 REDUCING THE SET-UP TIME IN

A CNC MACHINING LINE USING

QCO METHODS 

Guided by

Mr. Mahesh RAssociate Prof

SUBMITTED BY

VINUVARGHESE

31122

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 2/24

COMPANY PROFILE

By the end of Second World War, the Govt. of India was facing

a big problem of disposing collosial war wastes.

 A committee report of 1948 proposed the establishment of a

government owned machine tool industry. This was expected to

fulfill two aspects.

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 3/24

The first was utilization of Rs 4000 million worth of

metallic waste.

The second was incorporation of a state owned

manufacturing facility.

The result was the birth of Hindustan Machine Tools

Limited which diversified in due course of time to present

status of the multiproduct industrial giant.

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 4/24

HMT MACHINE TOOLS UNITS

HMT MACHINE TOOLS UNITS

HMT MACHINE TOOLS, Bangalore

HMT MACHINE TOOLS, Hyderabad

HMT MACHINE TOOLS, Kalamassery

HMT MACHINE TOOLS, Pinjore

HMT MACHINE TOOLS, Ajmer

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 5/24

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 6/24

DEFINE THE PROBLEM

Due to high change-over time between the product changes

the company is losing the production and is not able to cope

up with the increasing demands from the customers. Currently

the line is producing low product mix and high quantity which

is piling up WIP

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 7/24

PROBLEM SOLUTION

To reduce set-up time from 2.5 hrs to less than 10 min on

CNC machining line by employing SMED Technique

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 8/24

  OBJECTIVES 

To carry out web survey on advanced QCF techniques and

quick change jaws.

To study existing CNC machining line changeover process

methodology. To segregate and optimize internal set-ups and external

set-ups.

To identify similarities in operations between all products

and generalize cutting tools.

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 9/24

DATA COLLECTION AND ANALYSIS

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 10/24

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 11/24

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 12/24

TOOLS

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 13/24

QUICK CHANGE FIXTURE (QCF)

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 14/24

QUICK CHANGE JAW PROCESS

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 15/24

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 16/24

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 17/24

 PROCESS PARAMETER

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 18/24

PALLET ARRANGEMENT

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 19/24

SIMULATION

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 20/24

COST ESTIMATE

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 21/24

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 22/24

CONCLUSION 

The Set-up activities are a vital part of the productionlead-time and so affect overall product cost

The Quick Change Fixtures and Quick Change Jaws

were designed and validated through real time

simulation

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 23/24

REFERENCE 

1. P. Shaw, B.G. Dale, Set-up time reduction

 2. Claire Moxham, Richard Greatbanks, Prerequisites

for the implementation of the SMED methodology: A

study in a textile processing environment, International

Journal of Quality & Reliability Management, Vol:18

Issue:4, pp:404-414, 2010.

3. G Gest, S.J. Culley, R.I. McIntosh, A.R. Mileham,

G.W. Owen, Review of fast tool change systems,Computer Integrated Manufacturing

8/11/2019 vinu 31122

http://slidepdf.com/reader/full/vinu-31122 24/24

 

THANK YOU