TRACK CONSTRUCTION MACHINE
-
8/16/2019 tcm60_ang
2/8
TCM 60
TCM
TCM
TCM 60
Pad insertionTrack laying andpositioning
Gantry 1Winches forrail pulling
Sleeper laying andpositioning
Track Construction Machine TCM 60The TCM 60 is built to lay new track continuously. It uses thesame working principle as the MATISA Track Renewal Trainswhich are internationally renowned for their excellence
OptionsRail pulling on the platformXPost for rail pad positioning on the sleepersX
Additional drive wagon (WES)X A second gantryXPositioning and insertion of 10% of the elastic fasteningsX
Automatic insertion of the “fast clips”X
TCM 60 MOR (China)
Basic execution
Rail pulling tractor
-
8/16/2019 tcm60_ang
3/8
WES
TCM 60
Provisional storage for fasteningsRail insertion
Gantry 2Fastening insertionRail advancing (2 units)
Sens de travail
Rail and sleepers
transport wagon
Rail positioning
Gantry
Working direction
Sleeper transport wagon
Complete execution
Right of technical modifications reserved
-
8/16/2019 tcm60_ang
4/8
1 12 23 34 45 56 6
Working direction
Working direction1,8 km = 12 rails of 300 meters
Worksite set-upThe initial machine set-up at a new worksite is an autonomousand very rapid process, as all the units required are carried bythe machine itself.
After the initial set-up, continuation of work at the worksiteonly requires the exchange of the sleeper or rail and sleepertransport wagons; thus there is no interruption to the tracklaying process.
Rail and sleeper transportationThe adjacent drawing shows the procedure when the choice ismade to pull the rails from the machine onto the platform. Thissolutions avoids trains crossing on the work-site.
-
8/16/2019 tcm60_ang
5/8
Working direction
Working direction
2 winches at the front of the TCM to pull the rail to theX
system2 pairs of driven rollers under the WES, to push the railsX
To guide the rails and to avoid any damage to the platform, supportrollers are placed manually every 10 meters directly onto theplatform.
These rollers are picked up when the sleepers are laid.
Rail pulling on the platformThis operation, which is not simultaneous with the sleeper
laying, requires the following equipment:
1 caterpillar tractor XGuiding rollers to be installed along the machine and theXsupplementary wagonRollers to be placed every 10 meters along the platformX
Rail passage holders
Rail guidinghead
Platformroller
This operation is not simultaneous with the sleeperlaying
Rail and sleepertransport wagon
-
8/16/2019 tcm60_ang
6/8
5
1
3
2
4
6
7
TCM 60
Working direction
Working direction
Track laying unitThe technique used for laying the sleepers is the same as thatdeveloped and used on the latest generation of track renewaltrains. Thanks to its rapid, short movements, this laying unit isrenown as the most reliable and accurate currently available onthe market.
Drawings 1 to 5 on the left show the sleeper’s cinematic in thelaying unit.
Drawings 6 and 7 show that before adjusting the distancebetween the sleepers, they are laid on the track formationensuring constant and regular spacing.
P2: post for rail positioning
P1: post for sleepersand machine guiding
Cabin work postsThe cabin of the TCM 60 features two work posts:
one for laying the sleepers and guiding the machineXone for laying the rails on the sleepersX
-
8/16/2019 tcm60_ang
7/8
Guiding the machine A line painted on the track platform helps the operator toguide the caterpillar; moreover the working unit can be movedlaterally to refine the guiding precision.
Equipment for connection to the
existing rail
Alignment tolerance to the crawler ± 50 mmX
Alignment tolerance to the working group lateral movementX± 20 mm
Guideline spray-painted on the platformCrawlers, controlled bythe sleepers operator
Laying group, with lateral displacement controlWorking post
Right of technical modifications reserved
-
8/16/2019 tcm60_ang
8/8
v14.00 - 0209
MATISA S.A.S.
9, rue de l’Industrie
Z. I. Les Sablons
FR-89100 Sens
Tél.: +33-386 95 83 35
Fax: +33-386 95 36 94
E-mail: [email protected]
MATISA Japan Co., Ltd.
JR Hatchobori Bldg., 8F3-25-10 Hatchobori, Chuo-ku
JP-Tokyo 104-0032
Tel.: +81-3-5540-8211
Fax: +81-3-5540-8220
E-mail: [email protected]
MATISA Matériel Industriel S.A.
Arc-en-Ciel 2
Case postale
CH-1023 Crissier 1
Tél.: +41-21-631 21 11
Fax: +41-21-631 21 68
E-mail: [email protected]
MATISA Maschinen GmbH
Kronenstrasse 2DE-78166 Donaueschingen
Tel.: +49-771 15 80 63
Fax: +49-771 15 80 64
E-mail: [email protected]
MATISA S.p.A.
Via Ardeatina Km 21
IT-00040 Pomezia/
Santa Palomba (RM)
Tel.: +39-06-918 291
Fax: +39-06-919 84 574
E-mail: [email protected]
MATISA (U.K.) Ltd
P.O. Box 202GB-Scunthorpe DN 15 6XR
Tel.: +44-17-248 770 00
Fax: +44-17-248 770 01
E-mail: [email protected]
MATISA Matériel Industriel S.A.
Sucursal Española
C/Francia 39
Poligono Industrial “La Estacion”
ES-28971 Griñon (Madrid)
Tel.: +34-91-814 01 71
Fax: +34-91-814 11 94
E-mail: [email protected]
Technical specifcationsOverall Length (without WES)X .........................26’650 mmMaximum width (without gantry rail)X .................2’900 mmHeight with gantry craneX ..................................4’200 mmWeight without gantryX ................................................70 tEngine power X .....................................................285 kWWorking speed up toX ...................16 sleepers per minuteMax. speed in convoyX .......................................100 km/hPivots center spacingX .....................................19’300 mmWheel diameter X .................................................920 mmMinimum working radiusX .......................................250 mMinimum travelling radiusX .....................................150 m
Vehicle gaugeX ...........................................................UICMaximum sleeper lengthX ..................................2’600 mmLifting capacity of the craneX .................................22,5 tm