railway report 2007
Embed Size (px)
TRANSCRIPT
-
2007 ..
/
-
-
............................................................................................................................................ 1
.................................................................................................................................. 1 ............................................. 3 ............................................................................................................................ 3 .................................................................................................. 3 ....................................................................... 4 ........................................................................................................................... 4 ........................................................................................................................................ 5 ......................................................................................................... 5 (Process description).................................................... 6 (Contract Administration) ............................................... 7 ...................................................................................................................................... 8 ...................................................................................................................... 8 ................................................................................................................................... 9 ........................................................................................................ 9 ....................................................................................................... 10
......................................................................................................................................... 11 .................................................................................................................................... 11 / /// ........................................................................................................................... 11 ..................................... 11 (Project proposal) .............................. 11 ........................................ 13 ........................................................................................ 15 ... 17 ........................................................ 19 ...................................................................................................................................... 21 ................................................................................. 23 .......................................................................................................... 26 ...................................................................................................................................... 29 ......................................................................................................... 31 ................................................................ 33 .................................................................................................................... 35 ........................................................................................... 41
-
......................... 46 /
.......................................................................................................................................... 49 ...................................... 49 ................................................ 52 ........ 54 .............................................................. 56 ............................................. 60 ................................................................. 62 ................................................................................................................ 65 ......................................... 68 ................................................................................................................. 73 ..................................................................... 74 ................... 77 - ............................................ 78 ...................................................................................................................................... 79
/ /Data Base/
..................................................... 83 ..................................................................................................................... 83 ................................................. 87 ............................ 88 ............................................................................................ 89 / ...................................................................................................................................... 90
.......................................................................................................................................... 92 .................................................................................................................................. 92
-
/ /// ........................................................................................................................... 92
/
.......................................................................................................................................... 94 / /Data Base/
..................................................... 96 ......................................................................................................................................... 98 ................................................................................................................................... 98 / /// ........................................................................................................................... 98
/
........................................................................................................................................ 100 / /Data Base/
................................................... 103 .......................................................................................................................................................... i 1- ........................................................................................... i
-
(Acroynms) AMD - Asset Mangment Department
ATP - Automatic Train Protection
CCCC - China Communication Construction Company
CCECC - China Civil Engineering Construction Company
CIECC - China International Engineering Consulting Company
CPED - Construction & Project Execution Department
CREC - China Railway Group Limited
DEPD - Design & Engineering Procurement Department
DK - Distance Kilometer
EPC - Engineering, Procurement & Construction
GIS - Global Information System
INSA- Information Network Security Agency
SWEDROAD - Swedish National Road Consulting AB
-
1
1.
141/2000 2000 .
2. 3
750
100
691/2003 5
25/1984 47(1)()
39
780 9 945
3.
34.25 . -
16.9 . -
17.35 .
2.7 .
1.435
80
-
2
80 .
4.
( )
5. 2300 . /-
-- / --
/-- --
6.
7.
2003 2007 .
-
-
3
. //
/./ 2003 2004 2005 2006 2007
1. . //--
-
220 218 218 - - 656
2. ---
-
160 160 160 - - 480
3. -- 116 116 116 - - 348
4. . //---
- - 126 126 189 441
5. --
-
- - 200 200 156 556
6. .
(LRT)
17 17 34
.
513 511 820 326 345 2,515
1- 2003-2007 . /
/
8.
9. -
-
4
10.
4
5
11. (stakeholder)
(stakeholder)
/ /
-
5
12. 2004
452 2005
252 41
293 248
45
-
.
1 0 1 1 3.41%
2 0 17 17 5.80%
3 20 207 227 77.47%
4 6 3 9 3.07%
5 19 20 39 13.31%
45 248 293 100%
13. (Equity)
14. 2003 2004 2005
1,850,000,000
19,495,264,974.00 50,648,273,771.00
2004 1,192,631,218.00
2005 3,078,590,120.51
3,065,441.56 9,237,932,375.46 3,598,130,497.05
11,556,938.91 42,254,062.77
-
6
(Process description) 15.
16. (Division)
17.
18. (4) -
(DEPD)-
(ROWD)-
(CPED)-
(AMD)-
-
7
(Contract Administration) 19.
EPC
(Milestones)
20.
EPC
(Terms of Reference)
EPC
(Procurement)
21.
22.
EPC (Contract
Adminstration Manual)
-
8
23.
24.
25. 2003 2006
-
(Ethiopian Performance Audit standards)
/
669/2002
-
9
26.
27.
/Audit
Issues/
-
1.
1.1
1.2
2.
2.1
2.2
-
10
3.
/Data Base/
28.
(Audit issues) 48
(Evaluative Criteria)
-
/
(Evaluative
Criteria) 1 ::
-
11
/ ///
(Project proposal)
29.
30. 2006 2008
..
(Guidelines for the Preparation of
Public Sector Projects) 3.1
1999 . -
(Technical Advisory Group)
(Project
proposal)
31.
-
12
//
(Conceptual)
(Project
proposal)
32.
5
. 2005 ..
.
33.
(Phase I)
1999
. - (Technical
Advisory Group)
./- -
(Project
proposal)
34. /
-
13
35.
36.
(Feasiility Study)
37.
38. .
EPC
./- -
-
14
2012 ..
2012 ..
39.
/
/ .
//
.
40.
(
)
./- -
..
-
15
41. /
July 2009 ..
(Feasibility Study)
July 2009 .. (1st
Draft Bankable Feasibility study)
42.
..
3/2009
.. /2009
43. ()
-
44.
-
16
45.
46.
47.
/
/
/// /
48.
/2003
.
49.
-
17
. 5
.
/
50.
51. .
Quality assurance manual,
Lab-equipment manual, Original design document, etc (English
versions)
52. .
-
18
53. .
54.
55.
Quality Assurance in Civil Engineering
Project Management Guidelines for Construction Supervision
Quality assurance manual,
Lab-equipment manual, Original design document, etc (English
versions)
56.
-
19
57.
58.
59.
2395 .
85%
38/05
60.
.
(The Ethiopian Model)
40%
61. 35/04
EPC Turnkey
-
20
62. ./- -
. 40%
63.
(Master
Schedule)
(Master Schedule)
64.
///
65.
-
21
66.
67. 2006 2008 .. ///
(Draft project proposal & design) ///
()
./
68.
69.
///
/
-
22
(Draft project proposal & design)
///
70.
/
71.
Preliminary Design, Feasibility Study,
Conceptual Design
72.
73. ///
-
23
74.
75. 2006 2008 .. ///
1,639,031,409 1,841,407,000
202,375,591
///
76. 1,197,400,000
1,401,800,000
204,400,000 ///
7
.
77.
IATP
78.
(Embarkement)
-
24
200
7
Quantify
/
79.
. ()
DK 3
DK 50 DK 164 DK 326
80. ./
(Time gap)
(Improper Design)
DK 230-236
81. .
IATP
-
25
82.
TOR (Term of reference)
EPC
IATP
83.
///
IATP
///
84.
IATP
///
85.
141/2000
-
26
25/1984
( )
///
86. ///
87.
88. 2003-2007 .
-
27
89.
15
90.
91. 2003-2007 .
/ / 2003
2005 . ./-
(preliminary design)
92. -
(Detail Engineering
Design) - 72.8% - 79.5% -
82.2%
93. 2006 .
-
28
2006 . 30% 2006 .
40% -/
/- 2003
2005 . 2004 . YAPI Merkezi
CCCC
94.
2006 .
. 2003
30/2006 .
47.3%
95.
/Fact/
96. 2005 .
2003 .
-
29
97.
(
) 2006 .
98. - 2006
2006
- 2006
2006
99.
100.
101.
. .
-
30
102.
. Steering Committee
( )
103. Steering Committee
104.
/
(2004-2006)
105.
-
31
106.
107.
108.
( )
100
.
Conceptual Design ( )
-
32
109.
(Design, Bid & Build)
(Convetional Project
Cycle)
110. (EPC
Turnkey, Engineering, Procurement & Construction)
111.
.-
/Design--bid-
build/
-
33
112. /
October 2012
Preliminary Design 16/04/2013 Layout
Plan
113.
2003
(Coventional Project Life Cycle)
EPC/Turnkey Project Implementation
114.
(Risk Analysis) (Risk Abatement)
(Risk Transfer)
115. (./
.
-
34
/ / )
(Risk Analysis) (Risk Abatement)
(Risk Transfer)
116.
117.
./-
April 2012 Techno
Economic Feasibility Study
(Risk
Abatement) (Risk Transfer)
(Annex 2)
(Risk Analysis) (Risk
Abatement) (Risk Transfer)
118.
(EPC Turnkey Contract)
-
35
119.
. / 5
.
7
120.
./
- -
2012 ..
2013 2012 ..
121.
2012
2012
/
122.
-
36
2013
123.
/
25 2012 14
2012 ..
124.
/
(
)
125. /
()
126.
-
37
127.
2
.
100
128.
129.
(Downstream)
+
-
38
130.
/
131.
2004
(Environmental & Social
Impact Assesment) (
)
132.
133.
()
-
39
134. -
/ -
/
Rehabilitation plan
135. /
/
136.
CIECC
/
-
40
137.
. /
(Borrow pit)
Rehailitation program
138.
139.
RAP
(
)
Excuse
140.
-
... January 2012
141. MCE Consulting Engineers PLC
2013
-
41
25 December 2012 ..
()
142.
143. /
/
144.
145.
-
42
. 1
146.
147. -
(Hyena cave)
-
43
148. -
12/10/2003 . 11 2
149.
250
100
14
-
44
.2
150.
14
2 .
-
45
. 3
151. /
152.
-
46
5 .
(Borrow pit)
153.
154.
155. CCECC
2011 .. Technical
Proposal 0.5 cm per
year rift
(The great rift valley is still rifiting
currently, which results in active crustal movement & frequently
occurrence of volcanic eruption & earthquakes)
Sesmic data
-
47
156.
157.
(Sesmic consideration)
Technical Proposal
158.
/ /
159.
160.
161. .. November 2010 UNFCCC
-
48
Carbon Finance
NAMA Project
Interurban Electric Rail NAMA
UNFCCC November 2012 Carbon Finance
162.
20,000,000
20
50
163.
20,000,000 UK-Germeney NAMA Facility Apply
. TOD
500,000 AfdB
NRN (National Rail Network) .
(MRV = Monitoring, Reporting and
verification )
164.
-
49
/
165.
166.
.
./
2009 .. 2012
.. 2012 ..
./ March 2011
.. February 2012 ..
2011 ..
2012 ..
./-
167.
-
50
(5%) (Installement of Advance Payment)
30/2012 ..
20/2013 ..
(Interim Payments)
2012
(CIECC)
168.
DK17-DK19 31
(High voltage transmission lines (34 )
169.
(Branch 1)
(Each Branch)
170. /
2015 ..
-
51
171. . /
84
Scope
1
()
20042007 30% ( 2006)
20042007 40% ( 2006)
. 20042007 47.3% ( 2006)
/ 20042007
/
20042007
172.
CREC
-
52
2012 ..
CIECC
173.
174. /
/ 2004
.
175.
176.
-
53
177. (./
. )
1,639,031,409
1,841,407,000 202,375,591
(12.35%)
( 7 )
1,197,400,000
1,401,800,000
204,400,000 (17.07%)
178.
Embarkement
7
/
179. .
-
54
IATP
180. .
IATP
181.
182.
183. -
2006 .
( (2nd installement payment 5%) July 30
2012 .. December 20 2013 ..
30%
(Interim payments)
- 7
-
55
184.
.
(SWEROAD)
./--
(CIECC) 15%
185.
186. .
.13 19 (100%)
28
28 137
45 91
./-
-
28
-
56
28 141 79
. .1-12 -
.1-7
187.
188.
189.
190. .
(TPLS) ( )
( )
-
57
.
2006 . 22
191. .
1 2013 ..
1 2006
. 600 . 61
16
20
()
84 Overhead Cabels
1 2006 .
192.
(- )
1/2006 .
Exeternal Power GIS
.
2 ( )
193.
-
58
194.
.
195.
5
7
196. ./
120
40 152
150 68
155
25
-
59
197.
/
/
198. /
19/07/06
40
06/09/06 40
199.
200. (ARID)
19
-
60
201. --
202.
203.
204.
205.
-
61
206.
207.
(ITALFERR)
2
208.
International
209.
-
62
(Objective analysis)
210. (Railway engineering)
(Design Codes)
211.
EPC Turnkey
Contract
.
./- -
Railway Engineering Standard Class II
212.
(Chinese Design Standard English Version)
(railway
engineering) (Design Codes)
May 2014
Geometric Design of Railway Track Superstructure Railway
Subgrade Bridge and Culverts Tunneling
213. 2005 . 12
AREMA (American Railway
Engineering & Maintainance of ways Association)
-
63
(Conceptual
Design) EPC Turnkey Contract
214.
Chiese Railway Class II Standard
( )
215.
(railway
engineering) (Design Codes)
216. .
EPC
Ref. No. LRT/29/12 29/08/2012 ..
-
64
217. 05/10/2012 ..
.. 12/10/2012
Ref.
No. LRT/71/12 November 2012 ..
13 March 2013 ..
(Employer
Representative) in good faith
& mutual understanding
218.
(Railway engineering)
(Design Codes)
May 2014
Geometric Design of Railway Track
Superstructure Railway Subgrade Bridge and Culverts
Tunneling
219.
220. /
May 2014
-
65
Geometric Design of Railway Track
Superstructure Railway Subgrade Bridge and Culverts
Tunneling
221.
. CREC
222.
223.
1
///
//
-
66
224. -
/
2006 .
13 102
46
225. .
11
/
(
)
3
34 .
/
/
226. / /
-
(Job description)
/
-
67
227.
//
//
()
( 100)
/
228.
//
/
/
229. /
-
68
230.
231.
232. 2003 . 16
- -
- 5
-
69
9
233.
234.
250
235.
-
70
236. (Employer Representative)
Chinese Design Standard
English Version Quality assurance manual Lab equipment
manual in good faith &
mutual understanding
237.
(International Practice)
238. Swedroad 5 ./
Sweroad
239.
-
71
240. /
1-3 July 2014 Agreed Minutes of Meeting for
Dispute Settelment Panel Negotiation for Employers
Representative Services for the EPC Contract of Addis
Ababa/Sebeta-Adama-Diredawa-Dawanle (Ethiopian Border)
Railway
600,000
Costs of workforce, direct expense and
other termination costs earlier claimed by SweRoad/Hifab
July 2014
241.
242. ./--
( )
243. .
ER (Employer Requirment)
ER
(Conceptual Design)
-
72
8
244. ER
ER
245. OID & FZE
PLC (Overseas Infrastructure Developers & Convergent Business
Solution)
-
6.75
246.
(Poor Project
Management)
-
73
247.
248.
249.
250.
-
74
251.
252.
253.
254.
(Methodology)
(Programme of works)
EPC (Engineering Procurement
Construction)
-
75
(Initially proposed list of
senior personnel)
255.
(Master Work Schedule) 28
( Jan
31, 2012 ) July 2012 ..
::
256.
2012 ..
BOQ (Bill of Quantities)
23/2012 ..
EPC (Engineering Procurement Construction)
(Initially proposed list of senior personnel)
257.
BOQ
258. /
(Master Work Schedule) 28
(
February, 2012 )
July 2012 ..
-
76
259.
(Monthly Work Program)
2014 ..
Geotechnical Investigation
Preliminary Investigation Report
2014 ..
2014 ..
260. -
(Methodology)
(Initially proposed list of
senior personnel)
261. -
(Initially proposed list
of senior personnel)
262.
-
77
263. (Monthly Work Program)
Guide
.
-
CCECC
264.
265.
(Project management manual)
266.
EPC Contract Adminstration
March 26/2012 .. Consultant
-
78
Contract Adminstration March 2012 ..
267.
2012
268.
-
269.
270.
/
-
271.
//
/ /
// /
272. .
/ /
/
/ ()
./
-
79
/
273. .
274.
./
275.
276.
277.
.
-
80
2005
(Onthejob training) Design review, Construction
supervision, Project management
278. .
2005 .
2006 .
2005 .
279.
-
81
280.
281. .
/
.
282. (Onthejob training)
Design review, Construction supervision, Project management
Swedroad
Design
review, Construction supervision, Project management
-
82
283. /
18/09/06
6
205
284.
285. .
-
83
/
/Data Base/
286.
287.
288.
-
84
289.
RAP
(
)
290.
/
291.
292.
-
85
293.
20032005
294. 2004
295. /
296. ./
-
86
297.
298.
299. /
20/04/02
300.
-
87
301.
(
)
302.
( )
303.
-
88
304.
( )
305.
306.
307.
308. INSA
-
89
309.
310.
311.
312.
313.
314.
(ITALFERR)
2
315.
-
90
316.
/
317. /
318.
./
/
.
/ /
319.
/
320. / .
/
-
91
321. ./
/ /
322. /
/
-
92
/ ///
.
./
.
IATP
2003-2007 .
/ /
2003 2005 .
./- -
2004 .
-
93
. 2003
(./
. /
/ )
/
CCECC 2011 ..
-
94
/
. ./
/ /
2004 .
.
- -
EPC Turnkey Contract
Railway Engineering Standard Class II .
(Chinese
Design Standard English Version)
-
95
/ // /
/// //
/// //
/
// Job description
. // Job
description /
(Master Work
Schedule) 28
July 2012 ..
-
96
(Initially proposed
list of senior personnel)
.
2005
(Onthejob
training) Design review, Construction supervision, Project
management
/ /Data
Base/
-
97
./ /
.
/ /
-
98
/ ///
-
99
/
/
-
100
Rehabilitation plan
/
-
101
/
///
/
-
102
(Master Work Schedule)
-
103
/ /Data
Base/
-
104
/
/
-
i
1- (Audit Issues)
(Evaluative Criteria)
I.
1.
2.
3.
4.
5.
6.
7.
8. (Risk Analysis) (Risk Abatement) (Risk Transfer)
9.
-
ii
10.
11.
12.
13.
14.
15.
II.
16.
17.
18.
19.
20. (railway engineering) (Design Codes)
21.
-
iii
22.
23.
24.
25.
26.
27.
28. (Cash flow estimates)
29. (Programme of works)
30. (Project management manual)
31.
-
iv
32.
33.
34.
35.
36.
III. /Data Base/
37.
38.
39. ( )
40.
41.
42.
-
v
43. /
44.
45.
46.
47.
48. /