  • BriefingSpeaker: Hsinchu Biomedical Science Park Administration Hsinchu Biomedical Science Park

  • Contents1. Summary of the Planning of the Park2. Introduction to the Design of the Park

  • 1. Summary for the Planning of the Park

  • 1.Origin of the Plan923289262795901Executive YuanThe Plan was approved by Executive Yuan on March 28, 2003Authorized by Science Park Administration, Taiwan University found the Biomedical Science Preparatory Office on June 27, 2003The Biomedical Science Preparatory Office ran by Science Park Administration on Sep. 1, 2006

  • 2.Location & Boundary 33Km away from Chubei City Hall & Hsinchu County Government at Northwestern direction.8About 8Km away from Hsinchu downtown area at Southwestern direction.Science Park Administration OfficeBiomedical Science ParkHSR StationTouqian RiverNational Highway #3

  • (1/7) 3.Land Use Planning78,512m2137,985m225,048m224,870m2Medical Treatment Area #1Medical Treatment Area #2Total Area:Medical Treatment Area #4Medical Treatment Area #3Service Facilities:Public ParkingRoadsLandscapeEnergy CenterEnvironment Protection Facility

  • (2/7) 3.Land Use PlanningMedical Treatment Area #1Medical Treatment Area #2Treatment Complex Area #2Medical & Cancel Treatment CenterResearch CenterEnterprise Medical Treatment CenterHadron CenterHadron Treatment CenterEnterprise Medical Treatment Equipment R&D850 beds HospitalClinical Test & ResearchEnterprise Medical Treatment BuildingsMedical Treatment Equipment R&D

  • (3/7) 3.Land Use PlanningMedical Treatment Area #3Incubation AreaPark Administration CenterInnovative & Creative CenterJoint Research CenterAnimal & Cell Cultivate CenterPrecision Equipment CenterEducation CenterLiving Supply CenterPark Administration BuildingOffice, Meeting Room, LaboratoryCutting Edge Tech. Organization, Laboratory, Mid-size Medical CompanyAnimal & Cell Cultivate FacilityCommon Used Precision Equipment CenterShort-term Study, Human Resource, Outsourcing Research Engineer FacilityFood & Drink, Shopping Center, Entertainment Facility

  • (4/7) 3.Land Use PlanningMedical Treatment Area #3Enterprise AreaMedical Treatment Equipment R&DLocation for the Medical Treatment Equipment R&DBiomedical R&D (Bio-laboratory)Biomedical Research Center Possess Bio-laboratory Biomedical R&D (Tech. Type)Biomedical Research Center not Possess Bio-laboratory Information System (Office Type)General Office

  • (5/7) 3.Land Use PlanningMedical Treatment Area #4Food & Drink FacilityCommon FacilityPublic Facility For the ParkMeeting RoomLibraryHealth CenterBus Parking (B1)Public Facility For the ParkPublic Facility For the ParkPublic Facility For the ParkPublic Service Facility For the Park

  • (6/7) 3.Land Use PlanningService AreaPublic ParkingPlazaRoadLandscapeEnergy centerEnvironment Protection AreaPlanned Plaza AreaPublic Service Facility For the ParkPublic Service Facility For the ParkPublic Service Facility For the ParkPublic Service Facility For the ParkPublic Service Facility For the Park except for the Medical Waste Disposal Treatment FacilityReserved Area for Local Temple

  • (7/7) 3.Land Use PlanningMedical CenterEnergy CenterSite Plan of The ParkEnterprise AreaCentral Green Belt & Parking LotHadron Center

  • (1/4)4.Development Phases(700 )(50%)(50%)2005~20072008~20092010~2012(50%)(50%)(50%)(50%)()(50%) (50%) (50%)(50%)Phase 1Phase 2Phase 3Energy Center 1, Medical Center (700 beds), Research Center(50%), Incubation Center(50$), Public Parking, Plaza, Road, landscape.Energy Center 2, Hadron Center, Enterprise Medical Service Facility(50%), Incubation Center(50%), Other Common Facility(50%).Energy Center 3, Medical Center (Expansion), Research Center(50%), Enterprise Medical Service Facility(50%), Enterprise Area(50%), Other Common Facility(50%).

  • (2/4)4.Development Phases(700 )(50%)(50%)2005~2007Phase 1Energy Center 1, Medical Center (700 beds), Research Center(50%), Incubation Center(50$), Public Parking, Plaza, Road, landscape.

  • (3/4)4.Development Phases2008~2009(50%)(50%)(50%)(50%)Phase 2Energy Center 2, Hadron Center, Enterprise Medical Service Facility(50%), Incubation Center(50%), Other Common Facility(50%).

  • (4/4)4.Development Phases2010~2012()(50%) (50%) (50%)(50%)Phase 3Energy Center 3, Medical Center (Expansion), Research Center(50%), Enterprise Medical Service Facility(50%), Enterprise Area(50%), Other Common Facility(50%).

  • 2. Introduction to the Design of the Park

  • 1. Upper-level Plan

    Plan NameAdministration Dept.Northern Taiwan Area Planning---Construction and Planning AgencyHsinchu Science City Development Plan---Hsinchu County GovernmentHsinchu County Development Plan---Hsinchu County GovernmentHsinchu High Speed Rail Station Designated District Plan---Hsinchu County GovernmentHsinchu Biomedical Science Park Plan---Executive Yuan

  • 2. Road SystemL:2178mW:20mL:122m W:22mL:1009m W:12mMajor Road3 Connection Roads5 Secondary Roads

  • 3. Drainage System GutterNew Drainage TunnelExisting Drainage TunnelNorthSouth

  • 300mm400mm4.Sewage System 2 Water Quality Monitor Stations5 Water Quality Monitor StationsThe waste water is collected into local collection-well. Collection-well is connected to a 300mm Side Pipe. Via North-South 400mm Main Pipe, the water is directed into HSR Sewage System.

  • 5.High Voltage Electricity System Common Pipe Tunnel equips with pipeline-rack for Tai-power electricity cable.Connected into enterprise areaReserved Pipeline area for Tai-powerReserved Pipeline area (322.8KV) for Tai-powerTai-power Pipeline connected (322.8KV)Tai-power Mechanical RoomMain Power StationSecondary Power Station

  • 6.Low Voltage Electricity System Main Power Station supplies the west area requirements. (Street light, pump)Secondary Power Station supplies the east area requirements. (Street light, pump)Main Power StationSecondary Power StationTwo sets of emergency power generators. (Fire Extinguish & Life Supply System) (Allocated in Parking Lot)

  • 7.Street Light SystemSecondary Road: Single-arm street light. Duplex-metal light. Ave. illumination : above 15LuxSingle-arm street lightDouble-arm street lightMain Road: Double-arm street light 250Wx2. Duplex-metal light. Ave. illumination : above 20Lux

  • 121212128.Gas Supply SystemConnected to Gas Pipe100mm main pipe to supply Northern Enterprise Area

  • 9.Fire Hydrant System150mm stainless pipe surrounding the park. Water is supplied from North & South sides.One for each 60-80 MWater Supply Secondary ConnectionWater Supply Secondary Connection

  • 10.Telecommunication SystemReserved Telecommunication Pipes for Enterprise AreaCommon Telecommunication PipesTelecommunication Mechanical RoomConnected to optical fiber

  • 11.Monitoring SystemWater Quality Monitor StationParking Lot Secondary Monitor StationWater Quality Monitor StationData are transferred back to Main Monitor Station via optical Fiber.The Main and Secondary Monitor Station is able to back each other.The Main Monitor Station is located in Administration Center.

  • 12.Water Supply System7137CMD200mm side pipe supplies Enterprise Area and Medical CenterThe capacity of northern water tank shall be more than 6614Main PipeCommon PipeThe capacity of southern water tank shall be more than 6614Connected to main pipe 400 mmWater Supply Capacity: 7137CMD

  • 13.Conserved Water Supply System1365CMDRoof Rain WaterRoof Rain WaterRoof Rain WaterRoof Rain WaterRoof Rain WaterRoof Rain WaterRoof Rain WaterConserved Water Supply Capacity: 1365CMDFor Landscape Use Only.Water Tank200mm side pipe supplies Enterprise Area and Medical CenterCollection-wellCommon Pipe300mm Main Pipe

  • 14. Intensity of Land Use

  • 15. Setback Requirement10 Meters8 Meters6 Meters4 Meters

  • 16. Parking Space()(59 ) 1.5 (59)1.4 ()(59 )()()200 2 0.9 1.5 ()()Car park areas shall be determined according to the following requirements, and shall not be used for other purposes.(1)The number of car park for all areas in the science park except for Medical Treatment Area #1 shall be computed at 1.5 times of the requirements of the Building Technical Regulations (Article 59); The number of car park for all others areas in the science park shall be computed at 1.4 times of the requirements of the Building Technical Regulations. (Article 59)(2)For the same building or same site providing for more than 2 types of usages, the required number of car park shall be the same as the requirements of the Building Technical Regulations. (Article 59) (3)The building shall provide no less than 2% of the number of car park for disabled parking lots (provide at least one parking lot).(4)For the number of motorcycle parking lots, one parking lot shall be allocated for every 200 m of space area. The dimension of motorcycle parking lot shall be more than 2m in length and more than 0.9m in width, and the width of the passageway shall be above 1.5m. (5)The entrance/exit of car park space shall be more than 10m away from the roadside intersection or boundary line, intersection point of corner arc, zebra crossing, overpass bridge or underground passageway. (6)Allocating for more car park space than the regulations shall be carried out according to the Encouraging Regulations for Allocating More Car Park Space in Hsinchu County.