sunir catalouge

21
Our Commitments Cross Over Borders

Upload: morteza-amin

Post on 14-Feb-2017

40 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: SUNIR Catalouge

Our Commitments Cross Over Borders

Page 2: SUNIR Catalouge

ContentsMessage of Managing Director

Introduction

About SUNIR

Field of Activities

Scope of Works

Quality Certificates & Awards

Strategic Business Units

. Power Generation

. Power Transmission & Distribution

. Power Secondary Distribution

. Electricity Exchange

. Equipment Trading

. Water and Sewage

. Oil and Gas

. Finance and Investment

SUNIR Prominent Projects

[ 01 ]

[ 02 ]

[ 03 ]

[ 04 ]

[ 07 ]

[ 8 ]

[ 9 ]

[ 10 ]

[ 14 ]

[ 16 ]

[ 18 ]

[ 20 ]

[ 22 ]

[ 26 ]

[ 28 ]

[ 31 ]

SUNIR

Page 3: SUNIR Catalouge

[ 03 ][ 02 ]

IntroductionEnergy, as the driving fuel of economy, plays a unique role in today’s world. Development of the energy resources is held to be an essential to Economic Growth, and disregarding this aspect will result in damages hard to compensate.By the beginning of 1990s, the Iranian water, power and energy industries developed beyond the actual national demands. In 1994, “Iran Power & Water Equipment and Services Export Company” (SUNIR) was officially registered on the base of the recommendation made by Ministry of Energy with the aim of maintaining an effective and systematic participation in global markets by means of the Iranian capabilities in Energy Sector.In line with its mission to export engineering equipment and services, SUNIR has followed these objectives:

. Marketing and conducting projects in the global water, power and energy markets awarded through international tenders or direct negotiations . Purchase /sale or exchanging power from / to domestic or international resources / targets. . Cooperation with or investment in companies and promoting commercial activities. . Design, conduction, installation, execution, repair and maintenance of energy plants. SUNIR has successfully performed all phases of several important turn-key projects throughout the planet, from feasibility study to operation. In addition to its professional expertise, SUNIR has acquired numerous internationally accredited quality certificates.SUNIR is honored to be the pioneer Iranian company in energy exchange as a feature of improving the public quality of life in an international scale.

Iran Power & Water Equipment and Services Export Company consists of the most prominent companies active in water, power, oil and gas industries.A professional in developing and constructing energy related industries, SUNIR is a consultant in investment, execution and management and is a general contractor in EPC projects.Since its establishment in 1994, SUNIR has successfully performed a wide range of activities in more than 18 countries.Benefiting from the know-how and expertise available to its stockholder companies and also the services of its offices in other countries, SUNIR group conducts turn-key projects as well.Customer satisfaction through constant upgrading of products and services is the new approach of SUNIR as a pro-active company in the field of exporting preferred industries. In general, SUNIR activities procedure is as below:

. Doing market research and development, and international marketing

. Doing Feasibility Studies

. Preparing and providing tenders’ documents

. Exporting goods and services and exchanging energy

. Executing projects in BOT, BOO, BOOT and BLT bases

. Investing, financing and forming Joint Ventures

About SUNIR

Page 4: SUNIR Catalouge

[ 05 ][ 04 ]

1. Powerproduction, transmission, distribution and exchange of electricity.

Field of Activities

2. Waterdam and hydropower plants, water transmission lines, irrigation and drainage networks, pumping stations, water and sewage treatment plants, river engineering and environmental services.

3. Oil & Gasbuilding petrochemical and refinery complexes, laying pipelines, building storage tanks, compressor stations and offshore platforms, and repairing and maintaining industrial units.

4. Financing & InvestmentEvaluating plans and projects financially, providing business plans and reports, conducting risk studies and investment returns.

Benefiting from professional experts in its central office and utilizing the expertise

of its group members, SUNIR is ready to perform technical and engineering

services in the forms of contract management, engineering, procurement and

construction.

Since covering all the aspects of technical knowledge needed in an individual organization is almost impossible, SUNIR tries to utilize several companies, each of which

specializes in a particular field. In this way, we are able to focus on high-ranking management skills and satisfy customers’ needs. This brings about a considerable

flexibility in SUNIR for fulfilling the market’s new demands.

The most important SUNIR activities as a general contractor are divided into five main categories:

‘‘ ‘‘

Page 5: SUNIR Catalouge

Electricity Exchange & Trade

Distribution

Transmission

[ 07 ][ 06 ]

5. Civil & Industrialconducting civil and construction projects , establishing factories, building houses, doing industrial projects, building roads.

Scope of Works

Civil & Industrial

Power

Water

Oil & Gas

Financing & Investment

Water Resources

Dam & HP

Irrigation & Drainage

Water Treatment

Procurement

Generation

Refineries

Petrochemical Complexes

Pipelines

Tank Farms

Compressor & Pump Stations

Compressor & Pump StationsMaintenance, Overhaul and Revamp

Procurement

B. O. O.

B. O. T.

Civil Works

Construction

Factories Establishment

Industrial Projects

Procurement

Page 6: SUNIR Catalouge

014

014

[ 9 ][ 8 ]

Quality Certificates and Awards Strategic Business Units

PowerGeneration

Waterand Sewage

EquipmentTrading

Electricity Exchange

Secondary Distribution

Oiland Gas

Power Transmissionand Distribution

Financeand Investment

OHSAS 18001

ISO 14001

ISO 9001

2006

2011

2008 2009

2010 2012

Nowadays, export is a combination of science, specialty and experience. Competent in the water, power and energy industries in international markets, SUNIR has been nominated as an exemplary exporter in 2006, 2008, 2009, 2010 and 2011. In 2009 also, it was chosen by the Ministry of Energy as the highest-ranked company in power and water industry for making the largest amount of added value through exporting technical and engineering services.By acquiring the quality integrated management systems certificate (ISO 9001 – 2008, ISO 14001-2004 & OHSAS 18001-2007) SUNIR has set its agenda to adhere to these principles and standards of quality, environment and OH & S.To develop and improve its systems constantly, SUNIR is focusing on the following areas:

Developing and improving human resources

. Expanding and upgrading the knowledge of personnel in effectiveness enhancement

. Enriching the purchasing resources management system in order to recognize, evaluate and using the potentials of the contractors, producers and industry consultants in industry fields

. Enhancing and enriching SUNIR’s presence in target markets

. Improving project management and goods quality

. Recognizing and providing economic plans and sharing investment development

. Identify, evaluate and control significant environmental aspects, hazards and non acceptable occupational risks due to activities and equipments

. Consider environmental, OHSAS and other applicable requirements

.In addition to the aforementioned certificates and awards, SUNIR has become the member of the Federation of Consultants from Islamic Countries (FCIC). This federation was founded in 1986 by the Islamic Development Bank.

Page 7: SUNIR Catalouge

[ 11 ]

Electricity is created from other forms of energy via the process of power generation. For electric utilities, it is the first process in the delivery of electricity to consumers.

The other processes, such as electric power transmission and electricity distribution, are normally carried out by the electrical power industry.

Electricity is most often generated at a power station by electromechanical generators, primarily driven from heat engines fueled by chemical combustion or nuclear

fission, but also by other means, such as the kinetic energy of flowing water (hydropower plants) and wind (wind farms). There are many other technologies that can be

and are used to generate electricity such as solar photovoltaic and geothermal power.

Power Generation SBUPower generation SBU has been established In line with SUNIR Company long-term policies to attract and build power plant projects around the world, in order to pay specific attention to this field.Power generation SBU has developed a matrix structure to increase reliability and quality of services. It includes a permanent core of qualified and experienced professionals, capable of providing over 10,000 engineering man-hours per year.Also, Enjoying its external organizational relationships with experienced companies inside and outside of Iran, POWER GENERATION SBU will participate in Joint Venture in many large power plant projects of different types.Administrative structure of Power Generation SBU consists of two independent units which are called Negotiations and Tenders.In Negotiations unit, an experienced team in both technical and legal affairs is gathered to monitor the world markets of power plant activities.Benefitting its prominent relations through its offices in several countries, this unit also provides smaller local companies with commercial services to develop their activities in abroad.In Tenders unit, an experienced team consists of qualified engineers prepare technical proposals for power plant tenders.

Power Generation SBU

‘‘‘‘

Page 8: SUNIR Catalouge

[ 13 ][ 12 ]

SUNIR’s Outlook on Power Generation

Wind Farms

Steam Power Plants

Renewable Energy

Gas Power Plants

Types of Power Plants

Hydro Power

Procurement

Construction & Commissioning

Repair & Rehabilitation

Feasibility Study

Power Generation SBU Activities

Having more than 65000 MW installed power plant capacity, Iran enjoys a great potential for holding similar Power Plant Projects abroad. In this regard, the role of SUNIR Company, as the export wing of Energy Sector, remains second to none.SUNIR Co., being represented as General Contractor of Power Generation Projects, has the ability to handle almost all kinds the Power Plant described in preceding paragraphs. As an example, having completed the prominent project of 320-MW Al sadr Power Plant, SUNIR initiates the construction of another Power Plant named DIBIS with the capacity of 320 MW in Iraq.

‘‘‘‘

Scope of worksThe main activities of the Power Generation SBU include: Engineering, Procurement, Construction and Commissioning and Rehabilitation of different types of Power Plants (Thermal, Gas, Combined Cycle, Hydropower and Wind), as well as supervision on the Execution of Power Plant Projects. The Power Generation SBU activities fall into following services:

• Management of Power Plant Projects• Engineering• Procurement• Construction• Operation & Maintenance (O/M)

Major References. Gas Transmission Project from Iran to Armenia Design review, engineering, soil and construction works related to gas pipeline execution, supply, production, delivery of equipment, laying and commissioning of approximately 40 kM of natural gas pipeline between Megri and Kadjaran.. Water Treatment Plant and Pumping StationDesign, supply, and supervision of Banes, guanta, Jesus Menendez, La Maya & Palma Soriano water treatment plant and also the supply of equipment including horizontal and deep well pumps for Las Tunas, Camaguey, havana and Holguin city pumping station.. Engineering, Procurement, Installation, and Commissioning of SINDH Wind FarmStudy, design, supply, installation, test, and commissioning of 50-MW wind farm in Pakistan. It is based on an equity Joint Venture Iran Pak Wind Power Ltd.

Page 9: SUNIR Catalouge

[ 15 ]

The accelerating development of global technology has led to the emergence of the power industry as one of the important foundations of the economy. Power

transmission technology is the artery of the power industry.

‘‘‘‘The power transmission elements in transmission lines & substations include cables, steel towers and structures, hardware (such as clamps and warning balls), insulators, OPGW, power transformers and HV, LV, and MV elements. They are required for the transmission technology used to transfer electricity from generation centers to the end users, such as factories, offices, or homes. The followings are the main advantages of a power transmission network:

1. Avoiding local electricity generation for different zones (such as diesel generation or local power plants) and decreasing the amount of industrial pollution.2. Increasing the reliability and stability of energy transfer.3. Monitoring transmission line defects, maximum/minimum level of consumption, peak time, etc. in order to manage the energy market.4. The possibility of designing a load dispatching center (LDC) for control & monitoring of the network status and implementation of Supervisory Control And Data Acquisition (SCADA)

Scope of WorksPower Transmission Technology:Nowadays, international business is affected by import/export of goods and services in the global market which leads to economic improvement, investment and development . the engineering services export history of the Islamic Republic of Iran indicates a good potential of knowledge in engineering activities. We have progressed especially in electricity and water technologies due to the improved management among local manufacturers as well as engineering and consultant companies in the aforesaid industries. The recent report of power transmission technology illustrates these facts about power network in I.R. Iran:

• Total length of 400 KV lines: 18761 ckm• Total length of 230 KV lines: 29117 ckm• Total length of 132 KV lines: 21111 ckm• Total length of 63& 66 KV lines: 44007 ckm

Considering the above items, everybody can judge our expertise in power transmission technology and learn more about our recent developments as one of the leading countries in electrical industries.SUNIR company composed of the most successful companies in different sectors of the energy industries such as power, water, oil and gas has an extremely important role in equipment & engineering exportation for those industries as a General Contractor.As one of the active SUNIR SBUs, Power Transmission & Distribution SBU has progressed substantially in the Power Market. It improves its system to match several international competitors in power transmission tenders and projects in order to increase the export capabilities of engineering services.The wide range of services of POWER T&D SBU are as follows:

1. Attendance in international tenders 2. Engineering and consulting services3. Feasibility studies of power projects4. Project management (in different stages of E, P and C steps)5. Design, procurement and construction of transmission system (lines and substations)

Power Transmission & Distribution SBU

Page 10: SUNIR Catalouge

[ 17 ]

‘‘‘‘ Secoundary distribution of electricity is considered as “electrification vessel” to the consumers who are demanding more performances in terms of continuous duty,

reliability and qulity of the electrical power supply. This is the area where SUNIR shines. Secondary Distribution SBU at SUNIR is strongly committed to the quality,

accuracy, and reliability of its services and supplies.

Objectives• To improve quality of serveices, minimize interruptions, keep

good voltage profile• To save and better control of energy• To improve efficency of operation, relabiliaty, maximize use of

existing equipment, loss reduction• To provide economical solutions• System automation

Field of Activity• Electrification Projects• Industrial Electrification Projects• Distribution Network Optimization Projects• Loss Reduction Projects (Technical / Non-Technical Losses)• Renovation of Distribution Networks• Lighting Projects• Smart Grids

Scope Of WorksWhat SUNIR can offer via Secondary Distribution SBU to its clients:

Power Services and SolutionsWide Range of Consultancy, Design, Execution and Management in All Aspects of LV and MV Networks (Secondary Distribution) such as:• Feasibility study / feed• Detail design• At site supervision• Construction• Installation / testing / commissioning• Refurbishment and substation renovation

Control & Automation Services and Solutions• PMS / EMS• Distribution network automation• Monitoring and control systems • Dispatching / control centers• Remote terminal units• AVR systems (Automatic Voltage Regulation)

Secondary Distribution SBU

Page 11: SUNIR Catalouge

The latest predictions about electrical energy by the International Energy Agency show that the world is facing 8.2% annual growth in energy consumption. Therefore,

all countries are in need of connecting nets and grids to deal with electrical equipments.

Main Forms of Electrical TradeThe main forms of electrical trade involve either cooperation or competition.

The cooperative approach involves dealing with countries affiliated with IEA . In the competitive approach, countries act as regional or other consortiums (such as based on common generating methods).We are planning to work together with countries sharing borders with Iran; in particular, countries located to the west or east of Iran on account of the lag of sunlight shift time and optimum transmission vis-à-vis peak regional delay.After entering the international electrical market , SUNIR has been expanding into different fields of trade in the region year by year.SUNIR is the first in the country and first in the region to start electrical energy trading.The department in SUNIR which is responsible for trading electrical energy is the Electricity Exchange SBU.SUNIR has allocated its expert engineers and company knowledge to this job. It has also put substantial effort into maintaining high level community relations and staying abreast of updates.

The basic activities of the Electricity Exchange SBU are shown as below:

Feasibility studySite selectingEconomic studyNetwork and grid studyTransmission and dealing (execution section)

[ 19 ]‘‘‘‘

Electricity Exchange SBU

Page 12: SUNIR Catalouge

Equipment Trading SBUOne of main requirements in Power Plants, Power Grids and Water Networks is to supply relevant equipment. Hence Equipment Trading SBU of Sunir Company has to

follow the customers’ requirements all around the world and find the best supplier who meets the needed specifications at the lowest price. The nature of our activities

and responsibilities in Equipment Trading SBU makes us to have a very rich vendor list which is being updated continually.

[ 21 ]

‘‘‘‘Needs for electrical and water equipmentSince our mission is supplying the equipment and not performing the entire project, Equipment Trading SBU will be in charge and will contact the appropriate manufactures. SUNIR Equipment Trading SBU can also assist other SBUs when they are engaged in a turn-key project where the procurement should be a part of the job.

Scope of Works:Acquiring the offer from the best suppliers:

The first step of our task is to contact the companies manufacturing the required equipment. Vendors must satisfy the Technical Specifications , Target Price, shortest Delivery Time, Reference List and Quality Certificates. On the other hand, Clients have their own conditions and limitations. So this SBU is prepared to match both sides together and handle all technical and commercial queries.

Execution:If all of efforts end to a supply contract, we will do all needed follow-ups for performing the contract. It means this SBU will instruct the supplier how to follow the contractual terms and timings. This task will be continued until releasing all guarantees i.e. the final acceptance by the client. This task requires a good commercial knowledge including contractual, transportation, banking, customs, etc.

Scope of SupplyOur scope of supplies is including, but not limited to the following items: Power Generation, Transmission & Distribution Equipment:1. LV & MV Switch Boards (Distribution, Control & Protection)2. Power Transformers (Step-up, Auxiliary, Distribution, Earthing)3. Compact Substations4. Circuit Breakers (ACB/MCCB/MCB)

5. Earthing Switches6. Disconnectors / Isolating Switches7. Cut-out Fuse8 Line Trap9. Lightning Arrester & Surge Arrester10. Measurement Transformers (CT & PT)11. Overhead Line Conductors, Shield Wires & OPGW12. Cables (Power & Control) and Cabling Accessories (Sealing End)13. Transmission Towers & Poles14. Insulators15. Metering Equipment (Power /Water)16. Diesel Generator17. Turbine (Water /Gas)18. UPS19. DC Power20. Capacitor Bank21. Relays (Protection/Control)22. Ring Main Units (RMU)23. Auto Re-closers (SF6/Vacuum)

Facility Equipment:1. Steel Structure2. Power Transmission & Telecommunication Towers3. Solar Panels & Solar Lightitng Fixtures4. Lighting: Poles, Lamps & Accessories (Ballast)5. Explosion Proof Equipment6. Electrical Motors7. Pumps8. Valves9. Pipes10. Fittings & Accessories11. Fire Detection and Suppression12. High Precision Air Conditioner13. Access Control & CCTV14. Laboratory Equipment15. Paging & Intercom16. Cathodic Protection17. Laboratory Equipment

Page 13: SUNIR Catalouge

[ 23 ]

Nowadays, water shortage along with the rising demand for water in domestic, agriculture and industry sectors has highlighted the importance of water resource

management in recent years. Technoligical knowledge of supplying water from the available sources to consumers is one of the most important issue in the world.

Using its expertise and valuable experience in the planning and implementation of development of water resources and the possibility of issuing engineering services

and related equipment to other countries, SUNIR Company can present the best way to resolve technical and environmental issues in accordance to the customer's and

employer's needs.

Water Resources in the WorldResearches indicate that about 1.4 billion cubic kilometers of water (in liquid, solid and vapor form) are available on the planet. Approximately 97.2% is saltwater (ocean water), and approximately 2.15% is in glaciers and icecaps. Just 0.65% (equivalent to 8.5 million cubic kilometers) of water remains as drinkable water, from which 0.16% is scattered as vapor in the atmosphere. Therefore, only 0.49% remains as groundwater or running in lakes, rivers and streams.As a result, the amount of drinking water in comparison to the whole water supply on the earth seems to be a few big drops. Therefore, Engineering Companies in the water field – such as SUNIR Water SBU – share in the revival and play a key mission in most corners of the earth.

‘‘‘‘Water & Sewage SBU

Page 14: SUNIR Catalouge

[ 25 ][ 24 ]

Scope of WorksSUNIR's activities in this field are mainly in three sections:

EngineeringEngineering studies involving meteorology, hydrology, hydrogeology, geology, geotechnical surveys, measuring, sampling water resources and qualitative and quantitative traces are necessary for preliminary studies. These engineering services from consultancy companies will be rendered by SUNIR group.

PerformanceThe execution of water resource development projects, like dams, hydro power and diversion dams, hydraulic and hydro-mechanical structures, and water transmission lines, tunnels, canals and pipelines, tanks, water distribution networks, sewage collection networks, water and wastewater treatment plants, irrigation and drainage networks, desalination plants, pumping stations, river engineering and environmental services.

EquipmentThis company supplies a wide range of goods, equipment, auxiliary and spare parts to the water industry. These items include but are not limited to pumps, electro-motors, pipes and fittings (steel, cast iron, ductile, polyethylene, PVC, GRP, concrete, etc.) control panels for pumping stations, transformers, water meters, valves, automation equipments, tele-control appliances, precision and measuring instruments, blowers, air compressors, and tanks (polyethylene, metal and cement).

Earth

Concrete & RCC

RubberDams & Hydropower Plants

Water Pipelines

Sewage Networks

Irrigation Networks/ Drainage

Pumping Stations

Water/Waste Water Treatment Plants

River Eng. & Environmental Services

Dams

Distribution Network

Main Transmission Line

Rural

Municipal

Sprinkler

Drip

Wastewater Treatment

Water Treatment

Water Projects

Page 15: SUNIR Catalouge

Oil, Gas & Petrochemical SBUThe availability of hydrocarbon is vital to many industries and is of importance to the maintenance of industrialized civilization. Therefore, it is of critical concern to many nations. According to the latest studies, oil will account for a large percentage of the world's energy till 2050.The petroleum industry is involved in the global processes of exploration, extraction, refining, transportation and marketing. Hydrocarbons are also the raw material for many chemical products including plastics, pharmaceuticals, fertilizers and many more vital products. The importance of Iran in world energy is based on its ranking. It is among the top three holders of proven oil and natural gas reserves in the world. Over a century of experience in oil production, having experienced engineers and technicians and an experienced labor force have highlighted Iran above her neighbors. Iran occupies a strategic location in the north of the Persian Gulf. Its geopolitical and geostrategic position offers the safest and most economical route for transporting oil and its byproducts. Iran not only possesses a great abundance of oil but also natural gas, which has enabled this country to be an exporter of CNG to neighboring countries through a network of pipelines and also LNG to the world market.At the present time, a network of 26,000 km of pipeline in Iran can export and swap up to 2.3 billion cubic meters to Armenia, 14 billion cubic meters to Turkey, 10 billion cubic meters to Turkmenistan, and 50.5 to 402 billion cubic meters to the Republic of Azerbaijan. SUNIR, with its group’s great capabilities, can offer its expertise in design, engineering and project management for oil, gas and petrochemical projects in the form of turnkey or GC.

Scope of WorksSUNIR Group members have furnished us with the capability to contribute in projects involving:

• Consulting• Design and Engineering• Procurement• Construction • Project Management

SUNIR Petrochemical and Oil & gas SBU can perform repairs, maintenance, rehabilitation and construction in the following areas:

• Refineries• Petrochemical complexes• Sale and swap of fuel-refinement products • Tank Farms• Oil & gas pumping stations• Jetties & offshore platforms• Exploration and drilling• Turbine and compressors CNG Stations• ... and more

[ 27 ]

Page 16: SUNIR Catalouge

[ 29 ]

Apart from supplying resources and technical, engineering, and management expertise, SUNIR has provided the necessary basis for supporting and cooperating in equipping and supplying resources by creating the finance SBU. Supplying financial contracts through domestic resources or exchange loans is called finance. It is performed in two ways:

1. Corporate finance2. Project finance

Financial resources are divided into two groups:

1. Loaned sources(World Bank, Islamic Development Bank, finance-credit lines)

2. Non-loaned sources, such as:

• B.O.T. (Build, Operate, Transfer)• B.O.O.T. (Build, Ownership, Operate, Transfer)• B.L.T. (Build, Lease, Transfer)• B.O.O. (Build, Operate, Ownership)• B.T.O. (Build, Transfer, Operate)• D.B.F.O. (Design, Build, Finance, Operate)• M.O.O.T. (Modernize, Operate, Own, Transfer)• R.O.O. (Rehabilitate, Operate, Own)• Buy-back: In this category of contracts, the foreign investor/company accepts all investment costs (including purchase, equipment installation, operation and technology transfer) and returns them back to the host country after operation.• Joint Ventures: the investor and the one who accepts the investment on a joint venture basis or to establish a business company starts to create, rebuild, modernize, reform and update the business plans; the members participating in this investment will assume the responsibility to finance the whole plan. Repayment to the members of the investment will be from the profit gained from projects operation and is based on joint venture contracts or on the statute of the company.• Risk taking service contracts: a group of business methods based on which the investor guarantees to supply financial resources needed (based on the outcomes of the business plan). The investor also promises to create, develop, renovate, rebuild, reform and update the said plan. The installments will be paid back by the contractor after the operation of the plan.

• Profit sharing contracts (also known as revenue sharing contracts) are predicated to business methods based on which, the investor guarantees to supply the needed financial resources based on the outcomes of the business plan. He also promises to create, develop, renovate, rebuild, reform and update the said plan. Payback to the investor will be through the investor's sharing in a determined portion of the project productions outcome.

Finance & Investment SBU

Page 17: SUNIR Catalouge

[ 30 ] [ 31 ]

Since after a determined period, the accessories and individual assets are considered the property of the task master, the three former types of the contracts are more accepted and more used among task masters. Some of the qualifications of the finance are as below:

. Low rate and long-term pay back

. Short-term selling of productions with interest

. Repay rate of the investment less than the rate of loan interest

. Risk assessmentBy using different financial methods, provisions for domestic and foreign investments are provided. By utilizing foreign investment resources, domestic economic growth can also be facilitated.

Scope of WorksThe finance SBU has provided needed basis to support and share equipment and provisions for sources in addition to technical, engineering and management services for projects. The following capacities have distinguished SUNIR in performing B.O.T., B.O.O., B.O.O.T., B.L.T., and other projects. The finance SBU is able to offer the following services:• Acquiring facilities in the form of buyer's credit• Acquiring facilities in the form of seller's credit• Acquiring facilities in the form of credit lines• LC discounting • Factoring• Offering exchange services in the form of hedging the risk of changing foreign exchange rate • Acquiring export insurances to hedge commercial-political risks (buyer)• Opening LCs and consulting about the type and quality of the credit• Performing investment projects in the form of B.O.T., B.O.O., etc.• Acquiring credit facilities on the project (LC contract) in the form of imported LCs and cash facilities.• Evaluating buyer’s credit• Determining the credit line available in target markets (short-term, medium-term, long-term)• Obtaining the necessary agreement to finance • Financing with the help of buyer’s domestic sources Design& Supply The Equipment for Six 66/20 KV

Conventional Substations

Type: Power -TransmissionCountry: Syria Client: Public Establishment for Distribution & Exploitation of Electrical EnergyContract year: 2000Design, manufacturing & supply the materials & equipment forsix 66/20 KV conventional substations . In addition to the civil & electrical works design , supervision on erection , civil works , commission , putting into operation , testing at the factory.

Supply, Erection and Installation of Agarak 220 KV Substation

Type: Power -TransmissionCountry: Armenia Client: ArmenergoContract year: 2000 Design preview & revision drawing, delivery of equipment, construction, erection, adjustment and commissioning of 220KV Agarak substation.

Design, Supply, and Erection of the Equipment Al-Bab Tadef Irrigation Project

Type: Water Country: SyriaClient: General Organization for Land Development Contract year: 2002 Designing, supplying and erecting hydro mechanical mechanic and electrical equipment that are required for Al-Bab Tadef irrigation project on an area of about 6700 hectares. In addition to the elaboration of working drawing for the civil works regarding this equipment.

Construction of 220/110 KV Overhead Lines & Related Substations

Type: Power -TransmissionCountry: ArmeniaClient: High Voltage Electrical NetworksContract year: 2002

Design preview & revision drawings, delivery of equipment, construction, erection, adjustment & commissioning of 220/110/35 KV overhead line plus extension of existing 220 KV Agarak & Shinuhair substations in Armenia.

From its establishment on, SUNIR has

performed a wide range of projects

in the fields of Power, Water, Oil &

Gas. The number of these projects

is about two hundred projects.

SUNIR has also some projects under

negotiation. Here some of the most

outstanding SUNIR projects are

mentioned. To view the complete

list of performed projects in Asia,

Africa and Latin America, you can

refer to our website in the address

www.sunir.com

SUNIRProminent Projects

‘‘

‘‘

Page 18: SUNIR Catalouge

[ 33 ][ 32 ]

Construction of 225 KV & 30 KV Touba - Tobene - Kaolack Transmission Lines & Substations

Type: Power-TransmissionCountry: Senegal Client: Senegal Electricity CompanyContract year: 2004

Design, procurement, construction & commissioning of Tobene – Touba - Kaolack 225/30 KV transmission lines & substations in Senegal.

Water Treatment Plants (10 Projects)

Construction of Gas Transmission Line

Type: WaterCountry: CubaClient: Cuba HidraulicaContract year: 2005

Supply of equipment for Camaguey, Havana, Holguin, Las Tunas and design, supply,supervision of Palma Soriano, La Maya, Jesus, Menendez, Guanta and Banes water treatment plants.

Type: Oil & GasCountry: ArmeniaClient: High Voltage Electrical NetworksContract year: 2004

Design review, engineering & constructional works & revision of drawings, fulfillment of soil and construction worked related to gas pipe line execution, supply, production, delivery of equipment, laying and commissioning of approximately 40 KM of natural gas pipe line between Megri & Kadjaran in republic of Armenia.

Construction of Wind Farm

Type: Power - GenerationCountry: ArmeniaClient: High Voltage Electrical NetworksContract year: 2003

Design, supply, and installation including civil works & successful testing & commissioning of the wind power plant in Armenia (Including 4 turbines with a capacity of 2.6 MW in Pushkin-Pass region).

Delivery of electrical energy from Turkmenistan to Iran ( Mary – Mashad )

Delivery of electrical energy from Turkmenistan to Iran ( Sarakhs – Sarakhs )

Delivery of electrical energy from Turkmenistan to Iran ( Balkanabat – Gonbad )

Type: Power - Electricity ExchangeCountry: TurkmenistanClient: Turkmenerego - state power corporationContract year: 2003

- The annual electrical energy to be transmitted will be approx 1,500,000,000 KWh.

Type: Power - Electricity ExchangeCountry: TurkmenistanClient: Turkmenerego - state power corporation Contract year: 2003 The annual electrical energy to be transmitted from Turkmenistan will be approx 600,000,000 KWh.

Type: Power Country: TurkmenistanClient: Turkmenerego - state power corporationContract year: 2003- Turkmenerego - state Power Corporation The annual electrical energy to be transmitted Form Turkmenistan will be approx 900,000,000 KWh.

Irrigation Project in the City of Ashgabat

Type: Water Country: Turkmenistan Client: Ministry of Energy & Industry of TurkmenistanContract year: 2005 Study, design, supervision, construction of reservoir, pumping and plumbing works, installation of equipments and civil works of irrigation project in Turkmenistan.

Construction of Irrigation project & Tunnel

Type: Water Country: SyriaClient: Ministry of Irrigation & General Organization for Land DevelopmentContract year: 1999 & 2004 Construction of tunnel for irrigation of Homs and Homa with new irrigation methods and construction of tunnel for irrigation of south desert of Halab

Construction of 330&220 KV Overhead Transmission Lines & Substations

Type: Power - TransmissionCountry: AzerbaijanClient: Azerenrji JSCContract year: 2005

Design, geological surveying, manufacture, test, deliver, install, and commission of 330 KV & 220 KV overhead transmission lines and substations between Imishli - Ali Bayra, Li–Astara in republic of Azerbaijan.

Construction of Iran - Armenia Third Power Transmission Line and Related Substations

Type: Power - TransmissionCountry: Armenia Client: High Voltage Electrical NetworksContract year: 2006

Design, engineering, procurement, supply & construction of Iran – Armenia 400 KV third power transmission line and related substation.

Construction of Al-Sadir 324MW Power Plant

Type: Power - GenerationCountry: IraqClient: Ministry of Electricity of IraqContract year: 2007

The subject of this contract is engineering, supply of material & equipment, procurement, construction & commissioning in all sections of civil, mechanical, electrical works of the 2 x 162 MW open cycle gas turbine power station, to be located at Al-Sadir city, in Baghdad, Iraq.

Page 19: SUNIR Catalouge

[ 35 ][ 34 ]

Shikarpur 500 kV Transmission Line

SINDH Wind Farm Project

Type: Power - TransmissionCountry: PakistanClient: National Transmission & Dispatch Company of Pakistan (NTDCL) Contract Year: 2011

This Turn-Key project consists of Design, Manufacture, Supply, Installation, and Testing & Commissioning of double circuit 500KV Dadu-Guddu Transmission Line and 220kV Guddu-Sibbi Transmission Line.

Type: Power -GenerationCountry: PakistanClient: Alternative Development world & Sindh governmentContract Year: 2010

This project consists of Study, design, supply, installation, test, and commissioning of 50-MW wind farm in Pakistan. It is based on an equity Joint Venture Iran Pak Wind Power Ltd.

Power Transmission from Turkmenistan to Afghanistan

Type: Power -Transmission & DistributionCountry: AfghanistanClient: Ministry of Energy and Water of Islamic Republic of AfghanistanContract Year: 2011

Installation of new 110 KV OH Transmission Line with the length of 57 KM from Rabat Kashan in Turkmenistan to 110/20 KV substation in Kala-e-Naw city on turn-key basis. Based on this contract, SUNIR also works on installation of MV & LV distribution network in Kala-e-Naw city. Rabat Kashan Kala-e-Naw covers design, manufacture, testing, and construction/ erection.

DIBIS 320-MWPower Plant Construction

Type: Power -Generation Country: IraqClient: Ministry of Electricity of IraqContract Year: 2011

This contract includes Engineering, Procurement, Construction, Commissioning, and Erection. The duration of the project is scheduled to be 14.5 months From the commencement.

Construction of 220KV Transmission Line and 220/132KV GIS Substation

Type: Power -TransmissionCountry: PakistanClient: National Transmission and Dispatch Company Contract year: 2009

The subject of this contract is design, supply, construction and commissioning (EPC project) of 220 KV transmission line from Iranian border to Gawadar and 220/132 KV GIS substation at Gawadar.

Construction of 220 KV Double Circuit Transmission Line

Type: Power -TransmissionCountry: PakistanClient: National Transmission and Dispatch Company Contract year: 2008

The subject of this contract is the design, survey, manufacturing, test, delivery, installation, and commissioning of 220 KV double circuit transmission lines between Dadu & Khuzdar of Pakistan (120 km)

Rural Electrification Project

Type: Power - DistributionCountry: Sri LankaClient: Ministry of power and energyContract year: 2009

The subject of this contract is engineering, procurement and construction of electrification of 1000 rural villages.

Construction of 220 / 132 KV AIS Substation

Extension of 230 KV Substations

Type: Power -TransmissionCountry: PakistanClient: National Transmission and Dispatch CompanyContract year: 2008

The subject of this contract is design, supply, install, test and commissioning of the plant and equipment for Khuzdar 220/132 KV AIS substation of Pakistan.

Type: Power-TransmissionCountry: EthiopiaClient: Ethiopian Electric Power Corporation Contract year: 2009

The subject of this contract is design, manufacture, test, supply, erection and commissioning of 230 KV substation extensions at Bahir Dar, Gonder and Shehedi including civil works.

Water Supply System at Niabat Jabal Akhdar In Wilayat of Nizwa

Type: WaterCountry: OmanClient: Public Authority for Electricity and WaterContract year: 2010

The subject of this contract is supply, installation and construction of potable piped water supply to villages and other institutions in Niabat Jabal Akhdar in Wilayat of Nizwa.

Page 20: SUNIR Catalouge

Off ices

Printed by CUT

+98 912 395 82 95

SUNIRNo.1, Mozhdehi Alley, Somayeh St.Tehran, 1581761185, I.R. IRANTel: (+9821) 888 300 99 , Fax: (+9821) 888 22 [email protected]

Armenia - Yerevan

Azerbaijan - Baku

Ethiopia - Addis Ababa

Afghanistan - Kabul

Syria - Damascus

Oman - Muscat

United Arab Emirates - Jebel Ali

Pakistan – Lahore

Iraq-Erbil

Iraq- Baghdad

Turkmenistan - Ashgabat

Page 21: SUNIR Catalouge