    Acceptance Testing

  • 8/20/2019 fmconfaccptest

    2/117

     Acceptance Testing of FireProtection Systems 101

    • Touch on all types of Fire Sprinkler of systems

    • Fire Pumps and Standpipes

    • Requirements for Acceptance Testing per NFPAand the State Fire arshal

    • !ndustry "argon and #ommon terminology

    • State Rules$ Te%as !nsurance #ode #hapter &00'

    ( )* TA# SS '+,-00

    • !nformation in these slides comes from NFPAStandards 1'. 1+ and )0

  • 8/20/2019 fmconfaccptest

    3/117

    /efining Terms

    • Authority a2ing "urisdiction3

    • 4isted and Appro2ed

    • Shall3 2s, Should3

    • ydrostatic Testing And #o2er 

    •  Add and Relocates 5Remodels6 2s, Ne7System installs

    • ain /rain Test

  • 8/20/2019 fmconfaccptest

    4/117

    • #ontrol 8al2e Testing

    • Tagging Requirements

    • System Type$ 9et. /ry. Preaction

    and /eluge 7ith specific

    differences and required tests for

    each

    • Specific Application System$:SFR. #ontrol ode.

    Residential. /ou;le !nterlock. etc

  • 8/20/2019 fmconfaccptest

    5/117

     Authority a2ing"urisdiction 5A"6

    ',),)< An organi=ation. office orindi2idual responsi;le for

    enforcing the requirements of a

    code or standard. or forappro2ing equipment. materials.

    an installation. or a procedure3

  • 8/20/2019 fmconfaccptest

    6/117

    :%amples>

    • Fire #hief. Fire arshal

    • 4a;or /epartment• ealth /epartment$ T/A/S

    • ?uilding @fficial. :lectrical

    !nspector. Plum;ing !nspector • !nsurance @rgani=ations and their

    Representati2es

    • #ommanding @fficer on ?ase

  • 8/20/2019 fmconfaccptest

    7/117

    essentially

     Anyone 7ith a 2ested interest in the

    system performing as intended

  • 8/20/2019 fmconfaccptest

    8/117

    4isted

    ',),)< :quipment. materials. orser2ices included in a list

    pu;lished ;y an organi=ation

    that is accepta;le to theauthority ha2ing Burisdiction3,

  • 8/20/2019 fmconfaccptest

    9/117

     Appro2ed',),1 Accepta;le to the authority

    ha2ing Burisdiction3

     All materials and methods for

    installation are to conform to#hapter & of NFPA 1'$ )00- or

    the indi2idual product listings

    and appro2als, 9hen in

    dou;t,,

     Appro2ed aterials

  • 8/20/2019 fmconfaccptest

    10/117

    …Make the installingcontractor prove it to

    your satisfaction!!!!• !f it looks incorrect. it pro;a;ly is

    • ?e 7ary of ne7 products. ha2e

    contractor pro2ide cut sheets 7hen in

    dou;t

    • Cood re2ie7 7ith thorough 7alk

    through at hydro at end of Bo;

  • 8/20/2019 fmconfaccptest

    11/117

    • Dour interpretation of the codes

    and standards is to ;e met or

    pro2en incorrect$ codesE

    standards are in 7riting$ notinferred

    • Sometimes corners are cut ;y

    unscrupulous contractors• Some poor installs are mistakes

    or human error3 $ ?T,

  • 8/20/2019 fmconfaccptest

    12/117

    Report repeat

    offenders to theState Fire

    Marshal’s office!!!

  • 8/20/2019 fmconfaccptest

    13/117

    R::?:R

    • Dou are the last line of defense to

    ensure the end user gets 7hat theye%pect and paid forGGG These are

    your customers. you are their e%pertG

    •Poor installs fail annual inspectionsand cost the o7ner money later for

    repairs

  • 8/20/2019 fmconfaccptest

    14/117

    Shall

    ',),+ !ndicates a mandatory

    requirement,3

    Should

    ',),H !ndicates arecommendation or that 7hich

    ad2ised ;ut not required,3

  • 8/20/2019 fmconfaccptest

    15/117

    System Acceptance

    •  Acceptance Testing of systemsis contained in #hapter )+ of

    NFPA 1'$)00- :dition

    •  All required tests are listed. ;utrequired e%tra heads and some

    paper7ork is not,

  • 8/20/2019 fmconfaccptest

    16/117

    ydrostatic Test

    • Section )+,),1$ All piping andattached appurtenances su;Bected

    to system 7orking pressure shall

    ;e hydrostatically tested at )00 psi

    51',* ;ar6 and shall maintain that

    pressure 7ithout loss for t7o

    hours3

  • 8/20/2019 fmconfaccptest

    17/117

    • Section )+,),1,)$ Portions of

    systems normally su;Bected to

    7orking pressures in e%cess of

    1H0 psi 510,+ ;ar6 shall ;etested as descri;ed in )+,),1,1

    at a pressure of H0 psi 5',H ;ar6

    in e%cess of 7orking pressure 

  • 8/20/2019 fmconfaccptest

    18/117

    Things to 7atch at ydro

    • Need to kno7 e%pected pump

    churn pressure and e%pectedsystem 7orking pressure. are

    PR8Is requiredJ

    • ydrostatic test pressure is takenat the ;ottom of the system. not

    the top 5Section )+,),1,*6

  • 8/20/2019 fmconfaccptest

    19/117

    • Kno7 the limits of the materials$

    pressure limitations of fittings and

    sprinkler heads

    • !f there is free=e potential. aninterim pneumatic air test at +0

    psi can ;e conducted for )+

    hours per )+,),), This does notremo2e or replace the

    requirement for a hydrostatic test,

  • 8/20/2019 fmconfaccptest

    20/117

    • This test is referred to as a ydroTest3 or #o2er !nspection3

    •  All systems require this type of

    test$ Sprinkler. Standpipe. Pump• !n ne7 construction the pipe

    should not ;e co2ered up during

    the test•  A procedure for remo2ing test

    ;lanks3 must ;e in place

  • 8/20/2019 fmconfaccptest

    21/117

    • Retrofits are typically co2ered up,These are e%isting ;uildings and not

    all areas are accessi;le, se your

    o7n Budgment,• 9alk systems during the t7o hour

    test. look for leaks, Small leaks are

    not cause for concern,

    • :%cessi2e 7ater leakage and

    pressure drop are cause for failure

    and re$test of system

  • 8/20/2019 fmconfaccptest

    22/117

    ydro Test Procedure

    • #ontractor should ha2e system

    pumped up a;o2e )00 psi or H0a;o2e 7orking pressure. prior to

    your arri2al to remo2e air

    pockets

    • Note Pressure on gauge upon

    arri2al,

    • 9alk system$ look for leaks,

  • 8/20/2019 fmconfaccptest

    23/117

    • 9hile 7alking system. noteareas that are in need of repair

    or changes required in the

    system to installing contractor,•  At end of t7o hour period. note

    pressure 5loss if any6, a2e

    #ontractor drain system to =erothe gauge out in your presence,

  • 8/20/2019 fmconfaccptest

    24/117

    Things to Keep in ind• F/# piping is often o2erlooked$ Needs

    to ;e tested L 1H0psi after repairE

    replacement$ Sec )+,),1,10• Temperature changes affect system

    pressure during hydro,

    • Trapped air in the system takes time toescape. if the system has not ;een

    pumped up for some time then air 7ill

    escape,

  • 8/20/2019 fmconfaccptest

    25/117

     Add and Relocates• )+,),1,+$ odifications affecting

    )0 or fe7er sprinklers shall notrequire testing in e%cess of

    system 7orking pressure3

  • 8/20/2019 fmconfaccptest

    26/117

    • Per Section )+,),1,H$

    odifications a;o2e )0

    sprinklers. isolate the affected

    portion of the system and hydro• Per Section )+,),1,&$

    odifications that cannot ;e

    isolated 5i,e,, Relocated drops6shall not require tested in e%cess

    of system 7orking pressure

  • 8/20/2019 fmconfaccptest

    27/117

    ain /rain Test• )+,),',+,1 The main drain 2al2e

    shall ;e opened and remain open

    until system pressure sta;ili=es3

    • )+,),',+,) The static and residual

    pressures shall ;e recorded on the

    contractorIs material and testcertificate3

    • se the ;ottom gauge

  • 8/20/2019 fmconfaccptest

    28/117

    • @ften o2erlooked

    • Required on State 7hite tags3

    • Pro2ides ;aseline 7ater supply

    test information to measure 7ater

    supply deterioration in

    su;sequent NFPA )H !nspections,

    • This is required on all systems!The importance cannot be

    stressed enough!

  • 8/20/2019 fmconfaccptest

    29/117

    Si=e of main drainsTable "#$%$&'rain Si(e)))))))))

    Riser or Main Si(e Si(e of 'rain

    *onnection

    p to ) in, 'M+ in, or larger 

    )1M) in,. ' in,. '1M) in, 11M+ in, or larger 

    + in, and larger ) in, only

    No test orifices on main drainsGGGG Need fully open

    for ain /rain Test, 4isted Test and drain

    assem;lies are accepta;le if capa;le of full flo7,

  • 8/20/2019 fmconfaccptest

    30/117

    @perational Tests• Referred to as a Final3

    • 9hile performing this test. an

    inspection should ;e performed,

    Things to look for>  4oaded or painted sprinkler heads

      Adequate co2erage of all spaces  issing pieces or incorrect install

      Tamper and flo7 s7itch operation

      Fire Alarm System should ;e on Test3

  • 8/20/2019 fmconfaccptest

    31/117

    9alk the space$ #heckhead co2erage

    • 4ight a=ard

      ))H Sq Ft

      a%, 1HI O 1HI

    • @rdinary a=ard

      1'0 Sq Ft

      a%, 1H ft O *I$*3

  • 8/20/2019 fmconfaccptest

    32/117

    • :%tra a=ard

      100 Sq Ft

      a%, 10I O 10I or 1) O *I$+3

    • Storage. :SFR. #ontrol ode  4ook up each indi2idual section$

    these change often

      Request the sprinkler cut sheet fromthe #ontractor$ these are specific

    application and may ha2e some

    special requirements

  • 8/20/2019 fmconfaccptest

    33/117

    @;structions• /epending on the type of head

    and the o;struction

    • Refer to #hapter * in NFPA 1'$

    I0-,

    •  All types of heads are ;roken

    do7n indi2idually

  • 8/20/2019 fmconfaccptest

    34/117

  • 8/20/2019 fmconfaccptest

    35/117

     Alarm !nitiating /e2ices

  • 8/20/2019 fmconfaccptest

    36/117

    Testing Alarm S7itches• !nspectorIs test connection should

    ha2e at least 1 inch pipe

    connected to a corrosion resistantorifice equal to the si=e of the

    smallest orifice on the system,

    • @pen !T# all the 7ay. alarm shouldsound in less than H minutes

  • 8/20/2019 fmconfaccptest

    37/117

    • !f ;ell goes off too quick. ha2econtractor adBust delay on alarm

    de2ice to account for 7ater hammer

    in city 7ater to a2oid nuisancealarms,

    • :nsure co2er is on 9F s7itch after

    test is performed

    • #all the monitoring company$ 2erify

    signals are correct for the spaceE

    ;ldg

  • 8/20/2019 fmconfaccptest

    38/117

    8al2e Tamper S7itches

  • 8/20/2019 fmconfaccptest

    39/117

    Testing Tamper S7itches

    *,1&,1,1,),1$ 8al2es on

    connections to 7ater supplies.sectional control 2al2es. and

    other 2al2es in supply pipes to

    sprinklers and other fi%ed 7ater;ased fire suppression systems

    shall ;e super2ised ;y one of

    the follo7ing>3

  • 8/20/2019 fmconfaccptest

    40/117

    516#entral station. proprietary. orremote station signaling at a

    constantly attended point

    5)64ocal signaling ser2ice that 7illcause the sounding of an audi;le

    signal at a constantly attended point

    5'68al2es locked in the correct position

    5+68al2es in fenced enclosures underthe o7nerIs control

  • 8/20/2019 fmconfaccptest

    41/117

    Testing Tampers• )+,),',H,1 All control 2al2es

    shall ;e fully closed and opened

    under system 7ater pressure toensure proper operation3

    • #heck the 2al2e operation

    • #heck Tamper operation and

    signal to monitoring company

  • 8/20/2019 fmconfaccptest

    42/117

    )+,),+$ PressureReducing 8al2es

  • 8/20/2019 fmconfaccptest

    43/117

    #ommonisinterpretation

    • PR8Is should ;e a Pressure

    Reducing 8al2e$ +,T Restrictingor Relief 8al2e

    • True PR8Is Reduce pressure under

    ;oth Flo7 and Static #onditions• NFPA 1+$I0- Sec, ',',1&,+

    • NFPA 1'$I0- Sec, *,1&,1,),1

  • 8/20/2019 fmconfaccptest

    44/117

    9here Required• Sprinkler$9hen 7orking pressure

    e%ceeds 1-H psi unless all

    do7nstream components are rated forthe higher pressure

    • Standpipe$For Fire ose 8al2es 7here

    pressure e%ceeds 1-H psi on )$1E)3

    F8Is pressure shall ;e limited to 100

    psi$ 1$1E)3 2al2es can ;e of regulating

    type

  • 8/20/2019 fmconfaccptest

    45/117

  • 8/20/2019 fmconfaccptest

    46/117

    PR8 Requirements$Fire Sprinkler • *,1&,1,),)$ Pressure gauges shall

    ;e on the inlet and outlet sides of

    each pressure reducing 2al2e

    • *,1&,1,),'$ A relief 2al2e of not less

    than 3 shall ;e pro2ided on the

    discharge side set to operate at apressure not e%ceeding 1-H psi,

  • 8/20/2019 fmconfaccptest

    47/117

    • *,1&,1,),+$ A listed indicating2al2e shall ;e pro2ided on the

    inlet side of each PR8. unless the

    PR8 meets the listingrequirements for use as an

    indicating 2al2e,

    •*,1&,1,),H$ eans shall ;epro2ided do7nstream of all PR8Is

    for flo7 tests at sprinkler demand

  • 8/20/2019 fmconfaccptest

    48/117

     Acceptance TestingPR8Is

    • )+,),+,1$ :ach pressure$reducing

    2al2e shall ;e tested uponcompletion of installation to insure

    proper operation under flo7 and no$

    flo7 conditions,

    • )+,),+,)$ Testing shall 2erify de2iceregulates outlet at ma%imum and

    normal conditions

  • 8/20/2019 fmconfaccptest

    49/117

    • )+,),+,'$ The results of the flo7test of each PR8 shall ;e

    recorded on the contractorIs

    material and test certificate• )+,),+,+$ The results shall

    include the static and residual

    inlet pressures. static andresidual outlet pressures and

    the flo7 rate

  • 8/20/2019 fmconfaccptest

    50/117

    •  Ask for PR8 Testing 4ogs to sho7 7ork

    7as completed

    • NFPA 1+$ -,) requires 1$1E)3 hose

    2al2es residual pressure limited to 100psi and )$1E)3 hose 2al2es static and

    residual pressure limited to 100 psi

    7here pressure e%ceeds 1-H psi

    Standpipe ose 8al2ePR8Is$ NFPA 1+$I0-

    11,H,+

  • 8/20/2019 fmconfaccptest

    51/117

    ?ackflo7 Pre2ention

     Assem;lies$*,1-,+,&

    •  A,*,1-,+,&$ 9here ;ackflo7

    pre2ention de2ices are installed.

    they should ;e in an accessi;lelocation to pro2ide ser2ice and

    maintenance

  • 8/20/2019 fmconfaccptest

    52/117

    • *,1-,+,&,1$ eans shall ;e

    pro2ided do7nstream of all

    ;ackflo7 pre2ention 2al2es for

    flo7 tests at system demands•  A,*,1-,+,&,1 descri;es the

    descri;es the methods a2aila;le$

    essentially ensuring the ;ackflo77ill not restrict the system

    demand

  • 8/20/2019 fmconfaccptest

    53/117

    ?ackflo7 Pre2ention Assem;lies

    Section )',1,* references A99A

    1+. Recommended Practice for

    ?ackflo7 Pre2ention and #ross#onnection #ontrol and the pu;lic

    ealth A" requirements

    9here are they RequiredJJJ

  • 8/20/2019 fmconfaccptest

    54/117

    ?ackflo7 Pre2ention Acceptance Testing$

    )+,),H• )+,),H,1$ The ;ackflo7 pre2ention

    assem;ly shall ;e for7ard flo7

    tested to ensure proper operation,

    • )+,),H,)$ The minimum flo7 rateshall ;e the system demand.

    including hose stream

  • 8/20/2019 fmconfaccptest

    55/117

    •  A copy of the state or local test

    report performed ;y a T#:Q

    appro2ed tester should ;e

    attached to the riser 

    •  An appro2ed inspection ;y the

    local ealth A" should ;e

    pro2ided prior to final,

  • 8/20/2019 fmconfaccptest

    56/117

    #irculating #losed 4oop

    Systems

    • These are co2ered in )+,',

    • Requires certification of pressure

    ratings for au%iliary de2ices and proof of

    pressure test in all modes of operation• /ischarge tests to ;e per &,,1$ the fi2e

    minute requirement

  • 8/20/2019 fmconfaccptest

    57/117

    -et .ipe System

    For eated ?uildings

     #ommercial !ndustrial Residential ospitals :ducational Retailost #ommon

    Sprinkler System

    :asiest to aintainand @perateRequires the 4east

     Amount of Testing

  • 8/20/2019 fmconfaccptest

    58/117

    -et System

  • 8/20/2019 fmconfaccptest

    59/117

    9et System Tests andRequirements

    • ydrostatic and #o2er 

    • 9alkthrough and Final  @perational 5Alarms. Tamper. ain

    /rain Test6

      #onfirm #ode compliance

      :nsure correct num;er of spare heads

    are left on site per NFPA 1'$)00-

    Section &,),$ /ry heads not required,

    Sprinkler 9rench is,

  • 8/20/2019 fmconfaccptest

    60/117

    • Ne7 systems to ha2e 9hite Tag and

    ?lue !T Tag

    •  All additions o2er )0 heads are to ha2ea ne7 7hite tag added

    • ydraulic Placard and Ceneral

    !nformation Sign

    • PR8 test tags on each PR8

    • ?ackflo7 certification and !nspection

    ;y Plum;ing /ept

    9et System Riser ReqtIs

  • 8/20/2019 fmconfaccptest

    61/117

    'ry .ipe System

    For Non$eated ?uildings

     #ommercial !ndustrial

     Parking Carages ?uilding :%teriors

  • 8/20/2019 fmconfaccptest

    62/117

    'ry .ipe System

  • 8/20/2019 fmconfaccptest

    63/117

    /ry System Tests andRequirements $)+,),)

    • ydrostatic and #o2er 

    • 9alkthrough and Final  @perational 5Alarms. Tamper. ain

    /rain Test6

      #onfirm #ode compliance

      :nsure correct num;er of spare heads

    are left on site per NFPA 1'$)00-

    Section &,),$ /ry heads not required,

    Sprinkler 9rench is,

  • 8/20/2019 fmconfaccptest

    64/117

    • !n addition to )00 psi hydrostatic

    test$ an air leakage test isrequired

    • +0 psi of air for )+ hours$ any

    leakage in e%cess of 1$1E) psishall ;e corrected

    /ry Systems AlsoRequire

  • 8/20/2019 fmconfaccptest

    65/117

    • )+,),',) co2ers operational test

    • Trip test of 2al2e and any quick

    opening de2ices$ time ho7 long ittakes for 7ater to ;e discharged

    from the inspectorIs test connection,

    • 8erify it is per -,),',& and record it

    on the #ontractorIs aterial and

    Test #ertificate

    System @perational Test

  • 8/20/2019 fmconfaccptest

    66/117

    9ater /eli2ery per NFPA1'$ )00-

     Table 7.2.3.6.1 Dry System Water

    Delivery

    Hazard

    Nmber !" #!st$em!te

    Sprin%lers&nitially 'pen

    #a(imm Time !" Water

    Delivery

    $esidential 1 1) sec!nds

    *ig+t 1 6, sec!nds'rdinary & 2 ), sec!nds

    'rdinary && 2 ), sec!nds

    -(tra & ) sec!nds

    -(tra && ) sec!nds

    Hig+ piled , sec!nds

  • 8/20/2019 fmconfaccptest

    67/117

    • -,),&,),)$ The air supply shallha2e a capacity capa;le of

    restoring normal air pressure inthe system 7ithin '0 minutes

    • A,-,),&,),)0$ 9hen a singlecompressor ser2es multiplesystems. the '0 minute fill timeis ;ased in the largest system

     Air #ompressor Testing

  • 8/20/2019 fmconfaccptest

    68/117

    • Ne7 systems to ha2e 9hite Tag and

    ?lue !T Tag

    •  All additions o2er )0 heads are to ha2ea ne7 7hite tag added

    • ydraulic Placard and Ceneral

    !nformation Sign

    • PR8 test tags on each PR8• ?ackflo7 certification and !nspection

    ;y Plum;ing /ept

    /ry System Riser ReqtIs

  • 8/20/2019 fmconfaccptest

    69/117

    .re /ction System

    For :n2ironmentally

    Sensiti2e Areas

     #omputer Rooms

     Surgical Suites Tele$/ata S7itch Rooms Fine Art Storage Rooms

  • 8/20/2019 fmconfaccptest

    70/117

    .re /ction System

  • 8/20/2019 fmconfaccptest

    71/117

    Preaction Requirements$)+,),','

    • ydrostatic and #o2er 

    • 9alkthrough and Final  @perational 5Alarms. Tamper. ain

    /rain Test6

      #onfirm #ode compliance

      :nsure correct num;er of spare heads

    are left on site per NFPA 1'$)00-

    Section &,),$ /ry heads not required,

    Sprinkler 9rench is,

  • 8/20/2019 fmconfaccptest

    72/117

    • Test the preaction 2al2e operation in accordance 7ith the

    manufacturerIs instructions$ ask for literature if there is any

    questions on operation• Test manual and remote control acti2ation$ this can ;e

    electric. pneumatic or a com;ination

    Preaction Systems AlsoRequire

  • 8/20/2019 fmconfaccptest

    73/117

    • !s the piping super2isedJ Sec,-,',),+ requires super2ision to

    ensure system integrity,

    • !f super2isory air or nitrogen isused$ it needs to conform to -,),&

    for dry systems

      '0 minute refill requirement,

    •  Also needs to maintain a

    minimum super2isory pressure of

    - psi,

  • 8/20/2019 fmconfaccptest

    74/117

    • Ne7 systems to ha2e 9hite Tag and

    ?lue !T Tag

    •  All additions o2er )0 heads are to ha2ea ne7 7hite tag added

    • ydraulic Placard and Ceneral

    !nformation Sign

    • PR8 test tags on each PR8• ?ackflo7 certification and !nspection

    ;y Plum;ing /ept

    Preaction Riser ReqtIs

  • 8/20/2019 fmconfaccptest

    75/117

    'eluge System

    For ighly

    Flamma;le Areas

     Aircraft angers Sol2ent Processing /ynamite Plants

  • 8/20/2019 fmconfaccptest

    76/117

    'eluge System

  • 8/20/2019 fmconfaccptest

    77/117

    /eluge SystemRequirements $)+,),','

    • ydrostatic and #o2er 

    • 9alkthrough and Final  @perational 5Alarms. Tamper. ain

    /rain Test6

      #onfirm #ode compliance

      :nsure correct num;er of spare heads

    are left on site per NFPA 1'$)00-

    Section &,),$ /ry heads not required,

    Sprinkler 9rench is,

  • 8/20/2019 fmconfaccptest

    78/117

    • Test the deluge 2al2e operation in accordance 7ith the

    manufacturerIs instructions$ ask for literature if there is any

    questions on operation• Test manual and remote control acti2ation$ this can ;e

    electric. pneumatic or hydraulic

    /eluge Systems AlsoRequire

  • 8/20/2019 fmconfaccptest

    79/117

    • Flo7 Testing of the system toensure hydraulic performance,

    #ali;rated gauges are to ;e used

    at different points on the system• These gauge readings are to ;e

    compared to the hydraulic

    calculations• /etection de2ices are to ;e

    automatically super2ised

  • 8/20/2019 fmconfaccptest

    80/117

    • Ne7 systems to ha2e 9hite Tag and

    ?lue !T Tag

    • All additions o2er )0 heads are to ha2ea ne7 7hite tag added

    • ydraulic Placard and Ceneral

    !nformation Sign

    • PR8 test tags on each pr2• ?ackflo7 certification and !nspection

    ;y Plum;ing /ept

    /eluge Riser ReqtIs

  • 8/20/2019 fmconfaccptest

    81/117

    Standpipe System

    For ulti$le2el

    ?uildings

     Per A"

  • 8/20/2019 fmconfaccptest

    82/117

    Stand .ipe System

  • 8/20/2019 fmconfaccptest

    83/117

    Standpipe System Testsand Requirements

    • ydrostatic and #o2er 

    • 9alkthrough and Final  @perational 5Alarms. Tamper. ain

    /rain Test6

      #onfirm #ode compliance and hose

    thread compati;ility  Flo7 test through roof manifold

    testing appro2ed 7ater source$ fire

    pump. F/ pumper truck. etc,

  • 8/20/2019 fmconfaccptest

    84/117

    • PR8 tests, Ask for test log• ain /rain flo7 tests$ record on

    material test certificate

    • /ry and semi automatic shall ;etrip tested to deli2er )H0 CP at

    the hydraulically most remote

    hose connection 7ithin ' minutes•  Air testing applies per dry

    systems in NFPA 1'

  • 8/20/2019 fmconfaccptest

    85/117

    • @pen and close each 2al2emanually$ make sure hose caps

    are on prior to testing

    • #heck for proper signage

  • 8/20/2019 fmconfaccptest

    86/117

    Fire .ump

  • 8/20/2019 fmconfaccptest

    87/117

  • 8/20/2019 fmconfaccptest

    88/117

    Fire Pump Tests andRequirements

    •Per NFPA )0$ )00- :dition#hapter 1+

    • Piping to ;e hydrostatically

    tested per NFPA 1' reqIs

    •  All piping si=es to ;e 2erified per

    ta;le H,)H 5a6 ;y rated pump flo7

  • 8/20/2019 fmconfaccptest

    89/117

  • 8/20/2019 fmconfaccptest

    90/117

    • All factory supplierrepresentati2es are to ;e inattendance during fieldacceptance tests$ A" should;e notified

    •  As a minimum. proof of theinitial startup and field

    acceptance test report should;e pro2ided at Fire arshal final

  • 8/20/2019 fmconfaccptest

    91/117

    • A copy of the certified pump testcharacteristic cur2e shall ;ea2aila;le for comparison of thefield acceptance test,

    • #ompare the cur2es to ensurethe pump meets itIs factoryspecs,

  • 8/20/2019 fmconfaccptest

    92/117

    • Pump shall ;e run at minimum.rated and peak loads

    • o7 is this determinedJJ

    • inimum is 0 CP or churn

    • Rated is the rating of the pump

      i,e,, 1000 CP pump needs to ;etested at 1000 CP

    • a%imum is 1H0 of pump rating$a 1000 CP rated pump is capa;leof 1H00 CP flo7

  • 8/20/2019 fmconfaccptest

    93/117

    • Per NFPA 1+$ )00-. Section&,),1$ Pumps shall furnish notless than 1H0 percent of rated

    capacity at not less than &Hpercent of total rated head,

    • &,),)$ The shutoff head shall note%ceed 1+0 percent of ratedhead for any type of pump,

  • 8/20/2019 fmconfaccptest

    94/117

    :%ample 1$ Pump is rated for -H0CP L 100 psi

    1H0 percent of load$

    1,H O -H0 11)H&H percent of total rated head$

    ,&H O 100 &H psi

    Pump should pro2ide &H psi!N! at 11)H CP

  • 8/20/2019 fmconfaccptest

    95/117

    :%ample )$ a%imum Shutoff 100 psi Fire pump

    a%imum Shutoff ead$

    1,+ O 100 psi 1+0 psi

    Pump shutoff pressure should not;e o2er 1+0 psi,

  • 8/20/2019 fmconfaccptest

    96/117

    Keep in mind that is the Fire

    Pump shutoff pressure$ the Bockey

    of maintenance pump 7ill add 10

    more psi to the 7orking pressureof the system

  • 8/20/2019 fmconfaccptest

    97/117

  • 8/20/2019 fmconfaccptest

    98/117

  • 8/20/2019 fmconfaccptest

    99/117

  • 8/20/2019 fmconfaccptest

    100/117

  • 8/20/2019 fmconfaccptest

    101/117

    • Test fire alarm signals in FirePump control panel

      Pump Run

      AE# Po7er Fail

      Phase Re2ersal  Normal po7er and alternate po7er 

  • 8/20/2019 fmconfaccptest

    102/117

    State Requirements

    • 9hat does )* TA# UU '+,-00

    The Fire Sprinkler Rules require

    for ne7 systems and systemmodificationsJ

  • 8/20/2019 fmconfaccptest

    103/117

    • 9hite @riginal !nstallation Tag

  • 8/20/2019 fmconfaccptest

    104/117

    • To ;e affi%ed to riser after ne7install or scheduled testing andmaintenance,

    • To remain on riser for the life ofthe system$ pro2ides ;aseline7ater flo7 information forsu;sequent inspections,

    • 9ork for this tag to ;e filled out;y licensed R:$C or R:$!,

  • 8/20/2019 fmconfaccptest

    105/117

    • ?lue !nspection Testing andaintenance Tag

  • 8/20/2019 fmconfaccptest

    106/117

    • To ;e affi%ed to riser after ne7install or scheduled testing andmaintenance,

    • To remain on riser for minimumof fi2e years$ only to ;e remo2ed;y employee of authori=ed firm

    • 9ork for this tag to ;e filled out;y licensed R:$C or R:$!,

  • 8/20/2019 fmconfaccptest

    107/117

    • ?lue Ser2ice Tag

  • 8/20/2019 fmconfaccptest

    108/117

    • To ;e affi%ed to riser after e2eryser2ice performed

    • To remain on riser for minimum offi2e years$ only to ;e remo2ed ;yemployee of authori=ed firm

    • 9ork for this tag to ;e filled out ;y!nstaller$ license not needed

    • !f anything is found to ;e impaired.a yello7 or red tag need to ;eaffi%ed as 7ell,

  • 8/20/2019 fmconfaccptest

    109/117

    #ontractorIs aterialand Test #ertificates

    • :nsure these are filled out in

    their entirety and affi%ed to the

    riser in a protecti2e sheath, Theo7ner 7ill 7ant these at a later

    date,

  • 8/20/2019 fmconfaccptest

    110/117

  • 8/20/2019 fmconfaccptest

    111/117

  • 8/20/2019 fmconfaccptest

    112/117

  • 8/20/2019 fmconfaccptest

    113/117

  • 8/20/2019 fmconfaccptest

    114/117

    ydraulic Placard

    • sed in future 7ork on system

    • @ften lost o2er the years

    • Should ;e metal and permanentlymarked per NFPA 1'$ 0-

  • 8/20/2019 fmconfaccptest

    115/117

  • 8/20/2019 fmconfaccptest

    116/117

    'esign *riteria

    • +F./ *odes0 "12 "1R2 "1'2 "%2 $32 $$2 $%2 $4 5 "3"

    • 67*

    • 87*

    • 8F*

    • 9ocal /:;’s

    • ,ther ;urisdictions < /rchitect2 =ngineer 5 ,>ner 

    • 8nsurance 6nder>riter 

  • 8/20/2019 fmconfaccptest

    117/117

    .ost *onstruction 8nspections and Maintenance

    • Required per +F./ $4 and all 9ocal ;urisdictions

    • Te?as requires 9icensed 8nspectors

    • 8dentify changes in

    • ,ccupancy and use• *eiling and finishes @ie .ainted and loaded headsA

    • /dded building features(Decks, Canopies, Clouds)

    • =nsure system operation

    • Find system deficiencies and repair them in a timely

    manner