    The Monorail Technology

  • 7/31/2019 Enligtenment Mumbai Monorail

    2/28

    What is Monorail? A monorail (mono : single) is a guideway-based

    transportation system based on a single guideway beam,

    which acts as its sole support and its guideway.

    Mostly elevated, monorails can also run at grade or in

    subway tunnels.

    Vehicles are either suspended type or straddle type.

    Monorail vehicles are WIDER than the guide-way that

    supports them.

  • 7/31/2019 Enligtenment Mumbai Monorail

    3/28

    Suspended Type

    Straddle Type

    Types of Monorail

  • 7/31/2019 Enligtenment Mumbai Monorail

    4/28

    Rubber Tyres

    Steering Wheel

    Guide way

    Wheel Arrangement of Monorail

    Schematic of Bogie on Beam

  • 7/31/2019 Enligtenment Mumbai Monorail

    5/28

    Advantages of Monorail

    Safety

    Reliability

    Smallest footprint

    High Manoeuvrability

    Lower Cost

    Environmental Friendly

    Reduced Noise

    Aesthetics & Attractive

  • 7/31/2019 Enligtenment Mumbai Monorail

    6/28

    Merits : Small Footprint

    Narrow air space for Right-of-Way

    Smaller size & Light StructureGAINS

    Minimize land-use & save cost

    Least disruptive to road traffic

    Pre-casting allows more off-site const.

    Radius up to 50m

    Grade Up to 6%

  • 7/31/2019 Enligtenment Mumbai Monorail

    7/28

    Merits : Environment Friendly

    Simple structure -

    Does not obstruct much sunlight

    Does not trap excessive emission

    Quieter use of rubber wheels

    Monorail 75 dBA

    LRT 90 dBA

  • 7/31/2019 Enligtenment Mumbai Monorail

    8/28

    Merits : Aesthetics and City Scaping

    Sleek exterior appearance that ismore aero-dynamic and blends

    in with modern urban

    environment

    Add Aesthetics to the city

    Greenery Along Route

    Hide-A-Track

    Hide-A-Station

    Away from City too

  • 7/31/2019 Enligtenment Mumbai Monorail

    9/28

  • 7/31/2019 Enligtenment Mumbai Monorail

    10/28

    Comparison of Capacity (pphpd)

  • 7/31/2019 Enligtenment Mumbai Monorail

    11/28

    MUMBAI MONORAIL

  • 7/31/2019 Enligtenment Mumbai Monorail

    12/28

    First Monorail Project in India

    Route: SGM Chowk to Chembur Via Wadala

    Turnkey Design & Built Contract

    3 Years Operation & Maintenance

    Salient Features

  • 7/31/2019 Enligtenment Mumbai Monorail

    13/28

    Total Alignment Length 19.2 Km. Depot at Wadala

    Phase 1 (Wadala to Chembur) Length

    9.2Km Phase 2 (Wadala to SGM Chowk) Length 10.37 Km

    Salient Features

    Phase-II

    Wadala Depot

    GTB Nagar

    Acharaya Atre Nagar

    Wadala Bridge

    Dadar East

    Naigaon

    Ambedkar Nagar

    Mint Colony

    Lower Parel

    Sant Gadge Maharaj Chowk

    Phase-I

    Wadala

    Bhakti Park

    Mysore Colony

    Bharat Petroleum

    Fertilizer Township

    VNP & RC Marg

    Chembur

  • 7/31/2019 Enligtenment Mumbai Monorail

    14/28

    Journey Time : 37 Min

    No. of Cars : 4

    Passenger Carrying Capacity : 568 per train

    Average Speed : 31 kmph

    Maximum Speed : 80 kmph

    Frequency : Jacob Circle to Wadala - 4 Min

    Frequency : Wadala to Chembur 9 Min

    Salient Features

  • 7/31/2019 Enligtenment Mumbai Monorail

    15/28

    Mumbai Monorail Layout Plan

  • 7/31/2019 Enligtenment Mumbai Monorail

    16/28

    PHOTOGRAPHS MUMBAI MONORAIL

  • 7/31/2019 Enligtenment Mumbai Monorail

    17/28

    Birds Eye View

  • 7/31/2019 Enligtenment Mumbai Monorail

    18/28

    Guideway Structure with Traction Rail

  • 7/31/2019 Enligtenment Mumbai Monorail

    19/28

    Completed stretch of 2B Series in 4.50Km

  • 7/31/2019 Enligtenment Mumbai Monorail

    20/28

    Completed stretch of 2B Series in 4.50Km

  • 7/31/2019 Enligtenment Mumbai Monorail

    21/28

    Guideway Beam Erection in 2C Non-RC Marg

  • 7/31/2019 Enligtenment Mumbai Monorail

    22/28

    2F Series (RC Marg) Guideway Beam

  • 7/31/2019 Enligtenment Mumbai Monorail

    23/28

    Bhakti Park Station

  • 7/31/2019 Enligtenment Mumbai Monorail

    24/28

    Mysore Colony Station

  • 7/31/2019 Enligtenment Mumbai Monorail

    25/28

    Completed stretch of Mahul Creek

  • 7/31/2019 Enligtenment Mumbai Monorail

    26/28

    First Train under Testing at Wadala Depot

  • 7/31/2019 Enligtenment Mumbai Monorail

    27/28

  • 7/31/2019 Enligtenment Mumbai Monorail

    28/28

    Train under Testing at Rawang, KL