sispres9

Upload: sayedmh

Post on 14-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 SISPres9

    1/73

    www.sis.ro

    SIS

    GROUP

    WE are here to help you see, understand and make it work properly.

    Our name means something.

    If you cant see it, you dont understand it. If you dont understand it, you cantmake it work.

    Stanford

    SIS GROUP

    Contact:

    22 Electronicii Str.

    Phone: +4 021 252 55 77

    Fax: +4 021 252 56 94

  • 7/30/2019 SISPres9

    2/73

    www.sis.ro

    SIS

    GROUP

    er iousn ess + ntel l igence = ecur i ty

    SIS GROUP

  • 7/30/2019 SISPres9

    3/73

    www.sis.ro

    SIS

    GROUP

    Company Products

    SIS carries out three main lines of products and associatedservices:

    Process Contro l Systems

    Safety & secur i ty systems

    Real Time Informational Systems

    Safety Ins trumented Systems

    2009References

    Project References

  • 7/30/2019 SISPres9

    4/73

    www.sis.ro

    SIS

    GROUP

    Research & Development

    Help-Center Platform with remote diagnoses and remoteintervention for the management of plants in technological

    hazard situations PH CENTER

    Open Algorithms, Sequences and Strategies forAutomated Actions in Control Systems, in HazardSituations, for Food and Petrochemical Industries

    BIBLIODAS

    Integrated management system for energy consumptionoptimization SIS-EC

    Alerting System based on Artificial Intelligent SALINT

  • 7/30/2019 SISPres9

    5/73

    www.sis.ro

    SIS

    GROUP

    Research & Development

    Integrated enzymatic and photo colorimetric system for themanufacture of biodiesel with automatic management in

    hazard situations SEFOIB

    Grid experimental platform for application development offlow- oriented activities with dynamic allocation ofresources PEGAF

    System for tracking, locating and collecting data frommoving targets through the network of mobile sensors

    CULORS

  • 7/30/2019 SISPres9

    6/73

    www.sis.ro

    SIS

    GROUP

    Company Products

    Outsourcing services:

    Detai l Eng ineer ing

    System Conf igurat ion

    DCS, SCADA , MES, PLC and RTu prog ramm ing

    CAD Services

    Mimic Diagrams Design

    Tests and val idat ion

    OPC Servers, dr ivers and embeded so ftware

    development

    2009 ReferencesProject References

  • 7/30/2019 SISPres9

    7/73

    www.sis.ro

    SIS

    GROUP

    Company Products

    Contracting services:

    Procurement

    System integrator

    Installat ion

    Implementat ion

    Commiss ion ing

    Training

    Data base and strategy generat ion

    Maintenance

    Field c ontro l and administ ration

    Recruitment

    2009 References

    Project References

  • 7/30/2019 SISPres9

    8/73

    www.sis.ro

    SIS

    GROUP

    Process Control Systems

    Being the main promoter of the Fieldbus technology in Romania, SIS

    holds a leading position on this market.

    Also, SIS owns agreements as system integrator for companies like:

    EMERSON,HIMA ,

    YOKOGAWA,

    ABB,

    SIEMENS,

    ALLAN BRADLEY,

    WONDERWARE,ICONICS,

    Rabbit Semiconductors

    2009 References

    Project References

  • 7/30/2019 SISPres9

    9/73

    www.sis.ro

    SIS

    GROUP

    Process Control Systems

    SIS expertise is already proved in:

    Chemical Industry

    Oil and Gas Cement Industry Pulp and Paper Food and Beverage Power Industry Water Machinery and Equipment Environment

    2009 References

    Project References

  • 7/30/2019 SISPres9

    10/73

    www.sis.ro

    SIS

    GROUP

    Process Control Systems

    Monitoring and supervisory systems for:

    Environmental Water and waste water Telecommunications Pipelines Power distribution

    2009 References

    Project References

  • 7/30/2019 SISPres9

    11/73

    www.sis.ro

    SIS

    GROUP

    Safety & Security

    Safety & secur i ty systems for:

    Public and administrative buildings

    Industrial installations

    2009 References

    Project References

  • 7/30/2019 SISPres9

    12/73

    www.sis.ro

    SIS

    GROUP

    Safety Instrumented Systems

    Burner Management System Emergency shut-down systems Fire & Gas systems Gas or Liquid-product Pipelines

    Process Kiln Overfill-protection

    Project References

    2009 References

  • 7/30/2019 SISPres9

    13/73

    www.sis.ro

    SIS

    GROUP

    Safety & Security

    Public and administrative buildings

    The systems cover all range of applications from small systems(apartments, offices, and agencies) to office buildings, banksheadquarters, insurance companies and administration.

    The essential advantage against the competition is the companysapproach based on integration of all the systems in to BuildingManagement System.

    To this, SIS can add the promotion of new technologies based onanalogical detectors, wireless communications and perimeterarea security systems.

  • 7/30/2019 SISPres9

    14/73

    www.sis.ro

    SIS

    GROUP

    Safety & Security

    Industrial installations

    Given the competition, SIS offers not only the conception and the

    integrated delivery of the safety & security systems correlated

    and interconnected with the automation system, but alsoconsulting services, on sight tests and measures, the

    integration of new equipment in an already done system.

    SIS offers also quasi-unique solutions for CCTV and intercoms for

    environment with high risk of explosion, etc.

  • 7/30/2019 SISPres9

    15/73

    www.sis.ro

    SIS

    GROUP

    Real Time Informational Systems

    Based on the Smart Cardand RFID technology, SIS promotes a seriesof the latest systems like GMS (Gasoline Management System),Loading Management System, access control, etc.

    SIS is the promoter of Managerial Integrated Systems:

    Information management Management strategies Inventory/product tracking Manufacturing execution Material and capacity planning and optimisation strategies Automated materials handling and accounting Marketing strategies

  • 7/30/2019 SISPres9

    16/73

    www.sis.ro

    SIS

    GROUP

    Arguments Against The Competition

    Being, from the establishment of the company, the carrier of the

    Romanian school of automation and process software tradition, SIS

    has taken upon itself the role of the pioneer in this field, achieving

    almost every year national premiers.

    Over 30 years experience and the professionalism of the basic team,which is the main force in some fields, contribute to the position of a

    national leader.

    The covering of the main categories of activity, specific for an integrator

    in this field: design, engineering and consulting for process control &

    instrumentation systems, research &development of new products,

    software implementation and engineering, installation,

    commissioning, erection and service not only for automation systems

    but for security and safety ones make of SIS an almost unique leader.

  • 7/30/2019 SISPres9

    17/73

    www.sis.ro

    SIS

    GROUP

    Arguments Against The Competition

    SIS is already ready to make projects based on the last technologicachievements in the field. From the beginning, SIS has shown itselfinterested in the developments of PC 104 Consortium, FieldbusFoundation, Device Net, MODBUS, LONWORKS but also in the smartcard, ultrasounds, infrared, microwaves technologies, being able to makeprojects accordingly.

    SIS has agreements to be an engineering partner or integrator for worldleaders like ABB, EMERSON, Wonderware, Siemens, Allen Bradley,Yokogawa.

    SIS is a founder member of ANIS (the Romanian National Association of

    Software Companies), member of ARIES (Romanian Association forElectronics and Software) and the organisational support for SISP(Process Software Engineering Society).

  • 7/30/2019 SISPres9

    18/73

    www.sis.ro

    SIS

    GROUP

    Quality Assurance Policy

    The objective of the Management of SIS is to provide its products in amanner that conforms to the specified requirements of the Company,its customers and all applicable regulatory authorities.

    In order to achieve these objectives, it is the policy of SIS to establish andmaintain an effective and efficient quality management system,

    planned and developed in conjunction with other managementfunctions and ISO 9001 certified. This assists in the reduction of thepotential effects of product liability as it ensures that all relevantsafety standards are identified. Quality affected activities are suitablycontrolled and identified and appropriate user warnings andinstructions issued. The determination of conformity of work to

    contractual and regulatory requirements is made on the basis of theobjective evidence.

  • 7/30/2019 SISPres9

    19/73

    www.sis.ro

    SIS

    GROUP

    19 Years of Major Accomplishments

    First safety & security system for BCR- 1991 First integrated safety & security system in accordance with our

    "Intelligent Building" concept - 1992

    First computerized, multi - channel (64) flow computer,metrologically approved - 1993

    First Integrated Managerial System - 1994 First SCADA System for water - 1994 First SCADA System for power consumption - 1996 First Optimization System for steam production and distribution -

    1998

    First Paperless Recorder 1999 First system for editing proximity cards-1999

  • 7/30/2019 SISPres9

    20/73

    www.sis.ro

    SIS

    GROUP

    19 Years of Major Accomplishments

    First Lloyds agreement 2000 First export Fire and Gas Control System in Syria 2000 First Building Management System-2000 First research work for equipment and software compatible with

    FIELDBUS FOUNDATION-2000

    First DCS for refinery installations 2001 the first Loading Management System for Oil Tanks 2001 First Fieldbus Foundation Products 2001 First research work for Smart Cards-2001

    First metrological homologation for Flow Measurement on OpenChannels 2002 First DCS for Crude Oil Separation 2003 First SCADA for water monitoring of a power plant-2003

  • 7/30/2019 SISPres9

    21/73

    www.sis.ro

    SIS

    GROUP

    19 Years of Major Accomplishments

    First Field Distributed Control System (Fieldbus Foundation & ASi)for a chemical plant 2003

    First consulting services with Stone&Webster 2003 First data/voice, safety and security for PORSCHE SHOW ROOM

    and Service-2003

    First Integrated System for process control of a Thomassencompresor-2003

    First OUTSOURCING contracts for DELTA V EMERSON-2003 First project for process control and instrumentation based on

    Fieldbus Foundation, Asi, MODBUS and PROFIBUS-2004

    First OUTSOURCING contract for DCS PCS 7 SIEMENS-2004 First Power Distribution Control System for an International Airport

    2004

    First basic design for REBIS Italy-2004

  • 7/30/2019 SISPres9

    22/73

    www.sis.ro

    SIS

    GROUP

    19 Years of Major Accomplishments

    First ROCS award-2005 First WONDERWARE certifications-2005 First MES system for tobacco plant-2005 First HIMA certification-2005 First ESD assembled, programmed and tested-2005 First Burning Management System-2005 First CEEX R&D for Safety Instrumented Systems 2006 ISO 9001 certification - 2006 First turn-key Process Control System for Malaysia 2006

    DCS and instrumentation detail engineering for Ammonium nitratePlant Egypt 2007 Bitumen and Fuel Oil Pier 5 Process Contol - Midia Navodari-2008

  • 7/30/2019 SISPres9

    23/73

    www.sis.ro

    SIS

    GROUP

    Main References

    Process control for ammonia plant with pneumatic equipments Complex process control in petrochemical and refinary Utilities and energetic dispatcher Communication software interface RS 232, RS 485, RS 422 Process standard programme system SP2micro Host computer interface bus compatible IEC 61158 System software configuration elements and compatible structure IEC 61,158 System programs for automatic identification of the personal using advanced

    technologies based on smart cards

    Visual inspection system with multiple linear cameras for integrated andoptimized quality control on moving scene Portable data logger for process parameters Configurtaion KIT for SCADA applications RELANSIN SCADA system compatible with Fieldbus Foundation

  • 7/30/2019 SISPres9

    24/73

    www.sis.ro

    SIS

    GROUP

    Main References

    A device based on artificial sight and robotic installation for the on-line automaticidentification, localization and inspection of products regarding quality control,

    sorting and hook-ups - RELANSIN

    Modem for radio channel with signal processor Research on development of mechatronical systems for simulating the

    movements specific to walking for the recovery of persons with locomotor

    disabilities

    Collaborative network for research on the effects of pollutants in the environmenton health, in some complex systems

    Embedded system based on telesensors for monitoring and controlling

    parameters in distributed systems in areas with broad support communication viawireless networks

    Integrated systems of chemical technologies, command, control and managementof production-based on systems with increased security and emergency shut

    down, resulting from the hazard analysis

  • 7/30/2019 SISPres9

    25/73

    www.sis.ro

    SIS

    GROUP

    Main References

    ESD for POLIPROPYLENE PLANT ROMPETROL PETROCHEMICALS

    SCADA System for Utilities ROMPETROL PETROMIDIADCS & Burner Management System for ROMPETROL REFINERY

    PETROMIDIA

    DCS Process Control for Hexan ROMPETROL REFINERY VEGA

    LOAD MANAGEMENT SYSTEMS for ARAD LPG TERMINAL ROMPETROL

    LOGISTICS

    LOAD MANAGEMENT SYSTEMS for BACAU LPG TERMINAL

    ROMPETROL LOGISTICS

    PLC Process Control for Centrifugal Compressors

    ROMANIA

  • 7/30/2019 SISPres9

    26/73

    www.sis.ro

    SIS

    GROUP

    References

    DCS Process Control for Isocianate Complex KOPROM

    DCS Process Control for Propenoxid Plant OLTCHIM

    Manufacturing Execution Systems

    "OUTSOURCING" SERVICES for DCS programming and implementation

    ROMANIA

  • 7/30/2019 SISPres9

    27/73

    www.sis.ro

    SIS

    GROUP

    References

    SCADA&Process Control for Cement Plant

    Yemen

    Egypt

    SCADA&Process Control for Cement Plant

    DCS Process Control for Ammonia Nitrate Plant

  • 7/30/2019 SISPres9

    28/73

    www.sis.ro

    SIS

    GROUP

    References

    MALAYSIA

    FRANTA

    SCADA & PLC System for Biodiesel Pilot

    SCADA & PLC System for Pulp and Paper Plant

  • 7/30/2019 SISPres9

    29/73

    www.sis.ro

    SIS

    GROUP

    References

    SYRIA

    SCADA & ESD System for Banyas Refinery Bitumen Processing Unit

    Process Control for AMINE Banyas RefineryProcess Control for DEHEXANIZER Banyas Refinery

    SCADA for Fire and Gas Control System-L.P.G. Cylinder Filling Unit

    Aleppo-Tayara

    PLC and SCADA System-Fuel Oil Pipeline Banias Refinery- Banias

    Power Station

    SCADA & DCS SYSTEM-Gas Pipeline Project Aleppo-Palmira

  • 7/30/2019 SISPres9

    30/73

    OPEN ALGORITHMS, SEQUENCES ANDSTRATEGIES FOR AUTOMATED ACTIONS IN

    CONTROL SYSTEMS, IN HAZARD SITUATIONS,FOR FOOD AND PETROCHEMICAL INDUSTRIES

  • 7/30/2019 SISPres9

    31/73

    Introduction

    In Romania, there have been permanent researchesfor theoretical investigations for automated controlsystems, and for implementing them in advancedprograms for practical results. Our project aims tocontribute to the acceleration of technologicaltransfer in industrial environment of recent yearsremarkable studies

  • 7/30/2019 SISPres9

    32/73

    Introduction The algorithms developed will be integrated in the

    Remote Control and Diagnosis Platform

  • 7/30/2019 SISPres9

    33/73

    Agenda

    Basics of hazard analysis

    Project Approach

    Objectives, activities, expected results Partners and end-users

  • 7/30/2019 SISPres9

    34/73

    Keywords

    Process control

    Library

    Hazard Analysis Control algorithms, sequences and strategies

    Open-source platform

  • 7/30/2019 SISPres9

    35/73

    Basics of hazard analysisAhazard analysis is a process used to assess risk. The

    results of a hazard analysis is the identification ofunacceptable risks and the selection of means ofcontrolling or eliminating them

    There are several widely used methods:

    HAZOP

    Risk analysis

    P.H.A. - Process hazard analysis

  • 7/30/2019 SISPres9

    36/73

    Project approachAlgorithmic solutions will allow an important rise of

    efficiency, even in the case of using personal computers oflow level hardware and software performances.

    Use of an open source library will support technical andeducational collaboration, and will integrate latestresearches in the field

    Generating reusable algorithms, sequences and strategies

    Risk management and operating procedure synthesisbased on experience

  • 7/30/2019 SISPres9

    37/73

    Objectives Developing a complex software package and of on-line

    services, for process modeling in high risk and hazardsituations, for identifying new strategies forimplementation in special cases, and to establish acomprehensive database of hazards in food andpetrochemical industries with the solutions for solvingthem

    Building a database, both at a national and Europeanlevel, upon industrial clients experience in the field

    disposed to participate in the research, which willcontain examples of hazard situations found indifferent plants

  • 7/30/2019 SISPres9

    38/73

    System architecture

  • 7/30/2019 SISPres9

    39/73

    Activities Current stage: Stage 1: Evaluating the current context

    and fundamenting the solution

    Has a theoretical character that consists in underlying,

    elaboration and verification of the technical andscientific hypothesis that leads to establishing possiblesolutions, taking into account the existing national andinternational situation

  • 7/30/2019 SISPres9

    40/73

    Activities Stage 2: conceptual model development, domain

    taxonomy, methods and strategies for platformimplementation and their adaptability on theapplications

    Stage 3: hardware and software design, configurationand implementation of the system and the simulationon a functional model in virtual environments

    Stage 4: documentation and functional modeldevelopment, as well as its testing and validation

    Stage 5: experimental model development, testing andvalidation

    Stage 6: applying the experimental model on a casestudy; results dissemination

  • 7/30/2019 SISPres9

    41/73

    Duration 36 months

    Expertise and work of the

    partners Polytechnic University of Bucharest will provide

    automated strategies, access to educational research

    Administrative project manager Informatics Research Institute will provide

    algorithms and operating sequences

  • 7/30/2019 SISPres9

    42/73

    Industrial research companies which will come with

    new control algorithms System integrators which will add their experience in

    risk and hazard management

    Future partners

  • 7/30/2019 SISPres9

    43/73

    End users

    System integrators who want to optimize their controlsolutions

    Owners of chemical, oil and gas plants who want tominimize risk and hazard effects

    Owners of food plants who want to maximize their

    production by using advanced control strategies

  • 7/30/2019 SISPres9

    44/73

    Questions?

  • 7/30/2019 SISPres9

    45/73

    PLATFORM AND HELP CENTER FORTELEDIAGNOSYS AND TELEINTERVENTION FOR

    THE PLANT MANAGEMENT IN HAZARDOUSSITUATIONS

  • 7/30/2019 SISPres9

    46/73

    IntroductionA long time very conservative environment,

    namely safe automation technology, has beenstrongly changing over the last two decades

    towards fully electronic control and automationsystems.

    In the market of diagnosis of industrial processesthere are several software services which are

    specific to each producer and every application ,and each industry .

  • 7/30/2019 SISPres9

    47/73

    Introduction The diagnosis and debugging system will analyze the

    process data in real time by the specialists working inthe centre using remote desktop, via internet.

  • 7/30/2019 SISPres9

    48/73

    Agenda

    Project Approach

    System Architecture

    Objectives and Activities

    Expected Results

  • 7/30/2019 SISPres9

    49/73

    Key Words

    Help center

    Tele diagnosis

    Tele intervention

    Hazard

    Risk

  • 7/30/2019 SISPres9

    50/73

    Project Approach

    This project aims to achieve a software packetunique on the Romanian market, bringing newfeatures event to the international market.

    This kind of application runs remotely, viainternet, supervising and tuning the control loopseven if they are effected by different kinds of

    perturbations.

  • 7/30/2019 SISPres9

    51/73

    Project Approach

    The main advantage of remote tuning system isthe possibility of intervening at any time and fromany place in the world.

    The software package can be used permanentlyfor the analysis of several the control loops or tomonitor the performance of already tuned loops.

  • 7/30/2019 SISPres9

    52/73

    Project Approach

    The diagnosis service will continue to improve ,through knowledge data base building for more thenone application in the same centre , witch will have

    multiple solutions , linking them together will beproving to be a key factor in decision making in futureactivities.

    This will have a eloquent impact on the problem

    solving time as well as on non-functioning time in anhazardous plant

  • 7/30/2019 SISPres9

    53/73

    System Architecture

  • 7/30/2019 SISPres9

    54/73

    To underline the importance of this project in ourfirms activity we will consider two defining aspects:to show the innovative character and the integration

    of the software package in SIS SA activity. The projects relevance can be proven not only

    through a modern approach or by functions andfacilities offered compared with other classic

    diagnostic systems but also by a modular approach,by flexibility and openness of the system, whichrecommends it for new projects or updating old ones.

    Objectives and Activities

  • 7/30/2019 SISPres9

    55/73

    Projects objectives:

    Creating a remote connection in safety conditions usingmodern means of communication which implies the

    Internet and dedicated software. Obtaining a diagnostic and debugging system for

    supervised automation systems with anonconformingrunning

    Objectives and Activities

  • 7/30/2019 SISPres9

    56/73

    Projects objectives:

    Generalizing the software package: diagnosing anddebugging will be made no matter the manufacture of

    the automation equipment or the mode ofcommunication between them; OPC standard

    By developing this project is ensured the knowledgeassembly ( know-how) for all activities, at the Help

    Centre level, due to the Internet facilities.

    Objectives and Activities

  • 7/30/2019 SISPres9

    57/73

    Expected Results Remote diagnosis will offer industrial companies the

    opportunity to:

    run test services for software and instrumentation

    verify and modify settings

    upgrade software

  • 7/30/2019 SISPres9

    58/73

    Expected Results The clients will have a direct benefit from this service

    they can solve their problems without calling longdistances numbers , which will have as a first advantage

    no time zone difference the diagnosis will be done online , an engineer on site

    will no longer be necessary, which will reducemaintenance costs.

    experienced engineers will have direct access to thesystem, and they can work together with the localsystem engineer.

    can have training courses for new operators

  • 7/30/2019 SISPres9

    59/73

    Duration 36 months

    Expertise and work of the partnersUPB -wide experience in coordination and realization of processcontrol research based projects, having specialized laboratories, willcoordinate the project and the university team

    ICI wide experience not only in research projects, but also in analysis,studies and solution proposals regarding distributed architectures foraccessing heterogeneous information: Grid, Web services.

  • 7/30/2019 SISPres9

    60/73

    Questions?

  • 7/30/2019 SISPres9

    61/73

    E-TRAINING SYSTEM FOR OPERATORS,TECHNOLOGICAL ENGINEERS AND FOR THE

    MAINTENANCE ENGINEERS FOR AUTOMATION,

    SAFE AND SECURE SYSTEMS

  • 7/30/2019 SISPres9

    62/73

    Introduction Innovating the knowledge-transfer strategy plays a

    basic role in providing high quality support andassistance for the customers.

    The companies deploy their activities through a

    structure that often leads to a gap betweenmanagement and production personnel. A veryeffective answer to the requirements of flexibility intraining is the distance training. The classification and

    reutilization aspects of the multimedia content play animportant part in the improvement of the workingenvironment.

  • 7/30/2019 SISPres9

    63/73

    Introduction The project fits to the European research strategy,

    integrating in the research trends of the FP7.

    It will provide remotee-training functions

    that will beintegrated in theRemote Control andDiagnosis Platform

  • 7/30/2019 SISPres9

    64/73

    Agenda

    Project Approach

    Objectives

    Activities

    Expected results

  • 7/30/2019 SISPres9

    65/73

    Keywords

    E-training

    E-learning

    Platform

    Specialized content

  • 7/30/2019 SISPres9

    66/73

    Project approach The e-COPT project wants to create an integrated system

    of e-learning components, which will allow theadaptation of the learning- instruction-execution process,at a certain moment, according to the special needs of a

    trainee. The main purpose of the project is offering the client the

    opportunity to get specific training on a very narrow field,that aims strictly at the capacity of operators, technical

    engineers and maintenance engineers, to quicklyassimilate knowledge afferent to the processes that needto be supervised as well as to timely respond to technicalissues emerging on the technological line.

  • 7/30/2019 SISPres9

    67/73

    Objectives Design and implementation of an e-learning

    environment based on web technologies, able to leadto the construction and the developing of a f low cyclecomplete, personalized for each learner, in the field of

    the automation system, safety and security. Solving present limitations of the e-learning systems,

    especially the ones referring to the flexibility of theprocess of learning-teaching assisted by the computer

    and at the promoted learning methods, offering newfacilities to specific groups of users

  • 7/30/2019 SISPres9

    68/73

    Objectives

    Insurance of the compatibility with e-learningsystems at the national and European level, byevaluating and adopting some standards especially for

    the e-learning domain (IMS, IEEE SCORM etc).

  • 7/30/2019 SISPres9

    69/73

    Activities Stage 1: documentation which consists in

    fundamenting, formatting and checking the technico-scientific hypothesis which leads to the establishmentof some possible solutions, taking into consideration

    the situation on the national and international area Stage 2: development of conceptual methods,

    methods and strategies for implementing theplatform and the adaptability to other applications

    Stage 3: hardware and software structures design,configuration and implementation of the system andsimulation of the functional model in virtual areas.

  • 7/30/2019 SISPres9

    70/73

    Activities Stage 4: functional model development, testing and

    implementation

    Stage 5: experimental model development, testing andimplementation; writing documentation

    Stage 6: proving the functionality and use of theexperimental model on a case study

  • 7/30/2019 SISPres9

    71/73

    Expected results

    Quantitative results: Increasing chemical plants life

    Decreasing general revision time

    Increasing time between revisions

    Decreasing the loss produced by accidental plant shutdown

    Minimization of equipment failure

    Qualitative results:

    High degree of safety and security in plant operation

    Low risk of pollution

    Decreasing personnel intervention necessity foroperating, maintenance and managing the plant

  • 7/30/2019 SISPres9

    72/73

    End users The research results will be applied to beneficiaries

    who desire efficiency by assuring safely functioning,avoiding instability situations, optimization of theenergy consumption, stability of processes of

    fabrication in case of risk or unknown situations.

  • 7/30/2019 SISPres9

    73/73

    Questions?