REDUCING THE SET-UP TIME IN
A CNC MACHINING LINE USING
QCO METHODS
Guided by
Mr. Mahesh RAssociate Prof
SUBMITTED BY
VINUVARGHESE
31122
8/11/2019 vinu 31122
http://slidepdf.com/reader/full/vinu-31122 2/24
COMPANY PROFILE
By the end of Second World War, the Govt. of India was facing
a big problem of disposing collosial war wastes.
A committee report of 1948 proposed the establishment of a
government owned machine tool industry. This was expected to
fulfill two aspects.
8/11/2019 vinu 31122
http://slidepdf.com/reader/full/vinu-31122 3/24
The first was utilization of Rs 4000 million worth of
metallic waste.
The second was incorporation of a state owned
manufacturing facility.
The result was the birth of Hindustan Machine Tools
Limited which diversified in due course of time to present
status of the multiproduct industrial giant.
8/11/2019 vinu 31122
http://slidepdf.com/reader/full/vinu-31122 4/24
HMT MACHINE TOOLS UNITS
HMT MACHINE TOOLS UNITS
HMT MACHINE TOOLS, Bangalore
HMT MACHINE TOOLS, Hyderabad
HMT MACHINE TOOLS, Kalamassery
HMT MACHINE TOOLS, Pinjore
HMT MACHINE TOOLS, Ajmer
8/11/2019 vinu 31122
http://slidepdf.com/reader/full/vinu-31122 6/24
DEFINE THE PROBLEM
Due to high change-over time between the product changes
the company is losing the production and is not able to cope
up with the increasing demands from the customers. Currently
the line is producing low product mix and high quantity which
is piling up WIP
8/11/2019 vinu 31122
http://slidepdf.com/reader/full/vinu-31122 7/24
PROBLEM SOLUTION
To reduce set-up time from 2.5 hrs to less than 10 min on
CNC machining line by employing SMED Technique
8/11/2019 vinu 31122
http://slidepdf.com/reader/full/vinu-31122 8/24
OBJECTIVES
To carry out web survey on advanced QCF techniques and
quick change jaws.
To study existing CNC machining line changeover process
methodology. To segregate and optimize internal set-ups and external
set-ups.
To identify similarities in operations between all products
and generalize cutting tools.
8/11/2019 vinu 31122
http://slidepdf.com/reader/full/vinu-31122 22/24
CONCLUSION
The Set-up activities are a vital part of the productionlead-time and so affect overall product cost
The Quick Change Fixtures and Quick Change Jaws
were designed and validated through real time
simulation
8/11/2019 vinu 31122
http://slidepdf.com/reader/full/vinu-31122 23/24
REFERENCE
1. P. Shaw, B.G. Dale, Set-up time reduction
2. Claire Moxham, Richard Greatbanks, Prerequisites
for the implementation of the SMED methodology: A
study in a textile processing environment, International
Journal of Quality & Reliability Management, Vol:18
Issue:4, pp:404-414, 2010.
3. G Gest, S.J. Culley, R.I. McIntosh, A.R. Mileham,
G.W. Owen, Review of fast tool change systems,Computer Integrated Manufacturing