    ICL PLASTICS EXPLOSION- Background & Prosecution

    Workshop (Part 1) on 20th May 2009

    UKLPG 2nd Annual ConferenceLeeds

    by Rod Sylvester-EvansRSE Consultants Ltd

    No part of this Presentation can be used without the express permission of RSE Consultants Ltd

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    2/30

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    3/30

    Background - Overview

    An explosion occurred on 11th May 2004 which destroyedthe Grovepark Mills Factory in Maryhill, Glasgow, owned

    by ICI Plastics Ltd The explosion was caused by a leak from buried LPG

    pipework which accumulated in an unventilated basement

    of the factory. The explosion & collapse of the 4 storey building caused

    the loss of 9 lives, injured 33, (22 receiving severe injuries)

    and exposed a further 12 persons to risk of harm. Subject of a Public Inquiry held in July and Oct/Nov 2008

    and currently awaiting Lord Gills Report.

    (Following details based on the Crowns narrative at the Plea in Mitigation andTranscripts of the Public Inquiry)

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    4/30

    YARDENTRANCE

    GROVEPARK

    MILL

    LPG TANK

    FAILED LPGPIPEWORK

    FABRICATIONSHOP

    YARD

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    5/30

    (Photos courtesy of HSE)

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    6/30

    (Photos courtesy of HSE)

    Ariel view of excavatedbasement with section of

    steel floor structure replaced

    Excavated basement area

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    7/30

    2 Tonne LPG Tank Installedin the corner of the Yard at

    ICL Plastics Ltd

    RSE Consultants Ltd 20th May 2009(Photos courtesy of HSE)

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    8/30

    Vapour Off-take pipeworkand LPG Cylinders in cornerof the Yard

    1st stage pressure regulatorjust above pipe-riser

    RSE Consultants Ltd 20th May 2009(Photos courtesy of HSE)

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    9/30

    RSE Consultants Ltd 20th May 2009

    Crack atelbow asseen inmirror

    Into

    Basement

    After the explosion thepipework elbow at the entrypoint to the basement wasfound to be heavily corrodedand failed through more than70% of its circumference

    (Photos courtesy of HSE)

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    10/30

    Unsleeved and unsealedentry into the Basement

    though old bricked upwindow.

    Failed elbow

    Yard Basement

    View from inside Basement

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    11/30

    History of LPG Installation -1969 to early 80s

    Installed in 1969, with Calor Gas supplying the tank andan ICL Plastics contractor installing the pipework.

    The pipework was galvanised steel with fittings ofungalvanised whiteheart malleable iron no corrosionprotection (unwrapped).

    Pipework entry into the Mill was originally above ground.But level of yard was raised which buried the entry not

    sleeved and unsealed.

    Subsequently the basement area into which the pipework

    passed was enclosed unventilated storage area.

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    12/30

    History of LPG Installation -1988 to 2004

    In 1988 HSE concerned about size and siting of 2 tonne LPGtank. HSE recommended that buried pipework be excavated todetermine its state.

    Agreement between HSE and Calor that the condition of theattendant vapour pipework would be ascertained by examinationof the riser-pipe when the LPG tank was replaced

    The pipework was never excavated. Its state remained unknown.

    In 1991, LPG tank replaced by two 1 tonne tanks.

    In 1998, LPG Supplier changed to J Gas who substituted the twotanks with a 2 tonne LPG tank. Operating pressure was 1.4 barg

    On 11th May 2004 explosion in basement & collapse of building.

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    13/30

    ICL Plastics Risk Assessment

    At no time did ICL Plastics carry out any risk assessmentin relation to the buried LPG pipework.

    An initial risk assessment was done (by a student) butconsidered only part of the pipework in the Mill Building.

    Further risk assessments did consider the LPG tank(s)but never the buried pipework.

    No consideration was given to the requirements of

    DSEAR 2002.

    Those undertaking the risk assessments received no

    training. Outside assistance was rejected.

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    14/30

    Prosecution of ICL Plastics

    The Indictment charged ICL Plastics Ltd and ICL Tech Ltdvariously with breaches of HWSA s 2, 3 & 4 and the

    regulations MHSWR and DSEAR in relation to failures in: - Conducting a suitable & sufficient risk assessment

    Appointing competent persons

    Providing a proper system of inspection &maintenance

    Maintaining the buried pipework

    The Court had prepared 461 documentary productions,616 labelled productions and 321 witnesses

    Both Companies pled guilty to H&S charges and were

    fined 200,000 each.

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    15/30

    Issues Arising (1) based on Parties submissions

    Poor LPG Pipework Integrity & its Ownership, e.g.

    Lack of clarity of responsibilities out of sight andout of mind.

    Operating buried LPG pipework of an unknownintegrity;

    Lack of inspection & maintenance;

    Lack of data recording the system design;

    Lack of management of change; e.g. op pressure,raising the yard level and creating a basement

    Lack of non-competent persons to lay thepipework and in terms of PSSR

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    16/30

    Issues Arising (2)

    Poor Awareness and Management of LPG Hazards &Risks, e.g.

    Lack of suitable and sufficient risk assessment;

    Lack of appreciation of the potentialconsequences;

    Lack of management control & mitigation of theLPG hazards & risks;

    Lack of training in H&S and seeking competentadvice;

    Lack of response to problems raised, their follow-up and effective resolution

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    17/30

    Issues Arising (3)

    Poor Communication, Learning & Sharing of Knowledge,

    Lack of clarity in communicating corrective actions;

    Lack of supplementary guidance relating to risk-basedinspection of buried LPG vapour pipework;

    Potential lack of sharing knowledge and engagementbetween LPG supplier and user;

    Lack of regulatory inspection priority given to buried metallicLPG pipework;

    Potential lack of training of HSE Inspectors in LPG risks and

    awareness of damage potential to buildings Potential lack of understanding regarding the regulatory

    interface between HSE and LA responsibilities

    Lack of follow-up and close-out of regulatory inspectionissues

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    18/30

    ICL PLASTICS EXPLOSION- Public Inquiry

    Workshop (Part 2) - 20th May 2009

    UKLPG 2nd

    Annual ConferenceLeeds

    by Rod Sylvester-EvansRSE Consultants Ltd

    No part of this Presentation can be used without the express permission of RSE Consultants Ltd

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    19/30

    Background to Inquiry

    Phase 1 Scope for Lord Gill was to determine the cause & circumstances.

    Parties had to prepare Statements of Case and submit Applicationsfor those witnesses who should give evidence with relevant questions. Phase 1 lasted 12 days during July 2008. Parties Closing Submissions addressed Findings in Fact derived

    from Phase 1.

    Phase 2 Scope was to consider the safety-related issues and make

    recommendations in light of the circumstances.

    RSE asked in August to consider possible safety improvements to thecurrent regime relating to bulk LPG at commercial/industrial users andto report in early September for parties to consider prior to Phase 2.

    Phase 2 lasted 8 days (Days 13 to 20) in Oct/Nov 2008 and heard

    evidence from some 11 witnesses. Written/Oral Closing Submissions made on 13th Nov 2008 (Day 21).

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    20/30

    Basic Principles for Improvements

    Reflect Lord Robens responsibility for managing H&Srests with those who create the risks and work with them.

    Minimise prescription in favour of goal-setting; Target changes to tackle current weaknesses; Prioritise the changes to address the greatest risks first; Encourage ownership and transparency;

    Changes must be practical & robust, commensurate withthe risks mitigated

    Where possible align knowledge, competency, incentives

    and benefits; Changes should be self-consistent.

    Directed to LPG pipework at small industrial/commercial

    bulk LPG User sites

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    21/30

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    22/30

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    23/30

    Clarity ofResponsibilities

    Ownership

    Control &Mitigation of

    LPG Risks

    Site Record

    Safety Dossier

    Life Cycle

    Integrity of LPGSystem

    Communication,

    Sharing/ Learning

    Knowledge

    Suggested Improvements e.g.

    - Develop an inspection and maintenance strategy for LPG pipework- LPG User should retain all up-to-date information on its LPG system- LPG Supplier should provide the LPG User with a summary of its

    asset register for the tank and pipework, safety features, inspections

    and risk assessment for its equipment on the LPG users site

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    24/30

    Clarity ofResponsibilities Ownership

    Control &Mitigation of

    LPG Risks

    Site Record

    Safety Dossier

    Life Cycle

    Integrity of LPGSystem

    Communication,Sharing/ Learning

    Knowledge

    LPG UserManagement Circle

    Building Issues - Improvements

    - LPG pipe entries should be aboveground with ECV- LPG Pipework should not routedthrough unventilated spaces- Where this is not feasible, then

    acceptable (verified) alternatives only

    Suggested Improvements e.g.

    - Safety dossier should demonstrate how the LPG User has met itsstatutory duties and describes the management of LPG safety on thesite, e.g. training, inspection, maintenance, managing change etc.- UKLPG & HSE provide guidance/template for a Safety Dossierand provide guidance on how LPG Users can fulfil their statutoryduties

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    25/30

    Clarity of

    Responsibilities Ownership

    Control &Mitigation of

    LPG Risks

    Site Record

    Safety Dossier

    Life CycleIntegrity of LPG

    System

    Verification

    Process?

    Communication,Sharing/ Learning

    Knowledge

    LPG User

    Management Circle

    Suggested Improvements e.g.

    - Consider provision of a verification scheme- Conducted by an independent competent person (ICP)- Site verification renewed periodically- Ensure adequate competencies, resourcing & accreditation of ICPs

    - Scheme developed by UKLPG and HSE

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    26/30

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    27/30

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    28/30

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    29/30

    RSE Consultants Ltd 20th May 2009

  • 8/6/2019 MWhxZnVROS1tQWgyVXRmc2RYS2l4V0RnYThENFFhS3Y5dVRWclhOLWhaMHdnVmhUUE9RWmpZNHc2UkRaag==

    30/30

    Clarity ofResponsibilities

    Ownership

    Control &Mitigation ofLPG Risks

    Site Record

    Safety Dossier

    Life Cycle

    Integrity of LPGSystem

    Verification

    Process?

    Registration of

    LPG Suppliers?

    Communication,Sharing/ Learning

    Knowledge

    Review Process& Feedback

    LegalSanction?

    Metallic

    Risk-Based

    Replacement

    Programme

    Execution ofReplacement

    Programme

    Regulatory Oversight

    LPG Supplier Communication & Knowledge

    LPG User

    Management Circle

    Inspection Role

    RSE Consultants Ltd 20th May 2009