water and Sanitary Distribution in FlatsSanitary Fixtures and Fittings

Waterclosets–floormountedwithCistern(Europeanpattern)•

Wash basins – Counter top or Flat back, with hot and cold water mixture•

Sinks - Stainless steel sinks with drain board with mixtures in kitchen, and pantries etc.•

Urinals–Largeflatbackvitreouschinamountedonthewallfittedwithasensoroperatedautoflushingsystem(forPublicarea)•

Showers proposed for towers•

CP Fittings shall be used as per standard make and approved by Architect•

Soil and Waste System

Two pipe system in which the soil & waste pipes are distinct•

Pipe Material for Soil waste & vent pipes shall be uPVC up to First Man hole and Stoneware for external network up to STP•

Hot Water Supply System

Hot water requirement for the Toilets & Kitchen shall be met through independent localized Electrical operated geysers. Provisions •

has been made accordingly

Localised Water Treatment

Provisions shall be kept for Domestic RO connections for each dwelling units in respective Kitchens for drinking and cooking•

purposes.

34.

Highlights on Fire Fighting System

Blossomcountythe greener side of life

Fire Fighting System

Basis of DesignFire protection shall be provided by an • automatic and a combination of wet pipe sprinkler & standpipe system.

FireprotectionsystemShallbeasperNBC-2005Part-4&ConcernedChiefFireOfficer’sguidelinesandregulationsbased•

upon the following data:

Class of Building : □ Residential BuildingClassoffire : □ LighthazardMax. Height of the building : □ Below 60 Meter

Water Storage for Fire Protection

Central UG Fire Water Tank : 300KL(2X150 KL) •Individual Tower Fire Tank : • 10KL (on each tower)ThefirepipingforsprinklerandhydrantsshallbeMS/GI•

Capacities of various Fire Pumps

Various Fire Pumps has been provided meeting all statutory requirements

Jockey Pump : Capacity 180 LPM, 150 Mt. head•

Hydrant Pump : Capacity 2280 LPM, 150 Mt. head•

Sprinkler Pump : • Capacity 2280 LPM, 150 Mt. head

Diesel driven Pump : Capacity 2280 LPM, 150 Mt. head•

37.

Blossomcountythe greener side of life

Fire Fighting System

Distribution SystemInternal

Mainhydrantringshallfeedtoverticalwetrisersforupperfloorsandexternalhydrantsplacedatsuitablelocations.•

Sprinklersshallbeprovidedinthebasementaswellasintheflats•

Firehosereelcabinetswithcompletefirefightingaccessoriesshallbeprovidedwithfollowingspecifications,asperstatutoryrequirements:•

2 nos., 63mm dia and 15m long rubberized fabric lined hose pipe as per I.S: 636 type-II. □

Gunmetal made and female instantaneous type coupling as per I.S: 903. □

Gunmetal branch pipe with nozzle as per I.S: 903. □

First-aidfirehosereelswith20mmdia36.5mlongwith5mmboregunmetalnozzleasperI.S:884-1969. □

1 No. Brass ball valve of 25 mm dia. □

Fireman’s axe □

External Yard Hydrant System

Firehosecabinetwith1no.singleheadedhydrantvalves,2nos.firehoseand1no.branchpipeshallbeprovidedwitheachexternal•

hydrant

Internal Fire Fighting Equipment

Ithasbeenproposedtoprovidefollowingportabletypefireextinguishersatstrategiclocationsasperrequirements,generallytofollow•

IS – 2190:1992:9lit.WaterexpellingtypeasperI.S:940-1989atallupperfloors. □

4.5kg,CO2typeasperI.S:2878,inservicesareaandupperfloors. □

Mechanical foam type extinguisher - for services area. □

5 kg. ABC type. □

38.

Typical Section

Blossomcountythe greener side of life

Fire Fighting System

41.

Summary for overall Fire Fighting Cost for all Towers, Basement, External Works

Blossomcountythe greener side of life

Fire Fighting System

1 TOWER-A 581,393 2,667,542 150,437 3,399,372

2 TOWER-C 581,393 2,667,542 150,437 3,399,372

3 TOWER-D 581,393 2,667,542 150,437 3,399,372

4 TOWER-F 581,393 2,667,542 150,437 3,399,372

5 TOWER-G 581,393 2,667,542 150,437 3,399,372

6 TOWER-N 581,393 2,667,542 150,437 3,399,372

7 TOWER-O 581,393 2,667,542 150,437 3,399,372

8 TOWER-H 570,584 2,757,348 150,437 3,478,369

9 TOWER-I 570,584 2,757,348 150,437 3,478,369

10 TOWER-E 581,393 2,667,542 150,437 3,399,372

11 TOWER-L 581,393 2,667,542 150,437 3,399,372

12 TOWER-M 581,393 2,667,542 150,437 3,399,372

13 TOWER-J 581,393 2,667,542 150,437 3,399,372

14 TOWER-K 581,393 2,667,542 150,437 3,399,372

15 TOWER-Q 581,393 2,667,542 150,437 3,399,372

16 TOWER-J1 600,797 2,948,565 157,677 3,707,039

17 TOWER-P 570,584 2,757,348 150,437 3,478,369

TOTAL (A) Rs. 58,333,982

S.No. TOWER’S FIRE HYDRANT AUTOMATIC SPRINKLER HAND TOTAL(Rs.) SYSTEM SYSTEM APPLIANCES

B. Summary for Non Tower FF Works 7,500,000 C. Summary for Pump Room 2,500,000

GRAND TOTAL (A+B+C) 68,333,982

A. Summary for Internal FF Works

42.

Highlights on Mechanical System Design

Mechanical S

ystem

Blossomcountythe greener side of life

Basic Design CriteriaTemperature Conditions

Outdoor Conditions(ASHRAE / ISHRAE)Dry Bulb Temperature(Summer) – 41.7OC•

Wet Bulb Temperature(Summer) – 22.2OC•

Dry Bulb Temperature(Winter) – 6.7OC•

Indoor Conditions(Assumed)Dry Bulb Temperature – 24 + 2OC•

Relative Humidity – 60% •

Heat Load Conditions(Assumed)Lighting Load – 1 Watt / Sq. ft.•

Equipment Load – 2 Watt / Sq. ft.•

Mechanical Ventilation RequirementsToilets – 70 cfm per water closet and / or Urinal (As per ASHRAE 62.1)•

Basement Parking(As per NBC 2005)•

Normal Supply 10 ACPH □

Normal Extract 10 ACPH □

Smoke Extract 30 ACPH □

STP Room Exhaust 25 ACPH

44.

Mechanical S

ystem

Blossomcountythe greener side of life

Mechanical(HVAC) System DesignAirconditioningsystemhasbeenconsideredforclubhouseandMarketingOfficeonly•

Air conditioning facility shall be provided through• localizedsplit/VRVsystemforaboveElectricalprovisionhasbeendoneforairconditioningofflats•

Ventilation System DesignRequisitesmokeextract@30ACPHshallbeachievedbyprovidingaxialflowfans•Ventilation of kitchens and toilets has been considered to be with propeller type exhaust fans•

Lift well pressurization shall be provided using pressurization fans•

Service RoomsVentilationofSTProomandplantroomwillbedonethroughaxialflowfans;andelectricalserviceroomsshallbe•

ventilated through propeller type exhaust fans.

Vertical TransportationLiftshasbeenprovidedformovementofflatoccupants•

Variable Frequency Drives with required nos. of stops has been provided•

MaximumspeedoftravelofLifts,basedontheLiftTrafficstudyhasbeentakenas1.5m/s•

47.

Summary for overall MEP cost for all Towers, Basement, External Development

Blossomcountythe greener side of life

Electrical S

ystem

1. Electrical Cost

A. Summary For Internal Electrical Works All Towers 230,079,902

B. Summary For Non Tower Area And Extended Basement 1,441,778

C. Summary For External Electrical Works 111,981,892

D. Summary For Dg Set Works (With 100% Backup) 112,098,100

Total(1) Rs. 455,601,672

2. Plumbing Cost

A. Summary For Internal PHE Works 307,800,096

B. Summary For External Phe Works 6,000,000

C. Summary For Pump Room 7,000,000

D. Summary For Stp Works 9,500,000

Total(2) Rs. 330,300,096

3. FirefightingCost

A. Summary For Internal Ff Works 58,333,982

B. Summary For Non Tower Ff Works 7,500,000

C. Summary For Pump Room 2,500,000

Total(3) Rs. 68,333,982

4. Ventilation Cost A. Summary For Normal/ Smoke Exhaust 6,753,000

B. Summary For Lift Well Pressurization 2,158,000

C. Summary For Fresh Air Intake/ Exhaust Louvers 1,800,000

Total (4) Rs. 10,711,000

MEP Cost Rs. 864,946,750

Note: The Above Cost Does Not Include The Internal Mep Cost For Club

S.No. Description Total(Rs.)

49.

Meinhardt (India) Private Limited

A-8, Sector 16Noida 201301Uttar PradeshIndiat +91 120 251 6165f +91 120 251 5745

A subsidiary company of

Meinhardt Group International Ltd.168 Jalan Bukit Merah#09-01 Surbana OneSingapore 150168t +65 6273 5255f +65 6274 0788e [email protected] meinhardtgroup.com