Acceptance Testing
-
8/20/2019 fmconfaccptest
2/117
Acceptance Testing of FireProtection Systems 101
• Touch on all types of Fire Sprinkler of systems
• Fire Pumps and Standpipes
• Requirements for Acceptance Testing per NFPAand the State Fire arshal
• !ndustry "argon and #ommon terminology
• State Rules$ Te%as !nsurance #ode #hapter &00'
( )* TA# SS '+,-00
• !nformation in these slides comes from NFPAStandards 1'. 1+ and )0
-
8/20/2019 fmconfaccptest
3/117
/efining Terms
• Authority a2ing "urisdiction3
• 4isted and Appro2ed
• Shall3 2s, Should3
• ydrostatic Testing And #o2er
• Add and Relocates 5Remodels6 2s, Ne7System installs
• ain /rain Test
-
8/20/2019 fmconfaccptest
4/117
• #ontrol 8al2e Testing
• Tagging Requirements
• System Type$ 9et. /ry. Preaction
and /eluge 7ith specific
differences and required tests for
each
• Specific Application System$:SFR. #ontrol ode.
Residential. /ou;le !nterlock. etc
-
8/20/2019 fmconfaccptest
5/117
Authority a2ing"urisdiction 5A"6
',),)< An organi=ation. office orindi2idual responsi;le for
enforcing the requirements of a
code or standard. or forappro2ing equipment. materials.
an installation. or a procedure3
-
8/20/2019 fmconfaccptest
6/117
:%amples>
• Fire #hief. Fire arshal
• 4a;or /epartment• ealth /epartment$ T/A/S
• ?uilding @fficial. :lectrical
!nspector. Plum;ing !nspector • !nsurance @rgani=ations and their
Representati2es
• #ommanding @fficer on ?ase
-
8/20/2019 fmconfaccptest
7/117
essentially
Anyone 7ith a 2ested interest in the
system performing as intended
-
8/20/2019 fmconfaccptest
8/117
4isted
',),)< :quipment. materials. orser2ices included in a list
pu;lished ;y an organi=ation
that is accepta;le to theauthority ha2ing Burisdiction3,
-
8/20/2019 fmconfaccptest
9/117
Appro2ed',),1 Accepta;le to the authority
ha2ing Burisdiction3
All materials and methods for
installation are to conform to#hapter & of NFPA 1'$ )00- or
the indi2idual product listings
and appro2als, 9hen in
dou;t,,
Appro2ed aterials
-
8/20/2019 fmconfaccptest
10/117
…Make the installingcontractor prove it to
your satisfaction!!!!• !f it looks incorrect. it pro;a;ly is
• ?e 7ary of ne7 products. ha2e
contractor pro2ide cut sheets 7hen in
dou;t
• Cood re2ie7 7ith thorough 7alk
through at hydro at end of Bo;
-
8/20/2019 fmconfaccptest
11/117
• Dour interpretation of the codes
and standards is to ;e met or
pro2en incorrect$ codesE
standards are in 7riting$ notinferred
• Sometimes corners are cut ;y
unscrupulous contractors• Some poor installs are mistakes
or human error3 $ ?T,
-
8/20/2019 fmconfaccptest
12/117
Report repeat
offenders to theState Fire
Marshal’s office!!!
-
8/20/2019 fmconfaccptest
13/117
R::?:R
• Dou are the last line of defense to
ensure the end user gets 7hat theye%pect and paid forGGG These are
your customers. you are their e%pertG
•Poor installs fail annual inspectionsand cost the o7ner money later for
repairs
-
8/20/2019 fmconfaccptest
14/117
Shall
',),+ !ndicates a mandatory
requirement,3
Should
',),H !ndicates arecommendation or that 7hich
ad2ised ;ut not required,3
-
8/20/2019 fmconfaccptest
15/117
System Acceptance
• Acceptance Testing of systemsis contained in #hapter )+ of
NFPA 1'$)00- :dition
• All required tests are listed. ;utrequired e%tra heads and some
paper7ork is not,
-
8/20/2019 fmconfaccptest
16/117
ydrostatic Test
• Section )+,),1$ All piping andattached appurtenances su;Bected
to system 7orking pressure shall
;e hydrostatically tested at )00 psi
51',* ;ar6 and shall maintain that
pressure 7ithout loss for t7o
hours3
-
8/20/2019 fmconfaccptest
17/117
• Section )+,),1,)$ Portions of
systems normally su;Bected to
7orking pressures in e%cess of
1H0 psi 510,+ ;ar6 shall ;etested as descri;ed in )+,),1,1
at a pressure of H0 psi 5',H ;ar6
in e%cess of 7orking pressure
-
8/20/2019 fmconfaccptest
18/117
Things to 7atch at ydro
• Need to kno7 e%pected pump
churn pressure and e%pectedsystem 7orking pressure. are
PR8Is requiredJ
• ydrostatic test pressure is takenat the ;ottom of the system. not
the top 5Section )+,),1,*6
-
8/20/2019 fmconfaccptest
19/117
• Kno7 the limits of the materials$
pressure limitations of fittings and
sprinkler heads
• !f there is free=e potential. aninterim pneumatic air test at +0
psi can ;e conducted for )+
hours per )+,),), This does notremo2e or replace the
requirement for a hydrostatic test,
-
8/20/2019 fmconfaccptest
20/117
• This test is referred to as a ydroTest3 or #o2er !nspection3
• All systems require this type of
test$ Sprinkler. Standpipe. Pump• !n ne7 construction the pipe
should not ;e co2ered up during
the test• A procedure for remo2ing test
;lanks3 must ;e in place
-
8/20/2019 fmconfaccptest
21/117
• Retrofits are typically co2ered up,These are e%isting ;uildings and not
all areas are accessi;le, se your
o7n Budgment,• 9alk systems during the t7o hour
test. look for leaks, Small leaks are
not cause for concern,
• :%cessi2e 7ater leakage and
pressure drop are cause for failure
and re$test of system
-
8/20/2019 fmconfaccptest
22/117
ydro Test Procedure
• #ontractor should ha2e system
pumped up a;o2e )00 psi or H0a;o2e 7orking pressure. prior to
your arri2al to remo2e air
pockets
• Note Pressure on gauge upon
arri2al,
• 9alk system$ look for leaks,
-
8/20/2019 fmconfaccptest
23/117
• 9hile 7alking system. noteareas that are in need of repair
or changes required in the
system to installing contractor,• At end of t7o hour period. note
pressure 5loss if any6, a2e
#ontractor drain system to =erothe gauge out in your presence,
-
8/20/2019 fmconfaccptest
24/117
Things to Keep in ind• F/# piping is often o2erlooked$ Needs
to ;e tested L 1H0psi after repairE
replacement$ Sec )+,),1,10• Temperature changes affect system
pressure during hydro,
• Trapped air in the system takes time toescape. if the system has not ;een
pumped up for some time then air 7ill
escape,
-
8/20/2019 fmconfaccptest
25/117
Add and Relocates• )+,),1,+$ odifications affecting
)0 or fe7er sprinklers shall notrequire testing in e%cess of
system 7orking pressure3
-
8/20/2019 fmconfaccptest
26/117
• Per Section )+,),1,H$
odifications a;o2e )0
sprinklers. isolate the affected
portion of the system and hydro• Per Section )+,),1,&$
odifications that cannot ;e
isolated 5i,e,, Relocated drops6shall not require tested in e%cess
of system 7orking pressure
-
8/20/2019 fmconfaccptest
27/117
ain /rain Test• )+,),',+,1 The main drain 2al2e
shall ;e opened and remain open
until system pressure sta;ili=es3
• )+,),',+,) The static and residual
pressures shall ;e recorded on the
contractorIs material and testcertificate3
• se the ;ottom gauge
-
8/20/2019 fmconfaccptest
28/117
• @ften o2erlooked
• Required on State 7hite tags3
• Pro2ides ;aseline 7ater supply
test information to measure 7ater
supply deterioration in
su;sequent NFPA )H !nspections,
• This is required on all systems!The importance cannot be
stressed enough!
-
8/20/2019 fmconfaccptest
29/117
Si=e of main drainsTable "#$%$&'rain Si(e)))))))))
Riser or Main Si(e Si(e of 'rain
*onnection
p to ) in, 'M+ in, or larger
)1M) in,. ' in,. '1M) in, 11M+ in, or larger
+ in, and larger ) in, only
No test orifices on main drainsGGGG Need fully open
for ain /rain Test, 4isted Test and drain
assem;lies are accepta;le if capa;le of full flo7,
-
8/20/2019 fmconfaccptest
30/117
@perational Tests• Referred to as a Final3
• 9hile performing this test. an
inspection should ;e performed,
Things to look for> 4oaded or painted sprinkler heads
Adequate co2erage of all spaces issing pieces or incorrect install
Tamper and flo7 s7itch operation
Fire Alarm System should ;e on Test3
-
8/20/2019 fmconfaccptest
31/117
9alk the space$ #heckhead co2erage
• 4ight a=ard
))H Sq Ft
a%, 1HI O 1HI
• @rdinary a=ard
1'0 Sq Ft
a%, 1H ft O *I$*3
-
8/20/2019 fmconfaccptest
32/117
• :%tra a=ard
100 Sq Ft
a%, 10I O 10I or 1) O *I$+3
• Storage. :SFR. #ontrol ode 4ook up each indi2idual section$
these change often
Request the sprinkler cut sheet fromthe #ontractor$ these are specific
application and may ha2e some
special requirements
-
8/20/2019 fmconfaccptest
33/117
@;structions• /epending on the type of head
and the o;struction
• Refer to #hapter * in NFPA 1'$
I0-,
• All types of heads are ;roken
do7n indi2idually
-
8/20/2019 fmconfaccptest
34/117
-
8/20/2019 fmconfaccptest
35/117
Alarm !nitiating /e2ices
-
8/20/2019 fmconfaccptest
36/117
Testing Alarm S7itches• !nspectorIs test connection should
ha2e at least 1 inch pipe
connected to a corrosion resistantorifice equal to the si=e of the
smallest orifice on the system,
• @pen !T# all the 7ay. alarm shouldsound in less than H minutes
-
8/20/2019 fmconfaccptest
37/117
• !f ;ell goes off too quick. ha2econtractor adBust delay on alarm
de2ice to account for 7ater hammer
in city 7ater to a2oid nuisancealarms,
• :nsure co2er is on 9F s7itch after
test is performed
• #all the monitoring company$ 2erify
signals are correct for the spaceE
;ldg
-
8/20/2019 fmconfaccptest
38/117
8al2e Tamper S7itches
-
8/20/2019 fmconfaccptest
39/117
Testing Tamper S7itches
*,1&,1,1,),1$ 8al2es on
connections to 7ater supplies.sectional control 2al2es. and
other 2al2es in supply pipes to
sprinklers and other fi%ed 7ater;ased fire suppression systems
shall ;e super2ised ;y one of
the follo7ing>3
-
8/20/2019 fmconfaccptest
40/117
516#entral station. proprietary. orremote station signaling at a
constantly attended point
5)64ocal signaling ser2ice that 7illcause the sounding of an audi;le
signal at a constantly attended point
5'68al2es locked in the correct position
5+68al2es in fenced enclosures underthe o7nerIs control
-
8/20/2019 fmconfaccptest
41/117
Testing Tampers• )+,),',H,1 All control 2al2es
shall ;e fully closed and opened
under system 7ater pressure toensure proper operation3
• #heck the 2al2e operation
• #heck Tamper operation and
signal to monitoring company
-
8/20/2019 fmconfaccptest
42/117
)+,),+$ PressureReducing 8al2es
-
8/20/2019 fmconfaccptest
43/117
#ommonisinterpretation
• PR8Is should ;e a Pressure
Reducing 8al2e$ +,T Restrictingor Relief 8al2e
• True PR8Is Reduce pressure under
;oth Flo7 and Static #onditions• NFPA 1+$I0- Sec, ',',1&,+
• NFPA 1'$I0- Sec, *,1&,1,),1
-
8/20/2019 fmconfaccptest
44/117
9here Required• Sprinkler$9hen 7orking pressure
e%ceeds 1-H psi unless all
do7nstream components are rated forthe higher pressure
• Standpipe$For Fire ose 8al2es 7here
pressure e%ceeds 1-H psi on )$1E)3
F8Is pressure shall ;e limited to 100
psi$ 1$1E)3 2al2es can ;e of regulating
type
-
8/20/2019 fmconfaccptest
45/117
-
8/20/2019 fmconfaccptest
46/117
PR8 Requirements$Fire Sprinkler • *,1&,1,),)$ Pressure gauges shall
;e on the inlet and outlet sides of
each pressure reducing 2al2e
• *,1&,1,),'$ A relief 2al2e of not less
than 3 shall ;e pro2ided on the
discharge side set to operate at apressure not e%ceeding 1-H psi,
-
8/20/2019 fmconfaccptest
47/117
• *,1&,1,),+$ A listed indicating2al2e shall ;e pro2ided on the
inlet side of each PR8. unless the
PR8 meets the listingrequirements for use as an
indicating 2al2e,
•*,1&,1,),H$ eans shall ;epro2ided do7nstream of all PR8Is
for flo7 tests at sprinkler demand
-
8/20/2019 fmconfaccptest
48/117
Acceptance TestingPR8Is
• )+,),+,1$ :ach pressure$reducing
2al2e shall ;e tested uponcompletion of installation to insure
proper operation under flo7 and no$
flo7 conditions,
• )+,),+,)$ Testing shall 2erify de2iceregulates outlet at ma%imum and
normal conditions
-
8/20/2019 fmconfaccptest
49/117
• )+,),+,'$ The results of the flo7test of each PR8 shall ;e
recorded on the contractorIs
material and test certificate• )+,),+,+$ The results shall
include the static and residual
inlet pressures. static andresidual outlet pressures and
the flo7 rate
-
8/20/2019 fmconfaccptest
50/117
• Ask for PR8 Testing 4ogs to sho7 7ork
7as completed
• NFPA 1+$ -,) requires 1$1E)3 hose
2al2es residual pressure limited to 100psi and )$1E)3 hose 2al2es static and
residual pressure limited to 100 psi
7here pressure e%ceeds 1-H psi
Standpipe ose 8al2ePR8Is$ NFPA 1+$I0-
11,H,+
-
8/20/2019 fmconfaccptest
51/117
?ackflo7 Pre2ention
Assem;lies$*,1-,+,&
• A,*,1-,+,&$ 9here ;ackflo7
pre2ention de2ices are installed.
they should ;e in an accessi;lelocation to pro2ide ser2ice and
maintenance
-
8/20/2019 fmconfaccptest
52/117
• *,1-,+,&,1$ eans shall ;e
pro2ided do7nstream of all
;ackflo7 pre2ention 2al2es for
flo7 tests at system demands• A,*,1-,+,&,1 descri;es the
descri;es the methods a2aila;le$
essentially ensuring the ;ackflo77ill not restrict the system
demand
-
8/20/2019 fmconfaccptest
53/117
?ackflo7 Pre2ention Assem;lies
Section )',1,* references A99A
1+. Recommended Practice for
?ackflo7 Pre2ention and #ross#onnection #ontrol and the pu;lic
ealth A" requirements
9here are they RequiredJJJ
-
8/20/2019 fmconfaccptest
54/117
?ackflo7 Pre2ention Acceptance Testing$
)+,),H• )+,),H,1$ The ;ackflo7 pre2ention
assem;ly shall ;e for7ard flo7
tested to ensure proper operation,
• )+,),H,)$ The minimum flo7 rateshall ;e the system demand.
including hose stream
-
8/20/2019 fmconfaccptest
55/117
• A copy of the state or local test
report performed ;y a T#:Q
appro2ed tester should ;e
attached to the riser
• An appro2ed inspection ;y the
local ealth A" should ;e
pro2ided prior to final,
-
8/20/2019 fmconfaccptest
56/117
#irculating #losed 4oop
Systems
• These are co2ered in )+,',
• Requires certification of pressure
ratings for au%iliary de2ices and proof of
pressure test in all modes of operation• /ischarge tests to ;e per &,,1$ the fi2e
minute requirement
-
8/20/2019 fmconfaccptest
57/117
-et .ipe System
For eated ?uildings
#ommercial !ndustrial Residential ospitals :ducational Retailost #ommon
Sprinkler System
:asiest to aintainand @perateRequires the 4east
Amount of Testing
-
8/20/2019 fmconfaccptest
58/117
-et System
-
8/20/2019 fmconfaccptest
59/117
9et System Tests andRequirements
• ydrostatic and #o2er
• 9alkthrough and Final @perational 5Alarms. Tamper. ain
/rain Test6
#onfirm #ode compliance
:nsure correct num;er of spare heads
are left on site per NFPA 1'$)00-
Section &,),$ /ry heads not required,
Sprinkler 9rench is,
-
8/20/2019 fmconfaccptest
60/117
• Ne7 systems to ha2e 9hite Tag and
?lue !T Tag
• All additions o2er )0 heads are to ha2ea ne7 7hite tag added
• ydraulic Placard and Ceneral
!nformation Sign
• PR8 test tags on each PR8
• ?ackflo7 certification and !nspection
;y Plum;ing /ept
9et System Riser ReqtIs
-
8/20/2019 fmconfaccptest
61/117
'ry .ipe System
For Non$eated ?uildings
#ommercial !ndustrial
Parking Carages ?uilding :%teriors
-
8/20/2019 fmconfaccptest
62/117
'ry .ipe System
-
8/20/2019 fmconfaccptest
63/117
/ry System Tests andRequirements $)+,),)
• ydrostatic and #o2er
• 9alkthrough and Final @perational 5Alarms. Tamper. ain
/rain Test6
#onfirm #ode compliance
:nsure correct num;er of spare heads
are left on site per NFPA 1'$)00-
Section &,),$ /ry heads not required,
Sprinkler 9rench is,
-
8/20/2019 fmconfaccptest
64/117
• !n addition to )00 psi hydrostatic
test$ an air leakage test isrequired
• +0 psi of air for )+ hours$ any
leakage in e%cess of 1$1E) psishall ;e corrected
/ry Systems AlsoRequire
-
8/20/2019 fmconfaccptest
65/117
• )+,),',) co2ers operational test
• Trip test of 2al2e and any quick
opening de2ices$ time ho7 long ittakes for 7ater to ;e discharged
from the inspectorIs test connection,
• 8erify it is per -,),',& and record it
on the #ontractorIs aterial and
Test #ertificate
System @perational Test
-
8/20/2019 fmconfaccptest
66/117
9ater /eli2ery per NFPA1'$ )00-
Table 7.2.3.6.1 Dry System Water
Delivery
Hazard
Nmber !" #!st$em!te
Sprin%lers&nitially 'pen
#a(imm Time !" Water
Delivery
$esidential 1 1) sec!nds
*ig+t 1 6, sec!nds'rdinary & 2 ), sec!nds
'rdinary && 2 ), sec!nds
-(tra & ) sec!nds
-(tra && ) sec!nds
Hig+ piled , sec!nds
-
8/20/2019 fmconfaccptest
67/117
• -,),&,),)$ The air supply shallha2e a capacity capa;le of
restoring normal air pressure inthe system 7ithin '0 minutes
• A,-,),&,),)0$ 9hen a singlecompressor ser2es multiplesystems. the '0 minute fill timeis ;ased in the largest system
Air #ompressor Testing
-
8/20/2019 fmconfaccptest
68/117
• Ne7 systems to ha2e 9hite Tag and
?lue !T Tag
• All additions o2er )0 heads are to ha2ea ne7 7hite tag added
• ydraulic Placard and Ceneral
!nformation Sign
• PR8 test tags on each PR8• ?ackflo7 certification and !nspection
;y Plum;ing /ept
/ry System Riser ReqtIs
-
8/20/2019 fmconfaccptest
69/117
.re /ction System
For :n2ironmentally
Sensiti2e Areas
#omputer Rooms
Surgical Suites Tele$/ata S7itch Rooms Fine Art Storage Rooms
-
8/20/2019 fmconfaccptest
70/117
.re /ction System
-
8/20/2019 fmconfaccptest
71/117
Preaction Requirements$)+,),','
• ydrostatic and #o2er
• 9alkthrough and Final @perational 5Alarms. Tamper. ain
/rain Test6
#onfirm #ode compliance
:nsure correct num;er of spare heads
are left on site per NFPA 1'$)00-
Section &,),$ /ry heads not required,
Sprinkler 9rench is,
-
8/20/2019 fmconfaccptest
72/117
• Test the preaction 2al2e operation in accordance 7ith the
manufacturerIs instructions$ ask for literature if there is any
questions on operation• Test manual and remote control acti2ation$ this can ;e
electric. pneumatic or a com;ination
Preaction Systems AlsoRequire
-
8/20/2019 fmconfaccptest
73/117
• !s the piping super2isedJ Sec,-,',),+ requires super2ision to
ensure system integrity,
• !f super2isory air or nitrogen isused$ it needs to conform to -,),&
for dry systems
'0 minute refill requirement,
• Also needs to maintain a
minimum super2isory pressure of
- psi,
-
8/20/2019 fmconfaccptest
74/117
• Ne7 systems to ha2e 9hite Tag and
?lue !T Tag
• All additions o2er )0 heads are to ha2ea ne7 7hite tag added
• ydraulic Placard and Ceneral
!nformation Sign
• PR8 test tags on each PR8• ?ackflo7 certification and !nspection
;y Plum;ing /ept
Preaction Riser ReqtIs
-
8/20/2019 fmconfaccptest
75/117
'eluge System
For ighly
Flamma;le Areas
Aircraft angers Sol2ent Processing /ynamite Plants
-
8/20/2019 fmconfaccptest
76/117
'eluge System
-
8/20/2019 fmconfaccptest
77/117
/eluge SystemRequirements $)+,),','
• ydrostatic and #o2er
• 9alkthrough and Final @perational 5Alarms. Tamper. ain
/rain Test6
#onfirm #ode compliance
:nsure correct num;er of spare heads
are left on site per NFPA 1'$)00-
Section &,),$ /ry heads not required,
Sprinkler 9rench is,
-
8/20/2019 fmconfaccptest
78/117
• Test the deluge 2al2e operation in accordance 7ith the
manufacturerIs instructions$ ask for literature if there is any
questions on operation• Test manual and remote control acti2ation$ this can ;e
electric. pneumatic or hydraulic
/eluge Systems AlsoRequire
-
8/20/2019 fmconfaccptest
79/117
• Flo7 Testing of the system toensure hydraulic performance,
#ali;rated gauges are to ;e used
at different points on the system• These gauge readings are to ;e
compared to the hydraulic
calculations• /etection de2ices are to ;e
automatically super2ised
-
8/20/2019 fmconfaccptest
80/117
• Ne7 systems to ha2e 9hite Tag and
?lue !T Tag
• All additions o2er )0 heads are to ha2ea ne7 7hite tag added
• ydraulic Placard and Ceneral
!nformation Sign
• PR8 test tags on each pr2• ?ackflo7 certification and !nspection
;y Plum;ing /ept
/eluge Riser ReqtIs
-
8/20/2019 fmconfaccptest
81/117
Standpipe System
For ulti$le2el
?uildings
Per A"
-
8/20/2019 fmconfaccptest
82/117
Stand .ipe System
-
8/20/2019 fmconfaccptest
83/117
Standpipe System Testsand Requirements
• ydrostatic and #o2er
• 9alkthrough and Final @perational 5Alarms. Tamper. ain
/rain Test6
#onfirm #ode compliance and hose
thread compati;ility Flo7 test through roof manifold
testing appro2ed 7ater source$ fire
pump. F/ pumper truck. etc,
-
8/20/2019 fmconfaccptest
84/117
• PR8 tests, Ask for test log• ain /rain flo7 tests$ record on
material test certificate
• /ry and semi automatic shall ;etrip tested to deli2er )H0 CP at
the hydraulically most remote
hose connection 7ithin ' minutes• Air testing applies per dry
systems in NFPA 1'
-
8/20/2019 fmconfaccptest
85/117
• @pen and close each 2al2emanually$ make sure hose caps
are on prior to testing
• #heck for proper signage
-
8/20/2019 fmconfaccptest
86/117
Fire .ump
-
8/20/2019 fmconfaccptest
87/117
-
8/20/2019 fmconfaccptest
88/117
Fire Pump Tests andRequirements
•Per NFPA )0$ )00- :dition#hapter 1+
• Piping to ;e hydrostatically
tested per NFPA 1' reqIs
• All piping si=es to ;e 2erified per
ta;le H,)H 5a6 ;y rated pump flo7
-
8/20/2019 fmconfaccptest
89/117
-
8/20/2019 fmconfaccptest
90/117
• All factory supplierrepresentati2es are to ;e inattendance during fieldacceptance tests$ A" should;e notified
• As a minimum. proof of theinitial startup and field
acceptance test report should;e pro2ided at Fire arshal final
-
8/20/2019 fmconfaccptest
91/117
• A copy of the certified pump testcharacteristic cur2e shall ;ea2aila;le for comparison of thefield acceptance test,
• #ompare the cur2es to ensurethe pump meets itIs factoryspecs,
-
8/20/2019 fmconfaccptest
92/117
• Pump shall ;e run at minimum.rated and peak loads
• o7 is this determinedJJ
• inimum is 0 CP or churn
• Rated is the rating of the pump
i,e,, 1000 CP pump needs to ;etested at 1000 CP
• a%imum is 1H0 of pump rating$a 1000 CP rated pump is capa;leof 1H00 CP flo7
-
8/20/2019 fmconfaccptest
93/117
• Per NFPA 1+$ )00-. Section&,),1$ Pumps shall furnish notless than 1H0 percent of rated
capacity at not less than &Hpercent of total rated head,
• &,),)$ The shutoff head shall note%ceed 1+0 percent of ratedhead for any type of pump,
-
8/20/2019 fmconfaccptest
94/117
:%ample 1$ Pump is rated for -H0CP L 100 psi
1H0 percent of load$
1,H O -H0 11)H&H percent of total rated head$
,&H O 100 &H psi
Pump should pro2ide &H psi!N! at 11)H CP
-
8/20/2019 fmconfaccptest
95/117
:%ample )$ a%imum Shutoff 100 psi Fire pump
a%imum Shutoff ead$
1,+ O 100 psi 1+0 psi
Pump shutoff pressure should not;e o2er 1+0 psi,
-
8/20/2019 fmconfaccptest
96/117
Keep in mind that is the Fire
Pump shutoff pressure$ the Bockey
of maintenance pump 7ill add 10
more psi to the 7orking pressureof the system
-
8/20/2019 fmconfaccptest
97/117
-
8/20/2019 fmconfaccptest
98/117
-
8/20/2019 fmconfaccptest
99/117
-
8/20/2019 fmconfaccptest
100/117
-
8/20/2019 fmconfaccptest
101/117
• Test fire alarm signals in FirePump control panel
Pump Run
AE# Po7er Fail
Phase Re2ersal Normal po7er and alternate po7er
-
8/20/2019 fmconfaccptest
102/117
State Requirements
• 9hat does )* TA# UU '+,-00
The Fire Sprinkler Rules require
for ne7 systems and systemmodificationsJ
-
8/20/2019 fmconfaccptest
103/117
• 9hite @riginal !nstallation Tag
-
8/20/2019 fmconfaccptest
104/117
• To ;e affi%ed to riser after ne7install or scheduled testing andmaintenance,
• To remain on riser for the life ofthe system$ pro2ides ;aseline7ater flo7 information forsu;sequent inspections,
• 9ork for this tag to ;e filled out;y licensed R:$C or R:$!,
-
8/20/2019 fmconfaccptest
105/117
• ?lue !nspection Testing andaintenance Tag
-
8/20/2019 fmconfaccptest
106/117
• To ;e affi%ed to riser after ne7install or scheduled testing andmaintenance,
• To remain on riser for minimumof fi2e years$ only to ;e remo2ed;y employee of authori=ed firm
• 9ork for this tag to ;e filled out;y licensed R:$C or R:$!,
-
8/20/2019 fmconfaccptest
107/117
• ?lue Ser2ice Tag
-
8/20/2019 fmconfaccptest
108/117
• To ;e affi%ed to riser after e2eryser2ice performed
• To remain on riser for minimum offi2e years$ only to ;e remo2ed ;yemployee of authori=ed firm
• 9ork for this tag to ;e filled out ;y!nstaller$ license not needed
• !f anything is found to ;e impaired.a yello7 or red tag need to ;eaffi%ed as 7ell,
-
8/20/2019 fmconfaccptest
109/117
#ontractorIs aterialand Test #ertificates
• :nsure these are filled out in
their entirety and affi%ed to the
riser in a protecti2e sheath, Theo7ner 7ill 7ant these at a later
date,
-
8/20/2019 fmconfaccptest
110/117
-
8/20/2019 fmconfaccptest
111/117
-
8/20/2019 fmconfaccptest
112/117
-
8/20/2019 fmconfaccptest
113/117
-
8/20/2019 fmconfaccptest
114/117
ydraulic Placard
• sed in future 7ork on system
• @ften lost o2er the years
• Should ;e metal and permanentlymarked per NFPA 1'$ 0-
-
8/20/2019 fmconfaccptest
115/117
-
8/20/2019 fmconfaccptest
116/117
'esign *riteria
• +F./ *odes0 "12 "1R2 "1'2 "%2 $32 $$2 $%2 $4 5 "3"
• 67*
• 87*
• 8F*
• 9ocal /:;’s
• ,ther ;urisdictions < /rchitect2 =ngineer 5 ,>ner
• 8nsurance 6nder>riter
-
8/20/2019 fmconfaccptest
117/117
.ost *onstruction 8nspections and Maintenance
• Required per +F./ $4 and all 9ocal ;urisdictions
• Te?as requires 9icensed 8nspectors
• 8dentify changes in
• ,ccupancy and use• *eiling and finishes @ie .ainted and loaded headsA
• /dded building features(Decks, Canopies, Clouds)
• =nsure system operation
• Find system deficiencies and repair them in a timely
manner