Financial Statements For the Period September 1, 2012 February 28, 2013 For the Meeting of the Board of Trustees March 23, 2013 for Houston Community College System & Houston Community College Public Facility Corporation

Upload: houstoncommunitycollege

Post on 26-Jun-2015

129 views

Category:

Education


2 download

TRANSCRIPT

Page 1: Fs2013 february

Financial StatementsFor the Period

September 1, 2012 ‐ February 28, 2013

For the Meeting of the Board of Trustees ‐ March 23, 2013

for

Houston Community College System&

Houston Community College Public Facility Corporation

Page 2: Fs2013 february

Memorandum Management Discussion & Analysis

Summary HCCS Unrestricted Revenue & Expenditures 1

Exemptions & Wavier Detail 3

Fund Balances Balance Sheet By Fund   4

Adjusted Budgets by Division 5

Actual YTD by College  5

Cash Flow Analysis 6

Contact Hours Reimbursement 11

Enrollment Data 12Charts Revenue & Expenditure YTD thru February 28, 2013 13

Revenue and Expenditures with Trendlines 14

Revenue Source Comparison By Year 15

Expenditure Source Comparison By Year 16

Designated Funds Budget Summary / Cash Position 17

Capital Projects & Unexpended Plant Fund Projects 18

    Unexpended 2004 CIP Projects 19

    Plant Fund Maintenance Tax Notes 2006 (Central Utility Plant Project) 27

Maintenance Tax Notes/Sr. Lien Bonds 2008 28

Maintenance Tax Notes 2010  30

Maintenance Tax Notes 2011 31

Bonds/Notes Schedule of Bonds & Maintenance Tax Notes 33

Auxiliary Sources and Uses of Auxiliary Funds 34

Restricted Funds Grants, Contracts and Student Aid 36

Position Control 2013 Positions 42

Pos. Control Charts FTE (Full‐Time Equivalent) Monthly Comparison 48

Duplicated Headcount Monthly Comparison 57

Unduplicated Headcount Monthly Comparison 58

Statement of Net Assets PFC 1

Statement of Cash Flows  (Cash Basis‐ Interim Period) PFC 2

Public Safety Institute PFC 3

Westgate PFC 4

Hayes Road ‐ Alief Project PFC 5

Northline Mall Project PFC 6

Houston Community College ‐ Public Facility Corporation

Table of ContentsFor the Period September 1, 2012 ‐ February 28, 2013

For the Meeting of the Board of Trustees

Houston Community College System

Page 3: Fs2013 february

MEMORANDUM  

To:    Houston Community College System          Board of Trustees 

 

    Via:    Dr. Mary Spangler, Chancellor  

From:    Dr. Art Tyler, Deputy Chancellor     Chief Operating Officer  

Date:    March 18, 2013  

Re:  Financial Report for Month Ended February 28, 2013     

 

Enclosed please find the preliminary financial reports for the month ending February 28, 2013 for your review.  The financial report is an internal management report submitted to the Board of Trustees to compare actual financial activities to the approved budgets, strategic priorities, and financial policies for the reported fiscal year.   

 

Operating Fund net revenue through February 28, 2013 is $224,311,957 which is 1.3% below last year.  Expenditures year‐to‐date total $128,474,826 which is 0.3% less than the same time last year, for a net of $95,837,131. 

 

The reserves for the month of February 2013 are $62,432,031 or 21.4% of revenues (see page III).  Thus, we continue to project a healthy fiscal strength for the college. 

Page 4: Fs2013 february

Managements Discussion and Analysis

Thru February 28, 2013

Revenues

Expenditures 

Tuition and Fees net revenue year to date totaled $87,834,053 which is 4.7% lower than the same time last year.  

Enrollment numbers for Fall 2012 declined 6.5% compared to last year.  There is a 10% decline in international 

students compared to last year.  We are projecting tuition and fees revenue to be $107,116,938.  

i

Insurance/Risk Management payments totaled $6,518,335 year‐to‐date, 6.3% above last year.  The increase is 

due to an increase in insurance premiums.  Total expenses for the year are expected to be within budget at 

$6,871,709.

Tuition & Fee‐Extended Learning receipts totaled $4,035,211 year to date, 5.9% above last year.  Total tuition 

and fees‐Extended Learning at fiscal year end are expected to be $6,435,235.

Rental and Leases expenses totaled $1,290,158 year‐to‐date, which is 57.6% below the previous year.  The 

decrease is due to the completion of IT projects. Total expenses at  year end are projected to be $3,739,652.

Total revenue collections, net of exemptions and waivers, totaled $224,311,957 year‐to‐date.  This is a 1.3% decrease below last year. 

Total Salaries are $80,811,303 year‐to‐date, 0.6% above the previous year.  Total salaries at year end are 

expected to be $163,522,011.

Benefits costs totaled $8,874,300 year‐to‐date, 28.9% above last year.  This increase is due namely to  the 

reduction in the state's contribution to TRS and ORP and an increase in health insurance premiums. Total 

benefits at fiscal year end are expected to be $18,159,341.

Contract Services expense totaled $8,830,666 year‐to‐date, 16.1% above last year.  The increase is mainly due to 

IT hiring temporary personnel for projects, additional security staff at the District and using contract interpreters 

to fill the personnel shortages.  Fiscal year end expenses are projected to be $23,792,760.

Total revenues and expenditures by expense type for the Operating Fund for 2012‐2013 are reported on page one, 

behind the tab Detailed Financial Statements. Highlights of financial activities year‐to‐date are as follows:

State Appropriations received year to date totaled $30,904,179, 0.4% below last year. Total appropriations 

received are expected to be $70,014,007.  This amount was reduced by $218,031 due to a formula reallocation 

to align with the Legislative Budget Board data and methodology.

Ad Valorem Tax collections totaled $100,178,351 year‐to‐date.  The year‐to‐date total is 0.7% above last year.  

The proportion of tax revenue applied to operations decreased this year due to the increase in tax revenue 

applied to debt service.  However, this decrease in tax revenue to operations is offset by the increase in tax 

revenue due to increases in property valuations. We project total tax revenue for the fiscal year will be 

$105,811,761.

Utilities costs totaled $3,531,125 year‐to‐date.   We will continue to monitor these costs.  Total utilities cost at 

fiscal year end is projected to $12,335,836.

Instructional and Other Materials expenses totaled $3,466,703 year‐to‐date, which is 34.7% above last year.  

COMPASS Internet Units, TCCTA Adobe Master Collection and additional support for Moodlerooms, Inc 

contributed to the increase.  Expenses in this area are projected to be $10,733,700.

Page 5: Fs2013 february

Managements Discussion and Analysis

Thru February 28, 2013

Budget Priorities funding allocated for the year are detailed below through February 28, 2013. 

Contingency/Budget Priorities

Capital Outlay & Equipment

Position Management

Other

Total Contingency/Budget Priorities

Grants

Unexpended Plant Fund  

Public Facility Corporation

Total grant awards (federal, state & private) year‐to‐date total, $44,964,927.

Cash Position ‐ The use of the Unexpended Plant Fund Excluding 2004 CIP for deferred maintenance projects was 

discontinued in FY 2009.  All deferred maintenance expense is captured in the operating account.  See page 17 

for prior year encumbrances. 

Unexpended Plant Fund Projects include current construction, deferred maintenance, and property acquisition 

projects for a budget of $46,360,432.  Funds for these projects are 100% committed.  See page 18 for more 

details.

The 2004 CIP budgets are $263,779,995 and are 100% committed. The spending categories in the schedule have 

now been revised for more ease of reference to the Board approved budget.  Please see page 19 for the 

summary and pages 21 through 25 for details.

The Maintenance Tax Note 2006 tracks the financial progress of the Central Utility Plant.  Commitments year‐to‐

date total $12.5 million, 99.87% of budget.  See page 27 for the details. 

The Public Facility Corporation tracks the progress of the PFC ‐ Public Safety Institute, Katy Campus (Westgate), 

Alief and Northline Mall deferred maintenance, new construction and renovation projects.  Expenditures year‐to‐

date total $100.8 million, 98.7% of budget. See pages PFC 1‐6 for details. 

ii

5,834,411$       

3,800,000           4,995,652           (1,195,652)        

Capital Outlay expenses totaled $4,307,451 year‐to‐date.  Expenditures are projected to $8,453,843.

Transfers/Debt activities totaled $6,384,081 year‐to‐date, a 55.5% decrease compared to last year. The decrease 

is due to a transfer in FY2012 to purchase the Westheimer/Eldridge land.  Items in this expense category include 

all student revenue bond payments, transfers for scholarship matching funds, and transfers to the Unexpended 

Plant Fund.  Total expenses are expected to be $34,091,995.

Total operating fund expenditures year‐to‐date total $128,474,826, a 0.3% decrease below last year.  

Budget expenditures for grant‐funded projects so far this year total $7,234,718.

Budgeted

1,445,240           3,683,340           (2,238,100)        

11,372,376$      8,971,717$        2,400,659$       

Expensed Remaining

6,127,136$        292,725$           

The college has received $915,064 in new grant awards since the beginning of the current fiscal year. 

Page 6: Fs2013 february

Managements Discussion and Analysis

Thru February 28, 2013

Balance Sheet – Operating Fund   

Cash and Investments

Cash

Investments

    Total

Fund Balance

Audited Fund Balance, August 31, 2012

Projected Revenue @ 08/31/2013

Total Projected Revenue

Projected Expenses @ 08/31/2013

FY 2012 Purchase Order Roll 

Total Projected Expenses @ 08/31/2013

Ending Fund Balance (Beg. Fund Balance + Revenue ‐ Expenses)

Required Reserve for FY 2013 (11% Projected Revenues)

Added Reserves

Additional Expenditures Funded From Reserves:

FY2012‐2013 Salary Increases

Total Expenses Paid From Reserves

Added Reserves

Required Reserve for FY 2013 (11% Projected Revenues)

Current Reserves

% of Total Operating Revenue

The projected reserves at February 28, 2013 of $62,432,031 is an estimate at this time and represents 21.4% of 

expected general fund revenue for this fiscal year, which is within our financial stability policy requiring us to maintain 

a fund balance of 9% ‐11% of general fund revenues as of August 31.  

iii

(1,836,560)         ‐                           (1,836,560)                 

(1,836,560)$       ‐$                         (1,836,560)                 

30,285,597$              

32,146,434$              

62,432,031$              

21.4%

Budget

294,636,304$            

64,268,591$              

32,146,434$              

32,122,157$              

Expense to Date  Balance 

292,240,310              

358,904,895$            

292,240,310$            

2,395,994                   

9,983,111                1,990,898               

157,918,575$         133,177,971$        

66,664,585$              

February 2013 February 2012

147,935,464$         131,187,073$        

Page 7: Fs2013 february

g

YTD Adjusted Budget

YTD Actuals Thru 

February 28, 2013

YTD Actuals Thru 

February 29, 2012

2012‐2013 Inc/(Dec) 

vs. 2011‐2012

Actuals % 

Inc/(Dec)YTD vs. 

PriorYTD

Projected Actuals 

2012‐2013

Projected 2012‐2013 

Inc/(Dec) vs. Adj 

Budget

Projected 2012‐

2013 Inc/(Dec) vs. 

Adj Budget %

REVENUES

State Appropriations 70,232,038$           30,904,179$      31,042,116$      (137,937)$          ‐0.44% 70,014,007$      (218,031)$           ‐0.31%Ad Valorem Taxes 102,195,871           100,178,351     99,504,154       674,198            0.68% 105,811,761     3,615,890           3.54%Tuition, Net 43,067,676             34,267,568        35,888,702       (1,621,134)        ‐4.52% 41,904,849       (1,162,827)         ‐2.70%Fees 71,520,739             53,566,485        56,229,359       (2,662,874)        ‐4.74% 65,212,089       (6,308,651)         ‐8.82%Other Local Income* 2,517,960                1,090,070          566,781             523,289            92.33% 2,517,960         ‐                       0.00%Tuition & Fee, Net

 ‐‐ Extended Learning6,188,581                4,035,211            3,809,697           225,514              5.92% 6,345,235           156,654                2.53%

Grant Revenue 434,410                   270,092               228,939               41,154                 17.98% 434,410               ‐                         0.00%

Total Revenues 296,157,275           224,311,957       227,269,747       (2,957,789)          ‐1.30% 292,240,310$     (3,916,965)$         ‐1.32%

EXPENSES

Faculty‐FT  53,336,783             28,370,090        28,077,436       292,653            1.04% 53,336,783       ‐                       0.00%

Faculty‐PT 31,063,281             14,429,439        14,559,462       (130,024)           ‐0.89% 31,063,281       ‐                       0.00%

Librarian/Counselor‐FT  4,875,031                2,494,507          3,126,440         (631,933)           ‐20.21% 4,875,031         ‐                       0.00%

Librarian/Counselor‐PT 841,510                  322,501             265,794             56,707               21.33% 841,510             ‐                       0.00%

Staff‐FT 64,805,268             31,711,578        30,706,806       1,004,772         3.27% 64,805,268       ‐                       0.00%Staff‐PT 10,153,161             3,483,189          3,601,887         (118,699)           ‐3.30% 8,600,138         (1,553,023)           ‐15.30%

     Sub‐total Salaries 165,075,034           80,811,303          80,337,827         473,477              0.59% 163,522,011       (1,553,023)           ‐0.94%

Employee Benefits 18,159,341             8,874,300          6,886,968         1,987,332         28.86% 18,159,341       ‐                       0.00%

Supplies Gen Exp 5,728,773                2,415,233          2,088,157         327,076            15.66% 5,387,680         (341,093)             ‐5.95%

Travel 971,614                  329,228             309,943             19,285               6.22% 971,614             ‐                       0.00%

Marketing Costs 1,652,307                610,190             565,342             44,848               7.93% 1,466,130         (186,177)             ‐11.27%

Rental & Leases 3,739,652                1,290,158          3,039,548         (1,749,390)        ‐57.55% 3,739,652         ‐                       0.00%

Insurance/Risk Mgmt 6,871,709                6,518,335          6,132,824         385,511            6.29% 6,871,709         ‐                       0.00%

Contract Services 23,792,760             8,830,666          7,606,902         1,223,764         16.09% 23,792,760       ‐                       0.00%

Utilities 12,889,610             3,531,125          3,433,422         97,703               2.85% 12,335,836       (553,774)             ‐4.30%

Other Departmental Expenses 2,022,985                870,599             786,621             83,977               10.68% 1,445,530         (577,455)             ‐28.54%

Instructional & Other Materials 11,010,556             3,466,703          2,573,645         893,057            34.70% 10,733,700       (276,856)             ‐2.51%

Maintenance & Repair 1,268,509                235,455             299,381             (63,925)             ‐21.35% 1,268,509         ‐                       0.00%

Transfers/Debt 34,091,995             6,384,081          14,328,790       (7,944,708)        ‐55.45% 34,091,995       ‐                       0.00%

Contingency (3,092,761)              ‐                          ‐                          ‐                           0.00% ‐                          3,092,761           ‐100.00%Capital Outlay 11,975,191             4,307,451          497,409             3,810,042         765.98% 8,453,843         (3,521,348)           ‐29.41%

     Total Expenses  296,157,275           128,474,826     128,886,778     (411,952)           ‐0.32% 292,240,310     (3,916,965)         ‐1.32%

REVENUES H/(L) Vs EXPENSES 0                              95,837,131        98,382,969       (2,545,838)        0                         0                         

* Includes interest & dividends income, fines & penalties and parking fines

1

HOUSTON COMMUNITY COLLEGE2012‐2013 Revenues & Expenditures  HCCS CURRENT UNRESTRICTED

Page 8: Fs2013 february

O

g

Approved Budget Adjusted Budget

YTD Actuals Thru 

February 28, 2013

Encumbrances Thru 

February 28, 2013

Total Actuals & 

Encumbrances Thru 

February 28, 2013

Balance as of 

February 28, 2013

YTD Actuals Thru 

February 29, 2012

Encumbrances Thru 

February 29, 2012

Total Actuals & 

Encumbrances Thru 

February 29, 2012

2012‐2013 Inc/(Dec) 

vs. 2011‐2012

Actuals & 

Encumbrances % 

Inc/(Dec)YTD vs. 

PriorYTD

EXPENSES

Faculty‐FT  53,336,783              53,313,858          28,370,090        22,910,955          51,281,045        2,032,813           28,077,436        24,596,682        52,674,118        (1,393,073)        ‐2.64%

Faculty‐PT 31,063,281              30,975,626          14,429,439        210,307                14,639,746        16,335,880         14,559,462        6,402,739          20,962,201        (6,322,456)        ‐30.16%

Librarian/Counselor‐FT  4,875,031                4,843,031            2,494,507          1,959,197            4,453,704          389,327               3,126,440          2,639,814          5,766,254          (1,312,550)        ‐22.76%

Librarian/Counselor‐PT 841,510                   831,510               322,501              180,521                503,022              328,488               265,794             251,749             517,543             (14,521)              ‐2.81%

Staff‐FT 64,805,268              64,615,884          31,711,578        27,823,908          59,535,486        5,080,398           30,706,806        29,245,760        59,952,566        (417,080)           ‐0.70%

Staff‐PT 10,153,161              9,050,138            3,483,189          3,107,729            6,590,918          2,459,220           3,601,887          3,426,567          7,028,454          (437,536)           ‐6.23%

     Sub‐total Salaries 165,075,034           163,630,047       80,811,303          56,192,617            137,003,920        26,626,127          80,337,827          66,563,310          146,901,137       (9,897,217)          ‐6.74%

Employee Benefits 18,159,341              18,204,301          8,874,300          863                        8,875,163          9,329,138           6,886,968          1,970                  6,888,938          1,986,226         28.83%

Supplies Gen Exp 5,728,773                5,387,680            2,415,233          793,023                3,208,256          2,179,424           2,088,157          548,871             2,637,027          571,229             21.66%

Travel 971,614                   971,271               329,228              ‐                             329,228              642,043               309,943             1,200                  311,143             18,085               5.81%

Marketing Costs 1,652,307                1,466,130            610,190              253,273                863,463              602,667               565,342             355,768             921,110             (57,647)              ‐6.26%

Rental & Leases 3,739,652                3,738,794            1,290,158          710,230                2,000,388          1,738,406           3,039,548          951,343             3,990,891          (1,990,503)        ‐49.88%

Insurance/Risk Mgmt 6,871,709                6,871,709            6,518,335          ‐                             6,518,335          353,374               6,132,824          ‐                           6,132,824          385,511             6.29%

Contract Services 23,792,760              23,762,625          8,830,666          8,884,821            17,715,486        6,047,139           7,606,902          7,969,473          15,576,375        2,139,112         13.73%

Utilities 12,889,610              12,335,836          3,531,125          35,169                  3,566,293          8,769,543           3,433,422          105,086             3,538,508          27,785               0.79%

Other Departmental Expenses 2,022,985                1,445,530            870,599              146,516                1,017,115          428,416               786,621             106,655             893,276             123,838             13.86%

Instructional & Other Materials 11,010,556              11,004,039          3,466,703          2,636,148            6,102,851          4,901,188           2,573,645          927,092             3,500,737          2,602,114         74.33%

Maintenance & Repair 1,268,509                1,252,399            235,455              338,474                573,929              678,470               299,381             275,608             574,988             (1,059)                ‐0.18%

Transfers/Debt 34,091,995              34,018,395          6,384,081          7,723                    6,391,804          27,626,591         14,328,790        7,723                  14,336,513        (7,944,708)        ‐55.42%

Contingency (3,092,761)               (2,561,820)          ‐                           ‐                           (2,561,820)          ‐                           ‐                           ‐                          0.00%

Capital Outlay 11,975,191              8,491,374            4,307,451          2,187,671            6,495,122          1,996,252           497,409             651,195             1,148,604          5,346,517         465.48%

     Total Expenses  296,157,275           290,018,310       128,474,826      72,186,526          200,661,352      89,356,958         128,886,778     78,465,292        207,352,070     (6,690,718)        ‐3.23%

2

HOUSTON COMMUNITY COLLEGE2012‐2013 Revenues and Expenditures & Encumbrances  HCCS CURRENT UNRESTRICTED

Page 9: Fs2013 february

FY 2011‐12 FY 2012‐13

Tuition

Budget:Adjusted Budget FY 2012‐13 43,067,676$           

Exemptions & Waivers (5,801,782)              

Adjusted Budget FY 2012‐13, Net 37,265,894$           

Revenues Received:Tuition 48,824,432              42,009,255              40,069,351             

Waivers & Exemptions:Dual Credit (5,170,736)              (4,719,773)              (4,223,235)              

Other (1,693,502)              (1,400,780)              (1,578,547)              

Total Waivers & Exemptions (6,864,238)              (6,120,553)              (5,801,782)              

Total Tuition Revenue, Net 41,960,194$          35,888,702$          34,267,569$           

Tuition ‐ Extended Learning

Budget:Budget FY 2012‐13 6,188,581$             

Exemptions & Waivers (1,180,191)              

Budget FY 2012‐13, Net 5,008,390$             

Revenues Received:

Tuition 8,853,381                5,142,291                5,215,402               

Waivers & Exemptions:Corrections (2,612,080)            (1,332,594)            (1,180,191)             

Total EL Tuition Revenue, Net 6,241,301$            3,809,697$            4,035,211$             

Exemptions & Waivers

Dept of Corrections 2,612,080$              1,332,594$              1,180,191$             

Dual Credit Waiver 5,170,736                4,719,773                4,223,235               

Other:

Employee Fee Exemptions 84,810                     70,324                     57,828                     

Firemen 42,521                     38,544                     24,967                     

Hazelwood 906,036                   734,547                   973,918                   

Deaf & Blind 309,603                   262,912                   224,814                   

High Ranking Hi SCH Grad 868                           868                           1,984                       

Child of Disabled Vet ETC 431                           163                           4,510                       

Nonres Military Per & Dep 2,390                       1,593                       ‐                           

Emp of State Coll & Univ ‐                           ‐                           319                          

Nonres Teach/Research Asst 13,905                     10,985                     9,735                       

Nonres Competitive Scholar ‐                           ‐                           2,301                       

Senior Citizens 18,730                     15,904                     13,127                     

Scholarship Distribution 1,450                       1,450                       ‐                           

Apprenticeship Waivers (28)                           ‐                           ‐                           

Special Fees Waiver HFD 117                           117                           ‐                           

A VISA Waiver (Non‐Alien Waiver) 1,110                       1,110                   ‐                           

Refugee Waiver (1,554)                      (1,110)                      (162)                         

Foster Children‐Resident 294,543                   248,709                   253,002                   

Fire Academy Waiver 157                           157                           ‐                           

Undocumented Students 2,171                       1,282                       ‐                           

TX Tomorrow Waiver 2,874                       2,875                       ‐                           

Peace Officer Exemption 13,368                     10,350                     12,204                     

Total Other Exemptions 1,693,502                1,400,780                1,578,547               

Grand Total Exemptions & Waivers 9,476,318$            7,453,147$            6,981,973$             

Note:   As of December 31, 2008, the financial statements reflect all expenses incurred for Exemptions and Waivers as net of tuition and fee revenue.  Prior to this date Exemptions & Waivers were shown as an expenditure and revenue was shown as gross revenue.

3

Exemptions & Waivers

Thur February 28, 2013

Account

 End of Year 

Activity 

Year‐to‐Date 

Activity thru 

2/29/2012

 Year‐to‐Date 

Activity thru 

2/28/2013 

Page 10: Fs2013 february

     Unrestricted  Auxiliary  Restricted  Total 

Unexpended 

Plant Renewal 

 Retirement of 

Debt 

Investment in 

Plant  Total 

Consolidation & 

Elimination  Total All Funds 

ASSETSCurrent Assets:

Cash &  cash equivalents 147,935,464$      8,371,113$        ‐$                         156,306,577$     3,395,124$         19,335,339         ‐$                          22,730,463$            ‐$                              179,037,040$         

Restricted cash & cash equivalents ‐                             ‐                           10,183,895       10,183,895        120,382,912      681,428               ‐                           121,064,340           ‐                                131,248,235          

Short term Investments ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Accounts/Other receivable (net) 17,842,676          2,633,956           10,446,222       30,922,854        62,003                704,873               ‐                           766,876                   ‐                                31,689,730            

Deferred charges ‐                             669,701              ‐                          669,701              ‐                           ‐                           ‐                           ‐                                ‐                                669,701                  

Prepaids 26,309                  80,899                ‐                          107,208              1,762,224           ‐                           ‐                           1,762,224                ‐                                1,869,432               

Total Current Assets 165,804,449        11,755,669        20,630,117       198,190,235      125,602,263      20,721,640         ‐                           146,323,903           ‐                                344,514,138          

Non‐current Assets:

Deferred charges, net ‐                             ‐                           ‐                          ‐                           3,548,100           ‐                           2,601,880           6,149,980                ‐                                6,149,980               

Restricted long‐term investments ‐                             ‐                           ‐                          ‐                           2,779,978           2,637,883            ‐                           5,417,861                ‐                                5,417,861               

Long‐term investments 9,983,111             ‐                           ‐                          9,983,111           ‐                           ‐                           ‐                           ‐                                ‐                                9,983,111               

Capital Assets, net ‐                             ‐                           ‐                          ‐                           82,641,149        ‐                           655,901,501      738,542,650           ‐                                738,542,650          

Total Non‐current Assets 9,983,111             ‐                           ‐                          9,983,111           88,969,227        2,637,883            658,503,381      750,110,491           ‐                                760,093,602          

Total Assets 175,787,560$      11,755,669$      20,630,117$      208,173,346$     214,571,490$     23,359,523$       658,503,381$     896,434,394$          ‐$                              1,104,607,740$      

LIABILITIESCurrent Liabilities:

Accounts payable 11,842,743          209,330              4,645,004          16,697,077        656,699              ‐                           ‐                           656,699                   ‐                                17,353,776            

Accrued liabilities 372,279                6,503                   31,449                 410,231                142,635                ‐                            ‐                             142,635                     ‐                                  552,866                    

Compensated absences 2,351,464             ‐                           ‐                          2,351,464           ‐                           ‐                           ‐                           ‐                                ‐                                2,351,464               

Funds held for others 3,793                    107,889              601,136             712,818              189,209              ‐                           ‐                           189,209                   ‐                                902,027                  

Deferred revenue 3,132                    290,454              2,207,973          2,501,559           1,474,661           ‐                           (1,600,060)         (125,399)                  ‐                                2,376,160               

Notes payable‐current portion ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Bonds payable‐current portion ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           13,435,000        13,435,000             ‐                                13,435,000            

Capital lease obligations‐current ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Total Current Liabilities 14,573,411          614,176$            7,485,562          22,673,149        2,463,204           ‐                           11,834,940        14,298,144             ‐                                36,971,293            

Non‐current Liabilities:

Deposits ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Notes payable ‐                             ‐                           ‐                          ‐                           139,850,892      ‐                           37,761,145        177,612,037           ‐                                177,612,037          

Bonds payable ‐                             ‐                           ‐                          ‐                           61,575,522        1,279,420            270,416,919      333,271,860           ‐                                333,271,860          

Capital lease obligations ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           108,309,832      108,309,832           ‐                                108,309,832          

Total Non‐current Liabilities ‐                             ‐                           ‐                          ‐                           201,426,414      1,279,420            416,487,895      619,193,729           ‐                                619,193,729          

Total Liabilities 14,573,411$        614,176$            7,485,562$        22,673,149$       203,889,618$     1,279,420$         428,322,835$     633,491,873$          ‐$                              656,165,019$         

 Fund Balance‐ 

August 31, 2012 Audited  66,664,585          11,747,296         9,080,325            87,492,206          3,738,684             10,061,216         235,429,798        249,229,698             ‐                                  336,721,904            

Revenues Over Expenditures

     Unrestricted 94,549,564          (605,802)             93,943,762        93,943,762            

     Restricted 4,064,230          4,064,230           4,064,230               

     Net Investment in Plant     6,943,190           12,018,887         (5,249,252)         13,712,825             13,712,825            

Total Fund Balances 161,214,149$      11,141,494$      13,144,555$      185,500,198$     10,681,874$       22,080,103$       230,180,546$     262,942,523$          ‐$                              448,442,721$         

 Total Liabilities &  Fund Balances  175,787,560$      11,755,670$      20,630,117$      208,173,347$     214,571,490$     23,359,523$       658,503,381$     896,434,396$          ‐$                              1,104,607,740$      

      4 

PLANT & BOND FUNDS

Houston Community CollegeBalance Sheet By Fund

For Month Ended February 28, 2013

CURRENT & LOAN FUNDS

Page 11: Fs2013 february

 CENTRAL 

 NORTH

WEST 

 NORTH

EAST 

 SOUTH

WEST   SOUTH EAST   COLEMAN 

 EXTENDED 

LEARNING 

 CHAN‐

CELLOR 

DEPUTY CHAN‐

CELLOR 

INSTITU‐

TIONAL 

EFFECTIVE‐

NESS 

 INSTRUC‐

TION 

 INFO

TECH 

 STUDENT 

SUCCESS   SYSTEM   HCCS 

 % of 

Adjusted 

Budget 

EXPENSES

Faculty‐FT  10,224,009      10,167,313      7,400,874         12,084,048     4,872,675       5,895,933       2,368,137       ‐                  ‐                    ‐                   323,794          ‐                  ‐                  ‐                  53,336,783      18.01%

Faculty‐PT 4,777,739         6,329,732         4,075,911         5,783,823        3,804,931       1,831,174       3,672,377       ‐                  ‐                    ‐                   787,594          ‐                  ‐                  ‐                  31,063,281      10.49%

Librarian/Counselor‐FT  1,079,064         1,115,400         921,929            731,058           514,757          84,180            2,887              ‐                  ‐                    ‐                   340,010          ‐                  85,746            ‐                  4,875,031        1.65%

Librarian/Counselor‐PT 97,030              194,185            119,380            194,206           73,152            33,248            ‐                  ‐                  ‐                    ‐                   19,773            ‐                  110,536          ‐                  841,510           0.28%

Staff‐FT 5,509,934         4,542,246         4,798,017         5,706,843        3,839,520       2,420,100       3,711,801       3,665,042       15,244,734    102,108           4,293,666       6,641,796       4,329,461       ‐                  64,805,268      21.88%

Staff‐PT 1,949,207         1,672,318         743,949            1,578,188        1,249,828       413,922          728,620          275,749          561,143           ‐                   357,097          207,010          416,130          ‐                  10,153,161      3.43%

     Sub‐total Salaries 23,636,983      24,021,194      18,060,060      26,078,166     14,354,863    10,678,557    10,483,822    3,940,791       15,805,877    102,108           6,121,934       6,848,806       4,941,873       ‐                  165,075,034    55.74%

Employee Benefits ‐                     ‐                     ‐                     4                       ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  18,159,337    18,159,341      6.13%

Supplies Gen Exp 236,353            365,781            199,402            260,238           258,116          354,833          219,027          318,592          1,321,644        ‐                   190,173          240,843          (20,446)           1,784,217       5,728,773        1.93%

Travel 102,315            93,362              34,046              65,132             52,257            88,215            89,555            132,509          112,939           ‐                   83,076            85,507            32,701            ‐                  971,614           0.33%

Marketing Costs 49,979              46,485              99,559              36,566             73,207            38,323            382,284          81,220            842,684           ‐                   ‐                  2,000              ‐                  ‐                  1,652,307        0.56%

Rental & Leases 31,920              136,822            1,312,100         541,503           41,484            508,719          36,105            24,980            238,231           ‐                   3,750              854,317          9,721              ‐                  3,739,652        1.26%

Insurance/Risk Mgmt 794                    ‐                     ‐                     154                  ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  676                 ‐                  6,870,085       6,871,709        2.32%

Contract Services 320,835            302,988            65,005              40,985             145,194          348,092          357,814          513,843          13,173,957    ‐                   201,933          2,332,128       31,883            5,958,103       23,792,760      8.03%

Utilities 5,025                ‐                     4,600                ‐                   ‐                  ‐                  ‐                  ‐                  1,575,778        ‐                   ‐                  1,400,000       ‐                  9,904,207       12,889,610      4.35%

Other Departmental Expenses 82,625              45,133              42,030              43,300             131,339          115,635          54,771            318,903          194,010           ‐                   186,835          254,397          142,791          411,216          2,022,985        0.68%

Instructional & Other Materials 478,678            392,225            156,279            338,425           74,404            360,400          1,025,445       36,261            132,117           ‐                   1,076,605       6,660,625       279,092          ‐                  11,010,556      3.72%

Maintenance & Repair 138,595            33,839              49,797              36,869             15,772            86,074            158,950          1,265              722,373           ‐                   10,072            9,770              2,614              2,519              1,268,509        0.43%

Transfers/Debt ‐                     845,619            5,636,142         1,155,001        ‐                  ‐                  ‐                  ‐                  3,264               ‐                   ‐                  ‐                  494,389          25,957,580    34,091,995      11.51%

Contingency 250                    20,384              47,410              2,621               40,000            42,080            ‐                  83,000            121,218           ‐                   47,500            50,000            38,697            (3,585,921)     (3,092,761)       ‐1.04%

Capital Outlay 591,832            234,111            271,550            115,059           226,558          559,924          33,459            61,150            4,875,905        ‐                   1,089              759,565          1,873              4,243,116       11,975,191      4.04%

Total Budget 25,676,184      26,537,943      25,977,980      28,714,023     15,413,194    13,180,852    12,841,232    5,512,514       39,119,997    102,108           7,922,967       19,498,634    5,955,188       69,704,459    296,157,275    100.00%

  5 

 CENTRAL 

 NORTH

WEST 

 NORTH

EAST 

 SOUTH

WEST   SOUTH EAST   COLEMAN 

 EXTENDED 

LEARNING 

 CHAN‐

CELLOR 

DEPUTY CHAN‐

CELLOR 

INSTITU‐

TIONAL 

EFFECTIVE‐

NESS 

 INSTRUC‐

TION 

 INFO

TECH 

 STUDENT 

SUCCESS   SYSTEM   HCCS 

 % of 

Actuals 

EXPENSES

Faculty‐FT  5,519,229         5,429,222         3,896,531         6,451,855        2,618,103       3,123,812       1,249,520       ‐                  ‐                    ‐                   81,817            ‐                  ‐                  ‐                  28,370,090      22.08%

Faculty‐PT 2,276,290         3,004,165         1,955,910         2,825,807        1,807,280       775,097          1,606,392       ‐                  ‐                    ‐                   178,498          ‐                  ‐                  ‐                  14,429,439      11.23%

Librarian/Counselor‐FT  532,378            556,255            472,949            380,700           298,190          31,177            2,886              ‐                  ‐                    ‐                   178,703          ‐                  41,269            ‐                  2,494,507        1.94%

Librarian/Counselor‐PT 33,274              78,037              60,516              82,229             28,174            14,334            ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  25,938            ‐                  322,501           0.25%

Staff‐FT 2,698,193         2,176,894         2,313,389         2,757,712        1,868,923       1,194,977       1,823,124       1,817,574       7,577,066        51,054             2,090,616       3,231,753       2,110,303       ‐                  31,711,578      24.68%

Staff‐PT 616,079            632,077            333,108            579,883           438,204          133,589          291,714          60,058            166,844           ‐                   72,553            54,448            104,633          ‐                  3,483,189        2.71%

     Sub‐total Salaries 11,675,444      11,876,651      9,032,402         13,078,186     7,058,873       5,272,985       4,973,636       1,877,632       7,743,910        51,054             2,602,187       3,286,201       2,282,143       ‐                  80,811,303      62.90%

Employee Benefits ‐                     ‐                     ‐                     3                       ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  8,874,297       8,874,300        6.91%

Supplies Gen Exp 101,395            115,375            106,412            120,980           99,618            107,616          107,904          125,165          398,516           ‐                   102,360          50,059            55,832            924,001          2,415,233        1.88%

Travel 22,974              35,738              8,522                20,678             10,242            30,253            36,505            63,275            21,521             ‐                   44,071            20,552            14,897            ‐                  329,228           0.26%

Marketing Costs 3,470                21,679              14,290              23,637             20,738            17,664            74,612            64,244            369,857           ‐                   ‐                  ‐                  ‐                  ‐                  610,190           0.47%

Rental & Leases 31,318              38,091              481,555            400,639           10,143            203,855          4,782              5,068              106,748           ‐                   597                 4,947              2,415              ‐                  1,290,158        1.00%

Insurance/Risk Mgmt ‐                     ‐                     ‐                     ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  6,518,335       6,518,335        5.07%

Contract Services 32,099              29,026              18,617              13,165             43,752            269,540          23,968            89,875            4,670,476        ‐                   112,787          591,706          29,076            2,906,580       8,830,666        6.87%

Utilities 1,168                ‐                     1,300                ‐                   ‐                  ‐                  ‐                  ‐                  293,546           ‐                   ‐                  656,338          ‐                  2,578,773       3,531,125        2.75%

Other Departmental Expenses 16,052              19,324              12,480              14,594             11,883            28,965            30,348            198,082          59,427             ‐                   89,812            61,687            36,096            291,850          870,599           0.68%

Instructional & Other Materials 169,653            96,426              47,040              156,410           22,526            81,039            234,377          ‐                  7,390               ‐                   401,199          2,019,541       231,101          ‐                  3,466,703        2.70%

Maintenance & Repair 17,551              2,370                14,097              1,960               4,272              17,880            30,697            678                 137,214           ‐                   4,853              3,885              ‐                  ‐                  235,455           0.18%

Transfers/Debt ‐                     221,329            1,651,966         664,709           ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  3,846,078       6,384,081        4.97%

Contingency ‐                     ‐                     ‐                     ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    0.00%

Capital Outlay 39,107              34,795              17,410              52,838             10,738            42,846            27,977            27,561            3,891,240        ‐                   ‐                  162,940          ‐                  ‐                  4,307,451        3.35%

Total Expense 12,110,229      12,490,805      11,406,090      14,547,798     7,292,783       6,072,643       5,544,806       2,451,580       17,699,845    51,054             3,357,866       6,857,855       2,651,561       25,939,913    128,474,826    100.00%% of Adjusted 

Budget by Division 47.17% 47.07% 43.91% 50.66% 47.32% 46.07% 43.18% 44.47% 45.25% 50.00% 42.38% 35.17% 44.53% 37.21% 43.38% 100.00%

Remaining Balance 13,565,955      14,047,138      14,571,890      14,166,225     8,120,411       7,108,209       7,296,427       3,060,934       21,420,152    51,054             4,565,101       12,640,779    3,303,627       43,764,546    167,682,449   

HOUSTON COMMUNITY COLLEGE2012‐2013 Expenditures

YTD Adjusted Budget by Division

YTD Actuals by Division

Page 12: Fs2013 february

Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July  Aug.

Central                                 FY2013 8.77% 17.29% 26.04% 33.04% 39.26% 47.17%

                                              FY2012 8.89% 17.89% 27.03% 35.01% 41.49% 49.28% 58.01% 66.97% 74.34% 81.43% 88.98% 94.59%

Northwest                          FY2013 8.26% 17.69% 26.42% 33.44% 38.94% 47.07%

                                              FY2012 8.55% 18.72% 27.39% 33.69% 38.31% 46.70% 55.31% 66.77% 74.43% 81.57% 89.43% 95.09%

Northeast                           FY2013 6.80% 19.95% 27.15% 32.73% 37.67% 43.91%

                                              FY2012 6.70% 20.76% 27.75% 33.82% 40.16% 46.70% 53.35% 76.04% 82.19% 88.46% 94.27% 98.45%

Southwest                          FY2013 8.59% 19.46% 28.35% 35.52% 42.81% 50.66%

                                              FY2012 8.58% 19.19% 28.11% 36.68% 43.63% 50.96% 58.38% 71.97% 79.03% 85.23% 92.21% 96.87%

Southeast                            FY2013 7.94% 16.74% 25.87% 33.20% 39.17% 47.32%

                                              FY2012 8.68% 17.97% 27.56% 35.39% 41.33% 49.39% 57.90% 67.21% 74.92% 81.69% 89.81% 95.46%

Coleman                              FY2013 8.06% 17.28% 24.93% 31.55% 37.77% 46.07%

                                              FY2012 8.26% 17.29% 25.18% 32.46% 39.63% 47.52% 55.02% 63.80% 71.21% 79.83% 87.22% 93.29%

Extended Learning            FY2013 7.79% 15.60% 23.76% 31.35% 35.83% 43.18%

6                                               FY2012 7.97% 15.68% 23.55% 30.39% 37.09% 45.43% 53.07% 60.96% 69.35% 76.72% 84.68% 91.63%

Chancellor                           FY2013 7.14% 13.81% 24.51% 30.61% 37.97% 44.47%

                                              FY2012 8.66% 16.11% 23.27% 30.27% 39.34% 45.84% 53.37% 61.08% 68.18% 74.82% 81.30% 89.24%

Deputy Chancellor             FY2013 4.52% 10.80% 17.79% 31.74% 38.89% 45.25%

                                              FY2012 4.52% 10.28% 16.85% 22.58% 31.70% 38.52% 45.34% 51.71% 59.06% 69.23% 76.82% 80.46%

Institute Effectiveness      FY2013 8.33% 16.67% 25.00% 33.33% 41.67% 50.00%

                                              FY2012 5.76% 15.21% 22.37% 29.85% 38.13% 45.15% 52.82% 59.23% 67.73% 76.94% 85.77% 94.82%

Instruction                          FY2013 6.55% 15.59% 22.53% 28.70% 33.58% 42.38%

                                              FY2012 6.73% 16.23% 22.67% 28.96% 35.81% 42.78% 52.10% 59.22% 65.59% 72.63% 82.25% 89.27%

Info Tech                              FY2013 5.56% 12.11% 16.63% 20.99% 29.10% 35.17%

                                              FY2012 20.14% 33.96% 40.28% 45.47% 52.99% 59.23% 64.92% 71.03% 76.35% 82.70% 88.44% 99.49%

Student Success                 FY2013 7.33% 14.68% 23.02% 30.31% 40.96% 44.53%

                                              FY2012 8.33% 15.89% 23.44% 30.58% 40.76% 48.76% 56.63% 65.19% 72.58% 80.37% 90.28% 98.41%

System                                 FY2013 12.41% 18.87% 22.34% 27.24% 33.14% 37.21%

                                              FY2012 22.23% 25.94% 29.46% 32.09% 36.45% 39.69% 43.39% 63.98% 68.16% 71.84% 79.45% 88.27%

Total HCCS                           FY2013 8.55% 16.77% 23.49% 30.55% 36.88% 43.38%

                                              FY2012 12.05% 20.09% 26.81% 32.55% 38.82% 45.08% 51.63% 65.11% 71.48% 77.90% 85.35% 91.73%

Houston Community College

Cash Flow Analysis ‐ Monthly Percentage of Budget UsedFY2013 vs. FY2012

Page 13: Fs2013 february

Adjusted Budget 

FY2012

YTD Actuals Thru 

February 29, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

February 28, 2013 % of Budget Used

EXPENSES

Faculty‐FT  11,530,237          6,119,581        53.07% 10,224,009        5,519,229          53.98%

Faculty‐PT 3,648,664             1,830,502        50.17% 4,777,739           2,276,290          47.64%

Librarian/Counselor‐FT  1,079,656             539,794           50.00% 1,079,064           532,378             49.34%

Librarian/Counselor‐PT 90,023                  22,532              25.03% 97,030                33,274                34.29%

Staff‐FT 5,346,590             2,650,930        49.58% 5,509,934           2,698,193          48.97%

Staff‐PT 1,851,606             685,026           37.00% 1,949,207           616,079             31.61%

     Sub‐total Salaries 23,546,776          11,848,366      50.32% 23,636,983        11,675,444        49.39%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 225,732                77,947              34.53% 236,353              101,395             42.90%

Travel 102,733                39,748              38.69% 102,315              22,974                22.45%

Marketing Costs 51,979                  19,653              37.81% 49,979                3,470                 6.94%

Rental & Leases 80,498                  45,500              56.52% 31,920                31,318                98.11%

Insurance/Risk Mgmt 794                        ‐                    0.00% 794                       ‐                     0.00%

Contract Services 328,983                94,895              28.84% 320,835              32,099                10.00%

Utilities ‐                         ‐                    ‐                 5,025                  1,168                 0.00%

Other Departmental Expenses 83,704                  12,654              15.12% 82,625                16,052                19.43%

Instructional & Other Materials 451,212                182,015           40.34% 478,678              169,653             35.44%

Maintenance & Repair 119,984                20,299              16.92% 138,595              17,551                12.66%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency 3,140                    ‐                    0.00% 250                       ‐                     ‐                      

Capital Outlay 118,876                35,567              29.92% 591,832              39,107                6.61%

     Total Expenses  25,114,411          12,376,645      49.28% 25,676,184        12,110,229        47.17%

Adjusted Budget 

FY2012

YTD Actuals Thru 

February 29, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

February 28, 2013 % of Budget Used

EXPENSES

Faculty‐FT  10,673,442          5,568,614        52.17% 10,167,313        5,429,222          53.40%

Faculty‐PT 4,822,701             2,169,972        44.99% 6,329,732           3,004,165          47.46%

Librarian/Counselor‐FT  1,067,207             506,968           47.50% 1,115,400           556,255             49.87%

Librarian/Counselor‐PT 145,675                58,278              40.01% 194,185              78,037                40.19%

Staff‐FT 4,019,933             1,896,414        47.18% 4,542,246           2,176,894          47.93%

Staff‐PT 1,444,583             565,784           39.17% 1,672,318           632,077             37.80%

     Sub‐total Salaries 22,173,541          10,766,031      48.55% 24,021,194        11,876,651        49.44%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 269,875                51,020              18.91% 365,781              115,375             31.54%

Travel 86,464                  29,265              33.85% 93,362                35,738                38.28%

Marketing Costs 41,349                  19,133              46.27% 46,485                21,679                46.64%

Rental & Leases 128,563                33,189              25.82% 136,822              38,091                27.84%

Insurance/Risk Mgmt 15                          ‐                    0.00% ‐                        ‐                     0.00%

Contract Services 288,873                106,212           36.77% 302,988              29,026                9.58%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Other Departmental Expenses 39,224                  14,712              37.51% 45,133                19,324                42.82%

Instructional & Other Materials 202,801                50,823              25.06% 392,225              96,426                24.58%

Maintenance & Repair 23,737                  2,914                12.28% 33,839                2,370                 7.00%

Transfers/Debt 883,899                242,943           27.49% 845,619              221,329             ‐                      

Contingency 11,667                  ‐                    0.00% 20,384                ‐                     ‐                      

Capital Outlay 141,708                27,781              19.60% 234,111              34,795                14.86%

     Total Expenses  24,291,716          11,344,023      46.70% 26,537,943        12,490,805        47.07%

Central College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Northwest College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

7

Page 14: Fs2013 february

Adjusted Budget 

FY2012

YTD Actuals Thru 

February 29, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

February 28, 2013 % of Budget Used

EXPENSES

Faculty‐FT  7,931,442             4,196,122        52.90% 7,400,874           3,896,531          52.65%

Faculty‐PT 2,957,397             1,643,612        55.58% 4,075,911           1,955,910          47.99%

Librarian/Counselor‐FT  1,100,054             556,975           50.63% 921,929              472,949             51.30%

Librarian/Counselor‐PT 109,648                45,531              41.52% 119,380              60,516                50.69%

Staff‐FT 4,575,119             2,274,075        49.71% 4,798,017           2,313,389          48.22%

Staff‐PT 701,846                315,231           44.91% 743,949              333,108             44.78%

     Sub‐total Salaries 17,375,506          9,031,547        51.98% 18,060,060        9,032,402          50.01%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 295,644                127,993           43.29% 199,402              106,412             53.37%

Travel 33,784                  10,316              30.54% 34,046                8,522                 25.03%

Marketing Costs 46,417                  15,907              34.27% 99,559                14,290                14.35%

Rental & Leases 1,256,225             655,972           52.22% 1,312,100           481,555             36.70%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Contract Services 46,654                  14,947              32.04% 65,005                18,617                28.64%

Utilities 4,600                    950                   20.65% 4,600                  1,300                 0.00%

Other Departmental Expenses 43,848                  12,996              29.64% 42,030                12,480                29.69%

Instructional & Other Materials 140,734                59,522              42.29% 156,279              47,040                30.10%

Maintenance & Repair 51,352                  37,727              73.47% 49,797                14,097                28.31%

Transfers/Debt 5,640,942             1,697,155        30.09% 5,636,142           1,651,966          ‐                      

Contingency 33,706                  ‐                    0.00% 47,410                ‐                     ‐                      

Capital Outlay 48,101                  16,954              35.25% 271,550              17,410                6.41%

     Total Expenses  25,017,513          11,681,987      46.70% 25,977,980        11,406,090        43.91%

Adjusted Budget 

FY2012

YTD Actuals Thru 

February 29, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

February 28, 2013 % of Budget Used

EXPENSES

Faculty‐FT  13,511,520          7,233,120        53.53% 12,084,048        6,451,855          53.39%

Faculty‐PT 4,892,625             2,698,354        55.15% 5,783,823           2,825,807          48.86%

Librarian/Counselor‐FT  1,397,239             755,124           54.04% 731,058              380,700             52.08%

Librarian/Counselor‐PT 202,844                83,005              40.92% 194,206              82,229                42.34%

Staff‐FT 5,147,869             2,656,299        51.60% 5,706,843           2,757,712          48.32%

Staff‐PT 1,522,012             734,115           48.23% 1,578,188           579,883             36.74%

     Sub‐total Salaries 26,674,108          14,160,018      53.09% 26,078,166        13,078,186        50.15%

Employee Benefits ‐                         ‐                    ‐                 4                           3                         ‐                 

Supplies Gen Exp 251,146                87,719              34.93% 260,238              120,980             46.49%

Travel 63,821                  17,887              28.03% 65,132                20,678                31.75%

Marketing Costs 36,760                  24,293              66.08% 36,566                23,637                64.64%

Rental & Leases 778,102                526,684           67.69% 541,503              400,639             73.99%

Insurance/Risk Mgmt 154                        ‐                    ‐                 154                       ‐                     0.00%

Contract Services 45,414                  18,356              40.42% 40,985                13,165                32.12%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 42,578                  15,227              35.76% 43,300                14,594                33.70%

Instructional & Other Materials 219,207                89,032              40.62% 338,425              156,410             46.22%

Maintenance & Repair 30,175                  8,037                26.64% 36,869                1,960                 5.31%

Transfers/Debt 2,484,173             687,010           27.66% 1,155,001           664,709             57.55%

Contingency 14,861                  ‐                    0.00% 2,621                  ‐                     0.00%

Capital Outlay 89,000                  25,379              28.52% 115,059              52,838                45.92%

     Total Expenses  30,729,499          15,659,642      50.96% 28,714,023        14,547,798        50.66%

8

Northeast College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Southwest College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Page 15: Fs2013 february

Adjusted Budget 

FY2012

YTD Actuals Thru 

February 29, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

February 28, 2013 % of Budget Used

EXPENSES

Faculty‐FT  5,674,626             2,997,987        52.83% 4,872,675           2,618,103          53.73%

Faculty‐PT 2,708,766             1,341,508        49.52% 3,804,931           1,807,280          47.50%

Librarian/Counselor‐FT  694,643                355,484           51.18% 514,757              298,190             57.93%

Librarian/Counselor‐PT 79,814                  24,292              30.44% 73,152                28,174                38.51%

Staff‐FT 3,383,833             1,633,338        48.27% 3,839,520           1,868,923          48.68%

Staff‐PT 1,050,356             434,265           41.34% 1,249,828           438,204             35.06%

     Sub‐total Salaries 13,592,039          6,786,874        49.93% 14,354,863        7,058,873          49.17%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 190,215                102,799           54.04% 258,116              99,618                38.59%

Travel 50,563                  8,369                16.55% 52,257                10,242                19.60%

Marketing Costs 103,335                33,757              32.67% 73,207                20,738                28.33%

Rental & Leases 155,160                100,121           64.53% 41,484                10,143                24.45%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Contract Services 135,264                87,030              64.34% 145,194              43,752                30.13%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 145,695                10,562              7.25% 131,339              11,883                9.05%

Instructional & Other Materials 62,020                  22,644              36.51% 74,404                22,526                30.27%

Maintenance & Repair 15,172                  2,505                16.51% 15,772                4,272                 27.08%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency 32,436                  ‐                    0.00% 40,000                ‐                     0.00%

Capital Outlay 82,501                  38,215              46.32% 226,558              10,738                4.74%

     Total Expenses  14,564,400          7,192,876        49.39% 15,413,194        7,292,783          47.32%

Adjusted Budget 

FY2012

YTD Actuals Thru 

February 29, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

February 28, 2013 % of Budget Used

EXPENSES

Faculty‐FT  6,669,358             3,435,226        51.51% 5,895,933           3,123,812          52.98%

Faculty‐PT 1,173,507             483,983           41.24% 1,831,174           775,097             42.33%

Librarian/Counselor‐FT  186,866                93,564              50.07% 84,180                31,177                37.04%

Librarian/Counselor‐PT 29,835                  14,868              49.84% 33,248                14,334                43.11%

Staff‐FT 2,356,886             1,166,461        49.49% 2,420,100           1,194,977          49.38%

Staff‐PT 350,542                137,825           39.32% 413,922              133,589             32.27%

     Sub‐total Salaries 10,766,994          5,331,928        49.52% 10,678,557        5,272,985          49.38%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 345,739                80,310              23.23% 354,833              107,616             30.33%

Travel 80,439                  24,789              30.82% 88,215                30,253                34.29%

Marketing Costs 43,823                  ‐                    0.00% 38,323                17,664                46.09%

Rental & Leases 488,309                215,393           44.11% 508,719              203,855             40.07%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Contract Services 324,761                182,313           56.14% 348,092              269,540             77.43%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Other Departmental Expenses 64,433                  30,200              46.87% 115,635              28,965                25.05%

Instructional & Other Materials 322,337                96,415              29.91% 360,400              81,039                22.49%

Maintenance & Repair 59,754                  14,220              23.80% 86,074                17,880                20.77%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency 48,881                  ‐                    0.00% 42,080                ‐                     0.00%

Capital Outlay 30,205                  ‐                    0.00% 559,924              42,846                0.00%

     Total Expenses  12,575,675          5,975,569        47.52% 13,180,852        6,072,643          46.07%

Southeast College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Coleman College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

9

Page 16: Fs2013 february

Adjusted Budget 

FY2012

YTD Actuals Thru 

February 29, 2012 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

February 28, 2013 % of Budget Used

EXPENSES

Faculty‐FT  2,315,379             1,249,814        53.98% 2,368,137           1,249,520          52.76%

Faculty‐PT 3,325,188             1,505,158        45.27% 3,672,377           1,606,392          43.74%

Librarian/Counselor‐FT  67,910                  33,955              50.00% 2,887                  2,886                 99.97%

Librarian/Counselor‐PT ‐                         ‐                    0.00% ‐                        ‐                     0.00%

Staff‐FT 3,664,326             1,824,737        49.80% 3,711,801           1,823,124          49.12%

Staff‐PT 646,021                226,529           35.07% 728,620              291,714             40.04%

     Sub‐total Salaries 10,018,824          4,840,193        48.31% 10,483,822        4,973,636          47.44%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Supplies Gen Exp 203,799                52,424              25.72% 219,027              107,904             49.27%

Travel 64,262                  21,072              32.79% 89,555                36,505                40.76%

Marketing Costs 206,496                115,070           55.73% 382,284              74,612                19.52%

Rental & Leases 49,030                  11,385              23.22% 36,105                4,782                 13.24%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Contract Services 80,280                  27,472              34.22% 357,814              23,968                6.70%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 52,070                  19,022              36.53% 54,771                30,348                55.41%

Instructional & Other Materials 1,112,019             276,150           24.83% 1,025,445           234,377             22.86%

Maintenance & Repair 111,400                42,619              38.26% 158,950              30,697                19.31%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Capital Outlay 12,086                  5,354                0.00% 33,459                27,977                83.61%

     Total Expenses  11,910,266          5,410,760        45.43% 12,841,232        5,544,806          43.18%

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

10

Division of Extended Learning

Page 17: Fs2013 february

2006-07 2007-08 2008-09 2009-10 2010-11 2011-12Academic 12,077,904 12,739,232 14,345,992 16,652,752 17,802,080 17,354,256

Technical 4,378,250 4,422,336 4,883,890 5,680,164 5,924,078 5,822,072

Continuing Education 2,091,365 1,847,195 1,810,761 1,880,857 1,914,445 1,798,940

Total Fundable Contact Hrs 18,547,519 19,008,763 21,040,643 24,213,773 25,640,603 24,975,268

Source: Certified CBM004 & CBM00C.

11

HOUSTON COMMUNITY COLLEGEAnnual Fundable Contact Hours 

FY 2006-07 thru FY 2011-12

0

5000000

10000000

15000000

20000000

25000000

30000000

2006‐07 2007‐08 2008‐09 2009‐10 2010‐11 2011‐12

Continuing Education Technical Academic

+5.9%+15.1%

+10.7%+2.5%

‐2.6%

Page 18: Fs2013 february

HOUSTON COMMUNITY COLLEGEUnduplicated Headcount Comparison Semester‐To‐Semester (FY 2009‐10 thru FY 2012‐13)

Fall Semester (Unduplicated Enrollment ‐ All Students)

Spring Semester (Unduplicated Enrollment ‐ All Students)*

Summer Semester (Unduplicated Enrollment ‐ All Students)

* As of March 07, 2013.

12

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

-62

-52

-42

-32

-22

-12 -2 8 18 28 38 48 58 68

Sum 12

Sum 11

Sum 10

First Class Day

Census Day

Sum 12 Enrollment:‐0.0%  (Sum12 to 11)‐4.1% (Sum12 to 10)

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000-1

10

-100 -90

-80

-70

-60

-50

-40

-30

-20

-10 0 10 20 30 40 50 60 70 80 90 100

110

120

130

Fall 12

Fall 11

Fall 10

Fall 12 Enrollment:‐6.5%  (Fall12 to 11)‐3.9% (Fall12 to 10)

First Class Day

Census Day

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

-69

-59

-49

-39

-29

-19 -9 1 11 21 31 41 51 61 71 81 91 101

111

Spr 13

Spr 12

Spr 11

Census Day

First Class Day

Spr 13 Enrollment:‐1.4% (Spr13 to 12)‐3.8% (Spr13 to 11)

Page 19: Fs2013 february

HOUSTON COMMUNITY COLLEGERevenues & Expenditures Comparison Year to Date Thru February 28, 2013

2009 Positions

Revenues Expenditures Rev H/(L) Exp

YTD Actuals Thru February 28, 2013 224,311,957         128,474,826        95,837,131       

YTD Actuals Thru February 29, 2012 227,269,747         128,886,778        98,382,969       

(2,957,789)            (411,952)              

13

 ‐

 50,000,000

 100,000,000

 150,000,000

 200,000,000

 250,000,000

Revenues Expenditures

Page 20: Fs2013 february

` HOUSTON COMMUNITY COLLEGEMonthly Revenues & Expenditures Comparison Year to Date By Month

Revenues SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 58,227,650  9,431,856  25,352,097  36,128,428 60,245,426 41,908,473

2011‐2012 61,685,752  9,480,515  24,214,599  37,832,575 66,013,487 35,495,964 10,116,378 16,794,724  15,263,177 9,332,949 7,924,181 9,726,145

2009 Positions

Expenditures SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 28,324,834  24,699,442  20,905,041  21,510,456 20,451,195 19,565,831

2011‐2012 37,698,782  23,302,047  20,581,833  17,164,427 19,407,583 18,185,253 18,965,252 39,130,360  18,696,899 18,586,628 21,489,075 18,505,226

14

 ‐ 5,000,000

 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐ 5,000,000

 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 21: Fs2013 february

HOUSTON COMMUNITY COLLEGERevenues Comparison Year to Date Thru February 28, 2013 by Source

2009 Positions

State 

Appropriations Ad Valorem Taxes Tuition, Net Fees

Other Local 

Income* Extended Learning Grant Revenue Total Revenues

YTD Actuals Thru February 28, 2013 30,904,179  100,178,351 34,267,568 53,566,485 1,090,070 4,035,211 270,092 224,311,957

YTD Actuals Thru February 29, 2012 31,042,116  99,504,154 35,888,702 56,229,359 566,781 3,809,697 228,939 227,269,747

(137,937)  674,198 (1,621,134) (2,662,874) 523,289 225,514 41,154 (2,957,789)

15

 ‐

 20,000,000

 40,000,000

 60,000,000

 80,000,000

 100,000,000

 120,000,000

StateAppropriations

Ad Valorem Taxes Tuition, Net Fees Other LocalIncome*

Extended Learning Grant Revenue

Page 22: Fs2013 february

HOUSTON COMMUNITY COLLEGEExpense Comparison Year to Date Thru February 28, 2013 by Source

2009 Positions

YTD Actuals Thru Faculty‐FT  Faculty‐PT

Librarian/

Counselor‐FT 

Librarian/

Counselor‐PT Staff‐FT Staff‐PT

Employee 

Benefits

Supplies Gen 

Exp Travel

Marketing 

Costs

Rental & 

Leases

Insurance/

Risk Mgmt

Contract 

Services Utilities

Other 

Departmental 

Expenses

Instructional & 

Other 

Materials

Maintenance & 

Repair

Transfers/

Debt Capital Outlay      Total Expenses 

 February 28, 2013  28,370,090  14,429,439  2,494,507  322,501  31,711,578  3,483,189  8,874,300  2,415,233  329,228  610,190  1,290,158  6,518,335  8,830,666  3,531,125  870,599  3,466,703  235,455  6,384,081  4,307,451  128,474,826 

 February 29, 2012  28,077,436  14,559,462  3,126,440  265,794  30,706,806  3,601,887  6,886,968  2,088,157  309,943  565,342  3,039,548  6,132,824  7,606,902  3,433,422  786,621  2,573,645  299,381  14,328,790  497,409  128,886,778 

292,653  (130,024)  (631,933)  56,707  1,004,772  (118,699)  1,987,332  327,076  19,285  44,848  (1,749,390)  385,511  1,223,764  97,703  83,977  893,057  (63,925)  (7,944,708)  3,810,042  (411,952) 

16

 ‐

 1,000,000

 2,000,000

 3,000,000

 4,000,000

 5,000,000

 6,000,000

 7,000,000

 8,000,000

 9,000,000

 10,000,000

 11,000,000

 12,000,000

 13,000,000

 14,000,000

 15,000,000

 16,000,000

 17,000,000

 18,000,000

 19,000,000

 20,000,000

 21,000,000

 22,000,000

 23,000,000

 24,000,000

 25,000,000

 26,000,000

 27,000,000

 28,000,000

 29,000,000

 30,000,000

Page 23: Fs2013 february

TOTAL 

Unexpended Plant Funds

Total Unexpended Plant Fund Balances per Books (886,266)$           

  Spending/Encumbrances/Reserve for Future Use

‐ Encumbrances/PO Issued General Unexpended FY13 886,266               

Total  Plant Fund PO 886,266$             

     Anticipated Unexpended Plant Shortfall ‐$                         

HOUSTON COMMUNITY COLLEGEUnexpended Plant Fund Excluding 2004 CIP

Cash Position to February 28, 2013

17

Page 24: Fs2013 february

Description of Use

Total Budget to 

Date

Total 

Expenditures      

To Date

Encumbrances To 

Date Unexpended

DEFERRED MAINTENANCE FY05

System Administration 604,863$                604,863$                ‐$                              ‐$                             

Subtotal 604,863$               604,863$               ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY06

System Administration 649,625$                649,624$                ‐$                              ‐$                             

Northwest College 412,743                412,743                ‐                               ‐                            

Coleman College 190,738                190,736                ‐                               ‐                            

Subtotal 1,253,106$            1,253,103$            ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY07

System Administration 775,610$                775,610$                ‐$                              ‐$                             

Central College 373,917                373,917                ‐                               ‐                            

Northwest College 599,383                599,383                ‐                               ‐                            

Northeast College 1,059,733             1,059,733             ‐                               ‐                            

Southwest College 74,607                  74,607                  ‐                               ‐                            

Southeast College 38,742                  38,742                  ‐                               ‐                            

Coleman College 9,900                    9,900                    ‐                               ‐                            

Subtotal 2,931,893$            2,931,892$            ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY08

System Administration 10,195$                  10,195$                  ‐$                              ‐$                             

Central College 478,637                478,637                ‐                               ‐                            

Northwest College 1,217,755             1,217,755             ‐                               ‐                            

Northeast College 494,886                494,886                ‐                               ‐                            

Southwest College 42,063                  42,063                  ‐                               ‐                            

Coleman College 73,813                  73,813                  ‐                               ‐                            

Subtotal 2,317,348$            2,317,349$            ‐$                              ‐$                           

OTHER GENERAL PROJECTS

Minor Construction 657,807$               657,807$               ‐$                              ‐$                           

System 11,711,342           11,033,373           677,969                 ‐                            

Central College 3,112,802             2,978,874             133,928                 ‐                            

Northwest College 4,060,039             4,047,984             12,055                   ‐                            

Northeast College 626,331                622,548                3,783                     ‐                            

Southwest College 1,124,363             1,074,856             49,507                   ‐                            

Southeast College 1,995,204             1,989,030             6,174 ‐                            

Coleman College 1,341,159             1,341,159             ‐                            

Subtotal 24,629,047$         23,745,631$         883,416$                ‐$                           

SURPLUS PROPERTY

Palmetto Property ‐ Purchase 495,154$               495,154$               ‐$                              ‐$                           

Dixie Property‐ Refund 20,000                  20,000                  ‐                               ‐                            

 288 Property‐ Purchase 1,142,402             1,139,552             2,850                     ‐                            

Warehouse Property 12,966,619           12,966,619           ‐                               ‐                            

Subtotal 14,624,175$         14,621,325$         2,850$                    ‐$                           

Total Anticipated Uses 46,360,432$          45,474,163$          886,266$                ‐$                             

UNEXPENDED PLANT FUND PROJECTSas of February 28, 2013

18

HOUSTON COMMUNITY COLLEGE

Page 25: Fs2013 february

 

Total Budget 

to Date

Total 

Expenditures   

To Date

Encumbrances 

To Date

% of 

Expen‐ 

ditures Unexpended

% of 

Total 

BudgetSources:

Central College 2001A Bond 25,318,535$      

2003 Limited Tax Bond and Premium 150,748,497      

Actural Interest Earned 2003 Limited Tax Bonds 20,868,074         

2005 Limited Tax and Building Bond 1,875,000           

2003/2005 LTD Bond Issuance Cost (2,068,522)          

2006 Jr Lien Bond Std Revenue Bond 30,000,000         

Bond Issuance Cost (913,149)             

Actual Interest Earned 2006 Jr Lien Bonds 2,608,533           

Transferred to Fund 7305/Hayes Road (3,169,049)          

2008 Maintenance Tax Notes 56,912,320         

2008 MTN Bond Issuance Cost (1,056,912)          

Actual Interest Earned 2008 MTN 1,654,029           

2008 Sr. Lien Bond             1,714,953 

Transferred to Residual CIP Funds         (20,712,314)

Total Available with Reclassification 263,779,995$    

Uses:

Construction 119,646,470$     119,628,602$     17,868$                100% ‐$                          0%

CPMS PGAL  11,121,809          11,121,809          ‐                             100% ‐                             0%

Facility Planning 1,677,989            1,677,989            ‐                             100% ‐                             0%

Architect Fees and Engineering 7,604,912            7,505,762            99,149                  100% ‐                             0%

Other Costs including Bldg/Land Purchase 2,273,077            2,258,218            14,859                  100% ‐                             0%

Inspectors 890,000               890,000               ‐                             100% ‐                             0%

Design Standard 103,370               103,370               ‐                             100% ‐                             0%

Site Improvement and Infrastructure Development 52,571,865          51,753,201          818,664                100% ‐                             0%

IT Infrastructure Master Plan 29,726,967          29,082,477          644,490                100% ‐                             0%

Furniture and Fixtures 14,351,860          13,908,378          443,482                100% 0                            0%

Small Business 567,383               567,383               ‐                             100% ‐                             0%

Administrative Services 3,396,919            3,284,938            111,981                100% (0)                           0%

Material Testing 574,120               537,606               36,513                  100% ‐                             0%

Contingency for Construction 60                          0% 60                          100%

Surveying 471,813               460,552               11,260                  100% ‐                             0%

Design and Geotech 110,911               110,111               800                        100% ‐                             0%

Signage 70,000                  70,000                  100% ‐                             0%

Blue Light Security 126,000               115,200               10,800                  100% ‐                             0%

PGAL Website Development 181,208               181,208               ‐                             100% ‐                             0%

System Architect Furniture Consultant 11,367                  11,367                  100% ‐                             0%

Northline Demolition‐Pizza Hut 226,246               226,246               100% ‐                             0%

Police Cars 342,223               341,613               610                        100% ‐                             0%

Bering St. Property 50,687                  50,687                  100% ‐                             0%

General Repairs & Maintenance 2,079,239            2,079,239            100% ‐                             0%

Land Purchase 1,919,729            1,919,729            100% ‐                             0%

Amatuer Sports Complex ‐ Willie Gay Hall 2,235,647            2,221,947            13,700                  100% ‐                             0%

Total Construction Cost 252,331,872$     250,107,634$     2,224,179$          100% 60$                       0%

Note: Expenditures Not In Construction Schedule

Deferred Maintenance 5,000,000$          5,000,000$          ‐$                           100% ‐$                          0%

IT Development 6,448,123            6,448,122            ‐                             100% ‐                             0%

263,779,995$     261,555,756$     2,224,180$          100% 60$                       0%

Anticipated Budget Shortfall/Surplus (0)                          

*Footnote on next page

HOUSTON COMMUNITY COLLEGE2004 CIP Projects

as of February 28, 2013

19

Page 26: Fs2013 february

2003/2005 Limited Tax Bonds 2003 2005 TotalBond counsel fees 150,000 57,000 207,000Underwriters' discount 814,813 57,000 871,813Insurance premium 558,764 558,764Financial advisory fee 205,391 68,081 273,472Rating agencies fees 114,350 16,000 130,350Printing costs 10,386 4,506 14,892CPA consent letter fee 1,500 1,500 3,000Verification fees 3,500 3,500Paying agent fee 300 5,432 5,732

1,855,504 213,018 2,068,522

2006 Jr Lien Revenue BondsBond counsel fees 79,500Underwriters' discount 509,509Insurance premium 117,904Financial advisory fee 137,910Rating agencies fees 54,850Printing costs 3,502CPA consent letter fee 1,500Verification fees 3,500Paying agent fee 4,974

913,149

2008 Maintenance Tax NotesBond counsel fees 63,500Underwriters' discount 342,526Insurance premium 498,600Financial advisory fee 95,105Rating agencies fees 47,100Printing costs 9,617Paying agent fee 463

1,056,912

20

HOUSTON COMMUNITY COLLEGE2004 CIP Projects Footnotes

as of February 28, 2013

Page 27: Fs2013 february

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

Central ‐ San Jacinto:*

Construction Cost 1,241,868$         1,241,868$         ‐$                         

CPMS PGAL 111,440              111,440              ‐                         ‐                          

Facilities Space Programming 393,715              393,715              ‐                         ‐                          

Material Testing  ‐                           ‐                           ‐                         ‐                          

IT Infrastructure Capital Projects 10,000                5,687                  4,314                 ‐                          

Design Standards 3,904                  3,904                  ‐                          

  Total Central ‐ San Jacinto 1,785,007$          1,780,694$          4,314$               ‐$                          

Central ‐ Learning Hub/Science Bldg:*

Construction Cost 21,504,724$       21,499,805$       4,919$               -$ CPMS PGAL 1,967,801           1,967,801           ‐                          

Facilities Space Programming 148,096              148,096              ‐                         ‐                          

Architect and Engineering 1,242,506           1,242,506           ‐                          

Furniture, Fixtures & Equipment 2,049,869           2,019,706           30,163              ‐                          

Inspectors 187,000              187,000              ‐                          

Project Software 7,614                  7,614                  ‐                          

Design Standards 15,086                15,086                ‐                          

Site Infrastructure Improvements 5,688,424           5,144,720           543,704            ‐                          

IT Infrastructure Master Plan 2,751,121           2,726,528           24,593              ‐                          

Design Geotech 10,150                10,150                ‐                          

Material Testing  32,994                32,356                638                    ‐                          

Surveying  69,453                64,118                5,335                 ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total Central ‐ Learning Hub/Science 

Bldg:*

35,692,838$        35,081,686$        611,152$           ‐$                          

NEC ‐ Learning Hub:*

Construction Cost 14,001,119$       14,001,119$       ‐                          

CPMS PGAL 1,187,440           1,187,440           ‐                          

Facilities Space Programming 145,889              145,889              ‐                          

Architect and Engineering 723,556              723,556              ‐                          

Furniture, Fixtures & Equipment 1,660,682           1,651,908           8,774                 ‐                          

Other Costs including Bldg/Land Purchase ‐                           ‐                          

Inspectors 205,000              205,000              ‐                         ‐                          

Project Software ‐                           ‐                          

Design Standards 9,015                  9,015                  ‐                          

Site Infrastructure Improvements 92,682                92,682                ‐                         ‐                          

IT Infrastructure Master Plan 1,250,254           1,249,836           418                    ‐                          

Design Geotech ‐                           ‐                          

Material Testing  131,870              123,607              8,263                 ‐                          

Surveying  71,081                71,081                ‐                          

  Total NEC ‐ Learning Hub 19,478,588$        19,461,133$        17,455$             ‐$                          

HOUSTON COMMUNITY COLLEGE2004 CIP Projects

as of February 28, 2013

21

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 28: Fs2013 february

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projects

as of February 28, 2013

NEC ‐ Science Engineering & Technology:*

Construction Cost 11,627,061$       11,626,428$       633$                   ‐$                         

CPMS PGAL 857,203              857,203              ‐                         ‐                          

Facilities Space Programming 52,058                52,058                ‐                          

Architect and Engineering 635,906              635,906              ‐                          

Furniture, Fixtures & Equipment 644,019              607,016              37,003              ‐                          

Other Costs including Bldg/Land Purchase 84,400                73,800                10,600              ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 6,818                  6,818                  ‐                          

Site Infrastructure Improvements 15,423,461        15,357,930        65,531              ‐                          

IT Infrastructure Master Plan 1,173,585           1,160,824           12,761              ‐                          

Design Geotech 28,500                28,500                ‐                          

Material Testing  95,465                95,465                ‐                         ‐                          

Surveying  15,960                10,035                5,925                 ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total NEC ‐ Science Eng & Technology 30,662,436$        30,528,183$        134,253$           ‐$                          

NEC ‐ Pinemont:

CPMS PGAL 6,269$                 6,269$                 ‐$                        ‐$                         

Facilities Space Programming 71,292                71,292                ‐                         ‐                          

Other Costs including Bldg/Land Purchase

102,156              102,156             

‐                          ‐                            

Surveying  22,483                22,483                ‐                         ‐                          

  Total NEC ‐ Pinemont 202,200$              202,200$              ‐$                        ‐$                          

SEC - Felix Fraga (Drennan):*Construction Cost 12,419,858$       12,417,829$       2,029$               ‐$                         

CPMS PGAL 1,216,969           1,216,969           ‐                          

Facilities Space Programming 227,023              227,023              ‐                          

Architect and Engineering 850,383              835,511              14,872              ‐                          

Furniture, Fixtures & Equipment 1,007,615           977,469              30,146              ‐                          

Other Costs including Bldg/Land Purchase 62,466 62,466                ‐                          

Inspectors - ‐                          

Project Software - ‐                          

Design Standards 6,873                  6,873                  ‐                          

Site Infrastructure Improvements 5,992,274           5,959,525           32,749              ‐                          

IT Infrastructure Master Plan 1,279,923           1,268,405           11,518              ‐                          

Design Geotech 19,000                18,200                800                    ‐                          

Material Testing  150,272              137,662              12,610              ‐                          

Surveying  27,674                27,674                ‐                          

HUB/Small Business Program ‐                           ‐                           ‐                         ‐                          

HUB/Small Business Program ‐                           ‐                          

Bering St Property 50,687                50,687                ‐                          

Signage ‐                           ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                           Total SEC - Felix Fraga (Drennan):* 23,329,017$        23,222,493$        106,524$           ‐$                          

22

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 29: Fs2013 february

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projects

as of February 28, 2013

SEC ‐ Felix Morales:*

Construction Cost 3,653,330$         3,653,330$         ‐$                         

CPMS PGAL 667,905              667,905              ‐                          

Facilities Space Programming 62,181                62,181                ‐                          

Architect and Engineering 367,853              351,968              15,885              ‐                          

Furniture, Fixtures & Equipment 929,072              898,276              30,796              ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 3,117                  3,117                  ‐                          

Site Infrastructure Improvements 98,015                96,070                1,945                 ‐                          

IT Infrastructure Master Plan 1,164,463           1,008,321           156,142            ‐                          

Design Geotech ‐                           ‐                          

Material Testing  10,009                5,808                  4,201                 ‐                          

Surveying  1,225                  1,225                  ‐                          

  Total SEC ‐ Felix Morales 6,957,169$          6,748,200$          208,969$           ‐$                          

SEC ‐ Learning Hub:*

Construction Cost 16,555,351$       16,550,039$       5,312$               ‐$                         

CPMS PGAL 1,744,048           1,744,048           ‐                          

Facilities Space Programming 126,588              126,588              ‐                          

Architect and Engineering 875,415              875,415              ‐                          

Furniture, Fixtures & Equipment 2,006,195           1,838,307           167,888            ‐                          

 Other Costs including Bldg/Land Purchase  32,480                  28,221                  4,259                  ‐                            

Inspectors 258,000              258,000              ‐                         ‐                          

Project Software ‐                           ‐                          

Design Standards 9,367                  9,367                  ‐                          

Site Infrastructure Improvements 12,138,518        12,011,404        127,114            ‐                          

IT Infrastructure Master Plan 2,177,705           2,157,010           20,695              ‐                          

Administrative Services ‐                           ‐                          

Design Geotech 9,525                  9,525                  ‐                         ‐                          

Material Testing  122,370              115,883              6,487                 ‐                          

Surveying  144,094              144,094              ‐                          

Blue Light Security 18,000                18,000                - ‐                          

  Total SEC ‐ Learning Hub 36,217,654$        35,885,901$        331,755$           ‐$                          

23

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 30: Fs2013 february

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projects

as of February 28, 2013

SW ‐ Missouri City:*

Construction Cost 8,891,630$         8,891,630$         ‐$                         

CPMS PGAL 601,635              601,635              ‐                         ‐                          

Facilities Space Programming 194,111              194,111              ‐                          

Architect and Engineering 989,044              958,905              30,139              ‐                          

Furniture, Fixtures & Equipment 1,053,411           1,011,146           42,265              ‐                          

 Library & Bookstore  1,991,575           1,991,575           ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 4,999                  4,999                  ‐                          

Site Infrastructure Improvements 5,061,234           5,061,234           ‐                         ‐                          

IT Infrastructure Capital Projects 2,259,331           2,246,083           13,248              ‐                          

Design Geotech ‐                           ‐                          

Material Testing  ‐                           ‐                          

Surveying  48,311                48,311                ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total SW ‐ Missouri City 21,113,280$        21,025,828$        87,452$             ‐$                          

SW ‐ West Loop Phase I:*

Construction Cost 9,033,809$         9,031,922$         1,887$               ‐$                         

CPMS PGAL 1,033,865           1,033,865           ‐                          

Facilities Space Programming 76,260                76,260                ‐                          

Architect and Engineering 718,694              718,694              ‐                          

Furniture, Fixtures & Equipment 2,166,396           2,154,214           12,182              ‐                          

Design Standards 8,170                  8,170                  ‐                          

IT Infrastructure Capital Projects 2,893,767           2,864,190           29,577              ‐                          

Design Geotech 22,116                22,116                ‐                         ‐                          

Material Testing  21,141                21,141                ‐                         ‐                          

Surveying  14,995                14,995                ‐                         ‐                          

Exterior Signage 70,000                70,000                ‐                         ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total SW ‐ West Loop Phase I 16,077,212$        16,031,766$        45,446$             ‐$                          

24

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 31: Fs2013 february

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projects

as of February 28, 2013

SW ‐ Learning Hub ‐ Stafford:*

Construction Cost 20,717,717$       20,714,629$       3,088$               ‐$                         

CPMS PGAL 1,727,234           1,727,234           ‐                          

Facilities Space Programming 180,778              180,778              ‐                          

Architect and Engineering 1,193,942           1,155,688           38,254              ‐                          

Furniture, Fixtures & Equipment 2,834,604           2,750,339           84,265              ‐                          

Inspectors 240,000              240,000              ‐                          

Project Software ‐                           ‐                          

Design Standards 15,845                15,845                ‐                          

Site Infrastructure Improvements 8,077,256           8,029,635           47,621              ‐                          

IT Infrastructure Capital Projects 2,610,585           2,535,820           74,765              ‐                          

Design Geotech 21,620                21,620                ‐                          

Material Testing  ‐                           ‐                          

Surveying  56,536                56,536                ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total SW ‐ Learning Hub ‐ Stafford 37,694,118$        37,444,325$        249,793$           ‐$                          

System ‐ Network:

IT Infrastructure Capital Projects 12,162,330$       11,861,556$       300,774$           ‐                          

Administrative Services 3,396,919           3,284,938           111,981            ‐                          

PGAL Website Development 181,209              181,208              ‐                         ‐                          

HUB/Small Business Program 567,383              567,383              ‐                         ‐                          

 System Architect Furniture Consultant 

11,367                11,367               

‐                            

 Ft. Bend Library Inflation Cost Increase 

‐                          

‐                            

Northline Demolition‐Pizza Hut 226,246              226,246              ‐                          

Police Cars 342,223              341,613              610                    ‐                          

General Repairs & Maintenance 2,079,239           2,079,239           ‐                          

Land Purchase 1,919,729           1,919,729           ‐                          

Amatuer Sports Complex ‐ Willie Gay Hall 2,235,647           2,221,947           13,700              ‐                          

  Total ‐ System ‐ Network 23,122,292$        22,695,226$        427,063$           ‐$                          

Construction Contingency 60$                       ‐$                           ‐$                        60                         

Subtotal Above 252,331,871$      250,107,634$      2,224,176$        60$                      

100.00% 99.12% 0.88% 0.00%

EXPENDITURES NOT IN CONSTRUCTION SCHEDULE

Deferred Maintenance 5,000,000$         5,000,000$         ‐$                        ‐$                         

IT Development 6,448,123           6,448,122           ‐                         ‐                          

GRAND TOTAL 263,779,994$      261,555,756$      2,224,176$        60$                       

100.00% 99.16% 0.84% 0.00%

25

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 32: Fs2013 february

 

Total Budget to 

Date

Total 

Expenditures to 

Date  Encumbrances  Unexpended

Sources:Transferred CIP Funds 20,712,314

Uses:

Central Learning Hub/Science Bldg:

Site Infrastructure Improvements 6,599,554$         179,747$               68,682$                6,351,125$        

NEC ‐ Science Engineering & Technology:

Site Infrastructure Improvements 292,209 98,614 193,595                ‐                         

SEC ‐ Learning Hub:

Site Infrastructure Improvements 1,998,804 696,096                1,302,708             ‐                         

Material Testing 23,368 8,790                    14,578                  ‐                         

System ‐ Network:

IT Infrastructure Capital Projects 7,569,405 7,065,858            468,071                35,476              

Site Infrastructure Improvements 96,600 24,150                  72,450                  ‐                         

 

 Construction Contingency 942,305 ‐                             942,305            

Contingency* 3,190,069           ‐                             3,190,069         

Total Construction Cost 20,712,314$       8,073,254$           2,120,084$           10,518,976$     

Anticipated Budget Shortfall/Surplus ‐                          

*All of these funds, except for the Coningency of $3,190,069, arose from Maintenance Tax Notes which are intended

 for infrastructure and maintenance and repairs (capital‐related). The unexpended balance of $10,518,976 can be 

 used throughout the district.

26

HOUSTON COMMUNITY COLLEGE SYSTEMResidual CIP Funds

as of  2/28/13

Page 33: Fs2013 february

Total Budget 

to Date

Total 

Revenues /  

Expenditures 

To Date

Encumbrances To 

Date Unexpended

Sources of funds:

Proceeds from 

2006 Tax Maintenance Notes 12,000,000$   

Discount (88,756)            

Bond Issuance Cost (256,244)          

Interest Income 835,363           

Funds Available 12,490,363$  

Uses of funds:

Site Infrastructure 341,092$          327,728$          13,364$                 ‐$                     

Project Management 450,479            450,479            ‐                              ‐                       

Construction 8,805,292         8,805,292         ‐                              ‐                       

Design Phase 1,117,820         1,117,820         ‐                              ‐                       

Architecture 17,822              17,822              ‐                       

Material Testing & Inspection 6,399                6,399                ‐                              ‐                       

Land/Demolition 420,541            420,541            ‐                              ‐                       

Survey 9,473                9,473                ‐                              ‐                       

Construction‐Maintenance 1,259,003         1,247,114         11,889                   ‐                       

Contingency 62,441              46,700              15,741            

Grand Total Uses 12,490,363$    12,449,368$    25,253$                 15,741$          

Net Available 0$                    

27

HOUSTON COMMUNITY COLLEGEMaintenance Tax Notes 2006 (Central Utility Plant Project)

as of February 28, 2013

 Note: Budgets are adjusted as contracts are awarded; otherwise, budget is preliminary from inception. 

Page 34: Fs2013 february

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Sources:

2008 Maintenance Tax Notes 39,780,489$     

2008 Maintenance Tax Notes‐Phase 1 Infrastructure 15,078,286      

Transferred to CIP Residual Fund (7170) (17,522,242)     

Interest Earned To date 1,678,660        

Funds Available for Projects 39,015,193$     

Uses:

Site Infrastructure Improvements 5,679,383$        5,097,793$       581,590$              ‐$                       

Architectural/Engineering Fees 165,537            151,654           13,883                  ‐                         

IT Infrastructure Master Plan 19,553,388       19,243,543      309,845                ‐                         

Furniture, Fixtures & Equipment 5,043,248         4,572,572        470,676                ‐                         

Material Testing 33,351               29,035              4,316                    ‐                         

Construction 5,437,915         5,425,796        12,119                  ‐                         

Construction Management  132,478            132,478           ‐                             ‐                         

Campus Security 243,116            242,415           600                       101                   

Truck Driving School 99,200               99,200              ‐                             ‐                         

Land 517,306            517,306           ‐                             ‐                         

Energy  Services 8,860                 8,860                ‐                             ‐                         

Design GEOTECH 5,189                 5,189                ‐                             ‐                         

Surveying 16,310               16,310              ‐                             ‐                         

Contracted Services 2,079,239         2,079,239        ‐                             ‐                         

Residual Funds for Completion of CIP Projects 673                    ‐                        ‐                             673                   

Total  39,015,193$      37,621,390$    1,393,029$           774$                  

Bond Issuance Cost:

Bond counsel fees 63,500$            

Underwriters' discount 342,526           

Insurance premium 498,600           

Financial advisory fee 95,105              

Rating agencies fees 47,100              

Printing costs 9,617                

CPA consent letter fee 463                   

Total 1,056,912$       

HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds

as of February 28, 2013

Fund 7203 

Fund 7203 ‐ Maintenance Tax Notes

28

Page 35: Fs2013 february

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Source:

2008 Senior Lien Bonds:

Southeast Workforce Project 14,300,000$     

  Emergency Preparedness 1,000,000        

Interest Earned To date 470,511           

Funds Available for Projects 15,770,511$     

Uses:

Operation and Maintenance 77,034               77,034              ‐                    

Major Repairs and Renovation 821,560            820,726           834                       ‐                    

South East Work Force Project 3,712,405         3,444,075        268,330                ‐                    

Land  Purchase (Rosalie Property) 2,314,967         2,314,967        ‐                        ‐                    

Material Engineering and Testing 8,380                 4802 3,578                    ‐                    

Construction of Workforce Building 7,262,398         7,060,129        202,249                20                     

Residual Funds for All Projects 1,573,767         ‐                    ‐                        1,573,767        

15,770,511$      13,721,733$    474,991$              1,573,787$       

Bond Issuance Cost:

Bond counsel fees 123,267$          

Underwriters' discount 336,128           

Insurance premium 620,827           

Financial advisory fee 100,981           

Rating agencies fees 51,750              

Printing costs 5,880                

Paying agent fee 460                   

Verification fee 5,000                

Escrow agent fee 4,600                

1,248,893$       

29

Fund 7308 ‐ Senior Lien Bonds

HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds

Fund 7308as of February 28, 2013

Page 36: Fs2013 february

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Central 

San Jacinto Memorial 21,391,231$      8,829,282        4,147,979            8,413,970$       

J.B. Whitely Bldg.  4,540,000         1,131,568        990,133                2,418,299        

Theater One 1,699,500         216,728           ‐                             1,482,772        

Staff Instructional Services 1,005,286         188,955           14,884                  801,447           

Curriculum Innovation Center 190,000            36,586              105,678                47,736              

Fine Arts Parking Structure 190,000            171,082           5,100                    13,818              

Crawford Annex 68,200               18,138              ‐                             50,062              

Learning Hub/Science Bldg. 122,214            119,753           2,461                    ‐                         

Planned Parenthood Renovation 1,608,769         1,605,024        3,746                    ‐                         

  Total Central  30,815,200$      12,317,115$     5,269,981$           13,228,104$     

Northeast 

Automotive Tech. Training Ctr. 4,000,000$        630,213$          198,676$              3,171,111$       

Pinemont  66,558               39,237              ‐                             27,321              

Codwell Hall  438,000            328,338           102,837                6,826                

Codwell Hall Shower (Temp) 150,000            ‐                        150,000           

Roland Smith Truck Driving Ctr.  140,000            54,406              ‐                             85,594              

Northline 120,000            11,636              2,789                    105,575           

Public Safety Institute 115,000            11,668              89,483                  13,849              

NE Science and Tech. Bldg 49,500               ‐                        49,500              

NE Learning Hub 47,500               6,309                ‐                             41,191              

  Total Northeast 5,126,558$        1,081,806$       393,785$              3,650,967$       

Southeast 

Angela Morales 599,000$           538,595$          24,883$                 35,521$            

Office City 38,500               ‐                        ‐                             38,500              

  Total Southeast 637,500$           538,595$          24,883$                 74,021$            

Southwest

Stafford Campus (7 Bldgs) 4,257,843$        4,020,106$       237,736$              ‐$                       

Scarcella Center 911,919            436,635           8,633                    466,651           

Alief 138,680            132,664           ‐                             6,016                

Academic Ctr Sienna Plantation 93,500               89,294              4,102                    104                   

Stafford Learning Hub 54,000               ‐                        54,000              

Applied Technology Center 50,000               1,715                ‐                             48,285              

Greenbriar Annex 30,000               22,033              414                       7,553                

  Total Southwest 5,535,942$        4,702,448$       250,885$              582,609$          

System

System Building  2,368,630$        2,081,931$       286,699$              ‐$                       

Teaching Enhancement Renovations 2,737,135         1,074,963        196,310                1,465,862        

Surface Parking & Civil Infrastructure 2,400,000         1,585,705        31,308                  782,987           

Parking Structure 2,394,235         2,286,034        108,201$              ‐                         

  Total System 9,900,000$        7,028,632$       622,518$              2,248,849$       

Grand Total 52,015,200$      25,668,596$    6,562,051$           19,784,550$     

HOUSTON COMMUNITY COLLEGE SYSTEM2010 Maintenance Tax Notes

as of February 28, 2013

30

Page 37: Fs2013 february

 

Total Budget to 

Date

Total 

Revenues /  

Expenditures 

To Date

 Encumbrances 

To Date  Unexpended

Sources:

2011 Maintenance Tax Notes 40,000,000

Uses:

San Jacinto College Renovation

Constuction 35,000,000$       4,118,976$     30,881,024$      ‐$                       

Architect & Engineering ‐                       ‐                         

Site Infrastructure Improvements ‐                       ‐                         

Inspection ‐                         

IT Infrastructure ‐                       ‐                         

Furniture ‐                       ‐                         

Contingency 5,000,000           5,000,000          

40,000,000$       4,118,976      30,881,024       5,000,000          

31

HOUSTON COMMUNITY COLLEGE SYSTEM2011 Maintenance Tax Notes: Fund 7207

As of  February 28, 2013

Page 38: Fs2013 february

  Total Budget to Date

Total Revenues /  

Expenditures To 

Date

 Encumbrances To 

Date  Unexpended

Sources:

2011A Maintenance Tax Notes 21,000,000

Uses:Alief ‐ Hayes Road 5,224,725$                 5,224,725$               

Architect & Engineering 1,208,820                   778,029                 430,791                     ‐                                  Constuction 7,413,661                   470,200                 6,943,461                  ‐                                  Site Infrastructure Improvements 6,402                           6,402                     ‐                                   ‐                                  Material Testing 21,647                         ‐                              21,647                      IT Infrastructure ‐                                    ‐                              ‐                                   ‐                                  Inspection 122,800                       ‐                              122,800                     ‐                                  Furniture 1,945                           ‐                              1,945                           ‐                                  

14,000,000$               1,254,631             7,520,643                  5,224,725                 

NE ‐ North ForestArchitect & Engineering 126,060                       ‐                              126,060                     ‐                                  Constuction ‐                              ‐                                   ‐                                  Site Infrastructure Improvements ‐                              ‐                                   ‐                                  IT Infrastructure ‐                              ‐                                   ‐                                  Furniture ‐                              ‐                                   ‐                                  

126,060 ‐                              126,060                     ‐                                 

SW ‐ West Loop 3,263,739 3,263,739                 Architect & Engineering 13,000                         ‐                              13,000                       ‐                                  Constuction 397,405                       332,368                 65,037                       ‐                                  Site Infrastructure Improvements ‐                                    ‐                              ‐                                   ‐                                  IT Infrastructure ‐                                    ‐                              ‐                                   ‐                                  Furniture ‐                                    ‐                              ‐                                   ‐                                  Painting 139,631                       ‐                              139,631                     ‐                                  

3,813,775 332,368                 217,668                     3,263,739                 

SW ‐ Alief BissonnetArchitect & Engineering 186,225                       ‐                              186,225                     ‐                                  Constuction ‐                                    ‐                              ‐                                   ‐                                  Site Infrastructure Improvements ‐                                    ‐                              ‐                                   ‐                                  IT Infrastructure ‐                                    ‐                              ‐                                   ‐                                  Furniture ‐                                    ‐                              ‐                                   ‐                                  

186,225 ‐                              186,225                     ‐                                 

SE ‐ Workforce BldgArchitect & Engineering 96,720                         18,944                   77,776                       ‐                                  Constuction ‐                              ‐                                   ‐                                  Site Infrastructure Improvements ‐                              ‐                                   ‐                                  IT Infrastructure ‐                              ‐                                   ‐                                  Furniture ‐                              ‐                                   ‐                                  

96,720 18,944                   77,776                       ‐                                 

3100 Main System BldgArchitect & Engineering 10,000 ‐                              10,000                       ‐                                  Constuction 361,491 24,897                   336,594                     ‐                                  Site Infrastructure Improvements 0 ‐                              ‐                                   ‐                                  IT Infrastructure 0 ‐                              ‐                                   ‐                                  Furniture 79,483 ‐                              79,483                       ‐                                  Painting 11,597 10,437                   1,160                           ‐                                  

462,571 35,334                   427,237                     ‐                                 

Contingency 2,314,649 2,314,649                 

Total Construction Cost 21,000,000$                1,641,278$             8,555,610$                 10,803,113$             

32

HOUSTON COMMUNITY COLLEGE SYSTEM2011A Maintenance Tax Notes: Fund 7208

As of  February 28, 2013

Page 39: Fs2013 february

Description Date Issued

 Original Bond 

Amount

Principal 

Payments

Principal 

Balance

Principal & 

Interest FY12

Final Due 

Date Call Dates

Foot‐

note

2005 Senior Lien Revenue/Refunding Bonds 04/15/05 51,285,000 (13,540,000) 37,745,000 6,676,363 04/15/20 04/15/15 (A)

2006 Junior Lien Revenue/Refunding Bonds 11/01/06 72,815,000 (15,360,000) 57,455,000 6,274,230 04/15/30 04/15/16 (A)  (B)

2008 Senior Lien Revenue Bonds 05/14/08 54,540,000 (6,115,000) 48,425,000 4,075,100 04/15/30 04/15/18 (A)

2010 Senior Lien Revenue Bonds 07/29/10 27,250,000 (875,000)           26,375,000 2,124,275 04/15/31 04/15/20 (A) 

2011 Junior Lien Revenue Refunding Bonds 03/10/11 33,940,000 (2,350,000)       31,590,000 4,150,431 04/15/25 04/15/21 (A)

2011T Senior Lien Revenue Bond 11/15/11 16,000,000 16,000,000 388,800           04/15/21 11/15/13 (A)

2003 Limited Tax Bonds 12/01/03 144,155,000 (143,700,000) 455,000 782,175 02/15/14 (C)

2011 Limited Tax Refunding Bonds 10/20/11 109,490,000 109,490,000 5,308,300 02/15/28 02/15/21 (C)

2006 Maintenance Tax Notes 02/01/06 12,000,000 (3,165,000) 8,835,000 890,550 02/15/26 02/15/16 (C)

2008 Maintenance Tax Notes 03/01/08 54,975,000 (9,825,000) 45,150,000 4,171,426 02/15/28 02/15/18 (C)

2009 Maintenance Tax Notes 09/01/09 13,830,000 (2,200,000) 11,630,000 1,242,569 02/15/25 02/15/19 (C)

2010 Maintenance Tax Notes 07/29/10 47,645,000 (3,720,000)       43,925,000 3,998,400        02/15/29 02/15/20 (C)

2011 Maintenance Tax Notes 03/10/11 41,560,000 (2,645,000)       38,915,000 3,293,775 02/15/31 02/15/21 (C) 

2011A Maintenance Tax Notes 10/12/11 19,590,000 (670,000)           18,920,000 1,583,875 02/15/31 02/15/21 (C) 

PFC Series 2005A Lease Revenue Bonds 06/01/05 11,605,000 (2,485,000) 9,120,000 837,663 04/15/28 04/15/15 (A)

PFC Series 2005C Lease Revenue Bonds 12/01/05 19,155,000 (3,155,000) 16,000,000 1,313,456 04/15/30 04/15/15 (A)

PFC Series 2006 Lease Revenue Bonds 10/01/06 36,950,000 (5,135,000) 31,815,000 2,484,773 04/15/31 04/15/16 (A)  (D)

PFC Series 2007 Lease Revenue Bonds 02/01/07 58,885,000 (6,285,000) 52,600,000 4,321,500 04/15/31 04/15/17 (A) 825,670,000 (221,225,000) 604,445,000 53,917,660

Note: This schedule represents all bonds and maintenance tax notes with outstanding principal balances as of 2/28/13; 

             previously retired debt issues are not shown (i.e. 1997, 1998, 1999, 2001, 2001A, 2003 LTD, 2005 LTD)

Footnotes:

(A)  Funded from current operations, Fund 1110

(B)  Approximately $3.4 MM annually through 8/31/17 to be funded from student technology fees, Fund 8110; remainder from 

       current operations

(C)  Funded from real estate taxes, Fund 8300

(D) $1,329,772 of interest expense to be funded from real estate taxes

Schedule of Bonds and Maintenance Tax Notes

For the Month Ended February 28, 2013

Houston Community College

33

Page 40: Fs2013 february

3101‐3100 Main 

Leasing

**3102‐

Conference 

Training Center3103‐HCC‐TV 

Auxiliary

3105‐HCCS ‐ PFC 

Leasing **3110‐Auxiliary

3111‐ Auxiliary 

Student Services

3201‐Cafe Club 

NEO 3100 Main

3202‐Fitness 

Center‐Central

3204‐Heinen 

Theater

3207‐

International 

Initiatives

3208‐Saudi 

Consulting 

Services 3209‐Qatar Subtotal

Fund Balance 8/31/12 16,575,935$       (744,125)$         36,165$          898,968$           (6,225,160)$       (724,173)$           (1,362,924)$       (76,298)$           33,917               (82,495)               203,712             807,349        9,340,870        

FY2013 Revenue  2,685,776               69,754                   ‐                           12,255                   1,320,563               330                          222,807                   7,825                     10,603                   23,333                     ‐                              3,609,784        7,963,029            

 Salaries  120,133                   52                           243,497                   116,028                   128,977                   597                         640                         4,000                       2,873,599        3,487,522            

 Benefits  32,079                     4                             56,284                     24,625                     29,651                     3                             463,573           606,220               

 Supplies Gen Exp  13,817                     14,266                   556,018                   5,023                       3,790                     1,638                     4,390                       3,420                602,362               

 Travel  27,392                     6,047                       3,084                       10,393             46,916                 

 Marketing Costs  ‐                            

 Rental & Leases  1,337                     22,240                     640                          24,217                 

 Contract Services  684,902                   483,042                   1,450                     116,160           1,285,553            

 Utilities  167,260                   167,260               

 Departmental Expenses  2,750                       2,763,791               270                         6,647                2,773,458            

 Instructional & Other Materials  600                          4,033                       2,454                       1,291                     2,817                       11,196                 

 Maintenance & Repair  55                             96,888                     660                         97,604                 

 Indirect Cost Expenditures  ‐                            

 Exemptions and Waivers  738                          150                          888                       

 Capital Outlay  349,643                   349,643               

 Transfer  ‐                                ‐                            

 Total Expense  1,371,184               15,660                  ‐                           ‐                              4,157,090               146,700                  263,634                  4,389                     5,950                     14,441                     ‐                              3,473,792       9,452,839           

Contribution to Fund Balance 1,314,592           54,095              ‐                       12,255               (2,836,527)          (146,370)             (40,827)               3,436                 4,653                 8,892                  ‐                         135,992        (1,489,809)      

17,890,527         (690,030)           36,165            911,223             (9,061,687)          (870,543)             (1,403,751)          (72,862)             38,570               (73,603)               203,712             943,340        7,851,061        

*Restricted by limitations; must comply with laws, statues and regulations.

**Common Area Expense

34

HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund

as of February 28, 2013

Auxiliary Funds*

Net Fund Balance 

Page 41: Fs2013 february

HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund

as of February 28, 2013

3110‐ Student 

Vending 

Commission

3111‐Auxiliary 

Student 

Activities

3112‐Auxiliary 

Student Athletic 

Fee Subtotal Grand Total

Fund Balance 8/31/12 227,335            594,123          1,584,968         2,406,426           11,747,296        

FY2013 Revenue  45,639                   935,298              702,697                 1,683,633               9,646,662          

 Salaries  5,830                     9,700                  103,235                 118,765                   3,606,287          

 Benefits  39                        22,517                   22,556                     628,775             

 Supplies Gen Exp  20,338                   302,525              174,601                 497,464                   1,099,827          

 Travel  3,779                     17,021                44,069                   64,868                     111,784             

 Marketing Costs  ‐                                ‐                          

 Rental & Leases  ‐                                24,217               

 Contract Services  16,199                41,034                   57,233                     1,342,786          

 Utilities  ‐                                167,260             

 Departmental 

Expenses 

7,084                     3,022                  8,480                     18,586                     2,792,044          

 Instructional & 

Other Materials 

‐                                11,196               

 Maintenance & 

Repair 

‐                                97,604               

 Indirect Cost 

Expenditures 

‐                                ‐                          

 Exemptions and 

Waivers 

9,379                     10,775                20,154                     21,042               

 Capital Outlay  ‐                                349,643             

 Transfer  ‐                                ‐                          

 Total Expense  46,410                  359,281              393,935                 799,626                  10,252,465            

Contribution to Fund Balance (771)                  576,016          308,762             884,007              (605,803)            

226,564            1,170,140       1,893,729         3,290,433           11,141,493        

*Funds can only be used for services related to students

35

Net Fund Balance 

Student Auxiliary Funds ‐ Restricted*

Page 42: Fs2013 february

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total AwardProgram Title Period Number Expenditures Amount Amount** Ends Starts

U. S. Department of Education

Direct Programs:

Higher Education ‐ Institutional Aid 5 yrs. 84.031A 54,719               450,183            1,542,133         9/30/2014 10/1/2009

TRIO ‐ Student Support Services 5 yrs. 84.042 173,277            436,682            2,065,270         8/31/2015 9/1/2010

TRIO ‐ Upward Bound ‐ Southeast 4 yrs. 84.047 1,399                 16,669               1,172,562         ^   8/31/2012 9/1/2007

TRIO ‐ Upward Bound ‐ Southeast 5 yrs. 84.047 129,037            291,335            1,465,615          8/31/2017 9/1/2012

TRIO ‐ Upward Bound ‐ Central 5 yrs. 84.047A 221,259            410,055            2,845,845         5/31/2017 6/1/2012

Astra Stem Grant 3 yrs. 84.120A 48,160               293,375            881,873            9/30/2014 10/1/2011

Vast Academy TPSID 5 yrs. 84.407A 208,306            862,617            2,498,250         9/30/2015 10/1/2010

Pass‐Through From:

Texas Educational Agency

Adult Education ‐ State Grant Program 1 yr. 84.002 2,479,585         5,503,121         5,542,104         6/30/2013 7/1/2012

Adult Education ‐ State Grant Program 1 yr. 84.002 43,479               96,974               102,000            6/30/2013 7/1/2012

University of St. Thomas

Higher Education ‐ Institutional Aid 5 yrs. 84.031C 247,361            870,174            3,243,025         9/30/2016 10/1/2011

 Texas Higher Education Coordinating Board 

Vocational Education ‐ Basic Grants to States 1 yr. 84.048 222,764            1,171,019         1,171,019         8/31/2013 9/1/2012

College Access Challenge Grant Program 1 yr. 4 mos. 84.378A 15,000               26,707               208,548            8/13/2012 4/6/2011

College Access Challenge Grant Program 1 yr.  84.378A 68,249               169,803            171,798            8/13/2013 8/14/2012

Total Department of Education 3,912,594$        10,598,715$      22,910,042$     

U.S. Department of Agriculture

Direct Programs:

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 9,053                 36,414               298,538            ^   8/31/2013 8/1/2009

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 5,355                 26,428               244,000            ^   8/14/2013 8/15/2010

    Hispanic Serving Institutions Education Grants 2 yrs. 10.223 46,664               135,610            445,000            ^   8/31/2013 9/1/2010

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 55,896               202,726            245,000            8/31/2013 9/1/2011

Pass‐Through From:

Texas A & M University‐Corpus Christi 2 yrs 10.223 9,642                 30,435               48,700               ^   8/31/2013 9/1/2010

Total Department of Agriculture 126,609$           431,613$           1,281,238$       

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

36

HOUSTON COMMUNITY COLLEGE

as of February 28, 2013

Date Grant

Schedule of Federal Awards *

FY12 ‐ 13

Page 43: Fs2013 february

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total Award

Program Title Period Number Expenditures Amount Amount** Ends Starts

U.S. Department of Housing and Urban Development

Direct Programs:

Pass‐Through From:

Child Care Council of Greater Hous. Inc

Community Development Block Grant‐Entitlement Grant 1 yr 14.218 10,787               17,309               32,000               ^12/31/12 8/1/2011

Total Department of Housing And Urban Development 10,787$             17,309$             32,000$            

Department of Labor

DOL‐Logistics Technician Training 3yrs. 69,975$             159,097            327,404            6/30/2013 7/1/2010

Pass‐Through From:

Texas Workforce Commission

Recovery ‐ WIA Dislocated Worker Formula Grant 1 yr. 17 10,261 61,804 243,163 9/30/2012 7/1/2011

Total Department of Labor 80,237$             220,901$           570,567$          

Department of State

Pass‐Through From:

Northern Virginia Community College 1 yr 19 50,658               73,538               109,830            5/31/2013 3/8/2012

Total Department of State 50,658$             73,538$             109,830$          

National Science Foundation

Direct Programs:

 Education and Human Resources 4 yrs. 47.076 48,502               64,204               423,300            ^5/31/2013 2/15/2009

Pass‐Through From:

University of Houston System

Education and Human Resources 5 yrs. 47.076 12,100               47,212               190,000            8/31/2013 9/1/2011

Total National Science Foundation 60,602$             111,415$           613,300$          

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

Date Grant

FY12 ‐ 13

37

as of February 28, 2013

HOUSTON COMMUNITY COLLEGE

Schedule of Federal Awards *

Page 44: Fs2013 february

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total Award

Program Title Period Number Expenditures Amount Amount** Ends Starts

U. S. Department of Energy

Energy Sector Grant (SECO) 8 mos 81.041 37,180               63,836 460,480 ^  9/30/2012 5/10/2010

Solar Energy Technical Program 13 mos 81.087 106,382 591,069            750,000            12/30/14 11/1/2012

Pass Through From:

City of San Antonio 4.5 mos. 81.117

Energy Efficiency & Rene Energy Info Dissen Outrea,Train,&Tech Analy/Assist 14,897 15,000               15,000               02/14/13 9/1/2012

Total U. S. Department of Energy 158,459$           669,905$           1,225,480$       

U. S. Department of Health and Human Services

Direct Programs:

Head Start 5 yrs. 93.600 15,022 34,617               936,660            9/29/2013 9/30/2008

Head Start 5 yrs. 93.600 66,891 187,332            936,660            9/29/2013 9/30/2008

Pass‐Through From:

Texas Education Agency

Temporary Assistance for Needy Families 1 yr. 93.558 10,178               10,200               208,614            8/31/2012 9/1/2011

Temporary Assistance for Needy Families 1 yr. 93.558 109,170            244,749            244,749            8/31/2013 9/1/2012

YMCA of Greater Houston

Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 19,869               82,578               374,938            9/30/2012 10/1/2011

Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 124,215            342,105            342,105            9/30/2013 10/1/2012

Pitt Community College

Health Information Tech Professionals 2 yrs. 93.721 187,364            461,664            1,287,568         4/1/2013 4/2/2010

University of Texas at Austin

Block Grants for Prevention and Treatment of Substance Abus 1 yr. 93.959 ‐                           9,015                 22,000               9/29/2012 9/30/2011

Total Department of Health and Human Services 532,709$           1,372,259$        4,353,294$       

U. S. Department of Homeland Security

Direct Programs:

 Homeland Security 2 yrs. 97.062 11,468               58,856               250,000            ^12/31/12 9/1/2010

Total Department of Homeland Security 11,468$             58,856$             250,000$          

Total  Federal Financial Assistance 4,944,122$        13,554,511$      31,345,751$     

* Scholarship grants are not included in this schedule.

**Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

HOUSTON COMMUNITY COLLEGE

Schedule of Federal Awards *

as of February 28, 2013

FY12 ‐ 13

38

Date Grant

Page 45: Fs2013 february

Perform‐

ance Total Budget Total Award

Program Title ‐ State Grantor Period Expenditures Amount Amount** Ends Starts

Texas Education Agency

Adult Education 1 yr. 24,615$             24,615$             1,165,635$        8/31/2012 9/1/2011

Adult Education 1 yr. 658,218            1,292,271         1,165,635         8/31/2013 9/1/2012

Drop‐Out Recovery Program 18mos 960                     43,998               194,000            2/28/2013 8/1/2011

Drop‐Out Recovery Performance Pay 1 yr. 33,342               181,784            181,784            until expended 6/1/2011

Temporary Assistance for Needy Families 1 yr. 16,311               16,869               111,445            8/31/2012 9/1/2011

    Temporary Assistance for Needy Families 1 yr. 50,253               131,283            131,283            8/31/2013 9/1/2012

       Total Texas Education Agency 783,699$           1,690,821$        2,949,782$       

Texas Higher Education Coordinating Board

Adult Basic Education Innovation Grant 1 yr. 97,771$             158,314            500,000            8/31/2013 9/1/2012

Collegiate G‐Force Mentorship 1 yr. 1,365                 27,148               50,000               8/31/2013 9/1/2009

First Year Experience 13 mos. 5,577                 8,709                 50,000               until expended 7/18/2011

Nursing Shortage Reduction Program 4 yrs. 2,844                 112,280            157,314            8/31/2014 9/1/2010

Nursing Shortage Under 70 Program 1 yr. 51,733               383,891            383,891            8/31/2013 9/1/2012

Rider 58 ATCP School Grant 8 1/2 mos. ‐                           13,960               46,360               until expended 12/18/2009

Pass‐Through From:

University of Tex Health Science Center

Navigator Grant 1 yr. 30,410               51,452               129,195            ^11/30/2012 6/1/2011

       Total Texas Higher Education Coordinating Board 189,699$           755,754$           1,316,760$       

Texas Workforce Commission

Skills Development ‐ Skills for Small Business Initiatives 1 yr. 410                     18,791               20,000               5/31/2013 6/1/2012

The Methodist 14 mos. 188,001            902,965            902,965            10/31/2013 8/20/2012

Pass‐Through From:

       Total Texas Workforce Commission 188,410$           921,756$           922,965$          

Total State Financial Assistance 1,161,808$        3,368,330$        5,189,507$       

* Scholarship grants are not included in this schedule.**Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

Date Grant

as of February 28, 2013

Schedule of State Awards *

FY12 ‐ 13

39

HOUSTON COMMUNITY COLLEGE

Page 46: Fs2013 february

Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts

Achieving the Dream ‐ Intiative 1 yr.‐cont. ‐                           9,433                 20,000               until expended 12/1/2009

Achieving the Dream ‐ Gates Foundation 3 yrs. 195,658            262,135            743,000            ^12/31/2012 7/1/2009

Adult Education/We Can Work 1 yr. ‐                           ‐                         11,500               until expended 1/1/2010

American Chemical Society 8 mos 138                     248                    500                    until expended 9/1/2011

AT&T High School Success Grant 1 yr. 7 mos. ‐                           25,216               35,000               until expended 1/31/2010

Bank of America  2 yrs. ‐                           316                    50,000               until expended 5/1/2008

Baylor Summer Interns 1 yr. ‐                      1,638                 60,000               until expended 5/1/2010

Brown Foundation 1 yr.‐cont. ‐                      ‐                         100,000            until expended 2/1/2008

Bulletproof Vest Partnership Program 1 yr.‐cont. ‐                      ‐                         5,345                 until expended 9/1/2004

Capital Idea project 1 yr. 56,855               73,794               341,000            until expended 8/1/2010

Carnegie FDTN 1 yr 13,099               30,901               67,500               12/31/2012 1/1/2012

Citibank ‐ College Connection Program 1 yr. ‐                      20,475               41,718               until expended 8/15/2007

Civic Ventures 1 yr. 1 mo. 1,233                 1,246                 25,000               until expended 7/1/2010

Dow Male Minority Initiative Summer Prog. 1 yr. ‐                      12,588               23,986               1/2/2013 1/2/2012

Early College High School (Southeast) ‐ Gates/Dell 5 yrs. ‐                           6,779                 400,000            until expended 6/10/2005

Financial Empowerment Strat. Student Success 2 yrs. 2,111                 60,808               63,050               12/31/2013 1/1/2012

Goldman Sachs Grant ‐ Phase I 5 yrs. 615,307            1,955,011         1,955,011         5/31/2016 1/3/2011

Gulf Coast Pass 3 yrs. 53,441               602,625            1,175,000         12/31/2014 1/1/2012

Hammill FDTN ‐ Veterans Grants 2 yrs. ‐                           11                      18,191               until expended 9/1/2010

Houston Endowment Grant 3 yrs. ‐                           814                    267,000            until expended 11/16/2005

Houston Pathways Initiative 2 yrs. 38,369               345,471            1,580,000         8/31/2013 3/26/2009

Interlocal Metro (PSI) 10 yrs. ‐                           45,000               200,000            8/23/2017 8/23/2008

Interlocal Stafford ‐ City of Stafford 1 yr. 32,000               161,986            161,986            until expended 10/1/2010

KBR Veterans Orientation 1 yr.‐cont. ‐                           5,540                 19,685               until expended 9/1/2008

Kresge Fdtn‐Coordinator/Evaluation 1 yr. 29,686               17,221               82,450               until expended 9/1/2011

Kresge Fdtn‐Parent Academy 1 yr. 34,024               40,254               89,320               until expended 9/1/2011

Kresge Fdtn‐Veterans Grant 1 yr. 48,789               136,698            136,698            until expended 9/1/2011

MDRC ‐ Learning Community Demonstration Grant ‐ Northeast 4 yrs. ‐                           26,495               60,233               until expended 11/1/2007

MDRC ‐ Learning Community Demonstration Grant ‐ Southeast 4 yrs. ‐                           738                    75,000               until expended 11/1/2007

MDRC ‐ Learning Community Demonstration Grant ‐ Central 4 yrs. ‐                           385                    33,000               until expended 11/1/2007

Metlife Caregiving for Older Americans 1 yr.‐cont. ‐                           18,012               23,855               until expended 7/1/2007

Microsoft Elevate America 1 yr. 3,033                 31,985               34,969               3/20/2013 3/20/2012

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

FY12 ‐ 13

40

HOUSTON COMMUNITY COLLEGE

Schedule of Local Government and Private Awards *

as of February 28, 2013

Page 47: Fs2013 february

Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts

Mobile Go Center ‐ Valero 1 yr.‐cont. ‐                           494                    7,293                 until expended 9/1/2007

National Articulation & Transfer Network Council(NATN) 1 yr.‐cont. ‐                           29,273               29,273               until expended 4/1/2005

North Forest GED Preparation 3 mos 330                     6,799                 25,000               until expended 10/1/2011

St. Luke's Episcopal Health Charities Immunization Fellowship 2 yrs. ‐                           4,178                 142,650            until expended 9/10/2008

Susan B Komen Breast Cancer Initiative 1 yr. ‐                           6,610                 123,230            until expended 4/1/2010

Texas Pioneer Foundation Grant 1 yr. 466                     2,851                 23,117               12/31/2012 1/26/2012

Vast Job Developer 1 yr. 4,249                 20,299               94,898               until expended 11/1/2009

Verizon Foundation Grant 1 yr. ‐                           510                    12,510               until expended 1/1/2010

Walmart ‐ Minority Male Initiative 1 yr. ‐                           25,215               40,000               until expended 9/1/2009

Washington Mutual 1 yr.‐cont. ‐                           16,717               31,700               until expended 9/1/2006Total Private Financial Assistance 1,128,787$        4,006,769$        8,429,669$       

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

41

         HOUSTON COMMUNITY COLLEGE ‐ Schedule of Local Government and Private Awards *

Schedule of Local Government and Private Awards * continued

as of February 28, 2013

FY12 ‐ 13

Page 48: Fs2013 february

CHANCELLOR

10       

DEPUTY CHANCELLOR

New Postions

Katherine McCabe

Repl Norma Jackson‐Hired Internal

New Position‐Budger 11‐12‐Hired Internal

Security Officer

Police Department

Security Officer

Peace Officer

FebDelphine Campbell

Hector Silva Police Department

Repl Willie Williams‐Hired Internal

Oct

Sep

Police Department Corporal Repl Timothy Ramirez‐Hired Internal

Repl Willie Rostan‐Hired External Oct

Repl Anthony Maxie‐Hired Internal

Repl Alice Binkley‐Hired Internal

Security Officer

Maria Alarcon

VC, Administrative Special Projects

Sep

Police Department Corporal New Position‐Budger 11‐12‐Hired Internal Sep

Police Department

Shirley Voisin

Repl Victor Fisher‐Hired External

Police Department

Police Department

Police Department

Tobin Anderson

Navidad Martinez

Sep

Corporal

Oct

Business Services

Corporal

NewPosition‐Internal 7       

Repl Grayland Jones‐Hired External

Replacement‐InternalChancellor Replacement‐External

Patricia Thompson

Sr. Buyer New Position‐Budget 12‐13‐Hired External

Interim Chief HR Officer

Repl Tasharra Pickens‐Hired Internal

Repl Majid Iqbal‐Hired External

Student Financial Svs

New Position‐Budger 12‐13‐Hired External

Police Department Security Officer

New Position‐Budger 12‐13‐Hired External

Procurement Sr. Buyer

Accounts Payable

NovNew Position‐Budget 12‐13‐Hired External

Sr. Buyer Repl Shiela Perla‐Hired External

Edwin Johnson Police Department

Jan

My'Keshia Robinson

Ules Harris

Victor Camargo

Bapakaye Tamuno

Executive Secretary

Police Department

Oct

Jeremy Hardeway

Security Officer Repl Kenneth Bridges‐Hired External

Oct

Police Trianee

Nov

Procurement

Sr. Buyer

Buyer New Position‐Budget 12‐13‐Hired External

Leagal Assistant

Thomas Richardson

Kerry Doucette

Reginald Harmon

Alfred Kessellie, II

Feb

Freddy Conde

Mimi Lemmons

1        NewPosition‐External‐         1       

Nov

Nov

Buyer

Procurement

New Position‐Budget 12‐13‐Hired External

Nov

Procurement

Houston College Community

2012‐2013 Positions

Employee Name Department Month

SepBarlett Sheinberg Resource & Economic Dev

Procurement

Sharon Flowers General Counsel

CommentsJob Title

Nov

Nov

Wanda Pleasant New Position‐Budget 12‐13‐Hired External

Michael Schurwon Procurement Jan

Supvervisor

Procurement

New Position‐Budget 12‐13‐Hired External

Procurement

New Position‐Budget 12‐13‐Hired External

Supvervisor New Position‐Budget 12‐13‐Hired External

Interim Dir., Resource & Economic Dev New Position‐Budget 12‐13‐Hired Internal

William Thomson Student Financial Svs Accountant II

New Position‐Budget 12‐13‐Hired Internal

Karen Edwards

New Position‐Budger 12‐13‐Hired External Nov

Inventory Control Supervisor

JanHuman Resources

Repl Juanita Mei‐Hired External

Nov

HR‐Compensation

Deputy Chancellor

James Lindsey

Jan

Nov

Human Resources

Accounting Specialist

Nov

Business Affairs

New Position‐Budger 12‐13‐Hired External

Aracelia Saucedo

OctPolice Department

Repl John Chen‐Hired External‐TempManager

New Position‐Budget 12‐13‐Hired Internal Feb

Oct

Interim 1          

FebRepl Tobin Anderson‐Hired External

Accountant II

Police Trianee

Antonio Hill

Oct

Nov

Police Department

Willie Williams

HR‐Payroll Payroll Support Specialist

Shirley Parish

New Position‐Hired Internal

Keith Harris

Interim HRIS Manager

Police Trianee

Brittany Kaighen

42

Page 49: Fs2013 february

DEPUTY CHANCELLOR continued

29       

VICE CHANCELLOR INSTRUCTION

11       

VICE CHANCELLOR STUDENT SUCCESS

13       

New Postions

‐         ‐           3       

Tamara Jones

NewPosition‐Internal

International Student

Replacement‐ExternalReplacement‐Internal

Business Affairs

Feb

Police Department Lieutenant New Position‐Budget 10‐11‐Hired External

AVC, Economic Dev & Entrep. Initiatives New Position‐Budget 12‐13‐Hired Internal

Accounting Specialist

Feb

Broadcasting  Media Videographer

Economic Dev & Entrep

Repl Polly Cooper‐Hired Internal Feb

Economic Development

Community Relations

New Position‐Budget 12‐13‐Hired External‐Temp

FebAlobidey Mohammed

Lesa Spivey Dir, Community Relations & Small Bus. Dev

Jonathan Brook

Repl Joseph Smith‐Hired External

Feb

Ricardo Solis

Oct

Admissions

DSO/Advisor

Oct

Registrar

Nov

James Heironimus Police In‐Service

Distance Education Advisor New Position‐Budget 12‐13‐Hired External

Insternational Student

DOEL English Language Skills Instructor

Repl Deshaunta Stewart‐Hired Internal

Jan

Feb

Sep     

New Position‐Hired External

New Position‐Budget 12‐13‐Hired Internal‐Temp

Oct

Student Records Specialist

Registrar

VC Instr

Maya Durnovo

Interim 2          Deputy Chancell

Student Information Svcs Advisor Repl Laura Collins‐Hired External Sep     

New Position‐Budget 12‐13‐Hired Internal

Online Student Services

New Position‐Budget 12‐13‐Hired Internal

NewPosition‐Internal

Instructional Designer

New Position‐Budget 12‐13‐Hired External

Registrar

Transcript Evaluator

Opeerations of CTCE

Henry Thomas

Oct

Transcript Evaluator

8       

Repl Shantay Grays‐Hired External

5       

New Position‐Budget 12‐13‐Hired External

New Position‐Budget 12‐13‐Hired Internal

Shante Kelley

Exec. Dir of Economic Development

New Position‐Hired External

Paul Donaldson

Touhid Chowdhury

7       

New Position‐Budget 12‐13‐Hired External

Replacement‐Internal

Ashley Martin

Jesse Shelton

Distance Education

Feb

Mona Terrell Registrar

Gabrielle Kay

Outreach & Student Dev

Dec

Transcript Evaluator

New Position‐Budget 12‐13‐Hired Internal

Workforce Initiatives Program Manager

Financial Aid Associate Feb

New Position‐Budget 12‐13‐Hired External

Nov

New Position‐Hired External

Instructor

Anamaria Lopez

Student Information Representative

Oct

VCSS

Jan

International Student

Clairta Duron Student Information Svcs

NewPosition‐External

New Position‐Hired External

Nov

Replacement‐External

Instructional

7       

Kimberly Davis Oct

Advisor

New Position‐Hired External

7       

Instructional Designer

Advisor

Leila Abdullahi

New Position‐Budget 12‐13‐Hired External

Jan

Recording Imaging Nov

Interim ‐           

Leslie Dye

Randi Sprouse

Jan

Dec

‐        

Patricia Hernandez Academic Resource Dev Secretary II

Marion Davis Business Dvlp&Outreach

TLR

Student Recruiter Repl Scott Godley‐Hired External

Larke Clishe

Replacement‐Internal

Manuel Ramos

Repl Shanetta Burke‐Hired Internal

Nov

Scott Godley

Transcript Evaluator

Replacement‐External 2       

2        NewPosition‐External 6       

NewPosition‐Internal NewPosition‐External2       

Israel Salazar

Feb

Thomas Tynan Continuing Education Director Program Construction Repl Fred Woolridge‐Hired External Feb

New Position‐Budget 12‐13‐Hired Internal

Dir., Outreach & Student Development

Interim

VA/Student Support Svcs Advisor New Position‐Budget 12‐13‐Hired Internal

JanRepl Helen McMillan‐Hired External‐Temp

Liliana Silva

Kevin Lacey

DSO/Advisor

43

Houston College Community

2012‐2013 Positions

Employee Name Department Job Title Comments Month

Page 50: Fs2013 february

VICE CHANCELLOR INFORMATION TECHNOLOGY

3         

CENTRAL

10       

NORTHWEST

New Postions

Student Services

Repl Kinaya Palmer‐Hired InternalSaqueena Sutton

Isabel Zamora

Library

Feb

‐        

Erica Hubbard

NewPosition‐External

Jan

James Connery

Repl Stella Villarreal‐Hired External‐Temp

Instructor

FebCounseling Counselor

Jan

Student Services

1       

Sep 

Cashier II

Paul Brady

Anthony Hilliard

Central NewPosition‐Internal NewPosition‐External 1       

Christine Moore

Instructor

Director of Public Relations

Student Services Interim Dean of Student Dev

Student Services

Financial Aid Associate

Sep 

Anika Chowdhury

Repl Nellie Bradley‐Hired Internal‐Temp

Accounting

New Position‐Budget 12‐13‐Hired Internal

Sep 

Replacement‐Internal 2       

Community Outreach CoordinatorCOO

Sep 

Replacement‐External

Biology

JanLibrarian Repl Marcia Braun‐Hired Internal

Jason Wilson

Library Assistant I Repl Marion Kennedy‐Hired External

Katie Herod

Interim1       

VAST

‐           

Instructor

VCIT

Child Care specialist II

Oct

Nov

Oct

ADA Counselor

Replacement‐Internal

Dora Whiteside

Repl Denny Smith‐Hired ExternalSonya Sneed

Senta Eastern

Library

Repl David Lin‐Hired Internal

Repl Johnny Watson‐Hired External‐Temp

Repl Frank Colmenero‐Hired External

Sep

Replacement‐External

Repl Cheryl Johnson‐Hired Internal

Oct

System Analyst

Administrative Services Director, Administrative Services

Financial Aid Associate

Testing AssociateInstruction‐Testing

Student Recruiter

Public Relations

Oct

Instructor

New Position‐Budget 12‐13‐Hired External

Sandra Brooks Enrollment Service Assistant Repl Makeba Brown‐Hired External‐Temp

Sherhonda Le

Laleh Golestani

InstructorEngineering

Hardware/Software Technician

Student Services

Oct

Nov

Public Relations

Enrollment Service Assistant

Courtney Martinez

Lusinda Eshelman

Advisor

Nov

Repl Maria Dabrowski‐Hired Enternal

Repl Dora Whiteside‐Hired External

Financial Aid

Repl Kimberly Crocker Montgomery‐Hire External‐Temp

Oct

Senior Advisor Oct

Student Life Coordinator

Student Services

Repl Diane Wilborn‐Hired External

Instructor

1       

Senior Advisor

Repl Rima Adil‐Hired External‐Temp

Sep 

Repl Joaquin Torres‐Hired External‐Temp

Nellie Bradley

System Support

Repl Carlana Brooks‐Hired External‐Temp

Fine Arts

Application Dev

Admissions

1          

Child Care

Feb

Rodney Sam

Sep

Jan

Brigid Wilson

Technician Services

Bieu Nguyen

Student Services

NewPosition‐Internal

Repl Celia Gee‐Hired External

Eva Foster English

Student Services New Position‐Budget 12‐13‐Hired InternalGoddrick Austin

Repl Samuel sannl‐Hired External

Repl Bonnie Gallup‐Hired External‐Temp

Repl Laura Wilborn‐Hired External

Nov

Sep 

Oct

New Position‐Budget 12‐13‐Hired Internal

Nov

Thomas Tankersley

Bharat Sutaria

‐        

Sherin Isaac

Month

COO

New Position‐Hired External

6       

Comments

Construction

Oct

Repl Mallikarjun Shintri‐Hired External‐Temp Oct

Interim

Instructor

Steven Cohan

Rima Adil

Repl Manhal Chbat‐Hired External‐Temp

Wanda Taft

Sr. Network Analyst New Position‐Hired Internal‐Temp

44

Houston College Community

2012‐2013 Positions

Employee Name Department Job Title

Page 51: Fs2013 february

NORTHWEST continued

28       

NORTHEAST

19       

SOUTHWEST

New Postions

Repl Maya Durnovo‐Hired Internal Feb

New Position‐Budget 12‐13‐Hired Internal

Student Services Advisor New Position‐Budget 12‐13‐Hired External Jan

Walter Oduk Technician Services Hardware/Software Technician Repl Joseph Ogbechie‐Hired External Jan

Gina Calderone Philosophy Instructor

Robert Harris

Jaime Flores Student Services

Student Development Interim Associate Dean, Student Dev Repl Maria Cisneros‐Hired External Feb

Repl Thomas UrbanHired External‐Temp Jan

Deborah Adesokan Counseling Advisor Repl Christine Battle Moore‐Hired External‐Temp Jan

Evelyn Velasquez Workforce Development Interim Dean, Workforce

Olivia Blake COO 

Contrice Kendall Student Services Advisor New Position‐Budget 12‐13‐Hired Internal

Fidel Simmons

Nov

Repl James Bishop‐Hire External‐Temp

Nov

English

Repl Adriana Jimenez‐Hired External

Advisor

Houston College Community

2012‐2013 Positions

Employee Name Department Job Title Comments Month

Replacement‐Internal InterimReplacement‐External

Nov

Repl Lois Avery‐Hired External

Student Services

New Position‐Budget 12‐13‐Hired External

Instructor

Petroleum Engineering

Counseling

Khansaa Almansor

Secretary II

18     NewPosition‐Internal

Repl Barbara Smith‐Hired Internal

Corey Aeck Advisor

3       

Replacement‐Internal Replacement‐External4       

Student Services Oct

Feb

Advising Manager

Repl Lesley Savoy Green‐Hired External

Petroleum Engineering

Instructor

Technology

‐           

New Position‐Budget 12‐13‐Hired External

Oct

11     NewPosition‐Internal ‐           

Sep

Testing Testing Assistant/Proctor

1       

New Position‐Budget 12‐13‐Hired Internal

Interim3       NewPosition‐External

Academic Instructor Repl Adballah Cherif‐Hired External‐TempLorraine Donovan

Student Dev/Advising Senior Advisor

COO

Instructor

Repl Bridgette Bauman‐Hired External

Leroy Chevalier Manager Weekend/Evening

Betty Keller

Repl John Jagdish‐Hired External‐Temp

Office Manager

Advisor Repl Ana Canek‐Hired Internal

Cybele Ayaquica

Feb

FebCounselor

FebNew Position‐Budget 12‐13‐Hired External

Hoang Nguyen

Nov

Sep

Process Technology

Instructor Repl Nicky Haddock‐Hired External Sep

Repl Pratap Talusani‐Hired External

Student Services

Student Services

Technology

Instructional

Eva Foster Instructor

Sep

3       

Repl Keffus Falls‐Hired External‐Temp

Randall Murphy

Instructor Repl Homer Stewart‐Hired External

Student Services

Kelli Caraway

NORTHEAST

Francis Pollo

Ayesha Farr

Farrish Betton

Shawket Alnakkash

Secretary II

Feb

Sazar Ali

Instructor Repl Martin See‐Hired External

Psychology Repl Tamara LeDuc‐Hired External

Jan

COO

Feb

Dec

Sep

Instructor Feb

Northwest

New Position‐Budget 12‐13‐Hired Internal

Jan

Sep

Sep

David Jones

Instructor

SepIfeanyi Oramulu

Hosein Tahvillian Electronic Engineering

Ronald Dewlen

Instructor Repl Homer Stewart‐Hired External‐Temp

Retention Specialist Repl Joseph Willis‐Hired Internal

Lesley Savoy‐Green Enrollment Services AssociateStudent Services Repl Alonia Whitmore‐Hired Internal

Automotive

NewPosition‐External 4       

Dean Instruction

Gregory Dock

William Nicholson

Nov

Oct

New Position‐Budget 12‐13‐Hired Internal

Nicki Norman

Electronic Engineering

45

Page 52: Fs2013 february

SOUTHWEST continued

25       

SOUTHEAST

4         

COLEMAN

New Postions

New Position‐Budget 12‐13‐Hired Internal

Repl Margie Ricks‐Hired External‐Temp

Nov

New Position‐Budget 12‐13‐Hired Internal

Campus Service Technician

English

A/V Technician

Senior Advisor

Computer Science

Public Relations

Repl Margo Reece‐Hired External‐Temp

Repl Paul Roberts‐Hired External‐Temp

Student Dev/Advising

Digital Communication Instructor

Director, Public Relations

Nov

Student Development

Student Services

Nov

Nov

Jan

Student Dev/Advising Advisor

Digital Communication

Instructor

New Position‐Budget 12‐13‐Hired External

Student Dev/Advising

Student Dev/Advising

Senior Advisor

Counselor

Repl Hoang Minh Thi Nguyen‐Hired Internal

Nov

Advisor

Jan

Nov

Advisor

Senior Advisor

Repl Ian Mayer‐Hired External‐Temp

Jan

Instructor

Enrollment Service Assistant

A/V Technician New Position‐Budget 12‐13‐Hired External Feb

Repl Kelli Caraway‐Hired Internal

Financial Aid Associate

Interim

New Position‐Hired External

Student Life Coordinator

Oct

Dec

Repl Lloyd Schuh‐Hired External

Repl Bill Hord‐Hired External

Repl Margo Reece‐Hired ExternalInstructor

Feb

JanNew Position‐Budget 12‐13‐Hired External

Oct

Jan

Student Development

Student Development

4        6       NewPosition‐External

COO

13     NewPosition‐Internal

Johanne Huber Digital Communication Instructor

‐           2       

Jan

Secretary II Repl Dipal Parekh‐Hired External‐Temp

COO

Librarian

Repl Ngoc Tien Nguyen‐Hired External

Repl Pearlie Watts‐Hired External

Repl Seymour Tatar‐Hired External

Feb

Library

Feb

‐        

Instructor

Interim ‐           

Vocaitonal Nursing

Replacement‐External NewPosition‐Internal

Vocaitonal Nursing

New Position‐Budget 12‐13‐Hired Internal

NewPosition‐External4       

Instructor

Caroline Couto‐Ortiz

Charmaine Lewinson‐Evans

Repl Verlicia Pope‐Hired External

Student Services

‐        Replacement‐Internal

Repl Sharon McCowan‐Hired External

Health Science SepNew Position‐Budget 12‐13‐Hired ExternalDental Hygiene Operations Assistant

Simulation Center

Sep

Sep

Advisor

Natural Sciences

SepChlinical Simulation Lab Technician

‐        

Financial Aid

Christy Muniz

New Position‐Budget 12‐13‐Hired External Feb

Replacement‐ExternalReplacement‐Internal

Repl Tara Webb‐Hired External

Oct

Lliya Lliev

Ashley Martin

Ansonia Jones

LaTrista Funchez Student Services

Drafting & Design  Instructor

Secretary II

Repl Vivian Flores‐Hired External

Nov

Nancy Garcia

Oct

Zhiqin Jiang

Ramiro Monsivais Castorena

David Stacy

Nicol Alexander

Gholam Pahlavan

Emilio Mendoza

Sabiha Mir

Todd Duplantis

Wendy Allen

Oct

Instructor

Digital Communication

Lucille Gore

Oct

Nov

Lanny Kwan

Christine Moore

Brandi Gaza

Dashiel Geyen

Aketa Guillory

Wendy Robbins

Counseling

Repl Belinda Defalco‐Hired Internal

Physical Science Instructor Repl Abdallah Cherif‐Hired Internal

Digital Communication

Jan

New Position‐Budget 12‐13‐Hired External

New Position‐Budget 12‐13‐Hired External

Repl Martha Barrera‐Hired External

Advisor

Micalyn Flagg

Juanna Shin

Wendy Robbins

Jose Cruz COO

Ashley Nichols

Daniel Guzman

Southeast

Southwest

Houston College Community

2012‐2013 Positions

Employee Name Department Job Title Comments Month

46

Page 53: Fs2013 february

COLEMAN continued

12        

EXTENDED LEARNING, DIVISION OF‐          

Adm. Totals Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 66       

College Totals Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 98       

Grand Total Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 164     

Over all Total

New Postions

Repl Linda Williams‐Hired External‐Temp

Vocaitonal Nursing Instructor

Enrollment Service Associate Repl Rory Gupta‐Hired External

New Position‐Budget 12‐13‐Hired External‐Temp

NovVocaitonal Nursing

Advisor

Repl Roxine Simms‐Hired External‐Temp Nov

Health Science

Repl Carmen Gentry‐Hired Internal

Instructor

Instructor

Counselor, Disability Services

Jan

Student Services

Student Services

Student Services

Student Services

Jan

2       

Nov

John Smith  Jan

Feb

Repl Maria Reyes‐Hired External

Repl Independencia Delacruz‐Hired External

Learning Success Coordinator

Jan

Carmela Blackshear

Veronica Mckissic

Jason Smith

Repl Lorenzo Walker‐Hired Internal

Student Services

Hope Pamplin

Virginia Otieno

David Pereida

Advisor

164  

59    

Replacement‐InternalColeman

15    

‐         Replacement‐External

3          8       

Interim ‐           7       

Ex. Learning

2       

Replacement‐Internal

Replacement‐External

23     74     18     43     4          

16     1          

NewPosition‐Internal 1        NewPosition‐External

‐         NewPosition‐Internal ‐         NewPosition‐External ‐         Interim ‐           

15     7       

11     27    

Rita Callahan

Houston College Community

2012‐2013 Positions

Employee Name Department Job Title Comments Month

47

Page 54: Fs2013 february

HOUSTON COMMUNITY COLLEGEFTE Comparison Year‐To‐Date Thru February 28, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 1,361    1,514    1,534    1,487    828       1,480   

2011‐2012 1,451    1,582    1,598    1,564    823       1,530    1,573    1,598    1,576    1,003    1,098    955      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 1,401    1,426    1,449    1,351    1,438    1,456   

2011‐2012 1,429    1,415    1,425    1,327    1,407    1,429    1,396    1,404    1,410    1,397    1,391    1,429   

F

T

E

F

T

E

48

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

 1,600

 1,800

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

 1,600

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 55: Fs2013 february

CENTRAL COLLEGEFTE Comparison Year‐To‐Date Thru February 28, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 238       270       272       270       153       256      

2011‐2012 254       293       296       293       159       279       298       300       291       184       204       178      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 155       159       164       145       161       164      

2011‐2012 161       158       165       145       155       163       157       157       158       156       154       161      

49

F

T

E

F

T

E

 ‐

 50

 100

 150

 200

 250

 300

 350

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 56: Fs2013 february

COLEMAN COLLEGEFTE Comparison Year‐To‐Date Thru February 28, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 108       107       113       110       78          106      

2011‐2012 115       112       113       109       82          109       107       110       110       99          98          84         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 56          55          55          52          58          58         

2011‐2012 58          58          59          55          56          58          55          55          57          54          54          55         

F

T

E

F

T

E

50

 ‐

 20

 40

 60

 80

 100

 120

 140

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 10

 20

 30

 40

 50

 60

 70

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 57: Fs2013 february

NORTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru February 28, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 281       310       310       306       156       306      

2011‐2012 267       292       293       307       155       323       330       334       335       198       224       190      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 131       135       143       125       142       145      

2011‐2012 104       106       108       108       129       138       122       129       130       132       131       138      

F

T

E

F

T

E

51

 ‐

 50

 100

 150

 200

 250

 300

 350

 400

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 58: Fs2013 february

NORTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru February 28, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 187       208       212       205       119       199      

2011‐2012 200       211       216       207       112       204       212       212       211       129       137       124      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 126       125       128       118       124       128      

2011‐2012 127       126       128       118       121       128       124       127       126       126       126       128      

F

T

E

F

T

E

52

 ‐

 50

 100

 150

 200

 250

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 59: Fs2013 february

SOUTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru February 28, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 318       385       375       370       187       364      

2011‐2012 380       433       435       422       183       377       382       386       382       229       252       217      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 152       154       161       142       154       163      

2011‐2012 185       184       182       145       146       155       144       150       152       151       147       153      

53

F

T

E

F

T

E

 ‐

 50

 100

 150

 200

 250

 300

 350

 400

 450

 500

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 60: Fs2013 february

SOUTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru February 28, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 130       160       164       163       74          158      

2011‐2012 143       168       173       169       77          161       178       183       179       101       120       95         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 96          103       104       95          102       105      

2011‐2012 99          96          97          86          94          98          91          95          96          99          96          101      

F

T

E

F

T

E

54

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 61: Fs2013 february

Division of Extended Learning (DOEL)FTE Comparison Year‐To‐Date Thru February 28, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 90          67          79          57          58          73         

2011‐2012 85          69          68          56          55          72          63          67          64          59          57          64         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 79          81          81          76          80          86         

2011‐2012 78          79          79          75          79          80          77          79          79          79          78          81         

F

T

E

F

T

E

55

 ‐

 10

 20

 30

 40

 50

 60

 70

 80

 90

 100

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 10

 20

 30

 40

 50

 60

 70

 80

 90

 100

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 62: Fs2013 february

DISTRICTFTE Comparison Year‐To‐Date Thru February 28, 2013 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 8            7            8            5            3            9           

2011‐2012 7            4            4            1            ‐             5            4            5            3            4            4            3           

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 606       612       614       598       617       609      

2011‐2012 616       609       608       595       627       609       625       612       614       601       605       612      

F

T

E

F

T

E

56

 ‐

 1

 2

 3

 4

 5

 6

 7

 8

 9

 10

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 100

 200

 300

 400

 500

 600

 700

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 63: Fs2013 february

HOUSTON COMMUNITY COLLEGEDuplicated Headcount Comparison Year‐To‐Date Thru February 28, 2013 by Type

FACULTY HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 FT 787       795       795       797       794       796      

12‐13 PT 1,992    2,361    2,491    2,224    409       2,207   

12‐13 Total Fac 2,779    3,156    3,286    3,021    1,203    3,003    ‐             ‐             ‐             ‐             ‐             ‐            

11‐12 FT 792       797       793       788       793       785       784       782       783       768       757       794      

11‐12 PT 1,911    2,334    2,390    2,331    275       2,387    2,391    2,351    2,367    1,075    1,372    679      

11‐12 Total Fac 2,703    3,131    3,183    3,119    1,068    3,172    3,175    3,133    3,150    1,843    2,129    1,473   

STAFF HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 FT 1,238    1,250    1,264    1,260    1,263    1,279   

12‐13 PT 840       833       851       842       703       801      

12‐13 Total Staff 2,078    2,083    2,115    2,102    1,966    2,080    ‐             ‐             ‐             ‐             ‐             ‐            

11‐12 FT 1,256    1,256    1,238    1,235    1,253    1,242    1,249    1,235    1,240    1,201    1,240    1,250   

11‐12 PT 877       879       883       839       629       822       834       828       846       767       790       790      

11‐12 Total Staff 2,133    2,135    2,121    2,074    1,882    2,064    2,083    2,063    2,086    1,968    2,030    2,040   

57

 

S

t

a

f

f

 

Headcount

 

F

a

c

u

l

t

y

Headcount

 ‐

 500

 1,000

 1,500

 2,000

 2,500

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 64: Fs2013 february

HOUSTON COMMUNITY COLLEGEUnduplicated* Headcount Comparison Year‐To‐Date Thru February 28, 2013 by Type

UNDUPLICATED HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 Total  4,475    4,446    4,551    4,726    3,085    4,629   

11‐12 Total  4,543    4,902    4,917    4,833    2,891    4,728    4,814    4,805    4,806    3,373    3,575    3,303   

* Includes Full‐time and Part‐time Faculties, Librarians, Counselors, and Staffs 

58

Unduplicated* Headcount

 ‐

 500

 1,000

 1,500

 2,000

 2,500

 3,000

 3,500

 4,000

 4,500

 5,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 65: Fs2013 february

Non‐current assets:

Restricted cash 6,807$                  

Restricted investment in trust accounts 2,243,782

Lease receivable from HCCS 172,194,009        

Deferred charges ‐ bond issuance costs 2,046,534            

Capital Assets:

Land ‐                         

Other Structures ‐                         

Furniture & equipment ‐                         

Leasehold improvements ‐                         

Construction in process 911,290            

911,290                

TOTAL ASSETS 177,402,421$      

Current liabilities:

Accounts payable ‐ HCC 144,304$             

Accounts payable ‐                             

Accrued liabilities ‐ interest ‐                             

Current bond payable 3,880,000            

Total current liabilities 4,024,304$          

Non‐current liabilities:

Deposits 440                       

Arbitrage payable ‐                             

Unearned interest income (23 years) ‐ HCC 70,298,500          

Premium on bonds 2,209,548            

Bonds payable 105,655,000        

Total non‐current liabilities 178,163,488$      

TOTAL LIABILITIES 182,187,792        

TOTAL NET ASSETS ‐ restricted (4,785,371)$         

PFC 1

Houston Community College ‐ Public Facility CorporationStatement of Net Assets

Cash Basis ‐ Interim Period

as of February 28, 2013

ASSETS

LIABILITIES

Page 66: Fs2013 february

Cash Flows from Capital Financing Activities

Receipt from HCCS for lease payment 2,538,004$     

Purchases of capital assets (871,057)          

Payment on capital debt ‐ principal and interest (2,538,696)      

Net cash provided (used by) in financing activities (871,749)          

Cash Flows from Investing Activities

  Interest income 1,626

Increase (decrease) in restricted cash and 

restricted investment in trust accounts (870,123)          

Restricted cash and restricted investment in 

trust accounts ‐ beginning of year 3,120,712        

Restricted cash and restricted investment in 

trust accounts ‐ end of period 2,250,589$     

Houston Community College System Public Facility CorporationStatement of Cash Flows

Cash Basis ‐ Interim Period

Six Month Ended as of February 28, 2013

PFC 2

Page 67: Fs2013 february

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Proceeds from 

2005C Lease Revenue Bond 19,155,000$   

Discount (170,064)        Land Purchase (4,212,644)    Bond Issuance Cost (606,201)        Interest Expense (524,785)        

13,641,306$  Interest Income 1,003,713      Vendor Contract Refund 102,706         Transfer to Payment Account (1,354,990)    

Funds Available 13,392,735$  

Uses of funds:4,092$             4,092$             ‐$ ‐$                   

11,550,643    11,550,643    ‐                      ‐                    Maintenance 393,940          171,324          222,616         ‐                    

6,443              6,443              ‐                    563,928          563,928          ‐                    

7,200              7,200              ‐                      ‐                    27,403            26,326            1,077              ‐                    24,940            24,940            ‐                    44,695            44,695            ‐                      ‐                    

596,787          596,787          ‐                      ‐                    

172,664            8,100                164,564         

Grand Total Uses 13,392,735$   13,004,478$   223,693$        164,564$     

Net Available ‐$                     

  PFC requires GMP before inception.

Total Proceeds from Bond

Houston Community College ‐ Public Facility CorporationPublic Safety Instituteas of February 28, 2013

PFC 3

Bank Service ChargesConstruction

Waste Water Management *Geo Technical Services*

Survey*Architect

Engineering ServicesFFE

Contingency

 * Included in GMP 

Site Infrasturcture

Page 68: Fs2013 february

Total Budget to 

Date

Total Revenues 

/  Expenditures 

to Date

Encumbrances    

to Date Unexpended

Sources of funds:

Proceeds from 

 2005 A Bonds  11,605,000$   

 Premium Received             492,931 

 Accrued Interest Received               53,425 

 Interest Income                    998 

 Bond Issuance Costs           (391,474)

 Repayment of Loans     (11,392,147)

Funds Available 368,733$        

Uses of funds:

Debt Service 53,425$            53,425$          ‐$                        ‐$                       

Renovation & Construction  169,759            169,759          ‐                          ‐                         

Demolish & Renovate Office 56,244              56,244            ‐                          ‐                         

Furniture & Fixtures 46,857              46,857            ‐                          ‐                         

Legal Fees 42,448              42,448            ‐                         

Grand Total Uses 368,733$         368,733$       ‐$                        ‐$                      

Net Available ‐$                     

Note 1: PFC requires GMP before inception.

Houston Community College ‐ Public Facility CorporationWestgate (Katy)

as of February 28, 2013

PFC 4

Page 69: Fs2013 february

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Principal Amount on Bonds 36,950,000$   

Discount on Bonds (546,238)          

Underwriter's Discount (209,273)

Accrued Interest on Bonds 98,080             

Amount Available 36,292,569$   

Issuance Costs (490,131)          

 Accrued and Capitalized Interest (1,449,023)      

Repair and Replacement (1,000,000)      

Title Fees Capitalized (81,379)            

Amount Available for Project 33,272,036$   

Repayment to HCC (188,006)          

Project Account Balance 33,084,030$   

Administrative & Legal Fees (29,486)            

Interest Income 836,615           

Transfer Cost Issuance 85,509             

Interest Expense on Notes (135,299)          

Funds Available 33,841,369$  

Uses of funds:

Land & Building 17,807,972$    17,807,972$    ‐$                     ‐$                

Maintenance Rehabilitation & 

Deferred Maintenance

12,856,469      12,856,469      ‐                  

CPMS PGAL 211,959            211,959            ‐                  

Facilities Space Programming 214,620            214,620            ‐                  

Furniture, Fixtures & Equipment 1,040,112         1,006,277         14,273            19,562       

Site Infrastructure 971,369            854,984            4,859               111,526     

Architect and Engineering 517,509            428,355            4,632               84,522       

Repair & Maintenance Contingency   ‐ 

per bond requirement

221,359            83,089              2,000               136,270     

Grand Total Uses 33,841,369$   33,463,726$   25,764$          351,880$  

Net Available ‐$                     

  PFC requires GMP before inception.

Houston Community College ‐ Public Facility CorporationHayes Road ‐ Alief Project

as of February 28, 2013

PFC 5

Page 70: Fs2013 february

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Principal Amount of 2007 Series Bonds 58,885,000$   

Premium on Bonds 3,094,498        

Underwriter's Discount (346,244)          

Accrued Interest Income‐ Bonds 173,733           

Total Amount Available 61,806,987$   

Issuance Cost (839,837)          

Accrued  and Capitalized Interest (4,632,122)      

Repair and Maintenance Account ‐                        

Amount Available for Project 56,335,028$   

Interest Income on Trust Account 2,498,635        

Interest Expense on Notes (414,601)          

Transfer to Trustee Payment Account (4,715,080)      

Vendor Contract Refunds 230,035           

Sale of Land 569,890           

Funds Available 54,503,907$  

Uses of funds:

Land & Building 10,671,234$    10,671,234$    ‐$                     ‐$                    

Construction Cost‐ Building 18,200,000      18,200,000      ‐                       ‐                      

Construction‐Demolition 494,972            ‐                         ‐                       494,972         

Constuction‐ Site 640,988            636,957            4,030              ‐                      

Site Improvement 14,221,039      13,888,128      332,911          ‐                      

Site Demolition & Abatement 791,298            791,298            ‐                      

CPMS PGAL 1,391,958         1,391,958         ‐                       ‐                      

Site and Infrastructure Design 2,334,840         2,334,840         ‐                       ‐                      

Facilities Space Programming 29,274              29,274              ‐                       ‐                      

Architect and Engineering 1,256,727         1,256,727         ‐                      

Furniture, Fixtures & Equipment 1,828,332         1,818,281         10,051            ‐                      

Library 66,564              66,182              382                 ‐                      

Inspections 214,981            214,981            ‐                       ‐                      

Design Geotech 17,500              17,500              ‐                       ‐                      

Material Testing  24,503              24,503              ‐                       ‐                      

Communications IT‐ PGAL 253,614            253,614            ‐                      

IT Telephone & Communications 790,467            790,467            ‐                      

Surveying  62,398              59,124              3,274              ‐                      

Administrative Expenses 34,505              34,505              ‐                      

Preconstruction Costs 886,377            886,377            ‐                      

Contingency 292,338            186                    ‐                       292,154         

Grand Total Uses 54,503,907$   53,366,135$   350,647$       787,126$     

  PFC requires GMP before inception.

as of February 28, 2013

PFC 6

Houston Community College ‐ Public Facility CorporationNorthline Mall Project