APPARECCHIATURE FLUIDODINAMICHE E COMPONENTI PER ASCENSORI Azienda Certificata UNI EN ISO 9001 GMV SpA Via Don Gnocchi, 10 - 20016 PERO – Milano (Italy) TEL. +39 02 33930.1 - FAX +39 02 3390379 - http://www.gmv.it - e-mail: [email protected] Doc. n° 10991036 Rev. 0.3.2 - 08.04.2005 File: Man-GL-06-SE-EN.doc Maintenance Manual LIFT q GL MRL–MC q GL MRL q GL 81 21 q GL TML SERIAL NR.: _____________ DOC 10991036

Upload: others

Post on 29-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

APPARECCHIATURE FLUIDODINAMICHE E COMPONENTI PER ASCENSORI

Azienda Certificata UNI EN ISO 9001

GMV SpA Via Don Gnocchi, 10 - 20016 PERO – Milano (Italy) TEL. +39 02 33930.1 - FAX +39 02 3390379 - http://www.gmv.it - e-mail: [email protected]

Doc. n° 10991036 Rev. 0.3.2 - 08.04.2005 File: Man-GL-06-SE-EN.doc

Maintenance Manual

LIFT q GL MRL–MC q GL MRL q GL 81 21 q GL TML

SERIAL NR.: _____________ DOC 10991036

Page 2: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

General Part Pag. 2 di 2

Doc. n° 10991036 Rev.0.3.2 - 08.04.2005 EN

1

MAIN INDEX This manual include the following sections:

0 - Safety and general notes 1 - Maintenance actions A - Maintenance actions - Specific Actions for MRL Lifts B - Maintenance actions - Specific Actions for GL 81 21 Lifts

WARNING Before starting any maintenance action on a GL MRL lift read first section A of this manual

WARNING Before starting any maintenance action on a GL 81 21 lift read first section B of this manual

INDEX 0 GENERAL PART 2 0.1 INTRODUCTION INFORMATIONS 2 0.1.1 DEFINITIONS 2 0.1.2 SYMBOLS USED 2 0.1.3 RULES REFERENCE 2

0.2 DOCUMENTS RELATED WITH MAINTENANCE 3 0.3 SAFETY PRECAUTION DURING MAINTENANCE 3 0.3.1 MAINTENANCE ADVICES 3 0.3.2 TOOLING 3

0.4 GENERAL ORDERS 4 0.5 GENERAL INFORMATIONS 4 0.5.1 INFORMATION TO THE OWNER OF THE INSTALLATION 4 0.5.2 INFORMATION FOR THE MAINTENANCE ORGANIZATION 5

1 MAINTEINING OPERATIONS 2 1.1 PROGRAMMED MAINTENANCE 2 1.2 PERIODICAL MAINTENANCE AND CHECKS TABLE 2 1.3 MAINTENANCE SCHEDULES 3

A MRL LIFT 2 A.1 GENERAL INFORMATIONS 2

A.1.1 DEFINITIONS 2 A.1.2 DESCRIPTION 2 A.1.3 COMMANDS OF THE REMOTE PUSH-BUTTON PANEL 2

A.2 ACCESS TO PIT OF THE MAINTENANCE MAN 3 A.3 MOVING THE CAR 3 A.4 EXIT FROM PIT 4 A.5 PERIODICAL MAINTENANCE AND CHECKS TABLE 4 A.6 MAINTENANCE SCHEDULES 4

B GL 81 21 LIFT 2 A.1 GENERAL INFORMATIONS 2 B.1.1 DEFINITIONS 2 B.1.2 DESCRIPTION 2

B.2 ACCESS TO PIT OF THE MAINTENANCE MAN 2 B.3 EXIT FROM PIT 3 B.4 ACCESS TO HEADROOM OF THE MAINTENANCE MAN 4 B.5 EXIT FROM HEADROOM 4 B.6 PERIODICAL MAINTENANCE AND CHECKS TABLE 4 B.7 MAINTENANCE SCHEDULES 5

All rights reserved. Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing progress, reserves the right to modify parts or this manual without notice. Drawings, descriptions and data included in this manual are indicatives. For all the data not included in this manual refer to the documents of any single part. To guarantee the products security, do not use spare parts not genuine or not approved by GMV Spa. GMV Spa will not assume any responsibility if the instructions included in this manual are not observed.

Emesso da - Issued by: DT

Controllato da - Checked by: CR

Approvato da - Approved by : CR

Data – Date: 08/04/2005

Page 3: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

APPARECCHIATURE FLUIDODINAMICHE E COMPONENTI PER ASCENSORI

Azienda Certificata UNI EN ISO 9001

GMV SpA Via Don Gnocchi, 10 - 20016 PERO – Milano (Italy) TEL. +39 02 33930.1 - FAX +39 02 3390379 - http://www.gmv.it - e-mail: [email protected] 0

Doc. n° 10991036 Rev. 0.3.2 - 08.04.2005 File: Man-GL-06-SE-EN.doc

Maintenance Manual

SAFETY AND GENERAL NOTES

Page 4: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

General Part Pag. 2 di 6

Doc. n° 10991036 Rev.0.3.2 - 08.04.2005 0 EN

4

0 GENERAL PART

0.1 INTRODUCTION INFORMATIONS

0.1.1 DEFINITIONS In this manual are used the definitions in EN81-1, EN81-2: Safety rules for the construction and installation of lifts, prEN81-28:: Remote alarms on passenger lifts, EN1050: Safety of machinery - Principles for risk assessment, ISO3864: Safety colours and safety signs, and the following apply: maintenance: All the necessary operations to ensure the safe and intended functioning of the installation and its components after the completion of the installation and throughout its life cycle. Maintenance includes: A) lubrication, cleaning, etc.; However, the following cleaning operations can be not considered as maintenance :

- cleaning of the external parts of the well, - cleaning of the inside of the car;

B) checks; C) passenger rescue operations; D) the operations of setting and adjustment; E) repair or changing of components which may occur due to wear or tear and do not affect the characteristics of the

installation. The following are not considered as maintenance operations: F) changing of a major component such as the machine, the car, the control panel, etc., or safety component

such as safety gear, etc., even if the characteristics of the new component are the same as the original; G) replacement of the installation; H) modernisation of the installation, including the changing of any characteristic of the installation (such as

speed, load, etc.); I) rescue operations carried out by Fire Brigades. maintenance organization: Company or part of company where competent maintenance person(s) carry out maintenance operations on behalf of the owner of the installation. competent maintenance person: a designated person, suitably trained (see EN ISO 9000 series), qualified by knowledge and practical experience, provided with necessary instructions and supported within his maintenance organization to enable the required maintenance operations to be safely carried out manufacturer: Natural or legal person who takes responsibility for the design, manufacture and placing on the market either of lifts. installer: Natural or legal person who takes responsibility for the design, manufacture, installation and placing on the market of lifts owner of the installation: Natural or legal person who has the power of disposal of the installation and takes the responsibility for its operation and use rescue operation: Operation starting after receiving notification of a person(s) trapped in a lift and finishing by releasing the trapped person(s)

0.1.2 SYMBOLS USED

NOTE Indicates information which contents must be seriously taken in consideration.

WARNING Indicates that the described operation is likely to cause, damages to the system or physical damages if performed without complying with the safety standards.

0.1.3 RULES REFERENCE For all definitions not included in this manual please refer to rules and local laws in force, following, particularly: EN 81-1, EN 81-2: Safety rules for the construction and installation of lifts, prEN 81-28: Remote alarms on passenger lifts, EN 1050: Safety of machinery - Principles for risk assessment, ISO 3864: Safety colours and safety signs.

Page 5: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

General Part Pag. 3 di 6

Doc. n° 10991036 Rev.0.3.2 - 08.04.2005 0 EN

4

0.2 DOCUMENTS RELATED WITH MAINTENANCE The documents to use for the maintenance of the lift are those required by the EN81-2:1998 and by the rules in force, particularly the following:

- THIS LIFT MAINTENANCE MANUAL - THE INSTALLATION MANUAL

• A provided book according with EN81-2:1998 16.2, which should contain: - INSTALLATION PROJECT DRAWS (EN81-2:1998 16.2.A.5). - WIRING AND HYDRAULIC DIAGRAMS (EN81-2:1998 16.2.A.6 AND 7). - PERIODICAL AND EXTRA MAINTAINING CHECKS RESULTS (EN81-2:1998 16.2.B). - DATED COPIES OF EXAMINATIONS AND INSPECTIONS REPORTS, WITH OBSERVATIONS (EN81-2:1998 16.2.B). - DECLARATION OF CONFORMITY COPY - COPY OF THE LIFT ACTIVATION REQUEST, THAT, ACCORDING TO LOCAL LAWS, OWNER OR LEGAL

REPRESENTATIVE SEND TO THE PROPER OFFICE, - COPY OF THE LIFT ACTIVATION COMMUNICATION, WITH REGISTER NUMBER, THAT THE PROPER OFFICE ,

ACCORDING TO LOCAL LAWS, SEND TO OWNER OR LEGAL REPRESENTATIVE All the documentation for a correct and safe maintenance of the lift, must be stored by the installation responsible. Please remember that this documentation is considered part of the plant and must be complete, well stored and unabridged in every part. In order to maintain the readability, the documentation shouldn’t be damaged and shouldn’t have missing parts. Moreover, do not tear or deteriorate sheets during consulting.

0.3 SAFETY PRECAUTION DURING MAINTENANCE

0.3.1 MAINTENANCE ADVICES For a correct and safe maintenance of the plant, it is advisable to follow this safety precautions: • Always wear the necessary individual protection devices (IPD) (particularly see Fig. 0.1) • Never wear draping clothes and/or objects (necklaces, watches, tie…) • Not let long hair free. • Do not keep cutting or sharp object in the shirt-pocket (screwdriver, scissors…). • Do not tamper with, damage or hide the warning shields/labels: in case of wear replace immediately. • To lift heavy weights, always use adequate devices, to limit the damage to the spine.

WARNING Before start all kind of maintenance operation. ALWAYS verify that al the safety devices, mechanical or electrical, are active and working properly.

Fig. 0.1 - Individual Protection Devices (IPD)

Overall closed on wrists

Helmet

Safety belt

Gloves

Hearing protection

Safety shoes

0.3.2 TOOLING Use standard building-yard tooling for the maintenance of the plant.

Page 6: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

General Part Pag. 4 di 6

Doc. n° 10991036 Rev.0.3.2 - 08.04.2005 0 EN

4

0.4 GENERAL ORDERS The installations shall be maintained in good working order in accordance with the European Standards. To this effect, regular maintenance of the installation shall be carried out, to ensure, in particular, the safety of the installation. The safety of an installation shall take into account the ability to be maintained without causing injury or damage to health. Regular maintenance of the installation shall be carried out to ensure the reliability of the installation. The access and the associated environment shall be maintained in good working order. The competence of the maintenance person within the maintenance organization shall be continuously updated.

Note We inform the owner of the installation that the qualification of the maintenance organization needs to be in conformity with the rules applicable in the country in which the installation operates; if no rules exist, the qualification can be ensured by a certified EN ISO 9001 quality system supplemented if necessary to take into account the specific features of the installation.

0.5 GENERAL INFORMATIONS

0.5.1 INFORMATION TO THE OWNER OF THE INSTALLATION It’s necessary for the owner : A) to keep the installation in a safe operating condition.

- To obtain this the owner shall use a maintenance organization complying with the requirements of the Standard and with adequate and proper insurance cover.

B) to take care of any regulations and other requirements, where relevant, and their implications on maintenance.

C) for planned maintenance to carry out by a maintenance organization, when the installation is put into service or if the installation is to remain unused for a long period of time.

D) to have the same maintenance organization in the case of several installations having common well/spaces and/or machine room.

E) to keep the two-way means of communication efficient and linked to a 24 hours rescue service for the whole of the time that the installation can be used, as described in prEN 81-28.

F) to remove the lift from service: - when the two-way means of communication is out of order. - in case of dangerous situations.

G) to inform the maintenance organization: - immediately about any abnormal operation of the installation - about any abnormal change in its direct environment - immediately after putting the installation out of service in the case of a dangerous situation - after any rescue - before any modification related to the installation and/or its environment or use - before any third party inspection or works other than maintenance works are carried out on the

installation - before taking the installation out of service for a prolonged period of time - before putting the installation back into service after a prolonged period of non operating time.

Note The owner of the installation should obtain from the company carrying out the relevant modification the maintenance instructions for the maintenance organization.

Page 7: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

General Part Pag. 5 di 6

Doc. n° 10991036 Rev.0.3.2 - 08.04.2005 0 EN

4

H) to take into consideration the consequences of the risk assessment carried out by the maintenance organization.

I) to make sure that the risk assessment for maintenance is carried out: - if the maintenance organization is replaced - if the use of the building and/or the installation changes; - after a major modification of the installation or of the building - after an accident involving the installation.

J) to ensure, through a risk assessment, that : - their premises are safe and free from risk to health as far as is practicable. This includes access to the

premises and installation equipment, and articles or substances used according to the regulation for the use of work equipment at the workplace

- the persons using the premises are informed about any remaining risks - any action to be done as a consequence of his risk assessment is carried out.

K) to inform the maintenance organization, regarding the access ways to areas reserved to maintenance persons, about: - the access ways to be used and fire evacuating procedures from the building - the place where the keys of the reserved areas can be found - if necessary, the persons who shall accompany the maintenance persons to the installation - if necessary, personal protective equipment to be used in the access ways, and, possibly, where this

equipment can be found. The information shall be made available also on site to the maintenance organization. L) to ensure that the name and the telephone number of the maintenance organisation are always available to

the user of the installation, permanently affixed and clearly visible. M) to ensure that the keys of machine and pulley room doors (trap doors) and of inspection and emergency

doors (trap doors) are permanently available in the building and are used only by persons authorized to gain access

N) to provide, in all circumstances, safe access to the building and to the installation for the maintenance organization involved in the rescue of persons

O) to keep the access to working areas and working rooms safe and free for the maintenance persons P) to inform the maintenance organization about any hazard or change in the workplace and/or the access ways

(lighting, obstructions, ground conditions, etc.) Q) to carry out periodically, in his own interests, in addition to those examinations and tests entrust to the

maintenance organization, the following: - A full ascent and descent to assess any changes in the quality of the ride or damage to the equipment. Typical items to be checked to ensure that they are in place, undamaged and functioning correctly are: - landing doors and bottom door tracks - stopping accuracy - indicators that are not located in a reserved area - landing push controls, car push controls, door open controls - two-way means of communication in the car which provides permanent contact with a rescue service - normal car lighting - door reversal device - safety signs/pictograms.

0.5.2 INFORMATION FOR THE MAINTENANCE ORGANIZATION It’s necessary for the maintenance organization : A) to carry out the work of maintenance in conformity with the maintenance instructions and based on

systematic maintenance checks. - After these checks, the maintenance organization shall decide in conformity with the maintenance

instructions what is required to be done - A list of typical examples of maintenance checks to maintain the installation is shown in annex A.

B) to update the original maintenance instructions if the installation changes its intended use and/or the environmental conditions existing on the completion of the installation.

Note The maintenance organization should be provided by the owner of the installation with the relevant maintenance instructions where modifications are carried out on the installation.

Page 8: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

General Part Pag. 6 di 6

Doc. n° 10991036 Rev.0.3.2 - 08.04.2005 0 EN

4

C) to ensure that a risk assessment for any working area and for any maintenance operation has been carried out taking into account the installer's maintenance instructions and all information supplied by the owner of the installation.

D) to inform the owner of the installation about any work to be carried out as a consequence of a risk assessment especially for the access and/or the environment related to the building/installation.

E) to carry out a maintenance plan so that preventive maintenance is suitable for the installation and maintenance time is as short as reasonably practicable, without reducing the safety of persons, in order to minimize the non-operational time of the installation.

F) to adapt the plan for maintenance so as to take account of any predictable failures, e.g. those due to misuse, mishandling, deterioration, etc.

G) to carry out maintenance operations by competent maintenance persons and provided with the necessary tools and equipment.

H) to maintain the competency of maintenance persons. I) to carry out the maintenance periodically. J) to provide a 24 hour, all year round call-out service for rescue of persons K) to keep records of the result of each intervention due to a failure of the installation.

- These records shall include the type of failures in order to detect any repetition. They shall be available to the owner of the installation on request.

L) to put out of service the installation if the maintenance organization is aware of a dangerous situation, detected during the maintenance, which cannot be eliminated immediately, and to inform the owner of the installation of the need to keep it out of service until repaired.

M) to be organized to provide the necessary spare parts for any repair N) to ensure the attendance of a competent maintenance person, given reasonable notice, for any inspection

carried out by an authorized third party or for building maintenance works to be carried out in the areas reserved for the maintenance organization.

O) to inform in due time the owner of the installation about necessary progressive upgrading of the installation. P) to organize rescue operations, even with subcontractor, and to make provision for circumstances such as

fire, panic, etc. ANNOTAZIONI

"

Page 9: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

APPARECCHIATURE FLUIDODINAMICHE E COMPONENTI PER ASCENSORI

Azienda Certificata UNI EN ISO 9001

GMV SpA Via Don Gnocchi, 10 - 20016 PERO – Milano (Italy) TEL. +39 02 33930.1 - FAX +39 02 3390379 - http://www.gmv.it - e-mail: [email protected] 1

Doc. n° 10991036 Rev. 0.3.2 - 08.04.2005 File: Man-GL-06-SE-EN.doc

Maintenance Manual

MAINTENANCE OPERATION

Page 10: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

Maintenance Operations Pag. 2 di 6

Doc. n° 10991036 Rev.0.3.2 - 08.04.2005 1 EN

5

1 MAINTEINING OPERATIONS

1.1 PROGRAMMED MAINTENANCE For a correct and safe lift use, it is necessary to make a preventive programmed maintenance, following a fixed plan. To define the periodical maintenance frequency, you should consider more events, particularly :

- Number of travel per year - Travelling and stopping periods - Age and condition of the lift - Site and type of the building in which the lift travel - Passengers and goods demand - Inside and outside working condition (climate, vandalism, etc.)

In the next table, parts are shared in groups and for each group is shown the type of check and its longest frequency recommended. Checks operative instructions are detailed in the maintenance schedules on chapter. Please, note that all checks are applicable only if the part is really installed.

1.2 PERIODICAL MAINTENANCE AND CHECKS TABLE OPERATION CHECKS RECOMMENDED MAXIMAL FREQUENCY

I. Group : General checks INSTALLATION 6 MONTH 5 YEARS I.a General cleaning þ þ II. Group : Guide rails and pit elements INSTALLATION 6 MONTH 5 YEARS II.a Grease guide rails þ þ II.b Guide rails verticality þ þ II.c Rope fixings þ þ II.d Buffers þ þ II.e Pit cleaning þ þ III. Group : Car frame and pulley frame INSTALLATION 6 MONTH 5 YEARS III.a Safety gear device þ þ III.b Rope fixings þ þ

III.c Shoes þ þ III.d Cleaning þ þ III.e Pulley wear and greasing þ IV. Group : Power unit and jack INSTALLATION 6 MONTH 5 YEARS IV.a Valve gaskets seal þ þ IV.b Oil level check up þ þ IV.c Characteristics of the oil þ IV.d Motor protection operation þ þ IV.e Filters þ þ IV.f Pressure check þ þ IV.g Pressure gauge shut off (6) þ þ IV.h Pressure test (static pressure x2) þ þ IV.i Ball valve seal þ IV.j Labels, signs and schemes þ þ IV.k Overall check-up þ

Page 11: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

Maintenance Operations Pag. 3 di 6

Doc. n° 10991036 Rev.0.3.2 - 08.04.2005 1 EN

5

V. Group : Doors and operator INSTALLATION 6 MONTH 5 YEARS V.a Landing locks and landing doors þ V.b Landing doors and car door working þ V.c Coupling landing doors and car doors þ V.d Chains and belts þ V.e Door shoes and hanger rollers þ V.f Safety edge þ V.g Photocells þ VI. Group : Ropes INSTALLATION 6 MONTH 5 YEARS VI.a Rope wear þ þ VI.b Tension and lengthening þ VII. Group : Other components INSTALLATION 6 MONTH 5 YEARS VII.a Ride quality þ VII.b Relevelling þ VII.c Pushbuttons and signals þ VII.d Communication devices þ VII.e Emergency floor return þ VII.f Emergency operation þ VII.g Labels and schemes þ VII.h Travelling cables þ VII.i Control panel grounding þ

1.3 MAINTENANCE SCHEDULES

I. Group : General checks What to do: I.a General cleaning

- Check , for their correct working, all components are sufficiently clean and kept free from corrosion and stay in good conditions.

• Change or restore all components that don’t work properly.

II. Group : Guide rails and pit elements What to do: II.a Grease guide rails

- Lubricate the guide rails, eliminate excess from the end of the guides - Check level and correct working of guide lubricator. (if installed) - For the lower piece of guide, lubricate directly from the pit.

II.b Guide Rails Verticality - Use a template to check guides verticality and their position. - Check all the bolts are well tights to fishplates and guides.

II.c Rope Fixings in pit - Check and clean tie roads and connecting terminal ropes. Make sure that rope fixings are well tights.

II.d Buffers - Make sure that the buffers are placed into the original position and that they are not damaged. - Check, for safety, fixing of the supports and the basements of the buffers

II.e Pit cleaning • At the operations end check the pit area is clean, dry and free from debris

Page 12: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

Maintenance Operations Pag. 4 di 6

Doc. n° 10991036 Rev.0.3.2 - 08.04.2005 1 EN

5

III. Group : Car frame and pulley frame What to do: III.a Safety gear device

- Check the lever, the roller and the switch are not wear, check their movements are regular and easy and, for safety, check all bolts are well tights.

- Perform the safety gear test and check its correct working, according to the safety gear installation instructions.

III.b Rope fixings on car frame - Check and clean tie roads and connecting terminal ropes. Make sure that rope fixings clamps are well

tights. III.c Shoes

- Check preservation, wear and free from dust of the car guide shoes, car frame and pulley-frame. - Check guide shoes and if it’s necessary, take up slack

Devices Cleaning - Check all elements are well oiled and free in their movements

III.d Wear and pulley greasing - Check pivot and pulley bearing don’t make noise or abnormal vibrations, otherwise clean and grease them. - Check groove of the races are not worn or deformed by ropes passing. - Check the race alignment and profile.

• Replace or restore all the components not correctly working.

IV. Group : Power unit and jack

What to do: (see Fig. 1.3.1) IV.a Valve gaskets seals

- At the end of installation, and during check-ups, verify the gasket seals, in the following way: with the oil at room temperature close the ball valve (B) and open the pressure gauge shut off (6). Check that the pressure gauge reading on pressure gauge should not drop more than 4 bar in 5 minutes.

IV.b Oil level check-up. - With the elevator at the highest floor, check, using dipstick (F) or level

indicator (L), that the oil level is above the minimum level and (the motor should be fully covered in oil).

IV.c Oil Characteristics - Check visually that no change are occurred in the oil conditions. Perform

this check after leaving the system down for a few hours. Once every year it should be better to discharge a little amount of oil from cap (J) and to check if it’s clean. If oil is not clean keep on discharging oil until you see to flow clean oil.

IV.d Motor protection functionality - Disconnect one terminal of the thermistors, and check that the motor

protection working properly. IV.e Filter

- Check the main filter (FIL) mounted inside the silencer and clean it if is necessary. Fig. 1.3.1- Pump unit

Scheme IV.f Pressures check

- Check static and dynamic (working) pressure at the end of installation. Check regularly that all values of these parameters remain unchanged.

IV.g Pressure gauge shut off (6) - Close the ball valve (B), open the pressure gauge shut off (6) and fully discharge the pressure using

electro-valve (VMD). Close the pressure gauge shut off (6) open the ball valve (B) and check that the level shown on pressure gauge is zero.

IV.h Pressure test (static pressure x2) - This test assures you about the integrity of parts under pressure, including those which can not be

visually checked.

Page 13: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

Maintenance Operations Pag. 5 di 6

Doc. n° 10991036 Rev.0.3.2 - 08.04.2005 1 EN

5

To correctly carry out this test follow these instructions and make reference to Fig. 1.3.1 and Fig. 1.3.2: - Close the pressure gauge valve (6) - Close the ball valve (B). - Remove the pressure gauge (MAN). - Connect the hand pump (M) in place of the pressure gauge (G1/4) as

shown on Fig. 1.3.2. - Open the pressure gauge valve (6) - Open the ball valve (B). - Open the hand pump valve (N) for about 1 minute. - Close the hand pump valve (N). - Close the ball valve (B) - Operate the hand pump (M) until the required pressure is reached,

checking it on hand pump pressure gauge (O). - At the end of the test, discharge the pressure to zero by pressing the

push-button on (VMD) (see Fig. 1.3.1) using a screwdriver. - Close the pressure gauge shut off (6) - Disconnect the hand pump (M) - Mount the pressure gauge (MAN).

Fig. 1.3.2 - Componenti centralina interessati alla

prova a due volte la pressione statica

IV.I Ball valve seal - Close the ball valve (B) and open the pressure gauge shut off (6). Fully

discharge the pressure-using valve (VMD). check that the level shown on pressure gauge (MAN) is zero.

LEGENDA: M - Pompa a mano di prova N - Rubinetto pompa a mano O - Manometro pompa P - Attacco pompa Q - Rondella in rame

IV.j Labels, signs and schemes - Check that all the tags and diagrams are in place and legible (oil data label, emergency operation

manual, electrical diagram and hydraulic power unit schemes). IV.k Overall check-up

- Perform an overall check up of the power unit. When the overall check-up ends, check all the settings for the power unit start-up.

• Replace or restore all the components not correctly working.

NOTE In case of oil replacement, do not throw the oil away in the environment, but give it to oil recycling company.

NOTE When the power unit in no longer required, don’t throw it away, but give it to a recycling company or to the manufacturer.

V. Group : Operator and doors What to do: V.a Landing locks and landing doors

- Check that all the operator close contacts and landing doors are clean and working. - Check the correct working of all the landing locks, performing the manual operation on the lift roof to let

the car travel up and down. V.b Landing Doors and car doors working

- Check that the safety unlocking triangle work properly. - Check correct operation at every floor and check if they are damaged. - Check the doors opening and closing, they should be:

A) frictionless B) quiet

V.c Coupling floor doors and car doors - Check that the lock rollers couple correctly with the operator - Check the good working of landing door lock and make sure that they are perfectly set. - Oil the door-stop.

V.d Chains and belts - Check that belt and chain are tensioned and are not wear, check rope and cables integrity.

V.e Doors shoes and hanger rollers - Check that are not wear

V.f Safety edge (if fitted) - Check that the device works properly.

Page 14: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

Maintenance Operations Pag. 6 di 5

Doc. n° 10991036 Rev.0.3.2 - 08.04.2005 1 EN

5

V.g Photocells - Check that the photocells works properly

• Replace or restore all the components not correctly working.

VI. Group : Ropes What to do: VI.a Rope wear

- The suspension ropes which show wear or a lot of broken threads, should be replaced. - In case of doubt replace the suspension ropes when broken or worn threads total section is more than

10% of the rope total metal section, for a length equal or longer than 10 diameters of the rope with 6 strands, or 8 diameters of the rope with 8 strands.

- In case of worn ropes there should be more frequent regular checks and you should consider broken threads the ones that are visually reduced of the 50% compared to the original ones.

In addition the ropes should be changed when: - The rope diameter is 7% reduced compared the nominal value, even if in only one point. - The rope looks crushed, squeezed or permanently kinked. - The core comes out even in only one piece. - The rope even if is in traction, has got one or more released or jutting out strands.

Before fitting a new rope, make sure that pulley has not been worn by old rope passing. VI.b Tension and stretching

- On regular checks, verify tension and stretching of ropes. In case of anomalies, re-establish the original condition.

• Replace or restore all the components not correctly working.

VII. Group : Other components What to do: VII.a Ride quality

- Observe the car while is travelling and for each floor check (on upward travel and downward travel): A) Acceleration; B) Slow down; C) Stop; D) Quietness; E) Frictionless.

VII.b Revelling - Check the relevelling for each floor: perform the descent manual operation to check that the electrical

circuit and the relevelling contacts work properly. VII.c Pushbuttons and signals

- Check that the pushbuttons and signals in car and at all landing floor are working. VII.d Alarm and intercommunication devices

- Check that the intercommunication and the alarm devices are working properly. VII.e Emergency floor return

- Check that the emergency light, the floor return device and the open doors device (if installed) work properly in case of power failure.

VII.f Emergency operation - Perform an emergency operation every year to check that all the elements work properly, according to

the instructions included in the use manual. VII.g Labels and schemes

- Check the entirety and easy finding of warning signs, schemes signs and system documents.. VII.h Flexible cable

- Check cables wear and replace them when necessary. VII.i Control panel and electrical wiring

- Verify that control panel and all electrical wiring are dry, free from dust and correctly insulated and grounded

• Replace or restore all the components not correctly working.

Page 15: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

APPARECCHIATURE FLUIDODINAMICHE E COMPONENTI PER ASCENSORI

Azienda Certificata UNI EN ISO 9001

GMV SpA Via Don Gnocchi, 10 - 20016 PERO – Milano (Italy) TEL. +39 02 33930.1 - FAX +39 02 3390379 - http://www.gmv.it - e-mail: [email protected] A

Doc. n° 10991036 Rev. 0.3.2 - 08.04.2005 File: Man-GL-06-SE-EN.doc

Maintenance Manual

MAINTENANCE OPERATION SPECIFIC PROCEDURES FOR MRL LIFTS

Page 16: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

Procedures for MRL lift Pag. 2 di 4

Doc. n° 10991036 Rev. 0.3.2 - 08.04.2005 A EN

6

A MRL LIFT

A.1 GENERAL INFORMATIONS

A.1.1 DEFINITIONS Machinery equipment traditionally placed in the machine room : cabinet for control and drive system, lift machine, main switch and means for emergency operations Machinery space Space inside or outside of the well where the machinery as a whole or in parts is placed. MRL Machine room less

A.1.2 DESCRIPTION The MRL lift peculiarity is to have the hydraulic power unit, the control panel, and, generally, all machinery, in pit, inside the well. This machinery placement oblige the maintainer to follow some particular procedures to provide safe and easy access to the machine room – pit. For this reason on system is installed an additional devices set that consent and at the same time, assure the execution of the maintenance and inspection actions on safety. The additional devices set includes:

- the remote control of the hydraulic power unit and of the control panel - the car stop electrical device - the car stop mechanical device - the remote landing door unlock device

WARNING All the actions should be absolutely made by competent maintenance person, designated, suitably trained, provided with necessary instructions and belonging to the maintenance organization.

A.1.3 COMMANDS OF THE REMOTE PUSH-BUTTON PANEL Main functions of the remote push-button panel: • SPK: microphone and speaker of the two-way means of communication • IN: push-button to enable two-way means of communication • L: Car at floor light signal (led)

- lighted = car in the stop at floor zone - unlighted = car out of the stop at floor zone

• RST: Law 13 reset push-button (only Italy) • KB: plug-in for control panel remote control • UP: ascent push-button • DN: descent push-button • PW: Motive power remote switch • KY: key to enable ascent push-button and system reset

- ON = on work - OFF = not on work

• KY (ON) + UP: lift ascent • KY (ON) + DN: system complete reset

Page 17: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

Procedures for MRL lift Pag. 3 di 4

Doc. n° 10991036 Rev. 0.3.2 - 08.04.2005 A EN

6

A.2 ACCESS TO PIT OF THE MAINTENANCE MAN To access to the pit follow this instructions: • Place the out of order sign at all the landing doors • To gain access using the proper key to the remote push button panel placed

- or in the upright on the closing side of the landing door - or inside a walled box near the landing door

• push the call button on the door panel and bring lift at lower landing floor • when the car reach the floor and the door is open:

- insert the proper key in the maintenance manoeuvre selector (KY) - rotate e keep the key (KY) to the ON position - at the same time push the ascent (UP) button - lift up the car until go over the electrical stop device.

NOTE The car lift up automatically stops when the correct position is reached. The electrical car stop device guarantee, to access to the pit, 1800 mm of clear high opening, measured between the sill at the lower landing floor and the lower side of the car apron.

• Unlock using the triangular key the door at the lower floor • Open the landing door pushing panels in the opening direction.

WARNING From floor, before to access to the pit, push the stop button placed in the pit on the closing side of the door, ant switch on the lights in pit and well.

• Go down in pit using the proper anti-slip ladder placed under the sill of the landing door

NOTE After these actions the use of the system is reserved exclusively to the maintenance man, but the maintenance push-button panel is not on work.

NOTE If you do not need to move the car, the activation of the mechanical car stop device is not compulsory.

A.3 MOVING THE CAR

If you need to move the car, follow these steps: • to operate on the mechanical car stop device placed on the guide

- pull down the yellow handle - the device in now on working and if the car accidentally go down, the

parachute stop the lift travel in a safety position. - Put the device on working also activate the safety switch on it and

power on the maintenance push-button panel

ON

WARNING Be sure that the mechanical car stop device is correctly on working.

• Manually close the lower landing door from the pit • Move the stop push-button to the standard working position (remove from safety stop) • Using the maintenance push-button panel lift up and down the car and make the provided maintenance

actions

WARNING All dynamical check should be made outside the well or pit using the remote controls.

NOTE It’s possible to move the car only over the electrical car stop device.

At the end of the actions : • Push the stop button in pit • Open the lower landing door

- To pull down the handle of the unlocking door remote control - Manually move the door panel in the opening direction - Move the handle of the unlocking door remote control to the initial position.

Page 18: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

Procedures for MRL lift Pag. 4 di 4

Doc. n° 10991036 Rev. 0.3.2 - 08.04.2005 A EN

6

A.4 EXIT FROM PIT

• to operate on the mechanical stop car device placed on the guide - pull down the black handle - the device in now not on working - put the device not on working also deactivate the safety switch that

power off the maintenance push-button panel. If the lower landing door is closed • Open the door

- To pull down the handle of the unlocking door remote control - Manually move the door panel in the opening direction - Move the handle of the unlocking door remote control to the initial

position • Exit from pit using the proper anti-slip ladder placed under the sill of the

landing door • From floor, staying out of the well or the pit, move the stop push-button to

the standard working position (remove from safety stop) • Close the door • To operate on the remote push button panel:

- Rotate and keep the key (KY) to the ON position - At the same time push the descent button (DN) - Rotate the key (KY) to the OFF position

• Close the remote control box door • Remove all the out of service sign from all landing doors.

OFF

A.5 PERIODICAL MAINTENANCE AND CHECKS TABLE

OPERATION CHECKS RECOMMENDED MAXIMAL FREQUENCY I. Group : MRL Devices INSTALLATION 6 MONTH 5 YEARS I.a Car stop electrical device þ þ I.b Car stop mechanical device þ þ I.c Remote landing door unlock device þ þ

I.d Remote control station þ þ I.e Remote hand pump þ þ

A.6 MAINTENANCE SCHEDULES II. Group : MRL Devices What to do: II.a Car stop electrical device

- Check that the switches on guide rails, correctly work, are well tights and in the correct position II.b Car stop mechanical device

- Verify that the mechanical device correctly work - Verify that the rope slides easily into the guide and if necessary lubricate it. - Check that the safety switches of the device correctly work

II.c Remote landing door unlock device - Verify that the unlock device correctly works. - Verify that the rope slides easily into the guide and if necessary lubricate it. - Make sure that rope fixings are well tights and clean.

II.d Remote control station - Check, for safety, that all the devices of the remote control station correctly work.

II.e Remote hand pump - Verify that the hand pump correctly works and that losses of oil are not taken place

• Change or restore all components that don’t work properly.

Page 19: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

APPARECCHIATURE FLUIDODINAMICHE E COMPONENTI PER ASCENSORI

Azienda Certificata UNI EN ISO 9001

GMV SpA Via Don Gnocchi, 10 - 20016 PERO – Milano (Italy) TEL. +39 02 33930.1 - FAX +39 02 3390379 - http://www.gmv.it - e-mail: [email protected] B

Doc. n° 10991036 Rev. 0.3.2 - 08.04.2005 File: Man-GL-06-SE-EN.doc

Maintenance Manual

MAINTENANCE OPERATION SPECIFIC PROCEDURES FOR GL 81 21 LIFTS

Page 20: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

Procedures for GL 81 21 lift Pag. 2 di 5

Doc. n° 10991036 Rev. 0.3.2 - 08.04.2005 B EN

7

B GL 81 21 LIFT

A.1 GENERAL INFORMATIONS

B.1.1 DEFINITIONS Machinery equipment traditionally placed in the machine room : cabinet for control and drive system, lift machine, main switch and means for emergency operations Machinery space Space inside or outside of the well where the machinery as a whole or in parts is placed.

B.1.2 DESCRIPTION The GL 81 21 lift peculiarity is to have the height of the pit and/or of the headroom lower than a standard lift according with EN81.2:1998 rule. This thing oblige the maintainer to follow some particular procedures to provide safe and easy access to the pit and the headroom. For this reason on system is installed an additional devices set that consent and at the same time, assure the execution of the maintenance and inspection actions on safety. The additional devices set includes:

- the car stop electrical devices (upward limit electrical switches) - the car stop mechanical device - the safety balustrade on car roof - the retractile apron - the electrical safety switch on the unlocking triangle.

WARNING All the actions should be absolutely made by competent maintenance person, designated, suitably trained, provided with necessary instructions and belonging to the maintenance organization.

B.2 ACCESS TO PIT OF THE MAINTENANCE MAN To gain access to a pit with height lower than what is required by EN81.2 rule, follow these instructions: • Place the out of order sign at all the landing doors • Push the call button on the door panel and bring lift at the upper landing floor • When the car reach the floor and the door is open:

- Unlock using the triangular key the door at the lower floor - Open the landing door pushing panels in the opening direction - From floor, outside the well, push the stop push-button moving it to the stop position (act safety stop)

• The system is now on complete stop status.

WARNING The lower landing door opening start up an acoustic device and an alarm intermittent light. These devices signal that is dangerous and not safe to gain access to the pit, even though the system is on complete stop status.

NOTE To gain easy and safe access to the pit, it’s necessary, from landing floor, to move the car stop mechanical device (strut) to the ON position.

WARNING Be sure that the mechanical car stop device is correctly on working. When the strut is correctly in the ON position the acoustic device and the alarm light stop working.

Page 21: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

Procedures for GL 81 21 lift Pag. 3 di 5

Doc. n° 10991036 Rev. 0.3.2 - 08.04.2005 B EN

7

ON

OFF

OFF ó ON

• To gain access to pit using the proper anti-slip ladder placed under the sill of the landing door

NOTE After these actions the use of the system is reserved exclusively to the maintenance man, but the maintenance push-button panel is not on work.

NOTE Also if you do not can to move the car, the activation of the mechanical car stop device is compulsory.

B.3 EXIT FROM PIT • To operate on the mechanical stop car device

- pull the handle toward the OFF side as far as the strut is removed completely

- the device in now not on working The lift not become operative when you put the stop device in not on working position. If the lower landing door is closed • Open the door

- To unlock the door acting on the lock lever on the suspension - Manually move the door panel in the opening direction

• Exit from pit using the proper anti-slip ladder placed under the sill of the landing door

• From the lower floor, keeping yourself out from the well, move the stop push-button to the standard working position (remove from safety stop)

• Close the door • When you finish the maintenance operations, reach the machine room

and put on service the system making the total reset procedure acting on the control panel - Restore the start condition of the system pushing the reset push-

button (red) • If the system restore fail you shall clear the failure history of the control

panel - using the remote control keyboard follow the procedure shown in

the user manual of the control panel • Remove all the out of service sign from all landing doors and place

them into the machine room. - Lock the door of the machine room with the key.

OFF ó ON

Page 22: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

Procedures for GL 81 21 lift Pag. 4 di 5

Doc. n° 10991036 Rev. 0.3.2 - 08.04.2005 B EN

7

B.4 ACCESS TO HEADROOM OF THE MAINTENANCE MAN To gain access to the car roof when the headroom has height lower than what is required by EN81.2 rule, follow these instructions: • Place the out of order sign at all the landing doors • Push the call button on the door panel and bring lift at the upper landing

floor • When the car roof reach the landing floor level:

- Unlock using the triangular key the door at the upper floor - Open the landing door pushing panels in the opening direction

• The system is now on stop status.

a)b)

c)d)

WARNING The upper landing door opening start up an acoustic device and an alarm intermittent light. These devices signal that is dangerous and not safe to gain access to the pit, even though the system is on complete stop status.

NOTE To gain easy and safe access to the headroom, it’s necessary, on car roof, insert the balustrade part d) into the part c) and both, joint, into the support bases a) and b).

WARNING Be sure that the mechanical car stop device is correctly on working. When the strut is correctly in the ON position the acoustic device and the alarm light stop working.

• To gain access to headroom go to the car roof from the landing door.

NOTE After these actions the use of the system is reserved exclusively to the maintenance man, and the maintenance push-button panel is on work.

NOTE Also if it is not necessary to move the car, the installation of the balustrade is compulsory.

B.5 EXIT FROM HEADROOM • To move the car roof to the same level of the upper landing floor. If the landing door is closed • Open the door

- To unlock the door acting on the lock lever on the suspension - Manually move the door panel in the opening direction

• Remove the balustrade The lift not become operative when you remove the balustrade. • Exit from headroom from the landing door. • Close the door • When you finish the maintenance operations, reach the machine room and put on service the system making

the total reset procedure acting on the control panel - Restore the start condition of the system pushing the reset push-button (red)

• If the system restore fail you shall clear the failure history of the control panel - using the remote control keyboard follow the procedure shown in the user manual of the control panel

• Remove all the out of service sign from all landing doors and place them into the machine room. • Lock the door of the machine room with the key.

B.6 PERIODICAL MAINTENANCE AND CHECKS TABLE

OPERATION CHECKS RECOMMENDED MAXIMAL FREQUENCY I. Group : GL 81 21 Devices INSTALLATION 6 MONTH 5 YEARS I.a Car stop electrical devices þ þ I.b Car stop mechanical device þ þ I.c Safety removable balustrade þ þ

I.d Retractile apron þ þ I.e Safety switch on the unlocking triangle þ þ

Page 23: Maintenance Manual - local gmv · Any kind of exploitation in any form and by any means is forbidden without a written permission of GMV Spa. GMV Spa, within technical or manufacturing

Maintenance Manual

Procedures for GL 81 21 lift Pag. 5 di 5

Doc. n° 10991036 Rev. 0.3.2 - 08.04.2005 B EN

7

B.7 MAINTENANCE SCHEDULES I. Group : GL 81 21 devices What to do: I.a Car stop electrical device

- Check that the switches on guide rails, correctly work, are well tights and in the correct position I.b Car stop mechanical device

- Verify that the mechanical device correctly work - Verify that the rope slides easily into the guide and if necessary lubricate it. - Check that the safety switches of the device correctly work

I.c Remote landing door unlock device

- Verify that the balustrade correctly works. - Verify that all the joints between the parts correctly work. - Make sure that the safety switch correctly works.

I.d Remote control station - Check, for safety, that the apron correctly work.

I.e Remote hand pump - Verify that the electrical safety switch correctly work

• Change or restore all components that don’t work properly. ANNOTATIONS

"