Sec~99 Inspection of Buried Piping埋地管道的检验

Page 2: Api570 chapter 9

9 Inspection of Buried Piping 埋地管道的检验

Page 3: Api570 chapter 9

9 Inspection of Buried Piping

9.1General9.2 Types and Methods of Inspection 9.3 Frequency and Extent of Inspection 9.4 Repairs to Buried Piping Systems9.5 Records

Page 4: Api570 chapter 9

9.1 General 总则

不同于其他工艺管道检验,因为土壤腐蚀性显着影响管道外部腐蚀和埋地也给外观检验带来困难. 非强制性地下管道检查的参考有

API 574- Inspection Practices for Piping System Components管道系统部件的检查实践

API 651- Cathodic Protection of Aboveground Petroleum Storage Tanks 地上石油储罐阴极保护

Page 5: Api570 chapter 9

• NACE RP0169- Control of External Corrosion on Underground or Submerged Metallic Piping Systems 地下或水下金属管道系统外部腐蚀控制

• NACE RP0274- High-voltage Electrical Inspection of Pipeline Coatings Prior to Installation 管道涂层高压电器检测

• NACE RP0275- Application of Organic Coatings to the External Surface of Steel Pipe for Underground Service 地下服务钢管外表面有机涂料中的应用.

Page 6: Api570 chapter 9
Page 7: Api570 chapter 9
Page 8: Api570 chapter 9
Page 9: Api570 chapter 9
Page 10: Api570 chapter 9
Page 11: Api570 chapter 9
Page 12: Api570 chapter 9
Page 13: Api570 chapter 9

9.2 Types and Methods of Inspection 类型和检验方法

Page 14: Api570 chapter 9

9.2.1 Above-grade Visual Surveillance 地面目视监控

埋地管道泄漏可能包括地面的表面轮廓的变化, 对土壤变色,沥青软化摊铺,池形成,陷坑,鼓泡,或有明显的气味:地面目视监控能带来一些有用的信息.

Page 15: Api570 chapter 9

沥青软化摊铺,池形成.

Page 16: Api570 chapter 9
Page 17: Api570 chapter 9
Page 18: Api570 chapter 9
Page 19: Api570 chapter 9
Page 20: Api570 chapter 9
Page 21: Api570 chapter 9
Page 22: Api570 chapter 9
Page 23: Api570 chapter 9
Page 24: Api570 chapter 9
Page 25: Api570 chapter 9
Page 26: Api570 chapter 9
Page 27: Api570 chapter 9
Page 28: Api570 chapter 9
Page 29: Api570 chapter 9
Page 30: Api570 chapter 9
Page 31: Api570 chapter 9

大连输油管道爆炸事故原因尚待调查:海洋污染影响水域100平方公里

Page 32: Api570 chapter 9
Page 33: Api570 chapter 9
Page 34: Api570 chapter 9
Page 35: Api570 chapter 9

9.2.2 Close-interval Potential Survey 密间隔管电位测量

在地面进行的调查埋地管道电位测量能有效的定位管的表面上的腐蚀活跃点. 由于涂层管表面和腐蚀表面的电位差, 腐蚀位置能被测量出来.

Page 36: Api570 chapter 9
Page 37: Api570 chapter 9
Page 38: Api570 chapter 9
Page 39: Api570 chapter 9
Page 40: Api570 chapter 9

http://www.rogeralexander1938.webspace.virginmedia.com/cpn/cips.htm

Page 41: Api570 chapter 9

9.2.3 Pipe Coating Holiday Survey 管涂层漏电调查

管涂层漏电调查能用来检测新建管线涂层质量,也能检测重新挖开的在职管线表面涂层的质量信息.从调查数据显示,涂料的有效性和涂料恶化率可确定.

Page 42: Api570 chapter 9
Page 43: Api570 chapter 9
Page 44: Api570 chapter 9
Page 45: Api570 chapter 9
Page 46: Api570 chapter 9

9.2.4 Soil Resistivity 土壤电阻率土壤的腐蚀性是以土壤电阻率来确定, 土壤电阻率越低土壤腐蚀性越大,特别是地埋管道接触显著不同土壤电阻率的区域.

有三种常用的方法确定电阻率;

温纳四针法(ASTM G57) Wenner Four-pin Soil Resistivity Test 土壤杆 Soil Bar Used for Soil Resistivity Measurements 土箱 Soil Boxes Used for Soil Resistivity Measurements

Page 47: Api570 chapter 9

API574: Figure 30—Wenner Four-pin Soil Resistivity Test

Page 48: Api570 chapter 9

API574: Figure 31—Soil Bar Used for Soil Resistivity Measurements

Page 49: Api570 chapter 9

API574: Figure 32—Two Types of Soil Boxes Used for Soil Resistivity Measurements

Page 50: Api570 chapter 9
Page 51: Api570 chapter 9
Page 52: Api570 chapter 9
Page 53: Api570 chapter 9
Page 54: Api570 chapter 9

Charlie Chong/ Fion Zhang/ He Jungang / Li Xueliang

9.2.5 Cathodic Protection Monitoring阴极保护埋地管道应定期监测,以保证足够的保护水平,监测应包括定期“管/地”(pipe to soil)电位差测量和分析.

参考: NACE RP0169 and Section 11 of API 651适用于埋地管道的阴极保护系统的检查和维护指导

API 651 Cathodic Protection of Aboveground Petroleum. Storage Tanks. NACE RP0169- Control of External Corrosion on Underground or

Submerged Metallic Piping Systems.

Page 55: Api570 chapter 9

9.2.6 Inspection Methods 测定方法

参考 API 574 更加详细描述检验方法

以下是一些检验地埋管到外表与内部检验的方法:

智能清管器检验方法 摄像机 挖掘 外加筛查技术-LRUT/LRGUT

http://www.ndt-ed.org/EducationResources/CommunityCollege/Ultrasonics/EquipmentTrans/ematlambwave.htm

Page 56: Api570 chapter 9
Page 57: Api570 chapter 9
Page 58: Api570 chapter 9
Page 59: Api570 chapter 9
Page 60: Api570 chapter 9
Page 61: Api570 chapter 9
Page 62: Api570 chapter 9
Page 63: Api570 chapter 9
Page 64: Api570 chapter 9
Page 65: Api570 chapter 9
Page 66: Api570 chapter 9
Page 67: Api570 chapter 9
Page 68: Api570 chapter 9
Page 69: Api570 chapter 9
Page 70: Api570 chapter 9
Page 71: Api570 chapter 9
Page 72: Api570 chapter 9
Page 73: Api570 chapter 9
Page 74: Api570 chapter 9
Page 75: Api570 chapter 9
Page 76: Api570 chapter 9
Page 77: Api570 chapter 9
Page 78: Api570 chapter 9

9.3 Frequency and Extent of Inspection 检查的频率和范围

Page 79: Api570 chapter 9

9.3.1 Above-grade Visual Surveillance 地面目视监控大约每隔6个月的调查 (看 9.2.1).

9.3.2 Pipe-to-soil Potential Survey 管/地电位差调查

阴极保护线:密间隔电位测量能有效的确认管道是否全面的保处于护电位.不良管道涂层导致不均匀的电压差,这些管道应每五年进行测量,探测出的腐蚀热点并开挖检查外表腐蚀情况.

9.3.3 Pipe Coating Holiday Survey 管涂层漏电调查

管涂层漏电调查通常是基于其他形式的腐蚀控制失效时,用来检测管道涂层的完整性.

Page 80: Api570 chapter 9

地面目视监控

大约每隔 “6个月”的调查 (看 9.2.1).

管地电位调查不良涂层, 阴极保护不完善的管道,

“5年”的时间间隔进行核查.

Page 81: Api570 chapter 9

9.3.4 Soil Corrosivity 土壤腐蚀性

对于非阴极保护,长度大于100英尺(30米)管道-每五年做土壤腐蚀性/土壤电阻率测量.

Page 82: Api570 chapter 9

9.3.5 Cathodic Protection如果管道阴极保护,该系统应监视的时间间隔,在根据第 NACE RP0169 Section 10 或 API 651.

NACE RP0169-2002 “Standard Recommended Practice Control of External Corrosion on Underground or Submerged Metallic Piping Systems”

10.3 The effectiveness of the cathodic protection system should be monitored annually. Longer or shorter intervals for monitoring may be appropriate, depending on the variability of cathodic protection factors, safety considerations, and economics of monitoring.”

Page 83: Api570 chapter 9

9.3.6 External and Internal Inspection Intervals 外部和内部检查间隔

没有有效的阴极保护管道,运用内管检测器(pigging)或要定期(表-5)在一个或多个位置被认为是 易受腐蚀开挖目视检查. (开挖目视部位为6 ft to 8 ft /2.0 m to 2.5 m) .

9.3.4 Soil Corrosivity 土壤腐蚀性对于非阴极保护,长度大于100英尺(30米)管道-每五年做土壤腐蚀性/土壤电阻率测量.

Page 84: Api570 chapter 9
Page 85: Api570 chapter 9
Page 86: Api570 chapter 9
Page 87: Api570 chapter 9
Page 88: Api570 chapter 9
Page 89: Api570 chapter 9
Page 90: Api570 chapter 9
Page 91: Api570 chapter 9

9.3.7 Leak Testing Intervals 泄漏测试时间间隔

替代或补充检查是执行泄漏试验,实验压力为110% MAWP.

时间间隔:

非管道阴极保护: Table 5 一半的时间间隔 管道阴极保护: Table 5 时间间隔

Page 92: Api570 chapter 9

泄漏测试应保持 8小时:

前四小时: 初始加压四小时后,检查压力,如果有必要重新加压到原始试验压力,

后四小时: 隔离受压系统观察保压压力变动.

如保压压力降低 5%以上,执行目视外部和/或内部检查, 定位泄漏部位

与评估腐蚀程度

Page 93: Api570 chapter 9

9.4 Repairs to Buried Piping Systems 埋地管道系统的维修

Page 94: Api570 chapter 9

9.4.1 Repairs to Coatings 涂层的维修

涂层修复应符合下列条件:

• 够的粘合力以防止的水分的渗透• 足够的延展性抵抗开裂• 涂层没有气孔, 漏点等缺陷• 足够的强度适用处理和土壤应力• 阴极保护合适性

使用高电压漏电检测器测试维修后涂层,电压必须调至合适被检测的涂层厚度.发现到的漏点进行标记,局部修复.(重新高压漏电检测)

Page 95: Api570 chapter 9
Page 96: Api570 chapter 9

9.4.2 Clamp Repairs 钳修复

钳修复的位置应记录在检查记录,并可进行表面标.所有夹具修复应视为暂时的应在第一时间(机会)做永久修复.

Page 97: Api570 chapter 9

9.4.3 Welded Repairs 焊接维修焊接维修应按照8.2.

Page 98: Api570 chapter 9

9.5 Records地管道的记录系统应按照7.6.档案.

Page 99: Api570 chapter 9
Page 100: Api570 chapter 9

140) Why is the inspector of buried process piping (not regulated by DOT) different from other process piping inspection ?

a) The insulating effect of the soil increases the possibility of more internal combustion

b) Internal corrosion has to be controlled by cathodic protectionc) Significant external deterioration can be caused by corrosive soil

conditionsd) Internal corrosion must be controlled by internal coatings.

141) Indications of leaks in buried piping may include several indications. Which of the ones listed below is NOT one of the indications ?

a) A change in the surface contour of the ground.b) Water standing on the pipeline right-of-wayc) Discoloration of the soild) Notice odour

Page 101: Api570 chapter 9

142) Corrosion cells can form on both bare and coated pipe where bare steel contacts the soil. How can these cells be detected ?

a) Run an acoustic emission test on the pipingb) Visually survey the route of buried pipingc) The potential at the area of corrosion will be measurable different than

other areas and a close-interval potential survey can detect the location of corrosion

d) Run an internal survey of the piping using a video camera

143) A pipe coating holiday survey is used to locate coating defects on coated pipes. It can be used on newly constructed pipe systems to ensure that the coating is intact and holiday-free. More often, it is used on buried pipe to:

a) Show the measurable differences in electrical potential in corroded areasb) Evaluate coating serviceability for buried piping that has been in-service

for a long time.c) Determine the depth of the piping for resistivity testingd) Evaluate the cathodic protection components of the under-ground pipe

Page 102: Api570 chapter 9

144) Cathodically protected buried piping should be monitored __________ to assure adequate levels of protection:

a) Regularlyb) Intermittentlyc) Erraticallyd) Frequently

145) If an "intelligent pigging" system is used to inspect buried piping, what type of bends are usually required in the piping system ?

a) Five diameter bendsb) 90 degree pipe ellsc) Ten diameter bendsd) Three diameter bends

Page 103: Api570 chapter 9

146) How often should above-grade visual surveillance of a buried pipeline right-of-way be made?

a) Once a monthb) Approximately 6 month intervalsc) Once a yeard) Once every 3 months

147) How often should poorly coated pipes with inconsistent cathodic protection potentials have a pipe-to-soil potential survey made ?

a) Yearlyb) Every 2 yearsc) Every 5 yearsd) Every 7 years

Page 104: Api570 chapter 9

148)On buried piping, what is the frequency of pipe coating holiday surveys?

a) The frequency is governed by the leak test interval of the pipeb) It is usually based on indications that other forms of corrosion control

are ineffective.c) Surveys are normally made every 5 yearsd) Pipe coating holiday surveys are made when the pipe is excavated.

149)For a piping buried in lengths greater than __________ feet and not cathodically protected, evaluation of soil corrosivity should be performed at 5-year intervals.

a) 50b) 75c) 100d) 150

Page 105: Api570 chapter 9

150)If buried piping is cathodically protected, the system should bemonitored at intervals in accordance with Section 10 of NACE RP0169 or Section 90 of API RP 651. API RP 651 specifies __________ interval.

a) Annualb) Biannualc) Bienniald) Trennial

Page 106: Api570 chapter 9

152) After excavation of buried piping, if inspection reveals damaged coating or corroded piping:

a) The condition should be noted in the records and the inspection interval shortened

b) The complete piping system must be day-lighted (excavated) for repair or replacement.

c) The damaged coating or corroded piping must be repaired or replacedd) Additional piping shall be excavated until the extent of the condition is

identified.

151) Buried piping inspected periodically by excavation shall be inspected in lengths of __________ feet at one or more locations judged to be most susceptible to corrosion

a) 2 to 4b) 4 to 6c) 6 to 8d) 8 to 10

Page 107: Api570 chapter 9

153)If buried piping is contained inside a casing pipe, the casing should be:

a) Capable of carrying the same pressure as the product pipeb) Checked to see if its protective coating is intact and serviceablec) Pressure tested to make sure it is serviceabled) Inspected to determine if water and / or soil has entered the casing

154)An alternative or supplement to inspection of buried piping is leak testing with liquid at a pressure at least __________ % greater than the maximum operating pressure at intervals ½ the length of those shown in Table 9-1 of API 570 for piping NOT cathodically protected and at the same intervals as shown in Table 9-1 for cathodically protected piping.

a) 5b) 10c) 25d) 50

Page 108: Api570 chapter 9

156)The leak test for a 8" diameter buried piping system is 300 psi. After 7 hours, the pressure reacts 273 psi. What should the inspector do?

a) Nothing is required. The loss of pressure is negligible and will not affect the test. The loss can be disregarded.

b) The system should be re-pressurised to the original leak test pressure and the test should begin again.

c) The test charts and the temperature should be reviewed to determine if any change in temperature caused the pressure drop.

d) The piping should be visually inspected externally and / or inspected internally to find the leak and assess the extent of corrosion.

155)The leak test for buried piping should be for a period of __________ hours.

a) 4b) 8c) 12d) 24

Page 109: Api570 chapter 9

157) A buried piping system that is not cathodically protected has to have an inspection interval set. The soil resistivity is checked and found to be 3400 ohm/cm. As the inspector, what interval would you set?

a) 2.5 yearsb) 7.5 yearsc) 5 yearsd) 10 years

158) Buried piping also may be surveyed for integrity by removing the line from service and performing a leak test. This inspection method typically involves pressurising the line with a __________, allowing time for the __________ to diffuse to the surface and surveying the buried line with a gas-specific detector to detect the __________

a) Tracer gas (such as helium or sulphur hexafluoride)b) Light hydrocarbon (such as butane)c) Smoke type material (such as chemical smoke)d) Water vapour (such as steam)

Page 110: Api570 chapter 9

159) Repairs to coating on buried piping may be tested using

a) A low-voltage holiday detectorb) Light taps with an inspection hammerc) A flaw indicator fluidd) A high-voltage holiday detector

160) If buried piping leaks are clamped and reburied:

a) No further action is required unless the piping leaks againb) The date of installation shall be marked on the clamp for future

identificationc) A record of the location and the date of installation shall be maintainedd) The clamped line shall be leak tested.

Page 111: Api570 chapter 9

18)An inspector finds a thin area in the body of a NPS 6, 600 lb. gate valve body. The body is made from ASTM A216 WCB material. The system operates at 900 psi and 750 degrees F. Using a corrosion allowance of 0.125", what minimum required thickness must the valve body have to continue to safely operate? (Round to the nearest 3 decimals)

a) 0.492”b) 0.427”c) 0.510”d) 0.345”

t = 1.5x [(900x6.625) / 2(14800)] + 0.125